Loading...
HomeMy WebLinkAboutUNION PARK - FDP240004 - SUBMITTAL DOCUMENTS - ROUND 1 - Drainage Related Document FINAL DRAINAGE REPORT FOR Union Park Prepared by: Highland Development Services 6355 Fairgrounds Ave, Suite 200 Windsor, Colorado 80550 Phone: 970.674.7550 Prepared for: Landmark Real Estate Holdings, LLC 6341 Fairgrounds Ave, Suite 100 Windsor, Colorado 80550 Office: 970.460.0567 April 10, 2024 Job Number 21-1044-00 6355 FAIRGROUNDS AVE, SUITE 200, WINDSOR, COLORADO 80550 | PHONE 970.674.7550 April 10, 2024 Mr. Wes Lamarque Fort Collins Utilities 700 Wood Street Fort Collins, CO 80522 RE: Final Drainage Report – Union Park Dear Wes, We are pleased to submit, for your review, the Final Drainage Report for the Union Park – Final Development Plan. This report describes the drainage design implemented with proposed development and infrastructure improvements in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Highland Development Services Jason T. Claeys, P.E., LEED AP Page i TABLE OF CONTENTS Table of Contents ............................................................................................................................. i Engineer’s Certification Block ..........................................................................................................ii General Description and Location .................................................................................................. 1 Site Description and Location ...................................................................................................... 1 Site Soils ....................................................................................................................................... 1 Storm Drainage Criteria .................................................................................................................. 3 Existing Conditions ...................................................................................................................... 3 Hydrologic Criteria ....................................................................................................................... 5 Hydraulic Criteria ......................................................................................................................... 5 Drainage Basins ............................................................................................................................... 7 Drainage Facility Design ................................................................................................................ 11 Drainage Conveyance Design .................................................................................................... 11 Detention/Water Quality Pond Design ..................................................................................... 11 Low Impact Development ............................................................................................................. 13 Stormwater Pollution Prevention ................................................................................................. 15 Conclusions ................................................................................................................................... 16 References .................................................................................................................................... 17 Appendix ....................................................................................................................................... 18 Appendix A – Site Vicinity Map & References ............................................................................. A Appendix B – SWMM Input / Output .......................................................................................... B Appendix C – Rational Calculations ............................................................................................. C Appendix D – Detention Pond Calculations ................................................................................ D Appendix E – Street Capacity & Inlet Calculations ...................................................................... E Appendix F – Conveyance Element Sizing ....................................................................................F Appendix G – Low Impact Development Calculations ................................................................ G Page ii ENGINEER’S CERTIFICATION BLOCK I hereby certify that this Final Drainage Report for Union Park was prepared by me (or under my direct supervision) for the owners thereof and meets or exceeds the criteria of the City of Fort Collins Stormwater Design Standards. ________________________________________ Jason T. Claeys, PE Registered Professional Engineer State of Colorado No. 42122 Page 1 GENERAL DESCRIPTION AND LOCATION SITE DESCRIPTION AND LOCATION The Union Park property is located in the Southeast Quarter of Section32, Township 7 North, Range 68 West of the Sixth Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. More specifically, the Union Park property is located north of the Front Range Village (FRV) commercial area, east of the Affinity residences, south of the English Ranch residential subdivision, and west of Ziegler Road. The project site is approximately 32.78 acres currently and is undeveloped agricultural and rural residential land, with one residence and multiple outbuildings. The site appears to be mostly vegetated with grass harvested for livestock feed. The site generally slopes from the west to the east at about 0.7% slope. The property is anticipated to be a high-density multi-use development, mainly multi-family residential, with retail space and supporting amenities according to the approved Ziegler- Corbett Overall Development Plan (ODP), the approved Preliminary Development Plan (PDP) and Harmony Corridor District/Plan per the City’s Land Use Code. The Union Park property is located within the City’s Fox Meadows Drainage Basin. In addition to the City of Fort Collins Stormwater Design Standards, drainage requirements are also described in both the “Final Drainage and Erosion Control Study for Front Range Village,” prepared by Stantec Consulting Inc., dated February 2007, and the “Final Drainage Report for Affinity Fort Collins,” prepared by JR Engineering, LLC, dated March 2, 2016. No City or FEMA floodplains/floodways are located within the Union Park property. SITE SOILS The Union Park project site consists primarily of Nunn clay loam (0 to 1 percent slopes) that is classified as Type-C hydrologic group. According to USDA/Natural Resource Conservation “Group, Type C soils have a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission.” Page 2 Per the “Preliminary Geotechnical Subsurface Exploration Report, Proposed Ziegler-Corbett Mixed-Use Development”, prepared by Soilogic, Inc., dated April 4, 2022: “approximately 4 to 6 inches of vegetation and topsoil was encountered at the surface at the boring locations, underlain by brown/beige/rust lean clay with varying amounts of sand which varied to clayey sand in places. The apparently-natural lean clay/clayey sand varied from soft to hard in terms of consistency or from very loose to medium dense in terms of relative density, typically exhibited no to low swell potential at in-situ moisture and density conditions (however one sample of sandy lean clay obtained from boring B-2 at a depth of about 9 feet below ground surface exhibited moderate swell potential) and extended to the bottom of each of the borings at a depth of approximately 15feet below present site grades.” “Groundwater was observed during the subsurface soil exploration: “Groundwater was not encountered in borings B-1, B-2, B-3 or B-5 to the depths explored (about 15 feet below ground surface), but was measured at a depth of about 15 feet below ground surface in boring B-4 when checked immediately after completion of drilling. When checked about five (5) days after drilling, borings B-1, B-2 and B-5 remained dry to the approximate depth explored, while groundwater was measured at a depth of about 14 feet below ground surface at the locations of borings B-3 and B-4 at that time. Groundwater information is indicated in the upper right- hand corner of the attached boring logs.” “Groundwater levels will vary seasonally and over time based on weather conditions, site development, irrigation practices and other hydrologic conditions. Perched and/or trapped groundwater conditions may also be encountered at times throughout the year. Perched water is commonly encountered in soils overlying less permeable soil layers and/or bedrock. Trapped water is typically encountered within more permeable zones of layered soil and bedrock systems. The location and amount of perched/trapped water can also vary over time.” Page 3 STORM DRAINAGE CRITERIA This Final Drainage Report was prepared to establish drainage basins, and required detention volumes, that meet or exceed the City of Fort Collins storm water criteria. The City of Fort Collin’s Storm Drainage Design Criteria and amendments to the Urban Drainage Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. EXISTING CONDITIONS The Union Park Property is a portion of a drainage basin that is situated north of Harmony Road, and west of Ziegler Road, which runoff is conveyed east under Ziegler Road into the existing drainage channel on the HP Harmony Campus property. It has been determined in the Final Drainage and Erosion Control Study for Front Range Village that this area is allowed to contribute 76.7 cfs to the HP Campus drainage channel during 100-year event peak discharge. More specifically to this site, 20.1 cfs release rate was allocated to the Union Park & the Affinity Fort Collins properties. Per the Final Drainage Report for Affinity Fort Collins, the Affinity site has a 100-yr peak release rate of 2.1 cfs, allowing a 100-yr peak discharge of 18.0 cfs from the Union Park property or a combined release rate of 20.1 cfs. Herein, Affinity’s pond and associated release is referenced as Pond 586. The Harmony Village Manufactured Home Community does not provide adequate detention facilities. During a 100-yr storm event, a portion of the site flows to the east into both the Front Range Village development as well as the Affinity Fort Collins site. Per the Final Drainage Report for Affinity Fort Collins, the peak runoff leaving FRV’s Pond D (Pond 286 per Fox Meadows) and was determined to be 116 cfs peak runoff during the 100-yr event. This runoff will be collected in the FRV Pond D (Pond 286), intended to collect but not detain this flow. During the 100-year event, this peak flow of 116 cfs will flow over the weir on the north side of Detention Pond D (Pond 286). It is conveyed via the private drive aisles to a level spreading weir on the northeast side of the Affinity Fort Collins site, where it is discharged into the Union Park property. This flow is then assumed to sheet flow east to be inadvertently detained on the east side of the Union Park property along Ziegler Road. In reference to the Final Drainage and Erosion Control Study for Front Range Village, a detention pond is planned to be incorporated into the Union Park site, Detention Pond 298. The volume of Detention Pond 298 will be determined by the lesser of the two following scenarios: 1. Standard detention volume required for the site, detaining the 100-yr peak developed runoff to the 2-yr historic runoff rate, plus the existing inadvertent detention volume, Page 4 the detention volume currently provided onsite due to existing constraints such as grade features and outlet restrictions, or 2. The volume required to detain the combination of 100-yr peak runoff rates from the developed onsite and existing offsite flows to the allocated release rate of 20.1 cfs. For the purposes of the ODP and PDP, it is assumed that Scenario 1 is the lesser of the two. During the preparation of this Final Drainage Report and the supporting calculations, it was determined that Scenario 2 was the lesser of the detention scenario options and is described further herein. For reference, based on the topographic survey of the existing conditions, the inadvertent detention volume is constrained for this site by the spill location along the north property line, at an approximate elevation of 4928.0 ft. The existing inadvertent detention volume is estimated to be 7.5± acre-ft. The estimated volume did not account for the two existing culverts along the west side of Ziegler Road that currently provide ponding relief for the Ziegler- Corbet site. Within the Fox Meadows Basin Master Plan (excerpts included in the Final Drainage and Erosion Control Study for Front Range Village), the detention pond within English Ranch, just north of Union Park and south of Paddington Road (referred as Pond 214), overtops and spills into the Union Park site. Based on review of the English Ranch drainage studies and development plans, the detention pond was not intended to discharge into the Union Park property and no spillway protection is provided. Due to the City’s change in 100-yr storm intensities, post the 1997 flood, and the limited capacities of this pond and the ponds upstream of Pond 214, Pond 214 now unintentionally spills into the Union Park property. It is noted within this report that this unintentional spill, along with the undetained runoff from the Harmony Mobile home park, the offsite runoff is detrimental to the existing residences. This report provides a recommendation for a regional detention pond on the Union Park property, referred to as the Ziegler Pond, that has not been funded nor constructed. Upon review of pre-development USGS maps, the area of English Ranch would have drained north and east towards Fossil Creek Reservoir Inlet Ditch, draining north and away from the Union Park property. The Front Range Village Stormwater Management Model (SWMM) was provided by the City of Fort Collins and the Affinity SWMM was provided by JR Engineering, the engineering company Page 5 that prepared the drainage design for the Affinity site. Both models were reviewed to determine the appropriate offsite inflow hydrographs from Pond 286 and Pond 598. All supporting references and calculations are located in the Appendix. HYDROLOGIC CRITERIA The rational method was performed to calculate the peak runoff rates for each basin. Percent impervious were estimated based on land use, and the associated runoff coefficients were calculated. The time of concentration was calculated using the City of Fort Collins’s initial time of concentration, and the intensity was calculated using the corresponding storm rainfall depth and USDCM Equation 4-3. To account for the City of Fort Collins’ IDF Curve, Coefficient 3 of the UDFCD’s intensity formula was adjusted to 0.7867. The City of Fort Collins area has a 2-yr 1-hr rainfall depth of 0.82 inches and a 100-yr 1-hr rainfall depth of 2.86 inches. These depths account for the 1999 adjusted rainfall depths. HYDRAULIC CRITERIA The hydraulic calculations provided in this report are limited to maximum street capacities based on the minimum street slopes (0.5%) for the most restrictive sections. The final Union Park storm drainage system has been designed to convey the minor and major storm events through the combination of streets, inlets, storm sewer pipes, and swales. Per the requirements provided by the City of Fort Collins Storm Drainage Design Criteria, all inlets and storm pipes will be designed such that, during the minor initial storm event, the 2-yr storm, the flows for the streets will not top the curb and may only rise to the street crown elevation, and for the entrance (with Median) will not top the curb and the flow spread will leave at least one 12 ft lane width free of water in each direction. During the major storm event, the 100-yr storm, the water depth for the streets will be held to a maximum depth of 6” at the street crown, 12” at the gutter flow line, and/or flow must be contained within right-of-way or easements paralleling the right-of-way. The peak basin runoff flows from the rational calculations was then be used to determine the street flows, and on-grade inlet locations. The on-grade and sump inlet capacities will be calculated using Mile High Flood District’s spreadsheet MHFD-Inlet_v5.03.xlsm. The inlet capacities were analyzed, and the necessary adjustments were applied to the street runoff flows based on the amount of runoff collected by on-grade inlets. The sump inlets were sized using the previously mentioned street capacity allowances, with overtopping if needed. Page 6 The captured flows were then be analyzed using the Hydraflow program to design pipe size and slopes. MHFD-Inlet applies a clogging factor while sizing the inlets, but while sizing the storm pipes, it is assumed that the inlets are free of clogging debris and capture the maximum amount of street runoff. Attenuated flows calculations were utilized to route the captured runoff through the storm drain system. The program accounts for head losses within manholes and bends and head losses associated with pipe friction. EPA’s SWMM 5.2 was utilized to analyze the pond sizing, 100-yr detention volumes and associated water surface elevations, and 100-yr peak release rates. The Front Range Village Stormwater Management Model (SWMM) was provided by the City of Fort Collins and the Affinity SWMM was provided by JR Engineering, the engineering company that prepared the drainage design for the Affinity site. Both models were reviewed to determine the appropriate offiste inflow hydrographs from Pond 286 and Pond 598. Hydraflow will be used to compute the open channel hydraulics and check the capacities of the drainage swales throughout the site. Flow velocities within these swales will be reviewed and where flows are found to be supercritical, the swales will be protected with turf reinforcement mat. All swale and pipe outlets will be protected with riprap or suitable erosion protection methods. Storm sewer pipe outlets will be protected using the requirements set by the USDCM to protect downstream of culverts. All supporting calculations for are located in the Appendix. Page 7 DRAINAGE BASINS The Union Park developed drainage basins are delineated by areas draining to major drainage elements. The Union Park property is divided into five developed drainage basins and are generally described below: Drainage Basin A1 consists entirely of pond 298a, having an area of 2.56 acres. This basin accepts offsite flows from Pond 598 (Affinity) and Pond 286 (FRV) and will convey offsite detained flows to pond 298c through a system of pipes, with emergency overflow being routed through streets to Pond 298c and ultimately offsite. No water quality will be provided for this basin. Drainage Basin B comprises of 8.99 acres divided into 7 sub-basins. These basins drain to and are treated by the infiltration gallery LID B prior being conveyed and ultimate detained within Detention Pond 298c prior to being released offsite. Below are descriptions for the sub-basins within: Sub-Basin B1 consists of 0.26 acres of single-family attached residential lots. Flows from this basin are collected through a series of small yard drains and conveyed through storm drains to LID B for water quality treatment. Sub-Basin B2 consists of 2.04 acres of attached single-family residential lots, attached garages, open space, and private drives. Flows from this basin are mainly conveyed along private drives to Sub-basin B3 where it is collected by an on-grade inlet and conveyed to LID B via storm drains. Sub-Basin B3 consists of 0.53 acres of attached single-family and apartment residential lots, and private drives. Flows from Sub-basin B2 are combined from this basin and collected by an on-grade inlet and conveyed via storm drains to LID B. 100% of the minor flows are collected within the on-grade inlet with major by-pass flow into Sub- basin D1. Sub-Basin B4 consists of 1.16 acres of apartment residential lots, detached garages, and private drives. Flows from this basin are collected by a sump inlet and conveyed to LID B via storm drains. Sub-Basin B5 consists of 1.11 acres of apartment residential lots, a portion of the recreational/clubhouse lot, and private drives. Flows from this basin are collected by a sump inlet and conveyed to LID B via storm drains. Page 8 Sub-Basin B6 consists of 0.82 acres of apartment residential lots, a portion of the recreational/clubhouse lot, and private drives. Flows from this basin are collected by an oversized inlet and conveyed to LID B via storm drains. This inlet is oversized to collect 100% of both the major and minor flows and is modeled as a sump inlet. Sub-Basin B7 consists of 3.07 acres of apartment residential lots, a portion of the recreational/clubhouse lot, open space, and private drives. Flows from this basin are collected by an on-grade inlet and conveyed to LID B via storm drains. 