Loading...
HomeMy WebLinkAboutENERGY CONSERVATION IN LDGS - 06-91 - SUBMITTAL DOCUMENTS - ROUND 1 - Supporting Documentation (9) BRAHAMSON ENGIN ERING r 419 Canyon Avenue, Suite 317 Fort Collins, Colo. 80521 Phone 221-2569 ABRAHAMSON ENGINEERING is a Mechanical Consulting Engineering firm . Founder and President, Roger D. Abrahamson, is a graduate Mechanical Engineer with more than nineteen years experience in Heating, Ventilating and Air Conditioning, and is a Regis- tered Engineer in Colorado, Wyoming and South Dakota. The firm was started in August of 1981, and specializes in mechanical design and construc-' tion supervision for buildings such as schools, office buildings, hospitals, banks, and other commercial and manufacturing facilities . Projects designed by ABRAHAMSON ENGINEERING include the Filtration and Energy Conservation Modifications for the Anatomy and Zoology Build- ings at Colorado State University, Computerized Energy Management System for the City of Fort Collins, a HUD Elderly Housing Project, Additions to Fort Collins and Poudre High Schools, Solar and Cooling Modifications to Fort Collins City Hall, and a large Computer Room Addition to the USDA Building in Fort Collins with 300 tons of air conditioning . Other projects include Landmark Townhomes Plumbing, Faith Evangelical Free Church Sanctuary Addition, NCR Chemical Storage Facility, Collins Plating, Chizzy's Pizza (Greeley) and Stuart Professional Park office buildings. Energy conserving mechanical systems to serve the people of Colorado and Wyoming is the primary goal of ABRAHAMSON ENGINEERING. HVAC ENERGY AUDITS PLUMBING MANAGEMENT ENERGY MANAGEMENT S:TE SPRINKLING GEOTHERMAL ENERGY FIRE PROTECTION SOLAR HEATINGICOOLING r, r ABRAHAMSON ENGINEERING PROJECTS COMPLETED FOR THE CITY OF FORT COLLINS 8102 Edora Park Improvements 8105 City of Fort Collins EMC's Community Center 8201 Energy Management and Control Systems 8215 Energy Management and Control Systems Phase II 8216 City Hall Solar Mod and Cooling Mod 8217 Pool Boiler Heat Recovery 8221 City Hall Cooling Check 8224 City Hall Solar Tank Piping Mods 8303 City Hall 2nd Floor Remodel 8312 Old City Hall Renovation EMS 8314 Transfort EMS 8321 Light and Power Heating Study 8324 Light and Power Bldg. C Remodel 8403 Indoor Pool Boiler Consultation 8415 Collindale Clubhouse AC 8416 City Hall 1st Floor W. Balancing 8417 City Hall W. Computer AC 8420 Bldg. B Remodel 8424 Fire Station Remodel 8431 Library Prelims and Remodel 8433 Equipment Services Center 8434 Blk. 31 Bldgs. - Inspection 8517 Outdoor Pool Bathhouse 8604 Blk. 31 Out-Of-Bounds Study 8611 Old Post Office Evaluation 8615 Indoor Pool Study 8618 Maint. Consultation 8628 S. Sherwood Remodel 8635 Larimer County Office Remodel - Blk. 31 8636 906 W. Vine - City Garage 8706 OD Pool Boiler Study 8708 Old Water Plant House Eval. 8710 OD Pool Boiler Spec 8714 DMA Plaza Energy Audit 8716 City Park Pool Installation 8718 Light and Power Bldg. Entrance 8719 Sludge Form Add'n 8720 City Park 9 Clubhouse 8723 Toliver's Remodel Prelims 8725 City Park Shop Ventilation 8728 Pottery Studio Toilet 8729 Fire Station Addition 8733 Equipment Services Center Vent 8804 Water Waste Treatment Plant Maint. Facility 8813 City Hall W. Computer Room 8818 200 W. Mountain Remodel 8819 321 Maple Addition 8822 Light and Power Whse Add'n 8827 Toliver's City Maintenance Office AC 8833 A-B Office Add'n S/D 8904 Respite Care Facility 8905 Fire Station 92 AC r r ABRAHAMSON ENGINEERING PROJECTS COMPLETED FOR THE CITY OF FORT COLLINS 8906 OD Pool Chlorine Vent 8914 281 N. College Remodel 8917 WWTP #2 CO Exhaust 8918 Rossborough Fire Station 19 Prelims 8927 City Fire Station #3 Add'n 8928 A-B