Loading...
HomeMy WebLinkAboutTAPESTRY - PDP240001 - SUBMITTAL DOCUMENTS - ROUND 1 - Utility PlansEAST LINCOLN AVENUE EAST VINE DRIVE LIN D E N S T R E E T 60' ROW 3RD STREET (MODIFIED LOCAL CONNECTOR - EX 60' R.O.W.) 41' FL-FL 20' FL-CL EXISTING ROLLOVER CURB W/ ATTACHED WALK 7' P A R K I N G 8' P A R K I N G / PA R K W A Y 10 ' T R A V E L 13' FL-CL 5' WALK 6' UTILITY EASEMENT 10 ' T R A V E L 3' P A R K I N G S P A C E R 3' P A R K I N G S P A C E R 21' FL-CL PARKING SECTION VERTICAL CURB & GUTTER 3' LANDSCAPE BUFFER 63' ROW LOGAN AVE (MODIFIED LOCAL CONNECTOR - 63' R.O.W.) 42' FL-FL 13' FL-CL 7. 5 ' P A R K I N G 13' FL-CL 8.5' PARKWAY 9' UTILITY EASEMENT 21' FL-CL 6' UTILITY EASEMENT VERTICAL CURB & GUTTER PARKING SECTION 10 ' T R A V E L 10 ' T R A V E L 3' P A R K I N G S P A C E R 3' P A R K I N G S P A C E R 5' S I D E W A L K 5' S I D E W A L K 8. 5 ' P A R K W A Y 8' P A R K I N G / PA R K W A Y 3' L A N D S C A P E B U F F E R ℄ 5' S I D E W A L K 9' UTILITY EASEMENT 8' P A R K W A Y 18' -℄ 8' P A R K 5' S I D E W A L K 9' UTILITY EASEMENT 8' P A R K W A Y 18' -℄ 8' P A R K 20' TRAVEL LANE 62' RIGHT-OF-WAY 36' - DRIVE-OVER CURB & GUTTER DRIVE-OVER CURB & GUTTER 4TH STREET (LOCAL CONNECTOR - 62' R.O.W.) VAR. ROW BUCKINGHAM STREET MODIFIED COLLECTOR INTERIM CONDITION - VARYING R.O.W. 34' EOP-FL 15' EOP-CL 4' S H O U L D E R 8' P A R K I N G 11 ' T R A V E L 19' FL-CL 6' UTILITY EASEMENT 11 ' T R A V E L 5' B I K E L A N E 27' FL-CL 5' S I D E W A L K PARKING SECTION VERTICAL CURB & GUTTER 3' L A N D S C A P E B U F F E R 3' P A R K I N G S P A C E R Sheet TA P E S T R Y Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 13 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 C 100 CO V E R S H E E T 1 APRIL 2024 CONTACT INFORMATION PROJECT TEAM: VICINITY MAP NORTH TAPESTRY PROJECT TEAM: SHEET INDEX LOCATED IN THE NORTHEAST QUARTER OF SECTION 12, TOWNSHIP 7 NORTH, RANGE 69 WEST, OF THE 6TH P.M., FORT COLLINS, LARIMER COUNTY, COLORADO TYPICAL SECTIONS 1 C 100 COVER SHEET 2 C 101 GENERAL & CONSTRUCTION NOTES 3 C 102 EXISTING CONDITIONS & DEMOLITION PLAN SITE SHEETS 4 C 200 CIVIL SITE PLAN UTILITY SHEETS 5 C 300 OVERALL UTILITY PLAN GRADING SHEETS 6 C 400 OVERALL GRADING PLAN ROADWAY SHEETS 7 C 500 LOGAN AVENUE PLAN & PROFILE 8 C 501 4TH STREET PLAN & PROFILE 9 C 502 BUCKINGHAM STREET PLAN & PROFILE 10 C 503 3RD STREET PLAN & PROFILE 11 C 504 BUCKINGHAM CROSS SECTIONS 12 C 505 3RD STREET CROSS SECTIONS DRAINAGE SHEETS 13 C 600 DRAINAGE EXHIBIT PRELIMINARY UTILITY PLANS FOR CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R APPROVED: City Engineer:Approved Sheets Date Water & Wastewater Utility Approved Sheets Date Stormwater Utility Approved Sheets Date Park Planning and Development Approved Sheets Date Traffic Operations Approved Sheets Date Environmental Planner Approved Sheets Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL APPROVED: APPROVED: APPROVED: APPROVED: APPROVED: Original Field Survey: Northern Engineering Project No. 368-005 Date: March 22, 2021 Project Datum: NAVD88 Benchmark 3-00 On a parapet wall at the Northwest end of the Lincoln Ave. bridge near the Northeast corner of Lincoln Ave. and Willow St. Elevation: 4967.33 Benchmark R-402 Described by National Geodetic Survey 1984 in Fort Collins, at the junction of 9th Street and Lincoln Avenue, in the East edge of the concrete footing for Highline Tower number 29, 47.8 meters (156.8 ft) North of the centerline of the avenue, 22.3 meters (73.2 ft) West of the East edge of the footing. Note--The footing is 96 inches in diameter, 26-1/2 feet deep and set into 9 feet of bedrock. Elevation: 4942.21 Please Note: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 unadjusted datum (Prior City of Fort Collins datum) for their vertical datums. If NGVD29 unadjusted datum (Prior City of Fort Collins datum) is required for any purpose, the following equation should be used: NGVD29 = NAVD88 - 3.17' Basis of Bearings The West line of the Subject Property as bearing North 00°47'31'' East, as assumed bearing, and monumented at both ends of said line with a set #4 rebar, 18" long with 1" blue plastic cap, PLS 38470. PROJECT BENCHMARKS: FIELD SURVEY BY: CTL Thompson Subsurface Exploration Report Geologice and Preliminary Geotechnical Investigation Odell Townhomes Fort Collins, Colorado CTL Project No. FC09777-115 Date: March 8, 2021 SUBSURFACE EXPLORATION BY: I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CERTIFICATION STATEMENT: ABBREVIATIONS: UTILITY CONTACT LIST: * UTILITY COMPANY * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. PHONE NUMBER GAS-----------------Xcel Energy-----------------------------Cory Thelen (970) 225-7843 cory.m.thelen@xcelenergy.com ELECTRIC--------City of Fort Collins Light & Power--Cody Snowdon (970) 416-2306 csnowdon@fcgov.com CABLE-------------Comcast----------------------------------Marcus Petty (970) 275-0572 marcus_petty@comcast.com TELECOM.--------Lumen-------------------------------Brady Craddock (970) 342-3431 brady.craddock@lumen.com WATER------------City of Fort Collins Utilities-----------Jim McChesney (970) 556-8179 jmcchesney@fcgov.com WASTEWATER--City of Fort Collins Utilities-----------Jim McChesney (970) 556-8179 jmcchesney@fcgov.com STORMWATER-City of Fort Collins Utilities-----------Heidi Hansen (970) 221-6854 hhansen@fcgov.com City of Fort Collins Construction Inspection Manager Ken Zetye kzetye@fcgov.com ABC =AGGREGATE BASE COURSE ACP =ASBESTOS-CEMENT PIPE BLDG =BUILDING BP =BEGINNING POINT CL =CENTERLINE CMP =CORRUGATED METAL PIPE C.O. =CLEAN OUT DIP =DUCTILE IRON PIPE DS =DOWN SPOUT EAE =EMERGENCY ACCESS EASEMENT EL or ELEV =ELEVATION EOA =EDGE OF ASPHALT EP =ENDING POINT FES =FLARED END SECTION FFE =FINISHED FLOOR ELEVATION FGW =FINISHED GROUND AT WALL FACE FL =FLOWLINE FH =FIRE HYDRANT GB =GRADE BREAK GV =GATE VALVE HC =HANDICAP HP =HIGH POINT INV =INVERT LF =LINEAR FEET LP =LOW POINT MAX =MAXIMUM MH or M.H.=MANHOLE MIN =MINIMUM PC =POINT OF CURVATURE PCR =POINT OF CURVE RETURN PERF =PERFORATED PRC =POINT OF REVERSE CURVE PT =POINT OF TANGENCY PVC =POLYVINYL CHLORIDE PVI =POINT OF VERTICAL INTERSECTION PVMT =PAVEMENT RCP =REINFORCED CONCRETE PIPE RD =ROOF DRAIN ROW =RIGHT OF WAY STA =STATION STD =STANDARD SQ FT =SQUARE FOOT / FEET SW =STEEL WATERLINE TB =THRUST BLOCK TBC =TOP BACK OF CURB TBW =TOP BACK OF WALK TF =TOP OF FOUNDATION TOW =TOP OF WALL TYP =TYPICAL UE =UTILITY EASEMENT WSEL =WATER SURFACE ELEVATION ABBREVIATIONS: OWNER/APPLICANT GEOTECHNICAL ENGINEER CTL Thompson 400 North Link Lane Fort Collins, Colorado 80524 (970)206-9455 Russell + Mills Studios Shelley La Mastra, RLA 506 S College Ave. Unit A Fort Collins, Colorado 80524 (970) 412-3474 EPS Group Inc. Cody Pape, PE 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 568-5412 EPS Group Inc. Bob Tessely, PLS 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 PLANNER/ LANDSCAPE ARCHITECT SITE ENGINEER SURVEYOR Fort Collins Habitat for Humanity Kristin Candella, ED and CEO 4001 S. Taft Hill Road Fort Collins, Colorado 80526 (970) 286-5889 TRAFFIC ENGINEER Rollins Consult LLC Ruth Rollins, PE P.O. Box 1164 Fort Collins, Colorado 80522 (970) 213-2393 DEVELOPER Hartford Homes Dave Thorpe, Director of Entitlements 4801 Goodman St. Timnath, Colorado 80547 (970)674-1109 PROJECT LOCATION Additional Field Survey: Northern Engineering Project No. 473-010 Date: July 2023 Sheet TA P E S T R Y Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 13 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 C 101 CO N S T R U C T I O N N O T E S GE N E R A L & 2 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R A. GENERAL NOTES 1.All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins. 2.All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3.These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans. 4.The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5.All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer. 6.The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. 