Loading...
HomeMy WebLinkAboutVILLAS ON MAIN - FDP240006 - SUBMITTAL DOCUMENTS - ROUND 1 - Drainage Related DocumentPreliminary Drainage & Sediment / Erosion Control Report Single Family Residential Project Fort Collins, Colorado VILLAS ON MAIN Prepared for: Robert Long PO BOX 1936 Fort Collins, CO 80522 970-227-1633 Rlong@pro-value.net Prepared By: Fetzer Engineering, LLC Attention: Shawn Fetzer, P.E. 308 Jewel Ct Fort Collins, CO 80525 970.702.4884 Sfetzerfetzerengineering.com Prepared: January 21, 2024 Revised: Revised: Project no.: ALTAVISTA Simplified Drainage report January 21, 2024 Table of Contents: 1. Cover Letter and Certification 2. General Location and Existing Site Information a. Location b. Description of Property 3. Master Drainage Basin Description 4. Floodplain Information 5. Project Description 6. Proposed Drainage Facilities a. Major Basin Description b. Sub-basin Description 7. Drainage Design Criteria a. Regulations b. Development Criteria Reference and Constraints c. Hydrological Criteria d. Street Capacity e. Hydraulic Criteria 8. Variance Requests 9. Erosion Control 10. Conclusion 11. Appendices Appendix A – Location Map Appendix B – Soils Report Appendix C – Hydrologic & Hydraulic Calculation Appendix D – Northfield Final Drainage Report Appendix E – FEMA Floodplain Map Appendix F – Drainage Plan Appendix G – Sediment & Erosion Control Plan January 21, 2024 Fort Collins Utilities 700 Wood Street Fort Collins, CO 80522 RE: Final Drainage Report for Alta Vista Residential Development Dear Bob, I am pleased to submit for your review, the Final Drainage Report for the Villas on Main subdivision (parcel 9701400032). This report describes the drainage design intent to be in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Shawn Fetzer, P.E. Engineering Services Certifications The report for the drainage design of Single Family Residencial Lots at Parcel 9701400032 was prepared by me (or under my supervision) for the owners thereof and meet or exceed the criteria in the Fort Collins Stormwater Design Standards. . Signature:_____________________ Shawn Fetzer Registered Professional Engineer State Of Colorado No. 49791 1. General Location and Description a. Location Parcel No. 9701400032 is located in the Southeast Quarter of Section 1, Township 7 North, Range 67 West of the Sixth Principal Meridian, City of Fort Collins, County of Larimer, within the State of Colorado. More specifically, is located north and east of the Alta Vista Subdivision, west of N. Lemay Avenue, and southeast of the Lake Canal irrigation ditch. A vicinity map is included in Appendix A. b. Description of Property The project site is approximately 0.65 acres and is currently undeveloped grassland. The site appears to be vegetated with grasses overgrowing on the site. The site generally slopes from the west to the east at about 0 - 0.5% slope. There are no existing surface improvements currently on the property. This site consists of Loveland clay loam and Nunn clay loam and are classified as Type C hydrologic group. More details are provided in Appendix B. 2. Master Plan Drainage Basin a. This site is located within the City’s Dry Creek Drainage Basin. In addition to the City of Fort Collins Stormwater Design Standards, drainage requirements are also described in the “North East College Corridor Outfall (NECCO) Design Report”, prepared by Ayres Associates, dated August 2009. The improvements associated with Northfield are located within basin 114 as delineated in the above report. This report has been referred to in the Northfield Drainage Report and has been included in Appendix D. 3. Floodplain Information a. The site is within “Flood Insurance Rate Map (FIRM) – Panel No. 08069C0977G” by the Federal Emergency Management Agency, dated June 17, 2008. The FIRM shows that all the site is outside the 100yr floodplain but inside the 500 yr floodplain. This floodplain information is included in Appendix E. 4. Project Description a. Project includes subdividing this lot into 4 separate lots. A single-family residential structure is planned for each lot. The site will be raised so that flows from the lots can be conveyed to the north to Northfield Pond D and to the south to an existing inlet in Main St which also flows via concrete pipe north to the Northfield Pond D. See the Drainage Plan in Appendix F for more information. 5. Proposed Drainage Facilities a. Drainage Basin Description This site is located within the Dry Creek Drainage basin. Sub-basin Description – Historically, the entire site basin drains to the east towards Lindenmeier Rd with existing shallow slopes of less than 0.5%. i. Basin E1 – Entire Site (Area = 0.61 AC) - The existing site is currently vacant with native grasses and plants covering most of the site. Existing slopes are 0-1% with no clear outfall. In larger storm events the site will outfall to the east and south to Main St. Existing basin 2-yr C-coefficient is 0.04 and generates 0.04 cfs of stormwater. Existing basin 100yr C-coefficient is 0.19 and produces 0.64 cfs of stormwater. A more detailed breakdown of the runoff flows and calculations is available in Appendix C b. Offsite Flows: There are no offsite flow enter the site 6. Drainage Design Criteria This final report was prepared to meet or exceed the City of Fort Collins storm water criteria. The City of Fort Collin’s Storm Drainage Design Criteria and amendments to the Urban Drainage Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. a. Hydrologic Criteria The rational method was performed to calculate the peak runoff rates for each basin. Percent imperviousness and runoff coefficients were calculated for each basin using the surface characteristics of each basin. The time of concentration was calculated using City of Fort Collins initial time of concentration and the intensity was calculated using the corresponding storm rainfall depth and the City of Fort Collins’ Intensity-Duration-Frequency Curve. b. Hydraulic Criteria This residential site storm drainage system has been designed to convey the minor and major storm events through the combination of streets, inlets, storm sewer pipes, and pans. Per the requirements provided by the City of Fort Collins Storm Drainage Design Criteria, all inlets and storm pipes have been designed such that, during the minor initial storm event, the 2-yr storm, the flows for the Local Street do not top the curb and may only rise to the street crown elevation, and for an Arterial (with Median) do not top the curb and the flow spread will leave at least one 12 ft lane width free of water in each direction. During the major storm event, the 100-yr storm, the water depth for the Local Street is held to a maximum depth of 6” at the street crown, 12” at the gutter flow line, and/or flow must be contained within right-of-way or easements paralleling the right-of-way. The Arterial (with Median) is held to a maximum depth that will not exceed the median gutter elevation, 12” at the gutter flowline, and/or flow must be contained within right-of-way or easements paralleling the right-of-way. 7. Drainage Facility Design a. General Concept – As mentioned, the proposed site work includes subdividing this single lot into 4 separate lots with one residential structure on each site. In addition to the residential structure, each lot will have a concrete drive. Main St will be reconstructed and upgraded to include curb, gutter and sidewalk with an inverted crown and a pan in the middle of the road flowing to an existing inlet. The site on which each proposed structure sits will be raised to above the elevation of the sidewalk and the adjacent detention pond. The site will then drain either towards Main St or towards the Northfield Pond D. general site grading does not significantly change with these proposed improvements and drainage patterns remain the unchanged. b. Sub-basin Description - i. Basin P1 – Northern Area of the site (Area = 0.48 AC) - This proposed basin includes the northern portion of the proposed lots. The site is raised at a level that aids in routing storm flows towards Northfield Pond D. Swales are proposed between the lots to help route flows from the high point and then to the north. Proposed basin 2-yr C-coefficient is 0.38 and generates 0.53 cfs of stormwater. Existing basin 100yr C-coefficient is 0.50 and produces 2.39 cfs of stormwater. ii. Basin P2 – Southern Area of the site (Area = 0.13 AC) - This proposed basin includes the southern portion of the proposed lots. The site is raised at a level that aids in routing storm flows towards Main Street. Swales are proposed between the lots to help route flows from the high point and then to the south. Proposed basin 2-yr C-coefficient is 0.07 and generates 0.03 cfs of stormwater. Existing basin 100yr C-coefficient is 0.10 and produces 0.13 cfs of stormwater. iii. Site Detention - With an authorized release rate equal to the existing site 100 yr flow rate and with the increased imperviousness of the proposed site the require detention is 3571 cf. Pond D of the Northfield subdivision has 1.46’ of additional volume available according to the final drainage report for Northfield. With the given area of the pond, the additional height of detained stormflows from this proposed development equals ¾”. By subtracting this from the overall additional volume the pond, there will be 1.40’ of additional volume still available in the Northfield Pond D. 8. Stormwater Quality and Sediment/Erosion Control a. Stormwater Quality – Larimer County is an operator of a Phase II Regulated Small Municipal Separate Storm Sewer System (MS4), Larimer County is required by the State of Colorado to be certified