Loading...
HomeMy WebLinkAboutENERGY CONSERVATION IN LDGS - 06-91 - SUBMITTAL DOCUMENTS - ROUND 1 - Supporting Documentation (4) F RAHAMSON ENGIN :RING 419 Canyon Avenue, Suite 317 Fort Collins, Colo. 80521 Phone 221-2569 November 1, 1990 Ms. Sherry Albertson-Clark Planning Department City of Fort Collins Re: LDGS Energy Conservation Project, Job No. 9038 Sherry; The following is my proposal for this project which may also serve as a supplement to our contract if desired. Work will be accomplished primarily by Abrahamson Engineering, with help from Dick Anderson as our special consultant. Proposed outline of services with estimated time frames follows: Project Name Phase_Description Time Schedule One Review energy conservation measures Two Weeks utilized by neighboring communities and the Colorado Office of Energy Conservation. Two Develop a model project to test One Week energy conservation measures (ecm's) . Test the ecm's for the model project by implementing heating and cooling loads into the "Load Design Analysis" computer program. Three Prepare the initial draft of ecm's Two Weeks and award points applicable to the Land Development Guidance System. Four Meet with design and development Two Weeks communities and implement input into the second draft. Five Prepare Final Draft. Two Weeks HVAC ENERGY AUDITS P i_MBING ENERGY MANAGEMENT E SPRINKLING GEOTHERMAL ENERGY F RE PROTECTION SOLAR HEATfNGICOOLING Proposed fee remains $3,360.00 lump sum, to be paid in proportion to work accomplished and as per progress statements. Fees shall be paid as soon as possible after receipt of statement. After 30 days from statement date, interest shall accrue and shall be paid at the rate of 1 1/4% per month on the unpaid balance, prorated daily. Fee shall be adjusted for changes in scope, at the following hourly rates: Principal/P.E. : $55.00/hr. Engineer : $35.00/hr. Draft/Office: $22.50/hr. We are looking forward to working with you on this project. Sincerely, �C� NA'et4 �� Roger D. Abrahamson, P.E. RDA:tic