Loading...
HomeMy WebLinkAboutTHE ELLIE AT OLD TOWN NORTH - PDP240002 - SUBMITTAL DOCUMENTS - ROUND 1 - Drainage Related DocumentPDP DRAINAGE REPORT The Ellie at Old Town North Old Town North 5th Filing Tract A for: Van Horn Development Management, LLC 14143 Denver West Parkway #100 Golden, CO 80401 engineer: TJC Limited 8751 E Hampden Ave, Suite B10, Denver, CO 80231 James W. Allen, PE 303.489.3346 www.tjcivil.com April 24, 2024 Preliminary Drainage Report Page 2 of 8 TABLE OF CONTENTS COVER LETTER .......................................................................... Error! Bookmark not defined. GENERAL LOCATION AND EXISTING SITE INFORMATION ............................................. 4 MASTER DRAINAGE BASIN INFORMATION ........................................................................ 4 FLOODPLAIN INFORMATION .................................................................................................. 5 PROPOSED DRAINAGE FACILITIES ....................................... Error! Bookmark not defined. DRAINAGE DESIGN CRITERIA................................................................................................. 6 VARIANCE REQUESTS ............................................................................................................... 7 EROSION CONTROL ................................................................................................................... 7 CONCLUSION ............................................................................................................................... 7 REFERENCES ............................................................................................................................... 7 APPENDICES ................................................................................................................................ 8 Preliminary Drainage Report Page 3 of 8 I hereby attest that this report for the [preliminary or final] drainage design for the Ellie at Old Town was prepared by me or under my direct supervision, in accordance with the provisions of the Fort Collins Stormwater Criteria Manual. I understand that the City of Fort Collins does not and will not assume liability for drainage facilities designed by others. James W. Allen Licensed Professional Engineer State of Colorado No. 42256 Preliminary Drainage Report Page 4 of 8 GENERAL LOCATION AND EXISTING SITE INFORMATION a) Site Location Description i. The site is located in Section 1, Township 7 North, Range 69 West of the 6th Principal Meridian, County of Larimer, State of Colorado. Also known Old Town North 5th Filing, Tract A. ii. A vicinity map is attached in appendix A. iii. The property is adjacent to Sungia Rd, Blondel St, and Alleys. iv. Adjacent land uses are residential Old Town North filings. v. The project is within North East College Corridor Outfall (NECCO) Basin 810. The project is with Old Town North Filing 3 Basin 7. vi. The existing site generally slopes west to east. There are two existing 18” RCP culverts that outfall the site under Blondel Street. These culverts were constructed for interim flows during the development of the area. These flows were eliminated when the NECCO improvements were completed. vii. There are no irrigation facilities on-site. viii. The land is currently vacant. ix. The property is covered with natural grass. Slopes range from 2% to 7%. x. Soils consist of Nunn clay loan with Hydrologic Soil Group C. A NRCS Soils Classification Map is attached as appendix B. MASTER DRAINAGE BASIN INFORMATION a) The site is located in the Lower Dry Creek Basin. The site was situated in the Dry Creek floodplain when the original Old Town North plat was recorded in 2004 and Old Town North was developed. The Dry Creek floodway has since been redefined to remove a majority of the site from the Dry Creek floodplain. The immediate area adjacent to the property is fully developed with residential use. i. The subject property is within the Old Town North Third Filing and 2009 NECCO study. The project runoff will conveyed through existing stormwater facilities to the NECCO Detention pond north of Sungia Road. ii. NECCO assumed a 90% imperviousness (developed condition). b) Site Drainage Basins i. The site is composed of one historic sub-basin and no offsite sub-basins: Sub-basin H1 – consists of grass covered vacant land. Runoff sheet flows east to the existing 18” RCP culverts under Blondel St. Sub-Basin Design