to discharge stormwater under the general permit (COR090000). As part of the certification, control measures need to be implemented within the County's MS4 permit coverage area. Since this site mainly flows to the detention area to the north, the required water quality volume will be met. In addition, Impervious areas will be disconnected as much as possible to help facilitate infiltration prior to entering the pond. b. Sediment/Erosion – Several erosion control methods will be utilized during and after construction. Initial setup will require the installation of silt fence along the perimeter of the site, and the placement of vehicle tracking pad at construction entrance. After completion of over lot grading, temporary seeding will be placed on the ground in areas that will be exposed for over 30 days. See Sedimentation and Erosion Control Plans in Appendix G of this report as well as the construction plans for more information. c. Inspection Schedule: An assigned Erosion Control Inspector shall inspect with the Superintendent and the Engineer (or their designated representatives) the stormwater management system at least every seven calendar days. Post-storm event inspections shall be conducted within 24 hours after the end of any precipitation or snow melt event that may cause surface erosion. If no construction activities will occur following a storm event, post-storm event inspections shall be conducted prior to commencing construction activities, but no later than 72 hours following the storm event. 9. Drainage Conclusions - The drainage design for project site is in general compliance with the Fort Collins Stormwater Design Standards as well as the Urban Drainage and Flood Control District Criteria Manual. Appendix A Location Map Location Map 1000 ft N ➤➤ N Appendix B Soils Report United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Larimer County Area, Colorado Alta Vista Residential Natural Resources Conservation Service October 9, 2023 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface....................................................................................................................2 Soil Map..................................................................................................................5 Soil Map................................................................................................................6 Legend..................................................................................................................7 Map Unit Legend..................................................................................................8 Map Unit Descriptions..........................................................................................8 Larimer County Area, Colorado......................................................................10 76—Nunn clay loam, wet, 1 to 3 percent slopes.........................................10 References............................................................................................................12 4 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 5 6 Custom Soil Resource Report Soil Map 44 9 4 1 1 0 44 9 4 1 2 0 44 9 4 1 3 0 44 9 4 1 4 0 44 9 4 1 5 0 44 9 4 1 6 0 44 9 4 1 7 0 44 9 4 1 8 0 44 9 4 1 1 0 44 9 4 1 2 0 44 9 4 1 3 0 44 9 4 1 4 0 44 9 4 1 5 0 44 9 4 1 6 0 44 9 4 1 7 0 44 9 4 1 8 0 495020 495030 495040 495050 495060 495070 495080 495090 495100 495110 495120 495020 495030 495040 495050 495060 495070 495080 495090 495100 495110 495120 40° 35' 54'' N 10 5 ° 3 ' 3 2 ' ' W 40° 35' 54'' N 10 5 ° 3 ' 2 7 ' ' W 40° 35' 51'' N 10 5 ° 3 ' 3 2 ' ' W 40° 35' 51'' N 10 5 ° 3 ' 2 7 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 20 40 80 120Feet 0 5 10 20 30Meters Map Scale: 1:508 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 18, Aug 24, 2023 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 2, 2021—Aug 25, 2021 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 7 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 76 Nunn clay loam, wet, 1 to 3 percent slopes 0.8 100.0% Totals for Area of Interest 0.8 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. Custom Soil Resource Report 8 An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Custom Soil Resource Report 9 Larimer County Area, Colorado 76—Nunn clay loam, wet, 1 to 3 percent slopes Map Unit Setting National map unit symbol: jpxq Elevation: 4,800 to 5,600 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Prime farmland if irrigated Map Unit Composition Nunn, wet, and similar soils:90 percent Minor components:10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Nunn, Wet Setting Landform:Alluvial fans, stream terraces Landform position (three-dimensional):Base slope, tread Down-slope shape:Linear Across-slope shape:Linear Parent material:Alluvium Typical profile H1 - 0 to 10 inches: clay loam H2 - 10 to 47 inches: clay H3 - 47 to 60 inches: gravelly loam Properties and qualities Slope:1 to 3 percent Depth to restrictive feature:More than 80 inches Drainage class:Somewhat poorly drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat):Moderately low to moderately high (0.06 to 0.60 in/hr) Depth to water table:About 24 to 36 inches Frequency of flooding:RareNone Frequency of ponding:None Calcium carbonate, maximum content:10 percent Maximum salinity:Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water supply, 0 to 60 inches: High (about 9.9 inches) Interpretive groups Land capability classification (irrigated): 2w Land capability classification (nonirrigated): 3s Hydrologic Soil Group: C Ecological site: R067BY038CO - Wet Meadow Hydric soil rating: No Minor Components Heldt Percent of map unit:6 percent Custom Soil Resource Report 10 Ecological site:R067BY042CO - Clayey Plains Hydric soil rating: No Dacono Percent of map unit:3 percent Ecological site:R067BY042CO - Clayey Plains Hydric soil rating: No Mollic halaquepts Percent of map unit:1 percent Landform:Swales Hydric soil rating: Yes Custom Soil Resource Report 11 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 12 United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf Custom Soil Resource Report 13 Appendix C Hydrologic & Hydraulic Calculations Basin -Existing (E1) Area of Analyzed Lot (acre) =0.61 Soil Type (A,B,C/D)Area (SF) Area (AC) % of Site Lot Equivalent % Imperviousness C2 Weighted C2 C100 Weighted C100 Weighted % Impervious A 0 0.00 0.00%0.00 0.9 0.73 0.00 0.81 0.00 0.00% A 0 0.00 0.00%0.00 1 0.84 0.00 0.89 0.00 0.00% A 0 0.00 0.00%0.00 0.4 0.25 0.00 0.42 0.00 0.00% A 26650 0.61 100.00%0.61 0.1 0.04 0.04 0.19 0.19 10.00% 26650 0.61 100.00%0.61 0.04 0.19 10.00% Basin - Proposed (P1) Area of Analyzed Lot (acre) =0.48 Soil Type (A,B,C/D)Area (SF) Area (AC) % of Site Lot Equivalent % Imperviousness C2 Weighted C2 C100 Weighted C100 Weighted % Impervious A 10400 0.24 49.35%0.24 0.9 0.73 0.36 0.81 0.40 44.41% A 0 0.00 0.00%0.00 1 0.84 0.00 0.89 0.00 0.00% A 0 0.00 0.00%0.00 0.4 0.25 0.00 0.42 0.00 0.00% A 10675 0.25 50.65%0.25 0.1 0.04 0.02 0.19 0.10 5.07% 21075 0.48 100.00%0.48 0.38 0.50 49.48% Basin - Proposed (P2) Area of Analyzed Lot (acre) =0.13 Soil Type (A,B,C/D)Area (SF) Area (AC) % of Site Lot Equivalent % Imperviousness C2 Weighted C2 C100 Weighted C100 Weighted % Impervious A 0 0.00 0.00%0.00 0.9 0.73 0.00 0.81 0.00 0.00% A 1580 0.04 7.50%0.04 1 0.84 0.06 0.89 0.07 7.50% A 0 0.00 0.00%0.00 0.4 0.25 0.00 0.42 0.00 0.00% A 3995 0.09 18.96%0.09 0.1 0.04 0.01 0.19 0.04 1.90% 5575 0.13 26.45%0.13 0.07 0.10 9.39% Total Area Analyzed (acre) =0.61 Area (SF) Area (AC) % of Site Lot Equivalent % Imperviousness C2 Weighted C2 C100 Weighted C100 Weighted % Impervious 21075 0.48 79.08%0.48 49.48%0.38 0.30 0.69 0.54 39.13% 5575 0.13 20.92%0.13 9.39%0.06 0.01 0.52 0.11 1.96% Total =26650 0.61 100.00%0.61 0.31 0.65 41.09% Total = Basin P1 Basin P2 Buildings Asphalt/Concrete Gravel Open Area Impervious Area / C-coefficient - Existing Basin Buildings Asphalt/Concrete Gravel Gravel Open Area Total = Open Area Total = Impervious Area / C-coefficient - Proposed Basin Buildings Asphalt/Concrete Basin No Basin No Basin No Basin No Avg I 10.00%Avg I 49.48%Avg I 9.39%Avg I #REF! C5 0.05 Table 6-4 C5 0.35 Table 6-4 C5 0.04 Table 6-4 C5 --- Table 6-4 Li 200 ft Li 36 ft Li 51 ft Li --- ft So 0.02 ft/ft So 0.25 ft/ft So 0.03 ft/ft So --- ft/ft Ti 21.42 min Ti 2.81 min Ti 9.49 min Ti --- min Lt 80 ft Lt 47 ft Lt 255 ft Lt --- ft So 0.05 ft/ft So 0.05 ft/ft So 0.02 ft/ft So --- ft/ft Vt 2.24 ft/sec Vt 2.24 ft/sec Vt 1.41421356 ft/sec Vt --- ft/sec K 10 Table 6-2 K 10 Table 6-2 K 10 Table 6-2 K ---Table 6-2 Tt 0.60 min Tt 0.35 min Tt 3.01 min Tt --- min Tc 22.02 mins Tc 3.16 mins Tc 12.50 mins Tc ---mins i 10.00%i 49.48%i 9.39%i --- St 0.005 St 0.005 St 3 St --- Lt 350 Lt 350 Lt 306 Lt --- Tc 32.23 Tc 22.77 Tc 24.69 Tc --- Time of Concentration E1 P1 P2 --- Existing Site Proposed Site Initial or Overland Flow Time Initial or Overland Flow Time Initial or Overland Flow Time Initial or Overland Flow Time Channelized Flow Time Channelized Flow Time Channelized Flow Time Channelized Flow Time Time of Concentration Time of Concentration Time of Concentration Time of Concentration Urban Catchment Check Urban Catchment Check Urban Catchment Check Urban Catchment Check Q = CIA (2 yr) =0.04 cfs Q = CIA (2 yr) =0.53 cfs Q = CIA (100 yr) =0.64 cfs Q = CIA (100 yr) =2.39 cfs C2 =0.04 C2 =0.38 C100 =0.19 C100 =0.50 I2 = 1.53 in/hr I2 = 2.85 in/hr I100 =5.60 I100 =9.95 A=0.61 Acres A=0.48 Acres Time of Concentration (storm duration)=22.02 mins Time of Concentration (storm duration)=3.16 mins I2=1.53 in/hr I2=2.85 in/hr I100=5.60 in/hr I100=9.95 in/hr Q = CIA (2 yr) =cfs Q = CIA (2 yr) =0.03 