HomeMy WebLinkAboutDUPLEX - 618 E MYRTLE STREET - BDR240004 - SUBMITTAL DOCUMENTS - ROUND 1 - ResponsesCommunity Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6689
970.224.6134 - fax
fcgov.com
October 13, 2023
Cristina Windsor
513 E Oak St
Fort Collins, CO
Re: Duplex at 618 E Myrtle
Description of project: This is a request for approval of a two-family dwelling at 618 E
Myrtle St (parcel # 9713232017). The applicant is seeking approval of an existing
unapproved duplex. Access is taken from E Myrtle St to the south and the alley to the east.
The site is approximately 0.06 miles south of E Mulberry St and approximately 0.48 miles
east of S College Ave. The property is within the Neighborhood Conservation, Medium
Density District (N-C-M) zone district and the project would be subject to Basic
Development Review (BDR) review.
Please see the following summary of comments regarding Duplex at 618 E Myrtle. The
comments offered informally by staff during the Conceptual Review will assist you in preparing
the detailed components of the project application. Modifications and additions to these
comments may be made at the time of formal review of this project. If you have any questions
regarding these comments or the next steps in the review process, please contact your
Development Review Coordinator, Marissa Pomerleau via phone at (970) 416-8082 or via
email at mpomerleau@fcgov.com.
Comment Summary
Development Review Coordinator
Contact: Marissa Pomerleau mpomerleau@fcgov.com (970) 416-8082
1. INFORMATION:
I will be your primary point of contact throughout the development review and permitting
process. If you have any questions, need additional meetings with the project reviewers, or
need assistance throughout the process, please let me know and I can assist you and your
team. Include me in all email correspondence with other reviewers and keep me informed
of any phone conversations. Thank you!
2. INFORMATION:
The proposed development project is subject to a Basic Development Review. The
decision maker for your project will be the Director of Community Development and
Neighborhood Services, or their designee.
3. INFORMATION:
I will provide you a roadmap specific to your development review project, helping to identify
each step of the process. For more detailed process information, see the Development
Review Guide at www.fcgov.com/drg. This online guide features a color coded flowchart
with comprehensive, easy to read information on each step in the process. This guide
includes links to just about every resource you need during development review.
4. INFORMATION:
I will provide a Project Submittal Checklist to assist in your submittal preparation. Please
use the checklist in conjunction with this comment letter and the Submittal Requirements
located at: http://www.fcgov.com/developmentreview/applications.php.
If you have questions regarding items in the checklist, or the applicability of an item to your
project, please reach out to me.
5. INFORMATION - SUBMITTAL:
As part of your submittal, you will respond to the comments provided in this letter. The final
letter is provided to you in Microsoft Word format. Please use this document to insert
responses to each comment for your submittal, using a different font color.
When replying to the comment letter please be detailed in your responses, as all
comments should be thoroughly addressed. Comments requiring action should NOT have
a response such as noted or acknowledged. You will need to provide references to
specific project plans, pages, reports, or explanations of why comments have not been
addressed [when applicable].
6. INFORMATION - SUBMITTAL:
Correct file naming is required as part of a complete submittal. Please follow the
Electronic Submittal Requirements and File Naming Standards found here:
https://www.fcgov.com/developmentreview/files/electronic-submittal-requirements-and-file-
naming-standards_v1_8-1-19.pdf?1680306305.
File names should have the corresponding number, followed by the file type prefix, project
information, and round number. For example: 1_SITE PLAN_Project Name_FDP_Rd1. A
list of numbers and prefixes for each file can be found at the link above.
7. INFORMATION:
All plans should be saved as optimized/flattened PDFs to reduce file size and remove
layers.
Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be removed
from the PDF’s.
AutoCAD turns drawing text into comments that appear in the PDF plan set, and these
must be removed prior to submittal as they can cause issues with the PDF file.
The default setting is "1" ("on") in AutoCAD. To change the setting and remove this
feature, type "EPDFSHX" (version 2016.1) or “PDFSHX (version 2017 and newer) in the
command line and enter "0".
Read this article at Autodesk.com for more on this topic:
https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarticles/sfdcart
icles/Drawing-text-appears-as-Comments-in-a-PDF-created-by-AutoCAD.html
8. INFORMATION - SUBMITTAL FEES:
The request will be subject to the Development Review Fee Schedule:
https://www.fcgov.com/developmentreview/fees.php.