100% of the minor flows are collected within the on-grade inlet with major by-pass flow into Sub- basin D6. The major flows overtop the private drive centerline and are divided with Sub- Basin B3 flows for inlet sizing. Drainage Basin C comprises of 4.69 acres divided into 4 sub-basins. These basins drain to and are treated by the infiltration gallery LID C prior being conveyed and ultimate detained within Detention Pond 298c prior to being released offsite. Below are descriptions for the sub-basins within: Sub-Basin C1 consists of 0.97 acres of attached single-family residential lots, attached garages, open space, and private drives. Flows from this basin are collected by a sump inlet and conveyed to LID C via storm drains. Sub-Basin C2 consists of 0.42 acres of attached single-family residential lots, attached garages, open space, and private drives. Flows from this basin are collected by a sump inlet and conveyed to LID C via storm drains. Sub-Basin C3 consists of 0.49 acres of single-family attached residential lots. Flows from this basin are collected through a series of small yard drains and conveyed through storm drains to LID C for water quality treatment. Sub-Basin C4 consists of 2.81 acres of attached single-family residential lots, attached garages, open space, and private drives. Flows from this basin are collected by a sump inlet and conveyed to LID C via storm drains. Drainage Basin D comprises of 7.09 acres divided into 6 sub-basins. These basins drain to and are treated by the infiltration gallery LID D, with exception of Sub-basin D1, prior being conveyed and ultimate detained within Detention Pond 298c prior to being released offsite. Detention Pond 298b is within these basins and provided overflow detention volume when upstream pipe capacities are exceeded. Below are descriptions for the sub-basins within: Page 9 Sub-Basin D1 consists of 0.99 acres of single-family attached residential lots, and private drives. Flows from this basin are collected by an on-grade inlet and conveyed to Pond 298c via storm drains. 100% of the minor flows are collected within the on-grade inlet with major by-pass flow into Sub-basin E2. Sub-basin D1 is unable to be conveyed to LID D due to the necessary size of the main line storm drain that obstructs the ability to pipe while maintaining separation of offsite flows from the onsite flows into the LID facility. Sub-Basin D2 consists of 1.59 acres of apartment residential lots, detached garages, and private drives. Flows from this basin are collected by a sump inlet and conveyed to LID D via storm drains. Sub-Basin D3 consists of 1.12 acres of apartment residential lots, and private drives. Flows from this basin are collected by a sump inlet and conveyed to LID D via storm drains. Sub-Basin D4 consists of 0.47 acres of apartment residential lots, and private drives. Flows from this basin are collected by an oversized inlet and conveyed to LID D via storm drains. This inlet is oversized to collect 100% of both the major and minor flows and is modeled as a sump inlet. Sub-Basin D5 consists of 0.39 acres of open space and Detention Pond 298b. Flows from this basin are collected by a grated manhole that conveys runoff directly to LID D. Sub-Basin D6 consists of 2.52 acres of apartment residential lots, a portion of the recreational/clubhouse lot, open space, and private drives. Flows from this basin are collected by an on-grade inlet and conveyed to LID B via storm drains. 100% of the minor flows are collected within the on-grade inlet with major by-pass flow into Sub- basin E3. The major flows overtop the private drive centerline and are divided with Sub- Basin D1 flows for inlet sizing. Drainage Basin E comprises of 8.43 acres divided into 8 sub-basins and include Detention Pond 298c. These basins drain to and are treated by standard water quality within Detention Pond 298c prior to being released offsite. Below are descriptions for the sub-basins within: Sub-Basin E1 consists of 1.01 acres of commercial area and private drives. Runoff from this basin is collected by an oversized inlet and conveyed to directly to Pond 298c via a storm drain. This inlet is oversized to collect 100% of both the major and minor flows and is modeled as a sump inlet. Page 10 Sub-Basin E2 consists of 2.01 acres of commercial area, single-family attached residential lots, open space, and private drives. Runoff from this basin, along with bypass flows from Sub-basin D1, are collected by a sump inlet and conveyed to Pond 298c via storm drains. Sub-Basin E3 consists of 1.53 acres of mixed use, apartment residential area, and private drives. Runoff from this basin, along with bypass flows from Sub-basin D6, are collected by a sump inlet and conveyed to Pond 298c via storm drains. Sub-Basin E4 consists of 0.60 acres of commercial area, and the north portion of Pond 298c. Sub-Basin E5 consists of 0.57 acres of mixed use, single-family attached lots, and private drives. Runoff from this basin is collected by a sump inlet and conveyed directly to Pond 298c via a storm drain. Sub-Basin E6 consists of 0.62 acres of apartment residential area, and private drives. Runoff from this basin is collected by a sump inlet and conveyed directly to Pond 298c via a storm drain. Sub-Basin E7 consists of 1.06 acres of apartment residential area, detached garages, and private drives. Runoff from this basin is collected by a sump inlet and conveyed directly to Pond 298c via a storm drain. Sub-Basin E8 consists of 1.03 acres of single-family residential lots, and the south portion of Pond 298c. Page 11 DRAINAGE FACILITY DESIGN DRAINAGE CONVEYANCE DESIGN Storm infrastructure to convey runoff will include concrete trickle pans, inlets, storm sewer and culverts. Stormwater detention and water quality enhancement will be achieved using extended detention and low impact development (LID). Storm inlets, storm sewers and the roadway culverts are appropriately sized to convey major and minor storms to the water quality and detention facilities. DETENTION/WATER QUALITY POND DESIGN EPA SWMM 5.2 was utilized to confirm the detention pond sizing and 100-yr release rates. During the final drainage design, it was determined that the previously described Scenario 2 provided the most effective use of the detention ponds and provided volumes. The detention ponds have been designed to provide the necessary detention for onsite and offsite runoff volumes to limit the overall release rate to the allowed 20.1 cfs. The outfall for the site is an existing 30-inch storm drain that conveys stormwater east under Ziegler Road. The ultimate outfall will be the existing HP Harmony Campus storm channel system, which ultimately flows into the Cache La Poudre River. EPA SWWM was utilized for the final detention and managing outfall release rate. Detention Pond 298a is located in the northwest corner of site and is graded to provide approximately 11.7 acre-ft of detention volume. All offsite runoff is directed and detained within this pond. The SWMM models from FRV and Affinity were provided and reviewed to acquire the offsite flow hydrograph for detention pond sizing. The calibrated SWMM from Affinity provided a higher runoff peak rate than the Front Range Village (FRV) model and was utilized for the offsite flows from Pond 286 into the proposed Pond 298a. The hydrograph from Affinity’s Pond 598 was also utilized for the offsite flows into the proposed Pond 298a. These offsite flows combined with the runoff from the proposed Basin A1 produce a 100-yr peak flow of 150.88 cfs, detained to a peak release rate of 37.54 cfs. All released flows are conveyed to Pond 298c that detains flows to the allowed release rate of 20.1 cfs. The timing of the peak inflow and release rate from Pond 298a is delayed from the peak runoff from the proposed basins from the Union Park development. Pond 298a provides 6.72 acre-ft of 100-yr detained onsite and offsite runoff volume. [Due to the unused storage volume of this pond, further discussion with the Owner will be held to consider removing a portion of the retaining walls and providing additional undulation of the pond side slopes.] Page 12 Detention Pond 298b is located in the middle of the site and is used to provide additional site detention in major storm events. The outlet, which is also the inlet for the LID facility, will be designed to surcharge during major storm events and provide approximate 0.42 acre-ft of detention storage. [A very limited amount of runoff volume surcharges into this pond. Further discussion with the Owner will be held and the retaining walls will likely be removed from this pond.] Detention Pond 298c is located along the east side of the site, adjacent to Ziegler Road. This pond will provide a combined standard water quality treatment volume, for the basins not being treated by a LID feature, and the detained 100-yr runoff volume, released at the allowed 20.1 cfs release rate. The peak inflow rate into this pond is 185.07 cfs and provides 3.86 acre-ft of storage combined with 0.24 acre-ft of water quality capture volume. Reference the appendix for estimated calculations and the drainage plan. Page 13 LOW IMPACT DEVELOPMENT The City of Fort Collins updated the Low Impact Development ordinance in 2016 (Ordinance No. 007, 2016) to require: • Treat at least 75% of any newly developed or redeveloped impervious area using one or a combination of LID techniques, or • Treat at least 50% of any newly developed or redeveloped impervious area using one or a combination of LID techniques when 25% of private drivable surfaces are permeable. To satisfy the required implementation of Low Impact Development (LID), the Union Park property will utilize below-grade filtration galleries (ADS StormTech chamber system). Other LID techniques were explored, but due to the limited grade available and the amount of detention volume required, shallow filtration galleries assisted in maintaining storm drain grades and detention volumes. Pavers within the private drives did not treat enough contributing areas to justify their use. Filtration galleries will promote filtration while capturing fine sediment that drains off the impervious areas. Isolator rows will be implemented at the headworks to the filtration galleries to allow larger sediment particles to settle before entering the gallery. The isolator rows will be accessible to remove sediments. A Standard Operations Procedure will be provided at the final design to ensure these BMPs adequately perform over time. The impervious area was calculated in each drainage basin. Basins B, C, and D will be treated utilizing filtration chambers (LID), resulting in 70.2% of the developed impervious area being treated using LID best practices. This is a slight reduction in LID treatment area due to the inability to treat Sub-Basin D1. Sub-basin D1 is unable to be conveyed to LID D due to the necessary size of the main line storm drain that obstructs the ability to pipe while maintaining separation of offsite flows from the onsite flows into the LID facility. Sub-Basin D1 is included in determining the required water quality treatment volume within Pond 298c. The remaining impervious area within Basin E, along with Sub-basin D1, will be treated using an extended dry detention pond (Pond 298c) with a 40-hour drain time of the WQCV. The water quality treatment provided by LID practices is slightly below the required 75% impervious area treatment. Consideration of the disconnected impervious areas, roof and walks that drain to landscape areas prior to being directed to storm drains, is requested as additional treatments. Page 14 Below is a description of the 4-step process for selecting structural BMPs: Urban Drainage and Flood Control District (UDFCD) recommends a Four Step Process for receiving water protection that focuses on reducing runoff volumes, treating the water quality capture volume (WQCV), stabilizing drainage ways, and implementing long-term source controls. The Four Step Process applies to manage more minor, frequently occurring events. Step 1: Employ Runoff Reduction Practices To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement Low Impact Development (LID) strategies, including Minimizing Directly Connected Impervious Areas (MDCIA). Captured runoff from strategic areas are routed through below grade filtration galleries, bioretention pond/rain gardens, and/or permeable pavers. Filtration galleries, rain gardens, and permeable pavers will slow runoff, promote filtration, and filter runoff prior to being released into the adjacent storm drain system. Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow Release The infiltration galleries, rain gardens, and permeable pavers are designed to provide water quality capture volume per Urban Drainage’s recommendations and calculations. The captured runoff is design for a 12-hr drain time. Step 3: Stabilize Drainageways Natural Drainageways are subject to bed and bank erosion due to increases in frequency, duration, rate, and volume of runoff during and following development. Because the site will drain to an existing storm system, bank stabilization is unnecessary with this project. Step 4: Implement Site Specific and Other Source Control BMPs Proactively controlling pollutants at their source by preventing pollution rather than removing contaminants once they have entered the stormwater system or receiving waters is important when protecting storm systems and receiving waters. This can be accomplished through site- specific needs such as construction site runoff control, post-construction runoff control, and pollution prevention / good housekeeping. It will be the contractor’s responsibility to develop a procedural best management practice for the site. Page 15 STORMWATER POLLUTION PREVENTION Erosion and sedimentation can be controlled on-site by use of sediment control logs, inlet protection, a gravel construction entrance, seeding, mulch, and turf. The measures are designed to limit the overall sediment yield increase due to construction as required by the City of Fort Collins. During overlot and final grading the soil will be roughened and furrowed perpendicular to the prevailing winds. During the performance of the work required by these specifications or any operations appurtenant thereto, whether on right-of-way provided by the City or elsewhere, the contractor shall furnish all labor, equipment, materials, and means required. The Contractor shall conduct proper efficient measures wherever and as necessary to reduce dust nuisance, and to prevent dust nuisance that has originated from his operations from damaging crops, orchards, cultivated fields, and dwellings or causing a nuisance to persons. The Contractor will be held liable for any damage from dust originating from his operations under these specifications on a right-of-way or elsewhere. It is unlawful to track or cause to be tracked mud or other debris onto city streets or rights-of- way. Wherever construction vehicles access routes or intersect paved public roads, provisions must be made to minimize sediment transport by runoff or vehicles tracking onto the paved surface. Stabilized construction entrances are required with base material consisting of 6” coarse aggregate. The contractor will be responsible for clearing mud tracked onto city streets daily. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to ensure the continued performance of their intended function. Silt fence and sediment control logs will require periodic replacement. Maintenance is the responsibility of the contractor. All disturbed areas must be seeded and mulched within 30 days of the project’s start. Vegetation shall not be considered established until a ground cover is achieved, which is demonstrated to be mature enough to control soil erosion to the satisfaction of the City Inspector and to survive severe weather conditions. Page 16 CONCLUSIONS This Final Drainage Report for the Union Park property has been prepared to comply with the stormwater criteria set by the City of Fort Collins. The proposed development’s drainage system is designed to convey the developed peak storm water runoff through the site to the existing storm drain system and to the development’s detention, water quality, and LID facilities. Storm drains are sized to provide the required roadway relief in both the 2-yr and 100-yr storm events, and to adequately convey the released runoff from the detention ponds disbursed throughout the site. Overland relief will be provided at all sump locations. The calculated 100-yr peak flows released from the Union Park property adheres to the allowed rates as established in the Front Range Village & Affinity Fort Collins drainage studies. This final drainage report anticipates the implementation of best management practices for erosion control, temporary and permanent, and on-site construction facilities. It can therefore be concluded that the development of the Union Park property will comply with the stormwater jurisdictional criteria and will not adversely affect the adjacent properties, streets, storm drain system and/or detention/water quality facilities. Controlling the developed runoff from these improvements will improve the current situation currently existing on the site. Page 17 REFERENCES 1. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3), Mile High Flood District, Revised August 2018. 2. Fort Collins Stormwater Criteria Manual, Fort Collins Utilities, City of Fort Collins, Colorado, Dated November 2018 3. “Final Drainage Report for Affinity Fort Collins,” prepared by JR Engineering, LLC, Dated March 2, 2016. 4. “Final Drainage and Erosion Control Study for Front Range Village, Fort Collins, Colorado,” Prepared by Stantec Consulting, Inc., dated February 2007. 