cfs Q = CIA (100 yr) =cfs Q = CIA (100 yr) =0.13 cfs C2 =C2 =0.07 C100 =C100 =0.10 I2 =in/hr I2 =2.85 in/hr I100 =I100 =9.95 A=Acres A=0.13 Acres Time of Concentration (storm duration)=mins Time of Concentration (storm duration)=12.50 mins I2=in/hr I2=2.85 in/hr I100=in/hr I100=9.95 in/hr Proposed Basin P2Existing Basin Intensity obtained from Tabel 3.4-1 of the Fort Collins Stormwater Criteria Manual Rational Method Calculations Existing Basin E1 Proposed Basin P1 For Spread n=0.04 Table 8-5 Bottom Width = 0 ft Depth = 0.22 ft - Varable based on Q Side Slope (Lt) = 0.1 ft/ft Side Length = 2.21 ft Side Slope (Rt) = 0.1 ft/ft Side Length = 2.21 ft Top Width = 4.40 ft A 0.49 ft/ft P 4.42 ft/ft R 0.11 S=0.0221 ft/ft Q=0.62 cfs V=0.79 fps Fr=0.295536 Basin P2 Trapazoidal Channel (Between Buildings) Analysis a =1 I =41.09%decimal percent A =0.61 acres WQCV = 0.183 watershed-inches V = 0.009288 Acre-Feet 404.60 CF Site Water Quality Analysis Cexisting**I* A (ac) Q (cfs) V (cf) Cproposed**I* A (ac) Q (cfc) V (cf) 5 0.19 7.24 0.61 0.830 249.085 0.65 7.24 0.61 2.871 861.198 10 0.19 5.51 0.61 0.632 379.132 0.65 5.51 0.61 2.185 1310.829 15 0.19 4.55 0.61 0.522 469.615 0.65 4.55 0.61 1.804 1623.668 20 0.19 5.60 0.61 0.642 770.650 0.65 5.60 0.61 2.220 2664.480 25 0.19 4.98 0.61 0.571 856.660 0.65 4.98 0.61 1.975 2961.855 30 0.19 3.06 0.61 0.351 631.657 0.65 3.06 0.61 1.213 2183.922 35 0.19 4.08 0.61 0.468 982.578 0.65 4.08 0.61 1.618 3397.212 40 0.19 3.74 0.61 0.429 1029.368 0.65 3.74 0.61 1.483 3558.984 45 0.19 3.46 0.61 0.397 1071.341 0.65 3.46 0.61 1.372 3704.103 50 0.19 3.23 0.61 0.370 1111.249 0.65 3.23 0.61 1.281 3842.085 55 0.19 3.03 0.61 0.347 1146.685 0.65 3.03 0.61 1.201 3964.604 60 0.19 2.86 0.61 0.328 1180.745 0.65 2.86 0.61 1.134 4082.364 65 0.19 2.71 0.61 0.311 1212.053 0.65 2.71 0.61 1.075 4190.609 70 0.19 2.59 0.61 0.297 1247.489 0.65 2.59 0.61 1.027 4313.127 75 0.19 2.48 0.61 0.284 1279.829 0.65 2.48 0.61 0.983 4424.940 80 0.19 2.38 0.61 0.273 1310.104 0.65 2.38 0.61 0.944 4529.616 85 0.19 2.29 0.61 0.263 1339.348 0.65 2.29 0.61 0.908 4630.724 90 0.19 2.21 0.61 0.253 1368.591 0.65 2.21 0.61 0.876 4731.831 95 0.19 2.13 0.61 0.244 1392.330 0.65 2.13 0.61 0.845 4813.907 100 0.19 2.06 0.61 0.236 1417.445 0.65 2.06 0.61 0.817 4900.740 105 0.19 2.00 0.61 0.229 1444.968 0.65 2.00 0.61 0.793 4995.900 110 0.19 1.94 0.61 0.222 1468.363 0.65 1.94 0.61 0.769 5076.786 115 0.19 1.88 0.61 0.216 1487.629 0.65 1.88 0.61 0.745 5143.398 120 0.19 1.84 0.61 0.211 1519.281 0.65 1.84 0.61 0.730 5252.832 Site Total 3733.551Required Storage (CF)= Modified FAA Storage Calculations (Entire Lot) Existing Proposed Time Duration 100 Year 100 Year Appendix D Northfield Final Drainage Report FINAL DRAINAGE REPORT FOR Northfield Prepared by: Highland Development Services 6355 Fairgrounds Ave, Suite 100 Windsor, Colorado 80550 Phone: 970.674.7550 Prepared for: Landmark Real Estate Holdings, LLC 6341 Fairgrounds Ave, Suite 100 Windsor, Colorado 80550 Office: 970.460.0567 February 26, 2020 Job Number 18-1000-00 6355 FAIRGROUNDS AVE, SUITE 100, WINDSOR, COLORADO 80550 | PHONE 970.674.7550 February 26, 2020 Mr. Shane Boyle Fort Collins Utilities 700 Wood Street Fort Collins, CO 80522 RE: Final Drainage Report for Northfield Dear Shane, We are pleased to submit for your review, the Final Drainage Report for the Northfield subdivision. This report describes the drainage design intent to be in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Jason T. Claeys, P.E., LEED AP Highland Development Services Page i TABLE OF CONTENTS Table of Contents ............................................................................................................................. i Engineer’s Certification Block ..........................................................................................................ii General Description and Location .................................................................................................. 1 Site Description and Location ...................................................................................................... 1 Site Soils ....................................................................................................................................... 2 Storm Drainage Criteria .................................................................................................................. 4 Hydrologic Criteria ....................................................................................................................... 4 Hydraulic Criteria ......................................................................................................................... 4 Drainage Basins ............................................................................................................................... 6 Drainage Facility Design ................................................................................................................ 13 Drainage Conveyance Design .................................................................................................... 13 Detention/Water Quality Pond Design ..................................................................................... 13 Low Impact Development ............................................................................................................. 18 Stormwater Pollution Prevention ................................................................................................. 21 Conclusions ................................................................................................................................... 22 References .................................................................................................................................... 23 Appendix ....................................................................................................................................... 24 Appendix A – Site Descriptions, Characteristics, & References .................................................. A Appendix B – SWMM Input/Output ............................................................................................ B Appendix C – Rational Calculations ............................................................................................. C Appendix D – Detention Pond Calculations ................................................................................ D Appendix E – Street Capacities & Inlet Calculations ................................................................... E Appendix F – Low Impact Development Calculations ..................................................................F Page ii ENGINEER’S CERTIFICATION BLOCK I hereby certify that this Final Drainage Report for Northfield was prepared by me (or under my direct supervision) for the owners thereof and meets or exceeds the criteria of the City of Fort Collins Stormwater Design Standards. ________________________________________ Jason T. Claeys, PE Registered Professional Engineer State of Colorado No. 42122 2/26/2020 Page 1 GENERAL DESCRIPTION AND LOCATION SITE DESCRIPTION AND LOCATION Northfield is located in the Southeast Quarter of Section 1, Township 7 North, Range 67 West of the Sixth Principal Meridian, City of Fort Collins, County of Larimer, within the State of Colorado. More specifically, Northfield is located north of the ALTA Vista Subdivision, west of N. Lemay Avenue, and southeast of the Lake Canal irrigation ditch. The project site is approximately 55.26 acres and is currently undeveloped agricultural land. The site appears to be vegetated with grasses harvested for livestock feed. The site generally slopes from the northwest to the southeast at about 0.5% slope. There are no existing surface improvements currently on the property. The property is proposed to be subdivided into multiple single-family lots and condominium tracts. Northfield will consist of 139 single family attached (fee simple) units and 301 condominium units, a mixed-use building with a combination of retail and apartments, and a community clubhouse. Northfield is located within the City’s Dry Creek Drainage Basin. In addition to the City of Fort Collins Stormwater Design Standards, drainage requirements are also described in the “North East College Corridor Outfall (NECCO) Design Report”, prepared by Ayres Associates, dated August 2009. The improvements associated with Northfield are located within basins 115, 116, 117, 414, 950, 951, 960, 961, 970, 971, 980, and 981 as delineated in the above report. A portion of the Northfield improvements are located within the FEMA regulatory, Dry Creek 100-year Floodplain as shown on FEMA FIRM map numbers 08069C0977G (revised June 17, 2008), and 08069C0981G (revised June 17, 2008). All improvements are outside of the 100-yr floodway, and a portion of the improvements are within the 100-yr floodplain. The first phase of the NECCO improvements were completed early in 2017 with the remaining improvements completed in the spring of 2018. It is anticipated that the LOMR associated with these improvements will be completed by the late spring/early summer of 2020. Once the LOMR is complete, the 100-yr floodplain is anticipated to be removed from the site. If circumstances occur that the LOMR is not complete at the time of construction for the Northfield improvements, a Floodplain Use Permit will be required. It is anticipated that the floodplain limits will be adjusted prior to the construction of the residential units. If buildings are constructed prior to the map revision, the buildings will be elevated above the Regulatory Base Floodplain Elevation and adhering to Fort Collins Municipal Code