Loading...
HomeMy WebLinkAboutWILLOX FARM - FDP240005 - SUBMITTAL DOCUMENTS - ROUND 1 - Supporting Documentation (4) NORTHERNENGINEERING.COM | 970.221.4158 FORT COLLINS | GREELEY 1 | 3 April 15, 2024 RE: WILLOX FARM SOFT GOLD PARK UTILITY SUMMARY To whom it may concern: Background Discussion The following is intended to provide an explanation of the current request to allow City of Fort Collins Water main, as well as City of Fort Collins Light & Power facilities, to be run through Soft Gold Park. These utilities would directly serve the Willox Farm project, and they would also provide improved service to the adjacent properties via additional capacity and redundancy beyond what exists today. Northern Engineering originally contacted City of Fort Collins staff in August 2018 and acquired information on the existing utility facilities around the project site. That information showed that there is an existing 12” sewer that runs along the railroad tracks to the east, another 12” sewer in Shields Street to the west, and a 12” sewer in Hickory Street to the south. After completing an analysis of each option, it was determined that the sewer connection to the existing 12” sewer along the railroad tracks to the east, would be the best option. Alternatives Analysis 12” Shields Sewer - The Shields Sewer is located approximately ½ mile west of the project site. A connection to this sewer main was considered but was ultimately rejected due to the sewer main inverts being too high for a connection from the project site. A lift station would need to be added to make this a viable option. The Shields option did not provide the needed water and electric looping that is needed for the project. 12” Hickory Sewer - The Hickory Sewer is located approximately ¼ mile south of the project site. The sewer inverts are low enough for a gravity connection from the project site, but just barely. Further analysis of this connection showed that it had many issues to deal with, including: traversing a City park (Soft Gold Park); crossing an existing 36” waterline that serves Budweiser; crossing an existing 24” ELCO waterline; crossing an existing 30” storm drain and crossing an existing 8” waterline. In addition to the numerous crossings, the proposed connection would have extremely minimal cover (+/-4’ in several locations) and would need to get through the existing park facilities. This would have created a berm along the west side of the park. Additional storm structures would be needed due to the berm. This option would be more costly and would impact existing utility infrastructures significantly. 12” Railroad Sewer - The 12” Railroad Sewer, offering close proximity to the project site, emerged as the favored choice for connection. Initially disregarded due to shallow sewer inverts, it became feasible following thorough investigation and regrading of the Willox Farm site, enabling the establishment of a gravity connection. The adjustment enables a shorter connection for the sewer line. While this option lacks the necessary water and electric line looping, we can accommodate this requirement by utilizing an easement through the park, as detailed below. Upon determining that the potential Railroad Sewer option was feasible, the project team was able to eliminate the sanitary sewer main through Soft Gold Park. This will allow for less conflicts with existing utilities and additional infrastructure needed to go around said existing utilities. A utility and access easement will still be needed through Soft Gold Park to route an 8” watermain and a combined electric/cable line, along with a 12’ concrete trail. The easement is roughly 40ft wide throughout the park and then varies in size on the southern half of the park property due to different connection locations. As currently shown, the utility easement will be NORTHERNENGINEERING.COM | 970.221.4158 FORT COLLINS | GREELEY 2 | 3 61,492sf (1.412 acres), see Attachment 1 for legal exhibit. The project proposes to limit the areas of disturbance to this corridor and will return the surface to a condition equal to or better than what was there to begin with. The easement will have standard restrictions within the limits, which precludes large trees within the easement and prevents “permanent” structures from being built in the easement. This means structures with foundations cannot be placed in the easement. Sidewalks, ornamental trees, grasses, etc. are all still allowed. Other utilities, including irrigation lines, can cross the easement. It is generally preferred that the utilities cross perpendicular to the mains. Soft Gold Park Construction Items throughout the park that will be revised during construction of the water and electric lines include: • New connections to water main for the existing park water meter and irrigation meter. Meters will remain in their existing locations but