Loading...
HomeMy WebLinkAboutSNOW RIDGE APARTMENTS - FDP240003 - SUBMITTAL DOCUMENTS - ROUND 1 - Supporting DocumentationRevised 12/19/2023 281 N College Ave, Fort Collins, CO 80525 970.416.4311, planning@fcgov.com Page 1 of 3 Water Adequacy Determination APPLICATION Purpose & Applicability: To fulfill the water adequacy requirements of the City of Fort Collins (LUC Division 3.13), every development or redevelopment that requires new, expanded, or increased water use must provide information related to the ensuring the proposed water supply is adequate for long-term satisfaction of potable and non-potable water demands of the development, based upon FCMC §26-148 to -150. The Applicant is responsible for familiarity with applicable code and requirements. The checklists and requirements below summarize the code; more detail regarding contents of documents and needed information may be found within the Fort Collins Land Use Code (LUC) and Municipal Code. PROJECT INFORMATION Project Name: _____________________________________________________ Project #: _____________________________ Project Type: Standard _________________________ Deferral _________________________ Waiver _________________________ Change _________________________ Date of Prior Determination _______________ Adress or Parcel # ___________________________________________________________________________________________ WATER PROVIDER Please SUBMIT a SEPARATE Water Adequacy Determination Application for each water provider that services the development Established Providers: _________________________________________ Other: ________________________________________ IF OTHER: Please Provide Contact Information for Water Provider Manager: ___________________________________________ Public Water Service Permit #: _________________________ Email: ______________________________________________ Phone: ____________________________________________ APPLICANT CERTIFICATION By submitting these materials and my signature affixed below, I acknowledge my awareness of Land Use Code Division 3.13 regulating the Determination of Water Adequacy and submit my Request for Review to the City of Fort Collins. I agree to reimburse the City for all costs associated with reviewing the attached application and associated materials, including costs associated with hiring consultants, not to exceed costs directly-attributable to the review [LUC §3.13.5.B(1) and 3.13.6.B(1)]. I also acknowledge that this Determination may contain conditions, shall be final, and becomes a material part of all future associated development applications. Applicant Name (printed): ______________________________________________________________________________________ Email: ________________________________________________________________ Phone: _______________________________ Signature: _____________________________________________________________ Date: ________________________________ Upon review of submittal materials, the Director may require additional information be provided; all such information shall be provided prior to final approval of any development or permit. Revised 12/15/2023 281 N College Ave, Fort Collins, CO 80525 970.416.4311, planning@fcgov.com Page 2 of 3 REQUIRED SUBMITTAL MATERIALS □Overall Map of Development area to be served. o Deferral request (For simple projects; materials due at Construction or Building Permit stage); OR o Detailed information related to the water demand of the project, the supply and utility provider – see checklist below. □ “Will Serve” Letter from a Colorado Licensed PE or Water Supply Expert from the Water Supply Entity which: •Describes the development area(s) to be served; •States the ability to provide an adequate water supply; •States the entities commitment, and any conditions, to provide adequate supply and service; and •Identifies the length of time for which the letter is valid. WATER PROVIDER SUPPLY PLAN AND SYSTEM INFORMATION If NO current 20-year Water Supply Plan is on file with the City, AND the provider is ELCO or FCLWD, provide a report from a Professional Engineer, licensed in Colorado, providing the following: □Estimated demand analysis of Project through build-out, including impact of phasing □Description of anticipated impact of conservation and demand management measures for proposed development. □Description and estimate of total Project Portfolio yield under various “hydrologic conditions”. □Results from any analyses performed demonstrating the ability for the proposed water supply to meet demands of the proposed development under various hydrologic conditions. □For other water providers, coordinate with City staff to provide other necessary materials, as required by the LUC. NON-POTABLE WATER SUPPLIERS FOR PERMANENT IRRIGATION SYSTEMS □Summary document linking the information provided to the standard of review as indicated in the land use code. □Provide a report from a Professional Engineer, licensed in Colorado, providing the Water Supply Description, to include at minimum: Estimated demand analysis of project through build-out, including impact of phasing. Physical Source of Water Provider’s water supply, and water quality test results. Description of all elements of the Project’s Water Portfolio, currently-owned or planned. Description and Estimate of Total Project Portfolio Yield under various hydrologic conditions. -Historical temporal availability of proposed supplies, annual volumetric yield, and frequent and flow rate of deliveries. -Decreed place of use -Augmentation requirements Water demand management measures that may be implemented to account for hydrologic variability. Description of all water conservation measures to be applied; and how enforced and effectuated. Financial documents reflecting entity’s ability to create and maintain supply in perpetuity. Statement describing how the entity ensures water conservation measures that meet or exceed City requirements. Approval documentation from other regulatory agencies, as well as any established potable water supply entity whose service area contains the proposed non-potable system. Revised 12/15/2023 281 N College Ave, Fort Collins, CO 80525 970.416.4311, planning@fcgov.com Page 3 of 3 Water Adequacy Determination WATER DEMAND SUMMARY WORKSHEET Project Name: ______________________________________________________ Project #: _____________________________ Applicant Name: __________________________________________________ Email: _____________________________________ DEVELOPMENT SUMMARY – AREA TAKE-OFFS SF Acres % of Total Total Site Size 100.0% Building Coverage Walks, Drives, Parking Total Landscape Areas In ROW Non-Irrigated Irrigated WATER SUPPLY REQUIREMENTS (WSR) Residential (FCMC §26-148) Total # of Bedrooms Total Area SF Gallons Subtotals (Rooms or SF x Gallon # ) Single Family Detached & Duplex Indoor Only x 12,200 gallons Outdoor On-site yard/ls area x 10 gallons Townhomes & Multifamily Indoor Only x 13,100 gallons Non-Residential (FCMC §26-149) Use Type, from Code List # of Gallons Multiplier: Building SF; Lot AC; # Bays / Rooms Subtotals (Gallons x Multiplier #) Example: Gas Station with 1-bay Car Wash Include multiple/mixed uses as appropriate (e.g., 3000 SF Office + 40,000 SF warehouse) 44 221,100 2200 SF 1 Bay 96,800 221,100 Irrigation (Per LUC §3.2.1(E)(3)b) Hydrozone: ………………. SF Gallons Subtotals (SF x Gallons #) High (Turf ) x 18 gallons Moderate x 14 gallons Low (Mulched, Drip-irrigated & Xeric) x 8 gallons Very Low (Xeric, Native) x 3 gallons Total Potable Irrigation Total Non-Potable Irrigation Total Potable Water Supply Requirements Total Non-Potable Water Supply Requirements