Loading...
HomeMy WebLinkAboutMONTAVA - PHASE D CORE - BDR240006 - SUBMITTAL DOCUMENTS - ROUND 1 - Drainage Related Document 1-1 | Page Project Development Plan (PDP) Preliminary Drainage Report For Montava Subdivision Phase D May 1, 2024 submitted to: City of Fort Collins, Colorado 748 Whalers Way May 1, 2024 Mr. Wes Lamarque City of Fort Collins Development Review Engineer 700 Wood Street Fort Collins, CO 80521 Re: Montava Subdivision Phase D Final Design Drainage Report Project No. 1230.0005.00 Dear Mr. Lamarque: TST, Inc. Consulting Engineers (TST) is pleased to submit this Preliminary Design Drainage Report for the Montava Subdivision Phase D project to the City of Fort Collins (City) for review and approval. The purpose of this drainage report is to evaluate the drainage conditions of the above-referenced proposed Montava Subdivision Phase D project site. The Fort Collins Stormwater Criteria Manual (referred to as FCSCM). Please review the attached report and provide any questions or comments at your earliest convenience. We appreciate the opportunity to be of continued service to the city and look forward to receiving your comments and moving forward on this important project. Sincerely, TST, INC. CONSULTING ENGINEERS Bryston Anthony M. Gartner, E.I. Derek A. Patterson, P.E. BAMG DAP I hereby attest that this report for the preliminary drainage design for the Montava Subdivision Phase D was prepared by me or under my direct supervision, in accordance with the provisions of the Fort Collins Stormwater Criteria Manual. I understand that the City of Fort Collins does not and will not assume liability for drainage facilities designed by others. ______________________________ Derek A. Patterson Registered Professional Engineer State of Colorado No. 48898 748 Whalers Way Suite 200 Fort Collins, CO 80525 970.226.0557 main 970.226.0204 fax ideas@tstinc.com www.tstinc.com Table of Contents Preliminary Design Drainage Report Montava Subdivision Phase D Page i 1.0 - GENERAL LOCATION AND DESCRIPTION ......................................................... 1 1.1 Project Location and Description ................................................................... 1 1.2 Description of Property ................................................................................... 2 2.0 - DRAINAGE BASINS AND SUB-BASINS .............................................................. 4 2.1 Major Basin Description .................................................................................. 4 2.2 Existing Conditions ......................................................................................... 4 2.3 Proposed Conditions ...................................................................................... 4 3.0 - DRAINAGE DESIGN CRITERIA ............................................................................ 9 3.1 Hydrological and Hydraulic Criteria ............................................................... 9 4.0 - CONCLUSIONS .................................................................................................... 11 5.0 - REFERENCES ...................................................................................................... 13 6.0 - APPENDICES ....................................................................................................... 14 List of Figures 1.1 Vicinity Map ..................................................................................................................... 2 Montava Subdivision Phase D Preliminary Drainage Report Page 1 1.0 - General Location and Description The purpose of this Preliminary Drainage Report is to present the drainage design for the Montava Subdivision Phase D (Hereinafter referred to as the “Phase D”) project site to the City of Fort Collins (hereinafter referred to as the “City”) for review and approval. The design objectives for this drainage report are to present:  Hydrologic analysis of the proposed improvements and surrounding off-site areas to determine the location and magnitude of the site’s storm runoff.  Hydrologic data used to design storm runoff collection and conveyance facilities.  Hydraulic analysis of proposed on-site and existing downstream storm infrastructure to ensure sufficient conveyance of stormwater runoff to the proposed detention areas.  Detention analysis and design of the proposed stormwater detention areas.  Best Management Practices (BMPs) are used to prevent erosion and sedimentation before, during, and after construction of the stormwater infrastructure.  Overall storm drainage plan that meets previously approved drainage plans and the FCSCM. The drainage system was designed using the Fort Collins Stormwater Criteria Manual (collectively referred to as FCSCM). 1.1 Project Location and Description The Phase D project site is located in Section 32, Township 8 North, Range 68 West of the 6th Principal Meridian, within the City of Fort Collins, Larimer County, Colorado. The proposed site is bounded on the north by farmland, Future Montava Subdivision phases, and Richards Lake Road. On the east by farmland, N. Giddings Road, and Future Montava Subdivision phases. On the south by farmland and Mountain Vista Drive. On the west by farmland, the Number 8 Outlet Ditch, and Future Montava Subdivision phases. A vicinity map illustrating the project location is provided in Figure 1.1. Montava Subdivision Phase D Preliminary Drainage Report Page 2 Figure 1.1: Vicinity Map 1.2 Description of Property The Phase D project site contains approximately 58 acres and consisting of the Single-Family and Open Space. Phase D is currently zoned as Mixed Density Neighborhood. According to Flood Insurance Rate Map (FIRM) #08069C0982F eff. 12/19/2006 prepared by the Federal Emergency Management Agency (FEMA), Phase D is located in unshaded Zone X. Zone X indicates areas determined to be outside of 500-year or 0.2% annual chance floodplain, meaning it is not designated as a special flood hazard zone. Copies of the FEMA maps that apply to Phase D are included in Appendix B. The types of soils found on the Montava Subdivision Phase D site consist of:  Aquepts, loamy (5).  Fort Collins loam (35) – 0 to 3 percent slopes.  Fort Collins loam (36) – 3 to 5 percent slopes.  Satanta loam (95) – 1 to 3 percent slopes. Montava Subdivision Phase D Preliminary Drainage Report Page 3  Satanta Variant clay loam (98) – 0 to 3 percent slopes. The characteristics of the soil found on the project site include:  Slow to very slow infiltration rate when thoroughly wet.  Slow to very slow rate of water transmission.  Majority of the site has a wind erodibility rating of 5 and 6 (8 being the least susceptible) These soils consist of the following hydrologic soil groups as defined in the United States Department of Agriculture (USDA), Web Soil Survey:  Group C – 38.90%.  Group D – 61.10%. The USDA web soil survey report is included in Appendix C. The following reports were utilized in the drainage analysis and design of Phase D.  Montava Master Drainage Study Fort Collins, Colorado, prepared by Martin/Martin, Inc., dated January 23, 2019. Hydrologic and hydraulic information was referenced from this report to analyze off-site areas and conveyance links downstream from Phase D and site. Montava Subdivision Phase D Preliminary Drainage Report Page 4 2.0 - Drainage Basins and Sub-Basins 2.1 Major Basin Description According to the FCSCM, Phase D is located within the Upper Cooper Slough Basin. The Upper Cooper Slough Basin stormwater generally flows from north to south which is ultimately being captured by the Larimer and Weld Canal. According to the Montava Master Drainage Study, Phase D is primarily located in Basin D, Basin F, and Basin G1. Generally, Basin D, Basin F, and Basin G1all drain from the northwest to the southeast and eventually end up in the Larimer and Weld Canal. 2.2 Existing Conditions The Phase D site is located in an undeveloped plot of land west of the Anheuser Busch property. The current land is undeveloped and used for agricultural purposes. The land currently consists of native grasses, bare ground, and crops. Phase D sheet flows southeast into an inadvertent detention area which will overtop Mountain Vista Drive, in a larger storm event, and eventually into the Larimer and Weld Canal through various existing drainage infrastructure. The existing site does not have any existing ponds or drainage facilities. The site has an inadvertent detention area near Giddings Road and Mountain Vista Drive. The major drainage way that is being utilized for Phase D is the Larimer and Weld Canal. 2.3 Proposed Conditions The proposed Phase D development generally maintains existing drainage patterns. Phase D is located in three basins, outlined in the Montava Master Drainage Plan. Phase D is located in Basin D, Basin F, and Basin G1. The portion of Phase D located in Basin D will generally flow west and south into an irrigation/ storm pond (Pond D Montava Master Drainage Plan). The portion of Phase D located in Basin F will generally flow southwest into a temporary storm infrastructure swale that outfalls into Interim Pond 427. The portion in Basin F will eventually be captured and detained by Pond F, constructed with Montava Subdivision Phase E. The portion of Phase D located in Basin G1 will generally flow south and east into Interim Pond 427. This portion of Phase D will eventually be detained in Pond 426 (southwest of the site). The following basins were delineated for the Montava Subdivision Phase D site plan, using the Montava Master Drainage Basins: Basin D (D1-D13)- Basin D, within Phase D, is made up of mixed density single family lots, streets, and open space. Basin D, within Phase D, is approximately 11.98 acres with a composite imperviousness of approximately 64.3%. Basin D was subdivided into 13 subbasins that have their own drainage patterns. Generally, the subbasins runoff starts from the single- family development and drains into street or alleys and into storm lines via curb inlets or area Montava Subdivision Phase D Preliminary Drainage Report Page 5 inlets and into Pond D. Basin D water quality will be treated in Pond D and/or a rain garden located in the center of the basin. Due to space