5. “Preliminary Geotechnical Subsurface Exploration Report Proposed Ziegler-Corbett Mixed-Use Development” Prepared by Soilogic, Inc., dated April 4, 2022. Page 18 APPENDIX Appendix A – Site Vicinity Map & References Appendix B – SWMM Input/Output Appendix C – Rational Calculations Appendix D – Detention Pond Calculations Appendix E – Street Capacity & Inlet Calculations Appendix F – Conveyance Element Sizing Appendix G – Low Impact Development Calculations Appendix A APPENDIX A – SITE VICINITY MAP & REFERENCES ZI E G L E R R D E. HARMONY RD PADDINGTON RD CO R B E T T D R KI N G S L E Y D R SITE Vicinity Map Scale: 1" = 1000' PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK #14-94 NORTHWEST CORNER OF HEWLETT PACKARD PROPERTY ON EAST SIDE ZIEGLER RD., ON THE NORTHWEST CORNER OF THE CONCRETE BASE OF A NATURAL GAS UNIT HOUSING. ELEV= 4927.83 CITY OF FORT COLLINS BENCHMARK #6-07 SOUTHEAST CORNER OF HARMONY RD. AND ZIEGLER RD. 50 FEET +/- SOUTH OF THE EDGE OF ASPHALT ON THE WALL OF A CONCRETE IRRIGATION DROP STRUCTURE. ELEV= 4931.08 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATIONS SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4927.83 (NAVD88 DATUM) - 3.19' NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) = 4931.08 (NAVD88 DATUM) - 3.19' PRELIMINARY GEOTECHNICAL SUBSURFACE EXPLORATION REPORT PROPOSED ZIEGLER-CORBETT MIXED-USE DEVELOPMENT 4105 ZIEGLER ROAD, FORT COLLINS, COLORADO SOILOGIC # 22-1062 April 4, 2022 Soilogic, Inc. 3522 Draft Horse Court • Loveland, CO 80538 • (970) 535-6144 April 4, 2022 Landmark Homes 6341 Fairgrounds Avenue, Suite 100 Windsor, Colorado 80550 Attn: Mr. Andrew Quest Re: Preliminary Geotechnical Subsurface Exploration Report Proposed Ziegler-Corbett Mixed-Use Development Larimer County Parcel #’s 8732400010, 8732400009 and 8732000002 4105 Ziegler Road, Fort Collins, Colorado Soilogic Project # 22-1062 Mr. Quest: Soilogic, Inc. (Soilogic) personnel have completed the preliminary geotechnical subsurface exploration you requested for the proposed mixed-use development to be constructed on a combined property consisting of Larimer County Parcel Numbers 8732400010, 8732400009 and 8732000002, located at 4105 Ziegler Road in Fort Collins, Colorado. The results of our subsurface exploration and pertinent geotechnical engineering recommendations are included with this report. In summary, approximately 4 to 6 inches of vegetation and topsoil was encountered at the surface at the boring locations, underlain by brown/beige/rust lean clay with varying amounts of sand which varied to clayey sand in places. The apparently-natural lean clay/ clayey sand varied from soft to hard in terms of consistency or from very loose to medium dense in terms of relative density, typically exhibited no to low swell potential at in-situ moisture and density conditions (however one sample of sandy lean clay obtained from boring B-2 at a depth of about 9 feet below ground surface exhibited moderate swell potential) and extended to the bottom of each of the borings at a depth of approximately 15 feet below present site grades. Groundwater was not encountered in borings B-1, B-2, B-3 or B-5 to the depths explored (about 15 feet below ground surface), but was measured at a depth of about 15 feet below ground surface in boring B-4 when checked immediately after completion of drilling. When checked about five (5) days after drilling, borings B-1, B-2 and B-5 remained dry to the approximate depth explored, while groundwater was measured at a depth of about 14 Preliminary Geotechnical Subsurface Exploration Report Proposed Ziegler-Corbett Mixed-Use Development 4105 Ziegler Road, Fort Collins, Colorado Soilogic # 22-1062 4 from boring B-2 at a depth of about 9 feet below ground surface exhibited moderate swell potential) and extended to the bottom of each of the borings at a depth of approximately 15 feet below present site grades. The stratigraphy indicated on the included boring logs represents the approximate location of changes in soil types. Actual changes may be more gradual than those indicated. Groundwater was not encountered in borings B-1, B-2, B-3 or B-5 to the depths explored (about 15 feet below ground surface), but was measured at a depth of about 15 feet below ground surface in boring B-4 when checked immediately after completion of drilling. When checked about five (5) days after drilling, borings B-1, B-2 and B-5 remained dry to the approximate depth explored, while groundwater was measured at a depth of about 14 feet below ground surface at the locations of borings B-3 and B-4 at that time. Groundwater information is indicated in the upper right-hand corner of the attached boring logs. Groundwater levels will vary seasonally and over time based on weather conditions, site development, irrigation practices and other hydrologic conditions. Perched and/or trapped groundwater conditions may also be encountered at times throughout the year. Perched water is commonly encountered in soils overlying less permeable soil layers and/or bedrock. Trapped water is typically encountered within more permeable zones of layered soil and bedrock systems. The location and amount of perched/trapped water can also vary over time. ANALYSIS AND RECOMMENDATIONS General Based on the subsurface conditions encountered in the completed site borings, results of field and laboratory testing and type of construction anticipated, we expect relatively lightly-loaded commercial/retail and residential structures could be constructed with conventional footing foundations and floor slabs bearing on natural site lean clay/clayey sand with no to low swell potential or a suitable zone of properly moisture conditioned Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/1/2021 Page 1 of 4 44 8 6 3 6 0 44 8 6 4 2 0 44 8 6 4 8 0 44 8 6 5 4 0 44 8 6 6 0 0 44 8 6 6 6 0 44 8 6 7 2 0 44 8 6 3 6 0 44 8 6 4 2 0 44 8 6 4 8 0 44 8 6 5 4 0 44 8 6 6 0 0 44 8 6 6 6 0 44 8 6 7 2 0 497700 497760 497820 497880 497940 498000 498060 498120 498180 498240 498300 497700 497760 497820 497880 497940 498000 498060 498120 498180 498240 498300 40° 31' 53'' N 10 5 ° 1 ' 3 8 ' ' W 40° 31' 53'' N 10 5 ° 1 ' 1 1 ' ' W 40° 31' 39'' N 10 5 ° 1 ' 3 8 ' ' W 40° 31' 39'' N 10 5 ° 1 ' 1 1 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 100 200 400 600 Feet 0 40 80 160 240 Meters Map Scale: 1:2,940 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 16, Sep 2, 2021 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Aug 11, 2018—Aug 12, 2018 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/1/2021 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 73 Nunn clay loam, 0 to 1 percent slopes C 26.6 91.7% 74 Nunn clay loam, 1 to 3 percent slopes C 2.4 8.3% Totals for Area of Interest 29.0 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/1/2021 Page 3 of 4 Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/1/2021 Page 4 of 4 Union Park Site Flow Rate to Union Park site from Affinity=116.0 cfs Union Park Site Affinity Pond D 100-yr Overflow = 116.0 cfs TRACT H FRONT RANGE VILLAGE LOT 11 FRONT RANGE VILLAGE LOT 16 FRONT RANGE VILLAGE LOT 12 FRONT RANGE VILLAGE TRACT B ENGLISH RANCH SOUTH P.U.D. ENGLISH RANCH SOUTH HOA PARCEL #8732100001 BARTRAN FAMILY LLC. TRACT A ENGLISH RANCH SOUTH P.U.D. ENGLISH RANCH SOUTH HOAENGLISH RANCH SOUTH P.U.D. THIRD FILING LOT 1 AFFINITY SUBDIVISION LOT 15 FRONT RANGE VILLAGE ENGLISH RANCH SOUTH P.U.D. CO R B E T T D R I V E PAD D I N G T O N R O A D CA R R I C K R O A D ED M O N D S RO A D ZI E G L E R R O A D (R O W V A R I E S ) KINGSLEY COURT NEWBURY COURT HARRINGTON COURT PARCEL 2 3.879± acres PARCEL 1 27.430± acres PROPOSED DETENTION POND 1 VOLUME PROVIDED=10.7± ACRE-FT 2.4± SURFACE ACRES AVAILABLE WATER CONNECTION AVAILABLE WATER CONNECTION AVAILABLE WATER CONNECTION AVAILABLE SANITARY OUTFALL AVAILABLE SANITARY OUTFALL AREA OF INADVERTENT DETENTION 7.5± ACRE-FT LOT 10 FRONT RANGE VILLAGE INADVERTENT DETENTION SPILL LOCATION OFFSITE AFFINITY SPILL LOCATION FULL MOVEMENT ACCESS (SIGNALIZED) BIKE & PEDESTRIAN ACCESS ONLY PARCEL 3 1.466± acres STORM DRAIN OUTFALL (CONNECT TO EX) PROPOSED DETENTION POND 2 VOLUME PROVIDED=5.6± ACRE-FT 1.4 ± SURFACE ACRES HIDDEN POND DRIVE RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 1 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) ZI E G L E R - C O R B E T T AM E N D E D O V E R A L L D E V E L O P M E N T P L A N MA S T E R U T I L I T Y & O V E R A L L D R A I N A G E P L A N 11/11/22 1" = 80' N/A JTC JTC 21-1044-00 ODP 1 1 N W E S 0 SCALE: 1" = 80' 160804080 NOTES 1.TOTAL SITE AREA IS 32.78± ACRES. 2.BOUNDARY, UTILITY AND TOPOGRAPHICAL INFORMATION PROVIDED BY ALTA LAND TITLE SURVEY PREPARED BY MAJESTIC SURVEYING, DATED 9-24-21. 3.PROJECT VERTICAL DATUM IS ON NAVD88. 4.WATER SERVICE TO BE PROVIDED BY THE CITY OF FORT COLLINS UTILIZING MAIN WITHIN CORBETT DRIVE AND ZIEGLER ROAD. 5.SEWER SERVICE TO BE PROVIDED BY THE CITY OF FORT COLLINS UTILIZING 30" MAIN ALONG THE WEST SIDE OF ZIEGLER ROAD AND/OR THE 8" MAIN ALONG EAST SIDE OF CORBETT DRIVE. 6.STORMWATER OUTFALL PROVIDED BY THE EXISTING 24" STORM DRAIN STUB, IN COMBINATION WITH ADEQUATELY SIZED SPILLWAYS. 7.ALL POINTS OF ACCESS, POINTS OF UTILITY CONNECTIONS, AND STORMWATER DETENTION LOCATIONS ARE CONCEPTUAL AND ARE SUBJECT TO CHANGE WITH SUBSEQUENT PROJECT DEVELOPMENT APPLICATIONS. Ziegler-Corbett Inadvertent Detention Volume Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Stage Storage Volume (pond volume calculated using the prismoidal formula): CONTOUR (FT)AREA (FT2) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE-FT) 4925.00 0 0.00 0.00 0.00 0.00 4926.00 3144 0.07 0.02 1.00 0.02 4927.00 164156 3.77 1.45 2.00 1.48 4928.00 377427 8.66 6.05 3.00 7.53 J.Claeys Highland Development 21-1044-00 November 9, 2022 *Inadvertant spill elevation = 4928.00 ft Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, Revised August 2018 () 3 2121 DepthAAAAV++= 21-1044-00 Inadvertant Detention.xls Page 1 of 1 Highland Development Services Appendix B APPENDIX B – SWMM INPUT / OUTPUT A1 B1+...+D6 E1+...+E8 02 03 05 06 07 01 04 Pond_596 Pond_286 Outlet-02 SDMH-07 Outlet-01 Pond_298a Pond_298b Pond_298c CoFC_100-yr 03/25/2024 00:05:00 Union Park - 100-yr SWMM SWMM 5.2 Page 1 Union Park - 100-yr.inp [TITLE] ;;Project Title/Notes Union Park - 100-yr SWMM J.Claeys 4/10/24 [OPTIONS] ;;Option Value FLOW_UNITS CFS INFILTRATION HORTON FLOW_ROUTING DYNWAVE LINK_OFFSETS DEPTH MIN_SLOPE 0 ALLOW_PONDING NO SKIP_STEADY_STATE NO START_DATE 03/25/2024 START_TIME 00:00:00 REPORT_START_DATE 03/25/2024 REPORT_START_TIME 00:00:00 END_DATE 03/26/2024 END_TIME 00:00:00 SWEEP_START 01/01 SWEEP_END 12/31 DRY_DAYS 0 REPORT_STEP 00:05:00 WET_STEP 00:05:00 DRY_STEP 00:05:00 ROUTING_STEP 0:01:00 RULE_STEP 00:00:00 INERTIAL_DAMPING PARTIAL NORMAL_FLOW_LIMITED BOTH FORCE_MAIN_EQUATION H-W VARIABLE_STEP 0.75 LENGTHENING_STEP 0 MIN_SURFAREA 12.566 MAX_TRIALS 8 HEAD_TOLERANCE 0.005 SYS_FLOW_TOL 5 LAT_FLOW_TOL 5 MINIMUM_STEP 0.5 THREADS 1 [EVAPORATION] ;;Data Source Parameters ;;-------------- ---------------- CONSTANT 0.0 DRY_ONLY NO [RAINGAGES] Page 1 Union Park - 100-yr.inp ;;Name Format Interval SCF Source ;;-------------- --------- ------ ------ ---------- CoFC_100-yr INTENSITY 0:05 1.0 TIMESERIES CoFC_100-yr [SUBCATCHMENTS] ;;Name Rain Gage Outlet Area %Imperv Width %Slope CurbLen SnowPack ;;-------------- ---------------- ---------------- -------- -------- -------- -------- -------- ---------------- A1 CoFC_100-yr Pond_298a 2.56 5.3 397 2.6 0 B1+...+D6 CoFC_100-yr SDMH-07 20.77 73.6 1369 0.42 0 E1+...+E8 coFC_100-yr Pond_298c 8.43 64.7 917 0.5 0 [SUBAREAS] ;;Subcatchment N-Imperv N-Perv S-Imperv S-Perv PctZero RouteTo PctRouted ;;-------------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- A1 0.016 0.025 0.1 0.3 1 OUTLET B1+...+D6 0.016 0.025 0.1 0.3 1 OUTLET E1+...+E8 0.016 0.025 0.1 0.3 1 OUTLET [INFILTRATION] ;;Subcatchment Param1 Param2 Param3 Param4 Param5 ;;-------------- ---------- ---------- ---------- ---------- ---------- A1 0.51 0.5 6.48 7 0 B1+...+D6 0.51 0.50 6.48 7 0 E1+...+E8 0.51 0.50 6.48 7 0 [JUNCTIONS] ;;Name Elevation MaxDepth InitDepth SurDepth Aponded ;;-------------- ---------- ---------- ---------- ---------- ---------- ;Affinity Release Rate Pond_596 4929.90 7.1 0 0 0 ;FRV Pond 286 Overflow Pond_286 4937.85 0 0 0 0 Outlet-02 4926.50 10.5 0 0 0 SDMH-07 4923.87 7.01 0 0 0 [OUTFALLS] ;;Name Elevation Type Stage Data Gated Route To ;;-------------- ---------- ---------- ---------------- -------- ---------------- Outlet-01 4922.35 FREE NO [STORAGE] ;;Name Elev. MaxDepth InitDepth Shape Curve Type/Params SurDepth Fevap Psi Ksat IMD ;;-------------- -------- ---------- ----------- ---------- ---------------------------- --------- -------- -------- -------- Pond_298a 4926.50 10.5 0 TABULAR POND_298a 0 0 Pond_298b 4928.90 2.45 0 TABULAR Pond_298b 0 0 Pond_298c 4922.35 7.65 0 TABULAR POND_298c 0 0 [CONDUITS] ;;Name From Node To Node Length Roughness InOffset OutOffset InitFlow MaxFlow ;;-------------- ---------------- ---------------- ---------- ---------- ---------- ---------- ---------- ---------- 02 SDMH-07 Pond_298c 454 0.012 0 0 0 0 Page 2 Union Park - 100-yr.inp 03 Outlet-02 SDMH-07 1023 0.012 0 0 0 0 05 Pond_596 Pond_298a 64 0.012 0 1.9 0 0 06 Pond_286 Pond_298a 50 0.020 0 0 0 0 07 SDMH-07 Pond_298b 400 0.01 0 0 0 0 [ORIFICES] ;;Name From Node To Node Type Offset Qcoeff Gated CloseTime ;;-------------- ---------------- ---------------- ------------ ---------- ---------- -------- ---------- ;17" Orifice 01 Pond_298c Outlet-01 SIDE 0 0.65 NO 0 ;12" Orifice 04 Pond_298a Outlet-02 SIDE 0 0.65 NO 0 [XSECTIONS] ;;Link Shape Geom1 Geom2 Geom3 Geom4 Barrels Culvert ;;-------------- ------------ ---------------- ---------- ---------- ---------- ---------- ---------- 02 CIRCULAR 5 0 0 0 1 03 CIRCULAR 48 0 0 0 1 05 CIRCULAR 1 0 0 0 1 06 TRAPEZOIDAL 2 100 4 4 1 07 CIRCULAR 1 0 0 0 1 01 CIRCULAR 1.4167 0 0 0 04 CIRCULAR 1 0 0 0 [INFLOWS] ;;Node Constituent Time Series Type Mfactor Sfactor Baseline Pattern ;;-------------- ---------------- ---------------- -------- -------- -------- -------- -------- Pond_596 FLOW POND_596 FLOW 1.0 1.0 Pond_286 FLOW POND_286 FLOW 1.0 1.0 [CURVES] ;;Name Type X-Value Y-Value ;;-------------- ---------- ---------- ---------- POND_298a Storage 0.0 0 POND_298a 0.5 1582 POND_298a 1.5 16848 POND_298a 2.5 42452 POND_298a 3.5 55814 POND_298a 4.5 61829 POND_298a 5.5 63775 POND_298a 6.5 66216 POND_298a 7.5 73768 POND_298a 8.5 83670 POND_298a 9.5 90558 POND_298a 10.5 96883 ; POND_298c Storage 0.00 0 POND_298c 0.65 4205 POND_298c 1.65 17640 POND_298c 2.65 22935 POND_298c 3.65 24919 Page 3 Pond Outlet Orifice Sizes Union Park - 100-yr.inp POND_298c 4.65 34586 POND_298c 5.65 40193 POND_298c 6.65 45535 POND_298c 7.65 49980 ; Pond_298b Storage 0.00 0.00 Pond_298b 0.10 26 Pond_298b 1.10 8359 Pond_298b 2.10 12922 Pond_298b 2.45 13440 [TIMESERIES] ;;Name Date Time Value ;;-------------- ---------- ---------- ---------- ;Pond 286 Spill From Affinity Model POND_286 0:05 0.00 POND_286 0:10 0.00 POND_286 0:15 0.00 POND_286 0:20 0.00 POND_286 0:25 0.00 POND_286 0:30 0.00 POND_286 0:35 0.00 POND_286 0:40 0.00 POND_286 0:45 0.00 POND_286 0:50 0.00 POND_286 0:55 0.00 POND_286 1:00 94.77 POND_286 1:05 147.00 POND_286 1:10 141.31 POND_286 1:15 112.13 POND_286 1:20 87.37 POND_286 1:25 67.06 POND_286 1:30 54.96 POND_286 1:35 48.09 POND_286 1:40 44.16 POND_286 1:45 41.94 POND_286 1:50 40.65 POND_286 1:55 39.89 POND_286 2:00 39.35 POND_286 2:05 34.04 POND_286 2:10 23.79 POND_286 2:15 16.06 POND_286 2:20 10.91 POND_286 2:25 7.73 POND_286 2:30 5.38 POND_286 2:35 3.51 POND_286 2:40 2.24 POND_286 2:45 1.39 POND_286 2:50 0.82 POND_286 2:55 0.43 POND_286 3:00 0.18 Page 4 Union Park - 100-yr.inp POND_286 3:05 0.02 POND_286 3:10 0.00 POND_286 3:15 0.00 POND_286 3:20 0.00 POND_286 3:25 0.00 POND_286 3:30 0.00 POND_286 3:35 0.00 POND_286 3:40 0.00 POND_286 3:45 0.00 POND_286 3:50 0.00 POND_286 3:55 0.00 POND_286 4:00 0.00 ; ;Affinity Release POND_596 0:05 0.00 POND_596 0:10 0.02 POND_596 0:15 0.06 POND_596 0:20 0.15 POND_596 0:25 0.25 POND_596 0:30 0.38 POND_596 0:35 1.53 POND_596 0:40 1.73 POND_596 0:45 1.84 POND_596 0:50 1.90 POND_596 0:55 1.95 POND_596 1:00 1.98 POND_596 1:05 2.00 POND_596 1:10 2.01 POND_596 1:15 2.02 POND_596 1:20 2.02 POND_596 1:25 2.03 POND_596 2:00 2.03 POND_596 2:05 2.02 POND_596 2:20 2.02 POND_596 2:25 2.01 POND_596 2:35 2.01 POND_596 2:40 2.00 POND_596 2:50 2.00 POND_596 2:55 1.99 POND_596 3:00 1.99 POND_596 3:30 1.97 POND_596 4:00 1.94 POND_596 4:30 1.92 POND_596 5:00 1.89 POND_596 5:30 1.87 POND_596 6:00 1.84 POND_596 6:30 1.82 POND_596 7:00 1.79 POND_596 7:30 1.76 POND_596 8:00 1.73 POND_596 8:30 1.69 Page 5 Union Park - 100-yr.inp POND_596 9:00 1.66 POND_596 9:30 1.61 POND_596 10:00 1.56 POND_596 10:30 1.51 POND_596 11:00 1.42 POND_596 11:30 1.13 POND_596 12:00 0.90 POND_596 12:30 0.70 POND_596 13:00 0.54 POND_596 13:30 0.42 POND_596 14:00 0.38 POND_596 14:30 0.37 POND_596 15:00 0.36 POND_596 15:30 0.34 POND_596 16:00 0.33 POND_596 16:30 0.32 POND_596 17:00 0.31 POND_596 17:30 0.30 POND_596 18:00 0.29 POND_596 18:30 0.28 POND_596 19:00 0.26 POND_596 19:30 0.25 POND_596 20:00 0.24 POND_596 20:30 0.22 POND_596 21:00 0.21 POND_596 21:30 0.19 POND_596 22:00 0.16 POND_596 22:30 0.16 POND_596 23:00 0.14 POND_596 23:30 0.12 POND_596 24:00 0.10 ; ;CoFC Rainfall Data CoFC_100-yr 0:05 1.00 CoFC_100-yr 0:10 1.14 CoFC_100-yr 0:15 1.33 CoFC_100-yr 0:20 2.23 CoFC_100-yr 0:25 2.84 CoFC_100-yr 0:30 5.49 CoFC_100-yr 0:35 9.95 CoFC_100-yr 0:40 4.12 CoFC_100-yr 0:45 2.48 CoFC_100-yr 0:50 1.46 CoFC_100-yr 0:55 1.22 CoFC_100-yr 1:00 1.06 CoFC_100-yr 1:05 1.00 CoFC_100-yr 1:10 0.95 CoFC_100-yr 1:15 0.91 CoFC_100-yr 1:20 0.87 CoFC_100-yr 1:25 0.84 CoFC_100-yr 1:30 0.81 Page 6 Union Park - 100-yr.inp CoFC_100-yr 1:35 0.78 CoFC_100-yr 1:40 0.75 CoFC_100-yr 1:45 0.73 CoFC_100-yr 1:50 0.71 CoFC_100-yr 1:55 0.69 CoFC_100-yr 2:00 0.67 [REPORT] ;;Reporting Options SUBCATCHMENTS ALL NODES ALL LINKS ALL [TAGS] [MAP] DIMENSIONS 0.000 0.000 2160.000 1440.000 Units None [COORDINATES] ;;Node X-Coord Y-Coord ;;-------------- ------------------ ------------------ Pond_596 149.781 1171.832 Pond_286 97.913 1002.352 Outlet-02 421.509 844.131 SDMH-07 1393.270 794.638 Outlet-01 1906.002 790.117 Pond_298a 308.731 1012.692 Pond_298b 1334.349 737.249 Pond_298c 1827.680 674.262 [VERTICES] ;;Link X-Coord Y-Coord ;;-------------- ------------------ ------------------ 02 1462.613 794.866 02 1625.248 823.950 02 1770.077 823.356 02 1770.077 787.149 02 1795.006 759.846 03 422.102 792.491 01 1836.555 763.407 01 1866.827 794.272 [Polygons] ;;Subcatchment X-Coord Y-Coord ;;-------------- ------------------ ------------------ A1 320.256 1122.033 B1+...+D6 1396.831 846.871 E1+...+E8 1831.317 626.067 ;;Storage Node X-Coord Y-Coord Page 7 Union Park - 100-yr.inp ;;-------------- ------------------ ------------------ Pond_298a 308.731 1012.692 Pond_298b 1334.349 737.249 Pond_298c 1827.680 674.262 [SYMBOLS] ;;Gage X-Coord Y-Coord ;;-------------- ------------------ ------------------ CoFC_100-yr 926.638 1235.251 [BACKDROP] FILE "Union Park - Overall DR.png" DIMENSIONS 0.000 0.000 2160.000 1440.000 Page 8 Time Series POND_286 Elapsed Time (hours) 43.532.521.510.50 140 120 100 80 60 40 20 0 Union Park - 100-yr SWMM 5.2 Page 1 Time Series POND_596 Elapsed Time (hours) 242220181614121086420 2 1.8 1.6 1.4 1.2 1 0.8 0.6 0.4 0.2 0 Union Park - 100-yr SWMM 5.2 Page 1 Union Park - 100-yr.rpt EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.3) ------------------------------------------------------------ Union Park - 100-yr SWMM J.Claeys 4/10/24 **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... DYNWAVE Surcharge Method ......... EXTRAN Starting Date ............ 