Point Area (acres) 5-Year Runoff (cfs) 100-Year Runoff (cfs) Preliminary Drainage Report Page 5 of 8 H1 H1 0.81 0.26 1.08 c) There are no irrigation facilities on or adjacent to the property. FLOODPLAIN INFORMATION a) The site is within a Zone X according to FEMA Flood Insurance Rate Map No. 08013C0411K (appendix C). b) The site was situated in the Dry Creek floodplain when the original Old Town North plat was recorded in 2004 and Old Town North was developed. The Dry Creek floodway has since been redefined to remove a majority of the site from the Dry Creek floodplain. PROJECT DESCRIPTION a) The project proposed two apartment buildings with tuck under garages. Surface parking is being provided on the west end of the site. The existing alley will be widened. A rain garden in proposed to meet Ft Collins LID requirements. b) The site is approximately 0.81 acres. PROPOSED DRAINAGE FACILITIES a) The project site is composed of four sub-basins and no offsite sub-basins: Sub-basin A – consists of roof, pavement, and landscaping. Runoff flows off-site undetained to the western ally and conveyed via an existing gutter pan to the south towards Emmaus Ln south of the site at Design Point 1. Sub-basin B – consists of roof, pavement and a rain gardensidewalks. Runoff flows down the private drive to a curb cut and into the rain garden. The rain garden outfalls into one of the existing 18” RCP culverts under Blondel St at Design Point 2. Sub-basin C – consists of sidewalks and landscaping. Runoff sheet flows into Sungia Rd and into an existing storm inlet at the corner of Sungia Rd and Blondel St at Design Point 3. Sub-basin D – consists of sidewalks and landscaping. Runoff sheet flows into Blondel St at Design Point 4. Sub-Basin Design Point Area (acres) 5-Year Runoff (cfs) 100-Year Runoff (cfs) A 1 0.16 0.24 0.99 B 2 0.47 0.91 3.82 C 3 0.11 0.08 0.33 D 4 0.06 0.06 0.23 Preliminary Drainage Report Page 6 of 8 b) There is no on-site detention required for this project. c) A rain garden is proposed within Basin B to treat a minimum of 75% of the new impervious area. Site topography and the existing 18” RCP outfall limits the location of the rain garden bottom requiring the use walls to obtain sufficient storage volume and provide 6 inches of freeboard. Total Impervious Area Added 26,054 sft Min Area Treated (75% for RG) 19,541 sft Actual Area Treated 19,550 sft The rain garden has walls on all sides varying from 1.0-2.0 ft tall. Approximately 1.0 ft of the wall will extrude from the ground. d) LID techniques utilized in this design include minimizing directly connection impervious areas by discharging roof downspouts onto the surface. No stormwater will be piped except for the stormwater discharging from the rain garden. e) Maintenance of the rain garden can be performed from the private drive or Blondel Street (20 ft east of the facility). f) A drainage easement will be provided over the rain garden. DRAINAGE DESIGN CRITERIA a) The subject property is within the Old Town North Third Filing and 2009 NECCO study. The project runoff will be conveyed through existing stormwater facilities to the NECCO detention pond north of Sungia Road. NECCO assumed a 90% imperviousness (developed condition). The previous studies have no impact to the proposed design. b) Four-step process a. Where possible, the runoff sheet flows across landscaping before discharging into Sungia Rd and Blondel St. b. A rain garden is proposed to treat a minimum of 75% of the new impervious pavement and roof areas. c. There are no streams within the project area to strengthen. d. A construction erosion control plan will be included with this project. c) Rainfall data is provided in table 3.4.1 IDF Table for Rational Method from the Fort Collins Stormwater Criteria Manual. d) Design frequencies used in this design: Minor: 2-year Major: 100-year e) The Rational method was used to calculate hydrological data following the Fort Collins Stormwater Criteria Manual chapter 5.0The peak runoff from minor and major storm events are calculated using the Rational Method formula as detailed below: Q=CIA Where: Preliminary Drainage Report Page 7 of 8 Q= Storm runoff in cubic feet per second (cfs) C= Runoff Coefficient I = Runoff intensity in inches per hour A= Drainage area in acres Runoff coefficients were obtained from Table 3.2-2. Times of concentration were calculated based on the initial time or overland flow time (for urbanized undeveloped