I will provide an estimate of the initial fees to begin the development review process based
on your Conceptual Review Application. As noted in the comments, there are additional
fees required by other departments, and additional fees at the time of building permit. The
City of Fort Collins fee schedule is subject to change – please confirm these estimates
before submitting.
Development Review Application Fees will be due at time of the project being submitted
for formal review. If you have any questions about fees, please reach out to me.
9. INFORMATION - SUBMITTAL FEES:
Payments can be made by check or credit card.
If paying by check, make payable to “City of Fort Collins”. This is accepted at the
Development Review Center, 281 N College Ave, Fort Collins, CO 80524, by mail or can
be placed in the blue drop box located at the west side of the building. Please mark it to
my attention and reference the project it is associated with.
If paying by credit card, I can process the payment over the phone with you. Credit card
payments include a convenience fee of 2% + $0.25 added to all payments under
$2,500.00, and 2.75% added to all payments over $2,500.00.
10. INFORMATION - SUBMITTAL:
Submittals are accepted any day of the week, with Wednesday at noon being the cut-off
for routing the same week. Upon initial submittal, your project will be subject to a
completeness review. Staff has until noon that Friday to determine if the project contains all
required checklist items and is sufficient for a round of review. If complete, a formal Letter
of Acceptance will be emailed to you and the project would be officially routed with its
initial round of review, followed by a formal meeting. Please check with me, your
Development Review Coordinator, regarding review timelines.
As you are preparing to submit your formal plans, please notify me with an anticipated
submittal date. Applications and plans are submitted electronically to me by email or
secured file sharing applications.
Pre-submittal meetings can be beneficial to ensure you have everything for a complete
submittal. Please reach out and I will assist in those arrangements.
11. INFORMATION - NOTICE:
Upon the scheduling of a Neighborhood Meeting, or initial review of the formal
Development Review Application, a Development Review sign will be posted on the
property. This sign will be posted through the final decision and appeal process. A request
for the removal of signs will be made by your Development Review Coordinator at the
appropriate time.
12. INFORMATION:
Once your project has been formally reviewed by the City and you have received
comments, please resubmit within 180 days, approximately 6 months, to avoid the
expiration of your project.
13.I will be your primary point of contact throughout the development review and permitting
process. If you have any questions, need additional meetings with the project reviewers, or
need assistance throughout the process, please let me know and I can assist you and your
team. Please include me in all email correspondence with other reviewers and keep me
informed of any phone conversations.
Thank you!
14.The proposed development project is subject to a Basic Development Review. The
decision maker for your project will be the Development Review Manager and/or Director
of Community Development and Neighborhood Services. All documents submitted to the
City in association with your Basic Development Review project are available to the public
through our website. Formal public notice of your project is at the discretion of the
Development Review Manager, including a posted sign, mailing to surrounding neighbors
and/or published notice elsewhere.
15.I will provide you a roadmap specific to your development review project, helping to identify
each step of the process. For more detailed process information, see the Development
Review Guide at www.fcgov.com/drg . This online guide features a color coded flowchart
with comprehensive, easy to read information on each step in the process. This guide
includes links to just about every resource you need during development review.
16.I will provide a Project Submittal Checklist to assist in your submittal preparation. Please
use the checklist in conjunction with the Submittal Requirements located at:
http://www.fcgov.com/developmentreview/applications.php.
The checklist provided is specific to this Conceptual project; if there are any significant
changes to this project, please let me know so we can adjust the checklist accordingly. I
can send an updated copy of the Submittal Checklist to ensure you are submitting the
correct materials.
17.As part of your submittal you will respond to the comments provided in this letter. This letter
is provided to you in Microsoft Word format. Please use this document to insert responses
to each comment for your submittal, using a different font color. When replying to the
comment letter please be detailed in your responses, as all comments should be
thoroughly addressed. Provide reference to specific project plans or explanations of why
comments have not been addressed, when applicable.
18.The request will be subject to the Development Review Fee Schedule:
https://www.fcgov.com/developmentreview/fees.php.
I will provide estimated fees, which are due at time of project submittal for formal review.