will have new connections to the proposed water main. • Relocation of existing fire hydrant located near the entrance to the park. • ±110 LF of existing 8” water line, near the entrance, will be removed. • Potential improvements to existing 8” PVC storm line, per City direction. NE will continue to work with the Stormwater Engineering Department on how the city would like the existing lines to be modified, if needed. • Relocation of irrigation boxes within proposed easement and proposed trail. • ±160 LF of existing dog park fencing will be removed and replaced outside of the trail and easement. • ±7060 SF of existing crusher fines trail removed and replaced with concrete trail. • ±3,435 SF of existing concrete trail to be removed and rebuilt with 12 FT concrete trail. • ±260 SF of existing sidewalk near the entrance to the parking lot. • Removal and replacement of the existing ADA pedestrian ramp into parking lot. • Removal and replacement of ±165 LF of 18” vertical curb and gutter throughout parking lot. Additional ±110 LF of 18” vertical curb and gutter added to parking lot. • ±8,975 SF of existing asphalt to be removed and replaced within the parking lot. • Restriping of parking stalls impacted by construction. • 1 existing tree near the parking lot and in the path of the proposed water line will need to be removed. Benefits to Soft Gold Park • Proposed 12ft concrete trail runs from W. Willox Lane through Soft Gold Park. The existing dirt trail will be replaced with concrete, providing better conditions for pedestrians to access the park. • The ADA pedestrian ramp will be reconstructed and brought up to code. • A portion of the parking lot will be removed for construction and will be replaced with new asphalt. A cape seal will be provided for the remaining portion of the parking lot. This will extend the life of the parking lot and eliminate existing cracks and potholes. Parking stalls will be restriped. NORTHERNENGINEERING.COM | 970.221.4158 FORT COLLINS | GREELEY 3 | 3 • Currently there is a low spot within the parking lot that ponds during rain events. The reconstruction and regrading of the parking lot will eliminate this low spot and allow for runoff to flow into Wood Duck Pond. The “Existing Conditions and Demolition” plan (Attachment 2), “Overall Utility Plan” (Attachment 3), “Overall Grading Plan” (Attachment 4) are provided for further clarification of the changes listed above. During construction, the Soft Gold Park parking lot will be phased out so that access can be provided. A one-way road with traffic control into and out of the park will be utilized while construction is occurring in the parking lot of the park. A conceptual phasing plan is called out in Attachment 2. A more detailed phasing plan will be provided prior to construction for review and approval by the Parks Department. A permit for the work within Soft Gold Park will be obtained prior to construction. We acknowledge that we’ve been informed by Parks that if the Soft Gold Park/Soft Gold Park entrances need to close, there will be a penalty assessed. Visitors can also utilize on-street parking close to the park and park entrance and will have access to walk into the park around construction. On-street parking close to a park entrance is located off Hickory Street and Elm Street (for the residents of Hickory Village). A Temporary Construction Easement will be requested prior to construction. This will cover the area of the utility easement and the parking lot. Additional information will be provided when applying for the TCE. After installation and revegetation are completed, impacts to the park are expected to be minimal. Should maintenance be needed, the concrete trail is intended to allow vehicles to access the line with minimal impacts to the adjacent park surfaces. Drainage Easement In addition to the utility easement, the project is also proposing stormwater discharge into an existing swale. This connection would be made on City property in the northwest corner of the Soft Gold property. The release rate is approximately 6.6 cfs and would be contained in the existing swale and drainage facilities that already serve properties to the west. The releases would meet all applicable City requirements for flow rate and water quality and would be contained within the existing drainage swale. An easement would also be needed for the stormwater discharge, which is being discussed by the Natural Areas Department internally. Once this easement has been confirmed, it will be added to the plat and utility plans. At this time, it is proposed to be 30ft in width and 350ft in length from the northwest corner of the park property straight south along the west property line. We hope that this letter addresses some of the history of the project and provides clarification on why the current solution is being pursued. If there are additional questions about anything discussed here, or that arise down the road, please don’t hesitate to contact me. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Amanda Poincelot, EI Project Manager NORTHERNENGINEERING.COM | 970.221.4158 LEGAL DESCRIPTION FORT COLLINS | GREELEY 1 |4 LEGAL DESCRIPTION AND EXHIBIT DESCRIPTION A parcel of land being a portion of Lot 1, Lakewood Estates Mobile Home Park, recorded as Book 1638, Page 616 of the Records of Larimer County and situate within the North Half of Section Two (2), Township Seven North (T.7N.), Range Sixty-nine West (R.69W.) of the Sixth Principal Meridian (6th P.M.), City of Fort Collins, County of Larimer, State of Colorado, being more particularly described as follows; Considering the north line of the Southeast Quarter of the Northwest Quarter of Section 2 as bearing North 89° 19' 45" West with the Center-East-Northwest 1/64th corner being a 3 ¼” aluminum cap on #6 rebar stamped LS 38106 and the Center-North 1/16th corner being a 2 ½” aluminum cap on #6 rebar and with all bearings contained herein relative thereto: COMMENCING at the Center-North 1/16th corner of Section 2, said point being on the north line of Lot 1, Lakewood Estates Mobile Home Park; THENCE along said north line, North 89° 19' 45" West a distance of 154.79 feet to the POINT OF BEGINNING; THENCE South 47° 23' 33" West a distance of 31.33 feet; THENCE along the arc of a non-tangent curve concave to the southeast a distance of 201.34 feet, said curve has a Radius of 280.00 feet, a Delta of 41° 11' 58" and is subtended by a Chord bearing South 26° 48' 25" West a distance of 197.03 feet; THENCE along the arc of a non-tangent curve concave to the west a distance of 39.35 feet, said curve has a Radius of 320.00 feet, a Delta of 07° 02' 45" and is subtended by a Chord bearing South 09° 43' 49" West a distance of 39.33 feet; THENCE South 31° 19' 49" East a distance of 43.64 feet; THENCE along the arc of a non-tangent curve concave to the southeast a distance of 59.54 feet, said curve has a Radius of 217.00 feet, a Delta of 15° 43' 13" and is subtended by a Chord bearing South 54° 55' 10" West a distance of 59.35 feet; THENCE South 24° 54' 24" West a distance of 39.58 feet; THENCE along the arc of a non-tangent curve concave to the east a distance of 282.74 feet, said curve has a Radius of 280.00 feet, a Delta of 57° 51' 22" and is subtended by a Chord bearing South 04° 01' 17" East a distance of 270.88 feet; THENCE along the arc of a curve concave to the southwest a distance of 172.18 feet, said curve has a Radius of 320.00 feet, a Delta of 30° 49' 40" and is subtended by a Chord bearing South 17° 32' 08" East a distance of 170.11 feet; THENCE South 02° 07' 18" East a distance of 40.48 feet; THENCE along the arc of a curve concave to the northeast a distance of 182.87 feet, said curve has a Radius of 280.00 feet, a Delta of 37° 25' 17" and is subtended by a Chord bearing South 20° 49' 56" East a distance of 179.64 feet; THENCE South 39° 32' 35" East a distance of 140.15 feet; THENCE along the arc of a curve concave to the southwest a distance of 97.65 feet, said curve has a Radius of 320.00 feet, a Delta of 17° 29' 00" and is subtended by a Chord bearing South 30° 48' 05" East a distance of 97.27 feet; THENCE South 22° 03' 35" East a distance of 59.65 feet; THENCE South 67° 03' 35" East a distance of 155.09 feet to the South line of said Lot 1; THENCE along said south line, North 89° 25' 57" West a distance of 162.14 feet; THENCE departing said south line, North 22° 03' 35" West a distance of 106.93 feet; THENCE along the arc of a curve concave to the southwest a distance of 85.44 feet, said curve has a Radius of 280.00 feet, a Delta of 17° 29' 00" and is subtended by a Chord bearing North 30° 48' 05" West a distance of 85.11 feet; THENCE North 39° 32' 35" West a distance of 140.15 feet; THENCE along the arc of a curve concave to the northeast a distance of 209.00 feet, said curve has a Radius of 320.00 feet, a Delta of 37° 25' 17" and is subtended by a Chord bearing North 20° 49' 56" West a distance of ATTACHMENT 1 NORTHERNENGINEERING.COM | 970.221.4158 LEGAL DESCRIPTION FORT COLLINS | GREELEY 2 |4 LEGAL DESCRIPTION AND EXHIBIT 205.30 feet; THENCE North 02° 07' 18" West a distance of 40.48 feet; THENCE along the arc of a non-tangent curve concave to the west a distance of 150.65 feet, said curve has a Radius of 280.00 feet, a Delta of 30° 49' 40" and is subtended by a Chord bearing North 17° 32' 08" West a distance of 148.84 feet; THENCE along the arc of a curve concave to the east a distance of 323.13 feet, said curve has a Radius of 320.00 feet, a Delta of 57° 51' 22" and is subtended by a Chord bearing North 04° 01' 17" West a distance of 309.58 feet; THENCE North 24° 54' 24" East a distance of 50.59 feet; THENCE along the arc of a non-tangent curve concave to the northwest a distance