basins < 300’ overland flow), with a minimum time of concentration of 5 minutes. t i = 1.87(1.1 - C 5 )√L / S0.33 MANUAL Eqn. (3.3-2) V = 1.49/n R2/3S1/2 MANUAL Eqn. (5-4) t t = L /(60V) MANUAL Eqn. (5-5) t c = t i + t t MANUAL Eqn. (5-3) MAX. t c = L/180 + 10 MANUAL Eqn. (3.3-5) f) No on-site detention is required as part of this project. g) No public streets requiring capacity calculations are required as part of this project. h) The rain garden outlet structure is sized using weir flow calculations. i) No storm sewer pipe networks are included with this project. j) No swale or channels are included with this project. k) No emergency spillways are included with this project. VARIANCE REQUESTS a) No variances are requested as part of this project. EROSION CONTROL a) This report is in compliance with all erosion control materials within the final Erosion Control Report and Plans. CONCLUSION a) Compliance with requirements – this design complies with the requirements of the city of Fort Collins and master drainage plans referenced in this report. b) Drainage plan effectiveness – this design effectively routes developed flows throughout the site and provides water quality for at least 75% of the new impervious areas. This design does not impact adjacent properties. REFERENCES 1. City of Fort Collins Stormwater Criteria Manuel, December 2018. 2. Urban Storm Drainage Criteria Manual, Volumes 1, 2, and 3, Revised March 2024 3. North East College Corridor Outfall (NECCO), August 2009. Preliminary Drainage Report Page 8 of 8 4. Old Town North Third Filing, Drainage, Sediment/Erosion Control, and Stormwater Quality Report, June 2017 APPENDICES A. Vicinity Map B. FEMA Map C. Soil Information D. Old Town North Third Filing Excerpts E. Drainage Calculations F. Drainage Plans Appendix A National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A, V, A99 With BFE or DepthZone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mileZone X Future Conditions 1% Annual Chance Flood HazardZone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to LeveeZone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood HazardZone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 4/19/2024 at 2:17 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. 1:6,000 105°4'40"W 40°36'12"N 105°4'3"W 40°35'45"N Basemap Imagery Source: USGS National Map 2023 Appendix B Soil Map—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/19/2024 Page 1 of 3 44 9 4 2 7 0 44 9 4 2 8 0 44 9 4 2 9 0 44 9 4 3 0 0 44 9 4 3 1 0 44 9 4 3 2 0 44 9 4 3 3 0 44 9 4 3 4 0 44 9 4 3 5 0 44 9 4 2 7 0 44 9 4 2 8 0 44 9 4 2 9 0 44 9 4 3 0 0 44 9 4 3 1 0 44 9 4 3 2 0 44 9 4 3 3 0 44 9 4 3 4 0 44 9 4 3 5 0 493800 493810 493820 493830 493840 493850 493860 493870 493880 493890 493900 493910 493920 493800 493810 493820 493830 493840 493850 493860 493870 493880 493890 493900 493910 493920 40° 35' 59'' N 10 5 ° 4 ' 2 4 ' ' W 40° 35' 59'' N 10 5 ° 4 ' 1 8 ' ' W 40° 35' 57'' N 10 5 ° 4 ' 2 4 ' ' W 40° 35' 57'' N 10 5 ° 4 ' 1 8 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 30 60 120 180 Feet 0 5 10 20 30 Meters Map Scale: 1:627 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. Appendix C MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 18, Aug 24, 2023 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 2, 2021—Aug 25, 2021 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Soil Map—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/19/2024 Page 2 of 3 Appendix C Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 73 Nunn clay loam, 0 to 1 percent slopes 1.6 100.0% Totals for Area of Interest 1.6 100.0% Soil Map—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/19/2024 Page 3 of 3 Appendix C Larimer County Area, Colorado 73—Nunn clay loam, 0 to 1 percent slopes Map Unit Setting National map unit symbol: 2tlng Elevation: 4,100 to 5,700 feet Mean annual precipitation: 14 to 15 inches Mean annual air temperature: 48 to 52 degrees F Frost-free period: 135 to 152 days Farmland classification: Prime farmland if irrigated Map Unit Composition Nunn and similar soils:85 percent Minor components:15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Nunn Setting Landform:Terraces Landform position (three-dimensional):Tread Down-slope shape:Linear Across-slope shape:Linear Parent material:Pleistocene aged alluvium and/or eolian deposits Typical profile Ap - 0 to 6 inches: clay loam Bt1 - 6 to 10 inches: clay loam Bt2 - 10 