This is an estimate of the initial fees to begin the development review process based on
your Conceptual Review Application. As noted in the comments, there are additional fees
required by other departments, and additional fees at the time of building permit. The City
of Fort Collins fee schedule is subject to change - please confirm these estimates before
submitting. If you have any questions about fees, please reach out to me.
19.Submittals are accepted any day of the week, with Wednesday at noon being the cut-off for
routing the same week. Upon initial submittal, your project will be subject to a
completeness review. Staff has until noon that Friday to determine if the project contains all
required checklist items and is sufficient for a round of review. If complete, a formal Letter
of Acceptance will be emailed to you and the project would be officially routed with a
three-week round of review, followed by a formal meeting.
20.When you are ready to submit your formal plans, please make an appointment with me at
least 24 hours in advance. Applications and plans are submitted electronically in person
with initial fees.
Pre-submittal meetings can be beneficial to ensure you have everything for a complete
submittal. Please reach out and I will assist in those arrangements.
Planning Services
Contact: Arlo Schumann aschumann@fcgov.com 970-221-6599
1. The applicant will need to provide land use table data on plans
This includes: Lot size, overall floor area, rear half floor area, land used designation
(two-family dwelling), parking spaces
2. A direct pedestrian connection from each unit entry to the street will be required.: currently there is a walkway
between the second unit and the sidewalk on Myrtle providing access to the street from both units.
3. During the review process, the applicant team would need to demonstrate that the duplex
would meet off-street parking space requirements, which scale up depending on the
number of bedrooms in the additional unit. Off-street parking will need to be provided per
the table in 3.2.2(K)(1)(a) Per the sketch plan, 4 parking stalls would be required. Stacked
(tandem) stalls would not be counted in the required total. See Alternative Parking Request. 2 car garage, 2
driveway parking spaces in tandem and a 5th parking spot to the left of the existing driveway. The main house is a total of
3 bedrooms, plus the additional unit is a studio.
Department: Historic Preservation
Contact: Jim Bertolini jbertolini@fcgov.com 970-416-4250
1. INFORMATION – HISTORIC SURVEY: This property completed historic survey under a
previous review process, known as “demo/alt” and determined Not Eligible on October
25, 2018. That finding is active but will expire on October 25, 2023. The previous
process did not involve significant historical research. Once the survey expires, any new
historic survey would need to meet the current historic review standards. However,
based on the scope of the project, new historic survey would likely be waived.
2. FOR BUILDING PERMIT: Historic Preservation can likely waive new historic survey if
modifications to meet current duplex requirements, if limited to minor modifications like
new/larger egress windows and designated parking spaces in the landscape. If
significant
alterations to the primary building is required, a new historic survey may be
required. No change to window egress, very limited change to parking and landscape and no change to
exterior of the building.
3. INFORMATION ONLY - POTENTIAL FEE: This comment does not currently apply but
may if significant exterior alterations are required to the building, or the owner/applicant
elects to complete a new historic survey. Any historic survey that is required to provide
documentation and a determination of eligibility of properties that contain buildings
more than 50 years old, within 200 feet of the development site, will require an $850 fee
per property/resource, paid by the applicant. Please contact Historic Preservation to
receive an order form for survey at preservation@fcgov.com.
Department: Engineering Development Review
Contact: Sophie Buckingham sbuckingham@fcgov.com
1. My understanding is that this project does not propose any improvements to the property
or the adjacent public right-of-way. My comments are general information that is
provided to every project at the conceptual stage. Depending on the ultimate scope of
the project, some of these comments may not be relevant, and other information not
included in this list may become relevant. If you have any questions about this
information, please contact me at sbuckingham@fcgov.com or 970-416-4344.
2. INFORMATION:
Larimer County Road Impact Fees and Transportation Capital Expansion Fees are due
prior to issuance of building permit. For more information, please visit
https://www.fcgov.com/engineering/tcef.php.
3. INFORMATION:
Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of
this project, shall be replaced or restored to City of Fort Collins standards at the
Developer's expense prior to the acceptance of completed improvements and/or prior
to the issuance of the first Certificate of Occupancy. NA
4. INFORMATION:
All public sidewalk, driveways and ramps, existing or proposed, adjacent or within the
site, need to meet ADA standards. If they currently do not, they will need to be
reconstructed so that they do meet current ADA standards as a part of this project.