of 91.38 feet, said curve has a Radius of 280.00 feet, a Delta of 18° 41' 58" and is subtended by a Chord bearing North 15° 33' 25" East a distance of 90.98 feet; THENCE along the arc of a non-tangent curve concave to the southeast a distance of 219.10 feet, said curve has a Radius of 320.00 feet, a Delta of 39° 13' 50" and is subtended by a Chord bearing North 25° 49' 21" East a distance of 214.85 feet; THENCE South 89° 21' 07" East a distance of 58.10 feet to the POINT OF BEGINNING. The above-described parcel of land contains 61,492 square feet or 1.412 acres, more or less (±), and may be subject to easements and rights-of-way now on record or existing. Exhibit attached hereto and made a part hereof. SURVEYOR’S CERTIFICATE I, Robert C. Tessely, a Colorado Registered Professional Land Surveyor do hereby state that this Property Description was prepared under my personal supervision and checking, and that it is true and correct to the best of my knowledge and belief. _________________________________________________________________________ Robert C. Tessely – for and on behalf of Northern Engineering Colorado Registered Professional Land Surveyor #38470 NORTHERN ENGINEERING 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 April 12, 2024 LMS S:\Survey Jobs\987-012\Dwg\Exhibits\987-012 EXHIBIT DESCRIPTION.docx C-N 1/16 CORNER SECTION 2-7-69 FND #6 REBAR WITH 2 1/2" ALUMINUM CAP ILLEGIBLE C-E-NW 1/64 CORNER SECTION 2-7-69 FND #6 REBAR WITH 3 1/4" ALUMINUM CAP STAMPED LS 38106, 2014 N89°19'45"W 154.79'NORTH LINE OF THE SE 1 4 OF THE NW 1 4 SECTION 2-7-69 BASIS OF BEARINGS AREA 61,492 sq. ft. 1.412 ac. 40' 40' LOT 1 LAKEWOOD ESTATES MOBILE HOME PARK L4 L5 L 6 C 8 L7 C 9 N02°07'18"W 40.48' C 1 0 C11 N24°54'24"E 50.59' C12 C13 S89°21'07"E 58.10' L1 C1 C2 S31°19'49"E 43.64' C 3 S24°54'24"W 39.58' C 4 C 5 S02°07'18"E 40.48' C 6 L2 C 7 L 3 EAST LINE OF THE SE 1 4 OF THE NW 1 4 SECTION 2-7-69 SOUTH LINE OF THE NORTH 1 2 SECTION 2-7-69 POINT OF COMMENCEMENT NOTE: THIS EXHIBIT IS NOT INTENDED TO BE A MONUMENTED LAND SURVEY. ITS SOLE PURPOSE IS AS A GRAPHIC REPRESENTATION TO AID IN THE VISUALIZATION OF THE WRITTEN PROPERTY DESCRIPTION WHICH IT ACCOMPANIES. THE WRITTEN PROPERTY DESCRIPTION SUPERCEDES THE EXHIBIT DRAWING. PAGE 3 OF 4 DR A F T 4- 1 2 - 2 4 PR E L I M I N A R Y - N O T F O R C O N S T R U C T I O N , RE C O R D I N G P U R P O S E S O R I M P L E M E N T A T I O N S:\SURVEY JOBS\987-012\DWG\EXHIBITS\987-012 EXHIBIT.DWG EXHIBIT A PARCEL OF LAND BEING A PORTION OF LOT 1, LAKEWOOD ESTATES MOBILE HOME PARK. LOCATED IN THE THE NORTH HALF OF SECTION 2, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6th P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO POINT OF BEGINNING LINE TABLE LINE L1 L2 L3 L4 L5 L6 L7 LENGTH 31.33' 140.15' 59.65' 155.09' 162.14' 106.93' 140.15' BEARING S47° 23' 33"W S39° 32' 35"E S22° 03' 35"E S67° 03' 35"E N89° 25' 57"W N22° 03' 35"W N39° 32' 35"W CURVE TABLE CURVE C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 DELTA 41°11'58" 7°02'45" 15°43'13" 57°51'22" 30°49'40" 37°25'17" 17°29'00" 17°29'00" 37°25'17" 30°49'40" 57°51'22" 18°41'58" 39°13'50" RADIUS 280.00' 320.00' 217.00' 280.00' 320.00' 280.00' 320.00' 280.00' 320.00' 280.00' 320.00' 280.00' 320.00' LENGTH 201.34' 39.35' 59.54' 282.74' 172.18' 182.87' 97.65' 85.44' 209.00' 150.65' 323.13' 91.38' 219.10' BEARING S26°48'25"W S09°43'49"W S54°55'10"W S04°01'17"E S17°32'08"E S20°49'56"E S30°48'05"E N30°48'05"W N20°49'56"W N17°32'08"W N04°01'17"W N15°33'25"E N25°49'21"E CHORD 197.03' 39.33' 59.35' 270.88' 170.11' 179.64' 97.27' 85.11' 205.30' 148.84' 309.58' 90.98' 214.85' PAGE 4 OF 4 DRAFT 4-12-24 PRELIMINA R Y - N O T F O R C O N S T R U C T I O N , RECORDIN G P U R P O S E S O R I M P L E M E N T A T I O N S:\SURVEY JOBS\987-012\DWG\EXHIBITS\987-012 EXHIBIT.DWG EXHIBIT A PARCEL OF LAND BEING A PORTION OF LOT 1, LAKEWOOD ESTATES MOBILE HOME PARK. LOCATED IN THE THE NORTH HALF OF SECTION 2, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6th P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO W WWW W W W T W S S W T T ELECS S MS W W T S MM W M HY D FO FO XXX G OHU FO W W W W W W W W W W FO X G FO FOG G G X X X X X X X FO FO OHU OHU OHU OHU W W FO FO X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X FO FO FO FO FO FO G G G G G G FO FO FO FO FO FO E E E E E W W W XXXXXXXXXXXXX X X OHU OHU OHU OHU OHU O H U O H U OHU OHU OHU OHU OHU OHU OHU OHU OHU X X X X X X X X X X X X W W W W W W W W W ACKELSON CONNIE A.KAFKA, AMY PITT, JEAN GBP LLC. WEST WILLOX LANE SOFT GOLD DOG PARK JE N S E N G O R D O N L . PEREZ DANIEL A. PEREZ DANIEL A. / / / / / / / / / / / / / / / / // / / / / / /////// EXISTING 20' SANITARY SEWER EASEMENT TO BE VACATED (ENCROACHES ON PROPERTY) EXISTING 20' PRIVATE DRAINAGE EASEMENT TO BE CONVERTED TO PUBLIC EASEMENT EXISTING 10' UTILITY EASEMENT EXISTING 6' CITY OF FORT COLLINS EASEMENT