to 26 inches: clay loam Btk - 26 to 31 inches: clay loam Bk1 - 31 to 47 inches: loam Bk2 - 47 to 80 inches: loam Properties and qualities Slope:0 to 1 percent Depth to restrictive feature:More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water (Ksat):Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table:More than 80 inches Frequency of flooding:None Frequency of ponding:None Calcium carbonate, maximum content:7 percent Maximum salinity:Nonsaline (0.1 to 1.0 mmhos/cm) Sodium adsorption ratio, maximum:0.5 Available water supply, 0 to 60 inches: High (about 9.1 inches) Interpretive groups Land capability classification (irrigated): 3e Map Unit Description: Nunn clay loam, 0 to 1 percent slopes---Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/19/2024 Page 1 of 2 Appendix C Land capability classification (nonirrigated): 4e Hydrologic Soil Group: C Ecological site: R067BY042CO - Clayey Plains Hydric soil rating: No Minor Components Heldt Percent of map unit:10 percent Landform:Terraces Landform position (three-dimensional):Tread Down-slope shape:Linear Across-slope shape:Linear Ecological site:R067BY042CO - Clayey Plains Hydric soil rating: No Wages Percent of map unit:5 percent Landform:Terraces Landform position (three-dimensional):Tread Down-slope shape:Linear Across-slope shape:Linear Ecological site:R067BY002CO - Loamy Plains Hydric soil rating: No Data Source Information Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 18, Aug 24, 2023 Map Unit Description: Nunn clay loam, 0 to 1 percent slopes---Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/19/2024 Page 2 of 2 Appendix C Page 4 Drainage, Sediment/Erosion Control, and Stormwater Quality Report Old Town North Third Filing; Fort Collins, Colorado a. Runoff from the front lots of the single family lots fronting Osiander Street and included in Sub -basin A is directed to the Old Town North detention Pond. Refer to original Old Town North Drainage Plan in Appendix IV. 3. A majority of the Old Town North Third Filing property is included in the 2009 North East College Corridor Outfall (NECCO) study. Old Town North Third Filing runoff will be conveyed to the NECCO detention Pond north of Suniga Road via storm sewer. a. A majority of the Old Town North Third Filing site is included in NECCO Basin 810 and was modeled as a developed basin. b. NECCO implemented an area of 8.2 acres for Basin 810 at 90% imperviousness (developed condition) in the SWMM model. 4. A portion of the North East College Corridor Outfall (NECCO) improvements were constructed adjacent to Old Town North Third Filing on the south side of Suniga Road with the Aspen Heights Subdivision project to the north. a. The section of storm sewer constructed in Suniga Road to convey runoff from the south side of Suniga Road to the north side of Suniga Road is a 36" diameter RCP. The storm sewer profile included with the Aspen Heights Subdivision Utility Plans is included with this report for immediate reference. Refer to Appendix IV. i. Reference Sheet 32 of 43 (record drawing) of the "Utility Plans for Suniga Road to Blue Spruce Drive to Redwood Street and Redwood Street from Lupine Drive to Cajetan Street" by Owen Consulting Group, Inc.; Owen Project Number: 155-101FC; Plans dated April 29, 2015; City Engineer approval date: 05/18/2015; Plan revision date: 10/28/2015 (As -Built storm). b. The existing NECCO 36" RCP storm sewer is currently bulkheaded at both ends with no outfall. Suniga Street existing inlets accept storm runoff and snowmelt runoff to this section of storm sewer with no outfall. Therefore, the NECCO 36" RCP storm sewer acts as a temporary storage facility. There is approximately 960 LF of existing NECCO 36" RCP storm sewer according to Sheet 32 of 43 (record drawing) of the "Utility Plans for Suniga Road to Blue Spruce Drive to Redwood Street and Redwood Street from Lupine Drive to Cajetan Street". C. The NECCO Regional Detention Pond on the north side of Suniga Road is not complete. It is currently built to accommodate Aspen Heights Subdivision in an interim condition. Our understanding is that the NECCO regional Pond and outfall will be completed in 2 to 4 years. Apendix D Project is part of NECCO Basin 810 Page 6 Drainage, Sediment/Erosion Control, and Stormwater Quality Report Old Town North Third Filing; Fort Collins, Colorado b. Refer to Aspen Heights Offsite Streets Sheet 30 of 43: Swale Plan and Profile included in Appendix