City Bldg. Exp. 8931 Indoor Pool Study Update 8938 City WWTP Add'n 8943 City Wide Lunchroom/Office Remodel 9008 City Hall E Re-roof C OFFICE BUILDINGS YEAR COMPLETED PROJECT_NAME_& LOCATION PRIME_ARCNITEC_T./ENG_NEER COMPLETED COST Solar One Office Plaza WX1 Assoc. , Architects 1983 $ 432,(000 Fart Collins, CO Larimer County jail Remodel Rabb, Brenner & Brelig, "nc. :SS4 $ 340,000 Fort Collins, CO Architects Service Center "3" Glaser Assoc. , Architects :90-515 ?LE,,!j00 City of Fort Collins Hospital Services Insurance Robb, Brenner & Brelig, Inc. 1965 7,300 Office Remodel, Architects Ft. Collins, CO "i-.Guam F'rofesS4Qnc?1 Park Robb, +� ?i Brelig, �' �� ti bb, refiner . 'relig, Inc. 1:SS 50,000 S,1dQ. - , Architects Fort Collins, CO 291 N. College Remodel, Architectural Resource Group 1990 $ 4ii,;=11iC.) City of Fort Collins City Utility Services Center Robb, Brenner & Brelig, Ir.c. 1991 $1,325,000 Expansion, Architects Ft. Collins, CO l r r ENERGY CONSERVATION MODIFICATIONS YEAR COMPLETED PROJECT NAME &_tOCATION PRIME_ARC_IITEC T/ENGI€ LF-P COMPLE_ED COST Colorado State University Abrahamson Engineering :992 $ 51,300 Anatomy Building Filtration/Energy Conservation Fort Collins, CO Colorado State University Abrahamson Engineering iSK $• 42"3100 Zoology Building Filtration/Energy Conservation Fort Collins, CO Colorado; State Jniversity Abrahamson Engineering E-3,000 Eddy Building Energy Conservation Modifications Fort Collins, CO Colorado State University Abrahamson Engineering 1987 it)ri `)i1i Microbiology, Energy Conservation Modifications Fort Collins, CO Colorado State University Abrahanson Engineering 9 = Sv,r]Crn Physiology Building, Energy Conservation Modifications Fort Collins, CO C r SCHOOLS YEAR COMPLETED PROJECT_NAME_&_LQCAT_QN PRIME_ARCHITECT_'ENGINEER COMPLETED COST Fort Collins High School Robb, Brenner & Brelig, Inc. :933 $ bbi;,si0i_i Addition & Remodel, Architects Fort Collins, uO oudre i'igh School Addition Rabb, Brenner & Esrel1G, Int. :9E3 �':,'�,%it0 Fort Collins, CO Architects Morgan Community Collage JJti Assoc. , Architects 1984 $I, i3C, 00 Addition, Fart Morgan, CO Putnam of O'Dea Elementary Rube, Brenner & Bvelig, Inc. 1.86 $ 254,000 School Additions Architects Fart Collins, CO Moore and Diann Elementary R bb, Brenrer & Brelig, Inc. 187 $ :S3,504 School Additions Architects Fort Collins, CO Eyestone Elementary School Rabb, Brenner & Brelig, Inc. 1989 �1,5�=>t�, �n0 Adai tun and Remodel, Architects a.ellington, CO BF Kitchen Elementary School Rabb, Brenner & Brelig, I-ic. 1330 $ C>v,C)C)C} Addition and Remodel, Architects Loveland, CO BUILDING AUTOMATION SYSTEMS YEAR COMPLETED PROJCCT �lF:_1E_°_LDCAT:CP: PRINE_ARCHITECT/ENGINEER COMPLETED COST City of Fort Collins Abrahamson Engineering 1583 p 140,800 Automaticzn System (7 Bldgs) Larimer County Automation Abrahamson Engineering 1984 $ 40, 300 System, courthouse � r COMPUTER FACILITIES YEAR COMPLETED PROJECT_NAME_&_LOCATION PRIME_ARCHITECT/ENGINEER COMPLETED COST USDA Forest Service A-E Design Associates :'3$3 $1,6k)C),ii1.ir, Computer Addition Fort Collins, CO CSU Engineering Building CSU, Tom Mcss 124,000 Computer Reams Remodel, B Wing Fart Collins, CO r r INSTITUTIONAL YEAR COMPLETED PROJECT_NAME_°i_LOCATION PRIME ARCHITECT/ENGINEER COMPLETED C05i Larimer Community Services Robb, Brenner & Br-elig, Inc. 1 Cie r: $1, 1iso,000 Ctr. , United Day Care Ctr. Architects Fort Collins, CO Colorado 'State Ur,ivers.-t Abrc;hams,_, 3 y -n Engineering .'