Loading...
HomeMy WebLinkAboutBLOOM FILING FOUR - FDP240001 - SUBMITTAL DOCUMENTS - ROUND 2 - Drainage Related Document 4025 Automation Way, Ste B2 | Fort Collins, CO 80525 | 970-698-6046 | www.civilworxeng.com Final Drainage and Erosion Control Report Bloom Multi Family Fort Collins, CO Prepared for: Hartford Acquisitions, LLC 4801 Goodman Road Timnath, CO 80547 April 30, 2024 Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO i C22026 - Bloom Multi Family Drainage Report FDP 2nd Round.docx April 30, 2024 Mr. Wes Lamarque City of Fort Collins Engineer 4750 Signal Tree Drive Timnath, CO 80547 RE: Bloom Multi Family Final Design and Erosion Control Report Project Number: C22026 Dear Wes, CivilWorx, LLC is pleased to submit this updated Final Design and Erosion Control Report for the Bloom Multi Family Development in Fort Collins, Colorado. This report serves to document the Final design plans for the Bloom Development. The recent modifications include some changes to the local catchment delineations based on a review of the overall drainage plan for the greater subdivision and minor internal changes to the site. In general, the proposed plan is not substantially different from the drainage plan presented with the preliminary plan review. We understand that review by the City of Fort Collins is to assure general compliance with standardized criteria contained in City of Fort Collins Storm Drainage Design Criteria and Construction Standards. This report was prepared in compliance with technical criteria set forth in both the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual and the City of Fort Collins Storm Drainage Design Criteria. If you should have any questions or comments as you review this report, please feel free to contact me at your convenience. Respectfully, Kelly W. Hafner, PE Senior Project Manager CivilWorx, LLC Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO ii C22026 - Bloom Multi Family Drainage Report FDP 2nd Round.docx TABLE OF CONTENTS PAGE I. General Location and Description ........................................................................................................................ 1 A. Location ....................................................................................................................................................... 1 B. Description of Property ............................................................................................................................... 1 II. Drainage Basins and Catchments ......................................................................................................................... 2 A. Major Basin Description............................................................................................................................... 2 B. Pre-Project Drainage Patterns ..................................................................................................................... 3 III. Drainage Design Criteria ...................................................................................................................................... 3 A. Regulations .................................................................................................................................................. 3 B. Development Criteria Reference and Constraints ....................................................................................... 3 C. Hydrological Criteria .................................................................................................................................... 3 D. Hydraulic Criteria and Governing Standards ............................................................................................... 3 IV. Drainage Facility Design ....................................................................................................................................... 4 A. General Developed Project Overview .......................................................................................................... 4 V. Sediment/Erosion Control .................................................................................................................................. 12 VI. Conclusions ........................................................................................................................................................ 13 A. Compliance with Standards ....................................................................................................................... 13 B. Drainage Plan ............................................................................................................................................. 13 VII. References ..................................................................................................................................................... 14 VIII. Certification ................................................................................................................................................... 14 List of Figures Figure 1. Vicinity and Phase Map................................................................................................................................... 1 Figure 2. Lower Cooper Slough Drainage Basin – As Shown on the City of Fort Collins Website .................................. 2 Figure 3. Proposed Drainage Plan .................................................................................................................................. 5 List of Tables Table 1. Existing Catchment Runoff Summary............................................................................................................... 3 Table 2. Developed Catchment Runoff Summary ......................................................................................................... 7 Table 3. Storm Sewer Piping Summary .......................................................................................................................... 8 Table 4. Storm Sewer Hydraulic Grade Line Summary .................................................................................................. 9 Table 5. Storm Sewer Inlet Interception Summary ..................................................................................................... 10 APPENDICES APPENDIX A – Drainage and Erosion Control Plans APPENDIX B – Hydrological Modelling (EPA SWMM) APPENDIX C – LID/Water Quality Calculations APPENDIX D – Referenced Reports Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 1 I. General Location and Description A. Location The Bloom Development (referred herein as “the site”) is located north of State Highway 14 (Mulberry Street) and just west of Interstate 25. The site is located within the southwest half of Section 9, Township 7 North, Range 68 West of the 6th Principal Meridian in the City of Fort Collins, County of Larimer, State of Colorado. The site is located on the parcel of land # 8709300004 with coordinates of 40.587086, - 105.016334. A vicinity map is shown with Figure 1. Figure 1. Vicinity and Phase Map B. Description of Property Currently, the property is undeveloped but surrounded by developing roads and a larger new subdivision. There are no structures or significant infrastructure located within the site. The historic use of the property was agriculture and farming and thus characterized as a tilled field. The site currently has been overlot graded and largely filled. Below is a detailed summary of the existing conditions: Ground Cover - The site was being used as cropland and therefore ground conditions can be characterized as tillage/field with varying seasonal crops. Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 2 Grades – In general, the entire site drains to the south. These grades are generally less than 1%, with a few localized areas that slope at approximately 2%. Soil Type - According to the Natural Resources Conservation (NRCS) web soil survey and report, the site consists of Garret loam and Ascalon sandy loam soils of hydrologic soils groups Type B and C. Soils are assumed type C/D for drainage purposes. Utilities – The site does not have an existing utilities with the exception of storm sewer within property. Domestic water, sanitary sewers, and storm water utilities have been designed and are planned to be built with the adjoining roads which are being constructed by others. Natural gas, telephone, fiber, and electric are planned to be installed in and around the site at a future time. Storm Drainage / Irrigation Facilities – The site does contain storm drainage infrastructure previously designed for the greater subdivision. No irrigation facilities are present on the site. Groundwater was observed at depths of 8.5’ on the western edge of the site (Appendix D) and were not observed in other borings around the site (10’). Note the site has been filled several feet with the initial overlot grading for the greater subdivision. Groundwater is not anticipated impact the facilities designed with this project. II. Drainage Basins and Catchments A. Major Basin Description This site is located within the Cooper Slough drainage basin as most recently described in the Mulberry Master Drainage Plan (MDP) by Galloway Engineering Firm and dated April 6th, 2021, with the last revision of the report being dated as June 20, 2023. Figure 2. Lower Cooper Slough Drainage Basin – As Shown on the City of Fort Collins Website Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 3 B. Pre-Project Drainage Patterns The project site is located within the Cooper Slough Drainage Basin as shown Figure 2 above. The proposed site area consists of approximately 15.8 acres. Four (4) proposed roads that will be constructed as part of the Bloom 1st Filing Project and shown in the construction plans by Galloway engineering surround the site property: Aria way on the west, Greenfields Drive on the east, International Boulevard to the north, and Donella Drive to the south. The entire site drains to the south but the site is generally at a very low gradient. The site has localized areas that have grades of approximately 2%, but most grades are less than 1%. The nearest receiving waters to the site are the Cooper slough drainage and wetlands (approximately 1,200 feet from the site) that flow into the Boxelder Creek, which further transports water to the Poudre River. Below is summary of the existing runoff generated by the site as it exists pre-development. Table 1. Existing Catchment Runoff Summary Existing Site Area (ac.) % Imperv. Q2 cfs Q100 cfs Bloom Property 15.83 2 0.92 19.0 III. Drainage Design Criteria A. Regulations The design criteria for this development are the City of Fort Collins Stormwater Drainage Criteria Manual (FCSDCM) dated March 2018 and the Mile High Flood District Criteria Manuals Volumes 2, and 3 (referred to herein as MHFDCM). B. Development Criteria Reference and Constraints The criteria used as the basis to analyze and design stormwater features of this project were done so according to the references cited in this report. C. Hydrological Criteria In accordance with the City of Fort Collins policy, a minor and major storm are identified as the 2-year and 100-year storms, respectively. These storms have been used as a basis for planning and design. The proposed developed drainage networks, including the stormwater detention system, are designed using the USEPA Stormwater Management Model (SWMM version 5.2.4) software. SWMM input parameters for catchment runoff utilized Table 4.1-1 of the referenced FCSDCM. Post development runoff for the site will be in accordance with the Mulberry and Greenfields Master Drainage Plan developed by Galloway Engineering. D. Hydraulic Criteria and Governing Standards The developed site will convey runoff to a proposed detention pond on the southeast corner of the site via a combination of channelized flow, sheet flow, and storm sewer, then release to the downstream system per the approved Mulberry and Greenfields Master Drainage Report as currently amended by Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 4 Galloway Engineering. SWMM modeling was used to estimate the required detention pond volume for the Bloom site. Hydraulic calculations for all pipes and swales were also completed using EPA-SWMM and are included in this report. SWMM catchment width parameters are calibrated using the theory of cascading planes (see Guo reference). This method was also documented in the 2016 SWMM Hydrology Reference Manual published by the EPA. IV. Drainage Facility Design A. General Developed Project Overview The developed Bloom project site area includes the construction of multi-family homes, parking areas, landscaped areas and access roads. The Bloom multi-family subdivision project is part of the Cooper Slough basin whose ultimate outfall is the Boxelder Creek, located south of Colorado Highway 14 (Mulberry Street). Runoff from the Bloom-multifamily site will be captured using a combination of curb & gutter and storm sewer pipe and conveyed to a proposed onsite detention facility. The proposed detention pond, designated as Pond G, will also include inflow from adjacent property to the east, west and north as shown on the Mulberry and Greenfields Master Drainage Plan (as currently amended) by Galloway Engineering. Information on the proposed Bloom site detention pond (Pond G) outlet structure listed the peak outflow is limited to 13.5 cfs and requires a minimum of 4.8 AF of storage to work with the overall drainage master plan. It is noted that the Galloway drainage modelling for the Bloom site and Pond G assumed 100% impervious coverage based on the catchment parameters within the referenced report (Appendix D). The proposed impervious area which considerably less than the full impervious coverage originally assumed by the drainage master plan. Modifications to the drainage plan from previous submittals include the addition of building roof drain collection and a more detailed design for the LID chamber system. The changes in the local catchment reflect the additional collection of roof drainage which is brought into the site internal drainage system and directed to the LID system. Overall Drainage Plan The overall drainage plan is to convey runoff to the detention facility on the southeast corner of the site prior to discharging via a proposed outlet structure and storm pipe. Following is an analysis of the site drainage concepts and routing as well as a summary of all of the proposed on site drainage Catchments. All flow summaries at design points, including conveyance facilities, have been designed in detail as part of the EPA SWMM model. Catchment 01: The 01 Catchment has an area of 2.29 acres and generally flows to the southeast. Runoff is conveyed via street flow and channelized curb/gutter/pan flow to a Type C inlet located at the southeastern corner of the Catchment. From here it is carried through Storm Line A into the proposed-on site detention pond. Street capacities, inlet sizing, and storm sewer sizing were all completed using EPA-SWMM. Catchment 02: The 02 Catchment has an area of 1.77 acres and generally flows to the southeast. Runoff is conveyed via street flow and channelized curb/gutter/pan flow to a Type C inlet located at the southern side of the Catchment. From here it is carried through Storm Line C & B and A respectively, after which it drains into Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 5 the proposed-on site detention pond. Street capacities, inlet sizing, and storm sewer sizing were all completed using EPA-SWMM. Figure 3. Proposed Drainage Plan Catchment 03: The 03 Catchment has an area of 2.18 acres, is located at the central eastern portion of the site and generally flows to the south. Runoff is conveyed via street flow and channelized curb/gutter/pan flow to a Type R inlet located at the southern portion of the Catchment. From here it is carried through Storm Lines C, B, and A respectively, after which it drains into the proposed-on site detention pond. Street capacities, inlet sizing, and storm sewer sizing were all completed using EPA-SWMM. Catchment 04: The 04 Catchment has an area of 1.65 acres, is located at the central western portion of the site and generally flows to the south. Runoff is conveyed via street flow and channelized curb/gutter/pan flow to a Type C inlet located at the south side of the Catchment. From here it is carried through Storm Line A, after which it drains into the proposed-on site detention pond. Street capacities, inlet sizing, and storm sewer sizing were all completed using EPA-SWMM. Catchment 05: The 05 Catchment has an area of 1.03 acres, is in the central portion of the site and generally flows to the south. Runoff is conveyed via street flow and channelized curb/gutter/pan flow to a Type R inlet located at the southern portion of the Catchment. From here it is carried through Storm Lines B and A respectively, after which it drains into the proposed-on site detention pond. Street capacities, inlet sizing, and storm sewer sizing were all completed using EPA-SWMM. Catchment 06: The 06 Catchment has an area of 0.31 acres, is in the central portion of the site and generally flows to the south. Runoff is conveyed via street flow and channelized curb/gutter/pan flow to a sidewalk chase/curb Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 6 cut where water then travels further south via a grass swale and into the proposed-on site detention pond. Street capacities, inlet sizing, and storm sewer sizing were all completed using EPA-SWMM. Catchment 07: The 07 Catchment has an area of 2.01 acres, is located at the southwestern portion of the site and flows to the center of itself where a proposed low point and Type R inlet is located. Runoff is conveyed via street flow and channelized curb/gutter/pan flow to the Type R inlet. From here it is carried north and east through Storm Lines A, after which it drains into the proposed-on site detention pond. During assessment it was noted the parking area may reach the 12’’ depth limit so an overflow drain was added to Pond A to control the HGL in this location for major storm events. Street capacities, inlet sizing, and storm sewer sizing were all assessed using the post-project EPA-SWMM model. Catchment 08: The 08 Catchment has an area of 2.39 acres and is located at the southwestern portion of the site. This Catchment is where the proposed detention pond for the site lies, and water eventually leaves the detention pond via an outlet control structure located at the southwest corner of the Catchment. Overall pond volume requirements were calculated with EPA-SWMM in conjunction with the Mile High Flood District Drainage Criteria. OS (offsite)_Catchments OS 1: Catchment OS-1 is 0.46 acres, located at the Northwestern portion of the site and drains offsite to the west via sheet flow and curb and gutter flow. All of the OS-1 flows will be captured in the proposed Bloom Filing 1 storm sewer infrastructure and directed via storm pipe to detention features planned with Bloom Filing 1 detention facilities. OS 2: Catchment OS-2 is 0.22 acres, located at the Northwestern portion of the site and drains offsite to the west via sheet flow and curb and gutter flow. All of the OS-2 flows will be captured in the proposed Bloom Filing 1 storm sewer infrastructure and directed via storm pipe and inlets to the existing-off site detention pond located on the north side of International Boulevard. OS 3: Catchment OS-3 is 0.58 acres, located at the Northeastern portion of the site and drains offsite to the north and east via sheet flow and curb and gutter flow. All of the OS-2 flows will be captured in the proposed Bloom Filing 1 storm sewer infrastructure and directed via storm pipe and inlets to an offsite detention pond to the east of the site. OS 4: Catchment OS-4 is 0.51 acres, located at the western portion of the site and drains offsite to the west via sheet flow and curb and gutter flow. OS-4 flows will be captured in the proposed Bloom Filing 1 storm sewer infrastructure and directed via storm pipe and inlets to the off-site detention facilities associated with Bloom Filing 1. OS 5: Catchment OS-5 is 0.40 acres, located at the southwestern portion of the site and drains to the west via sheet flow and curb and gutter flow. OS-5 flows will be captured in the proposed Bloom Filing 1 storm sewer infrastructure and directed via storm pipe and inlets to the off-site detention facilities associated with Bloom Filing 1. OS 6-9: Catchments OS-6 through OS-9 comprise perimeter and local street catchments that are not part of the site but are included on the initial drainage plan as designs collaboration continues with the Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 7 Galloway project. These catchments comprise 1.21 acres and are made up of areas that will be flowing to the proposed detention pond that are not on the Bloom-multifamily property and is not included in the pond WQ calculations provided in Appendix B. These Catchments include areas that surrounds the site located within City of Fort Collins Right-of-Way and includes mostly from back of curb and towards the property line primarily perimeter landscaping, walks, and drive areas. The surrounding street drainage system was designed by Galloway. Drainage Catchment Summaries The following is a summary of the Catchment runoff characteristics: Table 2. Developed Catchment Runoff Summary Catchment Area (ac.) % Imperv. C2 Q2 cfs C100 Q100 cfs C-01 2.296 83% 0.757 2.7 0.926 16.0 C-02 1.769 83% 0.759 2.3 0.927 12.9 C-03 2.181 87% 0.793 2.7 0.94 15.7 C-04 1.646 88% 0.803 2.4 0.944 12.8 C-05 1.030 71% 0.656 1.5 0.889 7.6 C-06 0.314 46% 0.445 0.4 0.809 2.1 C-07 2.105 94% 0.854 2.7 0.963 15.6 C-08 2.387 23% 0.135 0.8 0.713 14.9 C-OS-1 0.464 52% 0.487 0.5 0.821 2.9 C-OS-2 0.224 21% 0.206 0.1 0.699 1.0 C-OS-3 0.579 22% 0.215 0.3 0.703 2.7 C-OS-4 0.506 55% 0.519 0.7 0.837 3.5 C-OS-5 0.400 27% 0.265 0.3 0.733 2.2 C-OS-6 0.275 40% 0.374 0.2 0.767 1.3 C-OS-7 0.303 23% 0.222 0.2 0.702 1.3 C-OS-8 0.164 33% 0.317 0.1 0.752 0.9 C-OS-9 0.464 24% 0.227 0.3 0.685 1.6 Note the infiltration parameters prescribed by the FCSDCM represent fully saturated underlying soil moisture conditions and thus produce very high runoff rates and volumetric yields. Storm Sewers The proposed drainage system for the Bloom Multifamily development was modeled in EPA-SWMM to determine pipe sizing and flow routing. The SWMM models for the 100-year and 2-year storms are included in Appendix B for reference. • Storm Line A – This system drains the western portion of the site to the proposed WQCV chambers and detention pond. This storm sewer connects to the other storm sewer networks proposed at the site at STMH A-1-1. This system contains connected Type C inlets and manholes working in series. Building roof drains are connected to this system. Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 8 • Storm Line B – This system collects drainage from the central and southern portions of the site via a type R inlet and receives flows from Storm Line C. This line is connection to the LID chambers. • Storm Line C – This system collects drainage from the eastern central and northern of the site using 2 Type C inlets and conveys it through Storm Lines B then to the A system respectively and into the proposed LID system and then to the detention pond. Building roof drains are connected to this system. • Storm Line D – This system collects drainage from the southwesterly portion of the site ern central and northern of the site using manholes and a Type R inlet and conveys to the Storm Lines A system respectively and into the proposed LID system. Building roof drains are connected to this system. • Storm Line D-1 – This system is an overflow outlet for major storm ponding in catchment 7. A higher stage outlet pipe is connected to a type R inlet to allow major storm surcharge in the storm sewer network to reach Pond G. Table 3 summarizes the pipe flows for the storm sewer systems for the project. Table 3. Storm Sewer Piping Summary Link Element Size (in) V2 fps Q2 cfs V100 fps Q100 cfs Upstream Node Downstream Node P-A-1 18 3.7 1.2 3.9 3.8 J-SDI-A-1-5 J-SDI-A-1-4 P-A-2 18 2.6 1.8 3.7 6.5 J-SDI-A-1-4 J-SDMH A-1-3 P-A-3 18 4.1 6.4 4.7 8.3 J-SDMH A-1-3 J-SDI A-1-2 P-A-4 18 5.2 9.2 7.9 13.9 J-SDI A-1-2 J-SDMH A1-1 P-A-5 24 3.9 10.2 6.3 19.7 J-SDMH A-4 J-SDMH A1-1 P-A-6 24 1.3 4.1 6.2 19.6 J-SDMH A-4 J-SDMH A-3-IN P-A-7 24 2.9 4.2 6.4 20.2 J-SDMH A-3-OUT J-SDMH A-2 P-A-8 24 3.3 4.2 6.4 20.2 J-SDMH A-2 POND-G P-B-1 18 1.4 1.3 4.0 7.1 J-SDI B-1 J-SDMH A1-1 P-C-A 18 1.7 1.0 1.8 3.1 J-SDI C-3 J-SDI-C-3-1 P-C-B 18 2.4 2.2 3.4 5.9 J-SDI-C-3-1 J-SDMH C-1 P-C-C 18 2.2 2.4 3.2 5.6 J-SDI-C-1 J-SDMH C-1 P-C-D 18 4.0 4.6 4.1 6.4 J-SDMH C-1 J-SDMH A-1-3 P-D-1-A 18 1.0 1.7 2.0 3.0 J-SDMH_D.1.1 J-SDMH A-4 P-D-1-B 18 3.0 1.7 3.9 3.0 J-SDMH_D.1.1 J-SDMH D-1.2 P-D-1-C 18 2.1 1.3 2.6 2.1 J-SDMH D-1.3 J-SDMH D-1.2 P-D-1-D 18 0.9 1.2 1.2 2.0 J-SDMH D-1.3 J-SDMH D1.5 P-D-1-E 18 0.4 0.3 0.5 0.5 J-SDMH D1.6 J-SDMH D1.5 P-D-1-F 18 4.1 2.6 4.0 5.9 J-SDI-D-1.5.1 J-SDMH D1.5 P-D-2-A 18 0.5 0.5 0.7 1.1 J-SDMH_D.2.1 J-SDMH D-1.2 Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 9 Table 3. Storm Sewer Piping Summary Link Element Size (in) V2 fps Q2 cfs V100 fps Q100 cfs Upstream Node Downstream Node P-D-2-B 18 0.3 0.2 0.6 0.6 J-SDMH_D.2.2 J-SDMH_D.2.1 P-D-2-C 8 0.0 0.0 0.6 0.2 POC_RD-D-2.2 J-SDMH_D.2.2 P-D-2-D 8 0.1 0.0 0.7 0.2 POC_RD-D-2.1 J-SDMH_D.2.1 P-E-1-N 24 3.5 8.5 4.1 12.0 J-SDMH A-4 J-SDZ-CHAMB_N P-E-1-S 24 4.2 3.5 4.7 7.8 J-SDMH D1.5 J-SDZ-CHAMB_S P-E-CHAMB chamber 0.2 4.1 0.4 5.3 J-SDZ-CHAMB_S J-SDZ-CHAMB_N P-E-UD 6 1.8 0.4 2.9 0.6 J-SDZ-CHAMB_N J-SDMH A-3-IN P-F-1 18 1.9 0.8 3.2 5.7 J-SDI-D-1.5.1 POND-G P-Z-POND-OUT 18 2.7 1.0 2.7 1.0 POND-G OUT-POND Table 4 summarizes the hydraulics for of the proposed drainage plan for the major and minor storm events. Table 4. Storm Sewer Hydraulic Grade Line Summary Node Element D2 ft HGL2 ft Q2 cfs D100 ft HGL100 ft Q100 cfs Storm Sewer Structures J-SDI A-1-2 2.8 4935.9 9.2 6.6 4939.7 14.8 J-SDI B-1 2.3 4935.7 1.3 5.4 4938.8 10.5 J-SDI C-3 0.3 4938.6 1.0 2.5 4940.8 3.1 J-SDI-A-1-4 0.7 4936.1 1.8 5.4 4940.8 6.5 J-SDI-A-1-5 0.3 4938.7 1.2 2.7 4941.2 3.8 J-SDI-C-1 0.9 4937.0 2.4 3.9 4940.0 5.6 J-SDI-C-3-1 0.9 4936.9 2.3 4.6 4940.6 5.9 J-SDI-D-1.5.1 2.2 4935.7 2.6 4.3 4937.8 11.0 J-SDMH A1-1 3.3 4935.7 10.3 5.7 4938.2 19.8 J-SDMH A-1-3 1.2 4936.1 6.4 5.6 4940.4 8.5 J-SDMH A-2 1.0 4932.3 4.2 3.3 4934.6 20.2 J-SDMH A-3-IN 3.8 4935.6 4.3 4.7 4936.5 20.2 J-SDMH A-3-OUT 0.9 4932.7 4.3 4.4 4936.2 20.2 J-SDMH A-4 3.8 4935.7 10.2 5.8 4937.7 19.7 J-SDMH C-1 1.0 4936.8 4.6 4.6 4940.4 6.6 J-SDMH D-1.2 2.5 4935.7 1.7 4.6 4937.7 3.0 J-SDMH D-1.3 2.9 4935.7 1.3 5.0 4937.7 2.1 J-SDMH D1.5 3.4 4935.7 3.6 5.4 4937.7 7.9 J-SDMH D1.6 2.9 4935.7 0.1 4.9 4937.7 0.3 J-SDZ-CHAMB_N 3.7 4935.7 8.8 5.7 4937.7 12.3 J-SDZ-CHAMB_S 3.4 4935.7 7.5 5.4 4937.7 12.4 Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 10 Table 4. Storm Sewer Hydraulic Grade Line Summary Node Element D2 ft HGL2 ft Q2 cfs D100 ft HGL100 ft Q100 cfs J-STMH-D-1.1 3.2 4935.7 1.7 5.2 4937.7 3.0 Roadway Flowline/Curb at Storm Sewer Inlets RD-SDI A1-2 0.2 4939.2 2.9 0.74 4939.74 20.0 RD-SDI-A-1-4 0.1 4941.2 1.4 0.27 4941.4 11.6 RD-SDI-A-1-5 0.2 4942.7 2.7 0.3 4942.9 15.8 RD-SDI-B-1 0.1 4938.3 1.4 0.7 4938.9 44.3 RD-SDI-C-1 0.2 4939.3 2.5 0.8 4939.9 27.6 RD-SDI-C-3-1 0.2 4940.6 3.8 0.4 4940.8 24.2 RD-SDI-C-3A 0.1 4942.2 2.3 0.3 4942.4 12.8 RD-SDI-D-1.5.1 0.2 4937.2 2.6 1.0 4938.0 11.9 RD-SOUTHPARKING* 0.2 4937.2 2.7 0.9 4938.0 15.6 * Note this is the parking lot in catchment 7 modeled for ponding potential. Street Capacity The proposed drainage system for the development was modeled in SWMM with depths captured at the storm sewer inlet locations. This included internal surface conveyance pathways. The internal gutter system capacity is presented as adequate for the conveyance of runoff to the perspective outfalls. Inlets The proposed drainage system was modeled in EPA-SWMM. Inlet sizing and intercepted flows were modeled using the SWMM analysis, with corresponding flowline depths associated with inlets listed in Table 4 from the assessment. Table 5 below summarizes intercepted flow with the proposed inlets for the minor and major storms: Table 5. Storm Sewer Inlet Interception Summary Inlet Name Inlet Type/Size Q2 cfs Q100 cfs SDI A1-2 Type R (10’) 2.8 8.5 SDI B-1 Type R (10’) 1.3 10.5 SDI C-3 Type C 1.0 3.1 SDI-A-1-4 Type C 0.7 2.7 SDI-A-1-5 Type C 1.2 3.8 SDI-C-1 Type R (10’) 2.4 5.6 SDI-C-3-1 Type C 1.3 3.6 SDI-D-1.5.1 Type R (10’) 2.6 11.0 Detention Pond Summary The onsite detention pond (G) was modeled in the system noting the pond volumes and release rates were completed with the overall subdivision drainage assessment (Appendix D). The Bloom site detention Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 11 pond G also includes off-site flows and therefore, final calculations were taken from the Bloom Filing 1 Amendment – Drainage Modifications report by Galloway Engineering for the overall development. Amendment 1, excerpts in Appendix D, required a minimum storage volume of 4.8 Acre-ft of storage. The grading design shown on the submitted plans for this facility includes an active storage of 5.1 AF-FT with 1 foot of freeboard below spillway. The proposed design exceeds the required volume for the overall drainage master plan. Spillway Design The proposed detention system is a cut-in or depressed system with limited embankment. A 56’ wide broad-crested weir outlet is in the southern part of the east side of the proposed detention facility. Emergency overflow will be directed towards Greenfield Drive and south towards the Donella Drive intersection. Water Quality and LID Design The site will incorporate water quality capture volume into the proposed detention pond for the settlement and deposition of particles and contaminants. Sizing and calculations for this water quality volume and outlet release structure can be found in Appendix C. For additional Low-Impact Development water quality control, an underground stormwater chamber system is proposed with the site that will treat on-site runoff prior to discharge into the proposed-on site detention pond. The criterion for this approach requires one of the following options: 1) 50% of the newly added or modified impervious area must be treated by LID techniques and 25% of new paved (vehicle use) areas must be pervious. 2) 75% of all newly added or modified impervious area must be treated by LID techniques. For this site Option 2 is utilized. The below table outlines the LID treated area calculations. SF Acre % of Total Total Site Area 692,610 15.900 100.0% Measured Impervious 469,190 10.771 67.7% Measured Landscaped 223,420 5.312 32.3% New Impervious Required to LID 368,213 8.453 75% Actual to LID Feature 410,665 9.428 75.1% Required LID Volume Min. Required Volume 16,650 CF Provided Volume 17,548 CF The required LID volume calculations assumed 8.453 acres of impervious tributary area. The proposed design utilized the ADS StormTech design software for preliminary sizing and general layout recommendations. The proposed system is a StormTech MC-3500 system and is slightly modified and oversized to fit the site drainage plan. Appendix C contains the vendor recommended design and details for the proposed system. The found groundwater in this area was between 8.5 and greater than 10’ below Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 12 grade (prior to development). The base of the proposed LID chambers is between 3.5’ to 4’ below the ‘existing’ or predevelopment grade suggesting, a 4.5’ to 6’ differential between this system and the groundwater. The proposed system was modelled in SWMM to evaluate the drain time to reach the target 40-hour drain time for a 0.6” rainfall event. It was noted that the 6-inch underdrain recommended for the project is too large so a 2.0” screened outlet orifice and 3.4’ weir in SDMH A-3 is proposed to meet the LID requirements for the site. The LID controls are included with the modelling and impacts on the HGLs for the minor and major storm. Mapping of the LID calculations along with calculations for the water quality chamber system can be found in Appendix C. V. Sediment/Erosion Control In addition to the information provided below, A separate Storm Water Management Plan (SWMP) was prepared for this site in accordance with the Stormwater Discharge Permit for Colorado Department of Public Health and Environment and the City of Fort Collins criteria. This document is not included with this report but is part of the submittal. The SWMP has more detailed information on the sediment and erosion control items for this project. For reference, the erosion control plan sheets are provided in Appendix A. LID SYSTEM PERFORMANCE Elapsed Time (hours) 6050403020100 Depth (ft) 4.0 3.5 3.0 2.5 2.0 1.5 1.0 0.5 0.0 Node J-SDMH A-3-IN Depth (ft) Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 13 VI. Conclusions A. Compliance with Standards Storm drainage calculations have followed the guidelines provided by the City of Fort Collins Stormwater Criteria Manual and the Mile High Flood District Manuals Volumes 2, and 3. B. Drainage Plan The drainage system is not anticipated to have issues associated with conveyance, collection or detention based on the work to date in the subdivision planning. No negative impacts are expected due to this development as related to the existing downstream drainage networks or subdivisions. The proposed development is proposed at less impervious than originally assumed for the greater subdivision. Pond 5, as designed with this system meets or exceeds the required volume required by the referenced Galloway drainage plan. The Final drainage plan for the Bloom multifamily development is submitted as being both viable and sound in terms of drainage planning in both the short and long-term for the City of Fort Collins. Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO 14 VII. References 1. City of Fort Collins Stormwater Criteria Manual, As adopted by the City Council of the City of Fort Collins, as referenced in Section 26-500 of the Code of the City of Fort Collins, Revised December 2018. 2. Mile High Floor District Drainage Criteria Manuals 2 and 3, Urban Drainage and Flood Control District, Denver, Colorado, November 2010 with some sections revised January 2021. 3. Storm Water Management Model, Reference Manual Volume I, Hydrology, U.S. Environmental Protection Agency, January 2016. 4. Storm Water Management Model, Reference Manual Volume II, Hydraulics, U.S. Environmental Protection Agency, May 2017. 5. Mulberry Master Drainage Report, City of Fort Collins – Galloway, revised October 13th, 2021. VIII. Certification "I hereby attest that this report for the Final drainage design of the Bloom Multi-Family was prepared by me, or under my direct supervision, in general accordance with the provisions of the City of Fort Collins Storm Drainage Design Criteria for the responsible parties thereof. I understand that the City of Fort Collins does not and shall not assume liability for drainage facilities designed by others.” <Sealed with Final Approval> _____________________________________ Kelly W. Hafner Registered Professional Engineer State of Colorado No. 40968 Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO A APPENDIX A • DRAINAGE AND EROSION CONTROL PLAN MAPS PH A S E 1 PH A S E 2 PO T T E R D R I V E ( P R I V A T E S T R E E T ) BE L L A M Y L A N E ( P R I V A T E S T R E E T ) G G G G G G CLUBHOUSE AAA B B EB 24 " 24 " 24" 18"18" 18 " 18 " 18 " 18" 18" 18 " 18" 18" 18" 01 2.296 83% 02 1.769 83% 03 2.181 87% 04 1.646 88% 05 1.030 71% 06 0.314 46% 07 2.105 94% 08 2.387 23% OS-1 0.464 52% OS-3 0.579 22% OS-4 0.55 69% OS-5 0.400 27% OS-2 0.224 21% INLET A-1-5 SDI C-3 SDMH A-1-3 INLET-A-1-4 SDMH A1-1 SDMH C-1 SDI C-1 SDMH A-3 SDMH D-1.2 SDMH D-1.4 SDMH A-2 SDI B-1 SDI D-1.5.1 FES A-1 SDMH D-1.1 SDI C-3 (1) WQ CHAMBERS (LID) SYSTEM STORM LINE B: STORM LINE A: STORM LINE C: STORM LINE A OS-6 0.275 40% OS-9 0.464 24% OS-8 0.164 33% OS-7 0.303 23% SDMH D-2.2 SDMH D-2.1 STORM LINE D: STORM LINE D-1: 18 " 18" 15" FES D.1.5.2 SDMH D-1.6 SDMH A-4 SDMH D-1.3 EX. STM (INTO SITE) EX. STM (OUT OF SITE) 24"24" PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e fo r , o r l i a b l e f o r , u n a u t h o r i z e d c h a n g e s t o o r u s e s o f t h e s e pl a n s . A l l c h a n g e s t o t h e p l a n s m u s t b e i n w r i t i n g a n d mu s t b e a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : VERTICAL: HORIZONTAL: SCALE 4025 Automation Way Suite B2 Fort Collins, CO 80525 (970) 698-6046 CivilWorxeng.com BL O O M M U L T I - F A M I L Y D E V E L O P M E N T C22026 HA R T F O R D H O M E S 05 / 0 1 / 2 0 2 4 60 PRELIMINARY NOT FOR CONSTRUCTION POTTER DRIVE (PRIVATE STREET) BELLAMY LANE (PRIVATE STREET) 00 60'120' SCALE: 1" = 60' 30' PH A S E 2 KEYMAP NTS LEGEND MAPPING / SITE PROPERTY BOUNDARY RIGHT-OF-WAY LOT LINES EASEMENTS CENTER LINE CURB AND GUTTER EXISTING CONTOURS PROPOSED CONTOURS PHASING LINE PROPOSED UTILITIES STORM DRAIN PIPE FLARED END SECTION STORM DRAIN INLET STORM DRAIN OUTLET RIP RAP NOTES 1.SEE GRADING SHEETS FOR ADDITIONAL SPOT ELEVATIONS FOR THE PROJECT. 2.SEE EROSION CONTROL PLANS FOR ADDITIONAL INFORMATION. EXISTING UTILITIES STORM DRAIN PIPE FLARED END SECTION STORM DRAIN INLET STORM DRAIN OUTLET RIP RAP D-101 GRADING BASIN BOUNDARY DESIGN POINT BASIN LABEL BASIN IMPERVIOUSNESS BASIN AREA FLOW DIRECTION DR A I N A G E P L A N 1" = 60' 1" = 60' 17 DN01 PH A S E 1 POND G IP SF SF SF SF SF SF SF SF VTC A SF VTC CWA A PROJECT LIMITS OF DISTURBANCE PHASE 1: 12.78 ACRES PHASE 2: 3.72 ACRES TOTAL: 16.50 ACRES IP IP IP IP IP IP IP IP IP ER O S I O N C O N T R O L P L A N - I N I T I A L 1" = 60' 1" = 60' 18 EC01 PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e fo r , o r l i a b l e f o r , u n a u t h o r i z e d c h a n g e s t o o r u s e s o f t h e s e pl a n s . A l l c h a n g e s t o t h e p l a n s m u s t b e i n w r i t i n g a n d mu s t b e a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : VERTICAL: HORIZONTAL: SCALE 4025 Automation Way Suite B2 Fort Collins, CO 80525 (970) 698-6046 CivilWorxeng.com BL O O M M U L T I - F A M I L Y D E V E L O P M E N T C22026 HA R T F O R D H O M E S 05 / 0 1 / 2 0 2 4 60 PRELIMINARY NOT FOR CONSTRUCTION POTTER DRIVE (PRIVATE STREET) BELLAMY LANE (PRIVATE STREET) 00 60'120' SCALE: 1" = 60' 30' TOTAL PROJECT DISTURBED AREA 16.50 ACRES TOTAL "ONSITE" AREA OF DISTURBANCE 15.91 ACRES TOTAL "OFFSITE" AREA OF DISTURBANCE 0.59 ACRES TOTAL STORAGE/STAGING AREA 0.5000 ACRES TOTAL HAUL ROADS AREA N/A CONSTRUCTION VEHICLE TRAFFIC AREA N/A ESTIMATED PERCENT OF PROJECT AREA EXPOSED 100% ESTIMATED PERCENT VEGETATIVE COVER ~75%DENSITY EXISTING SOIL TYPE TYPE C & D LOAM GROUNDWATER DEPTH ~8.5 - +10 FEET NUMBER OF PHASES W/PROJECT 2 TOTAL VOUME OF IMPORTED (+) / EXPORTED (-) MATERIALS (+) 155,000 CUBIC YARDS TOTAL AREA OF STOCKPILING OF FILL OR BORROW AREAS OFF SITE N/A SQUARE FEET STEEPEST SLOPE 4 H:V DISTANCE FROM A RIPARIAN AREA OF SENSITIVE AREA 1,200 FEET KEYMAP NTS LEGEND MAPPING / SITE PROPERTY BOUNDARY RIGHT-OF-WAY LOT LINES CENTER LINE CURB AND GUTTER PHASING LINE EROSION CONTROL VEHICLE TRACKING CONTROL PAD WATTLE DIKE ROCK SOCK TEMPORARY SEDIMENT INLET PROTECTION SILT FENCE STOCKPILE MANAGEMENT SURFACE ROUGHENING CONCRETE WASHOUT STRUCTURE (SUBJECT TO MOVE IF NECESSARY) PERMANENT SEEDING SILT FENCE TO BE REMOVED NOTES 1.THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE FIELD CONDITIONS ARE AS SHOWN IN THE DRAWINGS. IF THE CONTRACTOR FINDS DISCREPANCIES THE CONTRACTOR SHALL CONTACT THE ENGINEER. 2.ALL DISTURBED AREAS SHALL BE REVEGETATED. 3.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 4.IN ADDITION TO THE EROSION CONTROL MEASURES SHOWN ON THIS DRAWING, THE CONTRACTOR SHALL COMPLETE, COORDINATE WITH, AND UPDATE AS REQUIRED, THE STORMWATER POLLUTION PREVENTION PLAN (SWPP) FOR THIS PROJECT. 5.CONTRACTOR TO TERRACE SLOPES USING A "TRACKED" VEHICLE, RUN PERPENDICULAR TO SLOPE TO INHIBIT RILL/GULLEY EROSION, CONTRACTOR MAY USE OTHER WINDROW-TYPE METHODS AS APPROVED BY ENGINEER. TYPICAL ALL SLOPES, REPEAT AS NECESSARY UNTIL LANDSCAPING IS INSTALLED. 6.ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE SWMP SHOULD BE UPDATED TO SHOW THESE AREAS AND SEDIMENT AND EROSION CONTROL ITEMS. THE ITEMS MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE WASHOUT, AND SEDIMENT TRAP. 7.TEMPORARY SEEDING OR TACKIFER PLACEMENT SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 14 DAYS WITH NO CONSTRUCTION ACTIVITY. 8.TURF REINFORCEMENT MAT SHALL BE PYRAMAT OR APPROVED EQUAL IF NECESSARY. 9.CONTRACTOR SHALL REMOVE ALL SEDIMENT, MUD, CONSTRUCTION DEBRIS, OR OTHER POTENTIAL POLLUTANTS THAT MAY HAVE BEEN DISCHARGED TO OR, ACCUMULATE IN, THE FLOW LINES AND PUBLIC RIGHTS-OF-WAY OF THE CITY, AS A RESULT OF CONSTRUCTION ACTIVITIES ASSOCIATED WITH THIS DEVELOPMENT OR CONSTRUCTION PROJECT. SAID REMOVAL SHALL BE CONDUCTED DAILY, AS MAY BE REQUIRED. SUCH MATERIALS SHALL BE PREVENTED FROM ENTERING THE STORM SEWER. 10.THE PROJECT LANDSCAPE PLAN WILL CONTAIN THE DETAILED INFORMATION REGARDING REQUIRED SEED TYPES/MIXES. 11.SEE THE GENERAL NOTES SHEETS FOR ALL OF THE CITY OF FORT COLLINS EROSION CONTROL NOTES. VTC WD TS IP SF LIMITS OF DISTURBANCE PERIMETER CONTROL WATTLES RIP RAP FLOW DIRECTION SF SRSR CWA PSPS A RS PHASE 1 STOCKPILE Implementation Timeline: Initial Overlot Grading Prior to Utility Construction NOTE: SYMBOLS NOT TO SCALE PO T T E R D R I V E ( P R I V A T E S T R E E T ) BE L L A M Y L A N E ( P R I V A T E S T R E E T ) 4.8:1 4.1:1 4. 0 : 1 4 . 8 : 1 6.9:1 4 . 1 : 1 5.2: 1 4.5:1 4.5 : 1 3.9: 1 IP A VTC VTCCWA A IP IP IP IP IP TS SR SR SR SR SR SR RS RS RS RS RS RS RS WDWD RS RS RS RS RS RS WD RS RS SRSR SR SR SR SR SRSR SR IP RS IP RS IP RS WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD RS RS RS RS RS RS RS RS RS RS RS RS RS RS RS PROJECT LIMITS OF DISTURBANCE PHASE 1: 12.78 ACRES PHASE 2: 3.72 ACRES TOTAL: 16.50 ACRES EXTENDED DETENTION POND UNDERGROUND WATER TREATMENT SURFACE ROUGHING FOR INITIAL SHAPING DURING OVERLOT ER O S I O N C O N T R O L P L A N - I N T E R I M 1" = 60' 1" = 60' 19 EC02 PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e fo r , o r l i a b l e f o r , u n a u t h o r i z e d c h a n g e s t o o r u s e s o f t h e s e pl a n s . A l l c h a n g e s t o t h e p l a n s m u s t b e i n w r i t i n g a n d mu s t b e a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : VERTICAL: HORIZONTAL: SCALE 4025 Automation Way Suite B2 Fort Collins, CO 80525 (970) 698-6046 CivilWorxeng.com BL O O M M U L T I - F A M I L Y D E V E L O P M E N T C22026 HA R T F O R D H O M E S 05 / 0 1 / 2 0 2 4 60 PRELIMINARY NOT FOR CONSTRUCTION POTTER DRIVE (PRIVATE STREET) BELLAMY LANE (PRIVATE STREET) 00 60'120' SCALE: 1" = 60' 30' PHASE 2 KEYMAP NTS LEGEND MAPPING / SITE PROPERTY BOUNDARY RIGHT-OF-WAY LOT LINES CENTER LINE CURB AND GUTTER PHASING LINE EROSION CONTROL VEHICLE TRACKING CONTROL PAD WATTLE DIKE ROCK SOCK TEMPORARY SEDIMENT INLET PROTECTION SILT FENCE STOCKPILE MANAGEMENT SURFACE ROUGHENING CONCRETE WASHOUT STRUCTURE (SUBJECT TO MOVE IF NECESSARY) PERMANENT SEEDING SILT FENCE TO BE REMOVED NOTES 1.THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE FIELD CONDITIONS ARE AS SHOWN IN THE DRAWINGS. IF THE CONTRACTOR FINDS DISCREPANCIES THE CONTRACTOR SHALL CONTACT THE ENGINEER. 2.ALL DISTURBED AREAS SHALL BE REVEGETATED. 3.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 4.IN ADDITION TO THE EROSION CONTROL MEASURES SHOWN ON THIS DRAWING, THE CONTRACTOR SHALL COMPLETE, COORDINATE WITH, AND UPDATE AS REQUIRED, THE STORMWATER POLLUTION PREVENTION PLAN (SWPP) FOR THIS PROJECT. 5.CONTRACTOR TO TERRACE SLOPES USING A "TRACKED" VEHICLE, RUN PERPENDICULAR TO SLOPE TO INHIBIT RILL/GULLEY EROSION, CONTRACTOR MAY USE OTHER WINDROW-TYPE METHODS AS APPROVED BY ENGINEER. TYPICAL ALL SLOPES, REPEAT AS NECESSARY UNTIL LANDSCAPING IS INSTALLED. 6.ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE SWMP SHOULD BE UPDATED TO SHOW THESE AREAS AND SEDIMENT AND EROSION CONTROL ITEMS. THE ITEMS MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE WASHOUT, AND SEDIMENT TRAP. 7.TEMPORARY SEEDING OR TACKIFER PLACEMENT SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 14 DAYS WITH NO CONSTRUCTION ACTIVITY. 8.TURF REINFORCEMENT MAT SHALL BE PYRAMAT OR APPROVED EQUAL IF NECESSARY. 9.CONTRACTOR SHALL REMOVE ALL SEDIMENT, MUD, CONSTRUCTION DEBRIS, OR OTHER POTENTIAL POLLUTANTS THAT MAY HAVE BEEN DISCHARGED TO OR, ACCUMULATE IN, THE FLOW LINES AND PUBLIC RIGHTS-OF-WAY OF THE CITY, AS A RESULT OF CONSTRUCTION ACTIVITIES ASSOCIATED WITH THIS DEVELOPMENT OR CONSTRUCTION PROJECT. SAID REMOVAL SHALL BE CONDUCTED DAILY, AS MAY BE REQUIRED. SUCH MATERIALS SHALL BE PREVENTED FROM ENTERING THE STORM SEWER. 10.THE PROJECT LANDSCAPE PLAN WILL CONTAIN THE DETAILED INFORMATION REGARDING REQUIRED SEED TYPES/MIXES. 11.SEE THE GENERAL NOTES SHEETS FOR ALL OF THE CITY OF FORT COLLINS EROSION CONTROL NOTES. VTC WD TS IP SF LIMITS OF DISTURBANCE PERIMETER CONTROL WATTLES RIP RAP FLOW DIRECTION SF SRSR CWA PSPS A RS PHASE 1 PHASE 1 STOCKPILE Implementation Timeline: Utility Installation and Building Construction SWEEPING REQUIRED AT ALL ENTRANCES SWEEPING REQUIRED AT ALL ENTRANCES SWEEPING REQUIRED AT ALL ENTRANCES SWEEPING REQUIRED AT ALL ENTRANCES TOTAL PROJECT DISTURBED AREA 16.50 ACRES TOTAL "ONSITE" AREA OF DISTURBANCE 15.91 ACRES TOTAL "OFFSITE" AREA OF DISTURBANCE 0.59 ACRES TOTAL STORAGE/STAGING AREA 0.5000 ACRES TOTAL HAUL ROADS AREA N/A CONSTRUCTION VEHICLE TRAFFIC AREA N/A ESTIMATED PERCENT OF PROJECT AREA EXPOSED 100% ESTIMATED PERCENT VEGETATIVE COVER ~75%DENSITY EXISTING SOIL TYPE TYPE C / D LOAM GROUNDWATER DEPTH ~8.5 - +10'FEET NUMBER OF PHASES W/PROJECT 2 TOTAL VOUME OF IMPORTED (+) / EXPORTED (-) MATERIALS (+) 155,000 CUBIC YARDS TOTAL AREA OF STOCKPILING OF FILL OR BORROW AREAS OFF SITE N/A SQUARE FEET STEEPEST SLOPE 4 H:V DISTANCE FROM A RIPARIAN AREA OF SENSITIVE AREA 1,200 FEET PO T T E R D R I V E ( P R I V A T E S T R E E T ) BE L L A M Y L A N E ( P R I V A T E S T R E E T ) 4.8:1 4.1:1 4. 0 : 1 4 . 8 : 1 6.9:1 4 . 1 : 1 5.2: 1 4.5:1 4.5 : 1 3.9: 1 IP PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS IP IP IP IP IP PS PS PS PS PS PS PS PS PS PS PS PS PS IP IP IP PROJECT LIMITS OF DISTURBANCE PHASE 1: 12.78 ACRES PHASE 2: 3.72 ACRES TOTAL: 16.50 ACRES EXTENDED DETENTION POND UNDERGROUND WATER TREATMENT SURFACE ROUGHING FOR INITIAL SHAPING DURING OVERLOT ER O S I O N C O N T R O L P L A N - F I N A L 1" = 60' 1" = 60' 20 EC03 PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e fo r , o r l i a b l e f o r , u n a u t h o r i z e d c h a n g e s t o o r u s e s o f t h e s e pl a n s . A l l c h a n g e s t o t h e p l a n s m u s t b e i n w r i t i n g a n d mu s t b e a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : VERTICAL: HORIZONTAL: SCALE 4025 Automation Way Suite B2 Fort Collins, CO 80525 (970) 698-6046 CivilWorxeng.com BL O O M M U L T I - F A M I L Y D E V E L O P M E N T C22026 HA R T F O R D H O M E S 05 / 0 1 / 2 0 2 4 60 PRELIMINARY NOT FOR CONSTRUCTION POTTER DRIVE (PRIVATE STREET) BELLAMY LANE (PRIVATE STREET) 00 60'120' SCALE: 1" = 60' 30' KEYMAP NTS LEGEND MAPPING / SITE PROPERTY BOUNDARY RIGHT-OF-WAY LOT LINES CENTER LINE CURB AND GUTTER PHASING LINE EROSION CONTROL VEHICLE TRACKING CONTROL PAD WATTLE DIKE ROCK SOCK TEMPORARY SEDIMENT INLET PROTECTION SILT FENCE STOCKPILE MANAGEMENT SURFACE ROUGHENING CONCRETE WASHOUT STRUCTURE (SUBJECT TO MOVE IF NECESSARY) PERMANENT SEEDING SILT FENCE TO BE REMOVED NOTES 1.THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE FIELD CONDITIONS ARE AS SHOWN IN THE DRAWINGS. IF THE CONTRACTOR FINDS DISCREPANCIES THE CONTRACTOR SHALL CONTACT THE ENGINEER. 2.ALL DISTURBED AREAS SHALL BE REVEGETATED. 3.EROSION CONTROL PRACTICES, SITE PROTECTION, AND REVEGETATION METHODS SHALL FOLLOW CITY REGULATIONS. 4.IN ADDITION TO THE EROSION CONTROL MEASURES SHOWN ON THIS DRAWING, THE CONTRACTOR SHALL COMPLETE, COORDINATE WITH, AND UPDATE AS REQUIRED, THE STORMWATER POLLUTION PREVENTION PLAN (SWPP) FOR THIS PROJECT. 5.CONTRACTOR TO TERRACE SLOPES USING A "TRACKED" VEHICLE, RUN PERPENDICULAR TO SLOPE TO INHIBIT RILL/GULLEY EROSION, CONTRACTOR MAY USE OTHER WINDROW-TYPE METHODS AS APPROVED BY ENGINEER. TYPICAL ALL SLOPES, REPEAT AS NECESSARY UNTIL LANDSCAPING IS INSTALLED. 6.ANY AREAS USED FOR STOCKPILING AND/OR STAGING SHOULD ALSO HAVE SEDIMENT AND EROSION CONTROL MEASURES AS NECESSARY. THESE AREAS SHOULD BE LOCATED AT LEAST 100' AWAY FROM DRAINAGE WAYS. THE SWMP SHOULD BE UPDATED TO SHOW THESE AREAS AND SEDIMENT AND EROSION CONTROL ITEMS. THE ITEMS MAY INCLUDE BUT ARE NOT LIMITED TO VEHICLE TRACKING CONTROL, SILT FENCE, CONSTRUCTION FENCE, CONCRETE WASHOUT, AND SEDIMENT TRAP. 7.TEMPORARY SEEDING OR TACKIFER PLACEMENT SHALL BE UTILIZED IN THE EVENT THAT A GRADED AREA IS EXPOSED LONGER THAN 14 DAYS WITH NO CONSTRUCTION ACTIVITY. 8.TURF REINFORCEMENT MAT SHALL BE PYRAMAT OR APPROVED EQUAL IF NECESSARY. 9.CONTRACTOR SHALL REMOVE ALL SEDIMENT, MUD, CONSTRUCTION DEBRIS, OR OTHER POTENTIAL POLLUTANTS THAT MAY HAVE BEEN DISCHARGED TO OR, ACCUMULATE IN, THE FLOW LINES AND PUBLIC RIGHTS-OF-WAY OF THE CITY, AS A RESULT OF CONSTRUCTION ACTIVITIES ASSOCIATED WITH THIS DEVELOPMENT OR CONSTRUCTION PROJECT. SAID REMOVAL SHALL BE CONDUCTED DAILY, AS MAY BE REQUIRED. SUCH MATERIALS SHALL BE PREVENTED FROM ENTERING THE STORM SEWER. 10.THE PROJECT LANDSCAPE PLAN WILL CONTAIN THE DETAILED INFORMATION REGARDING REQUIRED SEED TYPES/MIXES. 11.SEE THE GENERAL NOTES SHEETS FOR ALL OF THE CITY OF FORT COLLINS EROSION CONTROL NOTES. VTC WD TS IP SF LIMITS OF DISTURBANCE PERIMETER CONTROL WATTLES RIP RAP FLOW DIRECTION SF SRSR CWA PSPS A RS Implementation Timeline: Paving to Final Restoration TOTAL PROJECT DISTURBED AREA 16.50 ACRES TOTAL "ONSITE" AREA OF DISTURBANCE 15.91 ACRES TOTAL "OFFSITE" AREA OF DISTURBANCE 0.59 ACRES TOTAL STORAGE/STAGING AREA 0.5000 ACRES TOTAL HAUL ROADS AREA N/A CONSTRUCTION VEHICLE TRAFFIC AREA N/A ESTIMATED PERCENT OF PROJECT AREA EXPOSED 100% ESTIMATED PERCENT VEGETATIVE COVER ~75%DENSITY EXISTING SOIL TYPE TYPE C & D LOAM GROUNDWATER DEPTH ~8.5 - +10 FEET NUMBER OF PHASES W/PROJECT 2 TOTAL VOUME OF IMPORTED (+) / EXPORTED (-) MATERIALS (+) 155,000 CUBIC YARDS TOTAL AREA OF STOCKPILING OF FILL OR BORROW AREAS OFF SITE N/A SQUARE FEET STEEPEST SLOPE 4 H:V DISTANCE FROM A RIPARIAN AREA OF SENSITIVE AREA 1,200 FEET SDMH D-1.4 DETAIL PLAN SECTION LOW IMPACT DEVELOPMENT CHAMBER SYSTEM (SEE DT18) 60"Ø SDMH-D-1.4 18" Ø H D P E 18 " Ø H D P E 60"Ø SDMH-A-3 7.06'LOW IMPACT DEVELOPMENT CHAMBER SYSTEM TRASH GRATE 24"Ø HDPE 24" Ø HDPE 18" Ø STM 18 " Ø H D P E 18" Ø HDPE 18" Ø HDPE 18" Ø HDPE 18" Ø HDPE 18" Ø HDPE 2' SUMP 48"Ø SDMH-D-1.3 48"Ø SDMH-D-1.2 48"Ø SDMH-D-1.6 SEE DT18 FOR DETAILS MANIFOLD SECTION (SEE DT18) MANIFOLD SECTION (SEE DT18) 6'' UNDERDRAIN (SEE DT18) ONE-WAY CLEANOUT (SEE DT19) SDMH A-4 DETAIL PLAN SECTION LOW IMPACT DEVELOPMENT CHAMBER SYSTEM (SEE DT18) 1 8 " Ø S T M 24" Ø HDPE 72"Ø SDMH-A-4 72"Ø SDMH-A-4 LOW IMPACT DEVELOPMENT CHAMBER SYSTEM TRASH GRATE 9.19' 24"Ø HDPE 18" Ø STM 6'' UNDERDRAIN (SEE DT18) 48"Ø SDMH-D-1.1 60"Ø SDMH-A-3 CONCRETE WEIR WALL 24 " Ø S T M SEE DT18 FOR DETAILS TWO-WAY CLEANOUT (SEE DT19) SDMH A-3 DETAIL NTS. SECTION 60"Ø SDMH-A-3 BMP TRASH SCREEN (DT19) 6'' UNDER DRAIN 3.4' 24" Ø STM WEIR WALL #3 12 MAX. O.C. E.W. DOWEL & EPOXY INTO WALL OF MH 2'' SCH 40 PVC INSERT AT BASE OF MH 2'' SCH 40 PVC INSERT AT BASE OF MH UPSTREAM SIDE WEIR WALL 6'' PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e fo r , o r l i a b l e f o r , u n a u t h o r i z e d c h a n g e s t o o r u s e s o f t h e s e pl a n s . A l l c h a n g e s t o t h e p l a n s m u s t b e i n w r i t i n g a n d mu s t b e a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : VERTICAL: HORIZONTAL: SCALE 4025 Automation Way Suite B2 Fort Collins, CO 80525 (970) 698-6046 CivilWorxeng.com BL O O M M U L T I - F A M I L Y D E V E L O P M E N T C22026 HA R T F O R D H O M E S 05 / 0 1 / 2 0 2 4 60 PRELIMINARY NOT FOR CONSTRUCTION CO N S T R U C T I O N D E T A I L S N/A N/A 58 DT17 E CO N S T R U C T I O N D E T A I L S N/A N/A 59 DT18 0 40'80' SCALE: 1" = 40' 20' PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e fo r , o r l i a b l e f o r , u n a u t h o r i z e d c h a n g e s t o o r u s e s o f t h e s e pl a n s . A l l c h a n g e s t o t h e p l a n s m u s t b e i n w r i t i n g a n d mu s t b e a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : VERTICAL: HORIZONTAL: SCALE 4025 Automation Way Suite B2 Fort Collins, CO 80525 (970) 698-6046 CivilWorxeng.com BL O O M M U L T I - F A M I L Y D E V E L O P M E N T C22026 HA R T F O R D H O M E S 05 / 0 1 / 2 0 2 4 60 PRELIMINARY NOT FOR CONSTRUCTION POTTER DRIVE (PRIVATE STREET) BELLAMY LANE (PRIVATE STREET) MC-3500 STORMTECH CHAMBER SPECIFICATIONS 1.CHAMBERS SHALL BE STORMTECH MC-3500. DESIGN INCLDUES 91 CHAMBERS IN 8 ROWS. 2.CHAMBERS SHALL BE ARCH-SHAPED AND SHALL BE MANUFACTURED FROM VIRGIN, IMPACT-MODIFIED POLYPROPYLENE COPOLYMERS. 3.CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS" CHAMBER CLASSIFICATION 45x76 DESIGNATION SS. 4.CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL SUPPORTS THAT WOULD IMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION. 5.THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION REQUIREMENTS SHALL ENSURE THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1) LONG-DURATION DEAD LOADS AND 2) SHORT-DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATION FOR IMPACT AND MULTIPLE VEHICLE PRESENCES. 6.CHAMBERS SHALL BE DESIGNED, TESTED AND ALLOWABLE LOAD CONFIGURATIONS DETERMINED IN ACCORDANCE WITH ASTM F2787, "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". LOAD CONFIGURATIONS SHALL INCLUDE: 1) INSTANTANEOUS (<1 MIN) AASHTO DESIGN TRUCK LIVE LOAD ON MINIMUM COVER 2) MAXIMUM PERMANENT (75-YR) COVER LOAD AND 3) ALLOWABLE COVER WITH PARKED (1-WEEK) AASHTO DESIGN TRUCK. 7.REQUIREMENTS FOR HANDLING AND INSTALLATION: ·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. ·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 3”. ·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT SHALL BE GREATER THAN OR EQUAL TO 450 LBS/FT/%. THE ASC IS DEFINED IN SECTION 6.2.8 OF ASTM F2418. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. 8.ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. UPON REQUEST BY THE SITE DESIGN ENGINEER OR OWNER, THE CHAMBER MANUFACTURER SHALL SUBMIT A STRUCTURAL EVALUATION FOR APPROVAL BEFORE DELIVERING CHAMBERS TO THE PROJECT SITE AS FOLLOWS: ·THE STRUCTURAL EVALUATION SHALL BE SEALED BY A REGISTERED PROFESSIONAL ENGINEER. ·THE STRUCTURAL EVALUATION SHALL DEMONSTRATE THAT THE SAFETY FACTORS ARE GREATER THAN OR EQUAL TO 1.95 FOR DEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM F2787 AND BY SECTIONS 3 AND 12.12 OF THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS FOR THERMOPLASTIC PIPE. ·THE TEST DERIVED CREEP MODULUS AS SPECIFIED IN ASTM F2418 SHALL BE USED FOR PERMANENT DEAD LOAD DESIGN EXCEPT THAT IT SHALL BE THE 75-YEAR MODULUS USED FOR DESIGN. 9.CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY. IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF MC-3500 CHAMBER SYSTEM 1.STORMTECH MC-3500 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED A PRE-CONSTRUCTION MEETING WITH THE INSTALLERS. 2.STORMTECH MC-3500 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH MC-3500/MC-4500 CONSTRUCTION GUIDE". 3.CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR AN EXCAVATOR SITUATED OVER THE CHAMBERS. STORMTECH RECOMMENDS 3 BACKFILL METHODS: ·STONESHOOTER LOCATED OFF THE CHAMBER BED. ·BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE. ·BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR. 4.THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS. 5.JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE. 6.MAINTAIN MINIMUM - 6" (150 mm) SPACING BETWEEN THE CHAMBER ROWS. 7.INLET AND OUTLET MANIFOLDS MUST BE INSERTED A MINIMUM OF 12" (300 mm) INTO CHAMBER END CAPS. 8.EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE MEETING THE AASHTO M43 DESIGNATION OF #3 OR #4. 9.STONE MUST BE PLACED ON THE TOP CENTER OF THE CHAMBER TO ANCHOR THE CHAMBERS IN PLACE AND PRESERVE ROW SPACING. 10.THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THE SITE DESIGN ENGINEER. NOTES FOR CONSTRUCTION EQUIPMENT 1.STORMTECH MC-3500 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH MC-3500/MC-4500 CONSTRUCTION GUIDE". 2.THE USE OF EQUIPMENT OVER MC-3500 CHAMBERS IS LIMITED: ·NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS. ·NO RUBBER TIRED LOADER, DUMP TRUCK, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED IN ACCORDANCE WITH THE "STORMTECH MC-3500/MC-4500 CONSTRUCTION GUIDE". ·WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH MC-3500/MC-4500 CONSTRUCTION GUIDE". 3.FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING. USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO CHAMBERS AND IS NOT AN ACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY USING THE "DUMP AND PUSH" METHOD ARE NOT COVERED UNDER THE STORMTECH STANDARD WARRANTY. CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT. INSPECTION & MAINTENANCE STEP 1)INSPECT ISOLATOR ROW PLUS FOR SEDIMENT A.INSPECTION PORTS (IF PRESENT) A.1.REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN A.2.REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED A.3.USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4.LOWER A CAMERA INTO ISOLATOR ROW PLUS FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. B.ALL ISOLATOR PLUS ROWS B.1.REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW PLUS B.2.USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW PLUS THROUGH OUTLET PIPE i)MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY ii)FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE B.3.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. STEP 2)CLEAN OUT ISOLATOR ROW PLUS USING THE JETVAC PROCESS A.A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED B.APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN C.VACUUM STRUCTURE SUMP AS REQUIRED STEP 3)REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS. STEP 4)INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM. NOTES 1.INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. 2.CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY. MC-3500 ISOLATOR ROW PLUS DETAIL NTS 24" (600 mm) HDPE ACCESS PIPE REQUIRED USE FACTORY PRE-CORED END CAP PART #: MC3500IEPP24BC OR MC3500IEPP24BW STORMTECH HIGHLY RECOMMENDS FLEXSTORM INSERTS IN ANY UPSTREAM STRUCTURES WITH OPEN GRATES COVER PIPE CONNECTION TO END CAP WITH ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE MC-3500 CHAMBER INSPECTION PORT REQUIRED MC-3500 END CAP ONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS 8.25' (2.51 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS SUMP DEPTH TBD BY SITE DESIGN ENGINEER (24" [600 mm] MIN RECOMMENDED) INSTALL FLAMP ON 24" (600 mm) ACCESS PIPE PART #: MCFLAMP MC-SERIES END CAP INSERTION DETAIL NTS NOTE: MANIFOLD STUB MUST BE LAID HORIZONTAL FOR A PROPER FIT IN END CAP OPENING. MANIFOLD HEADER MANIFOLD STUB STORMTECH END CAP MANIFOLD HEADER MANIFOLD STUB 12" (300 mm) MIN SEPARATION 12" (300 mm) MIN INSERTION 12" (300 mm) MIN SEPARATION 12" (300 mm) MIN INSERTION PART #STUB B C MC3500IEPP06T 6" (150 mm)33.21" (844 mm)--- MC3500IEPP06B ---0.66" (17 mm) MC3500IEPP08T 8" (200 mm)31.16" (791 mm)--- MC3500IEPP08B ---0.81" (21 mm) MC3500IEPP10T 10" (250 mm)29.04" (738 mm)--- MC3500IEPP10B ---0.93" (24 mm) MC3500IEPP12T 12" (300 mm)26.36" (670 mm)--- MC3500IEPP12B ---1.35" (34 mm) MC3500IEPP15T 15" (375 mm)23.39" (594 mm)--- MC3500IEPP15B ---1.50" (38 mm) MC3500IEPP18TC 18" (450 mm) 20.03" (509 mm)---MC3500IEPP18TW MC3500IEPP18BC ---1.77" (45 mm) MC3500IEPP18BW MC3500IEPP24TC 24" (600 mm) 14.48" (368 mm)---MC3500IEPP24TW MC3500IEPP24BC ---2.06" (52 mm) MC3500IEPP24BW MC3500IEPP30BC 30" (750 mm)---2.75" (70 mm) NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH)77.0" X 45.0" X 86.0" (1956 mm X 1143 mm X 2184 mm) CHAMBER STORAGE 109.9 CUBIC FEET (3.11 m³) MINIMUM INSTALLED STORAGE*175.0 CUBIC FEET (4.96 m³) WEIGHT 134 lbs.(60.8 kg) NOMINAL END CAP SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH)75.0" X 45.0" X 22.2" (1905 mm X 1143 mm X 564 mm) END CAP STORAGE 14.9 CUBIC FEET (0.42 m³) MINIMUM INSTALLED STORAGE*45.1 CUBIC FEET (1.28 m³) WEIGHT 49 lbs.