W. C. Refer to Aspen Heights Offsite Streets Sheet 31 of 43: Swale Plan and Profile included in Appendix IV. 3. Two (2) 14"x23" elliptical RCP culverts were placed under Blondel Street and a channel was constructed on the Old Town north property with Aspen Heights construction. Our understanding is that the culverts and channel were constructed to convey interim historic flows from the west to Dry Creek and the Lake Canal. Our understanding is that these flows are eliminated when the NECCO improvements are completed. a. The two (2) 14"x23" elliptical RCP culverts convey a 10-year storm flow of 20.8 cfs. b. The 50-year storm flow to this point is 35.8 cfs. C. The 100-year storm peak flow is 46.8 cfs. d. Refer to Appendix for April 27, 2015 e-mail from Larry Owen to Michael Palizzi provided by Mr. Larry Owen discussing the Blondel Street culvert capacity and interim peak flows. 4. After development of Aspen Heights Subdivision,construction of Suniga Road and Redwood Street, and the construction of the interim channel on the Old Town North property with the Aspen Heights Subdivision for conveyance of historic flows from the west, runoff from a majority of the Old Town North Third Filing site has no outfall. The channel berm was built up higher than existing grades on the east and dammed the historic outfall point for this property. a. Refer to Topographical Survey for Block 6, Tracts JJ and KK, Old Town North by Intermill Land Surveying. IV. DRAINAGE DESIGN CRITERIA A. Regulations Stormwater management improvements are designed in compliance with the requirements of the City of Fort Collins Stormwater Criteria Manual adopted December 2011. (Manual). The Manual incorporates most of the Urban Storm Drainage Criteria Manual (USDCM) with amendments that are unique to Fort Collins. 2. The latest versions of the USDCM software were used for runoff calculations. Apendix D Culverts no longer required. AI W CJl r" R r---- Su k. QA4 L • `\ PROPERTY LNIE OU W SWAIE C Il.oS DOTrO %`0T TO ITOO' \ SOT7W M'OM AT GUE FAI] BOTiW W'OM AT CULYCA7S v' J TDA EOOOIL SWAL . . .MI `4 SIDE SLOPES, IYP. h BLONOEL CULVERT 0+00.00 THRU 1+01.00 STATION V"lM MA#VAX FAS[L1DYr 0#00 HIM 0400 IBM III STATION 0+00 1#00 DRANAM SWAB STA. 04MOO TMU 8+00.00 STUN 5+00 3#00 0+00 5+00 600 7+00 Noo Hf0 ff70 d 4%0 41NG N00 1400 2E00 N00 4[00 0400 f/00 7400 4400 L SIAIIM n CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO AT 1-800-922-1987-/. uDcO.Orq l. 1. wtll M1'd N,uu a.3i^nrnua KEYMAP Zyj i GRAPHIC SCALE SO L 4S SO 1 1W I INCH a 50 FEET CHY Or FORT COWNS. COtORADO MEET PLAN APPSOYAL WAJltn DATE CHECKED r I WATER & WASTEWATERUI17 Aft CHECKED DYr.04 NMA NICKED BY r .. A him DAW CNCCKEO BOYt NYYiONLEMAL 110 FAR — CHECKED BY, 0 0 O p ax 0a Z/ ( 1 Apendix D Project Location s n m- --••-- _ A-m-.ti,-..,,, O) w T a G'R :x SEE YAANnE-f31)) a OR B[•$IORY SlA O4CO.O0 RP-4w(H __- R 4= 13.0 i car - ei3a Prt - (4w) - tl aaaA[ Ilf _ 1r Or r q Y1 V V 34• KQ s nrnl DIIOE f0.1} • xJ, PPS - (4)0 it V tF 1t I 3) OpOi IYPEAI3 OWMO SUIV CO. \` G / fq`,`7FY N N 41•-YA w [ 1.6>3 fSUOL-- CM :INSt"A ^ OR/VC b4p4 EA IW)31 wE w- R SGA I W SIff1) SOOT TWM 13 OWSO b - INSM WT. 411341 TV K y pa' o u" Mr iEYfAT A' a flK' w 11 V V 30• wR o 2001 OESOE tT10r TtK IS COG[ WI . N31.7J M.4"1pqOOGLGrfR[CLOY P47u W OIIT .'01 1 `I ^ I . , PPE - (431 ISLI(A34 q va')kl a Ibli MADE WSTAll BW(HFAD 10R S+b3 4 BLONDEL Y vAANEE- all7 w wGRAPHICSCALESTflEET 5fl a 45' sV l9a 200, STASTOMi1;AV E /7 ljkb FORp(U0 CBULMEADONDITION It Wt. /IISf7 aPuiMu.P 1 INCH = 50 FEET AV i114lS00"^_ r moil 14 w _ NECCO S. SUNICA STA 10+00.00 THRU 20+75.00 w 1 EN. /71.411ffL41 i ` w STATION 20470 20+ 00 19400 91400 17400 104)o 15400 144a0 iM00 124M 11400 10+00 \ 4970 4960 4960 I. mI MfT - (10N07 6tA 1T. r 4.00T 1) 1 TOP- rI E N - IGfi11- t e0f - IGlLII - SSt MMEq NLt - ESSlj fiA ID19111 rW . 1tln40 c Ow=i/xS711n I 4970 49b OWEOVf 3f}3iEEFSLY BRIARVA Y SAYIKSE TIP . 1N3((((]Sl 1 E M . 41K04 I E M - 41KNEWt-1 K01 I DSEDPR<V GRAPE VPSIREAY IS IWkT o a3za t[Ax - I I I yyFp (' ET,G IGffiil STORMwInN,m EM-Mi4) E 011r . 