FINAL DRAINAGE REPORT
FORT COLLINS RESCUE MISSION
FORT COLLINS, COLORADO
FEBRUARY 14TH, 2024
NORTHERNENGINEERING.COM
970.221.4158
FORT COLLINS
GREELEY
This Drainage Report is consciously provided as a PDF. Please
consider the environment before printing this document in its entirety.
When a hard copy is necessary, we recommend double-sided printing.
NORTHERNENGINEERING.COM | 970.221.4158 PRELIMINARY DRAINAGE REPORT: FORT COLLINS RESCUE MISSION
FORT COLLINS | GREELEY COVER LETTER
February 14th, 2024
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins, CO 80526
RE: FINAL DRAINAGE REPORT FOR
THE FORT COLLINS RESCUE MISSION (1971-001)
Dear Staff:
Northern Engineering is pleased to submit this Final Drainage Report for your review. This report accompanies
the Preliminary Development Review submittal for the Fort Collins Rescue Mission.
This report has been prepared in accordance with the Fort Collins Stormwater Criteria Manual (FCSCM) and
serves to document the stormwater impacts associated with the proposed Fort Collins Rescue Mission project.
We understand the review by the City of Fort Collins is to ensure general compliance with standardized criteria
contained in the FCSCM.
If you should have any questions as you review this report, please feel free to contact us.
Sincerely,
NORTHERN ENGINEERING SERVICES, INC.
MASON RUEBEL, PE BLAINE MATHISEN, PE
Project Engineer Project Manager
NORTHERNENGINEERING.COM | 970.221.4158 FINAL DRAINAGE REPORT: MASON STREET INFRASTRUCTRE
FORT COLLINS | GREELEY TABLE OF CONTENTS
TABLE OF CONTENTS
GENERAL LOCATION AND DESCRIPTION .......................................................... 1
DRAIN BASINS AND SUB-BASINS ..................................................................... 3
DRAINAGE DESIGN CRITERIA .......................................................................... 3
DRAINAGE FACILITY DESIGN ........................................................................... 6
CONCLUSIONS .............................................................................................. 8
REFERENCES ................................................................................................ 8
TABLES AND FIGURES
FIGURE 1 - VICINITY MAP ..................................................................................................1
FIGURE 2 - FIRMETTE MAP 08069C0977G ........................................................................2
TABLE 1 – DETENTION & WQCV SUMMARY ......................................................................7
APPENDICES
APPENDIX A – HYDROLOGIC COMPUTATIONS
APPENDIX B – WATER QUALITY/LID COMPUTATIONS
APPENDIX C – HYDRAULIC CALCULATIONS
APPENDIX D – EROSION CONTROL REPORT
APPENDIX E – EXCERPTS FROM PREVIOUS REPORTS AND USDA SOILS REPORT
MAP POCKET
DR1 – DRAINAGE EXHIBIT
NORTHERNENGINEERING.COM | 970.221.4158 FINAL DRAINAGE REPORT: FORT COLLINS RESCUE MISSION
FORT COLLINS | GREELEY 1 | 11
GENERAL LOCATION AND DESCRIPTION
A. LOCATION
Vicinity Map
The Fort Collins Rescue Mission project site is located in the southwest quarter of Section 2,
Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of
Larimer, State of Colorado.
The project site (refer to Figure 1) is bordered to the west by the Hickory Regional Detention
Pond and residential homes. To the north and south by commercial businesses and to the east
by Mason Street and a mixture of residential and commercial businesses.
This project includes Lot 2 per the Mason Street Infrastructure plat. The adjacent streets are N
Mason Street and Hibdon Court. The nearest existing major streets are Hickory Street and N
College Ave.
B. DESCRIPTION OF PROPERTY
The Fort Collins Rescue Mission project requires the construction of the Mason Infrastructure
project and subdivision of the existing parcels. This project will be comprised of Lot 2 of the
Mason Street Infrastructure Plat with a total area of ±2.77 acres.
The site is currently vacant with native grasses.