(22.2 kg) *ASSUMES 12" (305 mm) STONE ABOVE, 9" (229 mm) STONE FOUNDATION, 6" SPACING BETWEEN CHAMBERS, 6" (152 mm) STONE PERIMETER IN FRONT OF END CAPS AND 40% STONE POROSITY MC-3500 TECHNICAL SPECIFICATION NTS 90.0" (2286 mm) ACTUAL LENGTH 86.0" (2184 mm) INSTALLED BUILD ROW IN THIS DIRECTION NOTE: ALL DIMENSIONS ARE NOMINAL LOWER JOINT CORRUGATION WEB CREST CREST STIFFENING RIB VALLEY STIFFENING RIB B C 75.0" (1905 mm) 45.0" (1143 mm) 25.7" (653 mm) FOOT 77.0" (1956 mm) 45.0" (1143 mm) STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" END CAPS WITH A WELDED CROWN PLATE END WITH "C" END CAPS WITH A PREFABRICATED WELDED STUB END WITH "W" UPPER JOINT CORRUGATION 22.2" (564 mm) INSTALLED CUSTOM PRECORED INVERTS ARE AVAILABLE UPON REQUEST. INVENTORIED MANIFOLDS INCLUDE 12-24" (300-600 mm) SIZE ON SIZE AND 15-48" (375-1200 mm) ECCENTRIC MANIFOLDS. CUSTOM INVERT LOCATIONS ON THE MC-3500 END CAP CUT IN THE FIELD ARE NOT RECOMMENDED FOR PIPE SIZES GREATER THAN 10" (250 mm). THE INVERT LOCATION IN COLUMN 'B' ARE THE HIGHEST POSSIBLE FOR THE PIPE SIZE. PART #STUB B C MC3500IEPP06T 6" (150 mm)33.21" (844 mm)--- MC3500IEPP06B ---0.66" (17 mm) MC3500IEPP08T 8" (200 mm)31.16" (791 mm)--- MC3500IEPP08B ---0.81" (21 mm) MC3500IEPP10T 10" (250 mm)29.04" (738 mm)--- MC3500IEPP10B ---0.93" (24 mm) MC3500IEPP12T 12" (300 mm)26.36" (670 mm)--- MC3500IEPP12B ---1.35" (34 mm) MC3500IEPP15T 15" (375 mm)23.39" (594 mm)--- MC3500IEPP15B ---1.50" (38 mm) MC3500IEPP18TC 18" (450 mm) 20.03" (509 mm)---MC3500IEPP18TW MC3500IEPP18BC ---1.77" (45 mm) MC3500IEPP18BW MC3500IEPP24TC 24" (600 mm) 14.48" (368 mm)---MC3500IEPP24TW MC3500IEPP24BC ---2.06" (52 mm) MC3500IEPP24BW MC3500IEPP30BC 30" (750 mm)---2.75" (70 mm) NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH)77.0" X 45.0" X 86.0" (1956 mm X 1143 mm X 2184 mm) CHAMBER STORAGE 109.9 CUBIC FEET (3.11 m³) MINIMUM INSTALLED STORAGE*175.0 CUBIC FEET (4.96 m³) WEIGHT 134 lbs.(60.8 kg) NOMINAL END CAP SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH)75.0" X 45.0" X 22.2" (1905 mm X 1143 mm X 564 mm) END CAP STORAGE 14.9 CUBIC FEET (0.42 m³) MINIMUM INSTALLED STORAGE*45.1 CUBIC FEET (1.28 m³) WEIGHT 49 lbs.(22.2 kg) *ASSUMES 12" (305 mm) STONE ABOVE, 9" (229 mm) STONE FOUNDATION, 6" SPACING BETWEEN CHAMBERS, 6" (152 mm) STONE PERIMETER IN FRONT OF END CAPS AND 40% STONE POROSITY MC-3500 TECHNICAL SPECIFICATION NTS 90.0" (2286 mm) ACTUAL LENGTH 86.0" (2184 mm) INSTALLED BUILD ROW IN THIS DIRECTION NOTE: ALL DIMENSIONS ARE NOMINAL LOWER JOINT CORRUGATION WEB CREST CREST STIFFENING RIB VALLEY STIFFENING RIB B C 75.0" (1905 mm) 45.0" (1143 mm) 25.7" (653 mm) FOOT 77.0" (1956 mm) 45.0" (1143 mm) STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" END CAPS WITH A WELDED CROWN PLATE END WITH "C" END CAPS WITH A PREFABRICATED WELDED STUB END WITH "W" UPPER JOINT CORRUGATION 22.2" (564 mm) INSTALLED CUSTOM PRECORED INVERTS ARE AVAILABLE UPON REQUEST. INVENTORIED MANIFOLDS INCLUDE 12-24" (300-600 mm) SIZE ON SIZE AND 15-48" (375-1200 mm) ECCENTRIC MANIFOLDS. CUSTOM INVERT LOCATIONS ON THE MC-3500 END CAP CUT IN THE FIELD ARE NOT RECOMMENDED FOR PIPE SIZES GREATER THAN 10" (250 mm). THE INVERT LOCATION IN COLUMN 'B' ARE THE HIGHEST POSSIBLE FOR THE PIPE SIZE. ACCEPTABLE FILL MATERIALS: STORMTECH MC-3500 CHAMBER SYSTEMS PLEASE NOTE: 1.THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE". 2.STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 9" (230 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. 3.WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. 4.ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. 5.WHERE RECYCLED CONCRETE AGGREGATE IS USED IN LAYERS 'A' OR 'B' THE MATERIAL SHOULD ALSO MEET THE ACCEPTABILITY CRITERIA OUTLINED IN TECHNICAL NOTE 6.20 "RECYCLED CONCRETE STRUCTURAL BACKFILL". NOTES: 1.CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS" CHAMBER CLASSIFICATION 45x76 DESIGNATION SS. 2.MC-3500 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 3.THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 4.PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 5.REQUIREMENTS FOR HANDLING AND INSTALLATION: ·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. ·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 3”. ·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT SHALL BE GREATER THAN OR EQUAL TO 450 LBS/FT/%. THE ASC IS DEFINED IN SECTION 6.2.8 OF ASTM F2418. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT D FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS. CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS.N/A PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND PREPARATION REQUIREMENTS. C INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 24" (600 mm) ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE 'C' LAYER. GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR PROCESSED AGGREGATE. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS LAYER. AASHTO M145¹ A-1, A-2-4, A-3 OR AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 BEGIN COMPACTIONS AFTER 24" (600 mm) OF MATERIAL OVER THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN 12" (300 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR PROCESSED AGGREGATE MATERIALS. B EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER ABOVE. CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE5 AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57 A FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER. CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE5 AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3 45" (1140 mm) 18" (450 mm) MIN* 8' (2.4 m) MAX 12" (300 mm) MIN77" (1950 mm) 12" (300 mm) MIN 6" (150 mm) MIN DEPTH OF STONE 12" MIN D C B A *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, INCREASE COVER TO 24" (600 mm). 6" (150 mm) MIN PERIMETER STONE (SEE NOTE 4) EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) MC-3500 END CAP SUBGRADE SOILS (SEE NOTE 3) PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) **THIS CROSS SECTION DETAIL REPRESENTS MINIMUM REQUIREMENTS FOR INSTALLATION. PLEASE SEE THE LAYOUT SHEET(S) FOR PROJECT SPECIFIC REQUIREMENTS. NO COMPACTION REQUIRED. ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS PROPOSED UNDERDRAIN PROPOSED ISOLATOR ROW INSPECTION PORTALS PROPOSED STORM SEWER PROPOSED STORM SEWER PROPOSED LOW IMPACT DEVELOPMENT CHAMBER SYSTEM (LID) T 9+7510+0011+0011+31 FOR LAYOUT PURPOSES N:16271.76 E:13551.23 FOR LAYOUT PURPOSES N:16271.57 E:13493.82 FOR LAYOUT PURPOSES N:16356.33 E:13493.82 FOR LAYOUT PURPOSES N:16356.33 E:13551.23 SDMH D-1.4 INV. IN=4933.26 (SE) INV. IN=4932.65 (W) INV. IN=4932.65 (E) INV. OUT=4932.33 (N) FG=4937.39 MC-3500 STORMTECH CHAMBER 13.03 LF 24" HDPE @ 1.21% SDMH A-4 INV. IN=4932.40 (N) INV. IN=4932.40 (W) INV. OUT=4931.92 (E) INV. OUT=4931.92 (S) FG=4939.11 7.97 LF 24" HDPE @ 2.75% PVC Pipe STORM CHAMBERS PROFILE SCALE: (H) 1" = 10' (V) 1" = 1' START STA: 9+25.00, END STA: 11+50.00 4925 4930 4935 4940 4945 4950 4955 4925 4930 4935 4940 4945 4950 4955 FG = FG = FG = 4 9 3 9 . 1 2 FG = 4 9 3 8 . 2 8 FG = 4 9 3 7 . 8 9 FG = 9+259+5010+0010+5011+0011+50 PROPOSED GROUND @ PIPE CENTERLINE SD M H D - 1 . 4 ST A 1 0 + 9 5 . 0 8 RI M 4 9 3 7 . 4 ± IN V . I N 4 9 3 3 . 2 6 ( S E ) IN V . I N 4 9 3 2 . 6 5 ( W ) IN V . I N 4 9 3 2 . 6 5 ( E ) IN V . O U T 4 9 3 2 . 3 3 ( N ) D = 7 . 0 6 ' SD M H A - 4 ST A 9 + 9 8 . 6 1 RI M 4 9 3 9 . 1 ± IN V . I N 4 9 3 2 . 4 0 ( N ) IN V . I N 4 9 3 2 . 4 0 ( W ) IN V . O U T 4 9 3 1 . 9 2 ( E ) IN V . O U T 4 9 3 1 . 9 2 ( S ) D = 9 . 1 9 ' MC-3500 STORMTECH CHAMBER 13.03 LF 24" HDPE @ 1.21% 7.97 LF 24" HDPE @ 2.75% BA S E O F C H A M B E R ST A : 1 0 + 0 2 . 9 3 EL E V . = 4 9 3 1 . 8 9 ' BA S E O F C H A M B E R ST A : 1 0 + 8 8 . 9 1 EL E V . = 4 9 3 2 . 0 9 ' CO N S T R U C T I O N D E T A I L S N/A N/A 60 DT19 0 40'80' SCALE: 1" = 40' 20' PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e fo r , o r l i a b l e f o r , u n a u t h o r i z e d c h a n g e s t o o r u s e s o f t h e s e pl a n s . A l l c h a n g e s t o t h e p l a n s m u s t b e i n w r i t i n g a n d mu s t b e a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : VERTICAL: HORIZONTAL: SCALE 4025 Automation Way Suite B2 Fort Collins, CO 80525 (970) 698-6046 CivilWorxeng.com BL O O M M U L T I - F A M I L Y D E V E L O P M E N T C22026 HA R T F O R D H O M E S 05 / 0 1 / 2 0 2 4 60 PRELIMINARY NOT FOR CONSTRUCTION POTTER DRIVE (PRIVATE STREET) BELLAMY LANE (PRIVATE STREET) ONE-WAY & TWO-WAY CLEANOUT (CO) CONFIGURATION CLEANOUT RISER (TYP.) WYE CONNECTIONS OR TW0-WAY CLEANOUT TEE w/45° BENDS OR APPROVED EQUAL 4" CLEANOUT ADAPTER FITTING WITH THREADED PLUG. 6" MIN. THICK CONC. PAD PROVIDE HEAVY DUTY (HS-20) OR HIGHER RATED CLEANOUT DRAIN COVER SUBMIT SHOP DRAWINGS FOR APPROVAL CONSTRUCT A 12" x 12" CONCRETE COLLAR AROUND THE VALVE BOX AT FINISHED GRADE. PROVIDE EXPANSION JOINT MATERIAL WHEN PLACING PAD IN CONCRETE PAVEMENTS 4-INCH (MIN.) RISER 12" MIN. 6" MI N . FLOW DIRECTION (ADD CAP FOR END OF LINE C.O.) FOR ONE-WAY CLEANOUTS, USE ONE (1) CLEANOUT RISER DIRECTED DOWNSTREAM TO BEND OR FITTING SEWER PLACE UPSTREAM OF 90° BENDS 12" MIN. 12" MIN. TYPICAL UNDERSLAB DRAIN & TRENCH DETAIL FREE DRAINING GRANULAR MATERIAL UNDERSLAB (TYP.) SEE WPWSS SECTION 02190 UNDER SECT. 2.11 AGGREGATE FOR DRAINS - GRADING 'A' OR 'B' OR APPROVED EQUAL (TYP.) GEOTEXTILE FILTER FABRIC ALL SIDES WITH 1' OVERLAP (TYP.) 4-INCH PERFORATED PERIMETER DRAIN 4" EDGE TO EDGE CLEARANCE FROM BASE GEOTEXTILE SOCK WRAP OR APPROVED EQUAL (TYP.) STAINLESS STEEL TO BE USED SEE DT17 Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO B APPENDIX B • SWMM Calibration Parameters • Inlet Calibration Parameters • SWMM Model Overview • 100-Year SWMM Model Status Report • 2-Year SWMM Model Status Report PROJECT Bloom Multi-Family SWMM Catchment Parameter Woksheet Enter Computed Use Enter Enter Channel X Z K y W W Basin Basin Area Flow Path SHAPE SHAPE SHAPE SHAPE FROM Rounded Average % ID Acres L FACTOR FACTOR FACTOR FACTOR SHAPE Up By Slope %Imperv (ft)FACTOR 25 1 1.850 377 0.56714 0.70 4.0 0.96354 363.3 375 2.8 85.00 2 1.323 406 0.34974 0.60 4.0 0.68801 279.3 300 3.0 86.00 3 1.957 540 0.29232 0.60 4.0 0.57937 312.9 325 3.7 84.00 4 1.397 300 0.67592 0.70 4.0 1.13154 339.5 350 3.2 82.00 5 1.030 300 0.49857 0.70 4.0 0.85485 256.5 275 3.4 75.00 6 0.363 170 0.54760 0.50 4.0 1.16598 198.2 200 3.5 51.00 7 1.685 350 0.59911 0.70 4.0 1.01347 354.7 375 2.7 92.00 8 2.446 350 0.86986 0.60 4.0 1.59486 558.2 575 11.2 23.00 OS-1 0.840 395 0.23449 0.80 4.0 0.36419 143.9 150 4.9 58.00 OS-2 0.449 355 0.15511 0.80 4.0 0.24337 86.4 100 2.8 41.00 OS-3 0.956 725 0.07922 0.80 4.0 0.12549 91.0 100 5.7 54.00 OS-4 0.852 350 0.30301 0.80 4.0 0.46646 163.3 175 5.1 68.00 OS-5 0.641 340 0.24170 0.80 4.0 0.37503 127.5 150 6.0 62.00 OS-6 0.709 730 0.05796 0.80 4.0 0.09206 67.2 75 3.1 42.00 OS-7 0.754 350 0.26800 0.80 4.0 0.41444 145.1 150 2.6 32.00 OS-8 0.469 292 0.23971 0.80 4.0 0.37204 108.6 125 1.8 69.00 OS-9 1.268 900 0.06821 0.80 4.0 0.10821 97.4 100 3.1 79.00 OS-10 0.118 340 0.04439 0.80 4.0 0.07064 24.0 25 2.5 31.00 EX-Site 15.830 1550 0.28702 0.60 4.0 0.56925 882.3 900 1.0 2.00 TOTAL - DEV 13.98 TOTAL - EX 1.85 OS-6-10 3.318 For Existing Conditions used Poor Grass Cover on Rough For Developed Conditions used Average Grass Cover PROJECT: Trevenna Subdivision LOCATION: Windsor, CO SWMM DESIGN STORM SEWER INLET CALIBRATION WORKSHEET Curb Inlet - Type R Opening Opening Reduced Reduced SWMM Parameters Using Orifice Equations Width Length Nominal Ao Reduction Ao Length H W (UDFCD)(in)(in)(sqin)Factor (sqin)(in)Co (ft)(ft) 5' Type R Inlet 6 60 360 80 288 48 0.67 0.5 4 10' Type R Inlet 6 120 720 85 612 102 0.67 0.5 8.5 15' Type R Inlet 6 180 1080 90 972 162 0.67 0.5 13.5 20' Type R Inlet 6 240 1440 95 1368 228 0.67 0.5 19.0 Side Flow Orifice used noting SWMM/SSA use weir flow equation until H is exceeded. Source: UDFCD January 2017 Edition Source: Town of Windsor Criteria (July 2020) 1 C-01 2.296 C-02 1.769 C-03 2.181 C-04 1.646 C-05 1.030 C-06 0.314 C-07 2.105 C-08 2.387 C-OS-1 0.464 C-OS-2 0.224 C-OS-3 0.579 C-OS-4 0.506 C-OS-5 0.400 C-OS-6 0.275 C-OS-7 0.303 C-OS-8 0.164 C-OS-9 0.464 EX-SITE 17.109 A-3-WEIR 0.00 GT-A-1-A 0.50 GT-A-1-B 0.57 GT-A-1-C 0.60 GT-A-1-C-1 1.00GT-A-1-D 0.50 GT-A-1-F 0.73 GT-A2-1-A 0.42 GT-A-B 0.20 GT-AR-A 0.94 GT-AR-B 0.29 GT-AR-C 0.21 GT-B-1-A 0.85GT-B-1-B 0.40 GT-C-1-A 0.88 GT-C-1-B 0.72 GT-C-1-C 1.25GT-C-1-D 1.24 GT-C-B 0.35 GT-INT-B 0.54 GT-INT-C 1.55 P-A-1 1.25 P-A-2 1.24 P-A-3 0.75 P-A-4 0.75P-A-5 -0.65 P-A-6 0.51 P-A-7 0.50 P-A-8 0.54 P-B-1 0.51 P-C-A 1.00 P-C-B 0.51P-C-C 0.25 P-C-D 0.50 P-D-1-A 0.57P-D-1-B -0.91P-D-1-C -2.03 P-D-1-D 0.52 P-D-1-E 0.49 P-D-1-F 2.01 P-D-2-A 1.04P-D-2-B 1.00P-D-2-C 3.39 P-D-2-D 1.99 P-E-1-N 0.45P-E-1-S 4.14 P-E-CHAMB 0.07 P-E-UD 0.18 P-Z-POND-OUT 0.30SW-B-P 24.41SW-CHASE 14.24 SDI A1-2 #N/A SDI B-1 #N/A SDI C-3 #N/A SDI-A-1-4 #N/A SDI-A-1-5 #N/A SDI-D-1.5.1 #N/A SDI-C-1 #N/A SDI-C-3-1 #N/A A-3-LF #N/A J-SDI A-1-2 6.63 J-SDI B-1 5.42 J-SDI C-3 2.53 J-SDI-A-1-4 5.37 J-SDI-A-1-5 2.74 J-SDI-C-1 3.93 J-SDI-C-3-1 4.60 J-SDI-D-1.5.1 5.03 J-SDMH A1-1 6.06 J-SDMH A-1-3 5.59 J-SDMH A-2 3.18 J-SDMH A-3-IN 4.98 J-SDMH A-3-OUT 3.67 J-SDMH A-4 5.79 J-SDMH C-1 4.60 J-SDMH D-1.2 5.09 J-SDMH D-1.3 5.50 J-SDMH D1.5 5.61 J-SDMH D1.6 5.44 J-SDMH_D.1.1 5.69 J-SDMH_D.2.1 4.43 J-SDMH_D.2.2 3.41 J-SDZ-CHAMB_N 5.88J-SDZ-CHAMB_S 5.82 POC_RD-D-2.1 3.14 POC_RD-D-2.2 1.53 RD-4-A 0.76 RD-4-B 0.34 RD-4-C 0.33 RD-4-D 0.36 RD-5-A 0.51RD-5-B 0.83 RD-A-1-A 0.39 RD-A-1-B 0.44 RD-A-1-D 0.39 RD-ANT-1-B 0.30 RD-ANT-1-C 0.24 RD-AR-1-A 0.22 RD-AR-1-B 0.39 RD-AR-1-C 0.48 RD-CHASE 0.12 RD-SDI A1-2 0.76 RD-SDI-A-1-4 0.27 RD-SDI-A-1-5 0.33 RD-SDI-B-1 0.74 RD-SDI-C-1 0.84 RD-SDI-C-3-1 0.39 RD-SDI-C-3A  0.29 RD-SDI-D-1.5.1 1.27 OUT-EAST 0.23 OUT-EX-SITE 0.00 OUT-N 0.00 OUT-POND 0.33 OUT-SE 0.00 OUT-SW 0.45 POND-G 6.05 Gage1 Subcatch Area 4.00 8.00 12.00 16.00 ac Node Max Depth 1.00 2.00 3.00 4.00 ft Link Slope 0.50 1.00 5.00 10.00 % 01/22/2024 00:05:00 BLOOM MULTI-FAMILY DEVELOPMENT - 100-YEAR EPA SWMM 5.2.4 Page 1 EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.4) ------------------------------------------------------------ BLOOM MULTI-FAMILY DEVELOPMENT EPA SWMM Version 5.2.4 Last Updated 4/28/2024 WARNING 04: minimum elevation drop used for Conduit P-E-1-S ************* Element Count ************* Number of rain gages ...... 1 Number of subcatchments ... 18 Number of nodes ........... 57 Number of links ........... 61 Number of pollutants ...... 0 Number of land uses ....... 0 **************** Raingage Summary **************** Data Recording Name Data Source Type Interval ------------------------------------------------------------------------ Gage1 100year INTENSITY 5 min. ******************** Subcatchment Summary ******************** Name Area Width %Imperv %Slope Rain Gage Outlet ----------------------------------------------------------------------------------------------------------- C-01 2.30 375.00 83.00 2.8000 Gage1 RD-A-1-A C-02 1.77 300.00 83.00 3.7000 Gage1 RD-4-C C-03 2.18 325.00 87.00 3.7000 Gage1 RD-SDI-C-3-1 C-04 1.65 350.00 88.00 3.2000 Gage1 RD-A-1-B C-05 1.03 275.00 71.00 3.4000 Gage1 RD-5-A C-06 0.31 200.00 46.00 3.5000 Gage1 RD-CHASE C-07 2.10 375.00 94.00 2.7000 Gage1 RD-SOUTHPARKING C-08 2.39 575.00 23.00 10.0000 Gage1 POND-G BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 1 C-OS-1 0.46 100.00 52.00 4.9000 Gage1 RD-AR-1-A C-OS-2 0.22 65.00 21.00 2.0000 Gage1 OUT-N C-OS-3 0.58 100.00 22.00 5.7000 Gage1 RD-ANT-1-B C-OS-4 0.51 175.00 55.00 5.1000 Gage1 RD-AR-1-B C-OS-5 0.40 100.00 27.00 6.0000 Gage1 RD-AR-1-C C-OS-6 0.28 60.00 40.00 2.0000 Gage1 RD-ANT-1-B C-OS-7 0.30 75.00 23.00 2.0000 Gage1 OUT-SE C-OS-8 0.16 60.00 33.00 2.0000 Gage1 POND-G C-OS-9 0.46 100.00 24.00 1.0000 Gage1 RD-AR-1-B EX-SITE 17.11 550.00 2.00 1.0000 Gage1 OUT-EX-SITE ************ Node Summary ************ Invert Max. Ponded External Name Type Elev. Depth Area Inflow ------------------------------------------------------------------------------- J-SDI A-1-2 JUNCTION 4933.08 12.00 0.0 J-SDI-A-1-4 JUNCTION 4935.43 12.00 0.0 J-SDI-A-1-5 JUNCTION 4938.42 12.00 0.0 J-SDI B-1 JUNCTION 4933.43 12.00 0.0 J-SDI C-3 JUNCTION 4938.31 12.00 0.0 J-SDI-C-1 JUNCTION 4936.08 12.00 0.0 J-SDI-C-3-1 JUNCTION 4936.00 12.00 0.0 J-SDI-D-1.5.1 JUNCTION 4933.46 12.00 0.0 J-SDMH A1-1 JUNCTION 4932.45 12.00 0.0 J-SDMH A-1-3 JUNCTION 4934.86 12.00 0.0 J-SDMH A-2 JUNCTION 4931.31 12.00 0.0 J-SDMH A-3-IN JUNCTION 4931.80 12.00 0.0 J-SDMH A-3-OUT JUNCTION 4931.80 12.00 0.0 J-SDMH A-4 JUNCTION 4931.92 12.00 0.0 J-SDMH C-1 JUNCTION 4935.83 12.00 0.0 J-SDMH D-1.2 JUNCTION 4933.15 12.00 0.0 J-SDMH D-1.3 JUNCTION 4932.75 12.00 50.0 J-SDMH D1.5 JUNCTION 4932.33 12.00 0.0 J-SDMH D1.6 JUNCTION 4932.82 12.00 50.0 J-SDZ-CHAMB_N JUNCTION 4931.95 12.00 50.0 J-SDZ-CHAMB_S JUNCTION 4932.33 12.00 50.0 J-STMH-D-1.1 JUNCTION 4932.52 12.00 0.0 POC_RD-D-2.1 JUNCTION 4935.11 12.00 50.0 BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 2 POC_RD-D-2.2 JUNCTION 4936.71 12.00 50.0 RD-4-A JUNCTION 4937.50 12.00 0.0 RD-4-B JUNCTION 4941.81 12.00 0.0 RD-4-C JUNCTION 4943.10 12.00 0.0 RD-4-D JUNCTION 4939.96 12.00 0.0 RD-5-A JUNCTION 4938.99 12.00 0.0 RD-5-B JUNCTION 4938.34 12.00 0.0 RD-A-1-A JUNCTION 4943.02 12.00 0.0 RD-A-1-B JUNCTION 4940.42 12.00 0.0 RD-A-1-D JUNCTION 4940.18 12.00 0.0 RD-ANT-1-B JUNCTION 4943.00 12.00 0.0 RD-ANT-1-C JUNCTION 4941.00 12.00 0.0 RD-AR-1-A JUNCTION 4941.00 12.00 0.0 RD-AR-1-B JUNCTION 4938.00 12.00 0.0 RD-AR-1-C JUNCTION 4936.00 12.00 0.0 RD-CHASE JUNCTION 4937.22 12.00 50.0 RD-SDI-A-1-4 JUNCTION 4941.14 12.00 0.0 RD-SDI-A-1-5 JUNCTION 4942.56 12.00 0.0 RD-SDI A1-2 JUNCTION 4939.00 12.00 0.0 RD-SDI-B-1 JUNCTION 4938.14 12.00 0.0 RD-SDI-C-1 JUNCTION 4939.11 12.00 0.0 RD-SDI-C-3-1 JUNCTION 4940.43 12.00 0.0 RD-SDI-C-3A JUNCTION 4942.08 12.00 0.0 RD-SDI-D-1.5.1 JUNCTION 4937.00 12.00 0.0 SDMH_D.2.1 JUNCTION 4933.81 12.00 50.0 SDMH_D.2.2 JUNCTION 4934.83 12.00 50.0 OUT-EAST OUTFALL 4940.00 1.00 0.0 OUT-EX-SITE OUTFALL 4936.00 0.00 0.0 OUT-N OUTFALL 4946.00 0.00 0.0 OUT-POND OUTFALL 4928.00 1.50 0.0 OUT-SE OUTFALL 4936.00 0.00 0.0 OUT-SW OUTFALL 4935.90 1.00 0.0 POND-G STORAGE 4928.40 11.00 0.0 RD-SOUTHPARKING STORAGE 4937.01 6.00 0.0 ************ Link Summary ************ Name From Node To Node Type Length %Slope Roughness --------------------------------------------------------------------------------------------- BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 3 A-3-WEIR J-SDMH A-3-IN J-SDMH A-3-OUT CONDUIT 5.0 0.2000 0.0160 GT-A-1-A RD-A-1-A RD-SDI-A-1-5 CONDUIT 92.8 0.5002 0.0160 GT-A-1-B RD-4-B RD-SDI-A-1-4 CONDUIT 117.0 0.5745 0.0160 GT-A-1-C RD-SDI-A-1-5 RD-4-B CONDUIT 124.9 0.6036 0.0160 GT-A-1-C-1 RD-SDI-A-1-4 RD-A-1-B CONDUIT 71.1 1.0006 0.0160 GT-A-1-D RD-A-1-B RD-A-1-D CONDUIT 49.5 0.5010 0.0160 GT-A-1-F RD-A-1-D RD-SDI A1-2 CONDUIT 161.4 0.7278 0.0160 GT-A2-1-A RD-SOUTHPARKING RD-SDI-D-1.5.1 CONDUIT 10.0 0.1000 0.0160 GT-A-B RD-SDI A1-2 RD-5-A CONDUIT 174.7 0.1958 0.0160 GT-AR-A RD-AR-1-A RD-AR-1-B CONDUIT 317.9 0.9437 0.0160 GT-AR-B RD-AR-1-B RD-AR-1-C CONDUIT 680.3 0.2940 0.0160 GT-AR-C RD-AR-1-C OUT-SW CONDUIT 47.4 0.2109 0.0160 GT-B-1-A RD-5-A RD-5-B CONDUIT 77.3 0.8504 0.0160 GT-B-1-B RD-5-B RD-SDI-B-1 CONDUIT 48.3 0.3974 0.0160 GT-C-1-A RD-4-C RD-SDI-C-3A CONDUIT 115.2 0.8846 0.0160 GT-C-1-B RD-SDI-C-3A RD-SDI-C-3-1 CONDUIT 229.4 0.7190 0.0160 GT-C-1-C RD-SDI-C-3-1 RD-4-D CONDUIT 37.1 1.2491 0.0160 GT-C-1-D RD-4-D RD-SDI-C-1 CONDUIT 69.0 1.2398 0.0160 GT-C-B RD-SDI-C-1 RD-5-A CONDUIT 129.8 0.3450 0.0160 GT-INT-B RD-ANT-1-B RD-ANT-1-C CONDUIT 370.9 0.5393 0.0160 GT-INT-C RD-ANT-1-C OUT-EAST CONDUIT 64.4 1.5532 0.0160 P-A-1 J-SDI-A-1-5 J-SDI-A-1-4 CONDUIT 239.4 1.2500 0.0130 P-A-2 J-SDI-A-1-4 J-SDMH A-1-3 CONDUIT 46.0 1.2403 0.0130 P-A-3 J-SDMH A-1-3 J-SDI A-1-2 CONDUIT 236.2 0.7524 0.0130 P-A-4 J-SDI A-1-2 J-SDMH A1-1 CONDUIT 84.5 0.7490 0.0130 P-A-5 J-SDMH A-4 J-SDMH A1-1 CONDUIT 7.9 -6.7412 0.0130 P-A-6 J-SDMH A-4 J-SDMH A-3-IN CONDUIT 39.0 0.3077 0.0130 P-A-7 J-SDMH A-3-OUT J-SDMH A-2 CONDUIT 151.8 0.3228 0.0130 P-A-8 J-SDMH A-2 POND-G CONDUIT 52.1 0.2801 0.0130 P-B-1 J-SDI B-1 J-SDMH A1-1 CONDUIT 192.0 0.5120 0.0130 P-C-A J-SDI C-3 J-SDI-C-3-1 CONDUIT 231.0 1.0002 0.0130 