193243 tl ll (f 34q a fl141 M141T. 4950iGRAML - - _ _ _ E19E rS 2' HATER LCO NOTE__ i1+59. M. {9{ 7. - _ _ I esnx Ir a a0r QII.i 0@LLt ON l37 1MI _I-3r I E705T. 60 WATER{ 940 5TA 11410.6E EI S. 4945.49 1915 NECCO SW STUO IO+CO.00 THRU 10+50.00 STATION moo 10+50 10+00 10F60 STATION STATION NECCO N. SUNIOA STA. -0+50.00 THRU 1+00.00 STATION 1+00 0+00 -"So 4970 wn _ g 4970 S TOP a ETO$TWC WATE3t NAW IS FOO'05ED. BEO/COS CASE STORM JOYIFS WITSHWITH9•+/- OF SDUEECEE, iH01 (LOW FiLL STORY PIPE 10' EITHER SIDE OF CR059N TRENCH TO SPM LWE OF STORY PAE. F EXISIW WIN OUrYL ADNESIK TAPENATENYAWISP40TEXPOSED. FLOW FILL STORY TROT TO STYBHD LEE OF STORY F',PE. CPrYCF0rE¢ WTE LWtIRYfp4NW1 AOI IXXE TIE FX011V(S C1T Or CYEEIiYnA1EA CSn Fr CFDIEN'Arl1 OfY71RUC1AWIAAW"IllEPsrrjGFOFTINTAJNIO\Ff<irlQ'AIWt1AV0 CEPnlallEvAsrrATFPETHEOnovE9Ef3EY•wA1EREr•Tigf4swuliE cartAE7mAw•>\vJeA<)/ATIm4 PFdON to Por HOLMA:a- NT10CO.` 9IIiFIq'1 OF liE CROEEKA. N ORCfA TO AILgY SCF 7YEEIT TA c TOR l'3FECICF610 LCIF0.AE 10 CE OS4 f rtE 0.FVl3C[I I IF1M1irF8. CCNIAGT pTIER11ERM1<ENOVIEA1gN1311i)1+OR EFi 11HELL At V P0) SbPOIf 0. OEAEPALNOIE AfE V.NROAF.E IIOIE COhA4 Uot ARE N THE ACA54 R OAMHATETP CFOR TO ROTATEOLATE TH3T W_ A04EIAVMEl9. LOCATETT ATDROTATETEkJTSVETHEMiesFTOf"W TIE K.CE34 HCT(Y100i60ETHEUNT30FTEf[twlix YMEAJ:`AQC54AE EALOAOTE EAST VRVEIP CGW4SHDfRLW AVVr( OF 9TAM4E RE+ CONSTA CNN CfI TES" TON 00FORSCETC W3COTACTHXLCYG1FTT'J t0 ALLOWFORSCHEELLIV3. CG)TEAV S T MAOTIE COe.9 miOR 1Aa1Ch6ER4EMA THETI Ci00A TMFA B13R31011 G)[RA Rll.4 M1':ALTIVO REP 6Y3TEAL b r411 CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO AT 1-800-922-1987 nvw.uncc.or9 I i ;Iki<jn IMIY(firCll.r1Ile.! Nf01:f p:nmwn lfli•ti r. f9 1 ZU 6` KEG Zyj F wz 000 to j8 G i w NECCO MIDDLE STUB 10+00.00 TNRU 10+40.00 STATION 10+00 10+ 40 970 N70 PROPOSED GRADE f44q 11 SF Q >0 Ra pppppp jjjj O 100 MADE 4960 498041 UTKIIV (L:I REVEYI GYM YIYr401r IJiIUTY Fi/11 REVIEW 49M I---- i---I-- 10+00 10+40 STATION Rs.;e.N BY Wn4rE YaIu7w 0ri R4.iaw s>.+rn aM4tMw •alYl0.ra1 p3v Aln E qk, b tMCfl,atl9lu Kp+ary 1Nwwd4:4aa a4OG3'yl UTILITY PEAM APPROVAL APPROVE01 CITY ENOW ER DATE CHECKED BY: WATERA A UIItf1Y CHECKED BY. STORUWATER UTUTY DATE CHECKED 9Tv PARKS & RECREATION Wc CHECKED BY: ENIARONWENTAL PLARNING DATE CHECKED BY$ Apendix D Project Location Anne mue, oftilRe. a'[i(IP}I](J SCALE— OI{ —0 EXISTING OVERNFAO METRIC TRANSMISSION UNE k PONE FO— EXISTING FIBER OPTIC UNE \\ Imn - eon. y_ EXISTING SANITARY SEWER W/MH \ 1 -- W 1 MSIa mi $CWRerV 3-15ItS— EXISTING IS' SANITARY SEWER p4 W— — EXIMMO WATER UNE W/SFRVICE \ \\,- _ y;CCO RgGIO AL POND e — EXISTING OAS UNE \ It\> p... 8---- EXISTING ELECTRIC UNE RO IF (]) IB' X0.(P W/ FEe NISWL 0'%e' 9COJN J J ` \ gia, IT PROPOSED UNITARY SEWER W/MH P'6q n V PROPOSED WATER UNE 7: 9 PROPOSED CAS UNE /\_ _ _. -. a. PROPOSED ELECTRIC UNE 9N(.l£ DEHR I PROPOSEDEIECCTRICALCONDUR ,- y L EXISTING flflF CCMBINAnW NOT NYOMM i! - --- / BLOCK I \ \ \ oEs (3) MMPRO SOWW/ rEs .., on LOT 1 4 1 —/' • N NSIAILIfi YB SCW As10P e ' 4 C\ t— i ti m ' E% Ifi RW Oa3. OG u.- R[ 1 FEMA pqY pr 6' 122 e' • y NnaE GD Wa I __ D x w N a ./ rts B oPo DII, PLF.. - 8 aunMrl Po-rR v SCWRsr o JAY ASPEN HEIGHTS\ m f.:. a - II pi N W N - a. 6 W I As AG " 1 e na a , i• Mi ' t . i° vP flns,\ SUBDIVISION \ \ \.',6nN y1fiB Dar- a not Sa f H' M23•HFAOP CL III Pr' x,',`\ pG" t0'T».Rmin }. _•< ~- _. zX•RCP CLN _ 1 oee m 9 \ \ k \ YYN. yrp Owq 0 10 Yj pB II 4a 6 6 _ 1 5 T oac al -ram r 1 _ elle acWR{,bP ,ygy. , m .., p Ip ose a.» •• ' _. r 1 Ara e I `]\o.,.a le eomeNmn¢. sus= ..:: a -^r_ 1 i. j' •_ ..n ,. ._ K. i --''. _ Zal - ri ''., I r p ' Y- r le t canen.uon ' ICI I'll J• Jj: y. 1 ':. /fir... ,. - }C, II 9 A p I I e y tlI q 110 II I I I II I IIi I _ M 1I L. yo I \ , wq, I I I I I ) aW y la Is 11 Ir•nci 7 I I I 16 y l u I f tt 1 J JJ \/ \ t •\ LEGEND v} i Iy d EXKTINO i' CONTOUR M Fj 1I 1Jl I v rx L _ V 3fl e i l i// iJ AA- — EXISTING 5- CONTOUR Il 502N PROPOSED I' CONTOUR ,A It 1=". 0 5020 PROPOSED !'CONTOUR BASIN BOUNDARY R. EWIN NEW ON SUGNASIN BOUNDARY _ _ — c v City GE Fort Colli Colorado A A to BASIN DESIGNATION UNITY PIAR APPROVAL B to ABU IN ACRES ?ECnd"SIIeHydrology ecCnoCOMPOSITERUNDWCOEFFICIENT ( IN YR. EVENT) y 1 "iJ1111'IdFI j NOfE9, yypWD t t Ob IL L AN APPROVED FIDODPLAIN USE PN IT pQ D=DESIGN POINT pESNiNAUON __I ())ARNy51AM/,tO,N 65f fr 011 011. 11 iir IS REQUIRED PRIOR TO BEOINNUYD ANY CNEURO BW wruerxnrw.rte ONm OM E6 U ___ - WORXPROPOSCDWITNPITHE6% ISTINO WE pip PROPOSED STORM SEWER 7, I OSI at - of _tll,,,, Ql, ,,,_,1E ,,_,-_ 1. ALNO IBe CERTIFICATION IS REQUIRED CMCIN06Y• dpeg L A ON IR -_ 011 U1_4/ IS ~ M Vi Den PNORTOBEOBLNINOANYWOMWEI111N EXISTING STORM SEWER 1 1 DU 6N ON 111 U— _,. THEFIDODIN". 'I re N .- N _.