Chapter 10 requirements. A portion of the site is located within the Cache la Poudre River 500-yr floodplain. Critical facilities Page 2 are prohibited within the 100-yr and/or 500-yr floodplains. Critical facilities include facilities for at-risk populations (daycares, schools, nursing homes, etc) and emergency service facilities (urgent care, hospitals, fire stations, police stations, etc). SITE SOILS The Northfield site consists of Loveland clay loam and Nunn clay loam and are classified as Type C hydrologic group. According to USDA/Natural Resource Conservation Group, this soil has a slow infiltration rate when thoroughly wet. These soils consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Per the “Preliminary Subsurface Exploration and Groundwater Report – Schlagel Property”, prepared be Earth Engineering Consultants (EEC), dated August 16, 2017: Vegetation growth and topsoil was encountered at the surface of each boring. Underlying the topsoil/vegetation layer was a zone of cohesive subsoils classified lean to fat clay with varying amounts of sand and clayey sand to approximate depths of 2 to 5-1/2 feet. Underlying the cohesive subsoils was a granular layer of poorly to well graded sand with silt and gravel extending to the depths explored at approximately 14 to 21-1/2 feet or to underlying bedrock. It appears that below the lean to fat clay, there is a granular materials layer that would exhibit more moderate infiltration rates than the surface materials. Groundwater was also observed during the subsurface soil exploration: Groundwater and/or the presence of a piezometric water surface, was generally observed at depths ranging from approximately 3 to 7 feet below ground surface as indicated on the enclosed boring logs. EEC monitored the groundwater level depths over a 12 month period after the original borings. Due to the observed groundwater elevations and in consideration of the building foundations, the site will include a permanent dewatering system that will be installed shortly after construction activities commence. The dewatering system will consist of 8” perforated underdrain pipes down around the east, north and west perimeters of the site. These drains will outfall to the existing NECCO regional stormwater system. Miller Groundwater Engineering modeled this proposed dewatering system in their groundwater study for the site. Their analysis of the monitoring data shows that the inflow rate of groundwater to the underdrains ranges from 200 to 500 gpm during seasonally high summer water conditions. The drains will take several weeks to draw the groundwater table down to the elevation of the underdrain Page 3 pipes, but once established, the flow rate from the underdrains into the stormwater system will decrease. Supporting figures can be found in Appendix A. Page 4 STORM DRAINAGE CRITERIA This final report was prepared to meet or exceed the City of Fort Collins storm water criteria. The City of Fort Collin’s Storm Drainage Design Criteria and amendments to the Urban Drainage Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. HYDROLOGIC CRITERIA The rational method was performed to calculate the peak runoff rates for each basin. Percent imperviousness and runoff coefficients were calculated for each basin using the surface characteristics of each basin. The time of concentration was calculated using City of Fort Collins initial time of concentration and the intensity was calculated using the corresponding storm rainfall depth and the City of Fort Collins’ Intensity-Duration-Frequency Curve. HYDRAULIC CRITERIA The final Northfield storm drainage system has been designed to convey the minor and major storm events through the combination of streets, inlets, storm sewer pipes, and pans. Per the requirements provided by the City of Fort Collins Storm Drainage Design Criteria, all inlets and storm pipes have been designed such that, during the minor initial storm event, the 2-yr storm, the flows for the Local Street do not top the curb and may only rise to the street crown elevation, and for an Arterial (with Median) do not top the curb and the flow spread will leave at least one 12 ft lane width free of water in each direction. During the major storm event, the 100-yr storm, the water depth for the Local Street is held to a maximum depth of 6” at the street crown, 12” at the gutter flow line, and/or flow must be contained within right-of-way or easements paralleling the right-of-way. The Arterial (with Median) is held to a maximum depth that will not exceed the median gutter elevation, 12” at the gutter flowline, and/or flow must be contained within right-of-way or easements paralleling the right-of-way. The peak basin runoff flows from the rational calculations were then used to determine the street capacities, and on-grade inlet locations. The on-grade and sump inlet capacities have been calculated using UDFCD’s spreadsheet UD-Inlet_v4.05.xlsm. The inlet capacities have been analyzed and the necessary adjustments applied to the street runoff flows based on the amount of runoff collected by on-grade inlets. The sump inlets have been sized using the previous mentioned street capacity allowances with overtopping if needed. The captured flows have been analyzed using EPA’s SWMM 5.0 program to design pipe size and slopes. UD-Inlet applies a clogging factor while sizing the inlets, but while sizing the storm Page 5 pipes, it is assumed that the inlets are free of clogging debris and capturing the maximum amount of street runoff. The program accounts for head losses within manholes and bends and head losses associated with pipe friction. Hydraulic grade line rating curves were provided by Ayres to represent the outfall conditions along the NECCO system. Hydraflow has been used to check the capacities of the private drive capacities throughout the site. Freeboard is provided by confirming that the 100-yr flows with an additional 30% do not overtop the private drive curb. All pipe outlets are protected with buried riprap or suitable erosion protection methods. Storm sewer pipe outlets are protected using the requirements set by the USDCM for the protection downstream of culverts. All supporting calculations for runoff rates, street sections, and inlets are located in the Appendix. Page 6 DRAINAGE BASINS The Northfield site is divided into 5 main drainage systems, which all outlet into the existing North East College Corridor Outfall (NECCO) storm system. These basins are broken into smaller sub-basins based on selected design points. The design points were placed in locations where the street capacities were analyzed and in sump locations. The peak 2-yr and 100-yr runoff values were determined for these design points using the rational method and used to size all onsite storm pipes and inlets. The five NECCO north/south flowing laterals to be constructed with this project, identified from west to east as lateral A5 (nearest Redwood St), A3 (near Lake Canal), A7 (west of Landmark Way), A8 (east of Landmark Way), & A4 (east of Lemay Ave) are sized per Ayres’ design report. Inlet structures and Snout hoods on these lateral lines have been updated from the original plans to reflect the proposed Northfield design conditions. Laterals A3 and A4 will only be partially constructed with this project, with future connections made as development occurs. All calculations can be found in the Appendix. Historical drainage analysis was completed for the areas of Northfield located within the NECCO basin map that allows the runoff to be released at historic rates. The remaining areas of Northfield did not calculate the historic runoff rates since the developed runoff is restricted to 0.2 cfs/acre release rate. Seven interconnected extended detention basins located throughout the site were analyzed using EPA SWMM 5.0 as a dynamic routing method. Outlet structures with control orifices were sized in the SWMM model to maximize detention volumes and restrict flows to the allowable release rate. Due to the limited grade across the site, utility conflicts, and the depth of the NECCO outfall, the drainage system is designed to surcharge runoff into the detention basins. The sub-basin descriptions have been summarized per inlet and are described as follows (refer to the Drainage & Erosion Control Plan located in the Appendix): Drainage System A: Drainage System A consists of 18.10 acres of improvements along the east side of the project site. Runoff from basins in System A drain to two interconnected extended detention basins, Ponds A1 and A2. Sub-basins A1 thru A2 consist of 0.85 acres of single-family attached residential lots and private drives. Flows from these basins are conveyed via curb and gutter and are collected by 2’ wide concrete channels with sidewalk chases and directed to roadways that ultimately Page 7 drain to detention Pond A2. All of sub-basins A1 & A2 are treated by a LID infiltration gallery in Pond A2. Sub-basins A3 thru A4 consist of 2.41 acres of single-family attached and condominium residential lots, public roadways and private drives. These basins include portions of Schlagel Street and Pioneer Trail Road. Runoff from these basins (along with the upstream flows from sub-basins A1 & A2) is conveyed along roadways and is captured by two 10’ Type R sump curb inlets and directed to detention Pond A2. All of sub-basins A3 & A4 are treated by a LID infiltration gallery in Pond A2. Sub-basins A5 thru A6 consist of 1.49 acres of single-family attached and condominium residential lots and private drives. Runoff from these basins is conveyed along private drives and is captured by a double Type 13 valley sump inlet and directed to detention