_87 ffi 40,000 Administrative An;-ex, Evaporative Cooling & Mechan- ical Modifications Fart Collins, CO Colorado State University Robb, Brenner & Brelig, Inc. 1957 3 347,500 Student Center Rambouillet Architects Remodel Fort Collins, CO Colorado State University Architectural Resource Group i9Ei7 $ 256,700 Student Center Cave Remodel =ort Collins, CO Cc,loradc, State University Abrahamson Engineering 1990 $ 241, ?CCU Anatomy-Zoology & Clark Bldgs. Controlled Maintenance Pr+-,jec ts, Fart Collins, CO Colorado State University Architectural Resource Group 1990 $ DG6,ow Bookstore Remodel, Lory Student Center, Fart Collins, CO Larimer County Shelter Care The Architect's Studio 1991 410,COO Facility at Foothills Gate..day, Fort Collins, CO ANIMAL FACILITIES, LABORATORIES YEAR COMPLETED PROJECT NAME &_LOCATION PRIME ARCHITECT/ENGINEE_P. COMPLETED COST Colorado State University Abrahamson Engineering 1986 Contagious Animal Research Laboratory Remodel, Fart Collins, CO Colorado State University Abrahamson Engineering 1982 10,()()0 Experimental Horse Barn Ventilation, Fort C._1 l ins, CO Lar:imer County Humane Architectural Resource Group $ 140,000 Society Remodel Fort Collins, CO Coiorado State University Architectural Resource Group ID89 $ 198,000 Insectary Remodel, Foothills Campus, Fart Collins, CO Colorado State University Architectural Resource Group 1990 $ 143,000 Foxhound Facility Renovation Foothills Campus, Fort Collins, CO Colorado State University Rvbb, Brenner & Brelig, :nc. 1'l89 $ 70,000 Plant Sciences Lab Remodel Architects Fort Co=liris, CO Colorado State University Colorado State University 1950 $ 76,000 Pathology Lab ;0j2 Remodel, Fart Collins, CO r r COMMERCIAL YEAR COMPLETED AR�JECT_MAME_R<_LOCATION PRihiE ARCHITECT/EhJGIh;tLR COMPLI=TED 9-0—Si Chizzy' s Pizza Restaurant Carolin Construction 1982 $ 435,000 Greeley, CO Fat Boy's Bar-9-0 Restaurant Larsen Assoc. Architects 1384 $ 50,000 Fort Collins, :0 Pear Richards's Restaura.,t Poor Richard's �s�� � _�0 1 20 ,006 Addition, Cheyenne, WY Mountain Bell Switch Station A-E Design Associates 1964 $ 442,000 Remodel Fort Collins, CO Great American Rib Co. Larsen Assoc. Architects 1983 S 245,000 Restaurant, Arvada, CO Yancey's Food Service Larsen Assoc. Architects .9S5 $ 534,000 Warehouse, Fart Collins, CO Group Publishing Addition and Rabb, Brenner & Erelig, .n•c. 19B7 $ 252,S00 Remodel, Architects Loveland, CO Steele's South Addition and Rabb, Brenner & Brelig, Inc. 1987 $ 350,000 Remodel„ Architects Fort Collins, CD � r INDUSTRIAL YEAR COMPLETED A4L7LC1'_PIAPiE_9e_LICATIOh PRiME_FiRCHI ECT/LPiiINEER _OMPLETrD COST HVAC and Insulation REtrofit Abrahamson Engineering 1984 $ 30,200 Bta lding "C" Light & Power City of Fort Collins Collins Eating Facility Stewart Environmental 1985 5 650,000 Fort Collins, CO Consultants S. Blue River Waste otter Stewart environmental not yet $ 00i),i_)0C. Treatment Plant & Pump Station Consultants constructed est. Breckenridge, CO Larimer County Landfill Robb, Brenner & Brelig, inc. 136E S 200,000 Maintenance Garage, Architects Fort Collins, CO K,:!dak Colorado Division A-E Design AsLociates 1966 $ 500,000 Lithe-Tech Remodel W,ndsor, CD Mountain Bell Chiller AbrahamEon Engineering 198E $ 79,900 Replacement and Mechanical Modifications, Brighton, CO Rocky Mountain Arsenal ARIX, Inc. not yet S1,56%OM) Consolidation of Maintenance contructe❑ Facilities, 5 ;dew Buildings, Denver, CO VCR Chemical Storage Building A-E Design Associates 1988 $ 482,000 Addition & Remodel, Fort Collins, CO CENTRAL HEATINE/COOL-ING PLANTS YEAR COMPLETED PROiECT_NAt0IE_p<_LOCATION PRIME ARCH ECT/ENGINEER COMPLETED CC!S Colorado State University Abrahamson Engineering 1986 352,000 Anatomy-Zoology, Microbiology and Physiology, Central Chiller Plant, Fort 3-n1lins, CO HOSPITALSIMEDICAL CENTERS YEAR COMPLETED PROJEGI'_NAt�E & LOCATION Pk£hl�_A�r�;IiECT1ENG_h: �R 99L2P 9M COST Solar