03/25/2024 00:00:00 Ending Date .............. 03/26/2024 00:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:05:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 00:05:00 Routing Time Step ........ 60.00 sec Variable Time Step ....... YES Maximum Trials ........... 8 Number of Threads ........ 1 Head Tolerance ........... 0.005000 ft ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 9.711 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 1.235 0.467 Surface Runoff ........... 8.378 3.166 Final Storage ............ 0.173 0.065 Continuity Error (%) ..... -0.778 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Page 1 Union Park - 100-yr.rpt Wet Weather Inflow ....... 8.373 2.728 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 9.319 3.037 External Outflow ......... 17.690 5.765 Flooding Loss ............ 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.000 0.000 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.018 0.006 Continuity Error (%) ..... -0.091 *************************** Time-Step Critical Elements *************************** Link 05 (78.23%) Link 02 (12.35%) Link 06 (9.11%) ******************************** Highest Flow Instability Indexes ******************************** All links are stable. ********************************* Most Frequent Nonconverging Nodes ********************************* Convergence obtained at all time steps. ************************* Routing Time Step Summary ************************* Minimum Time Step : 0.93 sec Average Time Step : 10.16 sec Maximum Time Step : 60.00 sec % of Time in Steady State : 0.00 Average Iterations per Step : 2.03 % of Steps Not Converging : 0.33 Time Step Frequencies : 60.000 - 23.031 sec : 6.97 % 23.031 - 8.841 sec : 29.96 % 8.841 - 3.393 sec : 63.00 % 3.393 - 1.303 sec : 0.06 % 1.303 - 0.500 sec : 0.01 % *************************** Page 2 Union Park - 100-yr.rpt Subcatchment Runoff Summary *************************** ------------------------------------------------------------------------------------------------------------------------------ Total Total Total Total Imperv Perv Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Runoff Runoff Coeff Subcatchment in in in in in in in 10^6 gal CFS ------------------------------------------------------------------------------------------------------------------------------ A1 3.67 0.00 0.00 1.28 0.19 2.23 2.42 0.17 22.81 0.660 B1+...+D6 3.67 0.00 0.00 0.36 2.64 0.62 3.26 1.84 163.82 0.889 E1+...+E8 3.67 0.00 0.00 0.48 2.33 0.83 3.16 0.72 75.02 0.860 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- Pond_596 JUNCTION 0.72 3.54 4933.44 0 02:27 3.54 Pond_286 JUNCTION 0.01 0.15 4938.00 0 01:05 0.15 Outlet-02 JUNCTION 0.57 2.56 4929.06 0 02:08 2.55 SDMH-07 JUNCTION 1.43 5.19 4929.06 0 02:06 5.18 Outlet-01 OUTFALL 0.00 0.00 4922.35 0 00:00 0.00 Pond_298a STORAGE 2.50 6.77 4933.27 0 02:27 6.77 Pond_298b STORAGE 0.01 0.16 4929.06 0 02:09 0.15 Pond_298c STORAGE 2.24 6.68 4929.03 0 02:08 6.68 ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- Pond_596 JUNCTION 2.03 2.03 0 01:25 0.644 0.644 -0.490 Pond_286 JUNCTION 146.97 146.97 0 01:05 2.39 2.39 0.013 Outlet-02 JUNCTION 0.00 37.54 0 00:49 0 3.34 0.273 SDMH-07 JUNCTION 163.82 163.82 0 00:40 1.84 5.17 -0.174 Outlet-01 OUTFALL 0.00 20.10 0 02:08 0 5.76 0.000 Pond_298a STORAGE 22.81 150.88 0 01:05 0.168 3.21 0.071 Pond_298b STORAGE 0.00 0.11 0 01:56 0 0.0005 0.394 Pond_298c STORAGE 75.02 185.07 0 00:40 0.722 5.77 0.010 Page 3 Pond 100-yr Water Surface Elevations Union Park - 100-yr.rpt ********************** Node Surcharge Summary ********************** Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet --------------------------------------------------------------------- Pond_596 JUNCTION 8.30 2.540 3.560 ********************* Node Flooding Summary ********************* No nodes were flooded. ********************** Storage Volume Summary ********************** ------------------------------------------------------------------------------------------------ Average Avg Evap Exfil Maximum Max Time of Max Maximum Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft³ Full Loss Loss 1000 ft³ Full days hr:min CFS ------------------------------------------------------------------------------------------------ Pond_298a 73.704 12.2 0.0 0.0 292.892 48.4 0 02:27 9.09 Pond_298b 0.000 0.0 0.0 0.0 0.016 0.1 0 02:09 0.10 Pond_298c 38.910 18.2 0.0 0.0 168.106 78.5 0 02:08 20.10 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg Max Total Freq Flow Flow Volume Outfall Node Pcnt CFS CFS 10^6 gal ----------------------------------------------------------- Outlet-01 99.92 8.07 20.10 5.764 ----------------------------------------------------------- System 99.92 8.07 20.10 5.764 ******************** Link Flow Summary Page 4 Pond 298 Peak Release Rate Pond Storage Volumes: 298a → 6.72 ac-ft 298b → 0.00 ac-ft 298c → 3.86 ac-ft Union Park - 100-yr.rpt ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- 02 CONDUIT 117.06 0 00:41 7.48 0.72 1.00 03 CONDUIT 35.61 0 00:49 1.81 0.00 0.08 05 CONDUIT 3.14 0 09:34 6.78 0.53 1.00 06 CONDUIT 146.95 0 01:05 1.31 0.01 0.54 07 CONDUIT 0.11 0 01:56 0.24 0.02 0.58 01 ORIFICE 20.10 0 02:08 1.00 04 ORIFICE 9.09 0 06:19 1.00 *************************** Flow Classification Summary *************************** ------------------------------------------------------------------------------------- Adjusted ---------- Fraction of Time in Flow Class ---------- /Actual Up Down Sub Sup Up Down Norm Inlet Conduit Length Dry Dry Dry Crit Crit Crit Crit Ltd Ctrl ------------------------------------------------------------------------------------- 02 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.48 0.00 03 1.00 0.00 0.00 0.00 0.99 0.00 0.00 0.00 0.75 0.00 05 1.00 0.00 0.00 0.00 0.57 0.02 0.00 0.41 0.18 0.00 06 1.00 0.00 0.90 0.00 0.10 0.00 0.00 0.00 0.96 0.00 07 1.00 0.00 0.81 0.00 0.18 0.00 0.00 0.00 0.90 0.00 ************************* Conduit Surcharge Summary ************************* ---------------------------------------------------------------------------- Hours Hours --------- Hours Full -------- Above Full Capacity Conduit Both Ends Upstream Dnstream Normal Flow Limited ---------------------------------------------------------------------------- 02 1.10 1.10 4.86 0.01 0.01 05 8.26 8.26 12.01 0.01 0.01 06 0.01 0.01 23.02 0.01 0.01 07 0.01 0.01 22.45 0.01 0.01 Analysis begun on: Sun Apr 7 15:19:28 2024 Analysis ended on: Sun Apr 7 15:19:28 2024 Total elapsed time: < 1 sec Page 5 Table - Node Outlet-01 Total Inflow Date Time (CFS) 03/25/2024 00:05:00 0.00 03/25/2024 00:10:00 0.01 03/25/2024 00:15:00 0.33 03/25/2024 00:20:00 1.48 03/25/2024 00:25:00 3.77 03/25/2024 00:30:00 7.10 03/25/2024 00:35:00 10.14 03/25/2024 00:40:00 14.18 03/25/2024 00:45:00 17.19 03/25/2024 00:50:00 18.26 03/25/2024 00:55:00 18.66 03/25/2024 01:00:00 19.02 03/25/2024 01:05:00 19.18 03/25/2024 01:10:00 19.35 03/25/2024 01:15:00 19.48 03/25/2024 01:20:00 19.58 03/25/2024 01:25:00 19.67 03/25/2024 01:30:00 19.74 03/25/2024 01:35:00 19.81 03/25/2024 01:40:00 19.87 03/25/2024 01:45:00 19.92 03/25/2024 01:50:00 19.97 03/25/2024 01:55:00 20.01 03/25/2024 02:00:00 20.05 03/25/2024 02:05:00 20.08 03/25/2024 02:10:00 20.10 03/25/2024 02:15:00 20.08 03/25/2024 02:20:00 20.03 03/25/2024 02:25:00 19.99 Union Park - 100-yr SWMM SWMM 5.2 Page 1 Pond 298 Outlet Total Inflow Date Time (CFS) 03/25/2024 02:30:00 19.93 03/25/2024 02:35:00 19.86 03/25/2024 02:40:00 19.80 03/25/2024 02:45:00 19.73 03/25/2024 02:50:00 19.66 03/25/2024 02:55:00 19.59 03/25/2024 03:00:00 19.51 03/25/2024 03:05:00 19.44 03/25/2024 03:10:00 19.36 03/25/2024 03:15:00 19.29 03/25/2024 03:20:00 19.21 03/25/2024 03:25:00 19.13 03/25/2024 03:30:00 19.06 03/25/2024 03:35:00 18.98 03/25/2024 03:40:00 18.90 03/25/2024 03:45:00 18.82 03/25/2024 03:50:00 18.75 03/25/2024 03:55:00 18.67 03/25/2024 04:00:00 18.59 03/25/2024 04:05:00 18.51 03/25/2024 04:10:00 18.43 03/25/2024 04:15:00 18.35 03/25/2024 04:20:00 18.27 03/25/2024 04:25:00 18.19 03/25/2024 04:30:00 18.11 03/25/2024 04:35:00 18.03 03/25/2024 04:40:00 17.95 03/25/2024 04:45:00 17.87 03/25/2024 04:50:00 17.79 03/25/2024 04:55:00 17.71 Union Park - 100-yr SWMM SWMM 5.2 Page 2 Total Inflow Date Time (CFS) 03/25/2024 05:00:00 17.63 03/25/2024 05:05:00 17.55 03/25/2024 05:10:00 17.46 03/25/2024 05:15:00 17.38 03/25/2024 05:20:00 17.30 03/25/2024 05:25:00 17.22 03/25/2024 05:30:00 17.14 03/25/2024 05:35:00 17.06 03/25/2024 05:40:00 16.97 03/25/2024 05:45:00 16.89 03/25/2024 05:50:00 16.81 03/25/2024 05:55:00 16.73 03/25/2024 06:00:00 16.65 03/25/2024 06:05:00 16.57 03/25/2024 06:10:00 16.48 03/25/2024 06:15:00 16.40 03/25/2024 06:20:00 16.32 03/25/2024 06:25:00 16.23 03/25/2024 06:30:00 16.15 03/25/2024 06:35:00 16.05 03/25/2024 06:40:00 15.95 03/25/2024 06:45:00 15.85 03/25/2024 06:50:00 15.76 03/25/2024 06:55:00 15.66 03/25/2024 07:00:00 15.56 03/25/2024 07:05:00 15.46 03/25/2024 07:10:00 15.35 03/25/2024 07:15:00 15.25 03/25/2024 07:20:00 15.15 03/25/2024 07:25:00 15.05 Union Park - 100-yr SWMM SWMM 5.2 Page 3 Total Inflow Date Time (CFS) 03/25/2024 07:30:00 14.94 03/25/2024 07:35:00 14.84 03/25/2024 07:40:00 14.73 03/25/2024 07:45:00 14.62 03/25/2024 07:50:00 14.51 03/25/2024 07:55:00 14.41 03/25/2024 08:00:00 14.29 03/25/2024 08:05:00 14.18 03/25/2024 08:10:00 14.07 03/25/2024 08:15:00 13.96 03/25/2024 08:20:00 13.85 03/25/2024 08:25:00 13.74 03/25/2024 08:30:00 13.63 03/25/2024 08:35:00 13.52 03/25/2024 08:40:00 13.40 03/25/2024 08:45:00 13.29 03/25/2024 08:50:00 13.18 03/25/2024 08:55:00 13.07 03/25/2024 09:00:00 12.96 03/25/2024 09:05:00 12.85 03/25/2024 09:10:00 12.74 03/25/2024 09:15:00 12.64 03/25/2024 09:20:00 12.53 03/25/2024 09:25:00 12.41 03/25/2024 09:30:00 12.31 03/25/2024 09:35:00 12.20 03/25/2024 09:40:00 12.09 03/25/2024 09:45:00 11.98 03/25/2024 09:50:00 11.88 03/25/2024 09:55:00 11.77 Union Park - 100-yr SWMM SWMM 5.2 Page 4 Total Inflow Date Time (CFS) 03/25/2024 10:00:00 11.67 03/25/2024 10:05:00 11.56 03/25/2024 10:10:00 11.46 03/25/2024 10:15:00 11.35 03/25/2024 10:20:00 11.25 03/25/2024 10:25:00 11.14 03/25/2024 10:30:00 11.04 03/25/2024 10:35:00 10.93 03/25/2024 10:40:00 10.83 03/25/2024 10:45:00 10.72 03/25/2024 10:50:00 10.62 03/25/2024 10:55:00 10.52 03/25/2024 11:00:00 10.41 03/25/2024 11:05:00 10.31 03/25/2024 11:10:00 10.20 03/25/2024 11:15:00 10.07 03/25/2024 11:20:00 9.94 03/25/2024 11:25:00 9.82 03/25/2024 11:30:00 9.69 03/25/2024 11:35:00 9.57 03/25/2024 11:40:00 9.44 03/25/2024 11:45:00 9.32 03/25/2024 11:50:00 9.20 03/25/2024 11:55:00 9.09 03/25/2024 12:00:00 8.97 03/25/2024 12:05:00 8.86 03/25/2024 12:10:00 8.75 03/25/2024 12:15:00 8.64 03/25/2024 12:20:00 8.53 03/25/2024 12:25:00 8.43 Union Park - 100-yr SWMM SWMM 5.2 Page 5 Total Inflow Date Time (CFS) 03/25/2024 12:30:00 8.32 03/25/2024 12:35:00 8.22 03/25/2024 12:40:00 8.12 03/25/2024 12:45:00 8.02 03/25/2024 12:50:00 7.93 03/25/2024 12:55:00 7.83 03/25/2024 13:00:00 7.74 03/25/2024 13:05:00 7.65 03/25/2024 13:10:00 7.55 03/25/2024 13:15:00 7.46 03/25/2024 13:20:00 7.37 03/25/2024 13:25:00 7.28 03/25/2024 13:30:00 7.19 03/25/2024 13:35:00 7.11 03/25/2024 13:40:00 7.02 03/25/2024 13:45:00 6.94 03/25/2024 13:50:00 6.82 03/25/2024 13:55:00 6.71 03/25/2024 14:00:00 6.60 03/25/2024 14:05:00 6.50 03/25/2024 14:10:00 6.40 03/25/2024 14:15:00 6.31 03/25/2024 14:20:00 6.23 03/25/2024 14:25:00 6.15 03/25/2024 14:30:00 6.07 03/25/2024 14:35:00 6.00 03/25/2024 14:40:00 5.92 03/25/2024 14:45:00 5.85 03/25/2024 14:50:00 5.78 03/25/2024 14:55:00 5.71 Union Park - 100-yr SWMM SWMM 5.2 Page 6 Total Inflow Date Time (CFS) 03/25/2024 15:00:00 5.64 03/25/2024 15:05:00 5.57 03/25/2024 15:10:00 5.50 03/25/2024 15:15:00 5.43 03/25/2024 15:20:00 5.36 03/25/2024 15:25:00 5.28 03/25/2024 15:30:00 5.21 03/25/2024 15:35:00 5.14 03/25/2024 15:40:00 5.06 03/25/2024 15:45:00 4.98 03/25/2024 15:50:00 4.89 03/25/2024 15:55:00 4.81 03/25/2024 16:00:00 4.72 03/25/2024 16:05:00 4.62 03/25/2024 16:10:00 4.52 03/25/2024 16:15:00 4.42 03/25/2024 16:20:00 4.31 03/25/2024 16:25:00 4.19 03/25/2024 16:30:00 4.07 03/25/2024 16:35:00 3.93 03/25/2024 16:40:00 3.79 03/25/2024 16:45:00 3.63 03/25/2024 16:50:00 3.45 03/25/2024 16:55:00 3.25 03/25/2024 17:00:00 3.04 03/25/2024 17:05:00 2.81 03/25/2024 17:10:00 2.58 03/25/2024 17:15:00 2.34 03/25/2024 17:20:00 2.10 03/25/2024 17:25:00 1.87 Union Park - 100-yr SWMM SWMM 5.2 Page 7 Total Inflow Date Time (CFS) 03/25/2024 17:30:00 1.65 03/25/2024 17:35:00 1.45 03/25/2024 17:40:00 1.27 03/25/2024 17:45:00 1.11 03/25/2024 17:50:00 0.96 03/25/2024 17:55:00 0.84 03/25/2024 18:00:00 0.74 03/25/2024 18:05:00 0.66 03/25/2024 18:10:00 0.59 03/25/2024 18:15:00 0.53 03/25/2024 18:20:00 0.48 03/25/2024 18:25:00 0.45 03/25/2024 18:30:00 0.42 03/25/2024 18:35:00 0.39 03/25/2024 18:40:00 0.37 03/25/2024 18:45:00 0.36 03/25/2024 18:50:00 0.34 03/25/2024 18:55:00 0.33 03/25/2024 19:00:00 0.32 03/25/2024 19:05:00 0.31 03/25/2024 19:10:00 0.30 03/25/2024 19:15:00 0.30 03/25/2024 19:20:00 0.29 03/25/2024 19:25:00 0.29 03/25/2024 19:30:00 0.28 03/25/2024 19:35:00 0.28 03/25/2024 19:40:00 0.27 03/25/2024 19:45:00 0.27 03/25/2024 19:50:00 0.27 03/25/2024 19:55:00 0.26 Union Park - 100-yr SWMM SWMM 5.2 Page 8 Total Inflow Date Time (CFS) 03/25/2024 20:00:00 0.26 03/25/2024 20:05:00 0.26 03/25/2024 20:10:00 0.26 03/25/2024 20:15:00 0.25 03/25/2024 20:20:00 0.25 03/25/2024 20:25:00 0.25 03/25/2024 20:30:00 0.25 03/25/2024 20:35:00 0.24 03/25/2024 20:40:00 0.24 03/25/2024 20:45:00 0.24 03/25/2024 20:50:00 0.24 03/25/2024 20:55:00 0.23 03/25/2024 21:00:00 0.23 03/25/2024 21:05:00 0.23 03/25/2024 21:10:00 0.23 03/25/2024 21:15:00 0.22 03/25/2024 21:20:00 0.22 03/25/2024 21:25:00 0.22 03/25/2024 21:30:00 0.22 03/25/2024 21:35:00 0.21 03/25/2024 21:40:00 0.21 03/25/2024 21:45:00 0.21 03/25/2024 21:50:00 0.21 03/25/2024 21:55:00 0.20 03/25/2024 22:00:00 0.20 03/25/2024 22:05:00 0.20 03/25/2024 22:10:00 0.19 03/25/2024 22:15:00 0.19 03/25/2024 22:20:00 0.18 03/25/2024 22:25:00 0.18 Union Park - 100-yr SWMM SWMM 5.2 Page 9 Total Inflow Date Time (CFS) 03/25/2024 22:30:00 0.18 03/25/2024 22:35:00 0.18 03/25/2024 22:40:00 0.17 03/25/2024 22:45:00 0.17 03/25/2024 22:50:00 0.17 03/25/2024 22:55:00 0.17 03/25/2024 23:00:00 0.16 03/25/2024 23:05:00 0.16 03/25/2024 23:10:00 0.16 03/25/2024 23:15:00 0.16 03/25/2024 23:20:00 0.16 03/25/2024 23:25:00 0.15 03/25/2024 23:30:00 0.15 03/25/2024 23:35:00 0.15 03/25/2024 23:40:00 0.14 03/25/2024 23:45:00 0.14 03/25/2024 23:50:00 0.14 03/25/2024 23:55:00 0.13 03/26/2024 00:00:00 0.13 Union Park - 100-yr SWMM SWMM 5.2 Page 10 2:001:000:0023:0022:0021:0020:0019:0018:0017:0016:0015:0014:0013:0012:0011:0010:009:008:007:006:005:004:003:002:001:00 To t a l I n f l o w ( C F S ) 25.0 20.0 15.0 10.0 5.0 0.0 Node Outlet-01 Total Inflow (CFS) Union Park - 100-yr SWMM SWMM 5.2 Page 1 Pond 298 Outlet Appendix C APPENDIX C – RATIONAL CALCULATIONS UPUP UPUP UPUP UPUP UPUP D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE DD UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLASTDONOTPOLLUTE DD UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLASTDONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLASTDONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRONRAINSTOWATERWAYSNYLOPLASTDONOTPOLLUTED D UCTILEIRONRAINSTOWATERWAYSNYLOPLASTDONOTPOLLUTED D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED DUCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTEDD UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLASTDONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRON RAINSTOWATERWAYSNYLOPLASTDONOTPOLLUTE NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYSNYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS NYLOPLAST DUCTILE IRONDO NOT POLLUTE DRAINS TO WATERWAYS D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLASTDONOTPOLLUTE DD UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLASTDONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLASTDONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRON RAINSTOWATERWAYSNYLOPLASTDONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLASTDONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLASTDONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE DD UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLASTDONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLASTDONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D DUCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE D D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTED D UCTILEIRONRAINSTOWATERWAYSNYLOPLAST DONOTPOLLUTE OFFSITE AFFINITY SPILL LOCATION INADVERTENT DETENTION SPILL LOCATION LO T 1 AFF I N I T Y S U B D I V I S I O N ZI E G L E R R O A D (R O W V A R I E S ) RAISED PLANTING AREA RAISED PLANTING AREA RAISED PLANTING AREA BLOCK 1 BLOCK 2 BLOCK 3 BLOCK 4BLOCK 5BLOCK 6 BLOCK 7 BLOCK 8 BLOCK 9 BLOCK 10BLOCK 11BLOCK 12 BLOCK 13 BLOCK 14 BLOCK 15 BLOCK 16BLOCK 17BLOCK 18 BLOCK 19 BLOCK 20 BLOCK 21 BLOCK 22BLOCK 23BLOCK 24 BL O C K 2 7 BL O C K 2 8 BLDG A2 ESMT EXCLUSION BLDG A11 ESMT EXCLUSION BLDG A10 ESMT EXCLUSION BLDG A9 ESMT EXCLUSION BLDG A8 ESMT EXCLUSION BLDG A7 ESMT EXCLUSION BLDG A1 ESMT EXCLUSION BLDG A3 ESMT EXCLUSION BLDG A4 ESMT EXCLUSION BLDG A5 ESMT EXCLUSION BLDG A6 ESMT EXCLUSION LOT C3 LOT C1 LOT C2 EE G1 EE G2EE AG1 EE AG2 EE AG3 EE G3 EE AG4EE G4 EE AG5 EE G5 LOT MU1 LOT MU2 BLOCK 29 LOT R1 BLOCK 25 BLOCK 26 KINGSLEY COURT NEWBURG COURT HARRINGTON COURT CO R B E T T D R I V E ZI E G L E R R O A D (R O W V A R I E S ) IN F A N T R Y T E R R A C E D R I V E UNION PARK AVENUE IN F A N T R Y T E R R A C E D R I V E FORT SUMTER WAY JU N C T I O N D R I V E FORT SUMTER WAY FORTITUDE LANE ZI E G L E R R O A D (R O W V A R I E S ) GOLDEN GROVE DRIVE UN I O N P A R K A V E N U E BL U E C O A T D R I V E LO C O M O T I V E D R I V E IR O N L A N E CITADEL PLACE HERITAGE HILL PLACE JU N C T I O N D R I V E TRACT A TRACT B TR A C T C TRACT D TRACT E TRACT F TRACT I TRACT J TRACT H TRACT L TRACT K TRACT G TRACT N TRACT M TRACT O LID B STORMTECH SC-800 (90 CHAMBERS)LID D STORMTECH SC-800 (69 CHAMBERS) POND 298A POND 298C POND 298C STORM OUTFALL 20.1 CFS LIMITED AFFINITY OUTFALL ROUTED THROUGH POND & SITE POND 298B LID C STORMTECH SC-310 (102 CHAMBERS) RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 2 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) UN I O N P A R K GR A D I N G & D R A I N A G E P L A N 4/10/24 1" = 60' N/A JTC JTC 21-1044-00 OVERALL ---- CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.CallKnow what's below. R N W E S 0 SCALE: 1" = 60' 120603060 BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY DRAINAGE BASIN FLOW PATH LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR Design Engineer: Design Firm: Project Number: Date: % Impervious Runoff Coefficient C Return Period Frequency Adjustment Factor (Cf) 100% 0.95 2-year to 10-year 1.00 90% 0.95 100-year 1.25 90% 0.95 40% 0.50 0% 0.25 C2 to C10 C100 A1 111,351 2.56 0 0 6,599 0 104,752 5.3% 0.29 0.36 B1 11,272 0.26 0 5,863 1,988 0 3,421 62.7% 0.74 0.92 B2 88,722 2.04 24,338 34,210 10,378 0 19,796 72.7% 0.79 0.99 B3 23,289 0.53 10,394 4,189 2,341 0 6,364 69.9% 0.76 0.95 B4 50,719 1.16 14,863 20,947 8,234 0 6,676 81.1% 0.86 1.00 B5 48,273 1.11 16,268 19,711 5,751 0 6,544 81.2% 0.86 1.00 B6 35,540 0.82 13,579 13,438 4,283 0 4,239 83.1% 0.87 1.00 B7 133,618 3.07 44,146 43,774 15,154 0 30,543 72.7% 0.79 0.99 B1+…+B7 391,433 8.99 123,588 142,133 48,129 0 77,583 75.3% 0.81 1.00 C1 42,346 0.97 12,314 14,028 4,778 0 11,226 69.0% 0.76 0.96 C2 18,147 0.42 8,120 2,038 2,968 0 5,021 69.6% 0.76 0.95 C3 21,462 0.49 0 11,132 4,607 0 5,723 66.0% 0.76 0.95 C4 122,343 2.81 31,218 45,953 15,275 0 29,897 70.6% 0.78 0.97 C1+...