Pond A2. All of sub-basins A5 & A6 are treated by a LID infiltration gallery in Pond A2. Sub-basins A7 thru A9 consist of 1.99 acres of single-family attached and condominium residential lots, a portion of the community clubhouse lot, and public roadways. These basins include portions of Landmark Way, Collamer Drive, and Pioneer Trail Road. Runoff from these basins is conveyed along roadways and discharged directly into detention Pond A2 via a sump CoFC sidewalk culvert. All of sub-basins A7 thru A9 are treated by a LID infiltration gallery in Pond A2. Sub-basins A10 thru A11 consist of 1.82 acres of single-family attached and condominium residential lots, and private drives. Runoff from these basins is conveyed along private drives and is captured by a sump 10’ Type R curb inlet and directed to detention Pond A2. All of sub-basins A10 & A11 are treated by a LID infiltration gallery in Pond A2. Sub-basin A12 consists of 1.25 acres of condominium residential lots and the open space encompassing detention Pond A2 and Infiltration Gallery A2. Flows within this basin are conveyed via roof downspouts and concrete pans. Runoff is conveyed from Pond A2 via storm pipes into Pond A1. All of sub-basin A12 is treated by the Infiltration Gallery A2. Sub-basins A13 thru A14 consist of 1.08 acres of single-family attached and condominium residential lots and private drives. Runoff from these basins is conveyed along private drives and is captured by a double Type 13 valley sump inlet and directed to detention Pond A1 via storm pipes. Conflicts with water & sewer utilities as well as grading constraints prevent these basins from discharging to the surface of Pond A1. Flows are discharged directly into Outlet Structure A02 before the flow control plate, therefore detained in Pond A1. These basins are unable to be treated in either a LID facility or standard water quality treatment. These basins represent approximately 2% of the total onsite area of the Northfield project. Page 8 Sub-basin A15 consists of 2.48 acres of single-family attached and condominium residential lots and public roadways. This basin includes the western half street section of N. Lemay Avenue and a portion of Schlagel Street. Runoff from this basin is conveyed along roadways and is captured by a sump 5’ Type R curb inlet and directed to detention Pond A1 via storm pipes. Grading constraints prevent these basins from discharging to the surface of Pond A1. Flows are discharged directly into Water Quality Outlet Structure A01, behind the WQ plate and before the flow control plate, therefore detained in Pond A1. Water quality treatment is provided by a Snout hood inside the inlet prior to discharging into the pond. Sub-basin A16 consists of 0.80 acres of single-family attached residential lots and public roadways. This basin includes the eastern half street section of N. Lemay Avenue and a portion of Schlagel Street. Runoff from this basin is conveyed along roadways to a 4’ wide curb cut on the east side of Lemay Avenue which directs runoff to a Type C area inlet. This inlet is to be constructed as part of the A4 NECCO lateral. Due to this basin being on the east side of Lemay, away from Northfield, runoff is unable to be directed to a water quality enhancement facility. This basin is unable to be directed to a detention pond. Sub-basin A17 consists of 0.90 acres of landscaped open space to the north. Runoff from this basin is conveyed over landscaping to a concrete pan near the north property line, then into a flared end section and piped directly into the A4 NECCO lateral. This landscaped basin is unable to be directed to a detention pond. Sub-basin A18 consists of 3.02 acres of single-family attached residential lots and the open space encompassing detention Pond A1. Flows within this basin are conveyed via roof downspouts and concrete pans. A total of three outlet structures in Pond A1 have been designed to limit discharge from the Northfield site into the NECCO storm system and provide the water quality capture volume to treat areas untreated by LID features. Water Quality Outlet Structure A01, located at the east end of Pond A1, includes both a water quality plate and a 100-yr flow control plate, and discharges into the existing NECCO 3’x10’ reinforced concrete box culvert (RCBC). Outlet Structure A02, located near the center of Pond A1, is a modified Type C inlet with a 100-yr flow control plate added over the outlet pipe, and discharges into the existing NECCO 4’x7’ RCBC. Water Quality Outlet Structure A03, located at the west end of Pond A1, includes a water quality plate to treat surface runoff but does not include a 100-yr flow control plate since flows discharge directly into downstream Outlet Structure A02, before its flow control plate. Page 9 Drainage System B: Drainage System B consists of 19.48 acres of improvements in the central portion of the project site. Runoff from basins in System B drain to three interconnected extended detention basins, Ponds B1, B2, & B3. Sub-basin B1 consists of 2.13 acres of condominium and multifamily residential lots and open space. Runoff is conveyed via roof downspouts and a concrete pan and is captured by a Type 13 inlet. All of basin B1 will be treated by LID Infiltration Gallery B3 in Pond B3. Sub-basins B2 thru B3 consist of 2.37 acres of single-family attached, condominium, and multifamily residential lots, public roadways and private drives. This basin includes portions of Schlagel Street. Runoff from these basins is conveyed along roadways and is captured by two 10’ Type R sump curb inlets. All of sub-basins B2 & B3 will be treated by LID Infiltration Gallery B3 in Pond B3. Sub-basin B4 consists of 1.32 acres of single-family attached residential lots and private drives. Runoff from this basin is conveyed along private drives and is captured by a double Type 13 valley sump inlet. All of sub-basin B4 will be treated by LID Infiltration Gallery B3 in Pond B3. Sub-basins B5 thru B6 consist of 1.02 acres of single-family attached and condominium residential lots and private drives. Runoff from these basins is conveyed along private drives and is captured by a double Type 13 valley sump inlet. All of sub-basins B5 & B6 will be treated by a LID Infiltration Gallery B3 in Pond B3. Sub-basin B7 consists of 0.27 acres of single-family attached and condominium residential lots and private drives. Flows from this basin are conveyed via drain pan and are collected by a 2’ wide concrete channel with sidewalk chase and directed to detention Pond B3. All of sub-basin B7 is treated by a LID Infiltration Gallery B3 in Pond B3. Sub-basin B8 consists of 0.40 acres of single-family attached residential lots and private drives. Runoff from this basin is conveyed along private drives and is captured by a single Type 13 valley sump inlet and directed to detention Pond B3. All of sub-basin B8 will be treated by a LID Infiltration Gallery in Pond B3. Sub-basin B9 consists of 2.29 acres of single-family attached and condominium residential lots, a portion of the community clubhouse lot, and the open space encompassing detention Pond B3 and Infiltration Gallery B3. Flows within this basin are conveyed via roof downspouts and concrete pans. All of sub-basin B9 is treated by the LID Infiltration Gallery B3. An outlet structure in Pond B3 includes an orifice plate sized to restrict the release rate in order to maximize detention volume in Pond B3. Runoff is conveyed from Pond B3 via storm pipes into Pond B1. Page 10 Sub-basins B10 thru B11 consist of 2.95 acres of single-family attached, condominium, and multifamily residential lots, public roadways and private drives. This basin includes portions of Schlagel Street and Collamer Drive. Runoff from these basins is conveyed along roadways and is captured by two 5’ Type R sump curb inlets. All of sub-basins B10 & B11 will be treated by LID Infiltration Gallery B2 in Pond B2. Sub-basin B12 consists of 0.41 acres of open space encompassing detention Pond B2 and Infiltration Gallery B2. Flows within this basin are conveyed via roof downspouts and concrete pans. All of sub-basin B12 is treated by the LID Infiltration Gallery B2. An outlet structure in Pond B2 includes an orifice plate sized to restrict the release rate in order to maximize detention volume in Pond B2. Runoff is conveyed from Pond B2 via storm pipes into Pond B1. Sub-basins B13 thru B17 consist of 2.53 acres of single-family attached and condominium residential lots and private drives. Runoff from these basins is conveyed along private drives and is captured by a quad Type 13 valley sump inlet and discharged to LID facility, Rain Garden B1. Sub-basins B18 thru B19 consist of 0.86 acres of condominium residential lots and public roadways. This basin includes portions of Landmark Way. Runoff from these basins is conveyed along roadways and is captured by two on-grade 5’ Type R curb inlets and discharged onto the surface of Pond B1 and treated for standard water quality. Sub-basin B20 consists of 2.94 acres of single-family attached and condominium residential lots and the open space encompassing detention Pond B1. Flows within this basin are conveyed via roof downspouts and concrete pans. An outlet structure in Pond B3 includes an orifice plate sized to restrict the release rate in order to maximize detention volume in Pond B3 and a water quality plate to treat the WQCV. Runoff is conveyed from Pond B1 via storm pipes into Pond A1. Drainage System C: Drainage System C consists of 3.67 acres of improvements along the western side of the project site. Runoff from basins in the C system drain to an extended detention basin, Pond C. Sub-basin C1 consists