5. INFORMATION:
Any public improvements must be designed and built in accordance with the Larimer
County Urban Area Street Standards (LCUASS). They are available online at:
https://www.larimer.org/urban-area-street-standards-2021
6. INFORMATION:
This project is responsible for dedicating any right-of-way and easements that are
necessary or required by the City for this project (i.e. drainage, utility, emergency
access). This shall include the standard utility easements that are to be provided behind
the right-of-way (15 foot along an arterial, 8 foot along an alley, and 9 foot along all other
street classifications). Information on the dedication process, as well as deed
templates, can be found at: http://www.fcgov.com/engineering/devrev.php
7. INFORMATION:
Utility plans may be required and a Development Agreement may be recorded once the
project is finalized.
8. INFORMATION:
A Development Construction Permit (DCP) may need to be obtained prior to starting
any work on the site.
9. INFORMATION:
LCUASS parking setbacks (Figure 19-6) apply and will need to be followed depending
on parking design.
10. INFORMATION:
All fences, barriers, posts or other encroachments within the public right-of-way are only
permitted upon approval of an encroachment permit. Applications for encroachment
permits shall be made to the Engineering Department for review and approval prior to
installation. Encroachment items shall not be shown on the site plan as they may not be
approved, need to be modified or moved, or if the permit is revoked then the site/
landscape plan is in non-compliance.
11. INFORMATION:
The development/site cannot use the right-of-way for any Low Impact Development to
treat the site’s storm runoff. We can look at the use of some LID methods to treat street
flows – the design standards for these are still in development.
12. INFORMATION:
Doors are not allowed to open out into the right-of-way.
13. INFORMATION:
Any bike parking that is required for the project cannot be placed within the right-of-way,
and if it is placed just behind the right-of-way, it needs to be placed so that when bikes
are parked, they do not extend into the right-of-way.
14. INFORMATION:
In regard to construction of this site, the public right-of-way shall not be used for staging
or storage of materials or equipment associated with the Development, nor shall it be
used for parking by any contractors, subcontractors, or other personnel working for or
hired by the Developer to construct the Development. The Developer will need to find a
location(s) on private property to accommodate any necessary staging and/or parking
needs associated with the completion of the Development. Information on the
location(s) of these areas will be required to be provided to the City as a part of the
Development Construction Permit application.
Department: Traffic Operations
Contact: Steve Gilchrist sgilchrist@fcgov.com 970-224-6175
1. INFORMATION: The rezoning of this lot from a single family home to a duplex would not
trigger the requirement for a Transportation Impact Study according to Chapter 4 of the
Larimer County Urban Area Street Standards. TIS waived.
Department: Stormwater Engineering – Erosion Control
Contact: Andrew Crecca acrecca@fcgov.com
1. INFORMATION:
This project is located within the City's MS4 boundaries and is subject to the erosion
control requirements located in the Fort Collins Stormwater Criteria Manual (FCSCM),
Chapter 2, Section 6.0. A copy of those requirements can be found at
www.fcgov.com/erosion
Based upon this project type, Conceptual Development Reviews (CDRs) & Preliminary
Design Reviews (PDRs) alone do not trigger erosion control requirements. Please be
aware that future submittals or planned work will be evaluated based upon the submittal
requirements of FCSCM may trigger erosion control requirements.
Department: Stormwater Engineering – Water Utilities
Contact: Water Utilities WaterUtilitiesEng@fcgov.com (970)224-6191
2. Minimal site improvements – single family, 1-lot development
For your information Stormwater requirements apply on Single Family 1-Lot
developments when the site adds or modifies greater than 1,000 square-feet of
impervious area (gross). Projects in this category will require a drainage report and
construction plans (site plan, grading /drainage plan, utility plan) prepared by a
Professional Engineer registered in the State of Colorado. The drainage report will
need to document existing and proposed drainage patterns, show the site impervious
area is consistent with the drainage master plan, show how new runoff will be safely
conveyed to an adequate public facility, and methods for basic water quality treatment.
If the project will add between 350- to 1,000-square feet of new impervious area, a
drainage letter, site grading plan, and impervious area documentation are required.