+C4 204,297 4.69 51,653 73,151 27,628 0 51,866 69.7% 0.77 0.97 D1 42,986 0.99 15,866 9,376 5,490 0 12,253 68.0% 0.75 0.94 D2 69,344 1.59 21,611 26,290 13,047 0 8,396 82.2% 0.87 1.00 D3 48,913 1.12 14,129 21,282 6,656 0 6,846 80.3% 0.85 1.00 D4 20,659 0.47 10,448 6,531 2,801 0 879 91.2% 0.92 1.00 D5 17,199 0.39 0 0 1,875 0 15,325 9.8% 0.33 0.41 D6 109,942 2.52 38,552 35,705 13,734 0 21,952 75.5% 0.81 1.00 D1+…+D6 309,043 7.09 100,606 99,184 43,603 0 65,650 74.1% 0.80 1.00 E1 44,024 1.01 12,072 16,383 5,836 0 9,733 72.8% 0.80 0.99 E2 87,519 2.01 30,510 18,902 14,883 0 23,224 69.6% 0.76 0.96 E3 66,643 1.53 32,185 13,962 8,211 0 12,286 78.2% 0.82 1.00 E4 26,089 0.60 0 5,031 357 0 20,701 18.6% 0.39 0.49 E5 25,041 0.57 9,959 9,324 3,808 0 1,950 87.0% 0.90 1.00 E6 26,840 0.62 10,922 9,512 3,348 0 3,057 83.8% 0.87 1.00 E7 46,050 1.06 15,902 18,479 6,721 0 4,948 83.8% 0.87 1.00 E8 44,852 1.03 0 1,766 2,512 0 40,574 8.6% 0.32 0.40 E1+…+E8 367,058 8.43 111,550 93,359 45,677 0 116,472 64.5% 0.73 0.91 Total 1,383,183 31.75 387,397 407,826 171,635 0 416,324 65.7% 0.74 0.92 B2+B3 112,010 2.57 34,732 38,400 12,718 0 26,160 72.1% 0.79 0.98 B4+B5 98,993 2.27 31,130 40,658 13,985 0 13,220 81.1% 0.86 1.00 B4+B5+B6 134,533 3.09 44,710 54,096 18,268 0 17,459 81.6% 0.86 1.00 B1+B4+B5+B6 145,805 3.35 44,710 59,959 20,256 0 20,880 80.2% 0.85 1.00 C1+C2 60,493 1.39 20,434 16,066 7,746 0 16,247 69.2% 0.76 0.95 C1+C2+C3 81,955 1.88 20,434 27,198 12,353 0 21,969 68.4% 0.76 0.95 B1+B4+B5+B6+C1+…+C4 350,102 8.04 96,362 133,110 47,884 0 72,746 74.1% 0.80 1.00 D2+D3 118,257 2.71 35,740 47,572 19,702 0 15,242 81.4% 0.86 1.00 D2+D3+D4 138,916 3.19 46,188 54,103 22,504 0 16,121 82.9% 0.87 1.00 D2+…+D6 266,057 6.11 84,740 89,808 38,112 0 53,397 75.1% 0.81 1.00 B1+B4+B5+B6+C1+…+C4+D2+…+D5 506,217 11.62 142,551 187,213 72,262 0 104,192 74.3% 0.81 1.00 B1+…+D6 904,773 20.77 275,847 314,467 119,359 0 195,100 73.6% 0.80 1.00 E1+E4 70,113 1.61 12,072 21,414 6,193 0 30,434 52.7% 0.65 0.81 B1+B4+B5+B6+C1+…+C4+D2+…+D5+E1+E4 576,331 13.23 154,623 208,627 78,456 0 134,625 71.7% 0.79 0.98 B1+…+E4 1,129,049 25.92 350,614 368,745 148,646 0 261,043 72.3% 0.79 0.99 E4+E8 70,942 1.63 0 6,798 2,869 0 61,275 12.3% 0.35 0.43 D1+E1+…+E8 410,044 9.41 127,417 102,735 51,167 0 128,725 64.9% 0.73 0.91 Weighted % Impervious COMPOSITEApaved (sq feet) Aroof (sq feet) Awalk (sq feet) Agravel/pavers (sq feet) Alawn (sq feet) Gravel/Pavers Lawns (Heavy, 2-7% Slope) Sub-basin Designation Atotal (sq feet) Atotal (acres) Combined Basins for Street, Inlet, & Pipe Capacity Calculations Union Park DEVELOPED IMPERVIOUS AREA CALCULATION DESIGN CRITERIA: Fort Collins Stormwater Criteria Manual BASINS: Highland Development Services % Impervious values from Table 3.2.2 in the Fort Collins Stormwater Criteria Manual J.Claeys 21-1044-00 April 9, 2024 Land Use Paved Roof Walks Runoff Coefficients and Frequency Adjustment Factors for City of Fort Collins - Storm Water Criteria Manual 21-1044-00 Rational Calcs.xlsx Page 1 of 4 Highland Development Services Design Engineer: Design Firm: Project Number: Date: EQUATIONS: -Equation 5-3 -Equation 5-4 -Urbanized Check Equation 3.3-5 - CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition 500 ft - Overland flow shall not exceed for undeveloped condition Final t c = minimum of t i + t t and urbanized basin check recommended minimum t c = 5 min for urbanized basins Time of Concentration (2-yr to 10-yr) A1 A1 5.3% 0.29 2.56 173 0.0542 11.32 224 0.0050 0.10 0.016 1.42 2.62 13.94 397 12.21 12.21 B1 B1 62.7% 0.74 0.26 30 0.0200 2.95 133 0.0050 0.10 0.016 1.42 1.56 5.00 163 10.91 5.00 B2 B2 72.7% 0.79 2.04 45 0.0200 3.05 390 0.0050 0.10 0.016 1.42 4.58 7.63 435 12.42 7.63 B3 B3 69.9% 0.76 0.53 20 0.0200 2.27 483 0.0050 0.10 0.016 1.42 5.67 7.94 503 12.79 7.94 B4 B4 81.1% 0.86 1.16 39 0.0200 2.24 334 0.0050 0.10 0.016 1.42 3.92 6.17 373 12.07 6.17 B5 B5 81.2% 0.86 1.11 127 0.0200 4.10 133 0.0050 0.10 0.016 1.42 1.56 5.66 260 11.44 5.66 B6 B6 83.1% 0.87 0.82 146 0.0200 4.19 140 0.0050 0.10 0.016 1.42 1.64 5.83 286 11.59 5.83 B7 B7 72.7% 0.79 3.07 33 0.0200 2.64 817 0.0082 0.10 0.016 1.82 7.47 10.12 850 14.72 10.12 C1 C1 69.0% 0.76 0.97 49 0.0200 3.49 237 0.0198 0.10 0.016 2.83 1.40 5.00 286 11.59 5.00 C2 C2 69.6% 0.76 0.42 48 0.0200 3.53 156 0.0053 0.10 0.016 1.45 1.79 5.32 204 11.13 5.32 C3 C3 66.0% 0.76 0.49 35 0.0200 2.96 335 0.0050 0.10 0.016 1.42 3.94 6.89 370 12.06 6.89 C4 C4 70.6% 0.78 2.81 47 0.0200 3.27 287 0.0058 0.10 0.016 1.53 3.13 6.40 334 11.86 6.40 D1 D1 68.0% 0.75 0.99 50 0.0200 3.67 602 0.0050 0.10 0.016 1.42 7.07 10.74 652 13.62 10.74 D2 D2 82.2% 0.87 1.59 44 0.0200 2.31 536 0.0050 0.10 0.016 1.42 6.30 8.61 580 13.22 8.61 D3 D3 80.3% 0.85 1.12 284 0.0100 7.81 118 0.0050 0.10 0.016 1.42 1.39 9.20 402 12.23 9.20 D4 D4 91.2% 0.92 0.47 109 0.0200 2.79 132 0.0050 0.10 0.016 1.42 1.55 5.00 241 11.34 5.00 D5 D5 9.8% 0.33 0.39 91 0.0380 8.84 92 0.0051 0.10 0.016 1.43 1.07 9.92 183 11.02 9.92 D6 D6 75.5% 0.81 2.52 65 0.0200 3.47 687 0.0071 0.10 0.016 1.70 6.75 10.22 752 14.18 10.22 E1 E1 72.8% 0.80 1.01 100 0.0200 4.52 209 0.0050 0.10 0.016 1.42 2.46 6.98 309 11.72 6.98 E2 E2 69.6% 0.76 2.01 83 0.0200 4.54 468 0.0082 0.10 0.016 1.82 4.28 8.82 551 13.06 8.82 E3 E3 78.2% 0.82 1.53 118 0.0200 4.50 454 0.0050 0.10 0.016 1.42 5.33 9.83 572 13.18 9.83 E4 E4 18.6% 0.39 0.60 113 0.0200 11.13 127 0.0050 0.10 0.016 1.42 1.49 12.62 240 11.33 11.33 E5 E5 87.0% 0.90 0.57 174 0.0100 5.04 72 0.0050 0.10 0.016 1.42 0.85 5.89 246 11.37 5.89 E6 E6 83.8% 0.87 0.62 111 0.0200 3.59 166 0.0050 0.10 0.016 1.42 1.95 5.54 277 11.54 5.54 E7 E7 83.8% 0.87 1.06 60 0.0200 2.59 460 0.0050 0.10 0.016 1.42 5.40 7.99 520 12.89 7.99 E8 E8 8.6% 0.32 1.03 18 0.0200 4.93 399 0.0050 0.10 0.016 1.42 4.69 9.62 417 12.32 9.62 B1+…+B7 LID B 75.3% 0.81 8.99 33 0.0200 2.46 817 0.0082 0.10 0.016 1.82 7.47 9.93 N/A -9.93 C1+...+C4 LID C 69.7% 0.77 4.69 49 0.0200 3.40 521 0.0117 0.10 0.016 2.17 3.99 7.40 N/A -7.40 D2+…+D6 LID D 75.1% 0.81 6.11 44 0.0200 2.86 993 0.0050 0.10 0.016 1.42 11.67 14.53 N/A -14.53 A1+…+E8 Pond 298c 65.7% 0.74 31.75 173 0.0542 5.05 1752 0.0030 0.10 0.016 1.10 26.57 31.62 N/A -31.62 OVERALL LENGTH (ft/ft) tc (min) SLOPE (ft/ft) ti (min) LENGTH (ft) SLOPE (ft/ft) VELOCITY (ft/s) ROUGHNESS COEFFICIENT HYDRAULIC RADIUS (ft) LENGTH (ft) DESIGN CRITERIA: City of Fort Collins Stormwater Criteria Manual Overland Flow Equations for City of Fort Collins Stormwater Criteria Manual SUB-BASIN DATA INITIAL/OVERLAND TIME (ti)TRAVEL TIME (tt) tc=ti+tt (min) Urban Check Final tc (min)DESIGN POINT Sub-basin % Impervious C2-10 AREA (acres) tt (min) April 9, 2024 Union Park DEVELOPED TIME OF CONCENTRATION J.Claeys 21-1044-00 Highland Development Services ticttt+= V Ltt60 = Design Engineer: Design Firm: Project Number: Date: EQUATIONS: -Equation 5-3 -Equation 5-4 -Urbanized Check Equation 3.3-5 - CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition 500 ft - Overland flow shall not exceed for undeveloped condition Final t c = minimum of t i + t t and urbanized basin check recommended minimum t c = 5 min for urbanized basins Time of Concentration (100-yr) A1 A1 5.3% 0.36 2.56 173 0.0542 10.30 224 0.0050 0.10 0.016 1.42 2.62 12.92 397 12.21 12.21 B1 B1 62.7% 0.92 0.26 30 0.0200 1.45 133 0.0050 0.10 0.016 1.42 1.56 5.00 163 10.91 5.00 B2 B2 72.7% 0.99 2.04 45 0.0200 1.07 390 0.0050 0.10 0.016 1.42 4.58 5.65 435 12.42 5.65 B3 B3 69.9% 0.95 0.53 20 0.0200 1.01 483 0.0050 0.10 0.016 1.42 5.67 6.68 503 12.79 6.68 B4 B4 81.1% 1.00 1.16 39 0.0200 0.93 334 0.0050 0.10 0.016 1.42 3.92 5.00 373 12.07 5.00 B5 B5 81.2% 1.00 1.11 127 0.0200 1.67 133 0.0050 0.10 0.016 1.42 1.56 5.00 260 11.44 5.00 B6 B6 83.1% 1.00 0.82 146 0.0200 1.79 140 0.0050 0.10 0.016 1.42 1.64 5.00 286 11.59 5.00 B7 B7 72.7% 0.99 3.07 33 0.0200 0.96 817 0.0082 0.10 0.016 1.82 7.47 8.43 850 14.72 8.43 C1 C1 69.0% 0.96 0.97 49 0.0200 1.50 237 0.0198 0.10 0.016 2.83 1.40 5.00 286 11.59 5.00 C2 C2 69.6% 0.95 0.42 48 0.0200 1.59 156 0.0053 0.10 0.016 1.45 1.79 5.00 204 11.13 5.00 C3 C3 66.0% 0.95 0.49 35 0.0200 1.28 335 0.0050 0.10 0.016 1.42 3.94 5.22 370 12.06 5.22 C4 C4 70.6% 0.97 2.81 47 0.0200 1.29 287 0.0058 0.10 0.016 1.53 3.13 5.00 334 11.86 5.00 D1 D1 68.0% 0.94 0.99 50 0.0200 1.70 602 0.0050 0.10 0.016 1.42 7.07 8.77 652 13.62 8.77 D2 D2 82.2% 1.00 1.59 44 0.0200 0.98 536 0.0050 0.10 0.016 1.42 6.30 7.28 580 13.22 7.28 D3 D3 80.3% 1.00 1.12 284 0.0100 3.15 118 0.0050 0.10 0.016 1.42 1.39 5.00 402 12.23 5.00 D4 D4 91.2% 1.00 0.47 109 0.0200 1.55 132 0.0050 0.10 0.016 1.42 1.55 5.00 241 11.34 5.00 D5 D5 9.8% 0.41 0.39 91 0.0380 7.91 92 0.0051 0.10 0.016 1.43 1.07 8.98 183 11.02 8.98 D6 D6 75.5% 1.00 2.52 65 0.0200 1.20 687 0.0071 0.10 0.016 1.70 6.75 7.95 752 14.18 7.95 E1 E1 72.8% 0.99 1.01 100 0.0200 1.57 209 0.0050 0.10 0.016 1.42 2.46 5.00 309 11.72 5.00 E2 E2 69.6% 0.96 2.01 83 0.0200 1.96 468 0.0082 0.10 0.016 1.82 4.28 6.24 551 13.06 6.24 E3 E3 78.2% 1.00 1.53 118 0.0200 1.61 454 0.0050 0.10 0.016 1.42 5.33 6.95 572 13.18 6.95 E4 E4 18.6% 0.49 0.60 113 0.0200 9.57 127 0.0050 0.10 0.016 1.42 1.49 11.07 240 11.33 11.07 E5 E5 87.0% 1.00 0.57 174 0.0100 2.47 72 0.0050 0.10 0.016 1.42 0.85 5.00 246 11.37 5.00 E6 E6 83.8% 1.00 0.62 111 0.0200 1.56 166 0.0050 0.10 0.016 1.42 1.95 5.00 277 11.54 5.00 E7 E7 83.8% 1.00 1.06 60 0.0200 1.15 460 0.0050 0.10 0.016 1.42 5.40 6.55 520 12.89 6.55 E8 E8 8.6% 0.40 1.03 18 0.0200 4.43 399 0.0050 0.10 0.016 1.42 4.69 9.12 417 12.32 9.12 A1+…+E8 Pond 298c 65.7% 0.92 31.75 173 0.0542 2.46 1752 0.0030 0.10 0.016 1.10 26.57 29.04 1925 20.69 20.69 OVERALL LENGTH (ft/ft) tc (min) SLOPE (ft/ft) ti (min) LENGTH (ft) SLOPE (ft/ft) VELOCITY (ft/s) HYDRAULIC RADIUS (ft) ROUGHNESS COEFFICIENT LENGTH (ft) DESIGN CRITERIA: City of Fort Collins Stormwater Criteria Manual Overland Flow Equations for City of Fort Collins Stormwater Criteria Manual SUB-BASIN DATA INITIAL/OVERLAND TIME (ti)TRAVEL TIME (tt) tc=ti+tt (min) Urban Check Final tc (min)DESIGN POINT Sub-basin % Impervious C100 AREA (acres) tt (min) April 9, 2024 Union Park DEVELOPED TIME OF CONCENTRATION J.Claeys 21-1044-00 Highland Development Services ticttt+= V Ltt60 = I = rainfall intensity (in/hr) P 1 = one-hour point rainfall depth (in) t c = time of concentration (min) P 1-2yr =0.82 in P 1-100yr =2.86 in BASIN SUMMARY: tc (min) Runoff Coeff (C2-10) Intensity (in/hr) Q2 (ft3/s) tc (min)Runoff Coeff (C100) Intensity (in/hr) Q100 (ft3/s) A1 A1 2.56 5.3% 12.21 0.29 2.04 1.52 12.21 0.36 7.11 6.62 B1 B1 0.26 62.7% 5.00 0.74 2.85 0.54 5.00 0.92 9.95 2.37 B2 B2 2.04 72.7% 7.63 0.79 2.45 3.95 5.65 0.99 9.36 18.92 B3 B3 0.53 69.9% 7.94 0.76 2.41 0.98 6.68 0.95 8.91 4.52 B4 B4 1.16 81.1% 6.17 0.86 2.62 2.61 5.00 1.00 9.95 11.59 B5 B5 1.11 81.2% 5.66 0.86 2.68 2.54 5.00 1.00 9.95 11.03 B6 B6 0.82 83.1% 5.83 0.87 2.66 1.88 5.00 1.00 9.95 8.12 B7 B7 3.07 72.7% 10.12 0.79 2.20 5.34 8.43 0.99 8.23 24.94 C1 C1 0.97 69.0% 5.00 0.76 2.85 2.12 5.00 0.96 9.95 9.24 C2 C2 0.42 69.6% 5.32 0.76 2.73 0.86 5.00 0.95 9.95 3.92 C3 C3 0.49 66.0% 6.89 0.76 2.53 0.95 5.22 0.95 9.58 4.50 C4 C4 2.81 70.6% 6.40 0.78 2.59 5.66 5.00 0.97 9.95 27.21 D1 D1 0.99 68.0% 10.74 0.75 2.15 1.59 8.77 0.94 8.12 7.51 D2 D2 1.59 82.2% 8.61 0.87 2.34 3.23 7.28 1.00 8.66 13.79 D3 D3 1.12 80.3% 9.20 0.85 2.29 2.19 5.00 1.00 9.95 11.17 D4 D4 0.47 91.2% 5.00 0.92 2.85 1.24 5.00 1.00 9.95 4.72 D5 D5 0.39 9.8% 9.92 0.33 2.22 0.29 8.98 0.41 8.05 1.30 D6 D6 2.52 75.5% 10.22 0.81 2.20 4.49 7.95 1.00 8.41 21.22 E1 E1 1.01 72.8% 6.98 0.80 2.52 2.02 5.00 0.99 9.95 10.00 E2 E2 2.01 69.6% 8.82 0.76 2.32 3.57 6.24 0.96 9.10 17.46 E3 E3 1.53 78.2% 9.83 0.82 2.23 2.80 6.95 1.00 8.80 13.46 E4 E4 0.60 18.6% 11.33 0.39 2.10 0.50 11.07 0.49 7.41 2.19 E5 E5 0.57 87.0% 5.89 0.90 2.65 1.37 5.00 1.00 9.95 5.72 E6 E6 0.62 83.8% 5.54 0.87 2.70 1.45 5.00 1.00 9.95 6.13 E7 E7 1.06 83.8% 7.99 0.87 2.41 2.23 6.55 1.00 8.96 9.47 E8 E8 1.03 8.6% 9.62 0.32 2.25 0.73 9.12 0.40 8.00 3.26 Pond 298c A1+…+E8 31.75 65.7% 31.62 0.73 1.24 28.75 20.69 0.92 5.51 161.79 B1+…+B7 LID B 8.99 75.3% 9.93 0.81 2.22 16.18 C1+...+C4 LID C 4.69 69.7% 7.40 0.77 2.47 8.95 D2+…+D6 LID D 6.11 75.1% 14.53 0.81 1.89 9.32 100-yr Peak Runoff I n = n -yr rainfall intensity (in/hr) A n = Basin drainage area (ac) Design Point Sub-basin Area (acres) % Impervious 2-yr Peak Runoff 21-1044-00 Highland Development Services J.Claeys DEVELOPED PEAK RUNOFF Union Park Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: City of Fort Collins Stormwater Criteria Manual EQUATIONS: C n = n -yr runoff coefficient Q n = n -yr peak discharge (cfs) April 9, 2024 Union Park Attenuated Flows Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: EQUATIONS: -Equation 5-3 -Equation 5-4 -CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition Final t c = minimum of t i + t t and urbanized basin check 500 ft - Overland flow shall not exceed for undeveloped condition recommended minimum t c = 5 min for urbanized basins Qn = n -yr peak discharge (cfs)I = rainfall intensity (in/hr) Cn = n -yr runoff coefficient P1 = one-hour point rainfall depth (in) In = n -yr rainfall intensity (in/hr) tc = time of concentration (min) A = drainage area (ac)P1-2yr =0.82 in. P1-100yr =2.86 in. BASINS: DP/Manhole B3 / Inlet-17 Contributing Basins B2+B3 Contributing Area (acres)2.57 C2-10 C100 Runoff Coefficients 0.79 0.98 Overland Flow Time Length (ft) 46 Slope (%) 2.00% 2-yr to 10-yr 100-yr ti (min)14.65 5.46 Travel Time Length (ft) Slope (%) Hydraulic Radius (ft) Roughness Coefficient Velocity (ft/s)tt (min) 517 0.50%0.10 0.016 1.42 6.07 Total Time 6.07 Final Time of Concentration - tc (min) 2-yr to 10-yr 100-yr 20.72 11.53 Intensities (in/hr) 2-yr 100-yr 1.58 7.29 Discharge (cfs) 2-yr 100-yr 3.19 18.42 Highland Development Services Fort Collins Stormwater Criteria Manual J.Claeys 21-1044-00 April 9, 2024 Union Park Attenuated Flows Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: EQUATIONS: -Equation 5-3 -Equation 5-4 -CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition Final t c = minimum of t i + t t and urbanized basin check 500 ft - Overland flow shall not exceed for undeveloped condition recommended minimum t c = 5 min for urbanized basins Qn = n -yr peak discharge (cfs)I = rainfall intensity (in/hr) Cn = n -yr runoff coefficient P1 = one-hour point rainfall depth (in) In = n -yr rainfall intensity (in/hr) tc = time of concentration (min) A = drainage area (ac)P1-2yr =0.82 in. P1-100yr =2.86 in. BASINS: DP/Manhole SDMH-30 Contributing Basins B4+B5 Contributing Area (acres)2.27 C2-10 C100 Runoff Coefficients 0.86 1.00 Overland Flow Time Length (ft) 39 Slope (%) 2.00% 2-yr to 10-yr 100-yr ti (min)10.48 4.30 Travel Time Length (ft) Slope (%) Hydraulic Radius (ft) Roughness Coefficient Velocity (ft/s)tt (min) 127 0.50%0.10 0.016 1.42 1.49 Total Time 1.49 Final Time of Concentration - tc (min) 2-yr to 10-yr 100-yr 11.97 5.79 Intensities (in/hr) 2-yr 100-yr 2.06 9.30 Discharge (cfs) 2-yr 100-yr 4.00 21.13 J.Claeys Highland Development Services 21-1044-00 April 9, 2024 Fort Collins Stormwater Criteria Manual Union Park Attenuated Flows Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: EQUATIONS: -Equation 5-3 -Equation 5-4 -CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition Final t c = minimum of t i + t t and urbanized basin check 500 ft - Overland flow shall not exceed for undeveloped condition recommended minimum t c = 5 min for urbanized basins Qn = n -yr peak discharge (cfs)I = rainfall intensity (in/hr) Cn = n -yr runoff coefficient P1 = one-hour point rainfall depth (in) In = n -yr rainfall intensity (in/hr) tc = time of concentration (min) A = drainage area (ac)P1-2yr =0.82 in. P1-100yr =2.86 in. BASINS: DP/Manhole SDMH-28 Contributing Basins B4+B5+B6 Contributing Area (acres)3.09 C2-10 C100 Runoff Coefficients 0.86 1.00 Overland Flow Time Length (ft) 39 Slope (%) 2.00% 2-yr to 10-yr 100-yr ti (min)10.36 4.30 Travel Time Length (ft) Slope (%) Hydraulic Radius (ft) Roughness Coefficient Velocity (ft/s)tt (min) 127 0.50%0.10 0.016 1.42 1.49 346 0.58%0.10 0.016 1.53 3.77 Total Time 5.27 Final Time of Concentration - tc (min) 2-yr to 10-yr 100-yr 15.63 9.57 Intensities (in/hr) 2-yr 100-yr 1.82 7.86 Discharge (cfs) 2-yr 100-yr 4.83 24.26 J.Claeys Highland Development Services 21-1044-00 April 9, 2024 Fort Collins Stormwater Criteria Manual Union Park Attenuated Flows Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: EQUATIONS: -Equation 5-3 -Equation 5-4 -CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition Final t c = minimum of t i + t t and urbanized basin check 500 ft - Overland flow shall not exceed for undeveloped condition recommended minimum t c = 5 min for urbanized basins Qn = n -yr peak discharge (cfs)I = rainfall intensity (in/hr) Cn = n -yr runoff coefficient P1 = one-hour point rainfall depth (in) In = n -yr rainfall intensity (in/hr) tc = time of concentration (min) A = drainage area (ac)P1-2yr =0.82 in. P1-100yr =2.86 in. BASINS: DP/Manhole SDMH-10 Contributing Basins B1+B4+B5+B6 *Basins B3 & B7 are on-grade inlet captured flows Contributing Area (acres)3.35 C2-10 C100 Runoff Coefficients 0.85 1.00 Overland Flow Time Length (ft) 39 Slope (%) 2.00% 2-yr to 10-yr 100-yr ti (min)10.77 4.30 Travel Time Length (ft) Slope (%) Hydraulic Radius (ft) Roughness Coefficient Velocity (ft/s)tt (min) 721 0.50%0.10 0.016 1.42 8.47 Total Time 8.47 Final Time of Concentration - tc (min) 2-yr to 10-yr 100-yr 19.24 12.77 Intensities (in/hr) 2-yr 100-yr 1.64 6.97 Discharge (cfs) 2-yr 100-yr 4.67 23.34 3.2 14.6 Captured Flows from Inlet-17 (B3) 5.3 14.6 Captured Flows from Inlet-16 (B7) 13.17 52.54 J.Claeys Highland Development Services 21-1044-00 April 9, 2024 Fort Collins Stormwater Criteria Manual Union Park Attenuated Flows Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: EQUATIONS: -Equation 5-3 -Equation 5-4 -CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition Final t c = minimum of t i + t t and urbanized basin check 500 ft - Overland flow shall not exceed for undeveloped condition recommended minimum t c = 5 min for urbanized basins Qn = n -yr peak discharge (cfs)I = rainfall intensity (in/hr) Cn = n -yr runoff coefficient P1 = one-hour point rainfall depth (in) In = n -yr rainfall intensity (in/hr) tc = time of concentration (min) A = drainage area (ac)P1-2yr =0.82 in. P1-100yr =2.86 in. BASINS: DP/Manhole C2 / Inlet-10 Contributing Basins C1+C2 Contributing Area (acres)1.39 C2-10 C100 Runoff Coefficients 0.76 0.95 Overland Flow Time Length (ft) 49 Slope (%) 2.00% 2-yr to 10-yr 100-yr ti (min)16.30 7.11 Travel Time Length (ft) Slope (%) Hydraulic Radius (ft) Roughness Coefficient Velocity (ft/s)tt (min) 237 1.98%0.10 0.016 2.83 1.40 36 0.50%0.10 0.016 1.42 0.42 Total Time 1.82 Final Time of Concentration - tc (min) 2-yr to 10-yr 100-yr 18.12 8.93 Intensities (in/hr) 2-yr 100-yr 1.69 8.06 Discharge (cfs) 2-yr 100-yr 1.79 10.66 J.Claeys Highland Development Services 21-1044-00 April 9, 2024 Fort Collins Stormwater Criteria Manual Union Park Attenuated Flows Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: EQUATIONS: -Equation 5-3 -Equation 5-4 -CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition Final t c = minimum of t i + t t and urbanized basin check 500 ft - Overland flow shall not exceed for undeveloped condition recommended minimum t c = 5 min for urbanized basins Qn = n -yr peak discharge (cfs)I = rainfall intensity (in/hr) Cn = n -yr runoff coefficient P1 = one-hour point rainfall depth (in) In = n -yr rainfall intensity (in/hr) tc = time of concentration (min) A = drainage area (ac)P1-2yr =0.82 in. P1-100yr =2.86 in. BASINS: DP/Manhole SDMH-22 Contributing Basins C1+C2+C3 Contributing Area (acres)1.88 C2-10 C100 Runoff Coefficients 0.76 0.95 Overland Flow Time Length (ft) 49 Slope (%) 2.00% 2-yr to 10-yr 100-yr ti (min)16.28 7.09 Travel Time Length (ft) Slope (%) Hydraulic Radius (ft) Roughness Coefficient Velocity (ft/s)tt (min) 237 1.98%0.10 0.016 2.83 1.40 36 0.50%0.10 0.016 1.42 0.42 218 0.50%0.10 0.016 1.42 2.56 Total Time 4.38 Final Time of Concentration - tc (min) 2-yr to 10-yr 100-yr 20.66 11.47 Intensities (in/hr) 2-yr 100-yr 1.58 7.30 Discharge (cfs) 2-yr 100-yr 2.27 13.09 J.Claeys Highland Development Services 21-1044-00 April 9, 2024 Fort Collins Stormwater Criteria Manual Union Park Attenuated Flows Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: EQUATIONS: -Equation 5-3 -Equation 5-4 -CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition Final t c = minimum of t i + t t and urbanized basin check 500 ft - Overland flow shall not exceed for undeveloped condition recommended minimum t c = 5 min for urbanized basins Qn = n -yr peak discharge (cfs)I = rainfall intensity (in/hr) Cn = n -yr runoff coefficient P1 = one-hour point rainfall depth (in) In = n -yr rainfall intensity (in/hr) tc = time of concentration (min) A = drainage area (ac)P1-2yr =0.82 in. P1-100yr =2.86 in. BASINS: DP/Manhole C4 / Inlet-09 Contributing Basins C1+...