of 1.30 acres of multifamily residential buildings and open space. Runoff is conveyed via concrete pan and into a culvert crossing under Steeley Drive. Basin C1 is treated for standard water quality within Pond C. Sub-basin C2 consists of 0.14 acres of open space. Runoff is conveyed via overland flow into a Type C area inlet and discharged to the surface of Pond C and is treated for standard water quality. Page 11 Sub-basins C3 thru C4 consist of 1.08 acres of condominium residential lots, a portion of the commercial lot, and public roadways. This basin includes portions of Steeley Drive and Schlagel Street. Runoff from these basins is conveyed along roadways and is captured by a 5’ and 10’ Type R sump curb inlets and discharged to the surface of Pond C and is treated for standard water quality. Sub-basin C5 consists of 1.15 acres of commercial lots and the open space encompassing Pond C. Flows within this basin are conveyed via sheet flow, roof downspouts and concrete pans. An outlet structure in Pond C includes an orifice plate sized to restrict the release rate in order to maximize detention volume in Pond C as well as a water quality plate to treat the WQCV. Runoff is conveyed from Pond C via storm pipes into Pond B1. Drainage System D: Drainage System D consists of 9.21 acres of improvements within the area south of Suniga Road. Runoff from basins in the D system drain to an extended detention basin, Pond D. Sub-basins D1 thru D4 consist of 2.70 acres of multifamily residential lots, private drives, and open space. Runoff is conveyed via roof downspouts, roadways, and concrete pans, and is captured by Type 13 and area inlets, ultimately discharged to the surface of Pond D and treated for standard water quality. Sub-basin D5 consists of 0.43 acres of multifamily residential lots and open space. Runoff is conveyed via roof downspouts and concrete pans and is captured by a single Type 13 inlet, ultimately discharged to the surface of Pond D and treated for standard water quality. Sub-basins D6 thru D7 consist of 0.19 acres of multifamily residential lots, and public roadways. This basin includes portions of Steeley Drive. Runoff from these basins is conveyed along roadways and is captured by two on-grade 5’ Type R curb inlets, ultimately discharging to the surface of Pond D and treated for standard water quality. Sub-basins D8 thru D13 consist of 3.40 acres of multifamily residential lots, private drives, and open space. Runoff from these basins is conveyed via roof downspouts, roadways, concrete pans and storm pipes, ultimately discharging to LID facility, Rain Garden D1. Sub-basin D14 consists of 2.50 acres of open space encompassing detention Pond D. This basin’s detention requirements allows a release rate equal to the current/historic runoff rates and is accounted for in the Pond D detention volume calculations. An outlet structure in Pond D has been designed to limit discharge into the NECCO storm system as well as treat for standard water quality enhancement. Sub-basin D15 consists of 0.44 acres of public roadway along the western half of N. Lemay Avenue. Runoff is conveyed along Lemay Ave and collected by a sump 5’ Type R curb inlet. Page 12 Runoff is then conveyed by storm drain pipe into the existing 3’x10’ RCBC NECCO storm drain. Water quality treatment is provided by a Snout hood in the inlet. Due to grade constraints, this sub-basin cannot be routed to Pond D; the difference in 100-yr runoff rate for the developed condition is reduced from the allowable release rate. Refer to the tabulated release rate summary on page 17. Drainage System E: Drainage System E consists of 8.23 acres of public roadway improvements along Suniga Road. Runoff from basins within the System E are conveyed to the existing NECCO storm drain system. Detention for these basins is not required and water quality enhancement is provided by Snout hoods within the curb inlets, per the NECCO report. Refer to Exhibit 4.2 of the NECCO report, included in the Appendix. Sub-basins E1 thru E2 consist of 1.14 acres of public roadway along Suniga Rd. Runoff is conveyed along Suniga Rd and collected by a double combination curb inlet on the south and a 10’ Type R inlet on the north. The north (downstream) inlet includes a Snout hood to filter debris before runoff enters the existing 54” RCP NECCO storm drain. Sub-basins E3 thru E4 consist of 3.51 acres of public roadway along Suniga Rd. Runoff is conveyed along Suniga Rd and collected by a double combination curb inlet on the south and a 10’ Type R inlet on the north. The north (downstream) inlet includes a Snout hood to filter debris before runoff enters the existing 4’x7’ RCBC NECCO storm drain. Sub-basins E5 thru E8 consist of 2.50 acres of public roadway along Suniga Rd. Runoff is conveyed along Suniga Rd and collected by a double combination curb inlet on the south and a sump 10’ Type R inlet on the north. The north (downstream) inlet includes a Snout hood to filter debris before runoff enters the existing 4’x7’ RCBC NECCO storm drain. Sub-basins E9 thru E10 consist of 0.64 acres of public roadway along Suniga Rd and the eastern half-street of N. Lemay Avenue. Runoff is conveyed along Suniga Rd and Lemay Ave and collected by a sump 5’ Type R curb inlet on the west side of Lemay, and a curb cut with run down to a Type C inlet on the east side of Lemay. Runoff is then conveyed by storm drain pipe into the existing 3’x10’ RCBC NECCO storm drain. Page 13 DRAINAGE FACILITY DESIGN DRAINAGE CONVEYANCE DESIGN Storm infrastructure to convey runoff will include concrete trickle pans, inlets, storm sewer and culverts. Stormwater detention and water quality enhancement will be achieved through the use of multiple interconnected extended detention basins, rain gardens, and infiltration galleries. Storm inlets, storm sewers and the roadway culverts have been appropriately sized to convey the minor and major storms. DETENTION/WATER QUALITY POND DESIGN EPA SWMM 5.0 has been utilized for the final drainage design. UDFCD is referenced for the standard water quality capture volume (WQCV) with a 40-hr drain time and the LID rain gardens and infiltration galleries WQCV with a 12-hr drain time. Due to the limited grades on the site, multiple ponds are proposed throughout the site. These ponds are interconnected via storm pipes and control structures that are designed with orifice plates to restrict flow and maximize pond volume while providing adequate freeboard. Overflow paths from each of the ponds have been provided in the event that the outlet structures clog and overtop. Below is a brief summary of the proposed design for each pond: Pond A1: Furthest downstream extended detention basin for all areas north of Suniga Road, with standard water quality treatment provided via two structures at the east and west ends (Water Quality Outlet Structures A01 and A03, respectively). WQ Outlet Structure A01 along with Outlet Structure A02 (located near the center of the pond) discharge directly into the existing NECCO system via 11” and 9” 100-yr orifice plates to maximize volume and restrict release rates. The 100-yr water surface elevation is 4950.36 feet, with a maximum depth in the pond of 2.36 feet, with another 1.64 feet of additional volume available. The 6” dewatering underdrain in Pond A1 will maintain a permanent groundwater surface elevation at approximately 3.8’ below the bottom of the pond. Should the pond outlets become clogged, overtopping will occur simultaneously at two locations; near the NECCO A7 lateral in Suniga Road, flows will spill over sidewalk and into public ROW across a length of 125 feet at a depth of 0.09 feet (spill elevation = 4952.36); near design point A15 in Lemay Ave, flows will spill over sidewalk and into the public ROW across a length of 161 feet at a depth of 0.36 feet (spill elevation = 4952.36). All calculations are provided in the Appendix. See plans for locations of spillways. Page 14 Pond A2: Detention basin with LID Infiltration Gallery A2 for water quality treatment. A Modified Type D outlet structure with a baffle wall separating the inlet and outlet compartments will direct incoming flows into the gallery. Flows will then spread throughout and fill the gallery chambers, settling out sediments and infiltrating through the gravel sub-base, where an 8” perforated underdrain set 12” below the bottom of the gallery will collect treated runoff and convey it to the outlet side of the modified Type D structure. A 24” 100-yr orifice plate maximizes volume in the pond and restricts flow to downstream Pond A1. During the major storm event, pipe flow will surcharge into the pond and be detained. The 100-yr water surface elevation is 4952.39 feet, with a maximum depth in the pond of 2.39 feet, with another 2.11 feet of additional volume available. The 8” dewatering underdrain in Pond A2 will maintain a permanent groundwater surface elevation at approximately 5.7’ below the bottom of the pond. Overtopping will occur simultaneously at two locations should the pond outlet become clogged; near the southeast corner, flows will spill over a depressed sidewalk across a length of 38 feet at a depth of 0.48 feet and down toward design point A10/A11; near the northeast corner, flows will spill into the 24’ wide private drive at a depth of 0.48 feet (water surface will not inundate finished floors at either spillway). The northern spill water surface elevation is approximately 4955.72 with the lowest adjacent top of foundation at 4957.43, providing 1.71 feet of freeboard. Flows will continue south and then overtop sidewalk into Pond A1 across a length of 98 feet at a depth of 0.36 feet. The southern spill water