constraints, we are proposing that the majority of the water quality to be treated in Pond D. This is not a traditional LID, but we believe that Pond D provides a higher degree of stormwater quality treatment than a standard stormwater quality pond due to it being a wet pond that has additional volume below the detention . Another proposed LID is a rain garden located in the center of the basin. Once the runoff has been treated in the rain garden it will be conveyed into Pond D. Basin F (F1- F26) – Basin F, within Phase D, is made of mixed density single family lots, streets, future apartments, and open space. Basin F, within Phase D, is approximately 24.48 acres with a composite imperviousness of approximately 68.7%. Basin F was subdivided into 26 subbasins that have their own drainage patterns. Generally, the subbasins runoff starts in the single-family lots and sheet flows into the street or alleys and into proposed storm lines via curb inlets or area inlets that discharge into the interim swale that borders the southwest portion of the site. In the master drainage plan this portion of Phase D will be detained in Pond F, not being constructed with Phase D. Basin F will be treated in two different rain gardens and in the future will be treated by underground water quality and, in the interim condition, in the interim swale that discharges into Interim Pond 427. In the full build out, future condition, the rain gardens will discharge into the future Pond F. Basin G (G1-1 –10) – Basin G, within Phase D, is made of mixed density single family lots, streets, future apartments, and open spaces. Basin G, within Phase D, is approximately 13.86 acres with a composite imperviousness of approximately 76.5%. Basin G was subdivided into 10 subbasins that have their own drainage patterns. Generally, the subdivision runoff starts in the single-family lots and sheet flows into the streets or alleys and into proposed storm line via curb inlet or area inlets that discharges into the interim swale that borders the southwest portion of the site and into Interim Pond 427. In the master drainage plan Interim Pond 427 will be turned into a conveyance channel to future pond 426. Basin G will have no proposed LID treatment. The future apartment sites will have to provide their own LID treatment and is not included in the LID calculations. Future Basin (1-3) - Future Basin is approximately 25.23 acres with a composite imperviousness of approximately 60.00%. Future Basins were subdivided into 3 subbasins that have their own drainage patterns. Basin Future – 1 and Future – 2 will have future street, proposed single-family lots, and a proposed drainage channel. The proposed drainage channel will act as LID and will be an interim pond to attenuate future and offsite flows. Basin Future – 3 will have future streets, future single-family lots. Future -1 and Future -2 water quality will be provided in the large interim drainage swale. Future-3 will have to provide their own LID treatment and are not included in the LID calculations. In the interim conditions Future 1 and 2 will be detained and attenuated in the proposed drainage swale/ Interim Pond. Future -3 drains directly into the Interim Pond 427. School Site- Basin School is approximately 18.47 acres with a composite imperviousness is Montava Subdivision Phase D Preliminary Drainage Report Page 6 approximately 60%. Basin School is for the future school site and future amenities. Basin School drains from the northwest of the basin to the southeast portion of the site where it is collected by a proposed storm sewer of Phase D and routed to Pond D. Basin School will have to provide their own LID treatment and was not included with the LID calculations. Pond D Basin- Pond D Basin is approximately 7.48 acres with a composite imperviousness of 20.00%. Pond D Basin consists of proposed amenities and the entirety of pond D. All runoff generated within Pond D Basin will sheet flow into the Pond. Pond D Basin water quality will be treated in Pond D. Pond 427 Basin- Pond 427 Basin is approximately 10.12 acres with a composite imperviousness of 2.00%. Pond 427 Basin consists of an interim drainage channel and an interim Pond. All runoff in this basin will sheet flow directly into the drainage channel or the interim pond. This basin is treated within the interim drainage channel. Once treated in the drainage swale the runoff will go into Pond 427. Off-Site Basins Offsite 1- Offsite 1 Basin is approximately 103.82 acres and will not have any improvements within it. Offsite 1 contains all the undeveloped land that is north of Phase D between Giddings Road, The number 8 ditch, and Richards Lake Road. All calculations that involve Offsite 1 will be done with the interim undeveloped condition. In the future when this basin is developed each separate phase will have a drainage report and ponds that will more closely match the master drainage plan. The proposed condition will capture all the runoff from the north into the drainage channel and run it as close to existing conditions and will outfall south of Mountain Vista drive. Offsite 2- Offsite 2 Basin is approximately 70.35 acres and will not have any improvements within it. Offsite 2 contains all the undeveloped land that is south of Phase D between Interim Pond 427, Number 8 Ditch and Mountain Vista Drive. No calculations were made using runoff from Offsite 2. Offsite 2 follows existing drainage patterns where runoff from the basin sheet flows south into an spot near Mountain Vista Drive (inadvertent detention) and overtops the road in large storm events. In the future when this basin is developed each phase will have a drainage report and ponds that will attenuate the runoff as described in the master drainage report. In the future Phase D will only be receiving runoff from the school site. All other basins will be following the master drainage plan and will have their own drainage reports that shows conformance with the master drainage plan. 2.4 Low Impact Development (LID) Per City of Fort Collins criteria, Low Impact Development (LID) features are proposed to treat 50% of the newly developed Single-Family, and 75% of the newly developed Multi-family within Phase D. Montava Subdivision Phase D Preliminary Drainage Report Page 7 Three LID systems are being proposed for Phase D, Rain Gardens, and Wet Pond. One LID system will be used in the future for Phase D, Underground detention chambers (StormTech Chambers). The percentage of newly developed areas treated by these systems is included in Appendix B. The proposed LID systems, water quality, and detention facilities will be located in tracts owned and maintained by the Montava Metropolitan District. 2.5 MDCIA “Four Step Process” Step 1 – Employee Runoff Reduction Practices Montava Phase D provides LID treatment for 50% of the single-family development and 75% of the multifamily development, through various systems (Raingardens, Wet Ponds, and future Underground detention chambers). The LID systems have been placed throughout the site to minimize directly connected impervious areas. Step 2 – Implement BMPs That Provide a WQCV with Slow Release The remaining Single-Family and Multi-family development throughout the site not being treated by the LID described is being treated through traditional water quality control volume extended drainage basins designed to release the water quality event within a minimum if 40 hours. Step 3 – Stabilize Streams Portions of Phase D will be spilling into a temporary swale that will connect Pond D with Interim Pond 427. Phase D will be spilling into a couple of ponds that will reduce the sediment load to the downstream open irrigation channel. Step 4 – Implement Site Specific and Other Source Control BMPs 1. The following practices suggested by City of Fort Collins Criteria will be implemented throughout the design and construction process: 2. Being a single-family development, trash receptacles will be dispersed throughout the neighborhood and likely be enclosed containers that minimize concentrated and polluted runoff from entering the storm sewer system or receiving drainageways prior to being treated. 3. Phase D of Montava Subdivision does not include a dog park, but any future dog parks shall be located in areas away from detention basins and educational opportunities to reinforce pick-up practices for dog owners shall be employed. 4. Phase D of Montava Subdivision does not include any community gardens, but future community gardens shall be located in areas that are outside of the detention basins to Montava Subdivision Phase D Preliminary Drainage Report Page 8 prevent chemical and sediment loading. 5. Construction Best Management Practices (BMPs) will be employed to located material storage away from drainage facilities. 2.6 Variance Requests No drainage variances are being requested at this time. Montava Subdivision Phase D Preliminary Drainage Report Page 9 3.0 - Drainage Design Criteria The drainage design presented in this report has been developed in accordance with the guidelines established by the FCSCM dated December 2018. Storm system infrastructure including pipes, culverts, inlets, and drainage swales will be sized to convey the 100-year storm event. In areas of concern, storm system infrastructure will sized to handle the 100-year and any additional bypass flow from upstream infrastructure. 