P-C-B J-SDI-C-3-1 J-SDMH C-1 CONDUIT 32.6 0.5091 0.0130 P-C-C J-SDI-C-1 J-SDMH C-1 CONDUIT 98.3 0.2534 0.0130 P-C-D J-SDMH C-1 J-SDMH A-1-3 CONDUIT 195.6 0.4959 0.0130 P-D-1-A J-STMH-D-1.1 J-SDMH A-4 CONDUIT 21.3 2.8207 0.0130 P-D-1-B J-STMH-D-1.1 J-SDMH D-1.2 CONDUIT 69.2 -0.9110 0.0130 P-D-1-C J-SDMH D-1.3 J-SDMH D-1.2 CONDUIT 19.8 -2.0257 0.0130 P-D-1-D J-SDMH D-1.3 J-SDMH D1.5 CONDUIT 19.6 2.1433 0.0130 P-D-1-E J-SDMH D1.6 J-SDMH D1.5 CONDUIT 34.8 1.4082 0.0130 P-D-1-F J-SDI-D-1.5.1 J-SDMH D1.5 CONDUIT 40.6 2.7890 0.0130 P-D-2-A SDMH_D.2.1 J-SDMH D-1.2 CONDUIT 63.2 1.0447 0.0130 BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 4 P-D-2-B SDMH_D.2.2 SDMH_D.2.1 CONDUIT 101.9 1.0010 0.0130 P-D-2-C POC_RD-D-2.2 SDMH_D.2.2 CONDUIT 55.4 3.3936 0.0130 P-D-2-D POC_RD-D-2.1 SDMH_D.2.1 CONDUIT 65.3 1.9863 0.0130 P-E-1-N J-SDMH A-4 J-SDZ-CHAMB_N CONDUIT 13.0 -0.2308 0.0130 P-E-1-S J-SDMH D1.5 J-SDZ-CHAMB_S CONDUIT 6.0 0.0167 0.0130 P-E-CHAMB J-SDZ-CHAMB_S J-SDZ-CHAMB_N CONDUIT 95.0 0.4000 0.0240 P-E-UD J-SDZ-CHAMB_N J-SDMH A-3-IN CONDUIT 80.0 0.1875 0.0160 P-F-1 J-SDI-D-1.5.1 POND-G CONDUIT 200.0 0.9015 0.0320 P-Z-POND-OUT POND-G OUT-POND CONDUIT 100.0 0.4000 0.0130 SW-B-P RD-SDI-B-1 POND-G CONDUIT 20.0 24.4114 0.0350 SW-CHASE RD-CHASE POND-G CONDUIT 20.0 14.2423 0.0350 A-3-LF J-SDMH A-3-IN J-SDMH A-3-OUT ORIFICE SDI A1-2 RD-SDI A1-2 J-SDI A-1-2 ORIFICE SDI B-1 RD-SDI-B-1 J-SDI B-1 ORIFICE SDI C-3 RD-SDI-C-3A J-SDI C-3 ORIFICE SDI-A-1-4 RD-SDI-A-1-4 J-SDI-A-1-4 ORIFICE SDI-A-1-5 RD-SDI-A-1-5 J-SDI-A-1-5 ORIFICE SDI-C-1 RD-SDI-C-1 J-SDI-C-1 ORIFICE SDI-C-3-1 RD-SDI-C-3-1 J-SDI-C-3-1 ORIFICE SDI-D-1.5.1 RD-SDI-D-1.5.1 J-SDI-D-1.5.1 ORIFICE ********************* Cross Section Summary ********************* Full Full Hyd. Max. No. of Full Conduit Shape Depth Area Rad. Width Barrels Flow --------------------------------------------------------------------------------------- A-3-WEIR RECT_OPEN 3.00 18.00 1.50 6.00 1 97.97 GT-A-1-A TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 612.10 GT-A-1-B TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 655.98 GT-A-1-C TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 672.38 GT-A-1-C-1 TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 865.72 GT-A-1-D TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 612.59 GT-A-1-F TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 738.33 GT-A2-1-A TRAPEZOIDAL 1.50 170.25 0.75 226.00 1 413.95 GT-A-B TRAPEZOIDAL 2.00 200.40 1.00 200.20 1 823.94 GT-AR-A TRAPEZOIDAL 1.00 25.60 0.50 51.10 1 144.89 GT-AR-B TRAPEZOIDAL 1.00 25.60 0.50 51.10 1 80.87 GT-AR-C TRAPEZOIDAL 1.00 25.60 0.50 51.10 1 68.50 GT-B-1-A TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 798.10 BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 5 GT-B-1-B TRAPEZOIDAL 1.50 57.68 0.75 76.70 1 277.68 GT-C-1-A TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 813.98 GT-C-1-B TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 733.84 GT-C-1-C TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 967.25 GT-C-1-D TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 963.64 GT-C-B TRAPEZOIDAL 1.00 50.10 0.50 100.10 1 172.27 GT-INT-B TRAPEZOIDAL 1.00 25.60 0.50 51.10 1 109.53 GT-INT-C TRAPEZOIDAL 1.00 25.60 0.50 51.10 1 185.88 P-A-1 CIRCULAR 1.50 1.77 0.38 1.50 1 11.74 P-A-2 CIRCULAR 1.50 1.77 0.38 1.50 1 11.70 P-A-3 CIRCULAR 1.50 1.77 0.38 1.50 1 9.11 P-A-4 CIRCULAR 1.50 1.77 0.38 1.50 1 9.09 P-A-5 CIRCULAR 2.00 3.14 0.50 2.00 1 58.74 P-A-6 CIRCULAR 2.00 3.14 0.50 2.00 1 12.55 P-A-7 CIRCULAR 2.00 3.14 0.50 2.00 1 12.85 P-A-8 CIRCULAR 2.00 3.14 0.50 2.00 1 11.97 P-B-1 CIRCULAR 1.50 1.77 0.38 1.50 1 7.52 P-C-A CIRCULAR 1.50 1.77 0.38 1.50 1 10.51 P-C-B CIRCULAR 1.50 1.77 0.38 1.50 1 7.49 P-C-C CIRCULAR 1.50 1.77 0.38 1.50 1 5.29 P-C-D CIRCULAR 1.50 1.77 0.38 1.50 1 7.40 P-D-1-A CIRCULAR 1.50 1.77 0.38 1.50 1 17.64 P-D-1-B CIRCULAR 1.50 1.77 0.38 1.50 1 10.03 P-D-1-C CIRCULAR 1.50 1.77 0.38 1.50 1 14.95 P-D-1-D CIRCULAR 1.50 1.77 0.38 1.50 1 15.38 P-D-1-E CIRCULAR 1.50 1.77 0.38 1.50 1 12.47 P-D-1-F CIRCULAR 1.50 1.77 0.38 1.50 1 17.54 P-D-2-A CIRCULAR 1.50 1.77 0.38 1.50 1 10.74 P-D-2-B CIRCULAR 1.50 1.77 0.38 1.50 1 10.51 P-D-2-C CIRCULAR 0.67 0.35 0.17 0.67 1 2.23 P-D-2-D CIRCULAR 0.67 0.35 0.17 0.67 1 1.71 P-E-1-N CIRCULAR 2.00 3.14 0.50 2.00 1 10.87 P-E-1-S CIRCULAR 2.00 3.14 0.50 2.00 1 2.92 P-E-CHAMB SEMICIRCULAR 3.90 19.31 1.15 6.40 8 82.96 P-E-UD CIRCULAR 0.50 0.20 0.12 0.50 1 0.20 P-F-1 CIRCULAR 1.50 1.77 0.38 1.50 1 4.05 P-Z-POND-OUT CIRCULAR 1.50 1.77 0.38 1.50 1 6.64 SW-B-P TRAPEZOIDAL 2.00 230.00 1.07 215.00 1 5046.00 SW-CHASE TRAPEZOIDAL 2.00 201.00 1.00 200.50 1 3225.52 BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 6 **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ YES Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... DYNWAVE Surcharge Method ......... SLOT Starting Date ............ 01/22/2024 00:00:00 Ending Date .............. 01/24/2024 12:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:05:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 2.00 sec Variable Time Step ....... YES Maximum Trials ........... 20 Number of Threads ........ 1 Head Tolerance ........... 0.005000 ft ********************* Control Actions Taken ********************* ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 11.199 3.927 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 4.001 1.403 Surface Runoff ........... 7.148 2.507 Final Storage ............ 0.096 0.034 BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 7 Continuity Error (%) ..... -0.412 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 7.147 2.329 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 5.989 1.952 Flooding Loss ............ 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 1.164 0.379 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.000 0.000 Continuity Error (%) ..... -0.087 ************************* Highest Continuity Errors ************************* Node J-SDZ-CHAMB_S (-1.86%) Node J-SDMH D1.5 (1.18%) Node J-SDI B-1 (-1.16%) *************************** Time-Step Critical Elements *************************** Link A-3-WEIR (5.96%) ******************************** Highest Flow Instability Indexes ******************************** Link P-E-1-N (19) Link P-D-1-A (18) Link P-A-5 (18) Link P-A-6 (18) BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 8 Link P-A-4 (8) ********************************* Most Frequent Nonconverging Nodes ********************************* Node J-SDI-C-1 (0.09%) Node OUT-EAST (0.09%) Node OUT-EX-SITE (0.09%) Node OUT-N (0.09%) Node OUT-POND (0.09%) ************************* Routing Time Step Summary ************************* Minimum Time Step : 0.20 sec Average Time Step : 1.94 sec Maximum Time Step : 2.00 sec % of Time in Steady State : 0.00 Average Iterations per Step : 2.65 % of Steps Not Converging : 0.09 Time Step Frequencies : 2.000 - 1.516 sec : 93.90 % 1.516 - 1.149 sec : 2.01 % 1.149 - 0.871 sec : 2.01 % 0.871 - 0.660 sec : 2.02 % 0.660 - 0.500 sec : 0.06 % *************************** Subcatchment Runoff Summary *************************** ------------------------------------------------------------------------------------------------------------------------------ Total Total Total Total Imperv Perv Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff Subcatchment in in in in in in in 10^6 gal CFS ------------------------------------------------------------------------------------------------------------------------------ C-01 3.93 0.00 0.00 0.24 3.64 0.44 3.64 0.23 15.96 0.926 C-02 3.93 0.00 0.00 0.23 3.64 0.44 3.64 0.17 12.90 0.927 BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 9 C-03 3.93 0.00 0.00 0.18 3.69 0.34 3.69 0.22 15.68 0.940 C-04 3.93 0.00 0.00 0.16 3.71 0.31 3.71 0.17 12.76 0.944 C-05 3.93 0.00 0.00 0.40 3.49 0.75 3.49 0.10 7.61 0.889 C-06 3.93 0.00 0.00 0.74 3.18 1.40 3.18 0.03 2.10 0.809 C-07 3.93 0.00 0.00 0.08 3.78 0.16 3.78 0.22 15.63 0.963 C-08 3.93 0.00 0.00 1.14 0.89 2.80 2.80 0.18 14.94 0.713 C-OS-1 3.93 0.00 0.00 0.68 3.23 1.22 3.23 0.04 2.87 0.821 C-OS-2 3.93 0.00 0.00 1.18 2.75 1.93 2.75 0.02 1.04 0.699 C-OS-3 3.93 0.00 0.00 1.17 2.76 1.91 2.76 0.04 2.72 0.703 C-OS-4 3.93 0.00 0.00 0.62 3.29 1.16 3.29 0.05 3.52 0.837 C-OS-5 3.93 0.00 0.00 1.05 2.88 1.84 2.88 0.03 2.23 0.733 C-OS-6 3.93 0.00 0.00 0.90 3.01 1.47 3.01 0.02 1.31 0.767 C-OS-7 3.93 0.00 0.00 1.17 2.76 1.87 2.76 0.02 1.32 0.702 C-OS-8 3.93 0.00 0.00 0.97 2.95 1.68 2.95 0.01 0.87 0.752 C-OS-9 3.93 0.00 0.00 1.23 2.69 1.76 2.69 0.03 1.60 0.685 EX-SITE 3.93 0.00 0.00 2.31 0.08 1.54 1.62 0.75 17.17 0.412 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- J-SDI A-1-2 JUNCTION 0.70 6.59 4939.67 0 00:44 6.59 J-SDI-A-1-4 JUNCTION 0.19 5.36 4940.79 0 00:41 5.26 J-SDI-A-1-5 JUNCTION 0.06 2.72 4941.15 0 00:41 2.62 J-SDI B-1 JUNCTION 0.51 5.38 4938.82 0 00:45 5.38 J-SDI C-3 JUNCTION 0.07 2.53 4940.83 0 00:41 2.47 J-SDI-C-1 JUNCTION 0.16 3.93 4940.00 0 00:42 3.90 J-SDI-C-3-1 JUNCTION 0.18 4.60 4940.59 0 00:41 4.56 J-SDI-D-1.5.1 JUNCTION 0.47 4.33 4937.80 0 00:48 4.33 J-SDMH A1-1 JUNCTION 0.92 5.70 4938.15 0 00:47 5.70 J-SDMH A-1-3 JUNCTION 0.25 5.57 4940.43 0 00:41 5.52 J-SDMH A-2 JUNCTION 0.88 3.26 4934.57 0 02:15 3.26 J-SDMH A-3-IN JUNCTION 1.23 4.73 4936.53 0 00:48 4.72 J-SDMH A-3-OUT JUNCTION 0.72 4.38 4936.18 0 00:48 4.37 J-SDMH A-4 JUNCTION 1.19 5.76 4937.68 0 00:48 5.75 BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 10 J-SDMH C-1 JUNCTION 0.18 4.59 4940.42 0 00:42 4.55 J-SDMH D-1.2 JUNCTION 0.58 4.55 4937.70 0 00:48 4.54 J-SDMH D-1.3 JUNCTION 0.76 4.95 4937.70 0 00:48 4.95 J-SDMH D1.5 JUNCTION 0.97 5.38 4937.71 0 00:48 5.37 J-SDMH D1.6 JUNCTION 0.73 4.89 4937.71 0 00:48 4.88 J-SDZ-CHAMB_N JUNCTION 1.17 5.74 4937.69 0 00:48 5.73 J-SDZ-CHAMB_S JUNCTION 0.96 5.36 4937.69 0 00:48 5.35 J-STMH-D-1.1 JUNCTION 0.87 5.17 4937.69 0 00:48 5.16 POC_RD-D-2.1 JUNCTION 0.09 2.59 4937.70 0 00:48 2.58 POC_RD-D-2.2 JUNCTION 0.02 0.99 4937.70 0 00:48 0.98 RD-4-A JUNCTION 0.00 0.00 4937.50 0 00:00 0.00 RD-4-B JUNCTION 0.01 0.34 4942.15 0 00:41 0.33 RD-4-C JUNCTION 0.02 0.33 4943.42 0 00:40 0.32 RD-4-D JUNCTION 0.01 0.36 4940.33 0 00:41 0.34 RD-5-A JUNCTION 0.02 0.51 4939.50 0 00:44 0.50 RD-5-B JUNCTION 0.03 0.82 4939.16 0 00:44 0.82 RD-A-1-A JUNCTION 0.02 0.39 4943.42 0 00:40 0.39 RD-A-1-B JUNCTION 0.02 0.44 4940.86 0 00:41 0.43 RD-A-1-D JUNCTION 0.02 0.39 4940.56 0 00:42 0.37 RD-ANT-1-B JUNCTION 0.01 0.30 4943.30 0 00:45 0.30 RD-ANT-1-C JUNCTION 0.01 0.24 4941.24 0 00:46 0.23 RD-AR-1-A JUNCTION 0.01 0.22 4941.22 0 00:41 0.22 RD-AR-1-B JUNCTION 0.02 0.39 4938.39 0 00:46 0.39 RD-AR-1-C JUNCTION 0.02 0.48 4936.48 0 00:48 0.48 RD-CHASE JUNCTION 0.00 0.12 4937.34 0 00:40 0.12 RD-SDI-A-1-4 JUNCTION 0.01 0.27 4941.40 0 00:42 0.26 RD-SDI-A-1-5 JUNCTION 0.01 0.33 4942.89 0 00:40 0.32 RD-SDI A1-2 JUNCTION 0.02 0.74 4939.74 0 00:44 0.74 RD-SDI-B-1 JUNCTION 0.02 0.73 4938.88 0 00:44 0.73 RD-SDI-C-1 JUNCTION 0.02 0.84 4939.94 0 00:42 0.82 RD-SDI-C-3-1 JUNCTION 0.01 0.39 4940.81 0 00:41 0.37 RD-SDI-C-3A JUNCTION 0.01 0.29 4942.36 0 00:41 0.28 RD-SDI-D-1.5.1 JUNCTION 0.02 0.95 4937.95 0 00:48 0.95 SDMH_D.2.1 JUNCTION 0.35 3.89 4937.70 0 00:48 3.88 SDMH_D.2.2 JUNCTION 0.13 2.87 4937.70 0 00:48 2.86 OUT-EAST OUTFALL 0.01 0.23 4940.23 0 00:46 0.23 OUT-EX-SITE OUTFALL 0.00 0.00 4936.00 0 00:00 0.00 OUT-N OUTFALL 0.00 0.00 4946.00 0 00:00 0.00 OUT-POND OUTFALL 0.24 0.39 4928.39 0 00:24 0.39 OUT-SE OUTFALL 0.00 0.00 4936.00 0 00:00 0.00 OUT-SW OUTFALL 0.02 0.45 4936.35 0 00:48 0.45 BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 11 POND-G STORAGE 2.41 6.16 4934.56 0 02:39 6.16 RD-SOUTHPARKING STORAGE 0.03 0.94 4937.95 0 00:48 0.94 ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- J-SDI A-1-2 JUNCTION 0.00 14.75 0 00:37 0 0.493 -0.046 J-SDI-A-1-4 JUNCTION 0.00 6.46 0 00:41 0 0.135 -0.023 J-SDI-A-1-5 JUNCTION 0.00 3.82 0 00:40 0 0.0839 0.024 J-SDI B-1 JUNCTION 0.00 10.53 0 00:37 0 0.144 -1.142 J-SDI C-3 JUNCTION 0.00 3.09 0 00:41 0 0.0666 0.038 J-SDI-C-1 JUNCTION 0.00 5.58 0 00:42 0 0.127 0.122 J-SDI-C-3-1 JUNCTION 0.00 5.93 0 00:37 0 0.151 -0.018 J-SDI-D-1.5.1 JUNCTION 0.00 11.00 0 00:38 0 0.232 -0.221 J-SDMH A1-1 JUNCTION 0.00 19.77 0 00:37 0 0.641 0.000 J-SDMH A-1-3 JUNCTION 0.00 8.49 0 00:29 0 0.305 0.049 J-SDMH A-2 JUNCTION 0.00 20.16 0 00:48 0 0.646 0.102 J-SDMH A-3-IN JUNCTION 0.00 20.16 0 00:48 0 0.648 -0.122 J-SDMH A-3-OUT JUNCTION 0.00 20.16 0 00:48 0 0.647 0.015 J-SDMH A-4 JUNCTION 0.00 19.67 0 00:36 0 0.722 -0.047 J-SDMH C-1 JUNCTION 0.00 6.64 0 00:29 0 0.225 0.034 J-SDMH D-1.2 JUNCTION 0.00 2.98 0 00:33 0 0.0353 0.000 J-SDMH D-1.3 JUNCTION 0.00 2.11 0 00:33 0 0.0292 -0.440 J-SDMH D1.5 JUNCTION 0.00 7.92 0 00:33 0 0.1 1.189 J-SDMH D1.6 JUNCTION 0.00 0.27 0 00:36 0 0.000923 28.392 J-SDZ-CHAMB_N JUNCTION 0.00 12.26 0 00:33 0 0.146 0.782 J-SDZ-CHAMB_S JUNCTION 0.00 12.40 0 00:33 0 0.0951 -1.825 J-STMH-D-1.1 JUNCTION 0.00 3.03 0 00:33 0 0.0351 0.952 POC_RD-D-2.1 JUNCTION 0.00 0.24 0 00:37 0 0.0004 0.009 POC_RD-D-2.2 JUNCTION 0.00 0.22 0 00:39 0 0.000163 0.028 RD-4-A JUNCTION 0.00 0.00 0 00:00 0 0 0.000 gal RD-4-B JUNCTION 0.00 11.80 0 00:41 0 0.143 0.039 RD-4-C JUNCTION 12.90 12.90 0 00:40 0.175 0.175 -0.044 BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 12 RD-4-D JUNCTION 0.00 22.04 0 00:41 0 0.243 -0.115 RD-5-A JUNCTION 7.61 44.83 0 00:43 0.0976 0.39 -0.094 RD-5-B JUNCTION 0.00 44.36 0 00:44 0 0.39 0.004 RD-A-1-A JUNCTION 15.96 15.96 0 00:40 0.227 0.227 -0.019 RD-A-1-B JUNCTION 12.76 20.12 0 00:41 0.166 0.257 -0.051 RD-A-1-D JUNCTION 0.00 20.08 0 00:41 0 0.257 -0.269 RD-ANT-1-B JUNCTION 3.97 3.97 0 00:45 0.0659 0.0659 -0.194 RD-ANT-1-C JUNCTION 0.00 3.89 0 00:45 0 0.066 0.195 RD-AR-1-A JUNCTION 2.87 2.87 0 00:40 0.0406 0.0406 -0.526 RD-AR-1-B JUNCTION 4.98 7.62 0 00:40 0.0791 0.12 -0.509 RD-AR-1-C JUNCTION 2.23 9.00 0 00:45 0.0313 0.152 0.552 RD-CHASE JUNCTION 2.10 2.10 0 00:40 0.0271 0.0271 -0.000 RD-SDI-A-1-4 JUNCTION 0.00 11.61 0 00:42 0 0.143 0.104 RD-SDI-A-1-5 JUNCTION 0.00 15.83 0 00:40 0 0.227 -0.029 RD-SDI A1-2 JUNCTION 0.00 19.96 0 00:42 0 0.258 0.408 RD-SDI-B-1 JUNCTION 0.00 44.29 0 00:44 0 0.39 0.029 RD-SDI-C-1 JUNCTION 0.00 27.57 0 00:41 0 0.298 0.078 RD-SDI-C-3-1 JUNCTION 15.68 24.24 0 00:40 0.219 0.327 -0.012 RD-SDI-C-3A JUNCTION 0.00 12.78 0 00:40 0 0.175 0.059 RD-SDI-D-1.5.1 JUNCTION 0.00 11.91 0 00:38 0 0.216 0.013 SDMH_D.2.1 JUNCTION 0.00 1.07 0 00:33 0 0.00472 -0.282 SDMH_D.2.2 JUNCTION 0.00 0.56 0 00:34 0 0.0013 0.017 OUT-EAST OUTFALL 0.00 3.85 0 00:46 0 0.0659 0.000 OUT-EX-SITE OUTFALL 17.17 17.17 0 00:50 0.751 0.751 0.000 OUT-N OUTFALL 1.04 1.04 0 00:45 0.0167 0.0167 0.000 OUT-POND OUTFALL 0.00 1.00 0 00:24 0 0.944 0.000 OUT-SE OUTFALL 1.32 1.32 0 00:45 0.0227 0.0227 0.000 OUT-SW OUTFALL 0.00 8.31 0 00:48 0 0.151 0.000 POND-G STORAGE 15.74 80.55 0 00:44 0.195 1.28 -0.082 RD-SOUTHPARKING STORAGE 15.63 15.63 0 00:40 0.216 0.216 -0.014 ********************** Node Surcharge Summary ********************** Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 13 --------------------------------------------------------------------- J-SDI A-1-2 JUNCTION 9.72 5.092 5.408 J-SDI-A-1-4 JUNCTION 1.37 3.860 6.640 J-SDI-A-1-5 JUNCTION 0.43 1.225 9.275 J-SDI B-1 JUNCTION 6.63 3.883 6.617 J-SDI C-3 JUNCTION 0.54 1.025 9.475 J-SDI-C-1 JUNCTION 1.16 2.426 8.074 J-SDI-C-3-1 JUNCTION 1.18 3.098 7.402 J-SDI-D-1.5.1 JUNCTION 0.62 1.133 7.667 J-SDMH A1-1 JUNCTION 10.81 3.703 6.297 J-SDMH A-1-3 JUNCTION 1.77 4.073 6.427 J-SDMH A-2 JUNCTION 12.55 1.261 8.739 J-SDMH A-4 JUNCTION 15.51 3.760 6.240 J-SDMH C-1 JUNCTION 1.24 3.087 7.413 J-SDMH D-1.2 JUNCTION 9.01 3.046 7.454 J-SDMH D-1.3 JUNCTION 12.61 3.451 7.049 J-SDMH D1.5 JUNCTION 11.87 3.376 6.624 J-SDMH D1.6 JUNCTION 11.97 3.386 7.114 J-SDZ-CHAMB_N JUNCTION 1.41 1.839 6.261 J-SDZ-CHAMB_S JUNCTION 0.81 1.459 6.641 J-STMH-D-1.1 JUNCTION 14.75 3.666 6.834 POC_RD-D-2.1 JUNCTION 1.60 1.926 9.407 POC_RD-D-2.2 JUNCTION 0.41 0.326 11.007 RD-4-A JUNCTION 60.00 0.000 12.000 SDMH_D.2.1 JUNCTION 2.41 2.388 8.112 SDMH_D.2.2 JUNCTION 0.73 1.369 9.131 ********************* Node Flooding Summary ********************* No nodes were flooded. ********************** Storage Volume Summary ********************** ------------------------------------------------------------------------------------------------ Average Avg Evap Exfil Maximum Max Time of Max Maximum BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 14 Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft³ Full Loss Loss 1000 ft³ Full days hr:min CFS ------------------------------------------------------------------------------------------------ POND-G 43.835 10.2 0.0 26.2 145.710 33.9 0 02:39 1.50 RD-SOUTHPARKING 0.028 0.0 0.0 0.0 2.303 0.7 0 00:48 11.91 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg Max Total Freq Flow Flow Volume Outfall Node Pcnt CFS CFS 10^6 gal ----------------------------------------------------------- OUT-EAST 9.61 0.88 3.85 0.066 OUT-EX-SITE 9.65 8.61 17.17 0.751 OUT-N 7.43 0.29 1.04 0.017 OUT-POND 61.32 0.97 1.00 0.944 OUT-SE 7.83 0.37 1.32 0.023 OUT-SW 12.75 1.50 8.31 0.151 ----------------------------------------------------------- System 18.10 12.62 32.20 1.951 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- A-3-WEIR CONDUIT 20.10 0 00:48 3.41 0.21 0.39 GT-A-1-A CONDUIT 15.83 0 00:40 2.39 0.03 0.24 GT-A-1-B CONDUIT 11.61 0 00:42 2.47 0.02 0.20 GT-A-1-C CONDUIT 11.80 0 00:41 2.06 0.02 0.22 GT-A-1-C-1 CONDUIT 8.79 0 00:42 1.41 0.01 0.23 GT-A-1-D CONDUIT 20.08 0 00:41 2.37 0.03 0.27 BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 15 GT-A-1-F CONDUIT 19.96 0 00:42 2.10 0.03 0.37 GT-A2-1-A CONDUIT 11.91 0 00:38 1.30 0.03 0.63 GT-A-B CONDUIT 12.21 0 00:44 1.16 0.01 0.23 GT-AR-A CONDUIT 2.74 0 00:41 1.23 0.02 0.31 GT-AR-B CONDUIT 6.82 0 00:46 1.49 0.08 0.43 GT-AR-C CONDUIT 8.31 0 00:48 1.49 0.12 0.47 GT-B-1-A CONDUIT 44.36 0 00:44 2.00 0.06 0.44 GT-B-1-B CONDUIT 44.29 0 00:44 2.83 0.16 0.52 GT-C-1-A CONDUIT 12.78 0 00:40 2.72 0.02 0.20 GT-C-1-B CONDUIT 9.21 0 00:41 1.60 0.01 0.23 GT-C-1-C CONDUIT 22.04 0 00:41 3.12 0.02 0.25 GT-C-1-D CONDUIT 22.00 0 00:41 2.36 0.02 0.40 GT-C-B CONDUIT 27.63 0 00:42 2.23 0.16 0.50 GT-INT-B CONDUIT 3.89 0 00:45 2.12 0.04 0.27 GT-INT-C CONDUIT 3.85 0 00:46 2.69 0.02 0.24 P-A-1 CONDUIT 3.82 0 00:40 3.87 0.32 1.00 P-A-2 CONDUIT 6.46 0 00:41 3.66 0.55 1.00 P-A-3 CONDUIT 8.26 0 00:30 4.67 0.91 1.00 P-A-4 CONDUIT 13.94 0 00:36 7.89 1.53 1.00 P-A-5 CONDUIT 19.67 0 00:36 6.26 0.33 1.00 P-A-6 CONDUIT 19.60 0 00:48 6.24 1.56 1.00 P-A-7 CONDUIT 20.16 0 00:48 6.42 1.57 1.00 P-A-8 CONDUIT 20.16 0 00:48 6.42 1.68 1.00 P-B-1 CONDUIT 7.05 0 01:11 3.99 0.94 1.00 P-C-A CONDUIT 3.09 0 00:41 1.82 0.29 1.00 P-C-B CONDUIT 5.92 0 00:37 3.35 0.79 1.00 P-C-C CONDUIT 5.58 0 00:42 3.16 1.05 1.00 P-C-D CONDUIT 6.41 0 00:29 4.10 0.87 1.00 P-D-1-A CONDUIT 3.03 0 00:33 1.97 0.17 1.00 P-D-1-B CONDUIT 2.98 0 00:33 3.92 0.30 1.00 P-D-1-C CONDUIT 2.11 0 00:33 2.55 0.14 1.00 P-D-1-D CONDUIT 2.04 0 00:33 1.17 0.13 1.00 P-D-1-E CONDUIT 0.52 0 00:22 0.47 0.04 1.00 P-D-1-F CONDUIT 5.88 0 00:33 4.00 0.34 1.00 P-D-2-A CONDUIT 1.07 0 00:33 0.70 0.10 1.00 P-D-2-B CONDUIT 0.56 0 00:34 0.62 0.05 1.00 P-D-2-C CONDUIT 0.22 0 00:39 0.63 0.10 1.00 P-D-2-D CONDUIT 0.24 0 00:37 0.70 0.14 1.00 P-E-1-N CONDUIT 11.95 0 00:33 4.09 1.10 1.00 P-E-1-S CONDUIT 7.79 0 00:33 4.72 2.67 1.00 P-E-CHAMB CONDUIT 5.27 0 00:30 0.40 0.01 1.00 BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 16 P-E-UD CONDUIT 0.56 0 00:48 2.85 2.84 1.00 P-F-1 CONDUIT 5.72 0 00:48 3.24 1.41 1.00 P-Z-POND-OUT CONDUIT 1.00 0 00:24 2.71 0.15 1.00 SW-B-P CONDUIT 38.59 0 00:44 6.19 0.01 0.16 SW-CHASE CONDUIT 2.10 0 00:40 2.56 0.00 0.06 A-3-LF ORIFICE 0.18 0 00:33 1.00 SDI A1-2 ORIFICE 8.45 0 00:37 1.00 SDI B-1 ORIFICE 10.53 0 00:37 1.00 SDI C-3 ORIFICE 3.09 0 00:41 SDI-A-1-4 ORIFICE 2.74 0 00:42 SDI-A-1-5 ORIFICE 3.82 0 00:40 SDI-C-1 ORIFICE 5.58 0 00:42 1.00 SDI-C-3-1 ORIFICE 3.56 0 00:37 SDI-D-1.5.1 ORIFICE 11.00 0 00:38 1.00 *************************** Flow Classification Summary *************************** ------------------------------------------------------------------------------------- Adjusted ---------- Fraction of Time in Flow Class ---------- /Actual Up Down Sub Sup Up Down Norm Inlet Conduit Length Dry Dry Dry Crit Crit Crit Crit Ltd Ctrl ------------------------------------------------------------------------------------- A-3-WEIR 