-Do BN wl IB 11 U CN[OQO BY' • • Mve Mok gFL9WDIRECTION0 _B Op AN _ " I _ I U III not MO wrt N -/ 11 6N 41S -1 _._ !i _ _. _ _. _. I CNECIW `Y _ SF — SF— SILT FENCE U _ + SR ..ON m an I AI s s OA s6 ON L M U _ N 111 ID It --1 —_- CHEpBD BY• wvwxu: xru wwxEe wrz WIN• MP MP _le ._ _ _I_._ Ul EK `x_ _ O_l(.___f___. if .._- _..._ CN[CXCO BY• BNBNw1IWm __ OR J _s.. iiED11%m IN UI U _ EI _ WATTLE 1 SyLA1MA tB EIE as E0 U A9 Bpmf4•BIde10 NIOYWNWwpYCbw >a... Nw e.n e..m ..aeoe pF of ody, a rere Centel An Ne, v CURB SOCX S B ON RG O11 __-an W U me uelo ua wwumwa•as "Mon, eamnot Moor mr AMaI or roe ad a adubo m eeooee.r me'n,woonn, w I OA WB 011 _ BA fa WibWkMWAW koRd _- _ quou uuu a Ji an me Muter •re me me quemuuee i 1± IF —ON 39]-- - OI IlY U L M6bMIlinNMEYPoSn ! Re nn•. Nw ma be eeutwnd In may rwem m S L Imw el MmWJ =Wffioi by 0, LY[! a Jvl j YENICIE TRACKING CONTROL PAD LBeBa MM 41f1 91YouWMM SAT eu tlo agbi Am f oeom UVI my be I N prnsaxs Dole N T oxen D.U.C./ B.R.B. nar SHEAR ENGINEERING CORPORATION 1RL° DRAD7AGE PLU7 reaam no. SHEET No. sxEErs M— w rod RroL_T cX. aea B.W.S. GREELEY ASSOCIATES, LLC M636 S. COLLEGE AVE, SUDS 12, FORT DOWNS, COLORADO 30525 OLD TOWN NORTH THIRD FILING 2Be11-at-t5 to 19 rf7 NM r— Bs tUx Smb = RBPraWe Bws PHONE: (970) 316-5351 (970) 226-usl FORT COLLINS. COLORAD G Apendix D FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 3.0 Rational Method 3.2 Runoff Coefficients Page 5 Table 3.2-2. Surface Type - Runoff Coefficients Surface Type Runoff Coefficients Hardscape or Hard Surface Asphalt, Concrete 0.95 Rooftop 0.95 Recycled Asphalt 0.80 Gravel 0.50 Pavers 0.50 Landscape or Pervious Surface Lawns, Sandy Soil, Flat Slope < 2% 0.10 Lawns, Sandy Soil, Avg Slope 2-7% 0.15 Lawns, Sandy Soil, Steep Slope >7% 0.20 Lawns, Clayey Soil, Flat Slope < 2% 0.20 Lawns, Clayey Soil, Avg Slope 2-7% 0.25 Lawns, Clayey Soil, Steep Slope >7% 0.35 3.2.1 Composite Runoff Coefficients Drainage sub-basins are frequently composed of land that has multiple surface types or zoning classifications. In such cases a composite runoff coefficient must be calculated for any given drainage sub-basin. The composite runoff coefficient is obtained using the following formula: ( ) t n i ii A xAC C ∑ ==1 Equation 5-2 Where: C = Composite Runoff Coefficient Ci = Runoff Coefficient for Specific Area (Ai), dimensionless Ai = Area of Surface with Runoff Coefficient of Ci, acres or square feet n = Number of different surfaces to be considered At = Total Area over which C is applicable, acres or square feet 3.2.2 Runoff Coefficient Frequency Adjustment Factor The runoff coefficients provided in Table 3.2-1 and Table 3.2-2 are appropriate for use with the 2-year storm event. For any analysis of storms with higher intensities, an adjustment of the runoff coefficient is required due to the lessening amount of infiltration, depression retention, evapotranspiration and other losses that have a proportionally smaller effect on high-intensity storm runoff. This adjustment is Appendix E TJC Project Ellie Date 4/8/2024 PAVEMENT 0.95 ROOFS 0.95 GRAVEL 0.50 LANDSCAPE/UNDEVELOPED 0.15 2-7% BASIN OVERALL (ACRE)OVERALL (SF)PAVEMENT (SF) GRAVEL (SF)ROOFS (SF) LANDSCAPE (SF) 2 YR C 100 YR C H1 0.81 35,197 - - - 35,197 0.15 0.18 Site Total 0.81 35,197 - - - 35,197 0.15 0.18 BASIN OVERALL (ACRE)OVERALL (SF)PAVEMENT (SF) GRAVEL (SF)ROOFS (SF) LANDSCAPE (SF) 2 YR C 100 YR C A 0.16 7,130 3,445 - 1,054 2,631 0.65 0.79 B 0.47 20,348 6,146 - 13,404 798 0.92 1.10 C 0.11 4,932 1,105 - - 3,827 0.33 0.40 D 0.06 2,787 900 - - 1,887 0.41 0.49 Site Total 0.81 35,197 11,596 - 14,458 9,143 0.74 0.89 Total Imperviouss Area Added 26,054 SFT Min Area Treated (75% for RG)19,541 SFT Actual Area Treated 19,550 SFT OKAY! "C" CALCULATIONS T:\Projects\Ellie\03_Project Reports\Drainage\C Calcx - C-CALCS 4/19/2024 Appendix E TJC Project Ellie Date: 4/19/2024 ti = 1.87(1.1 - C5)√L / S0.33 MANUAL Eqn. (3.3-2) V = 1.49/n R 2/3S1/2 MANUAL Eqn. (5-4) tt =L /(60V )MANUAL Eqn. (5-5) tc = ti + tt MANUAL Eqn. (5-3) MAX. tc =L/180 + 10 MANUAL Eqn. (3.3-5) COMP FINAL REMARKS AVG. SLOPE Tc Tc Design Point BASIN(S) AREA C LENGTH AVG. SLOPE Ti LENGTH S n R VEL Tt TOTAL Tc=(L/180)+10 (Acres) (ft/ft) (ft/ft) (fps) (min) LENGTH (ft) (min) (min) H1 H1 0.81 0.15 300 0.02 118.83 0.0 0.0 118.83 300 11.7 11.7 1A0.16 0.65 45 0.04 16.16 76 0.01 0.12 0.50 0.8 1.6 17.78 121 10.7 10.7 2B0.47 0.92 45 0.02 8.27 214 0.008 0.12 1.00 1.1 3.2 11.48 259 11.4 11.4 3C0.11 0.33 15 0.02 20.30 200 0.01 0.12 0.50 0.8 4.3 24.56 215 11.2 11.2 4D0.06 0.41 12 0.02 16.29 200 