These must document the existing and proposed drainage patterns. In most cases
these will be prepared by a Professional Engineer registered in Colorado. No change greater than 350 sqft.
If site improvements are anticipated, please contact Water Utilities Engineering at
WaterUtilitiesEng@FCgov.com to discuss the project specific stormwater
requirements.
3. Master plan and criteria compliance
The design of this site must conform to the drainage basin design of the Old Town Basin
Master Drainage Plan as well the Fort Collins Stormwater Criteria Manual (FCSCM).
The stormwater criteria manual is available on our website here:
https://www.fcgov.com/utility-development. NA
4. Fees
The 2023 city wide Stormwater development fee (PIF) is $11,019/acre ($0.253/ sq. ft.)
of new impervious area over 350 square feet. No fee is charged for existing impervious
area. This fee is to be paid at the time each building permit is issued. Information on
fees can be found at:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-develo
pment-fees
or contact our Utility Fee and Rate Specialists at (970) 416-4252 or
UtilityFees@fcgov.com for questions on fees. NA
Department: Water-Wastewater Engineering
Contact: Water Utilities WaterUtilitiesEng@fcgov.com (970)224-6191
1. Existing Water Infrastructure
There is an existing 4-inch water main in E Myrtle St with an existing 3/4-inch water
service to the site.
2. Existing Sewer Infrastructure
There is an existing 6-inch sanitary sewer main in the alley to the east of the property
with an existing sanitary sewer service to the site.
3. Change of Use
The proposed change of use for this property will result in a change to its classification
in the water & sewer fee structure. This property is currently classified as single-family
and the proposed change would convert the property to a duplex rate structure. As such,
new water and sewer development fees, Plant Investment Fees (PIFs), and WSR fees
will occur. These fees are to be paid at the time each building permit is issued.
Please contact our Utility Fee and Rate Specialists at (970) 416-4252 to discuss.
Information on fees can be found at:
www.fcgov.com/development-fees
Department: Electric Engineering
Contact: Luke Unruh lunruh@fcgov.com 970-416-2724
1. The existing electric infrastructure will need a comprehensive review to understand if the
existing transformer can handle another dwelling. The transformer may need to be
upgraded or other system upgrades maybe needed to accommodate the proposed
plan. Please contact me to discuss. To be done at the time of permitting. A thorough review by an
electrician will be done to identify areas where the property needs to be brought to code.
2. Each dwelling must have its own electric meter.
The electric service to a duplex is considered customer owned. If a upgraded service is
needed, it will need to be installed by the owner. As a heads up, you may want to put
the service in an easement if the duplexes will sit on separate lots. To be discussed with Luke at time of
permitting to ensure the requirement holds, building is a single structure and shares a lot.
3. This project will need to comply with our electric metering standards. Electric meter
locations will need to be coordinated with Light and Power Engineering.
4. Electric capacity fees, development fees, building site charges and any system
modification charges necessary to feed the site will apply to this development. Please
contact me to discuss development fees or visit the following website for an estimate of
charges and fees related to this project:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-develo
pment-fees
5. You may contact Luke Unruh with project engineering if you have questions. (970)
416-2724 or lunruh@fcgov.com. You may reference Light & Power’s Electric Service
Standards at:
https://www.fcgov.com/utilities/img/site_specific/uploads/electricservicestandards.pdf?1
645038437
You may reference our policies, development charge processes, and use our fee
estimator at http://www.fcgov.com/utilities/business/builders-and-developers.
Department: Environmental Planning
Contact: Kristie Raymond kraymond@fcgov.com
1. INFORMATION ONLY:
Our city has many sustainability programs that may benefit this project. Of particular
interest may be the:
1) Solar Rebate Program offers up to $1500 in rebates to Fort Collins Utility customers
for the installation of solar PV: www.fcgov.com/solar, contact Rhonda Gatzke at 970-416
-2312 or rgatzke@fcgov.com
2) Integrated Design Assistance Program offers financial incentives and technical
support for new construction and major renovation projects. Must apply early in the
design phase: http://fcgov.com/idap, contact David Suckling at 970-416-4251 or
dsuckling@fcgov.com
Department: Forestry
Contact: Christine Holtz choltz@fcgov.com
1. With no construction planned and no trees being affected, Forestry has no comments.
Department: Fire Authority
Contact: Katie Quintana Katie.Quintana@poudre-fire.org
1. PREMISES IDENTIFICATION
505.1.1 Address assignment and standards. (Amended) Addresses shall be assigned
by the governmental entity having jurisdiction (Fort Collins, Timnath, or Larimer County)
and shall comply with the Larimer County Street Naming and Addressing Standards as
contained in the Larimer County Urban Area Street Standards.