7.The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8.The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9.If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction. 10.The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11.No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12.The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13.The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14.A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15.The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16.The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17.Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18.The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19.All recommendations of the Preliminary Drainage Report for Tapestry, dated April 24, 2024 by Northern Engineering shall be followed and implemented. 20.Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21.The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street inspector. 22.No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. 23.The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24.The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report. 25.The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets. 26.All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27.Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these districts. 28.All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29.Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30.The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31.The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by the construction activities. 32.Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33.The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34.There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by City of Fort Collins. 35.The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36.Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37.The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38.If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately. 39.The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer. 40.The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: Project Datum: NAVD88 Benchmark 3-00 On a parapet wall at the Northwest end of the Lincoln Ave. bridge near the Northeast corner of Lincoln Ave. and Willow St. Elevation: 4967.33 Benchmark R-402 Described by National Geodetic Survey 1984 in Fort Collins, at the junction of 9th Street and Lincoln Avenue, in the East edge of the concrete footing for Highline Tower number 29, 47.8 meters (156.8 ft) North of the centerline of the avenue, 22.3 meters (73.2 ft) West of the East edge of the footing. Note--The footing is 96 inches in diameter, 26-1/2 feet deep and set into 9 feet of bedrock. Elevation: 4942.21 Please Note: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 unadjusted datum (Prior City of Fort Collins datum) for their vertical datums. If NGVD29 unadjusted datum (Prior City of Fort Collins datum) is required for any purpose, the following equation should be used: NGVD29 = NAVD88 - 3.17' Basis of Bearings The West line of the Subject Property as bearing North 00°47'31'' East, as assumed bearing, and monumented at both ends of said line with a set #4 rebar, 18" long with 1" blue plastic cap, PLS 38470. 41.All stationing is based on centerline of roadways unless otherwise noted. 42.Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43.When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made. 44.Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45.Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46.After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47.The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: N.A. 48.Approved Variances are listed as follows: 1) N/A CONSTRUCTION NOTES A. Grading and Erosion Control Notes 1.The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2.There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3.All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4.At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5.Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6.All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County. 7.In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a.Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b.Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c.Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8.When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9.The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of way, and make sure streets and walkways are cleaned at the end of each working day. 10.All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11.No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12.The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the City/County or Homeowners Association (HOA). 13.City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14.A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15.Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City. 16.For additional information see separate Stormwater Management Plan / Erosion Control Report for Tapestry. B. Street Improvement Notes 1.All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2.A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3.Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins. 4.Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the City of Fort Collins Engineer. 5.Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6.When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7.All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8.The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9.Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector. C. Traffic Signing and Pavement Marking Construction Notes 1.All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2.All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3.All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD. 4.All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5.All lane lines for concrete pavement should be epoxy paint. 6.Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols. 7.Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8.Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9.All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10.All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11.A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12.The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13.Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14.Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15.Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. D. Storm Drainage Notes 1.The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2.All recommendations of the Preliminary Drainage Report for Tapestry, dated April 24, 2024 by Northern Engineering shall be followed and implemented. 3.Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. E. Utility Notes 1.All waterline and sanitary sewer construction shall conform to the City of Fort Collins Utility standards and specifications current to date of construction. 2.The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the water utility. 3.Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire. 4.HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer wire shall be installed with the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal valve box and "water" lid per City Water Detail 11A. INFILL AND REDEVELOPMENT NOTE A.Despite everyone's best efforts, it is impossible to fully display subsurface information prior to excavation. This is especially true in areas of infill and redevelopment. Unknown subsurface conditions can have cost and schedule implications. Prior to finalizing contract terms, it is strongly recommended that the Owner and General Contractor have a candid discussion to formulate a strategy for dealing with such circumstances when they arise. The process and procures should be in place prior to excavation. Allowances and contingencies can address the cost implications, but additional measures are required to deal with scheduling and factors impacting sequence of work. The Architect, Engineer(s), and Construction Surveyor should be made aware of the protocol for dealing with such unknown subsurface conditions prior to starting work. S ELEC ELEC VAULT F.O. VAULT CABLE VAULT F.O. ELEC VAULT F.O. ELEC D C S W C S CS C S H Y D C S C S S S W STOP SPEED LIMIT 30 SPEED LIMIT 25 W W W W W W W W W W W W W W W W W EEE E E FO FO FO G G G G G G G G G G G G G G G G GWWWWWWWWWWWWWWWWW G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W E E E E E E E E X X X X X X X X X X X X X X X X X X X X X X W W W W W W W W W W W W W W W W W EEE E E FO FO FO G G G G G G G G G G G G G G G G GWWWWWWWWWWWWWWWWW G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W E E E E E E E E X X X X X X X X X X X X X X X X X X X X X X AC ACACAC ACAC ELEC BRKR ELEC BRKR ELEC BRKRELEC BRKR D D ELEC BRKR ELEC BRKR ELEC BRKR ELEC BRKR ELEC BRKR H YD D E E E X X X X X X X X X X X X 24 " S S 24 " S S 24 " S S 24 " S S 24 " S S 24 " S S 24 " S S 24" SS 24" SS 24" SS X X S S AC X X X X X S S S D E E E E D E E E 38' TEMPORARY CONSTRUCTION & SLOPE EASEMENT REC. NO. 20120058189 TO BE VACATED WITH PLAT 10' UTILITY EASEMENT REC. NO. 432424 TO BE VACATED WITH PLAT CHAINLINK FENCE TO BE REMOVED EXISTING PARCEL LINE TO BE VACATED WITH PLAT 8' UTILITY EASEMENT REC. NO. 432424 TO BE VACATED WITH PLAT NEW BELGIUM BREWING CO INC 902 BUCKINGHAM STREET BUCKINGHAM STREET 3R D S T R E E T (E X . 6 0 ' R O W ) LOGAN STREET EX. STORM MANHOLE RIM: 4947.73 INV IN (NE): 4943.26 15" PVC INV OUT: 4943.21 15" PVC APPROX. LOCATION EX. SAN MANHOLE INV TO BE CONFIRMED EX. SAN MANHOLE RIM: 4945.66 INV IN (N): 4939.06 8" PVC INV IN (W): 4937.54 24" CLAY INV IN (S): 4937.39 24" CLAY GRAVEL DRIVE TO BE REMOVED GRAVEL DRIVE TO BE REMOVED GRAVEL DRIVE TO BE REMOVED EXISTING TREE TO BE REMOVED (TYP.) EXISTING GASLINE EXISTING WATERLINE (NWCWD) EXISTING 12" DIP WATERLINE (FC) REMOVE EX. SIGN EXISTING 8" DIP WATERLINE (FC) EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT EXISTING ELECTRIC EXISTING FIBER OPTIC EXISTING STREETLIGHT EXISTING STREETLIGHT EXISTING STREETLIGHT EXISTING STORM INLET EXISTING STORM MANHOLE EXISTING STORM INLET EXISTING GASLINE EXISTING TREES TO REMAIN EXISTING STORM INLET EXISTING SIDEWALK TO BE REMOVED EXISTING CONCRETE CURB TO BE REMOVED EXISTING DRIVEWAY TO BE REMOVED EXISTING CONCRETE CURB AND ATTACHED WALK TO BE REMOVED EXISTING CONCRETE CURB AND ATTACHED WALK TO BE REMOVED EXISTING HANDICAP RAMPS TO BE REMOVED TEMPORARY CONSTRUCTION EASEMENT REC. NO. 20090031970 PRIVATE ACCESS & UTILITY EASEMENT REC. NO. 20100026776 ODELL INVESTMENTS LLC 800 E LINCOLN AVE ALFREDO LOZANO 128 3RD STREET G AND A INVESTMENTS LLC 903 BUCKINGHAM STREET EXISTING 4.50' SIDEWALK AND CURB TO REMAIN #152 CP-MOUNTAIN STANDARD SET 18" #4 REBAR WITH ORANGE PLASTIC CAP #105 FOUND NO 3 REBAR WITH NO CAP #103 FOUND NO 4 REBAR WITH YELLOW PLASTIC CAP, LS 14823 #153 CP-SIPPIN PRETTY SET 18" #4 REBAR WITH ORANGE PLASTIC CAP EXISTING 30 MPH SPEED LIMIT SIGN EX. 68' ROW EX. 67.05' ROW VANWORKS INC 900 E LINCOLN AVE PROPOSED SAWCUT PROPOSED SAWCUT DEMO EXISTING ASPHALT (8400 SF) DEMO EXISTING ASPHALT (8400 SF) DEMO EXISTING ASPHALT (1546 SF) EXISTING STRIPING BE REMOVED (TYP.) EXISTING BIKE LANE STRIPING TO BE REMOVED (TYP.) EX. 31.5' FL-FL EX. 31.5' FL-FL /////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / ///////////////////////////////////////////////// Sheet TA P E S T R Y Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 13 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 C 102 DE M O L I T I O N P L A N EX I S T I N G C O N D I T I O N S & 3 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 EXISTING ELECTRIC E LEGEND: G T EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS EXISTING IRRIGATION BOX EXISTING GAS METER EXISTING TELEPHONE PEDESTAL EXISTING TREES (TO REMAIN) FIELD SURVEY BY: NOTES: EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT PROJECT BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR VAULT ELEC CONTROL IRR EXISTING TREES (TO BE REMOVED) EXISTING CABLE CTV EXISTING FIBER OPTIC FO 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3.CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. 4.ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5.CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. EXISTING OVERHEAD UTILITY OHE Original Field Survey: Northern Engineering Project No. 368-005 Date: March 22, 2021 Additional Field Survey: Northern Engineering Project No. 473-010 Date: July 2023 EXISTING ASPHALT TO BE REMOVED CURB AND GUTTER TO BE REMOVED ////////////// EXISTING CONCRETE TO BE REMOVED S ELEC ELEC VAULT CABLE ELEC ELEC D C S W C S CS C S H Y D C S C S S W W W W W W W W W W W W W W W W W W EEE E E FO FO FO G G G G G G G G G G G G G G G G GWWWWWWWWWWWWWWWWW G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W E E E E E E E E X X X X X X X X X X X X X X X X X X X X X X W W W W W W W W W W W W W W W W W EEE E E FO FO FO G G G G G G G G G G G G G G G G GWWWWWWWWWWWWWWWWW G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W E E E E E E E E X X X X X X X X X X X X X X X X X X X X X X AC ACACAC ACAC ELEC BRKR ELEC BRKR ELEC BRKRELEC BRKR D D ELEC BRKR ELEC BRKR ELEC BRKR ELEC BRKR ELEC BRKR HY D D E E X X X X X 24 " S S 24 " S S 24 " S S 24 " S S 24 " S S 24 " S S 24 " S S 24" SS / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / DN DN DNDN DN DN DNDN DN DN DN DN DNDN X X X X X X X D E E E D E E X X X X X X X D E E E D E E NEW BELGIUM BREWING CO INC 902 BUCKINGHAM STREET BUCKINGHAM STREET 3R D S T R E E T (E X . 6 0 ' R O W ) LOGAN STREET ODELL INVESTMENTS LLC 800 E LINCOLN AVE ALFREDO LOZANO 128 3RD STREET G AND A INVESTMENTS LLC 903 BUCKINGHAM STREET 900 E LINCOLN AVE 9' UTILITY EASEMENT 6' UTILITY EASEMENT 6' U T I L I T Y E A S E M E N T 9' U T I L I T Y E A S E M E N T 9' U T I L I T Y E A S E M E N T 6' UTILITY EASEMENT 26' EAE, UT, DR EASEMENT 26' EAE, UT, DR EASEMENT 26' EAE, UT, DR EASEMENT 24' EAE, UT, DR EASEMENT 26' EAE, UT, DR EASEMENT R9.95' R25' R25' R25' R15' R15' R15' R15' R15' R15' R15' R15' LOGAN STREET (PRP. 63' ROW) 4T H S T R E E T (P R P . 