+C4 Contributing Area (acres)4.69 C2-10 C100 Runoff Coefficients 0.77 0.97 Overland Flow Time Length (ft) 49 Slope (%) 2.00% 2-yr to 10-yr 100-yr ti (min)15.80 6.49 Travel Time Length (ft) Slope (%) Hydraulic Radius (ft) Roughness Coefficient Velocity (ft/s)tt (min) 237 1.98%0.10 0.016 2.83 1.40 36 0.50%0.10 0.016 1.42 0.42 218 0.50%0.10 0.016 1.42 2.56 30 0.50%0.10 0.016 1.42 0.35 Total Time 4.73 Final Time of Concentration - tc (min) 2-yr to 10-yr 100-yr 20.54 11.23 Intensities (in/hr) 2-yr 100-yr 1.59 7.37 Discharge (cfs) 2-yr 100-yr 5.75 33.36 J.Claeys Highland Development Services 21-1044-00 April 9, 2024 Fort Collins Stormwater Criteria Manual Union Park Attenuated Flows Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: EQUATIONS: -Equation 5-3 -Equation 5-4 -CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition Final t c = minimum of t i + t t and urbanized basin check 500 ft - Overland flow shall not exceed for undeveloped condition recommended minimum t c = 5 min for urbanized basins Qn = n -yr peak discharge (cfs)I = rainfall intensity (in/hr) Cn = n -yr runoff coefficient P1 = one-hour point rainfall depth (in) In = n -yr rainfall intensity (in/hr) tc = time of concentration (min) A = drainage area (ac)P1-2yr =0.82 in. P1-100yr =2.86 in. BASINS: DP/Manhole SDMH-09 Contributing Basins B1+B4+B5+B6+C1+…+C4 *Basins B3 & B7 are on-grade inlet captured flows Contributing Area (acres)8.04 C2-10 C100 Runoff Coefficients 0.80 1.00 Overland Flow Time Length (ft) 30 Slope (%) 2.00% 2-yr to 10-yr 100-yr ti (min)11.15 3.77 Travel Time Length (ft) Slope (%) Hydraulic Radius (ft) Roughness Coefficient Velocity (ft/s)tt (min) 721 0.50%0.10 0.016 1.42 8.47 414 0.26%0.10 0.016 1.02 6.74 Total Time 15.22 Final Time of Concentration - tc (min) 2-yr to 10-yr 100-yr 26.36 18.99 Intensities (in/hr) 2-yr 100-yr 1.38 5.77 Discharge (cfs) 2-yr 100-yr 8.95 46.35 3.2 14.6 Captured Flows from Inlet-17 (B3) 5.3 14.6 Captured Flows from Inlet-16 (B7) 17.45 75.55 J.Claeys Highland Development Services 21-1044-00 April 9, 2024 Fort Collins Stormwater Criteria Manual Union Park Attenuated Flows Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: EQUATIONS: -Equation 5-3 -Equation 5-4 -CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition Final t c = minimum of t i + t t and urbanized basin check 500 ft - Overland flow shall not exceed for undeveloped condition recommended minimum t c = 5 min for urbanized basins Qn = n -yr peak discharge (cfs)I = rainfall intensity (in/hr) Cn = n -yr runoff coefficient P1 = one-hour point rainfall depth (in) In = n -yr rainfall intensity (in/hr) tc = time of concentration (min) A = drainage area (ac)P1-2yr =0.82 in. P1-100yr =2.86 in. BASINS: DP/Manhole SDMH-15 Contributing Basins D2+D3 Contributing Area (acres)2.71 C2-10 C100 Runoff Coefficients 0.86 1.00 Overland Flow Time Length (ft) 44 Slope (%) 2.00% 2-yr to 10-yr 100-yr ti (min)10.98 4.57 Travel Time Length (ft) Slope (%) Hydraulic Radius (ft) Roughness Coefficient Velocity (ft/s)tt (min) 536 0.50%0.10 0.016 1.42 6.30 215 0.50%0.10 0.016 1.42 2.53 Total Time 8.82 Final Time of Concentration - tc (min) 2-yr to 10-yr 100-yr 19.80 13.39 Intensities (in/hr) 2-yr 100-yr 1.62 6.83 Discharge (cfs) 2-yr 100-yr 3.78 18.53 J.Claeys Highland Development Services 21-1044-00 April 9, 2024 Fort Collins Stormwater Criteria Manual Union Park Attenuated Flows Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: EQUATIONS: -Equation 5-3 -Equation 5-4 -CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition Final t c = minimum of t i + t t and urbanized basin check 500 ft - Overland flow shall not exceed for undeveloped condition recommended minimum t c = 5 min for urbanized basins Qn = n -yr peak discharge (cfs)I = rainfall intensity (in/hr) Cn = n -yr runoff coefficient P1 = one-hour point rainfall depth (in) In = n -yr rainfall intensity (in/hr) tc = time of concentration (min) A = drainage area (ac)P1-2yr =0.82 in. P1-100yr =2.86 in. BASINS: DP/Manhole SDMH-13 Contributing Basins D2+D3+D4 Contributing Area (acres)3.19 C2-10 C100 Runoff Coefficients 0.87 1.00 Overland Flow Time Length (ft) 44 Slope (%) 2.00% 2-yr to 10-yr 100-yr ti (min)10.57 4.57 Travel Time Length (ft) Slope (%) Hydraulic Radius (ft) Roughness Coefficient Velocity (ft/s)tt (min) 536 0.50%0.10 0.016 1.42 6.30 215 0.50%0.10 0.016 1.42 2.53 242 0.50%0.10 0.016 1.42 2.84 Total Time 11.67 Final Time of Concentration - tc (min) 2-yr to 10-yr 100-yr 22.23 16.24 Intensities (in/hr) 2-yr 100-yr 1.52 6.24 Discharge (cfs) 2-yr 100-yr 4.21 19.89 J.Claeys Highland Development Services 21-1044-00 April 9, 2024 Fort Collins Stormwater Criteria Manual Union Park Attenuated Flows Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: EQUATIONS: -Equation 5-3 -Equation 5-4 -CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition Final t c = minimum of t i + t t and urbanized basin check 500 ft - Overland flow shall not exceed for undeveloped condition recommended minimum t c = 5 min for urbanized basins Qn = n -yr peak discharge (cfs)I = rainfall intensity (in/hr) Cn = n -yr runoff coefficient P1 = one-hour point rainfall depth (in) In = n -yr rainfall intensity (in/hr) tc = time of concentration (min) A = drainage area (ac)P1-2yr =0.82 in. P1-100yr =2.86 in. BASINS: DP/Manhole SDMH-08 Contributing Basins B1+B4+B5+B6+C1+…+C4 *Basins B3, B7, D1, & D6 are on-grade inlet captured flows Contributing Area (acres)8.04 C2-10 C100 Runoff Coefficients 0.80 1.00 Overland Flow Time Length (ft) 30 Slope (%) 2.00% 2-yr to 10-yr 100-yr ti (min)11.15 3.77 Travel Time Length (ft) Slope (%) Hydraulic Radius (ft) Roughness Coefficient Velocity (ft/s)tt (min) 721 0.50%0.10 0.016 1.42 8.47 414 0.26%0.10 0.016 1.02 6.74 Total Time 15.22 Final Time of Concentration - tc (min) 2-yr to 10-yr 100-yr 26.36 18.99 Intensities (in/hr) 2-yr 100-yr 1.38 5.77 Discharge (cfs) 2-yr 100-yr 8.95 46.35 3.2 14.6 Captured Flows from Inlet-17 (B3) 5.3 14.6 Captured Flows from Inlet-16 (B7) 1.6 13.4 Captured Flows from Inlet-08 (D1) 3.2 13.4 Captured Flows from Inlet-07 (D6) 17.45 102.35 J.Claeys Highland Development Services 21-1044-00 April 9, 2024 Fort Collins Stormwater Criteria Manual Union Park Attenuated Flows Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: EQUATIONS: -Equation 5-3 -Equation 5-4 -CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition Final t c = minimum of t i + t t and urbanized basin check 500 ft - Overland flow shall not exceed for undeveloped condition recommended minimum t c = 5 min for urbanized basins Qn = n -yr peak discharge (cfs)I = rainfall intensity (in/hr) Cn = n -yr runoff coefficient P1 = one-hour point rainfall depth (in) In = n -yr rainfall intensity (in/hr) tc = time of concentration (min) A = drainage area (ac)P1-2yr =0.82 in. P1-100yr =2.86 in. BASINS: DP/Manhole SDMH-07 Contributing Basins B1+B4+B5+B6+C1+…+C4+D2+…+D5 *Basins B3, B7, D1, & D6 are on-grade inlet captured flows Contributing Area (acres)11.62 C2-10 C100 Runoff Coefficients 0.81 1.00 Overland Flow Time Length (ft) 30 Slope (%) 2.00% 2-yr to 10-yr 100-yr ti (min)11.10 3.77 Travel Time Length (ft) Slope (%) Hydraulic Radius (ft) Roughness Coefficient Velocity (ft/s)tt (min) 721 0.50%0.10 0.016 1.42 8.47 414 0.26%0.10 0.016 1.02 6.74 204 0.26%0.10 0.016 1.02 3.32 Total Time 18.54 Final Time of Concentration - tc (min) 2-yr to 10-yr 100-yr 29.64 22.31 Intensities (in/hr) 2-yr 100-yr 1.29 5.30 Discharge (cfs) 2-yr 100-yr 12.11 61.53 3.2 14.6 Captured Flows from Inlet-17 (B3) 5.3 14.6 Captured Flows from Inlet-16 (B7) 1.6 13.4 Captured Flows from Inlet-08 (D1) 3.2 13.4 Captured Flows from Inlet-07 (D6) 20.61 117.53 J.Claeys Highland Development Services 21-1044-00 April 9, 2024 Fort Collins Stormwater Criteria Manual Union Park Attenuated Flows Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: EQUATIONS: -Equation 5-3 -Equation 5-4 -CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition Final t c = minimum of t i + t t and urbanized basin check 500 ft - Overland flow shall not exceed for undeveloped condition recommended minimum t c = 5 min for urbanized basins Qn = n -yr peak discharge (cfs)I = rainfall intensity (in/hr) Cn = n -yr runoff coefficient P1 = one-hour point rainfall depth (in) In = n -yr rainfall intensity (in/hr) tc = time of concentration (min) A = drainage area (ac)P1-2yr =0.82 in. P1-100yr =2.86 in. BASINS: DP/Manhole E2 / Inlet-02 Contributing Basins E1+E4+E2 *Basin E2 Captured Flows Contributing Area (acres)1.61 C2-10 C100 Runoff Coefficients 0.65 0.81 Overland Flow Time Length (ft) 100 Slope (%) 2.00% 2-yr to 10-yr 100-yr ti (min)31.27 20.14 Travel Time Length (ft) Slope (%) Hydraulic Radius (ft) Roughness Coefficient Velocity (ft/s)tt (min) 208 0.50%0.10 0.016 1.42 2.44 Total Time 2.44 Final Time of Concentration - tc (min) 2-yr to 10-yr 100-yr 33.71 22.58 Intensities (in/hr) 2-yr 100-yr 1.20 5.26 Discharge (cfs) 2-yr 100-yr 1.24 6.84 3.57 20.76 Captured Flows from Inlet-02 (E2) 4.81 27.60 J.Claeys Highland Development Services 21-1044-00 April 9, 2024 Fort Collins Stormwater Criteria Manual Union Park Attenuated Flows Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: EQUATIONS: -Equation 5-3 -Equation 5-4 -CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition Final t c = minimum of t i + t t and urbanized basin check 500 ft - Overland flow shall not exceed for undeveloped condition recommended minimum t c = 5 min for urbanized basins Qn = n -yr peak discharge (cfs)I = rainfall intensity (in/hr) Cn = n -yr runoff coefficient P1 = one-hour point rainfall depth (in) In = n -yr rainfall intensity (in/hr) tc = time of concentration (min) A = drainage area (ac)P1-2yr =0.82 in. P1-100yr =2.86 in. BASINS: DP/Manhole SDMH-02 Contributing Basins B1+…+D6+E1+E2+E4 *Basins B3, B7, D1, D6 & E2 are inlet captured flows Contributing Area (acres)13.23 C2-10 C100 Runoff Coefficients 0.79 0.98 Overland Flow Time Length (ft) 30 Slope (%) 2.00% 2-yr to 10-yr 100-yr ti (min)11.83 4.41 Travel Time Length (ft) Slope (%) Hydraulic Radius (ft) Roughness Coefficient Velocity (ft/s)tt (min) 721 0.50%0.10 0.016 1.42 8.47 414 0.26%0.10 0.016 1.02 6.74 204 0.26%0.10 0.016 1.02 3.32 390 0.26%0.10 0.016 1.02 6.35 Total Time 24.89 Final Time of Concentration - tc (min) 2-yr to 10-yr 100-yr 36.72 29.30 Intensities (in/hr) 2-yr 100-yr 1.14 4.54 Discharge (cfs) 2-yr 100-yr 11.82 59.04 3.2 14.6 Captured Flows from Inlet-17 (B3) 5.3 14.6 Captured Flows from Inlet-16 (B7) 1.6 13.4 Captured Flows from Inlet-08 (D1) 3.2 13.4 Captured Flows from Inlet-07 (D6) 3.6 20.8 Captured Flows from Inlet-02 (E2) 25.12 115.04 J.Claeys Highland Development Services 21-1044-00 April 9, 2024 Fort Collins Stormwater Criteria Manual Union Park Attenuated Flows Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: EQUATIONS: -Equation 5-3 -Equation 5-4 -CoFC Overland Flow CONSTRAINTS: 300 ft - Overland flow shall not exceed for developed condition Final t c = minimum of t i + t t and urbanized basin check 500 ft - Overland flow shall not exceed for undeveloped condition recommended minimum t c = 5 min for urbanized basins Qn = n -yr peak discharge (cfs)I = rainfall intensity (in/hr) Cn = n -yr runoff coefficient P1 = one-hour point rainfall depth (in) In = n -yr rainfall intensity (in/hr) tc = time of concentration (min) A = drainage area (ac)P1-2yr =0.82 in. P1-100yr =2.86 in. BASINS: DP/Manhole E3 / Inlet-01 Contributing Basins B1+…+E4 Contributing Area (acres)25.92 C2-10 C100 Runoff Coefficients 0.79 0.99 Overland Flow Time Length (ft) 30 Slope (%) 2.00% 2-yr to 10-yr 100-yr ti (min)11.77 4.33 Travel Time Length (ft) Slope (%) Hydraulic Radius (ft) Roughness Coefficient Velocity (ft/s)tt (min) 721 0.50%0.10 0.016 1.42 8.47 414 0.26%0.10 0.016 1.02 6.74 204 0.26%0.10 0.016 1.02 3.32 390 0.26%0.10 0.016 1.02 6.35 10 0.26%0.10 0.016 1.02 0.16 Total Time 25.06 Final Time of Concentration - tc (min) 2-yr to 10-yr 100-yr 36.82 29.39 Intensities (in/hr) 2-yr 100-yr 1.13 4.53 Discharge (cfs) 2-yr 100-yr 23.17 115.71 J.Claeys Highland Development Services 21-1044-00 April 9, 2024 Fort Collins Stormwater Criteria Manual Appendix D APPENDIX D – DETENTION POND CALCULATIONS Union Park Pond Summary Design Engineer: Design Firm: Project Number: Date: Pond Summary Table N/A 0.24 N/A 4923.93 150.9 185.1 12" 17" 37.5 20.1 6.72 3.86 4933.27 4929.03 116.00 161.80 100.00 170.00 0.57 0.50 4936.00 4929.03 4937.00 4930.00 100-yr Site Release Rate (cfs) Outlet Orifice Size (in) Spillway Summary Table Top of Berm Elev. (ft) 100-yr Pond Max Inflow (cfs) Length (ft) Spillway Flow Depth (ft) Spillway Crest Elev. (ft) J. Claeys Highland Development 21-1044-00 April 9, 2024 100-yr Detention Volume (acre-ft) 100-yr Water Surface Elev. (ft) Pond 298a Summary Table Water Quality Capture Volume (acre-ft) WQCV Water Surface Elev. (ft) 100-yr Pond Max Inflow (cfs) Pond 298c Summary Table Water Quality Capture Volume (acre-ft) WQCV Water Surface Elev. (ft) 100-yr Pond Max Inflow (cfs) Outlet Orifice Size (in) 100-yr Site Release Rate (cfs) Spillway Crest Elev. (ft) Top of Berm Elev. (ft) 100-yr Detention Volume (acre-ft) 100-yr Water Surface Elev. (ft) Spillway Summary Table 100-yr Pond Max Inflow (cfs) Length (ft) Spillway Flow Depth (ft) 21-1044-00 PondCalcs.xls - Pond Summary Page 1 of 6 Interwest Consulting Group Union Park Water Quality Pond and Outlet Sizing - Pond 298c Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA: REQUIRED WATER QUALITY CAPTURE VOLUME (WQCV): Tributary Area, A 9.41 acres Composite. Imperviousness, I 64.9% WQCV (watershed inches)0.254 inches 40-Hour Drain Time (Fig SQ-2) Required WQCV 0.239 acre-feet Including 20% for Sedimentation WATER QUALITY OUTLET SIZING (Per USDCM, Volume 3): Design Water Quality Depth, DWQ 1.58 ft Determine K40 K40 = 0.013DWQ 2 + 0.22DWQ - 0.10 0.281 Maximum Area per Row, a a = WQCV / K40 0.849 square inches Number of Rows, nr 4 rows Number of Columns, nc (See Table 6a-1 for Max.)1 columns Choose Hole Diameter 1 inches Use USDCM Volume 3, Figure 5 1.000 inches Total Area per Row, Ao 0.79 square inches Total Outlet Area, Aot 3.14 square inches Does design work?Yes Minimum Steel Plate Thickness 1/4 inch (Not Used) Number of Rows, nr 2 rows Choose Rectangular Hole Width (w/ 2" Height)0 inches Use USDCM Volume 3, Figure 5 0.000 inches Total Outlet Area, Aot 0.00 square inches Does design work?Yes Minimum Steel Plate Thickness 1/4 inch J. Claeys Highland Development Services 21-1044-00 April 9, 2024 Urban Storm Drainage Criteria Manual (USDCM) Volume III, Urban Drainage and Flood Control District, June 2001 (Updated November 2010) Circular Perforation Sizing Rectangular Perforation Sizing 2.1** 12 AreaWQCVVolume  = 21-1044-00 PondCalcs.xls - WQCV & Outlet Structure Page 2 of 6 Interwest Consulting Group Union Park Water Quality Pond and Outlet Sizing - Pond 298c Design Engineer: Design Firm: Project Number: Date: J. Claeys Highland Development Services 21-1044-00 April 9, 2024 WATER QUALITY TRASH RACK SIZING (Per USDCM, Volume 3) Required Open Area, At At=0.5*[77(e-0.124D)]*Aot 107 square inches Min. Distance between Columns, Sc 4 inches Width of Trash Rack and Concrete Opening per Column 3 inches Use USDCM Volume 3, Table 6a-1 Total Width, Wconc 3 inches Height of Trash Rack Screen, Htr 19 inches Check - Does Not Work Type of Screen S.S. #93 VEE Wire (US Filter) Screen Opening Slot Dimension 0.139" (US Filter) Support Rod Type (See Table 6a-2) Spacing of Support Rod (O.C.)3/4 inches O.C. Total Screen Thickness (See Table 6a-2)0.31 inches Carbon Steel Frame Type (See Table 6a-2) (Not Used) Required Open Area, At (including 50% clogging) At=0.5*[77(e-0.124D)]*Aot 0 square inches Width of Trash Rack Opening, Wopening 1 inches Use USDCM Volume 3, Table 6b-1 Width of Concrete Opening, Wconc 12 inches Min Height of Trash Rack Screen, Htr (including 2' 4" below lowest openings)28.00 inches Type of Screen Kelmp KRP Series Aluminum Bar Gate (or Equal) Screen Opening Slot Dimension 3/16" Bars on 1-3/16" Centers Minimum Bearing Bar Size (See Table 6b-2) 3/8in x 1.0in flat bar Circular Perforation Trash Rack Sizing Rectangular Perforation Trash Rack Sizing 1 in x 3/16 in #156 VEE 21-1044-00 PondCalcs.xls - WQCV & Outlet Structure Page 3 of 6 Interwest Consulting Group Union Park Critical Pond Elevations Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised January 2016) Stage Storage - Pond 298a Volume (pond volume calculated using the prismoidal formula): CONTOUR (FT)AREA (FT2) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE- FT) 4926.50 0.000 0.000 0.00 0.000 4927.0 1,582 0.036 0.006 0.50 0.006 4928.0 16,848 0.387 0.181 1.50 0.187 4929.0 42,452 0.975 0.658 2.50 0.845 4930.0 55,814 1.281 1.124 3.50 1.969 4931.0 61,829 1.419 1.350 4.50 3.319 4932.0 63,775 1.464 1.442 5.50 4.761 4933.0 66,216 1.520 1.492 6.50 6.253 4934.0 73,768 1.693 1.606 7.50 7.859 4935.0 83,670 1.921 1.806 8.50 9.665 4936.0 90,558 2.079 1.999 9.50 11.664 Spillway 4937.0 96,883 2.224 2.151 10.50 13.815 Northwest POND J. Claeys Highland Development 21-1044-00 April 9, 2024 () 3 2121 DepthAAAA V ++ = 21-1044-00 PondCalcs.xls - Pond A Stage Storage Page 4 of 6 Highland Development Services Union Park Critical Pond Elevations Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised January 2016) Stage Storage - Pond 298b Volume (pond volume calculated using the prismoidal formula): CONTOUR (FT)AREA (FT2) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE- FT) 4928.90 0.000 0.000 0.00 0.000 4929.0 26 0.001 0.000 0.10 0.000 4930.0 8,359 0.192 0.068 1.10 0.068 4931.0 12,922 0.297 0.242 2.10 0.310 4931.35 13,440 0.309 0.106 2.45 0.416 Spillway J. Claeys Highland Development 21-1044-00 April 9, 2024 Northwest POND () 3 2121 DepthAAAA V ++ = 21-1044-00 PondCalcs.xls - Pond B Stage Storage Page 5 of 6 Highland