EXISTING 10' MOUNTAIN STATES UTILITY EASEMENT TO BE VACATED EXISTING 30' NORTHERN COLORADO WATER ASSOCIATION (NCWA) EASEMENT REMOVE APPROXIMATELY 656' OF EXISTING BARBWIRE FENCE EXISTING 6' CITY OF FORT COLLINS EASEMENT EXISTING 60' ROW 100' UNION PACIFIC RAILROAD ROW EXISTING OUT BUILDING PROPERTY BOUNDARY EXISTING GREEN HOUSES EXISTING GAS LINE REMOVE AND RELOCATE EXISTING OVERHEAD UTILITIES EXISTING FIBER OPTIC CABLE EXISTING BARBWIRE FENCE (PROTECT IN PLACE) EXISTING BARBWIRE FENCE EXISTING BARBWIRE FENCE EXISTING BARBWIRE FENCE TO BE REMOVED EXISTING 6' WOOD \PRIVACY FENCE EXISTING TREE (TYP.) EXISTING CHAIN LINK FENCE TO BE REMOVED EXISTING DENSE SHRUBS & TREES EXISTING TREE (TYP.) EXISTING STEEL PANELS w/ WOOD POSTS ENCROACHES ON PROPERTY. DO NOT REMOVE EXISTING UNDERGROUND ELECTRICAL REMOVE AND RELOCATE EXISTING R.R. CROSSING SIGN EXISTING UTILITY POLE (TYP.) EXISTING MAILBOX (TYP.) EXISTING 12" RCP CULVERT REMOVE EXISTING TREE/BUSH REMOVE & REPLACE EXISTING BURIED PIPE UNION PACIFIC RAILROAD EXISTING SANITARY MANHOLE CENTERLINE OF TWO TRACK DIRT ROAD CENTERLINE OF TWO TRACK DIRT ROAD EXISTING 12" PVC WATER LINE (FORT COLLINS) EXISTING GAS METER (TYP.) EXISTING FIRE HYDRANT REMOVE EXISTING TREE (TYP.) REMOVE AND RELOCATE EXISTING TELEPHONE PEDESTAL REMOVE AND RELOCATE EXISTING SIGN EXISTING NoCO WATER LINE REMOVE EXISTING UTILITY POLE REMOVE ± 665 LF EXISTING STRIPING REMOVE & REPLACE ±9,900 SF OF ASPHALT EXISTING WATER METER (TYP.) EXISTING NORTHERN COLORADO WATER ASSOCIATION WATER MAIN EXISTING OVER HEAD LINE TO TO BE REPLACED UNDER GROUND EXISTING GATE EXISTING NORTHERN COLORADO WATER ASSOCIATION WATER MAIN EXISTING GATE REMOVE APPROXIMATELY 160' OF EXISTING DOG PARK FENCE LIMITS OF SAWCUT & TRENCH FOR WATER LINE BORNING LIMITS OF SAWCUT & TRENCH FOR WATER LINE BORINGLIMITS OF SAWCUT EXISTING ELECTRICAL TRANSFORMER EXISTING GAS METER (TYP.) W W W WTESTSTA CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR W W E E E X X X X X X X X X X CSW H2O C S CS VAULT ELEC H Y D CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR ELEC C.O. S OHU OHU E E E E E E X X X X X X X X X X X X X X X X X X X X X W W Xh2o / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / XX SOFT GOLD BICYCLE COURSE SOFT GOLD PARK NO SURVEY DATA IN THIS AREA NO SURVEY DATA IN THIS AREA SOFT GOLD BASKETBALL COURTS EXISTING PLAYGROUND SOFT GOLD BASEBALL DIAMOND CITY OF FORT COLLINS HI C K O R Y V I L L A G E S U B D I V I S I O N CI T Y O F F O R T C O L L I N S / / / / / / 40' ROW EXISTING 20' UTILITY EASEMENT EXISTING 50' TEMP CONSTRUCTION EASEMENT EXISTING COFC CATHODIC PROTECTION PROJECT EASEMENT (WIDTH VARIES) HANSON WILLIAM A/ MERIAM P WETLAND BOUNDARY SHRUB & TREE BOUNDARY SOFT GOLD PARK BICYCLE COURSE TRACK RULES SHRUB & TREE BOUNDARY (APPROXIMATE) CENTERLINE OF TWO TRACK DIRT ROAD EXISTING NATURAL AREA SIGN RESTROOMS EXISTING 6' CONCRETE TRAIL TO BE REMOVED & REPLACED EXISTING GAZEBO EXISTING 8' CRUSHER FINES PATH TO BE REMOVED & REPLACED EXISTING TREE (TYP.) EXISTING DOG PARK FENCE EXISTING 6' CONCRETE TRAIL REMOVE & REPLACE EXISTING PEDESTRIAN RAMP EXISTING PEDESTRIAN RAMP EXISTING 8" PVC STORM LINE EXISTING UNDERGROUND ELECTRIC LINES EXISTING FENCE EXISTING 36" WATER MAIN (ANHEUSER-BUSCH) EXISTING 8" WATER LINE RELOCATE EXISTING FIRE HYDRANT REMOVE ±110' OF EXISTING 8" WATER LINE & 8" GATE VALVE EXISTING TREES (TYP.) PROPOSED SAW CUT PROPOSED SAW CUT REMOVE ±3260 SF OF EXISTING CONCRETE TRAIL REMOVE & REPLACE ±895 SF OF EXISTING ASPHALT REMOVE EXISTING CRUSHER FINES TRAIL REMOVE AND RELOCATE EXISTING IRRIGATION BOXES REMOVE AND RELOCATE EXISTING IRRIGATION BOXES EXISTING WATER & IRRIGATION METERS PROPOSED SAW CUT EXISTING 6' CONCRETE TRAIL TO BE REMOVED & REPLACED PROPOSED SAW CUT TEST STATION EXISTING COFC CATHODIC PROTECTION TEST STATION ON CONCRETE PAD EXISTING WATER SERVICE SOFT GOLD PARKING LOT CAPE SEAL ±15,000 SF APPROXIMATE LOCATION EXISTING 24" WATER (ELCO) REMOVE & REPLACE ±180 SF OF SIDEWALK REMOVE & REPLACE ±30 LF OF 18" VERTICAL CURB & GUTTER EXISTING STORM DRAIN REMOVE & REPLACE ±1,640 SF OF EXISTING ASPHALT Sheet WI L L O X F A R M Th e s e d r a w i n g s a r e i n s t r u m e n t s of s e r v i c e p r o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . a n d a r e no t t o b e u s e d f o r a n y t y p e o f co n s t r u c t i o n u n l e s s s i g n e d a n d se a l e d b y a P r o f e s s i o n a l E n g i n e e r in t h e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 60 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 EX1 DE M O L I T I O N P L A N EX I S T I N G C O N D I T I O N S & 4 NORTH ( IN FEET ) 1 inch = ft. Feet08080 80 160 240 KEYMAP T C.O. WEST WILLOX LANE SOFT GOLD PARK HICKORY STREET MATCH LINE - SEE THIS SHEET MATCH LINE - SEE THIS SHEET EXISTING ELECTRIC E LEGEND: G T EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS EXISTING IRRIGATION BOX EXISTING TELEPHONE PEDESTAL EXISTING TREES (TO REMAIN) FIELD SURVEY BY: SUBSURFACE EXPLORATION BY: NOTES: EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT PROJECT BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR VAULT ELEC CONTROL IRR EXISTING TREES (TO BE REMOVED) EXISTING CABLE CTV EXISTING FIBER OPTIC FO 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3.CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. 