6 2 ' R O W ) 24' FUTURE ACCESS 24' FUTURE ACCESS 8' UTIL ESMT. 8' UTIL ESMT.31.5' UTIL AND DRAINAGE ESMT. DRAINAGE EASEMENT 10' UTIL ESMT. 10' UTIL ESMT. 10' UTIL ESMT. 5' WALK 6' WALK 5' WALK 5' WALK 6' W A L K 5' W A L K 5' W A L K 6' W A L K 6' W A L K 5' WALK 5' W A L K 5' W A L K 26' FL-FL 26' FL-FL 26' FL-FL 24' FL-FL 30' SANITARY SEWER EASEMENT 30' SANITARY SEWER EASEMENT BY SEPARATE DOCUMENT REC. NO. ____________ 30' SANITARY SEWER EASEMENT BY SEPARATE DOCUMENT REC. NO. ____________ 20' DRAINAGE EASEMENT BY SEPARATE DOCUMENT REC. NO. ______________ 17' TYP. 9' TYP. 19' TYP. 9' TYP. DRAINAGE EASEMENT BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 5 BUILDING 6 BUILDING 7 BUILDING 4 GAR. 1 GA R . 2 GAR. 3 TRASH ENCLOSURE TRASH ENCLOSURE TRASH ENCLOSURE 8' 9' 8' 8' TEMPORARY CONSTRUCTION EASEMENT REC. NO. 20090031970 PRIVATE ACCESS & UTILITY EASEMENT REC. NO. 20100026776 P4 P4P4 P4 P4 P4 P4 P2 P2 20' DRAINAGE EASEMENT TRACT A TRACT B LOT 1 TRASH ENCLOSURE 10' UTIL ESMT. PROPOSED SIDEWALK CULVERT OUTLOT Z Sheet TA P E S T R Y Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 13 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 C 300 PA V I N G P L A N 4 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 EASEMENTS NOTES: 1.SEE DETAIL SHEETS FOR ADDITIONAL INFORMATION REGARDING CURBS AND PAVEMENT SECTIONS. 2.ATTACHED WALK WIDTHS ARE MEASURED FROM BACK OF CURB. 3.PAVEMENT MARKINGS SHALL BE PER CITY OF FORT COLLINS STANDARDS AND PROJECT SPECIFICATION MANUAL. 4.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY OF FORT COLLINS ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY OF FORT COLLINS STREET REPAIR STANDARDS. CONTRACTOR TO COORDINATE THE TIMING OF THE STREET PATCHING WITH THE CITY OF FORT COLLINS CONSTRUCTION INSPECTION MANAGER. 5.ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. 6.ALL PUBLIC CONCRETE PAVING SHALL BE 6" THICK. 7.REFER TO SITE AND LANDSCAPE PLANS (BY OTHERS) FOR ADDITIONAL INFORMATION RELATED TO DECORATIVE PAVING, HARDSCAPES, AND OTHER SITE AMENITIES. 8.HEAVY DUTY ASPHALT AND CONCRETE PAVING SHALL DESIGNED TO BE CAPABLE OF SUPPORTING 40 TONS. 9.SIGN PLACEMENT SHALL BE PER THE LATEST EDITION OF MUTCD REGARDLESS OF PLAN LOCATION. 10.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. PROPOSED VERTICAL CURB & GUTTER PROPERTY BOUNDARY EXISTING LOT LINE / / / / / / / /PROPOSED EDGE OF PAVEMENT LEGEND: PARKING STALL ASPHALT PAVING PRIVATE CONCRETE PAVING HEAVY DUTY ASPHALT PAVING PRIVATE CONCRETE FLATWORK ASPHALT PATCH X' CONCRETE PAN PX X X X X X X X D E E E D E E S ELEC ELEC VAULT CABLE ELEC ELEC D C S W C S C S C S HY D C S C S S W W W W W W W W W W W W W W W W W W EEE E E FO FO FO G G G G G G G G G G G G G G G G GWWWWWWWWWWWWWWWWW G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W E E E E E E E E X X X X X X X X X X X X X X X X X X X X X X W W W W W W W W W W W W W W W W W EEE E E FO FO FO G G G G G G G G G G G G G G G G GWWWWWWWWWWWWWWWWW G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W E E E E E E E E X X X X X X X X X X X X X X X X X X X X X X AC ACACAC ACAC ELEC BRKR ELEC BRKR ELEC BRKRELEC BRKR D D ELEC BRKR ELEC BRKR ELEC BRKR ELEC BRKR ELEC BRKR H Y D D E E X X X X X 24 " S S 24 " S S 24 " S S 24 " S S 24 " S S 24 " S S 24 " S S 24" SS / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / DN DN DNDN DN DN DNDN DN DN DN DN DNDN X X X X X X X D E E E D E E 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W T T T T T T E E E E G G G G G G G G G G G E G G G G G G G G G G G G G G G G G G G G G G G G G G E S S S S ELEC METERS EL E C M E T E R S EL E C M E T E R S ELEC METERS EL E C M E T E R S EL E C M E T E R S EL E C M E T E R S GA S M E T E R S GA S M E T E R S GA S M E T E R S GAS METERS GA S M E T E R S GA S M E T E R S GAS METERS E E E G G G G G G E E E E E E E E E E E E E E E E E E E E EEEEEEEE E E E E E E E E E E E E FOFOFOFOFOFOFOFO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO S SS 8" W 8" W 8" W 8" W 8" W 8" W 8" W S E E E E E W F F WW F F W F W WF F W UD UD E E E E E E E UD UD UD DUCTILE IRON NYLOPLAST DUCTILE IRON NYLOPLAST T NEW BELGIUM BREWING CO INC 902 BUCKINGHAM STREET BUCKINGHAM STREET 3R D S T R E E T (E X . 6 0 ' R O W ) LOGAN STREET ODELL INVESTMENTS LLC 800 E LINCOLN AVE ALFREDO LOZANO 128 3RD STREET G AND A INVESTMENTS LLC 903 BUCKINGHAM STREET 900 E LINCOLN AVE 9' UTILITY EASEMENT 6' UTILITY EASEMENT 6' U T I L I T Y E A S E M E N T 9' U T I L I T Y E A S E M E N T 9' U T I L I T Y E A S E M E N T 6' UTILITY EASEMENT 26' EAE, UT, DR EASEMENT 26' EAE, UT, DR EASEMENT 26' EAE, UT, DR EASEMENT 24' EAE, UT, DR EASEMENT 26' EAE, UT, DR EASEMENT LOGAN STREET (PRP. 63' ROW) 4T H S T R E E T (P R P . 6 2 ' R O W ) 8' UTIL ESMT. 8' UTIL ESMT. 31.5' UTIL AND DRAINAGE ESMT. DRAINAGE EASEMENT 10' UTIL ESMT. 10' UTIL ESMT. 10' UTIL ESMT. 26' FL-FL 26' FL-FL 26' FL-FL 24' FL-FL 30' SANITARY SEWER EASEMENT 30' SANITARY SEWER EASEMENT BY SEPARATE DOCUMENT REC. NO. ____________ 30' SANITARY SEWER EASEMENT BY SEPARATE DOCUMENT REC. NO. ____________ 20' DRAINAGE EASEMENT BY SEPARATE DOCUMENT REC. NO. ______________ DRAINAGE EASEMENT BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 5 BUILDING 6 BUILDING 7 BUILDING 4 GAR. 1 GA R . 2 GAR. 3 EX. STORM MANHOLE RIM: 4947.73 INV IN (NE): 4943.26 15" PVC INV OUT: 4943.21 15" PVC TIE INTO EXISTING MANHOLE APPROX. LOCATION EX. SAN MANHOLE INV TO BE CONFIRMED EXISTING GASLINE EXISTING WATERLINE (NWCWD) EXISTING 12" DIP WATERLINE (FC) EXISTING 8" DIP WATERLINE (FC) EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT EXISTING ELECTRIC EXISTING FIBER OPTIC EXISTING STREETLIGHT EXISTING STREETLIGHT EXISTING STREETLIGHT EXISTING STORM INLET EXISTING STORM MANHOLE EXISTING STORM INLET EXISTING GASLINE TEMPORARY CONSTRUCTION EASEMENT REC. NO. 20090031970 PRIVATE ACCESS & UTILITY EASEMENT REC. NO. 20100026776 PROPOSED 8" SEWER PROPOSED 8" SEWER PROPOSED 8" SEWER PROPOSED 8" SEWER PROPOSED 8" WATERLINE PROPOSED 8" WATERLINE CONNECT TO EXISTING 8" DIP WATERLINE W/ 8X8 TEE AND TB CONNECT TO EXISTING 12" DIP WATERLINE W/ WET TAP AND TB PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED 1.5" WATER METER AND CURB STOP (SIZE TO BE CONFIRMED BY MEP) PROPOSED 6" FIRELINE PROPOSED 6" SEWER SERVICE PROPOSED 6" SEWER SERVICE PROPOSED 6" SEWER SERVICE PROPOSED 1.5" WATER METER AND CURB STOP (SIZE TO BE CONFIRMED BY MEP) PROPOSED 6" FIRELINE PROPOSED 1.5" WATER METER AND CURB STOP (SIZE TO BE CONFIRMED BY MEP) PROPOSED 6" FIRELINE PROPOSED 1.5" WATER METER AND CURB STOP (SIZE TO BE CONFIRMED BY MEP) PROPOSED 6" FIRELINE PROPOSED 6" SEWER SERVICE PROPOSED 1.5" WATER METER AND CURB STOP (SIZE TO BE CONFIRMED BY MEP) PROPOSED 6" FIRELINE PROPOSED 6" SEWER SERVICE PROPOSED 1.5" WATER METER AND CURB STOP (SIZE TO BE CONFIRMED BY MEP) PROPOSED 6" FIRELINE PROPOSED 6" SEWER SERVICE PROPOSED 1.5" WATER METER AND CURB STOP (SIZE TO BE CONFIRMED BY MEP) PROPOSED 6" FIRELINE PROPOSED 6" SEWER SERVICE PROPOSED TRANSFORMER PROPOSED TRANSFORMER PROPOSED TRANSFORMER PROPOSED TRANSFORMER PROPOSED TRANSFORMER ELECTRIC METERS (TYP.) GAS METERS (TYP.) 20' DRAINAGE EASEMENT STORMTECH 4STORMTECH 3 STORMTECH 2 STORMTECH 1 PROPOSED ROOF DRAIN PROPOSED ROOF DRAIN PROPOSED ROOF DRAIN PROPOSED ROOF DRAIN PROPOSED AREA INLET PROPOSED AREA INLET PROPOSED ROOF DRAIN PROPOSED ROOF DRAIN PROPOSED ROOF DRAIN PROPOSED STORM DRAIN PROPOSED STORM DRAIN PROPOSED STORM DRAIN PROPOSED STORM DRAIN AREA OF INSULATION FOR SHALLOW SEWER CROSSING UNDER POND PROPOSED OUTLET STRUCTURE PROPOSED 6" SEWER SERVICE TRACT A TRACT B LOT 1 PROPOSED TRANSFORMER OUTLOT Z Sheet TA P E S T R Y Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 13 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 C 400 OV E R A L L U T I L I T Y P L A N 5 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 KEYMAP VAULTCABLE 4T H S T R E E T LOGAN AVENUE 3R D S T R E E T BUCKINGHAM STREET NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL WATER CONSTRUCTION SHALL BE PER CITY OF FORT COLLINS UTILITY SPECIFICATIONS, LATEST EDITION. 