Medical Center WJM Assc.c. , Architects Riverside Drive Fort Collins, CO ted Therapists vJjM Ae. -C Archite .s ' Affiliated��� t `�-'-� . , C •'1 8:r Ig 29N l)iliZ Medical Office Fort Collins, CO Colorado State Jniversit•r Architectural Pesource O;-oup is8S 3 so'000 Yeterin._,ry Teaching Hospital Scanner ,Addition, Fort Collins, CO CHURCHES YEAR COMPLETED PR07ECT_NAt'E_&_LOCATION PRIME_ARCHITECTIENGINEER COMPLETED COST First Methodist Church Glaser Assoc. Architects :98G $ Revisions, Loveland, CO First CcngreQational Church ARIY,, :-,Ic. 1998 $ �t;1,r10t1 Adeition & F'Rem Adel, Greeley, CO Faith Evangelical Free Church iobb, Bren'.Er, & $relig, Inc. i:ii �i, l) ),o0(_) Additioz/Remoudel, Architects Fort Collins, CO LIBRARIES PEAR COMPLETED PROJECT_h.A'_iE_°<_LOCATION PRIi_ir_ARCH TTRCTfENG N` -R COMPLETED COST Fart Collins City Library Glaser Assoc. Architects :985 Renodel f RESIDENTIAL YEAR COMPLETED AFtG�ECi'_'vF_E_°K_u�CFi7'IOi� °RIhiE_riPCHITECT/EAlGINcER CO'_SPi_�__E-L COST HUD Elderly Housing, Co. ZVFK Architects 444,000 Fort Collins, CO Landmark Townhomes Plumbing WiM AssQz. Arc�Fitec`z .984 $4, 1001000 Fort Collins, CO Gamma Phi Beta Sorority Abrahamson Engineering 398E S 29,900 House Heating `. Plumbing Modifications, Fort Collins, CO STUDIES YEAR COMPLETED PROJECT_t�iAI,E_Ti: LDCr?i0A7 i E w?/ELI9 i LEER CO"iPLEiED 9QS7 City of Fort Collins Abrahamson Engineering 1982 Computerized Energy Management System HVRC & insulation Study Abrahamson Engineering 1963 Light and Power Building C J'ity of F;. CKlirFs �n Colorado State University Abrahamson Engineering 1r.8Y Physiology Energy Conserva- tion Study Fort Collins, CO Colorado State University Abrahamson Engineering 1984 hi_crobi_,l._,uy Energy Conser- vation at'_.dy Fart Coliins, Co Colorado 'E; e University Abrahamson Engineering 1984 Chiller Replacement Study/ Central Chiller Plant Fort Collins, CO Colorado Etz-te University Abrahamson Engineering . ='Fe Eddy Bluilding Energy Conser- vation Study Fort Collins, CO Fort Col It ins Indc.or Pool Study Architectural Resource Sroup -,SSG City cif Ft. Collins 1635 Blue Spruce 4eat Pump ISSS Retrofit Study, Fort Collins, CO Jerry Moore POOLS/FOUNTAINS YEAR CO"PLETED PROjECT_NAME "(LO ATION PRINE_ARCIIIiECT/ENGINEER _QNP�LTL: COST City cnf Fort Collins Glaser Assoc. ArCLitects 19$7 $ -:100,00o Outdoor Pool Bathriouse Facility Windsor ~oL-i iK jcitKil+=:U5£ ARj X, i7L• i'%e.� JV� OO•/� t ROGER 0. ABRAHAMSON MECHANICAL ENGINEER b OWNER ABRAHAMSON ENGINEERING EDUCATION 1977 to 1981 Bachelor of Science Mechanical Engineering The Spitxnagel Partners Opened Mechanical Department at Sheri- S. Dakota School of Mines dan, Wyoming, as Department Head. 1966 transferred to home office in Sioux REGISTRATION Falls, South Dakota after two years. Projects completed for this employer Colorado Registered Engineer include Meadowlark Elementary School , Wyoming Registered Engineer large museum addition, various VA South Dakota Registered Engineer projects, freezer plant, computer tape manufacturing facility, county AFFILIATIONS detention and law enforcement facility, American Society of Heating, and numerous energy audits and energy Refrigeration, and Air Conditioning conservation projects. Engineers 1973 to 1977 AREAS OF SPECIALTY McFall and Konkel Consulting Engineers, Heating, Ventilating and Denver, Colorado Air Conditioning Promoted to Senior Project Engineer Design Plumbing, Fire Protection, responsible for mechanical design and Energy Management construction supervision of projects such as two Cherry Creek High Schools, office EXPERIENCE buildings at the Denver Technological Center, and buildings at the Auraria Higher Educa- 1981 to Present: tion Center, downtown Denver, among others. Owner of Abrahamson Engineering, Fort Collins, CO. Projects completed by Abrahamson 1969 to 1971 Engineering include numerous remodel projects for the City of Fort Collins Sales Engineer and Larimer County, including modifica- The• Trane Company, Lacrosse and Appleton, tions to City Hall West, Remodel of Wisconsin Service Center "B", Light and Power Sales and application of HVAC systems and Building "C" modifications , and equipment for industrials , mechanical Larimer County Jail remodel to office contractors , and owners. space, among others. Projects for Colorado State University 1967 to 1969 include energy conservation modifications 1st Lt. , U.S. Army Corps of Engineers, to the Anatomy Building, Zoology, Micro- 2 Years construction coordination biology, Eddy Building and a new central Experience in Germany. chiller plant for four major buildings. Other projects include a computerized Energy Management System for the City of Fort Collins, additions to Poudre and Fort Collins High Schools, and a 300 Ton Computer Room Addition to the USDA Building in Fort Collins. r RICHARD T. SCOTT, P.E. ABRAHAMSON ENGINEERING EDUCATION BA - Grinnell College BSME - University of Iowa Numerous ASHRAE , MCAA and other industry seminars. AREAS OF SPECIALTY Mechanical construction management, Cost estimating, Computer programming , Process piping and Energy conservation. EXPERIENCE Abrahamson Engineering - Dick has been responsible 2/28/90 to present. f or the design of mechanical work for an esccomate cost estimating enclosed shopping mall , a sof tware - Owner - 1985 to molasses to cattle-food present. plant , a heat recovery system in a manufacturing Environmental Systems plant , an atrium office Construction Company, Omaha, building and numerous small Nebraska - mechanical jobs . He has been active contractor - founder and in ASHRAE at the chapter , CEO - 1974 to 1985 . regional and national level . He served as a national Wray M . Scott Co . , Inc . , director and chaired several Omaha , Nebraska - mechanical c o m m i t t e e s f o r t h e contractor - 1961 to 1974 - Mechanical Contractors President 1970 to 1974 . Association of America . Dick' s contractor licenses During the period from 1961 include plumbing , heating, to 1985 Dick supervised tens airco nditioning and flamable of millions of dollars of liquid tank installer in mechanical construction . Omaha , Bellevue and Grand Projects included hospitals, Island, Nebraska. high-rise residential, food and other processing plants, and electric generating power plants. r cfu Colorado State University Office of Facilities Construction Fort Collins, Colorado and Utilization 80523 303 491-6306 May 11 , 1982 To Whom It May Concern Subject : Roger Abrahamson Dear Sir: Since coming to Fort Collins , Roger Abrahamson has worked on design of several small mechanically oriented projects. The largest and most complex project was retrofiting a major laboratory building for a better filtration system. Associated with this project was recalculating and reducing necessary supply air quantities for each room in accordance with current heating and cooling standards . The project is not yet complete , but I believe it will accomplish the intended purpose and save considerable energy besides . Mr. Abrahamson has performed in a professional manner on all projects to date . If I can be of further assistance , please contact me . Sincer ly , 4��-'acd A. Baker Senior Civil Engineer RAB/ble r � SACRED HEART HOSPITAL. West 4th Street o Yankton,S. D. 57078 Telephone 605-665-9371 October 28, 1981 To whom it may concern: Regarding: Roger Abrahamson Roger conducted our Technical