Development Services Union Park Critical Pond Elevations Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District, June 2001 (Revised January 2016) Water Quality Capture Volume (WQCV): Tributary Area, A 9.41 acres Basins D1+E1+…+E8 not treated by LID Composite. Imperviousness, I 64.9% WQCV (watershed inches) 0.254 inches 40-Hour Drain Time (Fig SQ-2) Required WQCV 0.239 acre-feet Including 20% for Sedimentation Stage Storage - Pond 298c Volume (pond volume calculated using the prismoidal formula): CONTOUR (FT)AREA (FT2) AREA (ACRE) VOLUME (ACRE-FT) DEPTH (FT) CUMULATIVE VOLUME (ACRE- FT) 4922.35 0 0.000 0.000 0.00 0.000 4923.0 4,205 0.097 0.021 0.65 0.021 4924.0 17,640 0.405 0.233 1.65 0.254 4925.0 22,935 0.527 0.464 2.65 0.718 4926.0 24,919 0.572 0.549 3.65 1.268 4927.0 34,586 0.794 0.680 4.65 1.948 4928.0 40,193 0.923 0.858 5.65 2.805 4929.0 45,535 1.045 0.983 6.65 3.788 Spillway 4930.0 49,980 1.147 1.096 7.65 4.884 0.239 4923.93 ftAcre-Ft Interpolates to an Elev. of J. Claeys Highland Development 21-1044-00 April 9, 2024 Southeast POND Required Water Quality Capture Volume (WQCV) = () 3 2121 DepthAAAAV++ = 21-1044-00 PondCalcs.xls - Pond C Stage Storage Page 6 of 6 Highland Development Services Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Apr 9 2024 Pond 298a Spillway Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 100.00 Total Depth (ft) = 0.75 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 2.67 Compute by: Known Q Known Q (cfs) = 116.00 Highlighted Depth (ft) = 0.57 Q (cfs) = 116.00 Area (sqft) = 58.30 Velocity (ft/s) = 1.99 Top Width (ft) = 104.56 0 10 20 30 40 50 60 70 80 90 100 110 120 130 Depth (ft)Depth (ft)Pond 298a Spillway -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft)Weir W.S. Weir Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Apr 9 2024 Pond 298c Spillway Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 170.00 Total Depth (ft) = 0.75 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 2.67 Compute by: Known Q Known Q (cfs) = 161.80 Highlighted Depth (ft) = 0.50 Q (cfs) = 161.80 Area (sqft) = 86.00 Velocity (ft/s) = 1.88 Top Width (ft) = 174.00 0 20 40 60 80 100 120 140 160 180 200 220 Depth (ft)Depth (ft)Pond 298c Spillway -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft)Weir W.S. Appendix E APPENDIX E – STREET CAPACITY & INLET CALCULATIONS Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Sep 6 2023 36' Crowned Street User-defined Invert Elev (ft) = 99.51 Slope (%) = 0.50 N-Value = 0.016 Calculations Compute by: Known Depth Known Depth (ft) = 0.99 (Sta, El, n)-(Sta, El, n)... ( -46.50, 100.58)-(16.00, 99.68, 0.013)-(18.00, 99.51, 0.013)-(18.04, 100.01, 0.013)-(26.50, 100.18, 0.020)-(31.50, 100.28, 0.013)-(46.50, 100.58, 0.020) Highlighted Depth (ft) = 0.99 Q (cfs) = 134.36 Area (sqft) = 36.77 Velocity (ft/s) = 3.65 Wetted Perim (ft) = 85.95 Crit Depth, Yc (ft) = 0.99 Top Width (ft) = 85.00 EGL (ft) = 1.20 -10 0 10 20 30 40 50 60 Elev (ft) Depth (ft)Section 99.00 -0.51 99.50 -0.01 100.00 0.49 100.50 0.99 101.00 1.49 Sta (ft) Depth @ flowline w/ 0.5' depth at crown Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Mar 26 2024 30' Crowned Street User-defined Invert Elev (ft) = 99.57 Slope (%) = 0.50 N-Value = 0.015 Calculations Compute by: Known Depth Known Depth (ft) = 0.73 (Sta, El, n)-(Sta, El, n)... ( -32.50, 100.42)-(13.00, 99.74, 0.013)-(15.00, 99.57, 0.013)-(15.04, 100.07, 0.013)-(21.50, 100.20, 0.020)-(26.50, 100.30, 0.013)-(32.50, 100.42, 0.020) Highlighted Depth (ft) = 0.73 Q (cfs) = 52.81 Area (sqft) = 16.43 Velocity (ft/s) = 3.21 Wetted Perim (ft) = 53.95 Crit Depth, Yc (ft) = 0.74 Top Width (ft) = 53.00 EGL (ft) = 0.89 -5 0 5 10 15 20 25 30 35 40 Elev (ft)Depth (ft)Section 99.00 -0.57 99.50 -0.07 100.00 0.43 100.50 0.93 101.00 1.43 Sta (ft) Depth @ Back of Walk Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Mar 26 2024 26' Inverted Street User-defined Invert Elev (ft) = 100.00 Slope (%) = 0.50 N-Value = Composite Calculations Compute by: Q vs Depth No. Increments = 10 (Sta, El, n)-(Sta, El, n)... ( -13.67, 100.72)-(2.00, 100.17, 0.013)-(13.00, 100.39, 0.013)-(13.67, 100.72, 0.013) Highlighted Depth (ft) = 0.72 Q (cfs) = 59.36 Area (sqft) = 12.44 Velocity (ft/s) = 4.77 Wetted Perim (ft) = 27.51 Crit Depth, Yc (ft) = 0.72 Top Width (ft) = 27.34 EGL (ft) = 1.07 -5 0 5 10 15 20 Elev (ft)Depth (ft)Section 99.75 -0.25 100.00 0.00 100.25 0.25 100.50 0.50 100.75 0.75 101.00 1.00 Sta (ft) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Mar 26 2024 26' Pitched Street (w/o Parking) User-defined Invert Elev (ft) = 100.00 Slope (%) = 0.50 N-Value = 0.016 Calculations Compute by: Known Depth Known Depth (ft) = 0.88 (Sta, El, n)-(Sta, El, n)... ( -24.50, 100.98)-(2.00, 100.17, 0.013)-(26.00, 100.62, 0.013)-(26.50, 101.15, 0.013)-(45.50, 101.53, 0.020)-(50.50, 101.63, 0.013) Highlighted Depth (ft) = 0.88 Q (cfs) = 58.33 Area (sqft) = 17.19 Velocity (ft/s) = 3.39 Wetted Perim (ft) = 46.08 Crit Depth, Yc (ft) = 0.88 Top Width (ft) = 45.75 EGL (ft) = 1.06 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 Elev (ft)Depth (ft)Section 99.50 -0.50 100.00 0.00 100.50 0.50 101.00 1.00 101.50 1.50 102.00 2.00 Sta (ft) Equivalent depth to TBC w/ parking Union Park PROPOSED DRAINAGE SUMMARY Design Engineer: Design Firm: Project Number: Date: INLET/STREET CAPACITY SUMMARY TABLE Minor Major Minor Major B3 / Inlet-17 B2+B3 3.19 18.42 8.9 36' Crowned @ S=0.5%Yes 9.52 On-grade Inlet - Overtopping, split w/ B7 3.19 21.68 3.20 14.60 3.20 14.10 0.00 7.60 By-Pass flows to D1 B4 / Inlet-13 B4 2.61 11.59 2.61 11.59 Sump Inlet B5 / Inlet-15 B5 2.54 11.03 2.54 11.03 Sump Inlet B6 / Inlet-14 B6 1.88 8.12 1.90 8.10 On-grade Inlet - Sized to Capture 100% B7 / Inlet-16 B7 5.34 24.94 8.9 36' Crowned @ S=0.5%Yes 16.04 On-grade Inlet - Overtoping, split w/ B3 5.34 21.68 5.30 14.60 5.30 14.10 0.00 7.60 By-Pass flows to D6 C1 / Inlet-11 C1 2.12 9.24 Sump Inlet - Overtopping split w/ C2 2.12 6.58 2.12 6.58 C2 / Inlet-10 C2 0.86 3.92 Sump Inlet - Overtopping split w/ C1 0.86 6.58 0.86 6.58 C4 / Inlet-09 C4 5.66 27.21 5.66 27.21 Sump Inlet D1 / Inlet-08 D1 1.59 7.51 8.9 Combined w/ By-Pass from B3 1.59 15.11 Overtopping, split w/ D6 1.59 18.25 1.60 13.40 1.60 12.90 0.00 5.30 By-Pass flows to E2 D6 / Inlet-07 D6 3.23 13.79 8.9 Combined w/ By-pass from B7 3.23 21.39 Overtopping, split w/ D1 3.23 18.25 3.20 13.40 3.20 12.90 0.00 5.30 By-Pass flows to E3 D2 / Inlet-04 D2 3.23 13.79 Sump Inlet D3 / Inlet-06 D3 2.19 11.17 Sump Inlet D4 / Inlet-05 D4 1.24 4.72 Sump Inlet E1 / Inlet-21 E1 2.02 10.00 Sump Inlet E2 / Inet-02 E2 3.57 17.46 8.9 Combined w/ By-Pass from D1 3.57 22.76 Overtopping, split w/ E3 3.57 20.76 Sump Inlet E3 / Inet-01 E3 2.80 13.46 8.9 Combined w/ By-Pass from D6 2.80 18.76 Overtopping, split w/E2 2.80 20.76 Sump Inlet E5 / Inlet-20 E5 1.37 5.72 Sump Inlet E6 / Inlet-19 E6 1.45 6.13 Sump Inlet DESIGN POINT TRIBUTARY SUB-BASIN Q2 (cfs) Inlet Capacity (cfs) To Be Used in SWMM J.Claeys Highland Development Services 21-1044-00 April 7, 2024 DRAINAGE STRUCTURE REMARKSQ100 (cfs)By-Pass Q2 (cfs) By-Pass Q100 (cfs) 1/2 Street or Private Drive Capacity (cfs) Does Q100 Overtop CL (Yes/No)? Q100 Overtopping (cfs) Inlet Capacity Including Clogging Factor (cfs)Street Section 21-1044-00 Rational Calcs.xlsx Page 1 of 1 Highland Development Services Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =19.83 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.020 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.005 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =5.84 10.64 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =8.9 57.9 cfs Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =3.0 3.0 inches Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =15.00 15.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo =N/A N/A ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf (G) =N/A N/A Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf (C) =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q = 3.2 14.1 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 7.6 cfs Capture Percentage = Qa/Qo C% = 100 65 % Note: Storm sewer should be sized for the sum of the unclogged interception capacities (Qminor = 3.2 cfs and Qmajor = 14.6 cfs) Minor storm max. allowable capacity GOOD - greater than the design peak flow of 3.19 cfs on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design peak flow of 21.68 cfs on sheet 'Inlet Management' INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.03 (August 2023) CDOT Type R Curb Opening MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Union Park Inlet-17 (DP B3) CDOT Type R Curb Opening 1 Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =7.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.016 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =30.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.015 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =30.0 30.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 16.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 7.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =10.00 10.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.33 0.42 ft Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.93 0.99 Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =8.3 12.4 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q Peak)Q PEAK REQUIRED =2.6 11.6 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.03 (August 2023) MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Union Park Inlet-13 (DP B4) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 1 Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =19.8 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.020 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.005 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =5.84 10.64 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =8.9 57.9 cfs Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =3.0 3.0 inches Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =15.00 15.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo =N/A N/A ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf (G) =N/A N/A Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf (C) =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q = 5.3 14.1 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 7.6 cfs Capture Percentage = Qa/Qo C% = 100 65 % Note: Storm sewer should be sized for the sum of the unclogged interception capacities (Qminor = 5.3 cfs and Qmajor = 14.6 cfs) Minor storm max. allowable capacity GOOD - greater than the design peak flow of 5.34 cfs on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design peak flow of 21.68 cfs on sheet 'Inlet Management' INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.03 (August 2023) CDOT Type R Curb Opening MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Union Park Inlet-16 (DP B7) CDOT Type R Curb Opening 1 Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =19.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.020 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =15.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =15.0 15.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =5.1 10.6 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =5.1 10.6 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =10.00 10.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.26 0.71 ft Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.88 1.00 Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =5.3 24.0 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q Peak)Q PEAK REQUIRED =2.1 6.6 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.03 (August 2023) MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Union Park Inlet-11 (DP C1) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 1 Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =19.5 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.020 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =15.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =15.0 15.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =5.1 10.6 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =5.1 10.6 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =10.00 10.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.26 0.71 ft Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.88 1.00 Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =5.3 24.0 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q Peak)Q PEAK REQUIRED =0.9 6.6 cfs CDOT Type R Curb Opening INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.03 (August 2023) MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Union Park Inlet-10 (DP C2) H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 1 Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =19.8 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.020 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.005 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =5.8 10.6 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =8.9 57.9 cfs Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =3.0 3.0 inches Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =15.00 15.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo =N/A N/A ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf (G) =N/A N/A Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf (C) =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q = 1.6 12.9 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 5.3 cfs Capture Percentage = Qa/Qo C% = 100 71 % Note: Storm sewer should be sized for the sum of the unclogged interception capacities (Qminor = 1.6 cfs and Qmajor = 13.4 cfs) MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Union Park Inlet-08 (DP D1) Minor storm max. allowable capacity GOOD - greater than the design peak flow of 1.59 cfs on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design peak flow of 18.25 cfs on sheet 'Inlet Management' INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.03 (August 2023) CDOT Type R Curb OpeningCDOT Type R Curb Opening 1 Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =19.8 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.020 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.005 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =5.8 10.6 inches Allow Flow Depth at Street Crown (check box for yes, leave blank for no) MINOR STORM Allowable Capacity is based on Spread Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Qallow =8.9 57.9 cfs Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a')aLOCAL =3.0 3.0 inches Total Number of Units in the Inlet (Grate or Curb Opening) No = 1 1 Length of a Single Unit Inlet (Grate or Curb Opening)Lo =15.00 15.00 ft Width of a Unit Grate (cannot be greater than W, Gutter Width) Wo =N/A N/A ft Clogging Factor for a Single Unit Grate (typical min. value = 0.5)Cf (G) =N/A N/A Clogging Factor for a Single Unit Curb Opening (typical min. value = 0.1)Cf (C) =0.10 0.10 Street Hydraulics: OK - Q < Allowable Street Capacity'MINOR MAJOR Total Inlet Interception Capacity Q = 3.2 12.9 cfs Total Inlet Carry-Over Flow (flow bypassing inlet)Qb =0.0 5.3 cfs Capture Percentage = Qa/Qo C% = 100 71 % Note: Storm sewer should be sized for the sum of the unclogged interception capacities (Qminor = 3.2 cfs and Qmajor = 13.4 cfs) MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Union Park Inlet-07 (DP D6) Minor storm max. allowable capacity GOOD - greater than the design peak flow of 3.23 cfs on sheet 'Inlet Management' Major storm max. allowable capacity GOOD - greater than the design peak flow of 18.25 cfs on sheet 'Inlet Management' INLET ON A CONTINUOUS GRADE MHFD-Inlet, Version 5.03 (August 2023) CDOT Type R Curb OpeningCDOT Type R Curb Opening 1 Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =7.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.020 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =30.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.015 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =30.0 30.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 16.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 8.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =10.00 10.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.33 0.50 ft Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.93 1.00 Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =8.3 16.3 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q Peak)Q PEAK REQUIRED =3.2 13.8 cfs MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Union Park Inlet-04 (DP D2) INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.03 (August 2023) CDOT Type R Curb Opening H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 1 Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =19.8 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.020 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =5.8 10.6 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =5.8 8.5 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =15.00 15.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.32 0.54 ft Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.78 0.91 Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =9.0 23.4 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q Peak)Q PEAK REQUIRED =3.6 20.8 cfs MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Union Park Inlet-02 (DP E2) INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.03 (August 2023) CDOT Type R Curb Opening H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 1 Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =19.8 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.020 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =18.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.020 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =18.0 18.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =5.8 10.6 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =5.8 8.5 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =15.00 15.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.32 0.54 ft Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.78 0.91 Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =9.0 23.4 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q Peak)Q PEAK REQUIRED =2.8 20.8 cfs MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Union Park Inlet-01 (DP E3) INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.03 (August 2023) CDOT Type R Curb Opening H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 1 Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =7.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.020 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =30.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.005 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =30.0 30.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =10.00 10.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.33 0.33 ft Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.93 0.93 Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =8.3 8.3 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q Peak)Q PEAK REQUIRED =1.4 5.7 cfs MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Union Park Inlet-20 (DP E5) INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.03 (August 2023) CDOT Type R Curb Opening H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 1 Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =7.