3.ALL SEWER CONSTRUCTION SHALL BE PER CITY OF FORT COLLINS UTILITY SPECIFICATIONS SANITARY SEWER DESIGN TECHNICAL CRITERIA MANUAL, LATEST EDITION. 4.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5.ALL WATERLINES SHALL HAVE A 4.5'-5.5' FROM FINISHED GRADE TO TOP OF PIPE. 6.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 7.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 8.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY OF FORT COLLINS ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY OF FORT COLLINS STREET REPAIR STANDARDS. 9.ALL MANHOLE RIM ELEVATIONS (EXISTING & PROPOSED) ARE TO BE ADJUSTED TO 14" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. 10.ALL WATER SERVICES SHALL BE 3 4" UNLESS OTHERWISE NOTED. EXISTING LOT LINE EASEMENT LINE SPROPOSED SEWER SERVICE WPROPOSED WATER SERVICE EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: G T EXISTING STORM SEWER EXISTING TELEPHONE EXISTING GAS EXISTING SANITARY SEWER PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT PROPERTY BOUNDARY EXISTING TELEPHONE PEDESTAL PROPOSED STREET LIGHT W SS PROPOSED LOT LINE PROPOSED ROW EXISTING ROW EXISTING CABLE CTV / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / DN DN DNDN DN DN DNDN DN DN DN DN DNDN X X X X X X X D E E E D E E S ELEC ELEC VAULT CABLE ELEC ELEC D C S W C S C S C S HYD C S C S S W W W W W W W W W W W W W W W W W W EEE E E FO FO FO G G G G G G G G G G G G G G G G GWWWWWWWWWWWWWWWWW G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W E E E E E E E E X X X X X X X X X X X X X X X X X X X X X X W W W W W W W W W W W W W W W W W EEE E E FO FO FO G G G G G G G G G G G G G G G G GWWWWWWWWWWWWWWWWW G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W E E E E E E E E X X X X X X X X X X X X X X X X X X X X X X AC ACACAC ACAC ELEC BRKR ELEC BRKR ELEC BRKRELEC BRKR D D ELEC BRKR ELEC BRKR ELEC BRKR ELEC BRKR ELEC BRKR HYD D E E X X X X X 24 " S S 24 " S S 24 " S S 24 " S S 24 " S S 24 " S S 24 " S S 24" SS X X X X X X X D E E E D E E UD UD UD UD UD DUCTILE IRON NYLOPLAST DUCTILE IRON NYLOPLAST NEW BELGIUM BREWING CO INC 902 BUCKINGHAM STREET BUCKINGHAM STREET 3R D S T R E E T (E X . 6 0 ' R O W ) LOGAN STREET ODELL INVESTMENTS LLC 800 E LINCOLN AVE ALFREDO LOZANO 128 3RD STREET G AND A INVESTMENTS LLC 903 BUCKINGHAM STREET 900 E LINCOLN AVE 26' EAE, UT, DR EASEMENT 26' EAE, UT, DR EASEMENT 26' EAE, UT, DR EASEMENT 24' EAE, UT, DR EASEMENT 26' EAE, UT, DR EASEMENT LOGAN STREET (PRP. 63' ROW) 4T H S T R E E T (P R P . 6 2 ' R O W ) 8' UTIL ESMT. 8' UTIL ESMT. 31.5' UTIL AND DRAINAGE ESMT. 10' UTIL ESMT. 10' UTIL ESMT. 10' UTIL ESMT. 26' FL-FL 26' FL-FL 26' FL-FL 24' FL-FL 30' SANITARY SEWER EASEMENT 30' SANITARY SEWER EASEMENT BY SEPARATE DOCUMENT REC. NO. ____________ 30' SANITARY SEWER EASEMENT BY SEPARATE DOCUMENT REC. NO. ____________ 20' DRAINAGE EASEMENT BY SEPARATE DOCUMENT REC. NO. ______________ BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 5 BUILDING 6 BUILDING 7 BUILDING 4 GAR. 1 GA R . 2 GAR. 3 TIE INTO EXISTING MANHOLE EX. STORM MANHOLE RIM: 4947.73 INV IN (NE): 4943.26 15" PVC INV OUT: 4943.21 15" PVC EXISTING STORM INLET EXISTING STORM MANHOLE EXISTING STORM INLET TEMPORARY CONSTRUCTION EASEMENT REC. NO. 20090031970 PRIVATE ACCESS & UTILITY EASEMENT REC. NO. 20100026776 9' UTILITY EASEMENT 6' UTILITY EASEMENT 6' U T I L I T Y E A S E M E N T 9' U T I L I T Y E A S E M E N T 9' U T I L I T Y E A S E M E N T 6' UTILITY EASEMENT DRAINAGE EASEMENT DRAINAGE EASEMENT TFFE=53.76 TFFE=53.76 TFFE=54.08 TFFE=53.55 TFFE=54.40 TFFE=53.84TFFE=54.83 PROPOSED INLET PROPOSED INLET PROPOSED INLET PROPOSED INLET COMBINED INLET AND WEIR STRUCTURE PROPOSED INLET PROPOSED INLET PROPOSED INLET WEIR STRUCTURE UNDERGROUND CHAMBERS 2 UNDERGROUND CHAMBERS 1 UNDERGROUND CHAMBERS 3 UNDERGROUND CHAMBERS 4 WEIR STRUCTURE WEIR STRUCTURE DETENTION POND SIDEWALK CULVERT PROPOSED DRAINAGE PAN PROPOSED OUTLET STRUCTURE 6:1 2.4% 2. 2 % 3.9 % 2.1% 2.2% 2.1% 1 . 8 % 2.4% 4: 1 6:1 6 : 1 7:1 6:1 4:1 6:1 5:1 6: 1 7: 1 4:1 10 . 0 % 7:1 1.4% 1.1% 1.0% 1.7% 0. 7 % 0. 5 % 0.5%0.5%0.5%0.5%0.5% 0. 5 % 0. 5 % 0. 7 % 0. 5 % 0.6% 0.5%0.5% 1.5% 0.6% 0. 6 % 0. 6 % 0. 7 % 0.4 % 0. 5 % 0. 5 % 0. 6 % 0. 5 % 2.8% 2.1% 2.4 % 2. 3 % 1 . 8 % 1 . 7 % 2.1 % 2.1 % 2.0% 2.6% 3.6% 2.0% 2.1% 2.1% 2.8% 2.1% 1.9% 2.1% 2.1 % 2 . 1 % 2.1 % 2 . 0 % 20' DRAINAGE EASEMENT 10 . 0 % 9:1 5:1 5: 1 4:1 1.0% 4: 14: 1 ( 1 . 0 % ) (1. 0 % ) ( 1 . 0 % ) ( 1 . 0 % ) (1. 0 % ) 4:1 PROPOSED INLET PROPOSED INLET 4. 2 % 4.2% 4 . 8 % 4. 1 % 4.1% 4.4% 1. 9 % 2 . 7 % 2.8 % PROPOSED INLET PROPOSED INLET PROPOSED INLET 0. 5 % 0. 5 % EMERGENCY SPILLWAY ELEV: 4949.50 TRACT A OUTLOT Z TRACT B LOT 1 POND BERM ELEV: 4950.50 POND BERM ELEV: 4950.50 POND BERM ELEV: 4950.50 POND BERM ELEV: 4950.50 Sheet TA P E S T R Y Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 13 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 C 500 OV E R A L L G R A D I N G P L A N 6 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 KEYMAP VAULTCABLE 4T H S T R E E T LOGAN AVENUE 3R D S T R E E T BUCKINGHAM STREET PROPOSED CONTOUR EXISTING STORM SEWER PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED SPOT ELEVATION PROPOSED SLOPES 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 3.ALL PROJECT DATA IS ON VERTICAL DATUM; NAVD 88. SEE COVER SHEET FOR BENCHMARK REFERENCES. 4.ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE FINISHED GRADE ELEVATIONS. 5.THE EXISTING SURFACE SHOWN ON THIS PLAN IS A COMBINATION OF FIELD SURVEY BY NORTHERN ENGINEERING AND THE APPROVED PLANS "UTILITY PLANS FOR ODELL NORTH, DATED 12/09/2021". IT IS ASSUMED AND REQUIRED THAT THE GRADING FROM THE ODELL NORTH PROJECT IS COMPLETED PRIOR TO THE START OF TAPESTRY. THE GRADING FOR TAPESTRY TIES DIRECTLY INTO THIS SURFACE. NOTES: PROPOSED STORM INLET 2.0% (47.45 ) EXISTING SPOT ELEVATION EXISTING LOT LINE PROPOSED CONCRETE CROSS PAN (TYP.) 33.43 EXISTING RIGHT OF WAY PROPOSED LOT LINE PROPOSED RIGHT OF WAY ALOT TYPE LEGEND: PROPOSED GRADE BREAK DNDN DNDN S D C S HYD W G G G G G G W W W W W W W X X X G G G G G G W W W W W W W X X X LOGAN STREET LOGAN STREET (PRP. 63' ROW) 4T H S T R E E T (P R P . 6 2 ' R O W ) BUILDING 6 BUILDING 7 9' UTILITY EASEMENT 6' UTILITY EASEMENT DETENTION POND 33 ' F L - F L 63 ' R O W 5' WALK 5' WALK 30" VERTICAL CURB MONOLITHIC OUTFALL CURB MONOLITHIC OUTFALL CURB ∆ 6' CROSSPAN TIE INTO EXISTING CURBLINE R20' R20'R20' OUTLET Z TRACT B LOT 1 4940 4945 4950 4955 4960 4965 4940 4945 4950 4955 4960 4965 9+75 10+00 11+00 12+00 13+00 14+00 15+00 15+50 0.60% -0.60% -2.45% 1.50%1.00% 0.60% PV I S T A = 1 0 + 0 1 . 