3.1 Hydrological and Hydraulic Criteria Design Rainfall & Runoff Calculation Method The hydrology of the project site for developed conditions will be evaluated based on the 2-, 10- and 100-year storm frequencies as dictated within the FCSCM manual. The Rational Method was used to determine peak runoff rates for each developed basin. Peak storm runoff values will be used to size on-site drainage facilities including storm culverts, sewers, inlets and channels for the initial and major design storms as specified in the FCSCM criteria and standards. Within the criteria and standards, the initial design storm was established as the 2- year minor storm event and the 100-year storm as the major event. Inlet Design All inlets within the project area will be designed to collect and convey the 2-year developed runoff. In areas where flooding is a concern, inlets were upsized to convey as much of the 100- year developed runoff as possible. As stated in FCSCM, Inlet Functions, Types and Appropriate Applications, the standard inlets for use on City of Loveland streets are: Inlet Type Permitted Use Curb Opening Inlet Type R All street types with 6 inches of vertical curb Type 13 Inlet with Valley Grate All alleys with reverse crown Storm Sewer and Culvert Design As stated in the FCSCM, the Manning’s roughness coefficient (n) for all storm sewer pipe capacity calculations shall be 0.013 regardless of pipe material. The storm sewers and culverts in the project area will be designed in accordance with the criteria and standards of the FCSCM using a minimum pipe diameter of 15 inches. Where applicable, storm sewers will be sized to convey the 100-year developed runoff to the existing detention ponds. Peak runoff for storm sewer design was calculated using the Rational Method Montava Subdivision Phase D Preliminary Drainage Report Page 10 per the FCSCM. All storm sewers will be sized using the Urban Drainage program, UD-Sewer 2009 Version 1.4.0. All culverts will be sized using the Federal Highway Administration (FHA) Program, HY-8 Version 7.30. For storm and culvert capacity calculations refer to Appendix G. Street Capacity The criteria and standards set forth in the FCSCM will be used to check street capacity for both the minor (2-year) and major (100-year) storm events. The FCSCM requires that stormwater overtopping curbs should not occur during the minor storms and the flow spread must meet the following guidelines for each street designation:  Local, Alley – flow may spread to crown of road.  Collector (without median) - flow spread must leave a minimum of 6 feet (6’) wide clear travel lane on each side of the centerline.  Arterial (with median) – flow spread must leave a minimum of 12 feet (12’) wide travel lane in both directions of travel. Additionally, the following allowable street flow depths were used for the drainage design:  Local, Alley – Minor Storm 0.50-ft depth at gutter, Major Storm 0.50-ft depth at crown and 1.0-ft at gutter (most restrictive will apply)  Collector - Minor Storm 0.50-ft depth at gutter, Major Storm 0.50-ft depth at crown and 1.0-ft at gutter (most restrictive will apply)  Arterial (without median) - Minor Storm 0.50-ft depth at gutter, Major Storm 0.50-ft depth at crown and 1.0-ft at gutter (most restrictive will apply)  Arterial (with median) - Minor Storm 0.50-ft depth at gutter, Major Storm not to exceed bottom of gutter at median and 1.0-ft at gutter (most restrictive will apply) Swale Design As defined in Chapter 9 of the Fort Collins Stormwater Criteria Manual, open channels are utilized to preserve, enhance, and restore stream corridors, used in the design of constructed channels and swales by use of natural concepts. Per the FCSCM criteria and standards, all open channels must be designed to carry the major (100-year) storm runoff. The swales will be sized to either contain the 100-year developed peak runoff plus 1 foot of freeboard or 133 percent of the 100-year developed peak runoff. Drainage swales were designed to be grass-lined, triangular channels with 4:1 side-slopes. Erosion potential in the swales will be analyzed to determine if additional protective measures are needed within the project area based on Froude number calculations. Montava Subdivision Phase D Preliminary Drainage Report Page 11 Detention Discharge and Storage Calculation Montava Phase D drains to three separate Detention/ Water Quality ponds. Pond D, Interim Pond, and Interim Detention Pond 427. Pond D is located in Pond D Basin and captures the runoff from Basin D, School Basin, and Pond D Basin. This pond discharges into a swale that runs on the southwest border of the and into Interim Pond 427. Pond D was sized with the SWMM model that was prepared with the Montava Master Drainage Plan. In the master drainage plan the 100-year volume required is 9 ac-ft. An emergency spillway will be designed with this pond to spill south down the embankment over Timberline Road and into a proposed interim channel/ future storm line. Pond D is proposed to be an LID wet pond which will handle LID credits for Basin D. An interim Pond is being proposed in the large swale that is north of the site. This pond was designed to handle future basins as much offsite runoff as possible, the remaining offsite runoff will be bypass flow. This interim pond will also act as LID for the road connection to Giddings and future basins. This interim pond will discharge south into a proposed swale that flows to Interim Pond 427. Interim Pond 427 was sized using a SWMM model that was prepared for the stormwater infrastructure set that was submitted with Phase E. In the stormwater infrastructure set the 100-year volume required the pond was designed for the entire surrounding area that includes Phase D, 18.7 ac- ft. Interim Pond 427 will outfall to the east of Giddings Road and then south under Mountain Vista Drive into an agricultural field and eventually into the L&W Canal. Erosion and Sediment Control Montava Phase D has been designed to be in compliance with the City of Fort Collins Erosion Control Criteria and all Erosion Control Materials will be provided with the Final Drainage Report. Erosion and sedimentation occurring on-site during construction will be controlled by the use of temporary Best Management Practices (BMPs – i.e., silt fence, gravel inlet filters, vehicle tracking control pads, and straw wattle barriers). A separate Stormwater Management Plan has been provided with the PDR Submittal. Montava Subdivision Phase D Preliminary Drainage Report Page 12 4.0 - Conclusions This preliminary drainage report has been prepared in accordance with the City of Fort Collins Stormwater Criteria Manual for a Project Development Plan (PDP) submittal. The PDP plans have also been prepared to be in compliance with the city’s current drainage criteria. Phase D has been designed to safely and effectively capture, convey, and attenuate stormwater runoff in accordance with the FCSCM, Fort Collins Stormwater Criteria Manual, and Montava Master Drainage Study. 50% of the newly single-family development and 75% of the newly developed multifamily development will be connected to a LID system, which will treat storms before the traditional water quality and detention ponds. The traditional water quality and detention ponds will treat the remaining development of the site. The proposed drainage infrastructure will attenuate the flow prior to entering the downstream properties/ infrastructure. Additionally, areas of future development adjacent to the project area will have to been analyzed to ensure that adequate facilities will accommodate future development. Montava Subdivision Phase D Preliminary Drainage Report Page 13 5.0 - References 1. Fort Collins Stormwater Criteria Manual, as adopted by the city of Fort Collins, as referenced in Section 26-500 of the Code of the City of Fort Collins, December 2018. 2. City of Fort Collins Cooper Slough Alternatives Analysis Update, prepared by Fort Collins Department of Utilities, prepared by ICON Engineering Inc., October 2017 3. Montava Planned Unit Development Master Drainage Study, by Martin/Martin Inc., dated January 23, 2019 Montava Subdivision Phase D Preliminary Drainage Report Page 14 6.0 - Appendices The following appendices are attached to and made part of this final drainage design report: APPENDIX A HYDROLOGIC ANALYSIS APPENDIX B LOW IMPACT DEVELOPMENT (LID) CALCULATIONS APPENDIX C FEMA FLOOD INSURANCE RATE MAP APPENDIX D USDA HYDROLOGIC SOIL GROUP MAP APPENDIX E DRAINAGE PLANS APPENDIX F DETENTION DESIGN Appendix A HYDOLOGIC ANALYSIS MONTAVA SUBDIVISION PHASE D Preliminary Drainage Report City of Fort Collins IDF Curves Duration 2-yr 10-yr 100-yr 5 2.85 4.87 9.95 6 2.67 4.56 9.31 7 2.52 4.31 8.80 8 2.40 4.10 8.38 9 2.30 3.93 8.03 10 2.21 3.78 7.72 11 2.13 3.63 7.42 12 2.05 3.50 7.16 13 1.98 3.39 6.92 14 1.92 3.29 6.71 15 1.87 3.19 6.52 16 1.81 3.08 6.30 17 1.75 2.99 6.10 18 1.70 2.90 5.92 19 1.65 2.82 5.75 20 1.61 2.74 5.60 21 1.56 2.67 5.46 22 1.53 2.61 5.32 23 1.49 2.55 5.20 24 1.46 2.49 5.09 25 1.43 2.44 4.98 26 1.40 2.39 4.87 27 1.37 2.34 4.78 28 1.34 2.29 4.69 29 1.32 2.25 4.60 30 1.30 2.21 4.52 31 1.27 2.16 4.42 32 1.24 2.12 4.33 33 1.22 2.08 4.24 34 1.19 2.04 4.16 35 1.17 2.00 4.08 36 1.15 1.96 4.01 37 1.13 1.93 3.93 38 1.11 1.89 3.87 39 1.09 1.86 3.80 40 1.07 1.83 3.74 41 1.05 1.80 3.68 42 1.04 1.77 3.62 43 1.02 1.74 3.56 44 1.01 1.72 3.51 45 0.99 1.69 3.46 46 0.98 1.67 3.41 47 0.96 1.64 3.36 48 0.95 1.62 3.31 49 0.94 1.60 3.27 50 0.92 1.58 3.23 51 0.91 1.56 3.18 52 0.90 1.54 3.14 53 0.89 1.52 3.10 54 0.88 1.50 3.07 55 0.87 1.48 3.03 56 0.86 1.47 2.99 57 0.85 1.45 2.96 58 0.84 1.43 2.92 59 0.83 1.42 2.89 60 0.82 1.40 2.86 From the City of Fort Collins Storm Drainage Design Criteria and Construction Standards MONTAVA SUBDIVISION PHASE D Preliminary Drainage Report From the Town of Timnath Design Criteria Manual and Construction Specifications y = 2.5665e-0.021x R² = 0.9519 y = 26.332x-0.53 R² = 0.9831 0.00 2.00 4.00 6.00 8.00 10.00 12.00 0 10 20 30 40 50 60 70 Ra i n f a l l I n t e n s i t y ( i n / h r ) Storm Duration (min) City of Fort Collins IDF Curves 2-yr 10-yr 100-yr Expon. (2-yr) Power (100-yr) MONTAVA SUBDIVISON PHASE D Preliminary Drainage Report City of Fort Collins Rational Method Runoff Coefficients High Density 0.85 70 Lawn, Clayey, <2% Slope 0.20 2 Lawn, Clayey, >7% Slope 0.35 2 Lawn, Clayey, 2-7% Slope 0.25 2 Lawn, Sandy, <2% Slope 0.10 2 Lawn, Sandy, >7% Slope 0.20 2 Lawn, Sandy, 2-7% Slope 0.15 2 Low Denisty 0.55 30 Medium Density 0.65 50 Open Lands, Transition 0.20 20 Roofs 0.95 90 Streets: Gravel 0.50 40 Streets: Paved 0.95 90 Streets: Permeable Pavers 0.30 40 Urban Estate 0.30 30 From Table 3-3 of the City of Fort Collins, Stormwater Criteria Manual Runoff Coefficient Impervious MONTAVA SUBDIVISION PHASE D Preliminary Drainage Report Composite C2 C2 C10 C100 Medium Density 0.00 0.65 50 Streets: Paved 0.77 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.63 0.65 50 Streets: Paved 0.92 0.95 90 Lawn, Sandy, >7% Slope 0.00 0.20 2 Medium Density 1.02 0.65 50 Streets: Paved 0.36 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.00 0.65 50 Streets: Paved 0.20 0.95 90 Lawn, Sandy, >7% Slope 0.00 0.20 2 Medium Density 0.00 0.65 50 Streets: Paved 0.20 0.95 90 Lawn, Sandy, >7% Slope 0.00 0.20 2 Medium Density 0.49 0.65 50 Streets: Paved 0.59 0.95 90 Lawn, Sandy, >7% Slope 0.00 0.20 2 Medium Density 1.38 0.65 50 Streets: Paved 0.65 0.95 90 Lawn, Clayey, >7% Slope 0.08 0.35 2 Medium Density 0.49 0.65 50 Streets: Paved 0.33 0.95 90 Lawn, Clayey, >7% Slope 0.78 0.35 2 Medium Density 0.36 0.65 50 Streets: Paved 0.14 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.37 0.65 50 Streets: Paved 0.68 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.00 0.65 50 Streets: Paved 0.35 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.13 0.65 50 Streets: Paved 0.46 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.17 0.65 50 Streets: Paved 0.44 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 BASIN D TOTAL 11.98 66.9% 0.78 0.78 0.78 0.93 Medium Density 0.00 0.65 50 Streets: Paved 0.10 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.00 0.65 50 Streets: Paved 0.19 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.00 0.65 50 Streets: Paved 0.06 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.09 0.65 50 Streets: Paved 0.07 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 1.30 0.65 50 Streets: Paved 0.72 0.95 90 Lawn, Clayey, >7% Slope 0.23 0.35 2 Medium Density 1.31 0.65 50 Streets: Paved 0.83 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 1.39 0.65 50 Streets: Paved 0.64 0.95 90 Lawn, Clayey, >7% Slope 0.08 0.35 2 Medium Density 0.93 0.65 50 Streets: Paved 1.82 0.95 90 Lawn, Clayey, >7% Slope 0.63 0.35 2 Medium Density 0.56 0.65 50 Streets: Paved 0.20 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.78 0.65 50 Streets: Paved 0.35 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.00 0.65 50 Streets: Paved 0.34 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.45 0.65 50 Streets: Paved 0.45 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.83 0.65 50 Streets: Paved 0.68 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.55 0.65 50 Streets: Paved 0.28 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.75 0.65 50 Streets: Paved 0.39 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.00 0.65 50 Streets: Paved 0.22 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.05 0.65 50 Streets: Paved 0.32 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.74 0.65 50 Streets: Paved 1.00 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.32 0.65 50 Streets: Paved 0.07 0.95 90 Lawn, Clayey, >7% Slope 0.33 0.35 2 Medium Density 0.37 0.65 50 Streets: Paved 0.14 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.66 0.65 50 Streets: Paved 0.09 0.95 90 Lawn, Clayey, >7% Slope 0.41 0.35 2 Medium Density 1.26 0.65 50 Streets: Paved 0.56 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.00 0.65 50 Streets: Paved 0.09 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.00 0.65 50 Streets: Paved 0.06 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.10 0.65 50 Streets: Paved 0.30 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.10 0.65 50 Streets: Paved 0.30 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 BASIN F TOTAL 24.48 68.7% 0.81 0.81 0.81 0.93 F-25 0.40 80.0% 0.88 0.88 0.88 2.11 60.1% 0.73 0.73 0.74 0.74 1.00 0.40 80.0% 0.88 0.88 0.88 1.00 F-23 0.09 0.51 61.1% F-24 0.06 F-26 0.95 1.00 F-11 0.34 90.0% 0.95 0.88 0.88 0.88 1.00 0.91 1.00 0.20 90.0% 0.95 0.95 0.95 0.91 1.00 0.73 0.56 0.73 0.71 0.73 0.950.95 0.56 0.56 0.73 0.73 0.73 1.00 0.85 0.85 1.000.85 0.91 D-6 1.07 71.9% D-11 0.35 90.0% D-8 1.60 34.7% D-7 2.11 D-9 0.50 60.9% 76.1% 81.2% D-1 0.95 0.95 0.81 90.0% D-2 1.55 73.7% 0.83 0.83 D-4 0.20 D-3 1.38 0.81 0.95 60.4% 0.73 0.73 0.83 0.77 60.5% 0.73 0.95 0.81 D-5 0.82 Onsite Basin Composite Runoff Coefficients Basin/ Sub-Basin Area (ac) Attribute 90.0% Attribute Area (ac) Composite Runoff CoefficientsRunoff Coefficient, C Percent ImperviousImpervious 0.95 0.95 1.00 D-12 0.59 0.95 0.95 1.00 0.74 0.93 F-7 D-10 1.05 0.95 D-13 0.87 0.87 1.00 0.95 0.95 1.00 F-1 0.10 90.0% 90.0% 0.95 0.95 F-3 0.92 F-2 0.19 0.54 0.54 F-5 90.0% 0.95 0.95 63.4% 0.75 0.75 0.73 0.73 90.0% 0.95 0.95 0.95 62.3% 0.740.74 0.82 0.82 31.9% 0.95 0.75 0.94 0.73 0.91 0.87 1.00 0.73 1.00 0.94 1.00 1.00 0.54 0.68 1.00 0.95 0.73 0.91 0.80 0.74 0.93 1.00 1.00 0.61 1.51 68.1% 0.79 0.79 0.95 0.95 0.95 78.9% 90.0% 0.95 0.80 0.80 0.06 2.25 57.9% 0.72 F-4 0.16 68.0% 0.79 0.79 0.79 0.98 F-6 2.14 65.6% 0.77 0.77 0.77 0.96 0.72 0.890.72 F-8 3.38 62.6% 0.76 0.76 0.76 0.94 0.73 0.7360.4% 0.71 F-22 1.82 F-17 0.37 0.98 1.00 1.00 84.2% 0.91 0.91 0.91 0.79 F-16 0.95 0.95 0.75 0.75 0.75 0.83F-14 F-13 F-9 0.76 F-10 1.13 62.5% F-21 1.16 36.1% 0.57 0.57 0.57 F-20 F-12 0.90 70.2% F-15 1.14 63.8% 0.22 90.0% F-18 1.74 73.0% F-19 0.71 MONTAVA SUBDIVISION PHASE D Preliminary Drainage Report MONTAVA SUBDIVISION PHASE D Preliminary Drainage Report Medium Density 0.61 0.65 50 Streets: Paved 1.96 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.71 0.65 50 Streets: Paved 1.28 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.00 0.65 50 Streets: Paved 0.38 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.00 0.65 50 Streets: Paved 1.70 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.90 0.65 50 Streets: Paved 1.23 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.43 0.65 50 Streets: Paved 0.14 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.74 0.65 50 Streets: Paved 0.65 0.95 90 Lawn, Clayey, >7% Slope 0.19 0.35 2 Medium Density 0.87 0.65 50 Streets: Paved 1.19 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.00 0.65 50 Streets: Paved 0.14 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.00 0.65 50 Streets: Paved 0.75 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 BASIN G1 TOTAL 13.86 76.5% 0.85 0.85 0.85 0.99 Medium Density 0.00 0.65 50 Streets: Paved 0.56 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 Medium Density 0.00 0.65 50 Streets: Paved 0.54 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 BASIN C2 TOTAL 1.10 90.0% 0.95 0.95 0.95 1.00 Medium Density 0.00 0.65 50 Streets: Paved 0.85 0.95 90 Lawn, Clayey, >7% Slope 1.11 0.35 2 Medium Density 0.00 0.65 50 Streets: Paved 0.60 0.95 90 Lawn, Clayey, >7% Slope 0.79 0.35 2 GIDDINGS TOTAL 3.35 40.1% 0.61 0.61 0.61 0.76 Medium Density 0.97 0.65 50 Streets: Paved 3.15 0.95 90 Lawn, Clayey, >7% Slope 2.41 0.35 2 Medium Density 5.00 0.65 50 Streets: Paved 4.19 0.95 90 Lawn, Clayey, >7% Slope 2.00 0.35 2 Medium Density 4.00 0.65 50 Streets: Paved 3.51 0.95 90 Lawn, Clayey, >7% Slope 0.00 0.35 2 FUTURE BASINS TOTAL 25.23 58.8% 0.73 0.73 0.73 0.91 Medium Density 0.00 0.65 50 Streets: Paved 10.97 0.95 90 Lawn, Clayey, >7% Slope 7.50 0.35 2 Medium Density 0.00 0.65 50 Streets: Paved 1.48 0.95 90 Lawn, Clayey, >7% Slope 6.00 0.35 2 Medium Density 0.00 0.65 50 Streets: Paved 0.00 0.95 90 Lawn, Clayey, >7% Slope 10.12 0.35 2 POND / SCHOOL TOTAL 36.07 32.4% 0.56 0.56 0.56 0.70 Open Lands, Transition 103.82 0.20 20 Open Lands, Transition 70.35 0.20 20 OFFSITE TOTAL 174.17 20.0% 0.20 0.20 0.20 0.25 0.47 0.68 0.68 0.68 0.79 FUTURE-2 56.4% 0.71 0.590.47 0.44 0.92 1.00 0.95 0.25 73.1% 1.00 2.0% 0.35 0.35 0.35 51.6% 68.7% 0.95 0.95 1.00 40.1% 0.61 0.61 0.61 0.76 20.0% 0.71 0.71 0.89 6.53 11.19 FUTURE-1 1.00 0.82 1.00 0.91 0.74 0.74 0.82 0.82 0.82 1.00 90.0% 0.95 0.95 73.1% 0.82 0.82 60.1% 0.73 0.73 G1-1 G1-3 POND D 7.48 19.4% 0.47 1.0080.4%2.57 0.38 SCHOOL G1-6 GIDDINGS-1 1.96 0.88 0.88 0.88 90.0% 0.95 0.95 0.95 0.73 60.8%G1-7 1.57 2.06 0.14 0.74 G1-2 1.99 G1-5 0.84 0.84 0.20 OFFSITE 2 70.35 20.0% 0.20 0.57 90.0% 0.95 0.95 0.95 75.6% 0.84 0.790.79FUTURE-3 0.85 0.99 0.25 POND 427 0.200.20 OFFSITE 1 103.82 10.12 0.20 0.20 GIDDINGS-2 1.39 G1-10 0.75 90.0% 0.95 0.95 0.95 G1-9 C2-2 18.47 54.3% 0.71 0.71 1.70 2.13 1.00 40.0% 0.61 0.61 0.61 0.76 0.54 90.0% 0.95 1.0090.0% 1.00 0.71 0.88 7.51 G1-4 C2-1 0.56 0.95 0.95 0.95 G1-8 MONTAVA SUBDIVISION PHASE D PRELIMINARY Drainage Report Overland Flow Average Channelized Channel Channel Channelized Length, D Overland Slope Tov Tov Tov Flow Length Slope Velocity Time (Tt) (ft) (%) 2-year 10-year 100-year (ft) (%) (ft/s) (min) 2-year 10-year 100-year D-1 0.95 0.95 1.00 20 2 1 1 1 844 0.5 1.4 10.0 11 11 11 D-2 0.83 0.83 1.00 60 2 3 3 1 890 0.5 1.4 10.6 14 14 12 D-3 0.73 0.73 0.91 65 2 4 4 2 345 0.5 1.4 4.1 8 8 6 D-4 0.95 0.95 1.00 20 2 1 1 1 180 0.5 1.4 2.1 5 5 5 D-5 0.95 0.95 1.00 20 2 1 1 1 170 0.5 1.4 2.0 5 5 5 D-6 0.81 0.81 1.00 20 2 2 2 1 350 0.5 1.4 4.2 6 6 5 D-7 0.73 0.73 0.91 60 2 4 4 2 740 0.5 1.4 8.8 13 13 11 D-8 0.56 0.56 0.71 60 2 6 6 5 356 0.5 1.4 4.2 10 10 9 D-9 0.73 0.73 0.91 60 2 4 4 2 155 0.5 1.4 1.8 6 6 5 D-10 0.85 0.85 1.00 60 2 3 3 1 520 0.5 1.4 6.2 9 9 7 D-11 0.95 0.95 1.00 20 2 1 1 1 375 0.5 1.4 4.5 5 5 5 D-12 0.88 0.88 1.00 20 2 1 1 1 400 0.5 1.4 4.8 6 6 6 D-13 0.87 0.87 1.00 60 2 3 3 1 320 0.5 1.4 3.8 7 7 5 F-1 0.95 0.95 1.00 15 2 1 1 1 105 0.5 1.4 1.3 5 5 5 F-2 0.95 0.95 1.00 15 2 1 1 1 250 0.5 1.4 3.0 5 5 5 F-3 0.95 0.95 1.00 15 2 1 1 1 65 0.5 1.4 0.8 5 5 5 F-4 0.79 0.79 0.98 30 2 3 3 1 65 0.5 1.4 0.8 5 5 5 F-5 0.72 0.72 0.89 60 2 4 4 2 583 0.5 1.4 6.9 11 11 9 F-6 0.77 0.77 0.96 60 2 4 4 2 775 0.5 1.4 9.2 13 13 11 F-7 0.73 0.73 0.91 60 2 4 4 2 645 0.5 1.4 7.7 12 12 10 F-8 0.76 0.76 0.94 60 2 4 4 2 835 0.5 1.4 9.9 14 14 12 F-9 0.73 0.73 0.91 60 2 4 4 2 290 0.5 1.4 3.5 7 7 5 F-10 0.74 0.74 0.93 120 2 6 6 3 140 0.5 1.4 1.7 8 8 5 F-11 0.95 0.95 1.00 20 2 1 1 1 845 0.5 1.4 10.1 11 11 11 F-12 0.80 0.80 1.00 120 2 5 5 2 200 0.5 1.4 2.4 7 7 5 F-13 0.79 0.79 0.98 60 2 4 4 1 1020 0.5 1.4 12.1 16 16 13 F-14 0.75 0.75 0.94 60 2 4 4 2 425 0.5 1.4 5.1 9 9 7 F-15 0.75 0.75 0.94 60 2 4 4 2 445 0.5 1.4 5.3 9 9 7 F-16 0.95 0.95 1.00 20 2 1 1 1 305 0.5 1.4 3.6 5 5 5 F-17 0.91 0.91 1.00 20 2 1 1 1 300 0.5 1.4 3.6 5 5 5 F-18 0.82 0.82 1.00 300 2 7 7 3 150 0.5 1.4 1.8 9 9 5 F-19 0.54 0.54 0.68 60 2 6 6 5 200 0.5 1.4 2.4 8 8 7 F-20 0.73 0.73 0.92 60 2 4 4 2 215 0.5 1.4 2.6 7 7 5 F-21 0.57 0.57 0.71 60 2 6 6 4 385 0.5 1.4 4.6 11 11 9 F-22 0.74 0.74 0.93 60 2 4 4 2 695 0.5 1.4 8.3 12 12 10 F-23 0.95 0.95 1.00 20 2 1 1 1 95 0.5 1.4 1.1 5 5 5 F-24 0.95 0.95 1.00 20 2 1 1 1 95 0.5 1.4 1.1 5 5 5 F-25 0.88 0.88 1.00 60 2 3 3 1 