Assistance Energy Audit for Sacred Heart Hospital . He also did the engineering on the Energy Conservation Measures. He is a very thorough conscientious worker and really under- stands the energy program. I am very pleased with his work and would like to recommend him to others. Sincerely, James J. Lichter Director of Physical Facilities JJL/eaa TSP The Spitznagel Partners, Inc. Architecture Engineering Energy Consultation Planning August 13, 1981 To Whom It May Concern: It has been my pleasure to have been personally and profes- sionally associated with Mr. Roger Abrahamson during the last four years. while at TSP, Roger was a Project Engineer and in responsible charge of various HVAC process piping and energy conservation projects and discharged his responsibility in a most professional manner. My supervision of his work was mostly in the form of technical discussions and exchange of ideas, rather than express direction. Roger is a very conscientious, methodical and thorough en- gineer, with a good track record and experience. I would have no reservation in recommending him for any building, process or energy related project, regardless of size and complexity. David L. Rosenstein, P.E. Director and Mechanical Department Head The Spitznagel Partners, Inc. 1112 West Avenue North Sioux Falls,SD 57104 (605)336-1160 r TSP The Spitznagel Partners, Inc. Architecture Engineering Energy Consultation Planning August 11, 1981 To Whom it May Concern: This letter is to serve as a personal credibility reference for Mr. Roger D. Abrahamson. My experience with Roger has been very favorable. We have worked together on several different projects and he has always been very cooperative. Some of the projects that Roger and I have worked together on are: Estimated Actual Mech. Cost Mech. Cost 1. Courthouse Remodel $229,000 $259, 000 2. Branch Bank 55, 000 52, 000 3. County Detention & Law 402,000 437, 000 Enforcement Facility In addition to the above, Roger and I also worked on several technical assistance energy audits, which resulted in many implemented energy conservation measures and happy clients. Roger has always been sympathetic with architectural design and aesthetics. Fie has always strived to work with the intent of the design whether the mechanical system is to be expressed as in an exposed system, or concealed, as in the more conventional systems. Roger has always been very cooperative. Roger' s ability as an engineer can best be attested to by the successful projects he has completed and the happy clients he has thereby created. 1112 West Avenue North Sioux Falls, SD 57104 (605)336.1160 Page 2 I trust that after your selection of Roger as your mechanical engineer that you too will be filled with praise . Re ectfully tted, erald I. Lotton I GIL*tlm childress I PtPeeUiln architects 1 planners 1865 south pearl t•denver, colorado • 80210 • phone744-6066 April 6, 1977 TO WHOM IT MAY CONCERN: Mr. Roger Abrahamson has worked directly with us for the past three years on the administration and production of mechanical engineering requirements for projects totalling over five million dollars construction costs. He was our prime contact for the total scope of work from design through construction. During our association, Roger has displayed a high degree on technical skill and administrative qualifications. He was punctual, reliable and cooperative and always handled himself in a professional manner. His pleasant personality and concern for others contributed to the success of the projects he was involved with. If additional information is desired, please contact me. C_HILQRESS/PAULIN . ARCHITECTS/PLANNERS Richor J. Pau in, A.I .A . RJP.sq i