9 8 PV I E L E V = 4 9 5 0 . 8 1 PV I S T A = 1 0 + 1 1 . 7 2 PV I E L E V = 4 9 5 0 . 5 8 PV I S T A = 1 0 + 3 9 . 7 2 PV I E L E V = 4 9 5 1 . 0 2 PV I S T A = 1 0 + 6 4 . 7 2 PV I E L E V = 4 9 5 1 . 2 7 80.0' VC HP ELEV = 4952.21 HP STA = 12+40.64 PVI STA = 12+40.64 PVI ELEV = 4952.33 BV C S : 1 2 + 0 0 . 6 4 BV C E : 4 9 5 2 . 0 9 EV C S : 1 2 + 8 0 . 6 4 EV C E : 4 9 5 2 . 0 9 A.D. = 1.20 K = 66.67 80.0' VC LP ELEV = 4950.98 LP STA = 14+86.03 PVI STA = 14+86.00 PVI ELEV = 4950.86 BC V S : 1 4 + 4 6 BV C E : 4 9 5 1 . 1 0 EC V S : 1 5 + 2 6 EV C E : 4 9 5 1 . 1 0 A.D. = 1.20 K = 66.71 49 5 0 . 8 0 49 5 1 . 1 3 49 5 1 . 3 4 49 5 1 . 4 9 49 5 1 . 6 4 49 5 1 . 7 9 49 5 1 . 9 4 49 5 2 . 0 9 49 5 2 . 1 9 49 5 2 . 2 0 49 5 2 . 1 2 49 5 1 . 9 7 49 5 1 . 8 2 49 5 1 . 6 7 49 5 1 . 5 2 49 5 1 . 3 7 49 5 1 . 2 2 49 5 1 . 0 7 49 5 0 . 9 9 49 5 0 . 9 9 49 5 1 . 0 9 PROPOSED GRADE EXISTING GROUND 24" HDPE STORM STA.=14+87.28 INV.=4945.44 PROPOSED GRADE EXISTING GROUND C 500 PL A N & P R O F I L E LO G A N A V E N U E 7 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 LINE MATCH STA 15+50 EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER PROPOSED EDGE OF ASPHALT PROPOSED STORM MANHOLE / / / / / / / / PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY OF FORT COLLINS ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 4.SEE INTERSECTION DETAIL SHEETS FOR INTERSECTION DESIGNS. 5.EXISTING AND PROPOSED MANHOLE RIMS AND VALVE BOX LIDS TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE EXISTING LOT LINE PROPOSED STORM INLET PROPOSED STREET LIGHT Sheet TA P E S T R Y Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 13 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 KEYMAP VAULTCABLE 4T H S T R E E T LOGAN AVENUE 3R D S T R E E T BUCKINGHAM STREET CENTERLINE LOGAN STREET SCALE : 1" = 40' (H) 1" = 5' (V) ST A MA T C H L I N E SE E S H E E T 15 + 5 0 C 5 0 1 UD U D UD / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / DN W W W W W W G G G G G G W W W W W W W W W W W W G G G G G G W W W W W W BU C K I N G H A M S T R E E T LO G A N S T R E E T (P R P . 6 3 ' R O W ) 4TH STREET (PRP. 62' ROW) BUILDING 2BUILDING 3BUILDING 7 9' UTILITY EASEMENT 9' UTILITY EASEMENT DETENTION POND 62' ROW 5' WALK 36' FL-FL 5' WALK 30" VERTICAL CURB ∆ R20' R20' 8' CROSSPAN 9' UTILITY EASEMENT 5' WALK R20' 30' SANITARY SEWER EASEMENT TRACT A OUTLET Z TRACT B LOT 1 4940 4945 4950 4955 4960 4965 4940 4945 4950 4955 4960 4965 15+50 16+00 17+00 18+00 19+00 20+00 21+00 22+00 22+25 0.60% 3.90% -1.50% PV I S T A = 2 1 + 0 2 . 8 8 PV I E L E V = 4 9 5 1 . 3 4 PV I S T A = 2 0 + 9 0 . 5 0 PV I E L E V = 4 9 5 0 . 9 2 PV I S T A = 2 0 + 8 6 . 5 0 PV I E L E V = 4 9 5 1 . 0 1 80.0' VC HP ELEV = 4953.30 HP STA = 19+05.22 PVI STA = 19+22.38 PVI ELEV = 4953.47 BV C S : 1 8 + 8 2 . 3 8 BV C E : 4 9 5 3 . 2 3 EV C S : 1 9 + 6 2 . 3 8 EV C E : 4 9 5 2 . 8 7 A.D. = 2.10 K = 38.11 49 5 1 . 5 4 49 5 2 . 1 4 49 5 2 . 7 4 49 5 3 . 3 0 49 5 2 . 3 1 49 5 1 . 2 3 49 5 1 . 3 9 49 5 1 . 6 9 49 5 1 . 8 4 49 5 1 . 9 9 49 5 2 . 2 9 49 5 2 . 4 4 49 5 2 . 5 9 49 5 2 . 8 9 49 5 3 . 0 4 49 5 3 . 1 9 49 5 3 . 2 5 49 5 3 . 0 4 49 5 2 . 6 8 49 5 1 . 9 3 49 5 1 . 5 6 49 5 1 . 1 8 PROPOSED GRADE EXISTING GROUND PROPOSED GRADE EXISTING GROUND 30" HDPE STORM STA.=15+86.35 INV.=4945.74 24" HDPE STORM STA.=16+18.46 INV.=4946.72 C 501 PL A N & P R O F I L E 4T H S T R E E T 8 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 LI N E MA T C H ST A 15 + 5 0 EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER PROPOSED EDGE OF ASPHALT PROPOSED STORM MANHOLE / / / / / / / / PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY OF FORT COLLINS ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 4.SEE INTERSECTION DETAIL SHEETS FOR INTERSECTION DESIGNS. 5.EXISTING AND PROPOSED MANHOLE RIMS AND VALVE BOX LIDS TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE EXISTING LOT LINE PROPOSED STORM INLET PROPOSED STREET LIGHT Sheet TA P E S T R Y Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 13 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 KEYMAP VAULTCABLE 4T H S T R E E T LOGAN AVENUE 3R D S T R E E T BUCKINGHAM STREET CENTERLINE 4TH STREET SCALE : 1" = 40' (H) 1" = 5' (V) ST A MA T C H L I N E SE E S H E E T 15 + 5 0 C 5 0 0 / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / DN DN DN DN VAULT CABLE ELEC C S W W W W W W W W W W W W W W W W W W W E E E FO FO G G G G G G G G G G G G G G G G G G G GWWWWWWWWWWWWWWWWWWWW G G G G W W E X X X W W W W W W W W W W W W W W W W W W W E E E FO FO G G G G G G G G G G G G G G G G G G G GWWWWWWWWWWWWWWWWWWWW G G G G W W E X X X HY D X NEW BELGIUM BREWING CO INC 902 BUCKINGHAM STREET BUCKINGHAM STREET (PRP. ROW VARIES) 3R D S T R E E T (E X . 6 0 ' R O W ) 4T H S T R E E T (P R P . 6 2 ' R O W ) BUILDING 1 BUILDING 2 6' UTILITY EASEMENT 5' WALK 5' W A L K 41 ' F L - E O P 68 ' R O W 71 ' R O W 36 ' H A L F RO W 39 ' F L - E O P 78 ' R O W 35 ' E X . F L - E O P 9' UTILITY EASEMENT 5' WALK ∆ ∆ ∆ ∆ TIE INTO EXISTING SIDEWALK PROPOSED SAWCUT MONOLITHIC OUTFALL CURB 30" VERTICAL CURB PROPOSED SIDEWALK CULVERT TIE INTO EXISTING CURB TRACT A PROPOSED WIDENING REQUIRED FOR PROPOSED SECTION PROPOSED WIDENING REQUIRED FOR PROPOSED SECTION 4940 4945 4950 4955 4960 4965 4940 4945 4950 4955 4960 4965 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 (-0.66%) (-0.34%)(0.09%) (-0.42%) EXISTING GROUND EXISTING GROUND 4940 4945 4950 4955 4960 4965 4940 4945 4950 4955 4960 4965 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 -0.40% PV I S T A = 1 0 + 0 0 . 0 0 PV I E L E V = 4 9 5 2 . 6 1 PV I S T A = 1 4 + 7 5 . 0 0 PV I E L E V = 4 9 5 0 . 7 3 49 5 2 . 6 1 49 5 2 . 5 1 49 5 2 . 4 2 49 5 2 . 3 2 49 5 2 . 2 2 49 5 2 . 1 2 49 5 2 . 0 2 49 5 1 . 9 2 49 5 1 . 8 2 49 5 1 . 7 2 49 5 1 . 6 2 49 5 1 . 5 3 49 5 1 . 4 3 49 5 1 . 3 3 49 5 1 . 2 3 49 5 1 . 1 3 49 5 1 . 0 3 49 5 0 . 9 3 49 5 0 . 8 3 PROPOSED GRADE EXISTING GROUND EXISTING GROUND PROPOSED GRADE C 502 PL A N & P R O F I L E BU C K I N G H A M S T R E E T 9 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 CENTERLINE BUCKINGHAM STREET SCALE : 1" = 40' (H) 1" = 5' (V) RIGHT FLOWLINE BUCKINGHAM STREET SCALE : 1" = 40' (H) 1" = 5' (V) EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER PROPOSED EDGE OF ASPHALT PROPOSED STORM MANHOLE / / / / / / / / PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY OF FORT COLLINS ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 4.SEE INTERSECTION DETAIL SHEETS FOR INTERSECTION DESIGNS. 5.EXISTING AND PROPOSED MANHOLE RIMS AND VALVE BOX LIDS TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE EXISTING LOT LINE PROPOSED STORM INLET PROPOSED STREET LIGHT Sheet TA P E S T R Y Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 13 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 KEYMAP VAULTCABLE 4T H S T R E E T LOGAN AVENUE 3R D S T R E E T BUCKINGHAM STREET DUCTIL E I R O N NYLOPL A S TDNDN DN EL E C EL E C D C SWC S C SC S HY D W W W W G G G W W W G G G G G G G G G G G G G G G G G G G WWWWWWWWWWWWWWWWWWWWW W W W G G G W W W G G G G G G G G G G G G G G G G G G G G WWWWWWWWWWWWWWWWWWWWW BU C K I N G H A M S T R E E T 3RD STREET (EX. 60' ROW) LO G A N S T R E E T LO G A N S T R E E T (P R P . 