225 0.5 1.4 2.7 6 6 5 F-26 0.88 0.88 1.00 60 2 3 3 1 225 0.5 1.4 2.7 6 6 5 G1-1 0.88 0.88 1.00 60 2 3 3 1 815 0.5 1.4 9.7 13 13 11 G1-2 0.84 0.84 1.00 60 2 3 3 1 815 0.5 1.4 9.7 13 13 11 G1-3 0.95 0.95 1.00 20 2 1 1 1 410 0.5 1.4 4.9 6 6 6 G1-4 0.95 0.95 1.00 20 2 1 1 1 560 0.5 1.4 6.7 8 8 8 G1-5 0.82 0.82 1.00 150 2 5 5 2 50 0.5 1.4 0.6 6 6 5 G1-6 0.73 0.73 0.91 60 2 4 4 2 215 0.5 1.4 2.6 7 7 5 G1-7 0.74 0.74 0.92 60 2 4 4 2 415 0.5 1.4 4.9 9 9 7 G1-8 0.82 0.82 1.00 200 2 6 6 2 50 0.5 1.4 0.6 7 7 5 G1-9 0.95 0.95 1.00 20 2 1 1 1 95 0.5 1.4 1.1 5 5 5 G1-10 0.95 0.95 1.00 220 2 3 3 2 325 0.5 1.4 3.9 7 7 6 C2-1 0.95 0.95 1.00 20 2 1 1 1 595 0.5 1.4 7.1 8 8 8 C2-2 0.95 0.95 1.00 20 2 1 1 1 595 0.5 1.4 7.1 8 8 8 GIDDINGS-1 0.95 0.95 1.00 20 2 1 1 1 1675 0.5 1.4 19.9 21 21 21 GIDDINGS-2 0.61 0.61 0.76 20 2 3 3 2 1150 0.5 1.4 13.7 17 17 16 FUTURE-1 0.68 0.68 0.85 150 2 8 8 4 1065 0.5 1.4 12.7 21 21 17 FUTURE-2 0.71 0.71 0.89 400 2 12 12 6 1435 0.5 1.4 17.1 29 29 23 FUTURE-3 0.79 0.79 0.99 400 2 9 9 3 565 0.5 1.4 6.7 16 16 10 SCHOOL 0.71 0.71 0.88 150 2 7 7 4 1000 0.5 1.4 11.9 19 19 16 POND D 0.47 0.47 0.59 150 2 11 11 9 150 0.5 1.4 1.8 13 13 11 POND 427 0.35 0.35 0.44 20 2 5 5 4 2750 0.5 1.4 32.7 38 38 37 Basin Time of Concentration Frequency Adj. Runoff Coefficients (C*Cf) C2 C10 C100 Overland Travel Time Time of Concentration Tc = Tov + Tt (min)Basin MONTAVA SUBDIVISION PHASE D Preliminary Drainage Report 2 - year 10 - year 100 - year 2 - year 10 - year 100 - year 2 - Year 10 - Year 100 - Year 2 - Year 10 - Year 100 - Year D-1 0.77 0.95 0.95 1.00 11 11 11 2.13 3.63 7.42 1.56 2.66 5.71 D-2 1.55 0.83 0.83 1.00 14 14 12 1.92 3.29 7.16 2.46 4.22 11.10 D-3 1.38 0.73 0.73 0.91 8 8 6 2.40 4.10 9.31 2.41 4.12 11.70 D-4 0.20 0.95 0.95 1.00 5 5 5 2.85 4.87 9.95 0.54 0.93 1.99 D-5 0.20 0.95 0.95 1.00 5 5 5 2.85 4.87 9.95 0.54 0.93 1.99 D-6 1.07 0.81 0.81 1.00 6 6 5 2.67 4.56 9.95 2.33 3.97 10.65 D-7 2.11 0.73 0.73 0.91 13 13 11 1.98 3.39 7.42 3.05 5.23 14.31 D-8 1.60 0.56 0.56 0.71 10 10 9 2.21 3.78 8.03 2.00 3.41 9.07 D-9 0.50 0.73 0.73 0.91 6 6 5 2.67 4.56 9.95 0.98 1.67 4.55 D-10 1.05 0.85 0.85 1.00 9 9 7 2.30 3.93 8.80 2.04 3.49 9.24 D-11 0.35 0.95 0.95 1.00 5 5 5 2.85 4.87 9.95 0.95 1.62 3.48 D-12 0.59 0.88 0.88 1.00 6 6 6 2.67 4.56 9.31 1.39 2.38 5.49 D-13 0.61 0.87 0.87 1.00 7 7 5 2.52 4.31 9.95 1.33 2.28 6.07 F-1 0.10 0.95 0.95 1.00 5 5 5 2.85 4.87 9.95 0.27 0.46 1.00 F-2 0.19 0.95 0.95 1.00 5 5 5 2.85 4.87 9.95 0.51 0.88 1.89 F-3 0.06 0.95 0.95 1.00 5 5 5 2.85 4.87 9.95 0.16 0.28 0.60 F-4 0.16 0.79 0.79 0.98 5 5 5 2.85 4.87 9.95 0.36 0.61 1.56 F-5 2.25 0.72 0.72 0.89 11 11 9 2.13 3.63 8.03 3.43 5.84 16.16 F-6 2.14 0.77 0.77 0.96 13 13 11 1.98 3.39 7.42 3.25 5.56 15.22 F-7 2.11 0.73 0.73 0.91 12 12 10 2.05 3.50 7.72 3.15 5.38 14.83 F-8 3.38 0.76 0.76 0.94 14 14 12 1.92 3.29 7.16 4.90 8.40 22.85 F-9 0.76 0.73 0.73 0.91 7 7 5 2.52 4.31 9.95 1.39 2.38 6.88 F-10 1.13 0.74 0.74 0.93 8 8 5 2.40 4.10 9.95 2.02 3.45 10.46 F-11 0.34 0.95 0.95 1.00 11 11 11 2.13 3.63 7.42 0.69 1.17 2.52 F-12 0.90 0.80 0.80 1.00 7 7 5 2.52 4.31 9.95 1.82 3.11 8.96 F-13 1.51 0.79 0.79 0.98 16 16 13 1.81 3.08 6.92 2.15 3.65 10.26 F-14 0.83 0.75 0.75 0.94 9 9 7 2.30 3.93 8.80 1.43 2.45 6.86 F-15 1.14 0.75 0.75 0.94 9 9 7 2.30 3.93 8.80 1.98 3.38 9.45 F-16 0.22 0.95 0.95 1.00 5 5 5 2.85 4.87 9.95 0.60 1.02 2.19 F-17 0.37 0.91 0.91 1.00 5 5 5 2.85 4.87 9.95 0.96 1.63 3.68 F-18 1.74 0.82 0.82 1.00 9 9 5 2.30 3.93 9.95 3.29 5.62 17.31 F-19 0.71 0.54 0.54 0.68 8 8 7 2.40 4.10 8.80 0.92 1.58 4.23 F-20 0.51 0.73 0.73 0.92 7 7 5 2.52 4.31 9.95 0.94 1.61 4.65 F-21 1.16 0.57 0.57 0.71 11 11 9 2.13 3.63 8.03 1.40 2.39 6.60 F-22 1.82 0.74 0.74 0.93 12 12 10 2.05 3.50 7.72 2.77 4.73 13.03 F-23 0.09 0.95 0.95 1.00 5 5 5 2.85 4.87 9.95 0.24 0.42 0.90 F-24 0.06 0.95 0.95 1.00 5 5 5 2.85 4.87 9.95 0.16 0.28 0.60 F-25 0.40 0.88 0.88 1.00 6 6 5 2.67 4.56 9.95 0.93 1.60 3.98 F-26 0.40 0.88 0.88 1.00 6 6 5 2.67 4.56 9.95 0.93 1.60 3.98 G1-1 2.57 0.88 0.88 1.00 13 13 11 1.98 3.39 7.42 4.47 7.65 19.07 G1-2 1.99 0.84 0.84 1.00 13 13 11 1.98 3.39 7.42 3.32 5.68 14.77 G1-3 0.38 0.95 0.95 1.00 6 6 6 2.67 4.56 9.31 0.96 1.65 3.54 G1-4 1.70 0.95 0.95 1.00 8 8 8 2.40 4.10 8.38 3.88 6.62 14.25 G1-5 2.13 0.82 0.82 1.00 6 6 5 2.67 4.56 9.95 4.68 8.00 21.19 G1-6 0.57 0.73 0.73 0.91 7 7 5 2.52 4.31 9.95 1.04 1.78 5.15 G1-7 1.57 0.74 0.74 0.92 9 9 7 2.30 3.93 8.80 2.66 4.55 12.74 G1-8 2.06 0.82 0.82 1.00 7 7 5 2.52 4.31 9.95 4.27 7.31 20.50 G1-9 0.14 0.95 0.95 1.00 5 5 5 2.85 4.87 9.95 0.38 0.65 1.39 G1-10 0.75 0.95 0.95 1.00 7 7 6 2.52 4.31 9.31 1.80 3.07 6.98 C2-1 0.56 0.95 0.95 1.00 8 8 8 2.40 4.10 8.38 1.28 2.18 4.69 C2-2 0.54 0.95 0.95 1.00 8 8 8 2.40 4.10 8.38 1.23 2.10 4.53 GIDDINGS-1 1.96 0.95 0.95 1.00 21 21 21 1.56 2.67 5.46 2.90 4.97 10.70 GIDDINGS-2 1.39 0.61 0.61 0.76 17 17 16 1.75 2.99 6.30 1.48 2.53 6.67 FUTURE-1 6.53 0.68 0.68 0.85 21 21 17 1.56 2.67 6.10 6.97 11.93 34.06 FUTURE-2 11.19 0.71 0.71 0.89 29 29 23 1.32 2.25 5.20 10.47 17.84 51.55 FUTURE-3 7.51 0.79 0.79 0.99 16 16 10 1.81 3.08 7.72 10.74 18.28 57.27 SCHOOL 18.47 0.71 0.71 0.88 19 19 16 1.65 2.82 6.30 21.53 36.79 102.74 POND D 7.48 0.47 0.47 0.59 13 13 11 1.98 3.39 7.42 6.94 11.89 32.52 POND 427 10.12 0.35 0.35 0.44 38 38 37 1.11 1.89 3.93 3.93 6.69 17.40 Basin Peak Discharge Rainfall Intensity (in/hr) Peak Discharge (cfs)Basin Basin Area (ac) Frequency Adj. Runoff Coefficients Time of Concentration, Tc (min) MONTAVA SUBDIVISION PHASE D Preliminary Drainage Report PROPOSED IMPERVIOUSNESS EXISTING IMPERVIOUSNESS D-1 90% 30% D-2 74% 30% D-3 60% 30% D-4 90% 30% D-5 90% 30% D-6 72% 30% D-7 61% 30% D-8 35% 30% D-9 61% 30% D-10 76% 30% D-11 90% 30% D-12 81% 30% D-13 79%30% F-1 90% 30% F-2 90% 30% F-3 90% 30% F-4 68% 30% F-5 58% 30% F-6 66% 30% F-7 60% 30% F-8 63% 30% F-9 60% 30% F-10 63% 30% F-11 90% 30% F-12 70% 30% F-13 68% 30% F-14 63% 30% F-15 64% 30% F-16 90% 30% F-17 84% 30% F-18 73% 30% F-19 32% 30% F-20 61% 30% F-21 36% 30% F-22 62% 30% F-23 90% 30% F-24 90% 30% F-25 80% 30% F-26 80%30% G1-1 80% 30% G1-2 76% 30% G1-3 90% 30% G1-4 90% 30% G1-5 73% 30% G1-6 60% 30% G1-7 61% 30% G1-8 73% 30% G1-9 90% 30% G1-10 90%30% C2-1 90% 30% C2-2 90%30% GIDDINGS-1 40% 40% GIDDINGS-2 40%40% FUTURE-1 52% 30% FUTURE-2 56% 30% FUTURE-3 69%30% SCHOOL 54%30% POND D 19%30% POND 427 2%30% Appendix B LOW IMPACT DEVELOPMENT (LID) CALCULATIONS Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =57.8 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.578 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.18 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 307,687 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 =0.60 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =6,557 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =10 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =3559 sq ft D) Actual Flat Surface Area AActual =6931 sq ft E) Area at Design Depth (Top Surface Area)ATop =9068 sq ft F) Rain Garden Total Volume VT=6,666 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Design Procedure Form: Rain Garden (RG) BAMG TST INC. April 30, 2024 MONTAVA PHASE D FORT COLLINS CO UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_BASIN D LID 1.xlsm, RG 4/30/2024, 11:08 AM LID-2 Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =63.5 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.635 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.20 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 254,289 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 =0.60 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =5,881 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =10 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =3232 sq ft D) Actual Flat Surface Area AActual =6134 sq ft E) Area at Design Depth (Top Surface Area)ATop =8867 sq ft F) Rain Garden Total Volume VT=6,250 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Design Procedure Form: Rain Garden (RG) BAMG TST INC. April 30, 2024 MONTAVA SUBDIVISION PHASE D FORT COLLINS, CO UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_BASIN F LID 1.xlsm, RG 4/30/2024, 11:37 AM LID-3 Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =53.4 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.534 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.17 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 408,157 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 =0.60 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =8,192 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =10 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =4359 sq ft D) Actual Flat Surface Area AActual =7577 sq ft E) Area at Design Depth (Top Surface Area)ATop =13668 sq ft F) Rain Garden Total Volume VT=8,852 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Design Procedure Form: Rain Garden (RG) BAMG TST INC. April 30, 2024 MONTAVA SUBDIVISION PHASE D FORT COLLINS, CO UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_BASIN F LID 3.xlsm, RG 4/30/2024, 11:43 AM LID-4 Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =57.2 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.572 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.18 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 304,235 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 =0.60 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =6,424 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =10 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =3478 sq ft D) Actual Flat Surface Area AActual =6697 sq ft E) Area at Design Depth (Top Surface Area)ATop =9457 sq ft F) Rain Garden Total Volume VT=6,731 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Design Procedure Form: Rain Garden (RG) BAMG TST INC April 30, 2024 MONTAVA PHASE D FORT COLLINS, CO UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_BASIN F LID 2.xlsm, RG 4/30/2024, 11:10 AM LID-5 Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =46.