0.01 0.12 0.50 0.8 4.3 20.55 212 11.2 11.2 (Urbanized Basins) TIME OF CONCENTRATION - DEVELOPED SUB-BASIN DATA INITIAL / OVERLAND TRAVEL TIME (Tt)Tc CHECK T:\Projects\Ellie\03_Project Reports\Drainage\C Calcx - CONC. TIME 4/19/2024 Appendix E FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 3.0 Rational Method 3.4 Intensity-Duration-Frequency Curves for Rational Method Page 8 Table 3.4-1. IDF Table for Rational Method Duration (min) Intensity 2-year (in/hr) Intensity 10-year (in/hr) Intensity 100-year (in/hr) Duration (min) Intensity 2-year (in/hr) Intensity 10-year (in/hr) Intensity 100-year (in/hr) 5 2.85 4.87 9.95 39 1.09 1.86 3.8 6 2.67 4.56 9.31 40 1.07 1.83 3.74 7 2.52 4.31 8.80 41 1.05 1.80 3.68 8 2.40 4.10 8.38 42 1.04 1.77 3.62 9 2.30 3.93 8.03 43 1.02 1.74 3.56 10 2.21 3.78 7.72 44 1.01 1.72 3.51 11 2.13 3.63 7.42 45 0.99 1.69 3.46 12 2.05 3.50 7.16 46 0.98 1.67 3.41 13 1.98 3.39 6.92 47 0.96 1.64 3.36 14 1.92 3.29 6.71 48 0.95 1.62 3.31 15 1.87 3.19 6.52 49 0.94 1.6 3.27 16 1.81 3.08 6.30 50 0.92 1.58 3.23 17 1.75 2.99 6.10 51 0.91 1.56 3.18 18 1.70 2.90 5.92 52 0.9 1.54 3.14 19 1.65 2.82 5.75 53 0.89 1.52 3.10 20 1.61 2.74 5.60 54 0.88 1.50 3.07 21 1.56 2.67 5.46 55 0.87 1.48 3.03 22 1.53 2.61 5.32 56 0.86 1.47 2.99 23 1.49 2.55 5.20 57 0.85 1.45 2.96 24 1.46 2.49 5.09 58 0.84 1.43 2.92 25 1.43 2.44 4.98 59 0.83 1.42 2.89 26 1.4 2.39 4.87 60 0.82 1.4 2.86 27 1.37 2.34 4.78 65 0.78 1.32 2.71 28 1.34 2.29 4.69 70 0.73 1.25 2.59 29 1.32 2.25 4.60 75 0.70 1.19 2.48 30 1.30 2.21 4.52 80 0.66 1.14 2.38 31 1.27 2.16 4.42 85 0.64 1.09 2.29 32 1.24 2.12 4.33 90 0.61 1.05 2.21 33 1.22 2.08 4.24 95 0.58 1.01 2.13 34 1.19 2.04 4.16 100 0.56 0.97 2.06 35 1.17 2.00 4.08 105 0.54 0.94 2.00 36 1.15 1.96 4.01 110 0.52 0.91 1.94 37 1.16 1.93 3.93 115 0.51 0.88 1.88 38 1.11 1.89 3.87 120 0.49 0.86 1.84 Appendix E TJC Project Ellie Date: 4/19/2024 FALSE DESIGN BASIN(S) AREA RUNOFF tc INTENSITY RUNOFF tc SUM INTENSITY RUNOFF DESIGN SLOPE PIPE LENGTH VEL Tt Tc POINT (ACRES) COEFF (MIN) C*A (IN/HR) (CFS) (MIN) C*A (IN/HR) (CFS) Q (%) SIZE (FT) (FPS) (MIN) (MIN) H1 H1 0.81 0.15 11.7 0.12 2.13 0.26 1 A 0.16 0.65 10.7 0.11 2.21 0.24 2 B 0.47 0.92 11.4 0.43 2.13 0.91 3 C 0.11 0.33 11.2 0.04 2.13 0.08 4 D 0.06 0.41 11.2 0.03 2.13 0.06 2 YR DESIGN STORM 2-YEAR DIRECT RUNOFF TOTAL RUNOFF TRAVEL TIME REMARKS T:\Projects\Ellie\03_Project Reports\Drainage\C Calcx - 2-Yr 4/19/2024 Appendix E TJC Project Ellie Date: 4/19/2024 FALSE DESIGN BASIN(S) AREA RUNOFF tc INTENSITY RUNOFF tc SUM INTENSITY RUNOFF DESIGN SLOPE PIPE LENGTH VEL Tt Tc POINT (ACRES) COEFF (MIN) C*A (IN/HR) (CFS) (MIN) C*A (IN/HR) (CFS) Q (%) SIZE (FT) (FPS) (MIN) (MIN) H1 H1 0.81 0.18 11.7 0.15 7.42 1.08 1 A 0.16 0.79 10.7 0.13 7.72 0.99 2 B 0.47 1.10 11.4 0.51 7.42 3.82 3 C 0.11 0.40 11.2 0.04 7.42 0.33 4 D 0.06 0.49 11.2 0.03 7.42 0.23 100 YR DESIGN STORM 100-YEAR DIRECT RUNOFF TOTAL RUNOFF TRAVEL TIME REMARKS T:\Projects\Ellie\03_Project Reports\Drainage\C Calcx - 100-Yr 4/19/2024 Appendix E Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =100.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i = 1.000 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.40 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area)Area = 19,541 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =651 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =391 sq ft D) Actual Flat Surface Area AActual =706 sq ft E) Area at Design Depth (Top Surface Area)ATop =706 sq ft F) Rain Garden Total Volume VT=706 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided?1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =2.5 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =651 cu ft iii) Orifice Diameter, 3/8" Minimum DO =9/16 in Design Procedure Form: Rain Garden (RG) Jim Allen TJC April 19, 2024 Ellie E Sungia & Blondel UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO Ellie RG Size, RG 4/19/2024, 12:11 PM Appendix E Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A)Is an impermeable liner provided due to proximity of structures or groundwater contamination? PROVIDE A 30 MIL (MIN) PVC LINER WITH CDOT CLASS B GEOTEXTILE ABOVE IT. USE THE SAME GEOTEXTILE BELOW THE LINER IF THE SUBGRADE IS ANGULAR 6. Inlet / Outlet Control A)Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Jim Allen TJC April 19, 2024 Ellie E Sungia & Blondel Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO Ellie RG Size, RG 4/19/2024, 12:11 PM Appendix E