1.00 0.94 0.00 0.00 0.01 0.00 0.00 0.06 0.00 0.00 GT-A-1-A 1.00 0.00 0.00 0.00 0.84 0.16 0.00 0.00 0.00 0.00 GT-A-1-B 1.00 0.00 0.00 0.00 0.90 0.09 0.00 0.00 0.01 0.00 GT-A-1-C 1.00 0.00 0.11 0.00 0.89 0.00 0.00 0.00 0.99 0.00 GT-A-1-C-1 1.00 0.00 0.70 0.00 0.30 0.00 0.00 0.00 1.00 0.00 GT-A-1-D 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.96 0.00 GT-A-1-F 1.00 0.00 0.00 0.00 0.70 0.29 0.00 0.00 0.02 0.00 GT-A2-1-A 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 GT-A-B 1.00 0.00 0.99 0.00 0.01 0.00 0.00 0.00 0.99 0.00 GT-AR-A 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.98 0.00 GT-AR-B 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.56 0.00 GT-AR-C 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.90 0.00 GT-B-1-A 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.00 0.00 GT-B-1-B 1.00 0.00 0.00 0.00 0.92 0.08 0.00 0.00 0.00 0.00 GT-C-1-A 1.00 0.00 0.00 0.00 0.56 0.44 0.00 0.00 0.00 0.00 GT-C-1-B 1.00 0.06 0.13 0.00 0.81 0.00 0.00 0.00 1.00 0.00 BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 17 GT-C-1-C 1.00 0.00 0.11 0.00 0.86 0.04 0.00 0.00 0.96 0.00 GT-C-1-D 1.00 0.00 0.00 0.00 0.77 0.23 0.00 0.00 0.03 0.00 GT-C-B 1.00 0.00 0.98 0.00 0.01 0.00 0.00 0.00 0.99 0.00 GT-INT-B 1.00 0.00 0.00 0.00 0.99 0.01 0.00 0.00 0.43 0.00 GT-INT-C 1.00 0.18 0.00 0.00 0.78 0.04 0.00 0.00 0.94 0.00 P-A-1 1.00 0.00 0.00 0.00 0.91 0.09 0.00 0.00 0.65 0.00 P-A-2 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.95 0.00 P-A-3 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.88 0.00 P-A-4 1.00 0.00 0.00 0.00 0.99 0.00 0.00 0.00 0.10 0.00 P-A-5 1.00 0.00 0.00 0.00 0.99 0.00 0.00 0.00 0.50 0.00 P-A-6 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.45 0.00 P-A-7 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.62 0.00 P-A-8 1.00 0.00 0.00 0.00 0.44 0.00 0.00 0.56 0.01 0.00 P-B-1 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.29 0.00 P-C-A 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.98 0.00 P-C-B 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.78 0.00 P-C-C 1.00 0.00 0.01 0.00 0.99 0.00 0.00 0.00 0.96 0.00 P-C-D 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.95 0.00 P-D-1-A 1.00 0.00 0.51 0.00 0.49 0.00 0.00 0.00 0.51 0.00 P-D-1-B 1.00 0.51 0.10 0.00 0.39 0.00 0.00 0.00 0.61 0.00 P-D-1-C 1.00 0.55 0.06 0.00 0.39 0.00 0.00 0.00 0.61 0.00 P-D-1-D 1.00 0.00 0.55 0.00 0.45 0.00 0.00 0.00 0.55 0.00 P-D-1-E 1.00 0.00 0.56 0.00 0.44 0.00 0.00 0.00 0.56 0.00 P-D-1-F 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.66 0.00 P-D-2-A 1.00 0.61 0.10 0.00 0.29 0.00 0.00 0.00 0.72 0.00 P-D-2-B 1.00 0.71 0.15 0.00 0.14 0.00 0.00 0.00 0.87 0.00 P-D-2-C 1.00 0.86 0.12 0.00 0.02 0.00 0.00 0.00 0.98 0.00 P-D-2-D 1.00 0.71 0.19 0.00 0.09 0.00 0.00 0.00 0.91 0.00 P-E-1-N 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.44 0.00 P-E-1-S 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 P-E-CHAMB 1.00 0.00 0.46 0.00 0.53 0.00 0.00 0.00 0.30 0.00 P-E-UD 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.45 0.00 P-F-1 1.00 0.80 0.13 0.00 0.06 0.00 0.00 0.02 0.97 0.00 P-Z-POND-OUT 1.00 0.39 0.00 0.00 0.61 0.00 0.00 0.00 0.41 0.00 SW-B-P 1.00 0.87 0.12 0.00 0.00 0.00 0.00 0.01 0.00 0.00 SW-CHASE 1.00 0.00 0.00 0.00 0.04 0.00 0.00 0.96 0.04 0.00 ************************* Conduit Surcharge Summary ************************* BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 18 ---------------------------------------------------------------------------- Hours Hours --------- Hours Full -------- Above Full Capacity Conduit Both Ends Upstream Dnstream Normal Flow Limited ---------------------------------------------------------------------------- P-A-1 0.43 0.43 1.37 0.01 0.01 P-A-2 1.37 1.37 1.77 0.01 0.01 P-A-3 1.77 1.77 9.72 0.01 0.01 P-A-4 9.68 9.72 15.35 1.04 1.18 P-A-5 10.81 10.81 15.54 0.01 0.06 P-A-6 15.54 15.54 16.85 0.63 1.26 P-A-7 8.72 8.72 12.55 0.63 0.71 P-A-8 12.13 12.55 13.24 0.65 1.13 P-B-1 6.63 6.63 15.35 0.01 0.08 P-C-A 0.54 0.54 1.18 0.01 0.01 P-C-B 1.18 1.18 1.24 0.01 0.30 P-C-C 1.16 1.16 1.24 0.12 0.01 P-C-D 1.24 1.24 1.77 0.01 0.01 P-D-1-A 14.74 14.74 20.60 0.01 0.01 P-D-1-B 9.01 9.01 14.74 0.01 0.01 P-D-1-C 9.01 9.01 12.61 0.01 0.01 P-D-1-D 12.61 12.61 16.53 0.01 0.01 P-D-1-E 11.97 11.97 16.53 0.01 0.01 P-D-1-F 6.40 6.40 16.53 0.01 0.01 P-D-2-A 2.41 2.41 9.01 0.01 0.01 P-D-2-B 0.73 0.73 2.41 0.01 0.01 P-D-2-C 0.41 0.41 59.37 0.01 0.01 P-D-2-D 1.60 1.60 59.44 0.01 0.01 P-E-1-N 15.31 15.35 15.54 0.08 1.33 P-E-1-S 11.85 11.88 11.86 0.26 8.79 P-E-CHAMB 0.81 0.81 1.41 0.01 0.01 P-E-UD 29.64 29.64 30.85 1.31 1.05 P-F-1 0.01 0.62 0.01 0.63 0.45 P-Z-POND-OUT 0.01 32.86 0.01 0.01 28.01 Analysis begun on: Tue Apr 30 13:17:41 2024 Analysis ended on: Tue Apr 30 13:17:43 2024 Total elapsed time: 00:00:02 BLOOM MULTI-FAMILY DEVELOPMENT - 100-Year EPA SWMM 5.2.4 Page 19 EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.4) ------------------------------------------------------------ BLOOM MULTI-FAMILY DEVELOPMENT EPA SWMM Version 5.2.4 Last Updated 4/28/2024 WARNING 04: minimum elevation drop used for Conduit P-E-1-S ************* Element Count ************* Number of rain gages ...... 1 Number of subcatchments ... 18 Number of nodes ........... 57 Number of links ........... 61 Number of pollutants ...... 0 Number of land uses ....... 0 **************** Raingage Summary **************** Data Recording Name Data Source Type Interval ------------------------------------------------------------------------ Gage1 2year INTENSITY 5 min. ******************** Subcatchment Summary ******************** Name Area Width %Imperv %Slope Rain Gage Outlet ----------------------------------------------------------------------------------------------------------- C-01 2.30 375.00 83.00 2.8000 Gage1 RD-A-1-A C-02 1.77 300.00 83.00 3.7000 Gage1 RD-4-C C-03 2.18 325.00 87.00 3.7000 Gage1 RD-SDI-C-3-1 C-04 1.65 350.00 88.00 3.2000 Gage1 RD-A-1-B C-05 1.03 275.00 71.00 3.4000 Gage1 RD-5-A C-06 0.31 200.00 46.00 3.5000 Gage1 RD-CHASE C-07 2.10 375.00 94.00 2.7000 Gage1 RD-SOUTHPARKING C-08 2.39 575.00 23.00 10.0000 Gage1 POND-G BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 1 C-OS-1 0.46 100.00 52.00 4.9000 Gage1 RD-AR-1-A C-OS-2 0.22 65.00 21.00 2.0000 Gage1 OUT-N C-OS-3 0.58 100.00 22.00 5.7000 Gage1 RD-ANT-1-B C-OS-4 0.51 175.00 55.00 5.1000 Gage1 RD-AR-1-B C-OS-5 0.40 100.00 27.00 6.0000 Gage1 RD-AR-1-C C-OS-6 0.28 60.00 40.00 2.0000 Gage1 RD-ANT-1-B C-OS-7 0.30 75.00 23.00 2.0000 Gage1 OUT-SE C-OS-8 0.16 60.00 33.00 2.0000 Gage1 POND-G C-OS-9 0.46 100.00 24.00 1.0000 Gage1 RD-AR-1-B EX-SITE 17.11 550.00 2.00 1.0000 Gage1 OUT-EX-SITE ************ Node Summary ************ Invert Max. Ponded External Name Type Elev. Depth Area Inflow ------------------------------------------------------------------------------- J-SDI A-1-2 JUNCTION 4933.08 12.00 0.0 J-SDI-A-1-4 JUNCTION 4935.43 12.00 0.0 J-SDI-A-1-5 JUNCTION 4938.42 12.00 0.0 J-SDI B-1 JUNCTION 4933.43 12.00 0.0 J-SDI C-3 JUNCTION 4938.31 12.00 0.0 J-SDI-C-1 JUNCTION 4936.08 12.00 0.0 J-SDI-C-3-1 JUNCTION 4936.00 12.00 0.0 J-SDI-D-1.5.1 JUNCTION 4933.46 12.00 0.0 J-SDMH A1-1 JUNCTION 4932.45 12.00 0.0 J-SDMH A-1-3 JUNCTION 4934.86 12.00 0.0 J-SDMH A-2 JUNCTION 4931.31 12.00 0.0 J-SDMH A-3-IN JUNCTION 4931.80 12.00 0.0 J-SDMH A-3-OUT JUNCTION 4931.80 12.00 0.0 J-SDMH A-4 JUNCTION 4931.92 12.00 0.0 J-SDMH C-1 JUNCTION 4935.83 12.00 0.0 J-SDMH D-1.2 JUNCTION 4933.15 12.00 0.0 J-SDMH D-1.3 JUNCTION 4932.75 12.00 50.0 J-SDMH D1.5 JUNCTION 4932.33 12.00 0.0 J-SDMH D1.6 JUNCTION 4932.82 12.00 50.0 J-SDZ-CHAMB_N JUNCTION 4931.95 12.00 50.0 J-SDZ-CHAMB_S JUNCTION 4932.33 12.00 50.0 J-STMH-D-1.1 JUNCTION 4932.52 12.00 0.0 POC_RD-D-2.1 JUNCTION 4935.11 12.00 50.0 BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 2 POC_RD-D-2.2 JUNCTION 4936.71 12.00 50.0 RD-4-A JUNCTION 4937.50 12.00 0.0 RD-4-B JUNCTION 4941.81 12.00 0.0 RD-4-C JUNCTION 4943.10 12.00 0.0 RD-4-D JUNCTION 4939.96 12.00 0.0 RD-5-A JUNCTION 4938.99 12.00 0.0 RD-5-B JUNCTION 4938.34 12.00 0.0 RD-A-1-A JUNCTION 4943.02 12.00 0.0 RD-A-1-B JUNCTION 4940.42 12.00 0.0 RD-A-1-D JUNCTION 4940.18 12.00 0.0 RD-ANT-1-B JUNCTION 4943.00 12.00 0.0 RD-ANT-1-C JUNCTION 4941.00 12.00 0.0 RD-AR-1-A JUNCTION 4941.00 12.00 0.0 RD-AR-1-B JUNCTION 4938.00 12.00 0.0 RD-AR-1-C JUNCTION 4936.00 12.00 0.0 RD-CHASE JUNCTION 4937.22 12.00 50.0 RD-SDI-A-1-4 JUNCTION 4941.14 12.00 0.0 RD-SDI-A-1-5 JUNCTION 4942.56 12.00 0.0 RD-SDI A1-2 JUNCTION 4939.00 12.00 0.0 RD-SDI-B-1 JUNCTION 4938.14 12.00 0.0 RD-SDI-C-1 JUNCTION 4939.11 12.00 0.0 RD-SDI-C-3-1 JUNCTION 4940.43 12.00 0.0 RD-SDI-C-3A JUNCTION 4942.08 12.00 0.0 RD-SDI-D-1.5.1 JUNCTION 4937.00 12.00 0.0 SDMH_D.2.1 JUNCTION 4933.81 12.00 50.0 SDMH_D.2.2 JUNCTION 4934.83 12.00 50.0 OUT-EAST OUTFALL 4940.00 1.00 0.0 OUT-EX-SITE OUTFALL 4936.00 0.00 0.0 OUT-N OUTFALL 4946.00 0.00 0.0 OUT-POND OUTFALL 4928.00 1.50 0.0 OUT-SE OUTFALL 4936.00 0.00 0.0 OUT-SW OUTFALL 4935.90 1.00 0.0 POND-G STORAGE 4928.40 11.00 0.0 RD-SOUTHPARKING STORAGE 4937.01 6.00 0.0 ************ Link Summary ************ Name From Node To Node Type Length %Slope Roughness --------------------------------------------------------------------------------------------- BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 3 A-3-WEIR J-SDMH A-3-IN J-SDMH A-3-OUT CONDUIT 5.0 0.2000 0.0160 GT-A-1-A RD-A-1-A RD-SDI-A-1-5 CONDUIT 92.8 0.5002 0.0160 GT-A-1-B RD-4-B RD-SDI-A-1-4 CONDUIT 117.0 0.5745 0.0160 GT-A-1-C RD-SDI-A-1-5 RD-4-B CONDUIT 124.9 0.6036 0.0160 GT-A-1-C-1 RD-SDI-A-1-4 RD-A-1-B CONDUIT 71.1 1.0006 0.0160 GT-A-1-D RD-A-1-B RD-A-1-D CONDUIT 49.5 0.5010 0.0160 GT-A-1-F RD-A-1-D RD-SDI A1-2 CONDUIT 161.4 0.7278 0.0160 GT-A2-1-A RD-SOUTHPARKING RD-SDI-D-1.5.1 CONDUIT 10.0 0.1000 0.0160 GT-A-B RD-SDI A1-2 RD-5-A CONDUIT 174.7 0.1958 0.0160 GT-AR-A RD-AR-1-A RD-AR-1-B CONDUIT 317.9 0.9437 0.0160 GT-AR-B RD-AR-1-B RD-AR-1-C CONDUIT 680.3 0.2940 0.0160 GT-AR-C RD-AR-1-C OUT-SW CONDUIT 47.4 0.2109 0.0160 GT-B-1-A RD-5-A RD-5-B CONDUIT 77.3 0.8504 0.0160 GT-B-1-B RD-5-B RD-SDI-B-1 CONDUIT 48.3 0.3974 0.0160 GT-C-1-A RD-4-C RD-SDI-C-3A CONDUIT 115.2 0.8846 0.0160 GT-C-1-B RD-SDI-C-3A RD-SDI-C-3-1 CONDUIT 229.4 0.7190 0.0160 GT-C-1-C RD-SDI-C-3-1 RD-4-D CONDUIT 37.1 1.2491 0.0160 GT-C-1-D RD-4-D RD-SDI-C-1 CONDUIT 69.0 1.2398 0.0160 GT-C-B RD-SDI-C-1 RD-5-A CONDUIT 129.8 0.3450 0.0160 GT-INT-B RD-ANT-1-B RD-ANT-1-C CONDUIT 370.9 0.5393 0.0160 GT-INT-C RD-ANT-1-C OUT-EAST CONDUIT 64.4 1.5532 0.0160 P-A-1 J-SDI-A-1-5 J-SDI-A-1-4 CONDUIT 239.4 1.2500 0.0130 P-A-2 J-SDI-A-1-4 J-SDMH A-1-3 CONDUIT 46.0 1.2403 0.0130 P-A-3 J-SDMH A-1-3 J-SDI A-1-2 CONDUIT 236.2 0.7524 0.0130 P-A-4 J-SDI A-1-2 J-SDMH A1-1 CONDUIT 84.5 0.7490 0.0130 P-A-5 J-SDMH A-4 J-SDMH A1-1 CONDUIT 7.9 -6.7412 0.0130 P-A-6 J-SDMH A-4 J-SDMH A-3-IN CONDUIT 39.0 0.3077 0.0130 P-A-7 J-SDMH A-3-OUT J-SDMH A-2 CONDUIT 151.8 0.3228 0.0130 P-A-8 J-SDMH A-2 POND-G CONDUIT 52.1 0.2801 0.0130 P-B-1 J-SDI B-1 J-SDMH A1-1 CONDUIT 192.0 0.5120 0.0130 P-C-A J-SDI C-3 J-SDI-C-3-1 CONDUIT 231.0 1.0002 0.0130 P-C-B J-SDI-C-3-1 J-SDMH C-1 CONDUIT 32.6 0.5091 0.0130 P-C-C J-SDI-C-1 J-SDMH C-1 CONDUIT 98.3 0.2534 0.0130 P-C-D J-SDMH C-1 J-SDMH A-1-3 CONDUIT 195.6 0.4959 0.0130 P-D-1-A J-STMH-D-1.1 J-SDMH A-4 CONDUIT 21.3 2.8207 0.0130 P-D-1-B J-STMH-D-1.1 J-SDMH D-1.2 CONDUIT 69.2 -0.9110 0.0130 P-D-1-C J-SDMH D-1.3 J-SDMH D-1.2 CONDUIT 19.8 -2.0257 0.0130 P-D-1-D J-SDMH D-1.3 J-SDMH D1.5 CONDUIT 19.6 2.1433 0.0130 P-D-1-E J-SDMH D1.6 J-SDMH D1.5 CONDUIT 34.8 1.4082 0.0130 P-D-1-F J-SDI-D-1.5.1 J-SDMH D1.5 CONDUIT 40.6 2.7890 0.0130 P-D-2-A SDMH_D.2.1 J-SDMH D-1.2 CONDUIT 63.2 1.0447 0.0130 BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 4 P-D-2-B SDMH_D.2.2 SDMH_D.2.1 CONDUIT 101.9 1.0010 0.0130 P-D-2-C POC_RD-D-2.2 SDMH_D.2.2 CONDUIT 55.4 3.3936 0.0130 P-D-2-D POC_RD-D-2.1 SDMH_D.2.1 CONDUIT 65.3 1.9863 0.0130 P-E-1-N J-SDMH A-4 J-SDZ-CHAMB_N CONDUIT 13.0 -0.2308 0.0130 P-E-1-S J-SDMH D1.5 J-SDZ-CHAMB_S CONDUIT 6.0 0.0167 0.0130 P-E-CHAMB J-SDZ-CHAMB_S J-SDZ-CHAMB_N CONDUIT 95.0 0.4000 0.0240 P-E-UD J-SDZ-CHAMB_N J-SDMH A-3-IN CONDUIT 80.0 0.1875 0.0160 P-F-1 J-SDI-D-1.5.1 POND-G CONDUIT 200.0 0.9015 0.0320 P-Z-POND-OUT POND-G OUT-POND CONDUIT 100.0 0.4000 0.0130 SW-B-P RD-SDI-B-1 POND-G CONDUIT 20.0 24.4114 0.0350 SW-CHASE RD-CHASE POND-G CONDUIT 20.0 14.2423 0.0350 A-3-LF J-SDMH A-3-IN J-SDMH A-3-OUT ORIFICE SDI A1-2 RD-SDI A1-2 J-SDI A-1-2 ORIFICE SDI B-1 RD-SDI-B-1 J-SDI B-1 ORIFICE SDI C-3 RD-SDI-C-3A J-SDI C-3 ORIFICE SDI-A-1-4 RD-SDI-A-1-4 J-SDI-A-1-4 ORIFICE SDI-A-1-5 RD-SDI-A-1-5 J-SDI-A-1-5 ORIFICE SDI-C-1 RD-SDI-C-1 J-SDI-C-1 ORIFICE SDI-C-3-1 RD-SDI-C-3-1 J-SDI-C-3-1 ORIFICE SDI-D-1.5.1 RD-SDI-D-1.5.1 J-SDI-D-1.5.1 ORIFICE ********************* Cross Section Summary ********************* Full Full Hyd. Max. No. of Full Conduit Shape Depth Area Rad. Width Barrels Flow --------------------------------------------------------------------------------------- A-3-WEIR RECT_OPEN 3.00 18.00 1.50 6.00 1 97.97 GT-A-1-A TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 612.10 GT-A-1-B TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 655.98 GT-A-1-C TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 672.38 GT-A-1-C-1 TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 865.72 GT-A-1-D TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 612.59 GT-A-1-F TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 738.33 GT-A2-1-A TRAPEZOIDAL 1.50 170.25 0.75 226.00 1 413.95 GT-A-B TRAPEZOIDAL 2.00 200.40 1.00 200.20 1 823.94 GT-AR-A TRAPEZOIDAL 1.00 25.60 0.50 51.10 1 144.89 GT-AR-B TRAPEZOIDAL 1.00 25.60 0.50 51.10 1 80.87 GT-AR-C TRAPEZOIDAL 1.00 25.60 0.50 51.10 1 68.50 GT-B-1-A TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 798.10 BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 5 GT-B-1-B TRAPEZOIDAL 1.50 57.68 0.75 76.70 1 277.68 GT-C-1-A TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 813.98 GT-C-1-B TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 733.84 GT-C-1-C TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 967.25 GT-C-1-D TRAPEZOIDAL 1.50 112.80 0.75 150.20 1 963.64 GT-C-B TRAPEZOIDAL 1.00 50.10 0.50 100.10 1 172.27 GT-INT-B TRAPEZOIDAL 1.00 25.60 0.50 51.10 1 109.53 GT-INT-C TRAPEZOIDAL 1.00 25.60 0.50 51.10 1 185.88 P-A-1 CIRCULAR 1.50 1.77 0.38 1.50 1 11.74 P-A-2 CIRCULAR 1.50 1.77 0.38 1.50 1 11.70 P-A-3 CIRCULAR 1.50 1.77 0.38 1.50 1 9.11 P-A-4 CIRCULAR 1.50 1.77 0.38 1.50 1 9.09 P-A-5 CIRCULAR 2.00 3.14 0.50 2.00 1 58.74 P-A-6 CIRCULAR 2.00 3.14 0.50 2.00 1 12.55 P-A-7 CIRCULAR 2.00 3.14 0.50 2.00 1 12.85 P-A-8 CIRCULAR 2.00 3.14 0.50 2.00 1 11.97 P-B-1 CIRCULAR 1.50 1.77 0.38 1.50 1 7.52 P-C-A CIRCULAR 1.50 1.77 0.38 1.50 1 10.51 P-C-B CIRCULAR 1.50 1.77 0.38 1.50 1 7.49 P-C-C CIRCULAR 1.50 1.77 0.38 1.50 1 5.29 P-C-D CIRCULAR 1.50 1.77 0.38 1.50 1 7.40 P-D-1-A CIRCULAR 1.50 1.77 0.38 1.50 1 17.64 P-D-1-B CIRCULAR 1.50 1.77 0.38 1.50 1 10.03 P-D-1-C CIRCULAR 1.50 1.77 0.38 1.50 1 14.95 P-D-1-D CIRCULAR 1.50 1.77 0.38 1.50 1 15.38 P-D-1-E CIRCULAR 1.50 1.77 0.38 1.50 1 12.47 P-D-1-F CIRCULAR 1.50 1.77 0.38 1.50 1 17.54 P-D-2-A CIRCULAR 1.50 1.77 0.38 1.50 1 10.74 P-D-2-B CIRCULAR 1.50 1.77 0.38 1.50 1 10.51 P-D-2-C CIRCULAR 0.67 0.35 0.17 0.67 1 2.23 P-D-2-D CIRCULAR 0.67 0.35 0.17 0.67 1 1.71 P-E-1-N CIRCULAR 2.00 3.14 0.50 2.00 1 10.87 P-E-1-S CIRCULAR 2.00 3.14 0.50 2.00 1 2.92 P-E-CHAMB SEMICIRCULAR 3.90 19.31 1.15 6.40 8 82.96 P-E-UD CIRCULAR 0.50 0.20 0.12 0.50 1 0.20 P-F-1 CIRCULAR 1.50 1.77 0.38 1.50 1 4.05 P-Z-POND-OUT CIRCULAR 1.50 1.77 0.38 1.50 1 6.64 SW-B-P TRAPEZOIDAL 2.00 230.00 1.07 215.00 1 5046.00 SW-CHASE TRAPEZOIDAL 2.00 201.00 1.00 200.50 1 3225.52 BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 6 **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ YES Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... DYNWAVE Surcharge Method ......... SLOT Starting Date ............ 01/22/2024 00:00:00 Ending Date .............. 01/24/2024 12:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:05:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 2.00 sec Variable Time Step ....... YES Maximum Trials ........... 20 Number of Threads ........ 1 Head Tolerance ........... 0.005000 ft ********************* Control Actions Taken ********************* ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 2.787 0.977 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 1.843 0.646 Surface Runoff ........... 0.856 0.300 Final Storage ............ 0.096 0.034 BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 7 Continuity Error (%) ..... -0.279 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 0.856 0.279 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 0.688 0.224 Flooding Loss ............ 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.168 0.055 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.000 0.000 Continuity Error (%) ..... 0.000 ************************* Highest Continuity Errors ************************* Node RD-AR-1-C (1.62%) Node J-SDZ-CHAMB_S (-1.58%) Node RD-AR-1-B (-1.52%) Node J-SDMH D1.5 (1.39%) *************************** Time-Step Critical Elements *************************** Link A-3-WEIR (1.77%) ******************************** Highest Flow Instability Indexes ******************************** Link P-A-5 (21) Link P-E-1-N (21) Link P-A-6 (19) BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 8 Link P-D-1-A (19) Link P-E-1-S (8) ********************************* Most Frequent Nonconverging Nodes ********************************* Convergence obtained at all time steps. ************************* Routing Time Step Summary ************************* Minimum Time Step : 0.04 sec Average Time Step : 1.99 sec Maximum Time Step : 2.00 sec % of Time in Steady State : 0.00 Average Iterations per Step : 2.41 % of Steps Not Converging : 0.00 Time Step Frequencies : 2.000 - 1.516 sec : 98.64 % 1.516 - 1.149 sec : 0.77 % 1.149 - 0.871 sec : 0.38 % 0.871 - 0.660 sec : 0.12 % 0.660 - 0.500 sec : 0.08 % *************************** Subcatchment Runoff Summary *************************** ------------------------------------------------------------------------------------------------------------------------------ Total Total Total Total Imperv Perv Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff Subcatchment in in in in in in in 10^6 gal CFS ------------------------------------------------------------------------------------------------------------------------------ C-01 0.98 0.00 0.00 0.16 0.74 0.01 0.74 0.05 2.67 0.757 C-02 0.98 0.00 0.00 0.16 0.74 0.01 0.74 0.04 2.28 0.759 C-03 0.98 0.00 0.00 0.12 0.77 0.01 0.77 0.05 2.66 0.793 C-04 0.98 0.00 0.00 0.11 0.79 0.01 0.79 0.04 2.36 0.803 C-05 0.98 0.00 0.00 0.27 0.64 0.01 0.64 0.02 1.48 0.656 BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 9 C-06 0.98 0.00 0.00 0.50 0.43 0.03 0.43 0.00 0.39 0.445 C-07 0.98 0.00 0.00 0.05 0.83 0.00 0.83 0.05 2.68 0.854 C-08 0.98 0.00 0.00 0.83 0.20 0.13 0.13 0.01 0.84 0.135 C-OS-1 0.98 0.00 0.00 0.46 0.48 0.01 0.48 0.01 0.54 0.487 C-OS-2 0.98 0.00 0.00 0.76 0.20 0.01 0.20 0.00 0.12 0.206 C-OS-3 0.98 0.00 0.00 0.75 0.21 0.01 0.21 0.00 0.33 0.215 C-OS-4 0.98 0.00 0.00 0.42 0.51 0.02 0.51 0.01 0.69 0.519 C-OS-5 0.98 0.00 0.00 0.69 0.26 0.02 0.26 0.00 0.29 0.265 C-OS-6 0.98 0.00 0.00 0.58 0.37 0.01 0.37 0.00 0.23 0.374 C-OS-7 0.98 0.00 0.00 0.74 0.22 0.01 0.22 0.00 0.18 0.222 C-OS-8 0.98 0.00 0.00 0.64 0.31 0.02 0.31 0.00 0.14 0.317 C-OS-9 0.98 0.00 0.00 0.73 0.22 0.01 0.22 0.00 0.25 0.227 EX-SITE 0.98 0.00 0.00 0.96 0.02 0.00 0.02 0.01 0.88 0.020 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- J-SDI A-1-2 JUNCTION 0.38 2.80 4935.89 0 01:08 2.79 J-SDI-A-1-4 JUNCTION 0.02 0.66 4936.09 0 01:06 0.65 J-SDI-A-1-5 JUNCTION 0.01 0.32 4938.74 0 00:42 0.31 J-SDI B-1 JUNCTION 0.27 2.27 4935.71 0 01:09 2.27 J-SDI C-3 JUNCTION 0.01 0.31 4938.61 0 00:43 0.31 J-SDI-C-1 JUNCTION 0.02 0.87 4936.95 0 00:45 0.87 J-SDI-C-3-1 JUNCTION 0.03 0.86 4936.86 0 00:45 0.86 J-SDI-D-1.5.1 JUNCTION 0.26 2.21 4935.68 0 01:09 2.21 J-SDMH A1-1 JUNCTION 0.60 3.26 4935.71 0 01:09 3.25 J-SDMH A-1-3 JUNCTION 0.05 1.23 4936.09 0 01:06 1.22 J-SDMH A-2 JUNCTION 0.09 1.01 4932.32 0 01:10 1.01 J-SDMH A-3-IN JUNCTION 0.89 3.82 4935.62 0 01:10 3.82 J-SDMH A-3-OUT JUNCTION 0.08 0.88 4932.68 0 01:10 