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 0.460 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.16 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 202,990 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 =0.60 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =3,693 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =10 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =1868 sq ft D) Actual Flat Surface Area AActual =4768 sq ft E) Area at Design Depth (Top Surface Area)ATop =7515 sq ft F) Rain Garden Total Volume VT=5,118 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Design Procedure Form: Rain Garden (RG) BAMG TST INC. April 30, 2024 MONTAVA SUBDIVISION PHASE D FORT COLLINS, CO UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO UD-BMP_BASIN F LID 4.xlsm, RG 4/30/2024, 11:46 AM LID-6 Appendix C FEMA FLOOD INSURANCE RATE MAP National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A, V, A99 With BFE or DepthZone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mileZone X Future Conditions 1% Annual Chance Flood HazardZone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to LeveeZone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood HazardZone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 4/4/2024 at 12:17 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. 1:6,000 105°1'42"W 40°37'4"N 105°1'5"W 40°36'37"N Basemap Imagery Source: USGS National Map 2023 Appendix D USDA HYDROLOGIC SOIL GROUP MAP United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Larimer County Area, ColoradoNatural Resources Conservation Service April 4, 2024 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface....................................................................................................................2 How Soil Surveys Are Made..................................................................................5 Soil Map..................................................................................................................8 Soil Map................................................................................................................9 Legend................................................................................................................10 Map Unit Legend................................................................................................11 Map Unit Descriptions.........................................................................................11 Larimer County Area, Colorado......................................................................13 5—Aquepts, loamy......................................................................................13 35—Fort Collins loam, 0 to 3 percent slopes..............................................14 36—Fort Collins loam, 3 to 5 percent slopes..............................................15 95—Satanta loam, 1 to 3 percent slopes....................................................17 98—Satanta Variant clay loam, 0 to 3 percent slopes.................................18 Soil Information for All Uses...............................................................................20 Soil Properties and Qualities..............................................................................20 Soil Qualities and Features.............................................................................20 Hydrologic Soil Group.................................................................................20 References............................................................................................................25 4 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5 scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and Custom Soil Resource Report 6 identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. Custom Soil Resource Report 7 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 8 9 Custom Soil Resource Report Soil Map 44 9 5 4 0 0 44 9 5 5 0 0 44 9 5 6 0 0 44 9 5 7 0 0 44 9 5 8 0 0 44 9 5 9 0 0 44 9 6 0 0 0 44 9 6 1 0 0 44 9 6 2 0 0 44 9 6 3 0 0 44 9 6 4 0 0 44 9 6 5 0 0 44 9 5 4 0 0 44 9 5 5 0 0 44 9 5 6 0 0 44 9 5 7 0 0 44 9 5 8 0 0 44 9 5 9 0 0 44 9 6 0 0 0 44 9 6 1 0 0 44 9 6 2 0 0 44 9 6 3 0 0 44 9 6 4 0 0 44 9 6 5 0 0 497600 497700 497800 497900 498000 498100 498200 498300 498400 497600 497700 497800 497900 498000 498100 498200 498300 498400 40° 37' 10'' N 10 5 ° 1 ' 4 3 ' ' W 40° 37' 10'' N 10 5 ° 1 ' 6 ' ' W 40° 36' 33'' N 10 5 ° 1 ' 4 3 ' ' W 40° 36' 33'' N 10 5 ° 1 ' 6 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 250 500 1000 1500 Feet 0 50 100 200 300 Meters Map Scale: 1:5,540 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 18, Aug 24, 2023 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 2, 2021—Aug 25, 2021 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 10 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 5 Aquepts, loamy 0.5 0.5% 35 Fort Collins loam, 0 to 3 percent slopes 33.0 33.5% 36 Fort Collins loam, 3 to 5 percent slopes 2.3 2.4% 95 Satanta loam, 1 to 3 percent slopes 3.0 3.0% 98 Satanta Variant clay loam, 0 to 3 percent slopes 59.9 60.7% Totals for Area of Interest 98.7 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. Custom Soil Resource Report 11 The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Custom Soil Resource Report 12 Larimer County Area, Colorado 5—Aquepts, loamy Map Unit Setting National map unit symbol: jpws Elevation: 4,500 to 6,700 feet Mean annual precipitation: 12 to 18 inches Mean annual air temperature: 39 to 50 degrees F Frost-free period: 80 to 140 days Farmland classification: Not prime farmland Map Unit Composition Aquepts and similar soils:80 percent Minor components:20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Aquepts Setting Landform:Depressions, draws, stream terraces Landform position (three-dimensional):Base slope, tread, dip Down-slope shape:Linear Across-slope shape:Linear Parent material:Loamy alluvium Typical profile H1 - 0 to 60 inches: variable Properties and qualities Slope:0 to 3 percent Depth to restrictive feature:More than 80 inches Drainage class:Very poorly drained Runoff class: Negligible Capacity of the most limiting layer to transmit water (Ksat):Moderately high to very high (0.60 to 99.90 in/hr) Depth to water table:About 6 to 18 inches Frequency of flooding:Rare Frequency of ponding:None Interpretive groups Land capability classification (irrigated): 5w Land capability classification (nonirrigated): 3w Hydrologic Soil Group: A/D Ecological site: R067BY038CO - Wet Meadow Hydric soil rating: Yes Minor Components Nunn Percent of map unit:5 percent Ecological site:R067BY002CO - Loamy Plains Hydric soil rating: No Kim Percent of map unit:5 percent Custom Soil Resource Report 13 Ecological site:R067BY002CO - Loamy Plains Hydric soil rating: No Stoneham Percent of map unit:5 percent Ecological site:R067BY002CO - Loamy Plains Hydric soil rating: No Fort collins Percent of map unit:5 percent Ecological site:R067BY002CO - Loamy Plains Hydric soil rating: No 35—Fort Collins loam, 0 to 3 percent slopes Map Unit Setting National map unit symbol: 2tlnc Elevation: 4,020 to 6,730 feet Mean annual precipitation: 14 to 16 inches Mean annual air temperature: 46 to 48 degrees F Frost-free period: 135 to 160 days Farmland classification: Prime farmland if irrigated Map Unit Composition Fort collins and similar soils:85 percent Minor components:15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Fort Collins Setting Landform:Interfluves, stream terraces Landform position (three-dimensional):Interfluve, tread Down-slope shape:Linear Across-slope shape:Linear Parent material:Pleistocene or older alluvium and/or eolian deposits Typical profile Ap - 0 to 4 inches: loam Bt1 - 4 to 9 inches: clay loam Bt2 - 9 to 16 inches: clay loam Bk1 - 16 to 29 inches: loam Bk2 - 29 to 80 inches: loam Properties and qualities Slope:0 to 3 percent Depth to restrictive feature:More than 80 inches Drainage class:Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat):Moderately high to high (0.20 to 2.00 in/hr) Custom Soil Resource Report 14 Depth to water table:More than 80 inches Frequency of flooding:None Frequency of ponding:None Calcium carbonate, maximum content:12 percent Maximum salinity:Nonsaline to very slightly saline (0.1 to 2.0 mmhos/cm) Available water supply, 0 to 60 inches: High (about 9.1 inches) Interpretive groups Land capability classification (irrigated): 3e Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Ecological site: R067BY002CO - Loamy Plains Hydric soil rating: No Minor Components Nunn Percent of map unit:10 percent Landform:Stream terraces Landform position (three-dimensional):Tread Down-slope shape:Linear Across-slope shape:Linear Ecological site:R067BY002CO - Loamy Plains Hydric soil rating: No Vona Percent of map unit:5 percent Landform:Interfluves Landform position (three-dimensional):Interfluve, side slope Down-slope shape:Linear Across-slope shape:Linear Ecological site:R067BY024CO - Sandy Plains Hydric soil rating: No 36—Fort Collins loam, 3 to 5 percent slopes Map Unit Setting National map unit symbol: 2yqpg Elevation: 4,800 to 5,900 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Prime farmland if irrigated Map Unit Composition Fort collins and similar soils:80 percent Minor components:20 percent Estimates are based on observations, descriptions, and transects of the mapunit. Custom Soil Resource Report 15 Description of Fort Collins Setting Landform:Alluvial fans, terraces Landform position (three-dimensional):Tread Down-slope shape:Linear, convex Across-slope shape:Linear Parent material:Pleistocene or older alluvium and/or eolian deposits Typical profile Ap - 0 to 5 inches: loam Bt1 - 5 to 8 inches: clay loam Bt2 - 8 to 18 inches: clay loam Bk1 - 18 to 24 inches: loam Bk2 - 24 to 80 inches: loam Properties and qualities Slope:3 to 5 percent Depth to restrictive feature:More than 80 inches Drainage class:Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat):Moderately high to high (0.20 to 2.00 in/hr) Depth to water table:More than 80 inches Frequency of flooding:None Frequency of ponding:None Calcium carbonate, maximum content:12 percent Maximum salinity:Nonsaline to very slightly saline (0.1 to 2.0 mmhos/cm) Available water supply, 0 to 60 inches: High (about 9.1 inches) Interpretive groups Land capability classification (irrigated): 4e Land capability classification (nonirrigated): 4e Hydrologic Soil Group: C Ecological site: R067BY002CO - Loamy Plains Hydric soil rating: No Minor Components