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.020 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =30.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.005 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =30.0 30.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.0 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =10.00 10.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.33 0.33 ft Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.93 0.93 Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =8.3 8.3 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q Peak)Q PEAK REQUIRED =1.5 6.1 cfs MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Union Park Inlet-19 (DP E6) INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.03 (August 2023) CDOT Type R Curb Opening H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 1 Project: Inlet ID: Gutter Geometry: Maximum Allowable Width for Spread Behind Curb TBACK =7.0 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb)SBACK =0.020 ft/ft Manning's Roughness Behind Curb (typically between 0.012 and 0.020)nBACK =0.020 Height of Curb at Gutter Flow Line HCURB =6.00 inches Distance from Curb Face to Street Crown TCROWN =30.0 ft Gutter Width W =2.00 ft Street Transverse Slope SX =0.005 ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or 0.083 ft/ft)SW =0.083 ft/ft Street Longitudinal Slope - Enter 0 for sump condition SO =0.000 ft/ft Manning's Roughness for Street Section (typically between 0.012 and 0.020)nSTREET =0.016 Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm TMAX =30.0 30.0 ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm dMAX =6.0 6.0 inches Check boxes are not applicable in SUMP conditions MINOR STORM Allowable Capacity is not applicable to Sump Condition Minor Storm Major Storm MAJOR STORM Allowable Capacity is not applicable to Sump Condition Qallow =SUMP SUMP cfs Design Information (Input)MINOR MAJOR Type of Inlet Type = Local Depression (additional to continuous gutter depression 'a' from above)alocal =3.00 3.00 inches Number of Unit Inlets (Grate or Curb Opening)No =1 1 Water Depth at Flowline (outside of local depression)Ponding Depth =6.0 6.5 inches Grate Information MINOR MAJOR Length of a Unit Grate Lo (G) =N/A N/A feet Width of a Unit Grate Wo =N/A N/A feet Open Area Ratio for a Grate (typical values 0.15-0.90)Aratio =N/A N/A Clogging Factor for a Single Grate (typical value 0.50 - 0.70)Cf (G) =N/A N/A Grate Weir Coefficient (typical value 2.15 - 3.60)Cw (G) =N/A N/A Grate Orifice Coefficient (typical value 0.60 - 0.80)Co (G) =N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening Lo (C) =10.00 10.00 feet Height of Vertical Curb Opening in Inches Hvert =6.00 6.00 inches Height of Curb Orifice Throat in Inches Hthroat =6.00 6.00 inches Angle of Throat Theta =63.40 63.40 degrees Side Width for Depression Pan (typically the gutter width of 2 feet)Wp =2.00 2.00 feet Clogging Factor for a Single Curb Opening (typical value 0.10)Cf (C) =0.10 0.10 Curb Opening Weir Coefficient (typical value 2.3-3.7)Cw (C) =3.60 3.60 Curb Opening Orifice Coefficient (typical value 0.60 - 0.70)Co (C) =0.67 0.67 Low Head Performance Reduction (Calculated)MINOR MAJOR Depth for Grate Midwidth dGrate =N/A N/A ft Depth for Curb Opening Weir Equation dCurb =0.33 0.38 ft Grated Inlet Performance Reduction Factor for Long Inlets RFGrate =N/A N/A Curb Opening Performance Reduction Factor for Long Inlets RFCurb =0.93 0.96 Combination Inlet Performance Reduction Factor for Long Inlets RFCombination =N/A N/A MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition)Qa =8.3 10.2 cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q Peak)Q PEAK REQUIRED =2.2 9.5 cfs MHFD-Inlet, Version 5.03 (August 2023) ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Union Park Inlet-18 (DP E7) INLET IN A SUMP OR SAG LOCATION MHFD-Inlet, Version 5.03 (August 2023) CDOT Type R Curb Opening H-VertH-Curb W Lo (C) Lo (G) Wo WP CDOT Type R Curb Opening Override Depths 1 Union Park TYPE 13 AREA INLET SIZING CALCULATION Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA EQUATIONS: Q i = Grate Capacity w/o Reduction Factor (cfs) C = Orifice Discharge Coefficient = 0.67 A = Orifice area (ft2) - Open Area of Grate G = Gravitational Constant (32.2 ft/s2) H = Allowed Head on Grate, Ponding Depth (ft) Grate Dimensions and Information: Width (W ):1.875 ft Length (L ):3.27 ft Opening Ratio (R ):0.375 sqft/sqft Reduction Factor (F ):50% Single Grate Open Area (A ):2.30 sqft Allowed Head (H ):0.5 ft Number of Grates Inlet Capacity (cfs) Inlet Capacity w/ Reduction Factor (cfs) 1 Single 8.74 4.37 2 Double 17.48 8.74 3 Triple 26.22 13.11 4 Quad 34.97 17.48 5 Penta 43.71 21.85 INLET SIZING CALCULATIONS Inlet ID: Design Flow Rate (Q 100 , cfs) Allowed Head (H , ft) Single Grate Capacity (Q sg , cfs) Number of Grates: Inlet Capacity (QG, cfs) Design Flow Depth (H, ft) Inlet-15 (DP B5)11.03 0.97 6.09 Double Type 13 12.18 0.80 Inlet-14 (DP B6)8.12 0.25 3.09 Triple Type 13 9.27 0.19 Inlet-09 (DP C4)27.21 1.10 6.48 Penta Type 13 32.41 0.78 Inlet-06 (DP D3)11.17 0.97 6.09 Double Type 13 12.18 0.82 Inlet-05 (DP D4)4.72 0.25 3.09 Double Type 13 6.18 0.15 Inlet-21 (DP E1)10.00 0.25 3.09 Quad Type 13 12.36 0.16 Apply Reduction Factor for the Allowable Capacity. Assumed Capacity w/ 0.5' Head Allowed J.Claeys Highland Development Services 21-1044-00 April 7, 2024 Appendix F APPENDIX F – CONVEYANCE ELEMENT SIZING Union Park Structure Flow Summary for Hydraflow Inputs Design Engineer: Design Firm: Project Number: Date: Inflow Summary: Structure Basin Q100 (cfs)Notes EXSDMH-06 596 2.03 Peak from Affinity Outlet-02 A1 / Pond 298a 2.03 Pond Release rate SDMH-12 2.03 SDMH-38 B1 2.37 SDMH-37 2.37 SDMH-36 2.37 SDMH-35 2.37 SDMH-34 2.37 Inlet-17 B3 14.60 On-Grade Inlet Capture SDMH-33 16.97 B1+B3 Inlet Capture Inlet-16 B7 31.57 B1+B3 & B7 Inlet Captures SDMH-11 33.60 Plus 298a Pond Release Inlet-13 B4 11.59 Sump Inlet Inlet-12 11.59 SDMH-31 11.59 Inlet-15 B5 11.03 Sump Inlet SDMH-30 21.13 B4+B5 Attenuated Flow SDMH-29 21.13 Inlet-14 B6 8.12 Sump Inlet SDMH-28 24.26 B4+B5+B6 Attenuated SDMH-10 52.54 B1+…+B7 Attenuated Inlet-11 C1 9.24 Sump Inlet SDMH-23 9.24 Inlet-10 C2 10.66 C1+C2 Attenuated Flow SDMH-27 C3 4.50 Sump Inlet (yard drains) SDMH-26 4.50 SDMH-22 13.09 C1+C2+C3 Attenuated Inlet-09 C4 33.36 C1+…+C4 Attenuated SDMH-21 33.36 SDMH-19 33.36 SDMH-09 75.55 B1+…+C4 Attenuated Inlet-08 D1 13.40 On-Grade Inlet Capture Inlet-07 D6 13.40 Combined Inet Capture SDMH-08 102.35 B1+…+D6 Attenuated Inlet-04 D2 13.79 Sump Inlet Inlet-03 13.79 SDMH-17 13.79 SDMH-16 13.79 Inlet-06 D3 11.17 Sump Inlet SDMH-15 18.53 D2+D3 Attenuated SDMH-14 18.53 Inlet-05 D4 4.72 Sump Inlet SDMH-13 19.89 D2+D3+D4 Attenuated SDMH-07 117.53 B1+…+D6 Attenuated SDMH-06 117.53 SDMH-05 117.53 SDMH-04 117.53 SDMH-03 117.53 Inlet-21 E1 10.00 Sump Inlet Headwall-02 E4 12.19 E1+E4 Peaks Added Inlet-02 E2 27.60 E1+E2+E4 Attenuated SDMH-02 115.04 Inlet-01 E3 115.71 B1+…E4 Attenuated Inlet-20 E5 5.72 Inlet-19 E6 6.13 Inlet-18 E7 9.47 J.Claeys Highland Development Services 21-1044-00 April 7, 2024 Pond 596 Outlet Main Trunk Line Pond 298a to Pond 298c SDMH-33 to SDMH-38 Inlet-17 to SDMH-11 Inlet-13 to SDMH-10 Inlet-15 to SDMH-30 Inlet-14 to SDMH-28 Inlet-10 to SDMH-09 SDMH-27 to SDMH-22 Inlet-08 to SDMH-08 Inlet-07 to SDMH-08 Inlet-04 to SDMH-07 Inlet-06 to SDMH-15 Inlet-05 to SDMH-13 HEADWALL-02 to SDMH-02 Inlet-21 to Pond 298c Inlet-20 to Pond 298c Inlet-19 to Pond 298c Pond 298c to Outfall Appendix G APPENDIX G – LOW IMPACT DEVELOPMENT CALCULATIONS Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA Low Impact Development Summary Sq-Ft Acres Impervious Area (sq-ft) % of Impervious Area Requiring Treatment Impervious Area Requiring Treatment 1,383,183 31.75 966,859 75% 725,144 LID Facility Contributing Basins Area Drainage to LID (sq-ft) % Impervious Impervious Area Treated (sq-ft) WQCV12-hr (watershed inches) WQCV12-hr (cu-ft) Treatment Method B B1+…+B6 391,433 75.3% 313,849 0.24 7,858 Filtration Gallery C C1+...+C4 204,297 69.7% 152,431 0.22 3,727 Filtration Gallery D D2+…+D6 266,057 75.1% 212,660 0.24 5,322 Filtration Gallery EDB Pond Contributing Basins Drainage Area (sq-ft) Drainage Area (sq-ft)% Impervious WQCV40-hr (watershed inches) WQCV40-hr (ac-ft) Pond 298C D1+E1+…+E8 410,044 9.41 64.9% 0.25 0.239 725,144 678,941 70.2% 93.6% Area (sq-ft) Area (acres) Treatment Ratio 861,787 19.78 62.3% 410,044 9.41 29.6% 1,271,831 29.20 91.9% 111,351 2.56 8.1% 1,383,183 31.75 Union Park Low Impact Development Total % of Required Treatment Development Area Breakdown City of Fort Collins - Ordinance No. 007, 2016 - Treat at least 75% of any newly developed or redeveloped impervious area using one or a combination of LID techniques, or - Treat at least 50% of any newly developed or redeveloped impervious area using one or a combination of LID techniques when 25% of private driveable surfaces are permeable. Total Impervious Area Treated (sq-ft) Total Impervious Area Required for LID Treatment (sq-ft) LID Treatment Summary LID Treatment Areas J.Claeys Highland Development Services 21-1044-00 April 9, 2024 Urban Storm Drainage Criteria Manual by Urban Drainage and Flood Control District, June 2001 (Revised January 2016) Standard Water Quality Areas Description Total % of Imervious Area Treated Development Area Total Improvement Area Water Quality Area Treatment Summary Description Total Area Treated by LID Total Area Treated by EDB Total Untreated Area (includes Pond 298A) Total Treated Area Allowed Filter Fabric Flow Ratea (cfs) 0.35 gpm/sq-ft SC-106LP 14 10 6 6 85.4 25 12 14.8 0.012 6.9 15.0 SC-310 18 8 6 6 85.4 34 16 20.2 0.016 14.7 31.0 SC-740 18 8 6 6 85.4 51 30 30.2 0.024 45.9 74.9 DC-780 18 12 6 9 85.4 51 30 30.2 0.024 46.2 78.4 SC-800 15 8 6 6 85.4 51 33 30.2 0.024 50.6 81.0 MC-3500 18 8 12 9 90 77 45 48.1 0.038 109.9 175.0 14.9 45.1 MC-4500 24 7 12 9 52 100 60 36.1 0.028 106.5 162.6 39.5 115.3 MC-7200 24 7 12 9 83 100 60 57.6 0.045 175.9 267.3 39.5 115.3 LID Facility Chamber Type Total Release Ratef (cfs) WQ Inflowg (cfs) Req'd Storage Volumeh (cu-ft) Minimum No. of Chambersi Chamber Storagej (cu-ft) No. of Endcapsk Endcap Storagel (cu-ft) Total Chamber Volumem (cu-ft) Total Installed System Volumen (cu-ft) WQCV12-hr (cu-ft) B SC-800 2.12 8.09 4,699 90 4,554 10 0 4,554 7,900 7,858 C SC-310 1.60 4.48 1,595 102 1,499 12 0 1,499 3,756 3,727 D SC-800 1.39 4.66 3,212 59 2,985 14 0 2,985 5,342 5,322 Union Park Low Impact Development StormTech Chamber Configuration Summary StormTech Chamber Data Design Engineer: Design Firm: Project Number: Date: Length (in) Width (in) Height (in) Floor Area (sq-ft) Chamber Volumeb (cu-ft) Min Aggregate Base (in) Min Aggregate Cover (in) Negligible Max Cover (ft) Min Cover (in) Chamber Model J.Claeys Highland Development Services 21-1044-00 April 9, 2024 Min Installed Chamber/Aggregate Volumec (cu-ft) Negligible Endcap Volumed (cu-ft) Min Installed Endcap/Aggregate Volumee (cu-ft) Negligible Negligible Negligible Note: a. Release rate per chamber, limited by flow through geotextile with accumulated sediment. City acceptable flow rates determined to be approximately 1/2 of the Nov-07 Qmax from Figure 17 of the "Final Report on Field Verification Testing of the StormTech Isoloator Row Treatement Unit", prepard by the University of New Hamphire Stormwater Center, dated Setpember 2010. b. Volume within chamber only, not accounting for void spaces in surrounding aggregate. c. Volume includes chamber and void spaces (40%) in surrounding aggregate, per chamber unit. d. Volume within endcap only, not accounting for void spaces in surrounding aggregate. e. Volume includes endcap and void spaces (40%) in surrounding aggregate, per chamber unit. f. Release rate per chamber times number of chambers. This is used as the allowed release rate for the FAA calculations. g. WQ flow, equal to 1/2 of the 2-yr peak runoff rate, referenced to size flow control structure. h. Required detention volume determined using the FAA Method based on the acceptable release rate of sediment accumulated filter fabric of the chambers and the 1/2 of the 2yr inflow rate. i. Number of chambers required to provide required FAA storage volume stored within the chamber and endcaps only (no aggregate storage). j. Total volume provided in chambers only (no aggregate storage). k. Number of endcaps based on desired chamber layout. l. Total volume provided in endcaps only (no aggregate storage). m. Total chamber and endcap storage (no aggregate storage). This number must meet or exceed the required FAA storage volume. n. System volume includes total chamber volume plus surrounding aggregate volume, assumes a 40% void ratio for aggregate storage. This total is provided from ADS Design Tool. DESIGN CRITERIA 0.81 1.00 0.81 (ft3)acre-ft 8.99 acres 4,699 0.11 2.12 cfs Time (min) 1/2 2-yr Intensity (I , in/hr) Q1/2 2-YR (cfs) Accumulative Runoff Volume (ft3) Accumulative Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.000 0.00 0 0 0 0.00 5 1.425 10.38 3,113 637 2,476 0.06 10 1.105 8.05 4,828 1,274 3,554 0.08 15 0.935 6.81 6,128 1,910 4,217 0.10 20 0.805 5.86 7,034 2,547 4,487 0.10 25 0.715 5.21 7,810 3,184 4,626 0.11 30 0.650 4.73 8,520 3,821 4,699 0.11 35 0.585 4.26 8,946 4,458 4,488 0.10 40 0.535 3.90 9,350 5,095 4,255 0.10 45 0.495 3.60 9,732 5,731 4,001 0.09 50 0.460 3.35 10,049 6,368 3,681 0.08 55 0.435 3.17 10,453 7,005 3,448 0.08 60 0.410 2.99 10,748 7,642 3,106 0.07 Allowed Release Rate Frequency Factor (C f )Required Detention Adjusted Runoff Coefficient (CC f ) Area (A ) Union Park WQ Treatment Volume - FAA Method - City of Fort Collins accepts 1/2 of the 2-yr runoff as the WQ inflow rate WQ Treatment Volume Calculation - LID B Filtration Gallery Runoff Coefficient (C ) J.Claeys Highland Development Services 21-1044-00 April 9, 2024 - City of Fort Collins - Storm Water Criteria Manual Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA 0.77 1.00 0.77 ft3 acre-ft 4.69 acres 1,595 0.04 1.60 cfs Time (min) 1/2 2-yr Intensity (I , in/hr) Q1/2 2-YR (cfs) Accumulative Runoff Volume (ft3) Accumulative Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.000 0.00 0 0 0 0.00 5 1.425 5.15 1,544 481 1,063 0.02 10 1.105 3.99 2,394 962 1,432 0.03 15 0.935 3.38 3,039 1,443 1,595 0.04 20 0.805 2.91 3,489 1,925 1,564 0.04 25 0.715 2.58 3,873 2,406 1,467 0.03 30 0.650 2.35 4,225 2,887 1,338 0.03 35 0.585 2.11 4,437 3,368 1,068 0.02 40 0.535 1.93 4,637 3,849 788 0.02 45 0.495 1.79 4,827 4,330 496 0.01 50 0.460 1.66 4,984 4,812 172 0.00 55 0.435 1.57 5,184 5,293 -109 0.00 60 0.410 1.48 5,330 5,774 -443 -0.01 April 9, 2024 Design Engineer: Design Firm: Project Number: Date: Union Park WQ Treatment Volume - FAA Method J.Claeys Highland Development Services 21-1044-00 Adjusted Runoff Coefficient (CC f ) Area (A ) Allowed Release Rate - City of Fort Collins - Storm Water Criteria Manual - City of Fort Collins accepts 1/2 of the 2-yr runoff as the WQ inflow rate WQ Treatment Volume Calculation - LID C Filtration Gallery Runoff Coefficient (C ) Frequency Factor (C f )Required Detention DESIGN CRITERIA 0.80 1.00 0.80 ft3 acre-ft 6.11 acres 3,212 0.07 1.39 cfs Time (min) 1/2 2-yr Intensity (I , in/hr) Q1/2 2-YR (cfs) Accumulative Runoff Volume (ft3) Accumulative Release Volume (ft3) Detained Volume (ft3) Detained Volume (acre-ft) 0 0.000 0.00 0 0 0 0.00 5 1.425 6.96 2,089 417 1,671 0.04 10 1.105 5.40 3,240 835 2,405 0.06 15 0.935 4.57 4,112 1,252 2,859 0.07 20 0.805 3.93 4,720 1,670 3,050 0.07 25 0.715 3.49 5,241 2,087 3,153 0.07 30 0.650 3.18 5,717 2,505 3,212 0.07 35 0.585 2.86 6,003 2,922 3,080 0.07 40 0.535 2.61 6,274 3,340 2,934 0.07 45 0.495 2.42 6,530 3,757 2,773 0.06 50 0.460 2.25 6,743 4,175 2,568 0.06 55 0.435 2.13 7,014 4,592 2,422 0.06 60 0.410 2.00 7,212 5,010 2,203 0.05 Allowed Release Rate WQ Treatment Volume Calculation - LID D Filtration Gallery Runoff Coefficient (C ) Frequency Factor (C f )Required Detention Adjusted Runoff Coefficient (CC f ) Area (A ) - City of Fort Collins accepts 1/2 of the 2-yr runoff as the WQ inflow rate Union Park WQ Treatment Volume - FAA Method Design Engineer: J.Claeys Design Firm: Highland Development Services Project Number: 21-1044-00 Date: April 9, 2024 - City of Fort Collins - Storm Water Criteria Manual User Inputs Chamber Model: SC-800 Outlet Control Structure: No Project Name: Union Park - LID B Engineer: Jason Claeys Project Location: Colorado Measurement Type: Imperial Required Storage Volume: 7700 cubic ft. Stone Porosity: 40% Stone Foundation Depth: 6 in. Stone Above Chambers: 6 in. Average Cover Over Chambers: 15 in. Design Constraint Dimensions:(32 ft. x 150 ft.) Results System Volume and Bed Size Installed Storage Volume: 7899.62 cubic ft. Storage Volume Per Chamber: 50.60 cubic ft. Number Of Chambers Required: 90 Number Of End Caps Required: 10 Chamber Rows: 5 Maximum Length:136.43 ft. Maximum Width: 25.25 ft. Approx. Bed Size Required: 3444.82 square ft. System Components Amount Of Stone Required: 310 cubic yards Volume Of Excavation (Not Including Fill): 479 cubic yards Total Non-woven Geotextile Required:1081 square yards Woven Geotextile Required (excluding Isolator Row): 2 square yards Woven Geotextile Required (Isolator Row): 434 square yards Total Woven Geotextile Required:435 square yards Impervious Liner Required:0 square yards User Inputs Chamber Model: SC-310 Outlet Control Structure: No Project Name: Union Park - LID C Engineer: Jason Claeys Project Location: Colorado Measurement Type: Imperial Required Storage Volume: 3600 cubic ft. Stone Porosity: 40% Stone Foundation Depth: 6 in. Stone Above Chambers: 6 in. Average Cover Over Chambers: 18 in. Design Constraint Dimensions:(30 ft. x 150 ft.) Results System Volume and Bed Size Installed Storage Volume: 3755.61 cubic ft. Storage Volume Per Chamber: 14.70 cubic ft. Number Of Chambers Required: 102 Number Of End Caps Required: 12 Chamber Rows: 6 Maximum Length:127.50 ft. Maximum Width: 24.00 ft. Approx. Bed Size Required: 3059.97 square ft. System Components Amount Of Stone Required: 209 cubic yards Volume Of Excavation (Not Including Fill): 265 cubic yards Total Non-woven Geotextile Required:911 square yards Woven Geotextile Required (excluding Isolator Row): 2 square yards Woven Geotextile Required (Isolator Row): 392 square yards Total Woven Geotextile Required:393 square yards Impervious Liner Required:0 square yards User Inputs Chamber Model: SC-800 Outlet Control Structure: No Project Name: Union Park - LID D Engineer: Jason Claeys Project Location: Colorado Measurement Type: Imperial Required Storage Volume: 5900 cubic ft. Stone Porosity: 40% Stone Foundation Depth: 6 in. Stone Above Chambers: 6 in. Average Cover Over Chambers: 15 in. Design Constraint Dimensions:(40 ft. x 80 ft.) Results System Volume and Bed Size Installed Storage Volume: 5342.18 cubic ft. Storage Volume Per Chamber: 50.60 cubic ft. Number Of Chambers Required: 59 Number Of End Caps Required: 14 Chamber Rows: 7 Maximum Length:72.01 ft. Maximum Width: 34.75 ft. Approx. Bed Size Required: 2367.29 square ft. System Components Amount Of Stone Required: 219 cubic yards Volume Of Excavation (Not Including Fill): 329 cubic yards Total Non-woven Geotextile Required:739 square yards Woven Geotextile Required (excluding Isolator Row): 2 square yards Woven Geotextile Required (Isolator Row): 290 square yards Total Woven Geotextile Required:291 square yards Impervious Liner Required:0 square yards