505.1.2 Location and size. (Amended) The address numbers and letters for any
commercial or industrial buildings shall be placed at a height to be clearly visible from
the street. The minimum height and stroke shall be in accordance with Table 505.1.2.
505.1.3 Posting on one- and two-family dwellings. (Amended) The address numbers
and letters for one- and two—family dwellings shall be a minimum of four inches in
height
with a minimum ½ inch stroke and shall be posted on a contrasting background. If
bronze
or brass numerals are used, they shall only be posted on a black background for
visibility. Will be done when project is complete.
Department: Building Code Review
Contact: Russell Hovland rhovland@fcgov.com 970-416-2341
1. The building will need to meet current code, for example the 1-hour dwelling separation
wall/floor must be installed if not currently present and both dwellings can't share a
forced-air-furnace for heating. These corrections would need to made with a building
permit and pass inspection. Mini split will be added to the additional unit for heating, in addition, construction
project will be done after the permitting phase to investigate the wall construction and add the 1hour fire separation as needed.
2. Townhome and duplex construction shall comply with adopted codes as amended.
Current adopted codes are:
2021 International Residential Code (IRC) with local amendments
2021 International Plumbing Code (IPC) as amended by the State of Colorado
2023 National Electrical Code (NEC) as amended by the State of Colorado
Projects shall comply with the current adopted building codes, local amendments and
structural design criteria can be found here: https://www.fcgov.com/building/codes
Please read the residential permit application submittal checklist for complete
requirements.
· Snow Live Load: Ground Snow Load 35 PSF.
· Frost Depth: 30 inches.
· Wind Loads: Risk Category II (most structures):
· 140mph (Ultimate) exposure B or Front Range Gust Map published by The Structural
Engineer's Association of Colorado
· Seismic Design: Category B.
· Climate Zone: Zone 5
· Energy Code: 2021 IECC residential chapter.
INFORMATIONAL ITEMS:
· For a fire-sprinkled building, 3ft setback required from property line or provide fire
rated walls & openings per chap 3 of the IRC.
· Bedroom egress windows (emergency escape openings) required in all bedrooms.
· For buildings using electric heat, heat pump equipment is required.
· New homes must provide electric vehicle ready wiring if garages are attached, see
local amendment.
· Provide site-wide accessibility plan in accordance with CRS 9-5. This requires
accessible units per that state standard.
· New IRC code amendment R320 requires dwellings with habitable space on the 1st
floor must provide a visitable bathroom and path to such.
· The roof must be provided with solar-ready zones at outlined in IRC appendix RB.
· Energy code requires short hot water supply lines by showing plumbing compactness.
· For projects located in Metro Districts, there are special additional code requirements
for new buildings. Please contact the plan review team to obtain the requirements for
each district.
Stock Plans:
When residential buildings will be built at least three times with limited variations, a
stock plan design or master plan can be submitted for a single review and then built
multiple times with site specific permits. More information can be found in our Stock
Plan Guide at fcgov.com/building/res-requirements.php.
Department: Technical Services
Contact: Jeff County jcounty@fcgov.com 970-221-6588
1. All development plans are required to be on the NAVD88 vertical datum. Please make
your consultants aware of this, prior to any surveying and/or design work. Please contact
our office if you need up to date Benchmark Statement format and City Vertical Control
Network information.
2. If submitting a replat is required for this property/project, the title/name may not begin
with addresses in numeral form. Address numbers must be spelled out. Please contact
our office with any questions. NA
3. If a Subdivision Plat is required and aliquot corners are shown, current acceptable
Monument Records will be required. These are required with Round 1 submittal.
4. Closure reports will be required for all Subdivision Plats, Easements, and any other
document requiring a legal description & sketch being submitted for review. These are
required with Round 1 submittal.