6 3 ' R O W ) BUILDING 1 BUILDING 6 BUILDING 4 GAR. 1GAR. 3 6' UTILITY EASEMENT 33' FL-FL 60' ROW 5' WALK TIE INTO EXISTING CURBLINE 30" VERTICAL CURB MONOLITHIC OUTFALL CURB MONOLITHIC OUTFALL CURB MONOLITHIC OUTFALL CURB MONOLITHIC OUTFALL CURB R20'R20'5' WALK 5' WALK 40' FL-FL PROPOSED SAWCUT PROPOSED CURB INLET MONOLITHIC INFALL CURB R20' PROPOSED SAWCUT 4940 4945 4950 4955 4960 4965 4940 4945 4950 4955 4960 4965 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 17+50 EXISTING GROUND EXISTING GROUND (0.38%) (0.14%) (0.55%) (-0.18%)(0.51%)(0.26%) (0.34%) 4940 4945 4950 4955 4960 4965 4940 4945 4950 4955 4960 4965 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 17+50 49 5 0 . 8 2 49 5 0 . 6 8 49 5 0 . 5 3 49 5 0 . 3 9 49 5 0 . 2 7 49 5 0 . 1 4 49 5 0 . 0 2 49 5 0 . 0 9 49 5 0 . 2 1 49 5 0 . 3 4 49 5 0 . 4 6 49 5 0 . 5 9 49 5 0 . 7 1 49 5 0 . 8 4 49 5 0 . 9 6 49 5 1 . 0 9 49 5 1 . 2 2 49 5 1 . 3 4 49 5 1 . 4 7 49 5 1 . 5 9 49 5 1 . 7 2 49 5 1 . 8 4 49 5 1 . 9 7 49 5 2 . 0 9 49 5 2 . 2 2 49 5 2 . 3 4 49 5 2 . 4 7 49 5 2 . 5 9 -0.50% -0.57% -0.50%0.50% PV I S T A = 1 0 + 0 0 . 0 0 PV I E L E V = 4 9 5 0 . 8 2 PV I S T A = 1 0 + 7 3 . 7 4 PV I E L E V = 4 9 5 0 . 4 0 PV I S T A = 1 1 + 5 5 . 3 9 PV I E L E V = 4 9 4 9 . 9 9 PV I S T A = 1 6 + 8 6 . 9 2 PV I E L E V = 4 9 5 2 . 6 5 PV I S T A = 1 6 + 9 4 . 2 1 PV I E L E V = 4 9 5 2 . 6 1 PROPOSED GRADE EXISTING GROUND EXISTING GROUND PROPOSED GRADE C 503 PL A N & P R O F I L E 3R D S T R E E T 10 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER PROPOSED EDGE OF ASPHALT PROPOSED STORM MANHOLE / / / / / / / / PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY OF FORT COLLINS ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 4.SEE INTERSECTION DETAIL SHEETS FOR INTERSECTION DESIGNS. 5.EXISTING AND PROPOSED MANHOLE RIMS AND VALVE BOX LIDS TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE EXISTING LOT LINE PROPOSED STORM INLET PROPOSED STREET LIGHT Sheet TA P E S T R Y Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 13 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 KEYMAP VAULTCABLE 4T H S T R E E T LOGAN AVENUE 3R D S T R E E T BUCKINGHAM STREET CENTERLINE 3RD STREET SCALE : 1" = 40' (H) 1" = 5' (V) RIGHT FLOWLINE 3RD STREET SCALE : 1" = 40' (H) 1" = 5' (V) / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / DN DN DN DN VAULT CABLE C S W W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G G G GWWWWWWWWWWWWWWWWW G G G W W E W W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G G G GWWWWWWWWWWWWWWWWW G G G W W E HY D X 10 + 5 0 11 + 0 0 11 + 5 0 12 + 0 0 12 + 5 0 13 + 0 0 13 + 5 0 14 + 0 0 14 + 5 0 15 + 0 0 4T H S T R E E T BUCKINGHAM STREET 3R D S T R E E T 68 ' R O W 5' SIDEWALK 5' SIDEWALK 26 . 9 0 ' C L - F L EXISTING EDGE OF ASPHALT PROPOSED EDGE OF ASPHALT 15 . 0 0 ' C L - E O P EXISTING GAS (TYP.) PROPOSED SAWCUT LINE (TYP.) EXISTING 24" DIP WATERLINE (NWCWD) EXISTING 12" DIP WATERLINE (FC) MONOLITHIC OUTFALL CURB 30" VERTICAL CURB TIE INTO EXISTING CURB 3.00' NEW BELGIUM BREWING CO INC 902 BUCKINGHAM STREET BUILDING 1 BUILDING 2 CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 13+00 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 40 600-20-40-60 CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 11+00 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 40 600-20-40-60 FL E L = 49 5 2 . 2 2 -3.13% CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 11+50 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 40 600-20-40-60 FL E L = 49 5 2 . 0 2 -1.57% CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 12+00 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 40 600-20-40-60 FL E L = 49 5 1 . 8 2 -2.69% CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 12+50 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 40 600-20-40-60 FL E L = 49 5 1 . 6 3 -3.38% FL E L = 49 5 1 . 4 3 -3.00% CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 13+50 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 40 600-20-40-60 FL E L = 49 5 1 . 2 3 -3.48% CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 14+00 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 40 600-20-40-60 CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 14+50 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 40 600-20-40-60 CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 15+00 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 40 600-20-40-60 49 5 2 . 4 49 5 2 . 3 6 49 5 2 . 2 49 5 2 . 1 8 49 5 2 . 0 49 5 2 . 0 3 49 5 1 . 8 49 5 1 . 8 2 49 5 1 . 9 49 5 1 . 9 4 49 5 1 . 9 49 5 1 . 8 7 49 5 1 . 6 49 5 1 . 5 8 49 5 1 . 3 49 5 1 . 3 0 49 5 1 . 1 49 5 1 . 0 8 GAS GAS GAS GAS GAS GAS GAS GAS GAS EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PROPOSED GROUND (TYP.) APPROXIMATE LOCATION EXISTING GAS (TYP.)APPROXIMATE EXISTING 12" DIP WATER (TYP.) EXISTING GROUND (TYP.) -5.1% -7.9: 1 -6.3% -10.0 : 1 -1.9% -5.1% -4. 3 : 1 -5.1% -9.3:1 -3.3% -4.3% -1.8%-2.0% -6.6%-2.1% -3.8% -7.8%-5.5% -4.5 : 1 -2.4%-3.8%-1.1% APPROXIMATE EXISTING 24" DIP WATER (TYP.) C 504 CR O S S S E C T I O N S BU C K I N G H A M S T R E E T 11 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER PROPOSED EDGE OF ASPHALT PROPOSED STORM MANHOLE / / / / / / / / PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY OF FORT COLLINS ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 4.SEE INTERSECTION DETAIL SHEETS FOR INTERSECTION DESIGNS. 5.EXISTING AND PROPOSED MANHOLE RIMS AND VALVE BOX LIDS TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE EXISTING LOT LINE PROPOSED STORM INLET PROPOSED STREET LIGHT Sheet TA P E S T R Y Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 13 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 KEYMAP VAULTCABLE 4T H S T R E E T LOGAN AVENUE 3R D S T R E E T BUCKINGHAM STREET DUCTIL E I R O N NYLOPL A S TDNDN DN EL E C EL E C D C SWC S C SC S HY D W W W W G G G W W W G G G G G G G G G G G G G G G G G G G WWWWWWWWWWWWWWWWWWWWW W W W G G G W W W G G G G G G G G G G G G G G G G G G G G WWWWWWWWWWWWWWWWWWWWW 10 + 0 0 10 + 5 0 11 + 0 0 11 + 5 0 12 + 0 0 12 + 5 0 13 + 0 0 13 + 5 0 14 + 0 0 14 + 5 0 15 + 0 0 15 + 5 0 16 + 0 0 16 + 5 0 LO G A N A V E N U E BU C K I N G H A M S T R E E T 3RD STREET 40 ' F L - F L 60 ' R O W 33 ' F L - F L PROPOSED 5' SIDEWALK 5' SIDEWALK EXISTING 3.04' ATTACHED SIDEWALK 6 0 ' R O W EXISTING GAS (TYP.) EXISTING 8" DIP WATER MONOLITHIC OUTFALL CURB 30" VERTICAL CURB 7.50' TIE INTO EXISTING CURB BUILDING 1 BUILDING 6 BUILDING 4 GAR. 1 GAR. 3 MONOLITHIC INFALL CURB EXISTING ROLL-OVER CURB & GUTTER CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 10+50 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 400-20-40 CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 11+00 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 400-20-40 CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 11+50 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 400-20-40 CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 12+00 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 400-20-40 CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 12+50 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 400-20-40 CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 13+00 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 400-20-40 CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 13+50 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 400-20-40 CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 14+00 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 400-20-40 CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 14+50 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 400-20-40 CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 15+00 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 400-20-40 CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 15+50 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 400-20-40 CE N T E R LI N E Horizontal Scale 1" = 20' Vertical Scale 1" = 5' 16+00 4942 4944 4948 4952 4956 4942 4944 4948 4952 4956 0 20 400-20-40 49 5 0 . 