4.ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5.CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 6.THERE SHALL BE NO EQUIPMENT, MATERIALS, OR ITEMS STORED ON A FORT COLLINS PARKS TRAIL OR WITHIN THE TRAIL EASEMENT. IF THERE IS A NEED TO CLOSE A SECTION OF THE TRAIL FOR ANY REASON, A TRAFFIC CONTROL PLAN IS REQUIRED TO BE SUBMITTED AND APPROVED THROUGH TRAFFIC CONTROL. THE PARKS DEPARTMENT WILL SIGN OFF ON IT ONCE SUBMITTED. PLEASE KEEP THE CLOSURES TO THE SHORTEST AMOUNT OF TIME DEPENDING ON WORK SCHEDULING AND FLOW. PARKS DEPARTMENT PLANNING STAFF CAN HELP WITH ANY QUESTIONS YOU MAY HAVE REGARDING THESE STANDARDS. PLEASE CONTACT JILL WUERTZ (jwuertz@fcgov.com), 9704162062, OR PARKS PLANNING TECHNICIAN, AARON WAGNER (aawagner@fcgov.com) 9706820344, 413 S. BRYAN AVE, FORT COLLINS, CO 80521 REGARDING THE PARKS’ DEPARTMENT’S INTEREST. 7.THERE SHALL BE NO ENCROACHMENTS INTO THE TRAIL EASEMENT DURING THE CONSTRUCTION PROCESS. IF IT IS DETERMINED THAT AN ENCROACHMENT IS REQUIRED, FOR ANY REASON, PLEASE CONTACT ONE OF THE ABOVE PARKS REPRESENTATIVES. EXISTING OVERHEAD UTILITY OHE Original Field Survery: Northern Engineering Project No. 987-012 Date: November 2019 (Additional May 2020) S W EXISTING METAL FENCE POST EXISTING WOOD FENCE POST Earth Engineering Consultants, LLC Preliminary Subsurface Exploration Report Proposed Residential Development Willox Farm Larimer County, Colorado EEC Project No. 1212027 Date: May 6, 2021 Additional Subsurface Exploration: Earth Engineering Consultants, LLC Additional Subsurface Exploration / Geothechnical Engineering Report Proposed Willox Farm Residential Development (Larimer County Parcel #970220003) Larimer County, Colorado EEC Project No. 1212027 Date: April 13, 2022 EXISTING CRUSHER FINES TRAIL (TO BE REMOVED) EXISTING CONCRETE TRAIL (TO BE REMOVED) EXISTING ASPHALT (TO BE REMOVED) Additional Field Survey: Majestic Surveying Project No. 2020351 Date: April 2022 LIMITS OF TRENCHING WITHIN EXISTING ROAD CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R LIMITS OF SAW CUT ATTACHMENT 2 W WWW W W W T W S S W T ELECS S T MS W W WM T S MM W M HY D FO FO XXX G G OHU OHU FO FO W W W W W W W W W W W FO X G FO FO G G G X X X X X X X FO FO OHU OHU OHU OHU W W FO FO X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X FO FO FO FO FO FO G G G G G G FO FO FO FO FO FO E E E E E W W W X X O H U O H U OHU OHU OHU OHU OHU OHU OHU OHU OHU X X X X X X X X W W W W W W W W W W / / / / / / / / ACKELSON CONNIE A. 603 W WILLOX LANE,KAFKA, AMY PITT, JEAN GBP LLC EXISTING 10' UTILITY EASEMENT 12" SS 12" SS 12" SS 12" SS 12" W 12" W 12" W 12" W 12" W 12" W 12" W 12" W T UG E UG E UGE UGE UGE U G E UGE VAU L TELEC 12" SS 12 " S S 1 2 " S S 1 2 " S S UD U DUD UGE UGE UGE UGE UGE UGE UGE UGE PEREZ DANIEL A. 400 HICKORY STREET 149 PEREZ DANIEL A. 400 HICKORY STREET 149 EXISTING 6' CITY OF FORT COLLINS EASEMENT LOT 3 LOT 8 LOT 10 LOT 9 LOT 7 LOT 6 LOT 1 LOT 2 LOT 4 LOT 5 LOT 14 LOT 13 LOT 12 LOT 6 LOT 8 LOT 7 LOT 5 LOT 11 LOT 10 LOT 9 LOT 1 LOT 2 LOT 3 LOT 4 LOT 9 LOT 8 LOT 3 LOT 2 LOT 4 LOT 5 LOT 6 LOT 14 LOT 13 LOT 12 LOT 11 LOT 10 LOT 7 LOT 1 LOT 12 LOT 11 LOT 8 LOT 13 LOT 9 LOT 10 LOT 1LOT 2LOT 3 LOT 4LOT 5LOT 6 LOT 7 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 1 LOT 2 LOT 3 LOT 5 LOT 4 TRACT B DE TRACT A DE,UE,AE TRACT D TRACT C DE BLOCK 3 BLOCK 6 BLOCK 2 BLOCK 5 BLOCK 4 BLOCK 1 PROPOSED FIRE HYDRANT PROPOSED 2' SIDEWALK CHASE CONNECT TO EXISTING 12" DIP WATER LINE EXISTING NCWA WATERLINE TO BE PROTECTED IN PLACE EXISTING FH PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED POND OUTLET STRUCTURE 18" STEEL CASING TO BE BORED UNDER UNION PACIFIC ROW REMOVABLE BOLLARDS (TYP.) PROPOSED FOREBAY (TYP.) PROPOSED FOREBAY FUTURE CITY OF FORT COLLINS PARKS DEPT. IRRIGATION LINE (TO BE DESIGNED BY OTHERS) FUTURE CITY OF FORT COLLINS PARKS DEPT. IRRIGATION LINE (TO BE DESIGNED BY OTHERS) PROPOSED UNDERGROUND ELECTRIC RAIN GARDEN B BIOMEDIA AREA RAIN GARDEN A BIOMEDIA AREA EXISTING 20' PRIVATE DRAINAGE EASEMENT TO BE CONVERTED TO PUBLIC EASEMENT EXISTING 6' CITY OF FORT COLLINS EASEMENT EXISTING 10' MOUNTAIN STATES UTILITY EASEMENT EXISTING 30' NCWA EASEMENT 100' UNION PACIFIC RAILROAD ROW 20' IRRIGATION EASEMENT FOR FUTURE CITY OF FORT COLLINS PARKS DEPT. IRRIGATION LINE 30' IRRIGATION EASEMENT FOR FUTURE CITY OF FORT COLLINS PARKS DEPT. IRRIGATION LINE 20' IRRIGATION EASEMENT FOR FUTURE CITY OF FORT COLLINS PARKS DEPT. IRRIGATION LINE 30' IRRIGATION