With the construction of the Mason Street Infrastructure project the project site (Lot 2) will
consist mainly of stockpiled dirt. Drainage from this lot will be in every direction with slopes
Figure 1 - Vicinity map
NORTHERNENGINEERING.COM | 970.221.4158 FINAL DRAINAGE REPORT: FORT COLLINS RESCUE MISSION
FORT COLLINS | GREELEY 2 | 11
around 5%. Runoff to the west and south overland flows directly to the Hickory Regional
Detention Pond. Runoff to the east and north is conveyed via curb and gutter and swale to the
regional pond. The outfall for the Hickory Regional Detention Pond is conveyed through a 24”
HP storm pipe and is conveyed to College Ave. The Fort Collins Rescue Mission project will
maintain historical drainage patterns by routing runoff to the regional pond outfall and to the
College Ave storm infrastructure. The ultimate regional pond will also include the realignment
of the site outfall and discharge directly to the Cache La Poudre River per the overall
development plan.
According to the United States Department of Agriculture (USDA) Natural Resources
Conservation Service (NRCS) Soil Survey website:
http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx), 83.3% of the site consists of
Nunn Clay loam (Hydrologic Soil Group C) and 16.7% of the site consists of Caruso clay loam
(Hydrologic Soil Group D). The calculations assume a Hydrologic Soil Group C. Hydrologic Soil
Group C has a slow rate of water absorption and infiltration.
A subsurface exploration report was completed by CTL Thompson “Geotechnical Investigation
Hibdon/Mason 24/7 Shelter SWC Hibdon Court and Mason Street Fort Collins, Colorado” on
October 25, 2022 (Project No. FC10,520.000-125-R1). According to the report the site generally
consists of Sandy Clay with groundwater at roughly 8’ to 11’ depths from existing ground. Lot 2
has been raised several feet with the Mason Street Infrastructure project and conflict with
groundwater is not expected with the proposed building or LID treatment.
The site is currently zoned as Service Commercial District (CS) in Fort Collins. Developments to
the north, south, and east are zoned as Service Commercial as well. The west properties are
zoned as Low Density Mixed-Use Neighborhood District (L-M-N).
FLOODPLAIN
The subject property is not located in a FEMA or City of Fort Collins regulatory floodplain.
Figure 2 - FIRMette Map 08069C0977G
NORTHERNENGINEERING.COM | 970.221.4158 FINAL DRAINAGE REPORT: FORT COLLINS RESCUE MISSION
FORT COLLINS | GREELEY 3 | 11
C. DESCRIPTION OF PROJECT
The project site will include the construction of one building. Other improvements include
asphalt and concrete parking areas, sidewalks, courtyards, and landscaping. This project will
increase the impervious area in Lot 2 and rain gardens will be installed to provide water
treatment. Existing conveyance methods to the Hickory Regional Detention Pond will be
modified to meet current Fort Collins requirements.
DRAIN BASINS AND SUB-BASINS
A. MAJOR BASIN DESCRIPTION
The Fort Collins Rescue Mission project is located in the Dry Creek Major Basin. Dry Creek, which
is tributary to the Poudre River, extends from near the Wyoming border to where it joins the
river near Mulberry and Timberline. The Dry Creek Basin is approximately 23 miles long and six
miles wide and encompasses approximately 62 square miles. The land use in the upper and
middle portion of the basin is primarily rangeland and irrigated hay meadows and pastures.
The majority of the lower basin is developed and includes commercial, industrial, and
residential uses.
Detention for this basin is to release at or below the allowable runoff rate of 0.20 cfs per acre.
The Hickory Regional Detention Pond will provide the required detention volume and standard
water quality treatment for this project.
B. SUB-BASIN DESCRIPTION
The existing subject site can be defined with three (3) major sub-basins that encompass the
entire project site. Historically runoff from the site overland flows to the south and west directly
to the Hickory Regional Detention Pond. Flows to the east are split and conveyed north and
south along N Mason Street to swales and conveyed to the regional pond.