0.88 J-SDMH A-4 JUNCTION 0.83 3.76 4935.68 0 01:10 3.75 J-SDMH C-1 JUNCTION 0.03 0.95 4936.78 0 00:45 0.95 J-SDMH D-1.2 JUNCTION 0.35 2.53 4935.68 0 01:09 2.53 J-SDMH D-1.3 JUNCTION 0.48 2.93 4935.68 0 01:09 2.93 BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 10 J-SDMH D1.5 JUNCTION 0.65 3.35 4935.68 0 01:10 3.35 J-SDMH D1.6 JUNCTION 0.45 2.86 4935.68 0 01:10 2.85 J-SDZ-CHAMB_N JUNCTION 0.82 3.73 4935.68 0 01:09 3.73 J-SDZ-CHAMB_S JUNCTION 0.64 3.35 4935.68 0 01:09 3.34 J-STMH-D-1.1 JUNCTION 0.57 3.16 4935.68 0 01:10 3.16 POC_RD-D-2.1 JUNCTION 0.01 0.57 4935.68 0 01:09 0.57 POC_RD-D-2.2 JUNCTION 0.00 0.00 4936.71 0 00:00 0.00 RD-4-A JUNCTION 0.00 0.00 4937.50 0 00:00 0.00 RD-4-B JUNCTION 0.01 0.16 4941.97 0 00:44 0.16 RD-4-C JUNCTION 0.01 0.17 4943.27 0 00:40 0.17 RD-4-D JUNCTION 0.01 0.16 4940.12 0 00:42 0.16 RD-5-A JUNCTION 0.00 0.14 4939.13 0 00:41 0.13 RD-5-B JUNCTION 0.01 0.21 4938.55 0 00:42 0.20 RD-A-1-A JUNCTION 0.01 0.20 4943.23 0 00:40 0.20 RD-A-1-B JUNCTION 0.01 0.21 4940.63 0 00:43 0.21 RD-A-1-D JUNCTION 0.01 0.19 4940.36 0 00:43 0.19 RD-ANT-1-B JUNCTION 0.00 0.14 4943.14 0 00:41 0.13 RD-ANT-1-C JUNCTION 0.00 0.10 4941.10 0 00:44 0.10 RD-AR-1-A JUNCTION 0.00 0.12 4941.12 0 00:41 0.11 RD-AR-1-B JUNCTION 0.01 0.20 4938.20 0 00:45 0.20 RD-AR-1-C JUNCTION 0.01 0.21 4936.21 0 00:51 0.21 RD-CHASE JUNCTION 0.00 0.06 4937.28 0 00:40 0.06 RD-SDI-A-1-4 JUNCTION 0.00 0.11 4941.24 0 00:45 0.11 RD-SDI-A-1-5 JUNCTION 0.00 0.15 4942.71 0 00:41 0.15 RD-SDI A1-2 JUNCTION 0.00 0.20 4939.20 0 00:46 0.19 RD-SDI-B-1 JUNCTION 0.00 0.12 4938.26 0 00:44 0.12 RD-SDI-C-1 JUNCTION 0.00 0.18 4939.28 0 00:45 0.18 RD-SDI-C-3-1 JUNCTION 0.00 0.16 4940.59 0 00:43 0.16 RD-SDI-C-3A JUNCTION 0.00 0.13 4942.21 0 00:42 0.13 RD-SDI-D-1.5.1 JUNCTION 0.00 0.19 4937.19 0 00:42 0.19 SDMH_D.2.1 JUNCTION 0.18 1.87 4935.68 0 01:09 1.87 SDMH_D.2.2 JUNCTION 0.03 0.85 4935.68 0 01:09 0.85 OUT-EAST OUTFALL 0.01 0.10 4940.10 0 00:44 0.10 OUT-EX-SITE OUTFALL 0.00 0.00 4936.00 0 00:00 0.00 OUT-N OUTFALL 0.00 0.00 4946.00 0 00:00 0.00 OUT-POND OUTFALL 0.08 0.39 4928.39 0 00:53 0.39 OUT-SE OUTFALL 0.00 0.00 4936.00 0 00:00 0.00 OUT-SW OUTFALL 0.01 0.20 4936.10 0 00:51 0.20 POND-G STORAGE 0.14 1.54 4929.94 0 02:21 1.54 RD-SOUTHPARKING STORAGE 0.01 0.22 4937.23 0 00:41 0.22 BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 11 ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- J-SDI A-1-2 JUNCTION 0.00 9.20 0 00:46 0 0.164 -0.048 J-SDI-A-1-4 JUNCTION 0.00 1.81 0 00:44 0 0.0383 0.013 J-SDI-A-1-5 JUNCTION 0.00 1.15 0 00:41 0 0.0268 -0.048 J-SDI B-1 JUNCTION 0.00 1.32 0 00:44 0 0.0194 -0.246 J-SDI C-3 JUNCTION 0.00 0.97 0 00:42 0 0.0209 -0.005 J-SDI-C-1 JUNCTION 0.00 2.42 0 00:45 0 0.0319 0.011 J-SDI-C-3-1 JUNCTION 0.00 2.27 0 00:43 0 0.0496 -0.000 J-SDI-D-1.5.1 JUNCTION 0.00 2.61 0 00:42 0 0.048 0.334 J-SDMH A1-1 JUNCTION 0.00 10.31 0 00:45 0 0.185 0.000 J-SDMH A-1-3 JUNCTION 0.00 6.43 0 00:45 0 0.12 0.183 J-SDMH A-2 JUNCTION 0.00 4.24 0 01:10 0 0.179 0.012 J-SDMH A-3-IN JUNCTION 0.00 4.26 0 01:09 0 0.181 -0.258 J-SDMH A-3-OUT JUNCTION 0.00 4.25 0 01:10 0 0.179 -0.013 J-SDMH A-4 JUNCTION 0.00 10.20 0 00:45 0 0.257 0.012 J-SDMH C-1 JUNCTION 0.00 4.64 0 00:45 0 0.0815 -0.046 J-SDMH D-1.2 JUNCTION 0.00 1.68 0 00:51 0 0.0235 0.000 J-SDMH D-1.3 JUNCTION 0.00 1.30 0 00:48 0 0.018 -0.854 J-SDMH D1.5 JUNCTION 0.00 3.61 0 00:46 0 0.0487 1.409 J-SDMH D1.6 JUNCTION 0.00 0.14 0 00:41 0 0.000732 25.639 J-SDZ-CHAMB_N JUNCTION 0.00 8.79 0 00:45 0 0.115 0.306 J-SDZ-CHAMB_S JUNCTION 0.00 7.47 0 00:45 0 0.0623 -1.557 J-STMH-D-1.1 JUNCTION 0.00 1.72 0 00:50 0 0.0243 0.198 POC_RD-D-2.1 JUNCTION 0.00 0.04 0 00:59 0 0.000172 0.011 POC_RD-D-2.2 JUNCTION 0.00 0.00 0 00:00 0 0 0.000 gal RD-4-A JUNCTION 0.00 0.00 0 00:00 0 0 0.000 gal RD-4-B JUNCTION 0.00 1.48 0 00:41 0 0.0194 0.138 RD-4-C JUNCTION 2.28 2.28 0 00:40 0.0356 0.0356 -0.062 RD-4-D JUNCTION 0.00 2.46 0 00:43 0 0.0319 -0.071 RD-5-A JUNCTION 1.48 1.48 0 00:40 0.0179 0.0179 -0.092 RD-5-B JUNCTION 0.00 1.36 0 00:41 0 0.0179 0.051 BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 12 RD-A-1-A JUNCTION 2.67 2.67 0 00:40 0.0461 0.0461 -0.026 RD-A-1-B JUNCTION 2.36 2.87 0 00:43 0.0351 0.0429 -0.106 RD-A-1-D JUNCTION 0.00 2.86 0 00:43 0 0.043 -0.155 RD-ANT-1-B JUNCTION 0.57 0.57 0 00:40 0.00603 0.00603 -0.717 RD-ANT-1-C JUNCTION 0.00 0.49 0 00:42 0 0.00608 0.723 RD-AR-1-A JUNCTION 0.54 0.54 0 00:40 0.00599 0.00599 -1.069 RD-AR-1-B JUNCTION 0.94 1.38 0 00:40 0.00976 0.0158 -1.494 RD-AR-1-C JUNCTION 0.29 1.20 0 00:47 0.00282 0.0189 1.650 RD-CHASE JUNCTION 0.39 0.39 0 00:40 0.00371 0.00371 -0.013 RD-SDI-A-1-4 JUNCTION 0.00 1.44 0 00:44 0 0.0194 0.248 RD-SDI-A-1-5 JUNCTION 0.00 2.65 0 00:40 0 0.0462 -0.066 RD-SDI A1-2 JUNCTION 0.00 2.90 0 00:44 0 0.0431 0.164 RD-SDI-B-1 JUNCTION 0.00 1.35 0 00:42 0 0.0179 -0.021 RD-SDI-C-1 JUNCTION 0.00 2.47 0 00:42 0 0.0319 0.056 RD-SDI-C-3-1 JUNCTION 2.66 3.78 0 00:42 0.0459 0.0606 -0.015 RD-SDI-C-3A JUNCTION 0.00 2.26 0 00:40 0 0.0356 0.076 RD-SDI-D-1.5.1 JUNCTION 0.00 2.64 0 00:40 0 0.0477 -0.002 SDMH_D.2.1 JUNCTION 0.00 0.46 0 00:57 0 0.00338 -0.191 SDMH_D.2.2 JUNCTION 0.00 0.22 0 01:00 0 0.000696 0.126 OUT-EAST OUTFALL 0.00 0.46 0 00:44 0 0.00603 0.000 OUT-EX-SITE OUTFALL 0.88 0.88 0 00:40 0.00922 0.00922 0.000 OUT-N OUTFALL 0.12 0.12 0 00:40 0.00122 0.00122 0.000 OUT-POND OUTFALL 0.00 1.00 0 00:53 0 0.187 0.000 OUT-SE OUTFALL 0.18 0.18 0 00:40 0.00179 0.00179 0.000 OUT-SW OUTFALL 0.00 0.98 0 00:51 0 0.0186 0.000 POND-G STORAGE 0.90 5.26 0 01:10 0.00993 0.204 0.013 RD-SOUTHPARKING STORAGE 2.68 2.68 0 00:40 0.0477 0.0477 -0.015 ********************** Node Surcharge Summary ********************** Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet --------------------------------------------------------------------- J-SDI A-1-2 JUNCTION 6.70 1.303 9.197 J-SDI B-1 JUNCTION 4.46 0.773 9.727 BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 13 J-SDMH A1-1 JUNCTION 7.39 1.255 8.745 J-SDMH A-4 JUNCTION 11.21 1.759 8.241 J-SDMH D-1.2 JUNCTION 6.12 1.026 9.474 J-SDMH D-1.3 JUNCTION 8.73 1.426 9.074 J-SDMH D1.5 JUNCTION 8.16 1.345 8.655 J-SDMH D1.6 JUNCTION 8.25 1.357 9.143 J-STMH-D-1.1 JUNCTION 10.43 1.655 8.845 RD-4-A JUNCTION 60.00 0.000 12.000 SDMH_D.2.1 JUNCTION 1.54 0.368 10.132 ********************* Node Flooding Summary ********************* No nodes were flooded. ********************** Storage Volume Summary ********************** ------------------------------------------------------------------------------------------------ Average Avg Evap Exfil Maximum Max Time of Max Maximum Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft³ Full Loss Loss 1000 ft³ Full days hr:min CFS ------------------------------------------------------------------------------------------------ POND-G 0.362 0.1 0.0 8.4 7.865 1.8 0 02:21 1.15 RD-SOUTHPARKING 0.001 0.0 0.0 0.0 0.043 0.0 0 00:41 2.64 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg Max Total Freq Flow Flow Volume Outfall Node Pcnt CFS CFS 10^6 gal ----------------------------------------------------------- OUT-EAST 6.37 0.09 0.46 0.006 BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 14 OUT-EX-SITE 5.89 0.14 0.88 0.009 OUT-N 4.21 0.03 0.12 0.001 OUT-POND 48.26 0.25 1.00 0.187 OUT-SE 4.54 0.03 0.18 0.002 OUT-SW 9.68 0.16 0.98 0.019 ----------------------------------------------------------- System 13.16 0.70 2.79 0.224 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- A-3-WEIR CONDUIT 4.07 0 01:10 2.04 0.04 0.11 GT-A-1-A CONDUIT 2.65 0 00:40 1.70 0.00 0.12 GT-A-1-B CONDUIT 1.44 0 00:44 1.63 0.00 0.09 GT-A-1-C CONDUIT 1.48 0 00:41 1.26 0.00 0.10 GT-A-1-C-1 CONDUIT 0.76 0 00:45 0.61 0.00 0.10 GT-A-1-D CONDUIT 2.86 0 00:43 1.44 0.00 0.13 GT-A-1-F CONDUIT 2.90 0 00:44 1.79 0.00 0.13 GT-A2-1-A CONDUIT 2.64 0 00:40 1.12 0.01 0.13 GT-A-B CONDUIT 0.00 0 00:00 0.00 0.00 0.03 GT-AR-A CONDUIT 0.48 0 00:41 0.85 0.00 0.15 GT-AR-B CONDUIT 1.07 0 00:47 1.07 0.01 0.20 GT-AR-C CONDUIT 0.98 0 00:51 0.90 0.01 0.21 GT-B-1-A CONDUIT 1.36 0 00:41 0.91 0.00 0.12 GT-B-1-B CONDUIT 1.35 0 00:42 1.95 0.00 0.11 GT-C-1-A CONDUIT 2.26 0 00:40 1.97 0.00 0.10 GT-C-1-B CONDUIT 1.20 0 00:42 1.07 0.00 0.10 GT-C-1-C CONDUIT 2.46 0 00:43 1.87 0.00 0.11 GT-C-1-D CONDUIT 2.47 0 00:42 1.98 0.00 0.11 GT-C-B CONDUIT 0.00 0 00:00 0.00 0.00 0.07 GT-INT-B CONDUIT 0.49 0 00:42 1.33 0.00 0.12 GT-INT-C CONDUIT 0.46 0 00:44 1.60 0.00 0.10 P-A-1 CONDUIT 1.15 0 00:42 3.72 0.10 0.30 P-A-2 CONDUIT 1.79 0 00:45 2.55 0.15 0.63 BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 15 P-A-3 CONDUIT 6.41 0 00:46 4.14 0.70 1.00 P-A-4 CONDUIT 9.17 0 00:46 5.19 1.01 1.00 P-A-5 CONDUIT 10.20 0 00:45 3.85 0.17 1.00 P-A-6 CONDUIT 4.14 0 01:09 1.32 0.33 1.00 P-A-7 CONDUIT 4.24 0 01:10 2.90 0.33 0.47 P-A-8 CONDUIT 4.23 0 01:11 3.25 0.35 0.43 P-B-1 CONDUIT 1.31 0 00:44 1.42 0.17 1.00 P-C-A CONDUIT 0.97 0 00:43 1.72 0.09 0.39 P-C-B CONDUIT 2.22 0 00:45 2.36 0.30 0.60 P-C-C CONDUIT 2.42 0 00:45 2.17 0.46 0.61 P-C-D CONDUIT 4.64 0 00:45 3.99 0.63 0.63 P-D-1-A CONDUIT 1.72 0 00:50 0.97 0.10 1.00 P-D-1-B CONDUIT 1.68 0 00:51 2.95 0.17 1.00 P-D-1-C CONDUIT 1.30 0 00:48 2.08 0.09 1.00 P-D-1-D CONDUIT 1.24 0 00:48 0.91 0.08 1.00 P-D-1-E CONDUIT 0.33 0 00:38 0.41 0.03 1.00 P-D-1-F CONDUIT 2.64 0 00:42 4.12 0.15 1.00 P-D-2-A CONDUIT 0.46 0 00:57 0.48 0.04 1.00 P-D-2-B CONDUIT 0.22 0 01:00 0.26 0.02 0.91 P-D-2-C CONDUIT 0.00 0 00:00 0.00 0.00 0.64 P-D-2-D CONDUIT 0.04 0 00:59 0.10 0.02 1.00 P-E-1-N CONDUIT 8.50 0 00:45 3.47 0.78 1.00 P-E-1-S CONDUIT 3.46 0 00:46 4.17 1.18 1.00 P-E-CHAMB CONDUIT 4.09 0 00:45 0.20 0.01 0.91 P-E-UD CONDUIT 0.35 0 00:42 1.79 1.78 1.00 P-F-1 CONDUIT 0.75 0 01:10 1.88 0.19 0.28 P-Z-POND-OUT CONDUIT 1.00 0 00:53 2.71 0.15 0.65 SW-B-P CONDUIT 0.00 0 00:00 0.00 0.00 0.00 SW-CHASE CONDUIT 0.39 0 00:40 1.68 0.00 0.03 A-3-LF ORIFICE 0.18 0 00:59 1.00 SDI A1-2 ORIFICE 2.79 0 00:46 0.39 SDI B-1 ORIFICE 1.32 0 00:44 0.24 SDI C-3 ORIFICE 0.97 0 00:42 SDI-A-1-4 ORIFICE 0.68 0 00:45 SDI-A-1-5 ORIFICE 1.15 0 00:41 SDI-C-1 ORIFICE 2.42 0 00:45 0.36 SDI-C-3-1 ORIFICE 1.30 0 00:43 SDI-D-1.5.1 ORIFICE 2.61 0 00:42 0.37 *************************** BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 16 Flow Classification Summary *************************** ------------------------------------------------------------------------------------- Adjusted ---------- Fraction of Time in Flow Class ---------- /Actual Up Down Sub Sup Up Down Norm Inlet Conduit Length Dry Dry Dry Crit Crit Crit Crit Ltd Ctrl ------------------------------------------------------------------------------------- A-3-WEIR 1.00 0.96 0.00 0.00 0.00 0.00 0.00 0.04 0.00 0.00 GT-A-1-A 1.00 0.00 0.00 0.00 0.82 0.17 0.00 0.00 0.00 0.00 GT-A-1-B 1.00 0.01 0.00 0.00 0.91 0.08 0.00 0.00 0.01 0.00 GT-A-1-C 1.00 0.00 0.11 0.00 0.88 0.00 0.00 0.00 0.99 0.00 GT-A-1-C-1 1.00 0.00 0.71 0.00 0.29 0.00 0.00 0.00 0.99 0.00 GT-A-1-D 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.97 0.00 GT-A-1-F 1.00 0.00 0.00 0.00 0.69 0.31 0.00 0.00 0.00 0.00 GT-A2-1-A 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 GT-A-B 1.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 GT-AR-A 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.98 0.00 GT-AR-B 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.56 0.00 GT-AR-C 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.91 0.00 GT-B-1-A 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.99 0.00 GT-B-1-B 1.00 0.00 0.00 0.00 0.92 0.08 0.00 0.00 0.00 0.00 GT-C-1-A 1.00 0.00 0.00 0.00 0.56 0.43 0.00 0.00 0.00 0.00 GT-C-1-B 1.00 0.06 0.14 0.00 0.80 0.00 0.00 0.00 1.00 0.00 GT-C-1-C 1.00 0.00 0.11 0.00 0.88 0.01 0.00 0.00 0.98 0.00 GT-C-1-D 1.00 0.00 0.00 0.00 0.76 0.24 0.00 0.00 0.01 0.00 GT-C-B 1.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 GT-INT-B 1.00 0.00 0.00 0.00 0.99 0.00 0.00 0.00 0.40 0.00 GT-INT-C 1.00 0.15 0.00 0.00 0.82 0.03 0.00 0.00 0.95 0.00 P-A-1 1.00 0.00 0.00 0.00 0.89 0.10 0.00 0.00 0.66 0.00 P-A-2 1.00 0.00 0.00 0.00 0.99 0.00 0.00 0.00 0.98 0.00 P-A-3 1.00 0.00 0.00 0.00 0.99 0.00 0.00 0.00 0.91 0.00 P-A-4 1.00 0.00 0.00 0.00 0.99 0.00 0.00 0.00 0.10 0.00 P-A-5 1.00 0.01 0.00 0.00 0.99 0.00 0.00 0.00 0.58 0.00 P-A-6 1.00 0.01 0.00 0.00 0.99 0.00 0.00 0.00 0.53 0.00 P-A-7 1.00 0.01 0.00 0.00 0.99 0.00 0.00 0.00 0.97 0.00 P-A-8 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.00 0.00 P-B-1 1.00 0.01 0.00 0.00 0.99 0.00 0.00 0.00 0.37 0.00 P-C-A 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.99 0.00 P-C-B 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.78 0.00 P-C-C 1.00 0.00 0.01 0.00 0.99 0.00 0.00 0.00 0.98 0.00 BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 17 P-C-D 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.97 0.00 P-D-1-A 1.00 0.01 0.59 0.00 0.40 0.00 0.00 0.00 0.59 0.00 P-D-1-B 1.00 0.60 0.10 0.00 0.30 0.00 0.00 0.00 0.69 0.00 P-D-1-C 1.00 0.63 0.06 0.00 0.30 0.00 0.00 0.00 0.69 0.00 P-D-1-D 1.00 0.00 0.63 0.00 0.37 0.00 0.00 0.00 0.63 0.00 P-D-1-E 1.00 0.00 0.64 0.00 0.36 0.00 0.00 0.00 0.64 0.00 P-D-1-F 1.00 0.00 0.00 0.00 0.99 0.00 0.00 0.00 0.74 0.00 P-D-2-A 1.00 0.70 0.10 0.00 0.21 0.00 0.00 0.00 0.79 0.00 P-D-2-B 1.00 0.79 0.11 0.00 0.10 0.00 0.00 0.00 0.90 0.00 P-D-2-C 1.00 0.90 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 P-D-2-D 1.00 0.79 0.14 0.00 0.07 0.00 0.00 0.00 0.93 0.00 P-E-1-N 1.00 0.01 0.00 0.00 0.99 0.00 0.00 0.00 0.53 0.00 P-E-1-S 1.00 0.00 0.00 0.00 0.99 0.00 0.00 0.00 0.00 0.00 P-E-CHAMB 1.00 0.01 0.54 0.00 0.46 0.00 0.00 0.00 0.38 0.00 P-E-UD 1.00 0.01 0.00 0.00 0.99 0.00 0.00 0.00 0.53 0.00 P-F-1 1.00 0.95 0.00 0.00 0.00 0.00 0.00 0.05 0.00 0.00 P-Z-POND-OUT 1.00 0.51 0.00 0.00 0.49 0.00 0.00 0.00 0.64 0.00 SW-B-P 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SW-CHASE 1.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 ************************* Conduit Surcharge Summary ************************* ---------------------------------------------------------------------------- Hours Hours --------- Hours Full -------- Above Full Capacity Conduit Both Ends Upstream Dnstream Normal Flow Limited ---------------------------------------------------------------------------- P-A-3 0.01 0.01 6.70 0.01 0.01 P-A-4 6.64 6.70 11.00 0.03 0.15 P-A-5 7.40 7.40 11.20 0.01 0.01 P-A-6 11.20 11.20 12.18 0.01 0.01 P-B-1 4.46 4.46 11.00 0.01 0.01 P-D-1-A 10.43 10.43 15.46 0.01 0.01 P-D-1-B 6.12 6.12 10.43 0.01 0.01 P-D-1-C 6.12 6.12 8.73 0.01 0.01 P-D-1-D 8.73 8.73 11.91 0.01 0.01 P-D-1-E 8.25 8.25 11.91 0.01 0.01 P-D-1-F 4.32 4.32 11.91 0.01 0.01 BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 18 P-D-2-A 1.54 1.54 6.12 0.01 0.01 P-D-2-B 0.01 0.01 1.54 0.01 0.01 P-D-2-D 0.01 0.01 59.02 0.01 0.01 P-E-1-N 10.95 10.95 11.20 0.01 0.14 P-E-1-S 8.16 8.16 8.17 0.18 5.94 P-E-UD 24.50 24.50 25.75 0.24 0.01 P-Z-POND-OUT 0.01 0.81 0.01 0.01 0.01 Analysis begun on: Tue Apr 30 14:07:31 2024 Analysis ended on: Tue Apr 30 14:07:33 2024 Total elapsed time: 00:00:02 BLOOM MULTI-FAMILY DEVELOPMENT - 2-Year EPA SWMM 5.2.4 Page 19 Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO C APPENDIX C • WATER QUALITY AND LID CALCULATIONS & MAP • LID Design Tool Outlet Bloom Multi-Family LID Summary CATCHMENTS Area % Acres Acres Imperv Imperv 1 2.296 83%1.91 2 1.769 83%1.47 3 2.181 87%1.91 4 1.646 88%1.44 5 1.030 71%0.73 6 0.314 46%0.14 7 2.105 94%1.98 8 2.387 23%0.55 OS-1 0.464 52%0.24 OS-2 0.224 21%0.05 OS-3 0.579 22%0.13 OS-4 0.506 55%0.28 OS-5 0.400 27%0.11 OS-6 0.275 40%0.11 OS-7 0.303 23%0.07 OS-8 0.164 33%0.05 OS-9 0.464 24%0.11 TOTAL 17.109 11.271 TOTAL TO OS-5 15.903 692726.2 PERVIOUS TOTAL 5.838 254,324 PERVIOUS ONSITE 5.132 223,536 GLOBAL %65.9%490,952 201,658 ON-SITE 67.7%469,190 223,420 IMPERVIOUS AREA 11.271 ACRES REQUIRED TO LID 8.453 368,214 SF Actual to LID 9.428 410,665 SF Difference -0.975 Actual % to LID 83.6% Runoff Coefficients and % Impervious for Chamber System Roof (1)Asphalt Walks(1)Gravel(1)Lawns(1) %I = 90% %I = 100% %I = 90% %I =40% %I=2% acres sf sf sf sf sf sf C2 C5 C10 C25 C50 C100 0.0 0 - - - - - - - 0.0 0 0 0 0 0 0 -- - - - - - Proposed Site to Chambers WQ Chambers 8.453 368214 128875 202518 36821 0 0 95.5% C/D 0.950 0.950 0.950 1.000 1.000 1.000 0 - - - - - - - Onsite Total 8.45 368214 128875 202518 36821 0 0 95.5%0.950 0.950 0.950 1.000 1.000 1.000 Notes: (1) Recommended % Imperviousness Values from USDCM Vol 1 - Ch 5 - Table RO-3. Increased Lawns from 0% to 2% Impervious.8.45 (2) Runoff C is based on %I, UDFCD Eq RO-7 and correction factors in Table RO-4. (3) Impervious area assumed to be 2500 s.f. of roof and 500 s.f. of driveway per single family and twin home lot. Proposed Basins Existing Basins Onsite Total Basin Areas Composite Imperviousness (%I) Total TotalDesign Pt.Composite Runoff Coefficients (2)NRCS Soil Type Calculations by: KWH Date: 4/28/2024 D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2022\C22026 - Bloom Multi Family\06_Design\Reports\Drainage\C22026 - Bloom WQ Chamber Sizing.xlsm Runoff Coefficients and % Impervious for Chamber System Area Length Slope ti (2)Length Slope Velocity (3)tt (4)Check tc?Total Length tc (5) acres ft % min ft % fps min min Urban? ft min min Existing Basins 0.00 0.0 - - - - - - - - 0.0 - - - - - - - - Proposed Site to Chambers WQ Chambers 8.5 Paved 0.90 115 2 3.1 1126 0.85 20 1.8 10.2 13.2 Yes 1241 17 13 Notes: (1) C5 based initial ground type and Table RO-5 (4)tt=L/(V*60 sec/min) (2)ti = [1.8(1.1-C5)L1/2]/S1/3, S= slope in %, L=length of overland flow (400' max)(5)tc check (for urban or developed areas only) = total length/180 + 10 (3)V=CvS0.5, S=watercourse slope in ft/ft, UDFCD Equation RO-4 (6)min tc = 5 min Proposed Basins Basin Design Pt. Initial Overland Flow Time (ti)Travel/Channelized Time of Flow (tt) ti+tt tc Check for Urbanized Basins Final tc (6)Initial Ground Type C5 (1)Cv 0 Calculations by: KWH Date: 4/28/2024 D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2022\C22026 - Bloom Multi Family\06_Design\Reports\Drainage\C22026 - Bloom WQ Chamber Sizing.xlsm Runoff Coefficients and % Impervious for Chamber System Final Runoff Coefficients Rainfall Intensity Peak Discharge tc (6)I Q acre min in/hr cfs Proposed Site to Chambers WQ Chambers 8.5 13 0.950 1.04 8.37 8.37Totals Proposed Basins Design Pt.AreaBasin C Calculations by: KWH Date: 4/28/2024 D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2022\C22026 - Bloom Multi Family\06_Design\Reports\Drainage\C22026 - Bloom WQ Chamber Sizing.xlsm Runoff Coefficients and % Impervious for Chamber System Area (acres)Area Watershed WQCV* (cf) (sf) (acres) (inches) (Extended Detention) Proposed Site 368,214 8.453 96%0.45 16,650 --- 16,650 0.382 SFTotal * based on 40 hr storage and additional 20% for extended detention Basin %I Required Onsite Water Quality Capture Volume Calculations by: KWH Date: 4/28/2024 D:\Civilworx\CivilWorx Dropbox\CivilWorx\Projects\2022\C22026 - Bloom Multi Family\06_Design\Reports\Drainage\C22026 - Bloom WQ Chamber Sizing.xlsm 01 0203 04 05 06 07 08 OS-1 OS-2 OS-3 OS-4 OS-5 OS-6 OS-7 OS-8 OS-9 OS-10 IM P E R V I O U S A R E A - L I D M A P 1" = 60' 1" = 60' 16 DN01 PR E P A R E D F O R : JOB NUMBER SHEET NUMBER SHEETSOF DA T E S U B M I T T E D : Th e e n g i n e e r p r e p a r i n g t h e s e p l a n s w i l l n o t b e r e s p o n s i b l e fo r , o r l i a b l e f o r , u n a u t h o r i z e d c h a n g e s t o o r u s e s o f t h e s e pl a n s . A l l c h a n g e s t o t h e p l a n s m u s t b e i n w r i t i n g a n d mu s t b e a p p r o v e d b y t h e p r e p a r e r o f t h e s e p l a n s . NO . BY DA T E CAUTION RE V I S I O N S : VERTICAL: HORIZONTAL: SCALE 4025 Automation Way Suite B2 Fort Collins, CO 80525 (970) 698-6046 CivilWorxeng.com BL O O M M U L T I - F A M I L Y D E V E L O P M E N T C22026 HA R T F O R D H O M E S 04 / 2 6 / 2 0 2 4 56 PRELIMINARY NOT FOR CONSTRUCTION 00 60'120' SCALE: 1" = 60' 30' KEYMAP NTS LEGEND MAPPING / SITE PROPERTY BOUNDARY RIGHT-OF-WAY LOT LINES EASEMENTS CENTER LINE CURB AND GUTTER EXISTING CONTOURS PROPOSED CONTOURS PHASING LINE PROPOSED UTILITIES STORM DRAIN PIPE FLARED END SECTION STORM DRAIN INLET STORM DRAIN OUTLET RIP RAP NOTES 1.SEE GRADING SHEETS FOR ADDITIONAL SPOT ELEVATIONS FOR THE PROJECT. 