EASEMENT FOR FUTURE CITY OF FORT COLLINS PARKS DEPT. IRRIGATION LINE PROPOSED DETENTION POND SANITARY LINE A4 SS2 SEE SHEET SANITARY LINE A SEE SHEET SS1 SANITARY LINE A7 SEE SHEET SS4 SANITARY LINE A6 SEE SHEET SS3 PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT WILLOX STORM DRAIN SEE SHEET ST3 STORM DRAIN A SEE SHEET ST1 STORM DRAIN C SEE SHEET ST2 STORM DRAIN B SEE SHEET ST2 PROPOSED 2' CONCRETE PAN PROPOSED 4' SIDEWALK CHASE PROPOSED 4' SIDEWALK CULVERT PROPOSED 4' CONCRETE PAN w/ 6" CURBS PROPOSED 2' SIDEWALK CHASE PROPOSED 2' CONCRETE PAN SA I N T T H E R E S E S T R E E T SA I N T J E R O M E S T R E E T SAINT JOSEPH STREET MOLLER STREET SAINT GRACE STREET WEST WILLOX LANE PROPOSED 4' SIDEWALK CULVERT 18' UTILITY EASEMENT RG B UNDERDRAIN SEE SHEET U2 PROPOSED 2' CONCRETE PAN PROPOSED 4' SIDEWALK CULVERT PROPOSED 2' CONCRETE PAN WILLOX WATER LINE SEE SHEET WT1 WATER LINE B SEE SHEET WT4-WT5 WATER LINE B SEE SHEET WT4-WT5 WATER LINE C SEE SHEET WT6 WATER LINE A SEE SHEET WT2-WT3 WATER LINE D SEE SHEET WT7 WATER LINE C SEE SHEET WT6 PROPOSED 4' CONCRETE PAN w/ 7" CURBS RG A UNDERDRAIN SEE SHEET U2 WILLOX EAST STORM DRAIN SEE SHEET ST4 EMERGENCY OVERFLOW WEIR W W W WTESTSTA CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR W W E E E X X X X X X X X X CSW H2O CS C S VAULT ELEC CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR ELEC C.O. B M S OHU OHU E E E E E E X X X X X X X X X X X X X X X X X X X X X X X W W Xh2o XX X / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / UGE UG E UG E U G E U G E U G E U G E UG E UG E U G E U G E UG E UG E U G E U G E U G E UG E UG E UG E PE R E Z D A N I E L A . 40 0 H I C K O R Y S T R E E T 1 4 9 HANSON WILLIAM A/ MERIAM P EXISTING RESTROOMS EXISTING GAZEBO CONNECT TO EXISTING 8" PVC WATER LINE REPLACE ± 140 LF OF FENCE ALONG EASEMENT LINE EXISTING 36" WATER LINE (ANHEUSER- BUSCH) TO BE PROTECTED IN PLACE TEST STATION COFC CATHODIC PROTECTION TEST STATION ON CONCRETE PAD PROPOSED FIRE HYDRANT REMOVABLE BOLLARDS APPROXIMATE LOCATION EXISTING 24" WATER LINE (ELCO) TO BE PROTECTED IN PLACE PROPOSED UNDERGROUND ELECTRIC (TYP.) 40' ROW EXISTING 20' UTILITY EASEMENT EXISTING 50' TEMP CONSTRUCTION EASEMENT COFC CATHODIC PROTECTION PROJECT EASEMENT (WIDTH VARIES) BICYCLE COURSE DOG PARK SOFT GOLD PARK BASKETBALL COURTS EXISTING PLAYGROUND BASEBALL DIAMOND PARKING LOT WOOD DUCK POND HICKORY STREET CULVERT SEE SHEET U4 4 - EXISTING 8" STORM PIPES EXISTING 30" STORM DRAIN WATER LINE A SEE SHEET WT2-WT3 WATER LINE A SEE SHEET WT2-WT3 40' UTILITY EASEMENT (BY SEPARATE DOCUMENT) Sheet WI L L O X F A R M Th e s e d r a w i n g s a r e i n s t r u m e n t s of s e r v i c e p r o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . a n d a r e no t t o b e u s e d f o r a n y t y p e o f co n s t r u c t i o n u n l e s s s i g n e d a n d se a l e d b y a P r o f e s s i o n a l E n g i n e e r in t h e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 60 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 OU1 OV E R A L L U T I L I T Y P L A N 5 NORTH ( IN FEET ) 1 inch = ft. Feet08080 80 160 240 NOTES: EXISTING LOT LINE EASEMENT LINE SPROPOSED SEWER SERVICE WPROPOSED WATER SERVICE EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: G T EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPERTY BOUNDARY EXISTING TELEPHONE PEDESTAL PROPOSED STREET LIGHT W SS PROPOSED LOT LINE PROPOSED ROW EXISTING ROW EXISTING CABLE CTV 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL WATER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS UTILITIES WATER AND WASTEWATER DESIGN CRITERIA MANUAL, EXCEPT THAT NO MECHANICAL JOINT RESTRAINTS ARE REQUIRED BETWEEN FITTINGS UNLESS SPECIFICALLY SHOWN ON THE PLAN OR AS REQUIRED FOR ABNORMAL DEFLECTIONS. 3.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 4.ALL WATERLINES SHALL HAVE A MINIMUM OF 4.5' AND MAXIMUM OF 5.5' WATER LINE COVER FROM FINISHED GRADE TO TOP OF PIPE. 5.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 6.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 7.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 8.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE THE CITY OF FORT COLLINS ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STREET REPAIR STANDARDS. 