Table mountain Percent of map unit:15 percent Landform:Alluvial fans, stream terraces Landform position (three-dimensional):Tread Down-slope shape:Linear Across-slope shape:Linear Ecological site:R067BY036CO - Overflow Hydric soil rating: No Larim Percent of map unit:5 percent Landform:Alluvial fans Down-slope shape:Linear Across-slope shape:Linear Ecological site:R067BY063CO - Gravel Breaks Hydric soil rating: No Custom Soil Resource Report 16 95—Satanta loam, 1 to 3 percent slopes Map Unit Setting National map unit symbol: 2w5f3 Elevation: 3,650 to 5,350 feet Mean annual precipitation: 12 to 18 inches Mean annual air temperature: 46 to 54 degrees F Frost-free period: 115 to 155 days Farmland classification: Prime farmland if irrigated Map Unit Composition Satanta and similar soils:90 percent Minor components:10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Satanta Setting Landform:Paleoterraces Landform position (two-dimensional):Backslope Landform position (three-dimensional):Head slope Down-slope shape:Linear Across-slope shape:Linear Parent material:Eolian sands Typical profile Ap - 0 to 9 inches: loam Bt - 9 to 18 inches: clay loam C - 18 to 79 inches: loam Properties and qualities Slope:1 to 3 percent Depth to restrictive feature:More than 80 inches Drainage class:Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat):Moderately high (0.20 to 0.60 in/hr) Depth to water table:More than 80 inches Frequency of flooding:None Frequency of ponding:None Calcium carbonate, maximum content:10 percent Maximum salinity:Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water supply, 0 to 60 inches: Very high (about 12.2 inches) Interpretive groups Land capability classification (irrigated): 3e Land capability classification (nonirrigated): 4c Hydrologic Soil Group: C Ecological site: R067BY002CO - Loamy Plains Hydric soil rating: No Custom Soil Resource Report 17 Minor Components Nunn Percent of map unit:5 percent Landform:Terraces Landform position (three-dimensional):Tread Down-slope shape:Linear Across-slope shape:Linear Ecological site:R067BY002CO - Loamy Plains Hydric soil rating: No Fort collins Percent of map unit:5 percent Landform:Alluvial fans Landform position (two-dimensional):Backslope Landform position (three-dimensional):Head slope Down-slope shape:Linear Across-slope shape:Linear Ecological site:R067BY002CO - Loamy Plains Hydric soil rating: No 98—Satanta Variant clay loam, 0 to 3 percent slopes Map Unit Setting National map unit symbol: jpyh Elevation: 4,800 to 5,600 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Prime farmland if irrigated Map Unit Composition Satanta variant and similar soils:90 percent Minor components:10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Satanta Variant Setting Landform:Terraces Landform position (three-dimensional):Tread Down-slope shape:Linear Across-slope shape:Linear Parent material:Alluvium Typical profile H1 - 0 to 9 inches: clay loam H2 - 9 to 22 inches: clay loam H3 - 22 to 60 inches: loam Custom Soil Resource Report 18 Properties and qualities Slope:0 to 3 percent Depth to restrictive feature:More than 80 inches Drainage class:Somewhat poorly drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat):Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table:About 24 to 48 inches Frequency of flooding:Occasional Frequency of ponding:None Calcium carbonate, maximum content:15 percent Gypsum, maximum content:10 percent Maximum salinity:Very slightly saline to slightly saline (2.0 to 4.0 mmhos/cm) Available water supply, 0 to 60 inches: Moderate (about 8.7 inches) Interpretive groups Land capability classification (irrigated): 2e Land capability classification (nonirrigated): 4e Hydrologic Soil Group: D Ecological site: R067BY036CO - Overflow Hydric soil rating: No Minor Components Nunn Percent of map unit:5 percent Ecological site:R067BY002CO - Loamy Plains Hydric soil rating: No Caruso Percent of map unit:3 percent Ecological site:R067BY036CO - Overflow Hydric soil rating: No Loveland Percent of map unit:2 percent Ecological site:R067BY036CO - Overflow Hydric soil rating: No Custom Soil Resource Report 19 Soil Information for All Uses Soil Properties and Qualities The Soil Properties and Qualities section includes various soil properties and qualities displayed as thematic maps with a summary table for the soil map units in the selected area of interest. A single value or rating for each map unit is generated by aggregating the interpretive ratings of individual map unit components. This aggregation process is defined for each property or quality. Soil Qualities and Features Soil qualities are behavior and performance attributes that are not directly measured, but are inferred from observations of dynamic conditions and from soil properties. Example soil qualities include natural drainage, and frost action. Soil features are attributes that are not directly part of the soil. Example soil features include slope and depth to restrictive layer. These features can greatly impact the use and management of the soil. Hydrologic Soil Group Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. 20 Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Custom Soil Resource Report 21 22 Custom Soil Resource Report Map—Hydrologic Soil Group 44 9 5 4 0 0 44 9 5 5 0 0 44 9 5 6 0 0 44 9 5 7 0 0 44 9 5 8 0 0 44 9 5 9 0 0 44 9 6 0 0 0 44 9 6 1 0 0 44 9 6 2 0 0 44 9 6 3 0 0 44 9 6 4 0 0 44 9 6 5 0 0 44 9 5 4 0 0 44 9 5 5 0 0 44 9 5 6 0 0 44 9 5 7 0 0 44 9 5 8 0 0 44 9 5 9 0 0 44 9 6 0 0 0 44 9 6 1 0 0 44 9 6 2 0 0 44 9 6 3 0 0 44 9 6 4 0 0 44 9 6 5 0 0 497600 497700 497800 497900 498000 498100 498200 498300 498400 497600 497700 497800 497900 498000 498100 498200 498300 498400 40° 37' 10'' N 10 5 ° 1 ' 4 3 ' ' W 40° 37' 10'' N 10 5 ° 1 ' 6 ' ' W 40° 36' 33'' N 10 5 ° 1 ' 4 3 ' ' W 40° 36' 33'' N 10 5 ° 1 ' 6 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 250 500 1000 1500 Feet 0 50 100 200 300 Meters Map Scale: 1:5,540 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 18, Aug 24, 2023 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 2, 2021—Aug 25, 2021 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 23 Table—Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 5 Aquepts, loamy A/D 0.5 0.5% 35 Fort Collins loam, 0 to 3 percent slopes C 33.0 33.5% 36 Fort Collins loam, 3 to 5 percent slopes C 2.3 2.4% 95 Satanta loam, 1 to 3 percent slopes C 3.0 3.0% 98 Satanta Variant clay loam, 0 to 3 percent slopes D 59.9 60.7% Totals for Area of Interest 98.7 100.0% Rating Options—Hydrologic Soil Group Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Custom Soil Resource Report 24 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 25 United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf Custom Soil Resource Report 26 Appendix E DRAINAGE PLANS Appendix F DETENTION DESIGN Project: Basin ID: Depth Increment = 1.00 ft Watershed Information 4987 Top of Micropool -- 0.00 -- -- -- 173 0.004 Selected BMP Type =EDB 4988 -- 1.00 -- -- -- 8,162 0.187 4,168 0.096 Watershed Area = 68.02 acres 4989 -- 2.00 -- -- -- 35,772 0.821 26,134 0.600 Watershed Length = 3,367 ft 4990 -- 3.00 -- -- -- 75,228 1.727 81,634 1.874 Watershed Length to Centroid = 2,366 ft 4991 -- 4.00 -- -- -- 107,043 2.457 172,770 3.966 Watershed Slope = 0.050 ft/ft 4992 -- 5.00 -- -- -- 133,704 3.069 293,143 6.730 Watershed Imperviousness = 65.60% percent 4993 -- 6.00 -- -- -- 151,585 3.480 435,788 10.004 Percentage Hydrologic Soil Group A = 0.0% percent 4994 -- 7.00 -- -- -- 160,821 3.692 591,991 13.590 Percentage Hydrologic Soil Group B = 0.0% percent 4995 -- 8.00 -- -- -- 167,206 3.839 756,005 17.355 Percentage Hydrologic Soil Groups C/D = 100.0% percent -- -- -- -- Target WQCV Drain Time = 40.0 hours -- -- -- -- Location for 1-hr Rainfall Depths = Denver - Capitol Building -- -- -- -- -- -- -- -- -- -- -- -- Optional User Overrides -- -- -- -- Water Quality Capture Volume (WQCV) = 1.454 acre-feet acre-feet -- -- -- -- Excess Urban Runoff Volume (EURV) = 4.314 acre-feet acre-feet -- -- -- -- 2-yr Runoff Volume (P1 = 0.83 in.) = 2.851 acre-feet inches -- -- -- -- 5-yr Runoff Volume (P1 = 1.09 in.) = 4.096 acre-feet inches -- -- -- -- 10-yr Runoff Volume (P1 = 1.33 in.) = 5.388 acre-feet inches -- -- -- -- 25-yr Runoff Volume (P1 = 1.69 in.) = 7.652 acre-feet inches -- -- -- -- 50-yr Runoff Volume (P1 = 1.99 in.) = 9.415 acre-feet inches -- -- -- -- 100-yr Runoff Volume (P1 = 2.31 in.) = 11.458 acre-feet inches -- -- -- -- 500-yr Runoff Volume (P1 = 3.14 in.) = 16.483 acre-feet inches -- -- -- -- Approximate 2-yr Detention Volume = 2.679 acre-feet ---- -- -- Approximate 5-yr Detention Volume = 3.966 acre-feet ---- -- -- Approximate 10-yr Detention Volume = 4.744 acre-feet -- -- -- -- Approximate 25-yr Detention Volume = 5.625 acre-feet -- -- -- -- Approximate 50-yr Detention Volume = 6.059 acre-feet -- -- -- -- Approximate 100-yr Detention Volume = 6.850 acre-feet -- -- -- -- -- -- -- -- Define Zones and Basin Geometry -- -- -- -- Select Zone 1 Storage Volume (Required) = acre-feet -- -- -- -- Select Zone 2 Storage Volume (Optional) = acre-feet -- -- -- -- Select Zone 3 Storage Volume (Optional) = acre-feet -- -- -- -- Total Detention Basin Volume = acre-feet -- -- -- -- Initial Surcharge Volume (ISV) = user ft 3 -- -- -- -- Initial Surcharge Depth (ISD) = user ft -- -- -- -- Total Available Detention Depth (Htotal) = user ft -- -- -- -- Depth of Trickle Channel (HTC) = user ft -- -- -- -- Slope of Trickle Channel (STC) = user ft/ft -- -- -- -- Slopes of Main Basin Sides (Smain) = user H:V -- -- -- -- Basin Length-to-Width Ratio (RL/W) = user -- -- -- -- -- -- -- -- Initial Surcharge Area (AISV) =user ft 2 -- -- -- -- Surcharge Volume Length (LISV) =user ft -- -- -- -- Surcharge Volume Width (WISV) =user ft -- -- -- -- Depth of Basin Floor (HFLOOR) =user ft -- -- -- -- Length of Basin Floor (LFLOOR) =user ft -- -- -- -- Width of Basin Floor (WFLOOR) =user ft -- -- -- -- Area of Basin Floor (AFLOOR) =user ft 2 -- -- -- -- Volume of Basin Floor (VFLOOR) =user ft 3 -- -- -- -- Depth of Main Basin (HMAIN) =user ft -- -- -- -- Length of Main Basin (LMAIN) =user ft -- -- -- -- Width of Main Basin (WMAIN) =user ft -- -- -- -- Area of Main Basin (AMAIN) =user