Loading...
HomeMy WebLinkAboutMONTAVA - PHASE D CORE - BDR240006 - SUBMITTAL DOCUMENTS - ROUND 1 - Supporting Documentation (14)kimley-horn.com 6200 South Syracuse Way, Suite 300, Greenwood Village, CO 80111 303 228 2300 April 16, 2024 Steven Gilchrist Civil Engineer II – Traffic Operations City of Fort Collins 626 Linden Street Fort Collins, CO 80524 Re: Montava – Phase D Core Traffic Study Cover Lover Fort Collins, Colorado Dear Mr. Gilchrist: The purpose of this cover letter is to provide responses to the pre-application traffic comments associated with Phase D Core of Montava. The responses are intended to assist the City of Fort Collins in their review of the Montava Phase D traffic study. Thank you for effectively and promptly holding a traffic study scoping meeting with the traffic team. The following provides responses to the traffic comments: Comment Number: 1 04/01/2024: The Transportation Impact Study has been scoped with the developer's traffic engineer. This will be required upon the first round submittal. The study will include the Phase D Core, and Phase D Infrastructure evaluations. Within the study, and for overall clarification, we would like more details regarding what exactly is being built with the Core versus the Infrastructure, and the timeline between the two phases. Is the multi family included or not? How will Multi Modal Level of Service be accommodate with limited connectivity? Response: Thank you for effectively and promptly holding a traffic study scoping meeting with the traffic team. For the purposes of the Phase D traffic study and although fully approved, it was assumed that Phase G & E of Montava would construct prior to Phase D and were conservatively included as background traffic in the Phase D traffic study. The external intersections and access intersections have been evaluated for the short-term horizon of the Montava Phase D Core. The access intersections and the intersection of Mountain Vista Drive and Giddings Road were evaluated for the Phase D Infrastructure long-term horizon consisting of full buildout of Montava. The external intersections are being evaluated in the ongoing 2045 Montava Supplemental Traffic Analysis in a separate memo consistent with the process associated with the Phase G & E application. A mix of single family detached, single family attached, and multifamily have been utilized within the Phase D traffic study. Multimodal transportation analysis is evaluated in Section 5.6 of the Montava Phase D Traffic Study. Comment Number: 2 04/01/2024: The narrative still references the possibility of multi-family units replacing some of the single family units. The Transportation Impact Study will need to reflect exactly what is being built with the Phase D Core in terms of trip/traffic generation. Response: Three development programs are currently being considered for Phase D of Montava. The traffic study has conservatively been evaluated with the highest trip generation of the three program options. A mix of single family detached, single family Traffic Letter 096391016 Page 2 kimley-horn.com 4582 South Ulster Street, Suite 1500, Denver, CO 80237 303 228 2300 attached, and multifamily have been utilized within the Phase D traffic study. The improvements have been isolated in the traffic study for the Phase D Core (short-term) and Phase D Infrastructure (long-term). Comment Number: 3 04/01/2024: INFORMATION: The narrative questions whether or not an interim condition would be acceptable for the Giddings intersections with Phase D Core. This will need further coordination with Engineering as the full build out would be preferred. The Transportation Impact Study will also need to detail whether or not off site improvements are required for other intersections like Giddings and Mountain Vista.. Response: The Phase D traffic study identifies that the Core can be accommodated with two access locations along Giddings Road with both accesses operating with stop and control and northbound left turn lanes for entering the development. Mountain Vista Drive and Giddings Road was evaluated for the short-term and long-term horizons. The remaining external intersections were evaluated for the short-term horizon and ongoing within the 2045 Montava Supplemental Traffic Analysis. The intersection of Mountain Vista Drive and Giddings Road is reported to operate acceptably with stop control with buildout of the Phase D Core. A two-lane roundabout with two right turn bypass lanes were identified as needed for this intersection in the long-term 2045 horizon. In addition, signal control was also evaluated at this intersection for the long-term horizon. Thank you for the continued coordination with the Montava project. We look forward to continuing to work with you on the Montava project. If you have any questions or require anything further, please feel free to call me at (720) 943-9962. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. Jeffrey R. Planck, P.E. Project Traffic Engineer