9.ALL MANHOLE RIM ELEVATIONS (EXISTING & PROPOSED) ARE TO BE ADJUSTED TO 14" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 10.ALL HOMES SHALL FEATURE 13D SPRINKLER SYSTEMS. PROPOSED UNDER GROUND ELECTRIC UGE UGE EXISTING EDGE OF ASPHALT PROPOSED EDGE OF ASPHALT / / / / / / / / EXISTING GAS METER EXISTING WATER METER EXISTING MAIL BOX M MATCH LINE - SEE THIS SHEET MATCH LINE - SEE THIS SHEET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R KEYMAP T C.O. WEST WILLOX LANE SOFT GOLD PARK HICKORY STREET U1 U2 U3 U4 ATTACHMENT 3 PROPOSED 10FT TRAIL THROUGH WILLOX FARM DEVELOPMENT PROPOSED 10FT TRAIL THROUGH WILLOX FARM DEVELOPMENT PROPOSED 10FT TRAIL THROUGH WILLOX FARM DEVELOPMENT PROPOSED 12FT TRAIL THROUGH SOFT GOLD PARK PROPOSED 12FT TRAIL THROUGH SOFT GOLD PARK NEW PARKING LOT SURFACE AND RESTRIPING OF ALL STALLS NEW ASPHALT WILL ELIMINATE LOW POINT. UNDERGROUND ELECTRIC CONNECTION NEW CONNECTION TO PROPOSED WATER MAIN TO EXISTING IRRIGATION AND WATER METERS T T T T XXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X / / / / / / / / UD U DUD SA I N T T H E R E S E S T R E E T SA I N T T H E R E S E S T R E E T SAINT JOSEPH STREET MOLLER STREET SAINT GRACE STREET PROPOSED POND FUTURE CITY OF FORT COLLINS IRRIGATION PIPE (TO BE DESIGNED BY OTHERS) PROPOSED POND OUTFALL WEST WILLOX LANE ACKELSON CONNIE A. KAFKA, AMY PITT, JEAN GBP LLC PEREZ DANIEL A. JENSEN GORDON L. LOT 3LOT 4LOT 5LOT 6 LOT 12 LOT 11 LOT 8 LOT 13 LOT 9 LOT 7 LOT 6 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 7 LOT 1 LOT 8 LOT 10 LOT 9 LOT 7 LOT 6 LOT 1 LOT 2 LOT 4 LOT 5 LOT 8 LOT 7 LOT 5 LOT 4 LOT 11 LOT 10 LOT 9 LOT 10 LOT 1LOT 2 LOT 3 BLOCK 3 BLOCK 6 BLOCK 2 TRACT B DE TRACT A DE,UE,AE TRACT D TRACT A DE,UE,AE PROPOSED RAIN GARDEN A BIOMEDIA AREA A3A3 A1A1 A2A2 LOT 1 LOT 2 LOT 3 LOT 5 LOT 4 LOT 6 LOT 1 LOT 2 LOT 3 LOT 9 LOT 8 LOT 3 LOT 2 LOT 4 LOT 5 LOT 6 LOT 14 LOT 13 LOT 12 LOT 11 LOT 10 LOT 14 LOT 13 LOT 2 TRACT C DE BLOCK 1 BLOCK 5 EXISTING 6' CITY OF FORT COLLINS EASEMENT EXISTING 20' PRIVATE DRAINAGE EASEMENT TO BE CONVERTED TO PUBLIC EASEMENT EXISTING 10' UTILITY EASEMENT EXISTING 6' CITY OF FORT COLLINS EASEMENT EXISTING 10' MOUNTAIN STATES UTILITY EASEMENT EXISTING 30' NCWA EASEMENT 100' UNION PACIFIC RAILROAD ROW 20' IRRIGATION EASEMENT FOR FUTURE CITY OF FORT COLLINS PARKS DEPT. IRRIGATION LINE 30' IRRIGATION EASEMENT FOR FUTURE CITY OF FORT COLLINS PARKS DEPT. IRRIGATION LINE 30' IRRIGATION EASEMENT FOR FUTURE CITY OF FORT COLLINS PARKS DEPT. IRRIGATION LINE 20' IRRIGATION EASEMENT FOR FUTURE CITY OF FORT COLLINS PARKS DEPT. IRRIGATION LINE PROPOSED SIDEWALK CHASES LOT 12 S A I N T J E R O M E S T R E E T SA I N T J E R O M E S T R E E T FUTURE CITY OF FORT COLLINS IRRIGATION PIPE (TO BE DESIGNED BY OTHERS) PROPOSED RAIN GARDEN B BIOMEDIA AREA WILLOX STORM DRAIN SEE SHEET ST3 STORM DRAIN A SEE SHEET ST1 STORM DRAIN C SEE SHEET ST2 STORM DRAIN B SEE SHEET ST2 RG B UNDERDRAIN SEE SHEET U2 RG A UNDERDRAIN SEE SHEET U2 WILLOX EAST STORM DRAIN SEE SHEET ST4 PROPOSED SIDEWALK CULVERT EMERGENCY OVERFLOW WEIR TESTSTA CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR X X X X X X X X X C.O. X X X X X X X X X X X X X X X X X X X X X X X X XX / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / SOFT GOLD PARK HICKORY STREET CITY OF FORT COLLINS HANSON WILLIAM A/ MERIAM P 40' ROW 20' UTILITY EASEMENT 50' TEMP CONSTRUCTION EASEMENT COFC CATHODIC PROTECTION PROJECT EASEMENT (WIDTH VARIES) WOOD DUCK POND CULVERT SEE SHEET U4 4 - EXISTING 8" STORM PIPES EXISTING 30" STORM DRAIN Sheet WI L L O X F A R M Th e s e d r a w i n g s a r e i n s t r u m e n t s of s e r v i c e p r o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . a n d a r e no t t o b e u s e d f o r a n y t y p e o f co n s t r u c t i o n u n l e s s s i g n e d a n d se a l e d b y a P r o f e s s i o n a l E n g i n e e r in t h e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 60 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 OG1 OV E R A L L G R A D I N G P L A N 25 KEYMAP T C.O. WEST WILLOX LANE SOFT GOLD PARK HICKORY STREET NORTH ( IN FEET ) 1 inch = ft. Feet08080 80 160 240 PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL PROJECT DATA IS ON VERTICAL DATUM; NAVD88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 4.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 5.LOT GRADING IS DESIGNED FOR TYPICAL RECTANGULAR FOOTPRINT WITH DIMENSIONS AS SHOWN HEREON. SHOULD BUILDING FOOTPRINT CHANGE, GRADING SHALL BE ADJUSTED BY PLOT PLAN FOR THE SPECIFIC FOOTPRINT. ALL MINIMUM OPENINGS SHALL BE A MINIMUM OF 18" ABOVE FRONT LOT ELEVATIONS AND PLOT PLAN DESIGN SHALL MEET FHA GRADING GUIDELINES AND BUILDING CODE REQUIREMENTS. NOTES: PROPOSED STORM INLET 2.0% (47.45 ) EXISTING SPOT ELEVATION EXISTING LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) 33.43 EXISTING RIGHT OF WAY PROPOSED LOT LINE PROPOSED RIGHT OF WAY ALOT TYPE LEGEND: PROPOSED GRADE BREAK SWALE SECTIONS PROPOSED ASPHALT REPAVING PROPOSED CONCRETE REPAVING SWALE SUMMARY TABLE SWALE ID MIN D MIN TW S1 (n:1)BW S2 (n:1)Q Q*1.33 A1 - A1 0.63 26.41 13.0 2.0 27.0 8.1 10.77 A2 - A2 0.96 22.11 10.7 4.0 16.7 39.0 51.87 A3 - A3 0.78 4.90 144.0 4.0 6.0 7.8 10.37 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R MATCH LINE - SEE THIS SHEET MATCH LINE - SEE THIS SHEET G1 G2 G3 G4 ATTACHMENT 4 NEW ASPHALT WILL ELIMINATE LOW POINT. DRAINAGE WILL FLOW WEST TOWARDS WOOD DUCK POND IMPROVED 12FT CONCRETE TRAIL WILL ELIMINATE PONDING ON TRAIL AND PROVIDE BETTER ACCESS FOR MAINTENANCE.