2.SEE EROSION CONTROL PLANS FOR ADDITIONAL INFORMATION. EXISTING UTILITIES STORM DRAIN PIPE FLARED END SECTION STORM DRAIN INLET STORM DRAIN OUTLET RIP RAP D-101 GRADING BASIN BOUNDARY DESIGN POINT BASIN LABEL BASIN IMPERVIOUSNESS BASIN AREA FLOW DIRECTION IMPERVIOUS TO LID IMPERVIOUS NOT TO LID PERVIOUS ACCEPTABLE FILL MATERIALS: STORMTECH MC-3500 CHAMBER SYSTEMS PLEASE NOTE: 1.THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE". 2.STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 9" (230 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. 3.WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. 4.ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. 5.WHERE RECYCLED CONCRETE AGGREGATE IS USED IN LAYERS 'A' OR 'B' THE MATERIAL SHOULD ALSO MEET THE ACCEPTABILITY CRITERIA OUTLINED IN TECHNICAL NOTE 6.20 "RECYCLED CONCRETE STRUCTURAL BACKFILL". NOTES: 1.CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS" CHAMBER CLASSIFICATION 45x76 DESIGNATION SS. 2.MC-3500 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 3.THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 4.PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 5.REQUIREMENTS FOR HANDLING AND INSTALLATION: ·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. ·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 3”. ·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT SHALL BE GREATER THAN OR EQUAL TO 450 LBS/FT/%. THE ASC IS DEFINED IN SECTION 6.2.8 OF ASTM F2418. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT D FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS. CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS.N/A PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND PREPARATION REQUIREMENTS. C INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 24" (600 mm) ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE 'C' LAYER. GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR PROCESSED AGGREGATE. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS LAYER. AASHTO M145¹ A-1, A-2-4, A-3 OR AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 BEGIN COMPACTIONS AFTER 24" (600 mm) OF MATERIAL OVER THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN 12" (300 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR PROCESSED AGGREGATE MATERIALS. B EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER ABOVE. CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE5 AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57 A FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER. CLEAN, CRUSHED, ANGULAR STONE OR RECYCLED CONCRETE5 AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57 PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3 NO COMPACTION REQUIRED. 45" (1140 mm) 18" (450 mm) MIN* 8' (2.4 m) MAX 12" (300 mm) MIN77" (1950 mm) 12" (300 mm) MIN 6" (150 mm) MIN DEPTH OF STONE TO BE DETERMINED BY SITE DESIGN ENGINEER 9" (230 mm) MIN D C B A *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, INCREASE COVER TO 24" (600 mm). 6" (150 mm) MIN PERIMETER STONE (SEE NOTE 4) EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) MC-3500 END CAP SUBGRADE SOILS (SEE NOTE 3) PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) **THIS CROSS SECTION DETAIL REPRESENTS MINIMUM REQUIREMENTS FOR INSTALLATION. PLEASE SEE THE LAYOUT SHEET(S) FOR PROJECT SPECIFIC REQUIREMENTS. ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS PART #STUB B C MC3500IEPP06T 6" (150 mm)33.21" (844 mm)--- MC3500IEPP06B ---0.66" (17 mm) MC3500IEPP08T 8" (200 mm)31.16" (791 mm)--- MC3500IEPP08B ---0.81" (21 mm) MC3500IEPP10T 10" (250 mm)29.04" (738 mm)--- MC3500IEPP10B ---0.93" (24 mm) MC3500IEPP12T 12" (300 mm)26.36" (670 mm)--- MC3500IEPP12B ---1.35" (34 mm) MC3500IEPP15T 15" (375 mm)23.39" (594 mm)--- MC3500IEPP15B ---1.50" (38 mm) MC3500IEPP18TC 18" (450 mm) 20.03" (509 mm)---MC3500IEPP18TW MC3500IEPP18BC ---1.77" (45 mm) MC3500IEPP18BW MC3500IEPP24TC 24" (600 mm) 14.48" (368 mm)---MC3500IEPP24TW MC3500IEPP24BC ---2.06" (52 mm) MC3500IEPP24BW MC3500IEPP30BC 30" (750 mm)---2.75" (70 mm) NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH)77.0" X 45.0" X 86.0" (1956 mm X 1143 mm X 2184 mm) CHAMBER STORAGE 109.9 CUBIC FEET (3.11 m³) MINIMUM INSTALLED STORAGE*175.0 CUBIC FEET (4.96 m³) WEIGHT 134 lbs.(60.8 kg) NOMINAL END CAP SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH)75.0" X 45.0" X 22.2" (1905 mm X 1143 mm X 564 mm) END CAP STORAGE 14.9 CUBIC FEET (0.42 m³) MINIMUM INSTALLED STORAGE*45.1 CUBIC FEET (1.28 m³) WEIGHT 49 lbs.(22.2 kg) *ASSUMES 12" (305 mm) STONE ABOVE, 9" (229 mm) STONE FOUNDATION, 6" SPACING BETWEEN CHAMBERS, 6" (152 mm) STONE PERIMETER IN FRONT OF END CAPS AND 40% STONE POROSITY MC-3500 TECHNICAL SPECIFICATION NTS 90.0" (2286 mm) ACTUAL LENGTH 86.0" (2184 mm) INSTALLED BUILD ROW IN THIS DIRECTION NOTE: ALL DIMENSIONS ARE NOMINAL LOWER JOINT CORRUGATION WEB CREST CREST STIFFENING RIB VALLEY STIFFENING RIB B C 75.0" (1905 mm) 45.0" (1143 mm) 25.7" (653 mm) FOOT 77.0" (1956 mm) 45.0" (1143 mm) STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" END CAPS WITH A WELDED CROWN PLATE END WITH "C" END CAPS WITH A PREFABRICATED WELDED STUB END WITH "W" UPPER JOINT CORRUGATION 22.2" (564 mm) INSTALLED CUSTOM PRECORED INVERTS ARE AVAILABLE UPON REQUEST. INVENTORIED MANIFOLDS INCLUDE 12-24" (300-600 mm) SIZE ON SIZE AND 15-48" (375-1200 mm) ECCENTRIC MANIFOLDS. CUSTOM INVERT LOCATIONS ON THE MC-3500 END CAP CUT IN THE FIELD ARE NOT RECOMMENDED FOR PIPE SIZES GREATER THAN 10" (250 mm). THE INVERT LOCATION IN COLUMN 'B' ARE THE HIGHEST POSSIBLE FOR THE PIPE SIZE. PART #STUB B C MC3500IEPP06T 6" (150 mm)33.21" (844 mm)--- MC3500IEPP06B ---0.66" (17 mm) MC3500IEPP08T 8" (200 mm)31.16" (791 mm)--- MC3500IEPP08B ---0.81" (21 mm) MC3500IEPP10T 10" (250 mm)29.04" (738 mm)--- MC3500IEPP10B ---0.93" (24 mm) MC3500IEPP12T 12" (300 mm)26.36" (670 mm)--- MC3500IEPP12B ---1.35" (34 mm) MC3500IEPP15T 15" (375 mm)23.39" (594 mm)--- MC3500IEPP15B ---1.50" (38 mm) MC3500IEPP18TC 18" (450 mm) 20.03" (509 mm)---MC3500IEPP18TW MC3500IEPP18BC ---1.77" (45 mm) MC3500IEPP18BW MC3500IEPP24TC 24" (600 mm) 14.48" (368 mm)---MC3500IEPP24TW MC3500IEPP24BC ---2.06" (52 mm) MC3500IEPP24BW MC3500IEPP30BC 30" (750 mm)---2.75" (70 mm) NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH)77.0" X 45.0" X 86.0" (1956 mm X 1143 mm X 2184 mm) CHAMBER STORAGE 109.9 CUBIC FEET (3.11 m³) MINIMUM INSTALLED STORAGE*175.0 CUBIC FEET (4.96 m³) WEIGHT 134 lbs.(60.8 kg) NOMINAL END CAP SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH)75.0" X 45.0" X 22.2" (1905 mm X 1143 mm X 564 mm) END CAP STORAGE 14.9 CUBIC FEET (0.42 m³) MINIMUM INSTALLED STORAGE*45.1 CUBIC FEET (1.28 m³) WEIGHT 49 lbs.(22.2 kg) *ASSUMES 12" (305 mm) STONE ABOVE, 9" (229 mm) STONE FOUNDATION, 6" SPACING BETWEEN CHAMBERS, 6" (152 mm) STONE PERIMETER IN FRONT OF END CAPS AND 40% STONE POROSITY MC-3500 TECHNICAL SPECIFICATION NTS 90.0" (2286 mm) ACTUAL LENGTH 86.0" (2184 mm) INSTALLED BUILD ROW IN THIS DIRECTION NOTE: ALL DIMENSIONS ARE NOMINAL LOWER JOINT CORRUGATION WEB CREST CREST STIFFENING RIB VALLEY STIFFENING RIB B C 75.0" (1905 mm) 45.0" (1143 mm) 25.7" (653 mm) FOOT 77.0" (1956 mm) 45.0" (1143 mm) STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" END CAPS WITH A WELDED CROWN PLATE END WITH "C" END CAPS WITH A PREFABRICATED WELDED STUB END WITH "W" UPPER JOINT CORRUGATION 22.2" (564 mm) INSTALLED CUSTOM PRECORED INVERTS ARE AVAILABLE UPON REQUEST. INVENTORIED MANIFOLDS INCLUDE 12-24" (300-600 mm) SIZE ON SIZE AND 15-48" (375-1200 mm) ECCENTRIC MANIFOLDS. CUSTOM INVERT LOCATIONS ON THE MC-3500 END CAP CUT IN THE FIELD ARE NOT RECOMMENDED FOR PIPE SIZES GREATER THAN 10" (250 mm). THE INVERT LOCATION IN COLUMN 'B' ARE THE HIGHEST POSSIBLE FOR THE PIPE SIZE. INSPECTION & MAINTENANCE STEP 1)INSPECT ISOLATOR ROW PLUS FOR SEDIMENT A.INSPECTION PORTS (IF PRESENT) A.1.REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN A.2.REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED A.3.USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4.LOWER A CAMERA INTO ISOLATOR ROW PLUS FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. B.ALL ISOLATOR PLUS ROWS B.1.REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW PLUS B.2.USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW PLUS THROUGH OUTLET PIPE i)MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY ii)FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE B.3.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. STEP 2)CLEAN OUT ISOLATOR ROW PLUS USING THE JETVAC PROCESS A.A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED B.APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN C.VACUUM STRUCTURE SUMP AS REQUIRED STEP 3)REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS. STEP 4)INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM. NOTES 1.INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. 2.CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY. MC-3500 ISOLATOR ROW PLUS DETAIL NTS 24" (600 mm) HDPE ACCESS PIPE REQUIRED USE FACTORY PRE-CORED END CAP PART #: MC3500IEPP24BC OR MC3500IEPP24BW STORMTECH HIGHLY RECOMMENDS FLEXSTORM INSERTS IN ANY UPSTREAM STRUCTURES WITH OPEN GRATES COVER PIPE CONNECTION TO END CAP WITH ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE MC-3500 CHAMBER OPTIONAL INSPECTION PORT MC-3500 END CAP ONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS 8.25' (2.51 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS SUMP DEPTH TBD BY SITE DESIGN ENGINEER (24" [600 mm] MIN RECOMMENDED) INSTALL FLAMP ON 24" (600 mm) ACCESS PIPE PART #: MCFLAMP UNDERDRAIN DETAIL NTS A A B B SECTION A-A SECTION B-B NUMBER AND SIZE OF UNDERDRAINS PER SITE DESIGN ENGINEER 4" (100 mm) TYP FOR SC-310 & SC-160LP SYSTEMS 6" (150 mm) TYP FOR SC-740, SC-800, DC-780, MC-3500, MC-4500 & MC-7200 SYSTEMS OUTLET MANIFOLD STORMTECH END CAP STORMTECH CHAMBERS STORMTECH END CAP DUAL WALL PERFORATED HDPE UNDERDRAIN ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE FOUNDATION STONE BENEATH CHAMBERS FOUNDATION STONE BENEATH CHAMBERS STORMTECH CHAMBER MC-SERIES END CAP INSERTION DETAIL NTS NOTE: MANIFOLD STUB MUST BE LAID HORIZONTAL FOR A PROPER FIT IN END CAP OPENING. MANIFOLD HEADER MANIFOLD STUB STORMTECH END CAP MANIFOLD HEADER MANIFOLD STUB 12" (300 mm) MIN SEPARATION 12" (300 mm) MIN INSERTION 12" (300 mm) MIN SEPARATION 12" (300 mm) MIN INSERTION St o r m T e c h 88 8 - 8 9 2 - 2 6 9 4 | WW W . S T O R M T E C H . C O M ® Ch a m b e r S y s t e m 46 4 0 T R U E M A N B L V D HI L L I A R D , O H 4 3 0 2 6 1- 8 0 0 - 7 3 3 - 7 4 7 3 DA T E : DR A W N : K H PR O J E C T # : CH E C K E D : N / A RE V : TH I S D R A W I N G H A S B E E N P R E P A R E D B A S E D O N I N F O R M A T I O N P R O V I D E D T O A D S U N D E R T H E D I R E C T I O N O F T H E S I T E D E S I G N E N G I N E E R O R O T H E R P R O J E C T R E P R E S E N T A T I V E . T H E S I T E D E S I G N E N G I N E E R S H A L L R E V I E W T H I S D R A W I N G P R I O R T O C O N S T R U C T I O N . I T I S T H E U L T I M A T E R E S P O N S I B I L I T Y O F T H E S I T E D E S I G N EN G I N E E R T O E N S U R E T H A T T H E P R O D U C T ( S ) D E P I C T E D A N D A L L A S S O C I A T E D D E T A I L S M E E T A L L A P P L I C A B L E L A W S , R E G U L A T I O N S , A N D P R O J E C T R E Q U I R E M E N T S . BL O O M M U L T I - F A M I L Y FO R T C O L L I N S , C O , U S A SHEET 1 1OF NO T T O S C A L E ISOLATOR ROW PLUS (SEE DETAIL) PLACE MINIMUM 17.50' OF ADSPLUS175 WOVEN GEOTEXTILE OVER BEDDING STONE AND UNDERNEATH CHAMBER FEET FOR SCOUR PROTECTION AT ALL CHAMBER INLET ROWS BED LIMITS CONCEPTUAL ELEVATIONS: MAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED):12.50 MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC):6.50 MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC):6.00 MINIMUM ALLOWABLE GRADE (TOP OF RIGID CONCRETE PAVEMENT):6.00 MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT):6.00 TOP OF STONE:5.50 TOP OF MC-3500 CHAMBER:4.50 24" ISOLATOR ROW PLUS INVERT:0.92 18" x 18" BOTTOM MANIFOLD INVERT:0.90 18" x 18" BOTTOM MANIFOLD INVERT:0.90 18" BOTTOM CONNECTION INVERT:0.90 BOTTOM OF MC-3500 CHAMBER:0.75 UNDERDRAIN INVERT:0.00 BOTTOM OF STONE:0.00 PROPOSED LAYOUT 91 STORMTECH MC-3500 CHAMBERS 14 STORMTECH MC-3500 END CAPS 12 STONE ABOVE (in) 9 STONE BELOW (in) 40 STONE VOID 17548 INSTALLED SYSTEM VOLUME (CF) (PERIMETER STONE INCLUDED) (COVER STONE INCLUDED) (BASE STONE INCLUDED) 5191 SYSTEM AREA (SF) 315.4 SYSTEM PERIMETER (ft) MAX FLOWINVERT*DESCRIPTIONITEM ON LAYOUTPART TYPE 2.06"24" BOTTOM CORED END CAP, PART#: MC3500IEPP24BC / TYP OF ALL 24" BOTTOM CONNECTIONS AND ISOLATOR PLUS ROWSAPREFABRICATED END CAP 1.77"18" BOTTOM CORED END CAP, PART#: MC3500IEPP18BC / TYP OF ALL 18" BOTTOM CONNECTIONSBPREFABRICATED END CAP INSTALL FLAMP ON 24" ACCESS PIPE / PART#: MCFLAMPCFLAMP 1.77"18" x 18" BOTTOM MANIFOLD, ADS N-12DMANIFOLD 1.77"18" x 18" BOTTOM MANIFOLD, ADS N-12EMANIFOLD 8.0 CFS OUTOCS (DESIGN BY ENGINEER / PROVIDED BY OTHERS)FCONCRETE STRUCTURE 20.9 CFS IN(DESIGN BY ENGINEER / PROVIDED BY OTHERS)GCONCRETE STRUCTURE W/WEIR 6" ADS N-12 DUAL WALL PERFORATED HDPE UNDERDRAINHUNDERDRAIN F G E A D B C H 47 . 9 2 ' 96.92' 50 . 5 2 ' 107.18' 1 MC-3500 CROSS SECTION DETAIL 2 MC-3500 TECHNICAL SPECIFICATION 3 MC-3500 ISOLATOR ROW PLUS DETAIL SPA C E I N T E N T I O N A L L Y L E F T B L A N K 4 UNDERDRAIN DETAIL SPA C E I N T E N T I O N A L L Y L E F T B L A N K 5 MC-SERIES END CAP INSERTION DETAIL NOTES •MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER. SEE TECH NOTE #6.32 FOR MANIFOLD SIZING GUIDANCE. •DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFIC SITE AND DESIGN CONSTRAINTS, IT MAY BE NECESSARY TO CUT AND COUPLE ADDITIONAL PIPE TO STANDARD MANIFOLD COMPONENTS IN THE FIELD. •THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IF NECESSARY ADJUST GRADING TO ENSURE THE CHAMBER COVER REQUIREMENTS ARE MET. •THIS CHAMBER SYSTEM WAS DESIGNED WITHOUT SITE-SPECIFIC INFORMATION ON SOIL CONDITIONS OR BEARING CAPACITY. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR DETERMINING THE SUITABILITY OF THE SOIL AND PROVIDING THE BEARING CAPACITY OF THE INSITU SOILS. THE BASE STONE DEPTH MAY BE INCREASED OR DECREASED ONCE THIS INFORMATION IS PROVIDED. •NOT FOR CONSTRUCTION: THIS LAYOUT IS FOR DIMENSIONAL PURPOSES ONLY TO PROVE CONCEPT & THE REQUIRED STORAGE VOLUME CAN BE ACHIEVED ON SITE. *INVERT ABOVE BASE OF CHAMBER Final Drainage and Erosion Control Report Bloom Multi Family Development Fort Collins, CO D APPENDIX D • Detention Pond Volume excerpt • Geotechnical Borings 5265 Ronald Reagan Blvd., Suite 210 Johnstown, CO 80534 970.800.3300 •GallowayUS.com Memorandum HFH22 - Memorandum F1 Amendment.docx Page 1 of 2 To:Wes Lamarque, PE City of Fort Collins From:Matthew Pepin, PE Galloway, Inc. Date:06/20/2023 Re:Bloom Filing 1 Amendment - Drainage Modifications To Mr. Lamarque, Bloom Filing 1 required revisions that would include a modified pond, an added pond, and modifications to associated storm infrastructure. This memorandum is to help provide information on the changes from the approved Bloom F1 Final Drainage Report for the stated Amendment. Pond Modification / Addition Pond G was initially approved to provide 9.5 ac-ft of volume and release at a rate of 17.6 cfs. This pond is being split into two separate ponds to allow for increased development within the piece of land where Pond G initially was planned. Pond G will now be reduced to a volume of 4.8 ac-ft and releasing at 13.5 cfs. A second pond, Pond G1, will be located on the western part of the site. Pond G1 will provide 5.1 ac-ft of volume and release at 4.4 cfs. This would increase the amount of total flow existing both ponds from the original by 0.2 cfs. In order to maintain a maximum of 22.3 cfs releasing into the southern part of the Cooper Slough outfall, Pond I’s flow will be restricted from 0.35 cfs to 0.15 cfs. Storm Infrastructure The associated basin that were tributary to the effected modification storm infrastructure are labeled as A-G1, A-G2,…A-G6. Inlet calculations were added for these basins as well. An updated StormCAD output for the effected storm lines has been included a part of this memo. Tailwater conditions were set based on the 100-year WSEL for the major storm event and a free outfall condition in the minor event. Note: there is HGL surcharging from SD Inlet L1.5 and SD Inlet L1. The HGL at this location is .27 higher than the RIM at the MH of SD MH L1.4. This equates to 3.24 inches and would remain within the ROW, not impacting the lots. Storm Infrastructure incorporating Bloom F2 In order to take into account LID’s within Bloom F2, there is another modification to the storm pipe infrastructure. A concern of too much flow entering the LID in the major storm events would cause damage needed to be mitigated. To prevent this from happening, a manhole would split flow from outfalling into the LID and by passing downstream to outfall into the EDB (Pond E). This flow split would have flow entering into the LID at a maximum of 15.5 cfs in the major storm event. The flow split is achieved by having the smaller 15” pipe sit lower than the larger pipe, restricting flow for the minor event to only pass through the 15” pipe. The flow rate allowing for all flow in the minor storm event to enter the LID at a flow rate of 12.02 cfs. Bloom Filing 1 06/20/2023 HFH22 - Memorandum F1 Amendment.docx Galloway & Company, Inc.Page 2 of 2 CONCLUSION The modifications to the site will not change the overall design intent that was originally approved with Bloom F1 Drainage Report. Sincerely, GALLOWAY Matthew Pepin, PE Civil Project Engineer MatthewPepin@Gallowayus.com 01/02/2024 TH-1 TH-2 TH-3 TH-4 TH-7 TH-8 TH-6 TH-5 Ari a W ay International Boulevard Gre e n f i e l d s D ri v e Donella Drive Del o z i e r R oa d Crusader Street TI M B E R L I N E R D . I- 2 5 E. MULBERRY ST. E. VINE DR. SITE LEGEND: INDICATES APPROXIMATE LOCATION OF EXPLORATORY BORING TH-1 HARTFORD HOMES BLOOM FILING 1 ROADS PHASE 3 CTL I T PROJECT NO. FC07733.010-135 FIGURE 1 Locations of Exploratory Borings VICINITY MAP (FORT COLLINS, COLORADO) NOT TO SCALE 450'225' APPROXIMATE SCALE: 1" = 450' 0' 0 5 10 15 20 25 30 35 40 0 5 10 15 20 25 30 35 40 26/12 25/12 13/12 WC=12.7DD=118SW=2.9SS=<0.01 WC=6.2LL=25 PI=10-200=41 TH-1 23/12 13/12 32/12 WC=9.5DD=126LL=31 PI=18-200=50 WC=7.2DD=108SW=1.0SS=0.070 TH-2 22/12 29/12 15/12 WC=7.0DD=123SW=3.5SS=<0.01 WC=0.9LL=NV PI=NP-200=5 TH-3 23/12 21/12 18/12 WC=6.6DD=117SW=3.2SS=0.090 WC=1.6LL=NV PI=NP-200=9 TH-4 DRIVE SAMPLE. THE SYMBOL 26/12 INDICATES 26 BLOWS OF A 140-POUND HAMMER FALLING 30 INCHES WERE REQUIRED TO DRIVE A 2.5-INCH O.D. SAMPLER 12 INCHES. CLAY, SANDY, SLIGHTLY MOIST TO MOIST, STIFF TO VERY STIFF, BROWN 1. 3. LEGEND: SAND, GRAVELLY, CLEAN TO SLIGHTLY CLAYEY, SLIGHTLY MOIST TO MOIST, MEDIUM DENSE TO DENSE, RED-BROWN, GREY (SP, SP-SC) GRAVEL, SANDY, CLEAN TO SLIGHTLY CLAYEY, MOIST TO WET, MEDIUM DENSE, RED- BROWN, GREY (GP) CLAY, SANDY WITH OCCASIONAL GRAVEL, MOIST, STIFF TO VERY STIFF, RED, BROWN (CL) DE P T H - F E E T THESE LOGS ARE SUBJECT TO THE EXPLANATIONS, LIMITATIONS AND CONCLUSIONS IN THIS REPORT. NOTES: FILL, SAND, CLAYEY, GRAVELLY, SLIGHTLY MOIST TO MOIST, LOOSE TO MEDIUM DENSE, BROWN INDICATES MOISTURE CONTENT (%). INDICATES DRY DENSITY (PCF). INDICATES SWELL WHEN WETTED UNDER OVERBURDEN PRESSURE (%). INDICATES PASSING NO. 200 SIEVE (%). INDICATES LIQUID LIMIT. INDICATES PLASTICITY INDEX. INDICATES SOLUBLE SULFATE CONTENT (%). 2. DE P T H - F E E T WATER LEVEL MEASURED AFTER DRILLING. Summary Logs of Exploratory Borings THE BORINGS WERE DRILLED ON OCTOBER 4TH, 2023 USING 4-INCH DIAMETER CONTINUOUS-FLIGHT AUGERS AND A TRUCK-MOUNTED DRILL RIG. FIGURE 2 WC DD SW -200 LL PI SS - - - - - - - HARTFORD HOMES BLOOM FILING 1 ROADS PHASE 3 CTL | T PROJECT NO. FC07733.010-135 0 5 10 15 20 25 30 35 40 0 5 10 15 20 25 30 35 40 24/12 23/12 32/12 WC=7.7DD=128SW=1.2SS=<0.01 WC=10.7LL=32 PI=19-200=49 TH-5 20/12 14/12 41/12 WC=14.9DD=119LL=32 PI=18-200=59 WC=10.5DD=121SW=0.4SS=<0.01 TH-6 10/12 10/12 13/12 WC=11.3DD=118SW=1.1SS=0.750 WC=10.9LL=29 PI=15-200=46 SS=0.800 TH-7 21/12 13/12 50/12 WC=11.1DD=121LL=28 PI=15-200=57 WC=17.3DD=114SW=-1.1SS=0.070 TH-8 Summary Logs of Exploratory Borings FIGURE 3 DE P T H - F E E T DE P T H - F E E T HARTFORD HOMES BLOOM FILING 1 ROADS PHASE 3 CTL | T PROJECT NO. FC07733.010-135