7 49 5 0 . 6 7 49 5 0 . 7 49 5 0 . 6 6 49 5 0 . 7 49 5 0 . 7 0 49 5 1 . 1 49 5 1 . 0 6 49 5 1 . 3 49 5 1 . 2 5 49 5 1 . 4 49 5 1 . 4 3 49 5 1 . 6 49 5 1 . 6 1 49 5 1 . 8 49 5 1 . 7 9 EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y EX I S T I N G R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PR O P O S E D R I G H T - O F - W A Y PROPOSED GROUND (TYP.) FL E L = 49 5 0 . 2 7 2.18% FL E L = 49 5 0 . 1 4 4.36% -2.00% FL E L = 49 5 0 . 2 1 -2.86% FL E L = 49 5 0 . 4 6 -3.89% FL E L = 49 5 0 . 7 1 -3.40% FL E L = 49 5 0 . 9 6 -2.71% FL E L = 49 5 1 . 2 1 -2.06% FL E L = 49 5 1 . 4 6 -1.44% FL E L = 49 5 1 . 7 1 -3.09% FL E L = 49 5 1 . 9 6 0.46% FL E L = 49 5 2 . 2 1 2.99% F.O. GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS APPROXIMATE LOCATION EXISTING GAS (TYP.)APPROXIMATE EXISTING 8" DIP WATER (TYP.) EXISTING GROUND (TYP.) -3.9% -2.2% -7.9% -8.6% -6.7 : 1 -2.0% -6.8% -9.8:1 -5.9 : 1 -5.5% -2.0% -7.1% -2.0% FL EL = 4949.99 C 505 CR O S S S E C T I O N S 3R D S T R E E T 12 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER PROPOSED EDGE OF ASPHALT PROPOSED STORM MANHOLE / / / / / / / / PROPOSED CURB & GUTTER PROPOSED CENTERLINE PEDESTRIAN ACCESS RAMPS PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY OF FORT COLLINS ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 4.SEE INTERSECTION DETAIL SHEETS FOR INTERSECTION DESIGNS. 5.EXISTING AND PROPOSED MANHOLE RIMS AND VALVE BOX LIDS TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE EXISTING LOT LINE PROPOSED STORM INLET PROPOSED STREET LIGHT Sheet TA P E S T R Y Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 13 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 KEYMAP VAULTCABLE 4T H S T R E E T LOGAN AVENUE 3R D S T R E E T BUCKINGHAM STREET S ELEC ELEC VAULT CABLE ELEC ELEC D CS W C S C S C S H Y D C S C S W W W W W W W W W W W W W W W W W FO FO G G G G G G G G G G G G G G G GWWWWWWWWWWWWWWWW G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W X X X X X X X X W W W W W W W W W W W W W W W W FO FO G G G G G G G G G G G G G G G GWWWWWWWWWWWWWWWW G G G G G G G G G G G G G G G G G G W W W W W W W W W W W W W W W W W W W X X X X X X X X AC ACACAC ACAC ELEC BRKR ELEC BRKR ELEC BRKRELEC BRKR D D ELEC BRKR ELEC BRKR ELEC BRKR ELEC BRKR ELEC BRKR H Y D D X X X X X UD UD UD UD UD DUCTILE IRON NYLOPLAST DUCTILE IRON NYLOPLAST X X D E E E D E E NEW BELGIUM BREWING CO INC 902 BUCKINGHAM STREET ALFREDO LOZANO 128 3RD STREET G AND A INVESTMENTS LLC 903 BUCKINGHAM STREET 20' DRAINAGE EASEMENT BY SEPARATE DOCUMENT REC. NO. ______________ / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / / / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / // / / / / / / / DN DN DNDN DN DN DNDN DN DN DN DN DNDN X X D E E E D E E BUCKINGHAM STREET 3R D S T R E E T (E X . 6 0 ' R O W ) LOGAN STREET LOGAN STREET (PRP. 63' ROW) 4T H S T R E E T (P R P . 6 2 ' R O W ) BUILDING 1 BUILDING 2 BUILDING 3 BUILDING 5 BUILDING 6 BUILDING 7 BUILDING 4 GAR. 1 GA R . 2 GAR. 3 A1 D4 B1 B2 C1 C2 D1 D2 D5 E1 F1 G1 P D3 A2 A1 A2 B1 B2 C1 C2 D1 D2 D3 D5 D4 E1 F1 G1 P DETENTION POND D1.2 C2.1 C2.1 D1.1 D1.3 D1.4 TIE INTO EXISTING MANHOLE EX. STORM MANHOLE RIM: 4947.73 INV IN (NE): 4943.26 15" PVC INV OUT: 4943.21 15" PVC EXISTING STORM INLET EXISTING STORM MANHOLE EXISTING STORM INLET TEMPORARY CONSTRUCTION EASEMENT REC. NO. 20090031970 PRIVATE ACCESS & UTILITY EASEMENT REC. NO. 20100026776 PROPOSED INLET PROPOSED INLET PROPOSED INLET PROPOSED INLET COMBINED INLET AND WEIR STRUCTURE PROPOSED INLET PROPOSED INLET PROPOSED INLET WEIR STRUCTURE UNDERGROUND CHAMBERS 2 UNDERGROUND CHAMBERS 1 UNDERGROUND CHAMBERS 3 UNDERGROUND CHAMBERS 4 WEIR STRUCTURE WEIR STRUCTURE SIDEWALK CULVERT PROPOSED DRAINAGE PAN SIDEWALK CULVERT PROPOSED OUTLET STRUCTURE PROPOSED INLET TRACT A OUTLOT Z TRACT B LOT 1 ODELL INVESTMENTS LLC 800 E LINCOLN AVE Sheet TA P E S T R Y Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 13 FO R T C O L L I N S | G R E E L E Y | M E S A | G O O D Y E A R | T U C S O N | N O R T H P H O E N I X | F O R T W O R T H no r t h e r n e n g i n e e r i n g . c o m 97 0 . 2 2 1 . 4 1 5 8 C 600 DR A I N A G E E X H I B I T 13 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R NORTH ( IN FEET ) 1 inch = ft. Feet05050 50 100 150 NORTH PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET A DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL MAJOR EVENT DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 11 NOTES: 1.REFER TO THE PRELIMINARY DRAINAGE REPORT FOR TAPESTRY, DATED APRIL 17, 2024 FOR ADDITIONAL INFORMATION. A LEGEND: FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION MINOR EVENT DRAINAGE BASIN BOUNDARY DEVELOPED DRAINAGE SUMMARY Basin ID Design Point Total Area (acres)C2 C100 2-Yr Tc (min) 100-Yr Tc (min) Q2 (cfs) Q100 (cfs) Proposed Basins A1 a1 0.50 0.76 0.95 5.00 5.00 1.07 4.67 A2 a2 0.33 0.80 1.00 5.00 5.00 0.76 3.31 B1 b1 0.66 0.82 1.00 5.00 5.00 1.55 6.59 B2 b2 0.97 0.88 1.00 5.00 5.00 2.46 9.69 C1 c1 1.29 0.74 0.92 5.53 5.00 2.61 11.77 C2 c2 0.61 0.86 1.00 5.00 5.00 1.49 6.05 D1 d1 0.73 0.89 1.00 5.00 5.00 1.85 7.22 D2 d2 0.23 0.90 1.00 5.00 5.00 0.59 2.30 D3 d3 1.11 0.50 0.62 10.89 8.88 1.20 5.69 D4 d4 0.21 0.77 0.96 5.00 5.00 0.45 1.96 D5 d5 0.21 0.79 0.98 5.00 5.00 0.46 2.01 E1 e1 1.24 0.77 0.96 6.16 5.00 2.55 11.87 F1 f1 1.15 0.21 0.26 12.17 12.17 0.50 2.17 G1 g1 1.26 0.20 0.25 11.67 11.67 0.53 2.29 P p 1.49 0.21 0.26 10.67 10.09 0.67 3.00 Future Development Basins F1 FUTURE f1 future 1.15 0.85 1.00 5.00 5.00 2.79 11.46 G1 FUTURE g1 future 1.26 0.85 1.00 5.00 5.00 3.05 12.51 Minor Storm Event Sub-Basins C2.1 c2.1 0.04 0.95 n/a 5.00 5.00 0.11 n/a D1.1 d1.1 0.01 0.95 n/a 5.00 5.00 0.04 n/a D1.2 d1.2 0.04 0.95 n/a 5.00 5.00 0.10 n/a D1.3 d1.3 0.16 0.95 n/a 5.00 5.00 0.43 n/a Combined Basins FUTURE future 11.98 0.71 0.89 11.13 7.80 18.23 91.89 WQCV wqcv 5.97 0.41 0.51 11.65 10.53 5.06 22.89 UG1 ug1 1.64 0.86 1.00 5.00 5.00 4.01 16.28 UG2 ug2 1.89 0.78 0.97 5.85 5.00 4.05 18.26 UG3 ug3 0.73 0.89 1.00 5.00 5.00 1.85 7.22 UG4 ug4 1.75 0.62 0.77 10.51 7.64 2.35 11.61 Combined Basins Minor Storm Event UG1*ug1*1.59 0.86 n/a 5.00 N/A 3.87 n/a UG2*ug2*1.94 0.78 n/a 5.82 N/A 4.16 n/a UG3*ug3*0.97 0.91 n/a 5.00 N/A 2.50 n/a UG4*ug4*1.52 0.57 n/a 11.46 N/A 1.83 n/a POND SUMMARY TABLE Pond ID Tributary Area (ac) Avg. Percent Imperviousness (%) Extended Detention WQCV (ac-ft) 100-Yr Detention Vol. (ac-ft) 100-Yr Detention WSEL (ft) Peak Release (cfs) Detention Pond 11.98 66 0.10 2.95 4,949.44 2.40