surface elevation is approximately 4954.54 with the lowest adjacent top of foundation at 4956.65, providing 2.11 feet of freeboard. All calculations are provided in the Appendix. Pond B1: Extended detention basin with LID rain garden and standard water quality treatment via the outlet structure located at the east end of the pond. An 11 ½” 100-yr orifice plate maximizes volume in the pond and restricts flow to downstream Pond A1. The rain garden includes a concrete forebay sized for 1% of the surface area for the WQCV with a rock embankment to dissipate flows before entering the media material bed. Large storm events in excess of the rain garden capacity will spill over a turf mat reinforced berm and down into Pond B1. The 100- yr water surface elevation is 4951.68 feet, with a maximum depth in the pond of 3.68 feet, with another 1.32 feet of additional volume available. The 6” dewatering underdrain in Pond B1 will maintain a permanent groundwater surface elevation at approximately 3.4’ below the bottom of the pond. Should the pond outlet become clogged, overtopping will occur at the southeast corner near the intersection of Landmark Way and Suniga Road, spilling over the sidewalk and into public ROW across a length of 93 feet at a depth of 0.35 feet (spill elevation = 4953.83). All calculations are provided in the Appendix. Page 15 Pond B2: Detention basin with LID infiltration gallery for water quality treatment. Modified Type D outlet structure with a baffle wall separating the inlet and outlet compartments will direct incoming flows into the gallery. Flows will then spread throughout and fill the gallery chambers, settling out sediments and infiltrating through the gravel sub-base, where an 8” perforated underdrain set 12” below the bottom of the galleries will collect treated runoff and convey it to the outlet side of the modified Type D structure. A 7” 100-yr orifice plate maximizes volume in the pond and restricts flow to downstream Pond B1. During the major storm event, pipe flow will surcharge into the pond and be detained. The 100-yr water surface elevation is 4955.94 feet, with a maximum depth in the pond of 2.44 feet, with another 1.06 feet of additional volume available. The 8” dewatering underdrain in Pond B2 will maintain a permanent groundwater surface elevation at approximately 5.7’ below the bottom of the pond. Should the pond outlet become clogged, overtopping will occur at the east corner near design point B11, spilling over the sidewalk into Collamer Drive ROW across a length of 54 feet at a depth of 0.22 feet (spill elevation = 4957.55). Flows will then continue over the street high point to the east (approximately 6” depth) and continuing down Landmark Way toward Suniga Road ROW. Pond B3: Detention basin with LID infiltration gallery for water quality treatment. Modified Type D outlet structure with a baffle wall separating the inlet and outlet compartments will direct incoming flows into the gallery. Flows will then spread throughout and fill the gallery chambers, settling out sediments and infiltrating through the gravel sub-base, where an 8” perforated underdrain set 12” below the bottom of the galleries will collect treated runoff and convey it to the outlet side of the modified Type D structure. A 7” 100-yr orifice plate maximizes volume in the pond and restricts flow to downstream Pond B2. During the major storm event, pipe flow will surcharge into the pond and be detained. The 100-yr water surface elevation is 4954.96 feet, with a maximum depth in the pond of 3.46 feet, with another 1.04 feet of additional volume available. The 8” dewatering underdrain in Pond B3 will maintain a permanent groundwater surface elevation at approximately 5.7’ below the bottom of the pond. Should the pond outlet become clogged, overtopping will occur at the northeast corner of the pond near design point B7, spilling into the 26‘ wide private drive and then splitting, with some flows running east toward Pioneer Trail ROW at a depth of 0.62 feet, and the rest to the south in the private drive (Coonts Lane) at a depth of 0.39 feet. The northern spill water surface elevation is approximately 4956.32 with the lowest adjacent top of foundation at 4958.17, providing 1.35 feet of freeboard. Flows will split again at the south end of the private drive, with some flows running east toward Pioneer Trail Road ROW at a depth of 0.34 feet, and the rest to the southeast into Collamer Dr ROW at a depth of 0.44 feet. The southern spill water surface elevation is approximately 4956.82 with the lowest adjacent top of foundation at 4958.00, Page 16 providing 1.68 feet of freeboard. Flows ultimately converge at the low point in Collamer Drive/Pioneer Trail and overtop the sidewalk into Pond A2. All calculations are provided in the Appendix. Pond C: Extended detention basin with standard water quality treatment provided via the outlet structure located at the east end of the pond. A 5” 100-yr orifice plate maximizes volume in the pond and restricts flow to downstream Pond B1. The 100-yr water surface elevation is 4955.52 feet, with a maximum depth in the pond of 3.32 feet, with another 2.98 feet of additional volume available. Should the pond outlet become clogged, overtopping will occur at the southeast corner, spilling over the sidewalk across a length of 52 feet at a depth of 0.35 feet (spill elevation = 4959.01), into Steeley Drive and Suniga Road public ROW. Pond D: Extended detention basin for all area south of Suniga Road, with LID rain garden and standard water quality treatment via the outlet structure located at the north center of the pond. An 4- 3/4” 100-yr orifice plate maximizes volume in the pond and restricts release rate into the NECCO system. The rain garden includes a concrete forebay sized for 1% of the surface area for WQCV with a rock embankment to dissipate flows before entering the media material. Large storm events in excess of the rain garden capacity will spill over a turf mat reinforced berm and down into Pond D. The 100-yr water surface elevation is 4949.54 feet, with a maximum depth in the pond of 3.92 feet, with another 1.46 feet of additional volume available. Should the pond outlet become clogged, overtopping will occur along the east side near design point D15, spilling over the sidewalk across a length of 120 feet at a depth of 0.32 feet (spill elevation = 4951.75), into Lemay Ave public ROW. As stated, the ultimate outfall for the Northfield site is the existing NECCO storm drain system. The area north of Suniga Road is required to reduce the 100-yr developed runoff to a rate of 0.2 cfs/acre. A portion of the area south of Suniga Road (delineated as sub-basins D13-D15) is allowed to release at a rate equal to current undeveloped/historic rates with the remaining area (delineated as sub-basins D1-D12) restricted to the 0.2 cfs/acre rate. Sub-basin D15, representing the western half-street section of Lemay Avenue adjacent to the development, cannot be routed to Pond D due to grade constraints; the difference in 100-yr runoff rate for the developed condition has been subtracted from the calculated allowable release rate to account for the undetained flows. Refer to the tabulated release rate summary below. There are three proposed outlet structures that will discharge runoff from the Northfield site into the NECCO system: one located at the east end of Pond A1 (Outlet A01), one near the Page 17 center of Pond A1 (Outlet A02), and one in Pond D (Outlet D01). The combined allowable release rate for the Northfield site of 13.87 cfs has been spread across these three outlet structures in order to achieve maximum detention volumes in all the interconnected ponds. Below is a summary of allowable and provided release rates: Allowable Release Rate: 47.69 ac = Total area north of Suniga & portion of area south of Suniga with max allowable release rate of 0.20 cfs/ac: 47.69 ac x 0.20 cfs/ac = 9.54 cfs 3.21 ac = Portion of area south of Suniga that can be released at historic rate of 5.51 cfs Flow from undetained Lemay Ave (sub-basin D15) (∆ historic - developed) is -1.18 cfs Total combined allowable release rate from Northfield site = 13.87 cfs Provided orifice-restricted release rates from each proposed three outlet structures: Outlet A01 4.55 cfs Outlet A02 7.02 cfs Outlet D01 1.22 cfs Total provided release rate = 12.79 cfs Total provided release rate of 12.79 cfs < Total allowable release rate of 13.87 cfs All supporting calculations are located in the Appendix. Page 18 LOW IMPACT DEVELOPMENT The City of Fort Collins updated the Low Impact Development ordinance in 2016 (Ordinance No. 007, 2016) to require: · Treat at least 75% of any newly developed or redeveloped impervious area using one or a combination of LID techniques, or · Treat at least 50% of any newly developed or redeveloped impervious area using one or a combination of LID techniques when 25% of private driveable surfaces are permeable. To satisfy the required implementation of Low Impact Development (LID) techniques, Northfield will utilize below grade infiltration galleries (such as ADS StormTech chamber system) and bioretention ponds/rain gardens. Details and specifications for these facilities are provided in the Appendix. Other LID techniques were explored, but due to the limited grade available and the amount of detention volume required, shallow infiltration galleries assisted in maintaining storm drain grades and detention volumes. Pavers within the private drives did not treat enough contributing area to justify their use. Infiltration galleries promote infiltration while capturing fine sediment that drains off the impervious areas. The proposed galleries