ft 2 -- -- -- -- Volume of Main Basin (VMAIN) =user ft 3 -- -- -- -- Calculated Total Basin Volume (Vtotal) =user acre-feet -- -- -- -- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft 2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft 2) Width (ft) Montava Phase D Pond 427 MHFD-Detention, Version 4.06 (July 2022) Volume (ft 3) Volume (ac-ft) Area (acre) After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. ExampleZone Configuration (Retention Pond) Pond 427.xlsm, Basin 4/30/2024, 12:12 PM 1 User Defined Stage-Area Booleans for Message 1 Equal Stage-Area Inputs Watershed L:W 1 CountA Watershed Lc:L Watershed Slope 0 Calc_S_TC Booleans for CUHP 1 CUHP Inputs Complete H_FLOOR 1 CUHP Results Calculated L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor #N/A #N/A #N/A Zone 1 #N/A #N/A 0.00 Zone 2 #N/A #N/A 0.00 Zone 3 #N/A #N/A DETENTION BASIN STAGE-STORAGE TABLE BUILDER MHFD-Detention, Version 4.06 (July 2022) 0.000 4.340 8.680 13.020 17.360 0.000 0.960 1.920 2.880 3.840 0.00 2.00 4.00 6.00 8.00 Vo l u m e ( a c - f t ) Ar e a ( a c r e s ) Stage (ft.) Area (acres)Volume (ac-ft) 0 41900 83800 125700 167600 0 5 10 15 20 0.00 2.00 4.00 6.00 8.00 Ar e a ( s q . f t . ) Le n g t h , W i d t h ( f t . ) Stage (ft) Length (ft)Width (ft)Area (sq.ft.) Pond 427.xlsm, Basin 4/30/2024, 12:12 PM Project: Basin ID: Depth Increment = 1.00 ft Watershed Information 4999.75 Top of Micropool -- 0.00 -- -- -- 172,456 3.959 Selected BMP Type =EDB 5000 -- 0.25 -- -- -- 173,026 3.972 43,185 0.991 Watershed Area = acres 5001 -- 1.25 -- -- -- 180,032 4.133 219,714 5.044 Watershed Length = ft 5002 -- 2.25 -- -- -- 187,141 4.296 403,301 9.259 Watershed Length to Centroid = ft -- -- -- -- Watershed Slope = ft/ft -- -- -- -- Watershed Imperviousness = percent -- -- -- -- Percentage Hydrologic Soil Group A = percent -- -- -- -- Percentage Hydrologic Soil Group B = percent -- -- -- -- Percentage Hydrologic Soil Groups C/D = percent -- -- -- -- Target WQCV Drain Time = hours Drain Time Too Short -- -- -- -- Location for 1-hr Rainfall Depths = Denver - Capitol Building -- -- -- -- -- -- -- -- -- -- -- -- Optional User Overrides -- -- -- -- Water Quality Capture Volume (WQCV) = acre-feet acre-feet -- -- -- -- Excess Urban Runoff Volume (EURV) = acre-feet acre-feet -- -- -- -- 2-yr Runoff Volume (P1 = 0.83 in.) = acre-feet inches -- -- -- -- 5-yr Runoff Volume (P1 = 1.09 in.) = acre-feet inches -- -- -- -- 10-yr Runoff Volume (P1 = 1.33 in.) = acre-feet inches -- -- -- -- 25-yr Runoff Volume (P1 = 1.69 in.) = acre-feet inches -- -- -- -- 50-yr Runoff Volume (P1 = 1.99 in.) = acre-feet inches -- -- -- -- 100-yr Runoff Volume (P1 = 2.31 in.) = acre-feet inches -- -- -- -- 500-yr Runoff Volume (P1 = 3.14 in.) = acre-feet inches -- -- -- -- Approximate 2-yr Detention Volume = acre-feet -- -- -- -- Approximate 5-yr Detention Volume = acre-feet -- -- -- -- Approximate 10-yr Detention Volume = acre-feet -- -- ---- Approximate 25-yr Detention Volume = acre-feet -- -- ---- Approximate 50-yr Detention Volume = acre-feet -- -- ---- Approximate 100-yr Detention Volume = acre-feet -- -- -- -- -- -- -- -- Define Zones and Basin Geometry -- -- -- -- Select Zone 1 Storage Volume (Required) = acre-feet -- -- -- -- Select Zone 2 Storage Volume (Optional) = acre-feet -- -- -- -- Select Zone 3 Storage Volume (Optional) = acre-feet -- -- -- -- Total Detention Basin Volume = acre-feet -- -- -- -- Initial Surcharge Volume (ISV) = user ft 3 -- -- -- -- Initial Surcharge Depth (ISD) = user ft -- -- -- -- Total Available Detention Depth (Htotal) = user ft -- -- -- -- Depth of Trickle Channel (HTC) = user ft -- -- -- -- Slope of Trickle Channel (STC) = user ft/ft -- -- -- -- Slopes of Main Basin Sides (Smain) = user H:V -- -- -- -- Basin Length-to-Width Ratio (RL/W) = user -- -- -- -- -- -- -- -- Initial Surcharge Area (AISV) =ft 2 -- -- -- -- Surcharge Volume Length (LISV) =ft -- -- -- -- Surcharge Volume Width (WISV) =ft -- -- -- -- Depth of Basin Floor (HFLOOR) =ft -- -- -- -- Length of Basin Floor (LFLOOR) =ft -- -- -- -- Width of Basin Floor (WFLOOR) =ft -- -- -- -- Area of Basin Floor (AFLOOR) =ft 2 -- -- -- -- Volume of Basin Floor (VFLOOR) =ft 3 -- -- -- -- Depth of Main Basin (HMAIN) =ft -- -- -- -- Length of Main Basin (LMAIN) =ft -- -- -- -- Width of Main Basin (WMAIN) =ft -- -- -- -- Area of Main Basin (AMAIN) =ft 2 -- -- -- -- Volume of Main Basin (VMAIN) =ft 3 -- -- -- -- Calculated Total Basin Volume (Vtotal) =acre-feet -- -- -- -- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. Volume (ft 3) Volume (ac-ft) Area (acre) DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft 2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft 2) Width (ft) Montava Phase D Pond 427 MHFD-Detention, Version 4.06 (July 2022) ExampleZone Configuration (Retention Pond) Pond D.xlsm, Basin 4/30/2024, 12:16 PM 1 User Defined Stage-Area Booleans for Message 1 Equal Stage-Area Inputs Watershed L:W 0 CountA Watershed Lc:L Watershed Slope 0 Calc_S_TC Booleans for CUHP 0 CUHP Inputs Complete H_FLOOR CUHP Results Calculated L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor #N/A #N/A #N/A Zone 1 #N/A #N/A 0.00 Zone 2 #N/A #N/A 0.00 Zone 3 #N/A #N/A DETENTION BASIN STAGE-STORAGE TABLE BUILDER MHFD-Detention, Version 4.06 (July 2022) 0.000 2.315 4.630 6.945 9.260 0.000 1.075 2.150 3.225 4.300 0.00 1.00 2.00 3.00 4.00 Vo l u m e ( a c - f t ) Ar e a ( a c r e s ) Stage (ft.) Area (acres)Volume (ac-ft) 0 46800 93600 140400 187200 0 5 10 15 20 0.00 1.00 2.00 3.00 4.00 Ar e a ( s q . f t . ) Le n g t h , W i d t h ( f t . ) Stage (ft) Length (ft)Width (ft)Area (sq.ft.) Pond D.xlsm, Basin 4/30/2024, 12:16 PM Project: Basin ID: Depth Increment = 1.00 ft Watershed Information 4995 Top of Micropool -- 0.00 -- -- -- 0 0.000 Selected BMP Type =EDB 4996 -- 1.00 -- -- -- 9,338 0.214 4,668 0.107 Watershed Area = 20.66 acres 4997 -- 2.00 -- -- -- 22,249 0.511 20,462 0.470 Watershed Length = 1,695 ft 4998 -- 3.00 -- -- -- 40,852 0.938 52,012 1.194 Watershed Length to Centroid = 976 ft 4999 -- 4.00 -- -- -- 56,939 1.307 100,908 2.317 Watershed Slope = 0.020 ft/ft 5000 -- 5.00 -- -- -- 69,899 1.605 164,327 3.772 Watershed Imperviousness = 51.60% percent -- -- -- -- Percentage Hydrologic Soil Group A = 0.0% percent -- ---- -- Percentage Hydrologic Soil Group B = 0.0% percent -- ---- -- Percentage Hydrologic Soil Groups C/D = 100.0% percent -- -- -- -- Target WQCV Drain Time = 40.0 hours -- -- -- -- Location for 1-hr Rainfall Depths = Denver - Capitol Building -- -- -- -- -- -- -- -- -- -- -- -- Optional User Overrides -- -- -- -- Water Quality Capture Volume (WQCV) = 0.363 acre-feet acre-feet -- -- -- -- Excess Urban Runoff Volume (EURV) = 1.011 acre-feet acre-feet -- -- -- -- 2-yr Runoff Volume (P1 = 0.83 in.) = 0.664 acre-feet inches -- -- -- -- 5-yr Runoff Volume (P1 = 1.09 in.) = 0.991 acre-feet inches -- -- -- -- 10-yr Runoff Volume (P1 = 1.33 in.) = 1.359 acre-feet inches -- -- -- -- 25-yr Runoff Volume (P1 = 1.69 in.) = 2.054 acre-feet inches -- -- -- -- 50-yr Runoff Volume (P1 = 1.99 in.) = 2.579 acre-feet inches -- -- -- -- 100-yr Runoff Volume (P1 = 2.31 in.) = 3.209 acre-feet inches -- -- -- -- 500-yr Runoff Volume (P1 = 3.14 in.) = 4.719 acre-feet inches -- -- -- -- Approximate 2-yr Detention Volume = 0.620 acre-feet ---- -- -- Approximate 5-yr Detention Volume = 0.962 acre-feet ---- -- -- Approximate 10-yr Detention Volume = 1.147 acre-feet -- -- -- -- Approximate 25-yr Detention Volume = 1.377 acre-feet -- -- -- -- Approximate 50-yr Detention Volume = 1.492 acre-feet -- -- -- -- Approximate 100-yr Detention Volume = 1.751 acre-feet -- -- -- -- -- -- -- -- Define Zones and Basin Geometry -- -- -- -- Select Zone 1 Storage Volume (Required) = acre-feet -- -- -- -- Select Zone 2 Storage Volume (Optional) = acre-feet -- -- -- -- Select Zone 3 Storage Volume (Optional) = acre-feet -- -- -- -- Total Detention Basin Volume = acre-feet -- -- -- -- Initial Surcharge Volume (ISV) = user ft 3 -- -- -- -- Initial Surcharge Depth (ISD) = user ft -- -- -- -- Total Available Detention Depth (Htotal) = user ft -- -- -- -- Depth of Trickle Channel (HTC) = user ft -- -- -- -- Slope of Trickle Channel (STC) = user ft/ft -- -- -- -- Slopes of Main Basin Sides (Smain) = user H:V -- -- -- -- Basin Length-to-Width Ratio (RL/W) = user -- -- -- -- -- -- -- -- Initial Surcharge Area (AISV) =user ft 2 -- -- -- -- Surcharge Volume Length (LISV) =user ft -- -- -- -- Surcharge Volume Width (WISV) =user ft -- -- -- -- Depth of Basin Floor (HFLOOR) =user ft -- -- -- -- Length of Basin Floor (LFLOOR) =user ft -- -- -- -- Width of Basin Floor (WFLOOR) =user ft -- -- -- -- Area of Basin Floor (AFLOOR) =user ft 2 -- -- -- -- Volume of Basin Floor (VFLOOR) =user ft 3 -- -- -- -- Depth of Main Basin (HMAIN) =user ft -- -- -- -- Length of Main Basin (LMAIN) =user ft -- -- -- -- Width of Main Basin (WMAIN) =user ft -- -- -- -- Area of Main Basin (AMAIN) =user ft 2 -- -- -- -- Volume of Main Basin (VMAIN) =user ft 3 -- -- -- -- Calculated Total Basin Volume (Vtotal) =user acre-feet -- -- -- -- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft 2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft 2) Width (ft) Montava Phase D INTERIM POND MHFD-Detention, Version 4.06 (July 2022) Volume (ft 3) Volume (ac-ft) Area (acre) After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. ExampleZone Configuration (Retention Pond) SWALE POND.xlsm, Basin 4/30/2024, 12:15 PM 1 User Defined Stage-Area Booleans for Message 1 Equal Stage-Area Inputs Watershed L:W 1 CountA Watershed Lc:L Watershed Slope 0 Calc_S_TC Booleans for CUHP 1 CUHP Inputs Complete H_FLOOR 1 CUHP Results Calculated L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor #N/A #N/A #N/A Zone 1 #N/A #N/A 0.00 Zone 2 #N/A #N/A 0.00 Zone 3 #N/A #N/A DETENTION BASIN STAGE-STORAGE TABLE BUILDER MHFD-Detention, Version 4.06 (July 2022) 0.000 0.945 1.890 2.835 3.780 0.000 0.405 0.810 1.215 1.620 0.00 1.50 3.00 4.50 6.00 Vo l u m e ( a c - f t ) Ar e a ( a c r e s ) Stage (ft.) Area (acres)Volume (ac-ft) 0 17500 35000 52500 70000 0 5 10 15 20 0.00 1.50 3.00 4.50 6.00 Ar e a ( s q . f t . ) Le n g t h , W i d t h ( f t . ) Stage (ft) Length (ft)Width (ft)Area (sq.ft.) SWALE POND.xlsm, Basin 4/30/2024, 12:15 PM