are configured entirely as ‘Isolator rows’ which are surrounded by filter fabric and include an inlet manifold for access, removal of sediment and maintenance, along with an inspection port on each row. Standard water quality treatment is also provided within the extended detention ponds and has been sized for those tributary basins not already treated by the LID facilities. For basins A15 & D15 that are not able to be routed to the extended detention basins for standard water quality treatment or a LID facility, Snout hoods have been utilized at the design point inlet to filter debris and sediment from runoff prior to discharging into the storm system. A Standard Operations Procedure will be included as part of the Development Agreement to assist in ensuring that these BMPs will adequately perform over time. Impervious calculations for the tributary areas to each of the LID infiltration galleries, rain gardens, and standard water quality facilities along with a colored coded exhibit showing all areas treated are provided in the Appendix. LID treatment requirements have been exceeded, achieving approximately 107% of the required impervious area treatment in the rain gardens and infiltration galleries. As previously noted in the drainage basin descriptions, grading constraints and tight/shallow utility conflicts prevented a fraction of the site from being routed through a water quality treatment facility before being discharged into the storm system. Two interior basins A13 & A14, along with the small portion of basin A16 lying on the Northfield site (not including the eastern half street section of Lemay), and the northeastern-most landscape basin A17 together represent approximately 3.9% of the total site area not able to be treated Page 19 for water quality. Consideration is requested that the overtreatment provided within the LID facilities be a compromise for the areas unable to be directed to a water quality or LID facility. We believe this meets the intent of the water quality treatment criteria to the maximum extent possible. Below is a description of the 4-step process for selecting structural BMPs: Urban Drainage and Flood Control District (UDFCD) recommends a Four Step Process for receiving water protection that focuses on reducing runoff volumes, treating the water quality capture volume (WQCV), stabilizing drainageways and implementing long-term source controls. The Four Step Process applies to the management of smaller, frequently occurring events. Step 1: Employ Runoff Reduction Practices To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement Low Impact Development (LID) strategies, including Minimizing Directly Connected Impervious Areas (MDCIA). Captured runoff from strategic areas are routed through below grade infiltration galleries and bioretention pond/rain gardens. Infiltration galleries and rain gardens will slow runoff, promote infiltration, and filter runoff prior to being released into the adjacent storm drain system. Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow Release The infiltration galleries and rain gardens are designed to provide water quality capture volume per Urban Drainage’s recommendations and calculations. The captured runoff is designed for a 12-hr drain time. Step 3: Stabilize Drainageways Natural Drainageways are subject to bed and bank erosion due to increases in frequency, duration, rate and volume of runoff during and following development. Because the site will drain to an existing storm system, bank stabilization is unnecessary with this project. Riprap and turf reinforcement mats are utilized throughout for onsite permanent stabilization. Step 4: Implement Site Specific and Other Source Control BMPs The proposed project will improve upon site specific source controls compared to historic conditions by providing localized trash enclosures within the development for disposal of solid waste; Snouts, infiltration galleries, and rain gardens for water treatment prior to flows Page 20 entering storm systems; and additional water quality measures to protect and prolong the design life of BMPS delineated in Step 1. Page 21 STORMWATER POLLUTION PREVENTION Erosion and sedimentation will be controlled on-site by use of sediment control logs, silt fencing, inlet protection, gravel construction entrances, temporary sediment basins, seeding, mulch, and turf. The measures are designed to limit the overall sediment yield increase due to construction as required by the City of Fort Collins. During overlot and final grading the soil will be roughened and furrowed perpendicular to the prevailing winds. During the performance of the work required by these specifications or any operations appurtenant thereto, whether on right-of-way provided by the City or elsewhere, the contractor shall furnish all labor, equipment, materials, and means required. The Contractor shall carry out proper efficient measures wherever and as necessary to reduce dust nuisance, and to prevent dust nuisance that has originated from his operations from damaging crops, orchards, cultivated fields, and dwellings, or causing naissance to persons. The Contractor will be held liable for any damage resulting from dust originating from his operations under these specifications on right-of-way or elsewhere. It is unlawful to track or cause to be tracked mud or other debris onto city streets or rights-of- way. Wherever construction vehicles access routes or intersect paved public roads, previsions must be made to minimize the transport of sediment by runoff or vehicles tracking onto the paved surface. Stabilized construction entrances are required with base material consisting of 6” coarse aggregate. The contractor will be responsible for clearing mud tracked onto city streets on a daily basis. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Silt fence and sediment control logs will require periodic replacement. Maintenance is the responsibility of the contractor. All disturbed areas must be seeded and mulched within 30 days of project start. Vegetation shall not be considered established until a ground cover is achieved which is demonstrated to be mature enough to control soil erosion to the satisfaction of the City Inspector and to survive severe weather condition. Page 22 CONCLUSIONS This Final Drainage Report for Northfield has been prepared to comply with the stormwater criteria set by the City of Fort Collins. The proposed drainage system presented in this report is designed to convey the developed peak storm water runoff through the site to the existing storm drain system and to the development’s LID features, detention and water quality facilities. Storm drains have been sized to provide the required roadway relief in both the 2-yr and 100-yr storm events, and to adequately convey the released runoff from the detention ponds disbursed throughout the site. Overland relief is provided at all sump locations. The calculated 100-yr peak flows released from Northfield adhere to the allowed rates as established in the NECCO drainage studies. This final drainage report anticipates the implementation of best management practices for erosion control, temporary and permanent, and on-site construction facilities. It can therefore be concluded that development of Northfield complies with the storm water jurisdictional criteria and will not adversely affect the adjacent properties, streets, storm drain system and/or detention/water quality facilities. Controlling the developed runoff from these improvements will improve the situations currently existing on the site. Page 23 REFERENCES 1. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3), Urban Drainage and Flood Control District, June 2001, Revised November 2010. 2. Storm Drainage Criteria Manual and Construction Standards, City of Fort Collins Storm Water Utility, City of Fort Collins, Colorado, Updated January, 1997 with 2012 amendments. 3. Fort Collins Stormwater Criterial Manual, Fort Collins Utilities, City of Fort Collins, Colorado, Dated December 2018, Adopted January 2019. 4. “Hydrologic Group Rating for Larimer County Area, Colorado”, USDA-Natural Resources Conservation Service, National Cooperative Soil Survey. Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov. [12/06/2017] 5. “Preliminary Subsurface Exploration and Groundwater Report – Schlagel Property”, prepared by Earth Engineering Consultants, LLC, Dated August 16, 2017 6. “Public Improvement Plans, East Vine Drive Relocation”, prepared by Ayres Associates, Dated February 2009, obtained from City of Fort Collins. 7. “Utility Plans for NECCO Ponds and Backbone” – Record Drawings, prepared by Ayres Associates, Dated June 2017, obtained from the City of Fort Collins. 8. “Flood Insurance Rate Map, Larimer County, Colorado – Map Number 08069C0977G”, Federal Emergency Management Agency, Map Revised June 17, 2008. 9. “Flood Insurance Rate Map, Larimer County, Colorado – Map Number 08069C0981G”, Federal Emergency Management Agency, Map Revised June 17, 2008. 10. “Northfield Development, Fort Collins, Colorado – Groundwater Evaluation”, prepared by Miller Groundwater Engineering, LLC, Dated June 25, 2019. Appendix E FEMA Floodplain Map Appendix F Drainage Plan Know what's below.before you dig.Call R Fe t z e r E n g i n e e r i n g , L L C Fo r t C o l l i n s , C O 8 0 5 2 5 97 0 - 7 0 2 - 4 8 8 4 Sf e t z e r @ f e t z e r e n g i n e e r i n g . c o m Feet 0 30 60 Appendix G Sediment & Erosion Control Plan Know what's below.before you dig.Call R Fe t z e r E n g i n e e r i n g , L L C Fo r t C o l l i n s , C O 8 0 5 2 5 97 0 - 7 0 2 - 4 8 8 4 Sf e t z e r @ f e t z e r e n g i n e e r i n g . c o m Feet 0 30 60