Runoff that is collected in the existing Hickory Regional Detention Pond and outfalls to a 24” HP
storm pipe that is conveyed to existing infrastructure within N College Ave.
The project site does not receive runoff from contiguous off-site properties. This project will
utilize the Hickory Regional Detention Pond for detention and standard water quality treatment
per the Mason Street Infrastructure Project and Master Drainage Plan. LID treatment will be
provided on site prior to discharging to the regional pond.
A more detailed description of the project drainage patterns is provided below.
DRAINAGE DESIGN CRITERIA
A. ORIGINAL PROVISIONS AND PREVIOUS STUDIES
There are no optional provisions outside the Fort Collins Stormwater Manual (FCSM)
B. STORMWATER MANAGEMENT STRATEGY
The overall stormwater management strategy employed with the Fort Collins Rescue
Mission project utilizes the "Four Step Process" to minimize adverse impacts of urbanization
on receiving waters. The following is a description of how the proposed development has
incorporated each step.
NORTHERNENGINEERING.COM | 970.221.4158 FINAL DRAINAGE REPORT: FORT COLLINS RESCUE MISSION
FORT COLLINS | GREELEY 4 | 11
Step 1 – Employ Runoff Reduction Practices.
The Fort Collins Rescue Mission aims to reduce runoff peaks, volumes and pollutant loads from
frequently occurring storm events (i.e., water quality (i.e., 80th percentile) and 2-year storm events)
by implementing Low Impact Development (LID) strategies. Wherever practical, runoff will be
routed across landscaped areas or through rain gardens. These LID practices reduce the overall
amount of impervious area, while at the same time Minimizing Directly Connected Impervious
Areas (MDCIA). The combined LID/MDCIA techniques will be implemented, where practical,
throughout the development, thereby slowing runoff and increasing opportunities for infiltration.
Step 2 – Implement BMPs that Provide a Water Quality Capture Volume (WQCV) with
Slow Release.
The efforts taken in Step 1 will help to minimize excess runoff from frequently occurring
storm events; however, urban development of this intensity will still have stormwater runoff
leaving the site. The primary standard water quality treatment and volume control will occur
in the Hickory Regional Detention Pond.
Step 3 – Stabilize Drainageways.
As stated in Section II. A. 1. above, the site will discharge to the storm infrastructure in N College
Ave and ultimately the Cache La Poudre River, however no changes to the channel are proposed
with this project. While this step may not seem applicable to the Fort Collins Rescue Mission, the
proposed project indirectly helps achieve stabilized drainageways, nonetheless. Once again, site
selection has a positive effect on stream stabilization. By developing with existing stormwater
infrastructure, combined with LID and MDCIA strategies, the likelihood of bed and bank erosion is
reduced. Furthermore, this project will pay one-time stormwater development fees, as well as
ongoing monthly stormwater utility fees, both of which help achieve Citywide drainageway
stability.
Step 4 – Implement Site Specific and Other Source Control BMPs.
This project will provide site specific source controls and will improve on historic conditions.
Localized trash enclosures within the development will contain and allow for the disposal of
solid waste. Standard Operating procedures (SOPs) will be implemented for BMP
maintenance of rain gardens and associated drainage infrastructure to remove sediment
accumulation regularly and prolong the design life of the BMPs.
C. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS
The subject property is part of a Master Drainage Plan for the properties adjacent to N Mason
Street and an Overall Development Plan (ODP) drainage study. However, stormwater from this
site will generally follow historic patterns and discharge into storm drains established with the
Mason Street Infrastructure project and previous surrounding developments.
This project proposes to utilize the existing Hickory Regional Detention Pond and existing
infrastructure as the site’s outfall. In the interim this runoff will be routed to the existing 24” HP
storm pipe outfall, but in the future an ultimate Hickory Pond outfall will be designed by the
City of Fort Collins. Detention requirements for this basin are to release at or below the
allowable runoff rate of 0.20 cfs per acre. This has already been taken into account with the
Mason Street Infrastructure Project. The interim release rate for the regional pond is calculated
NORTHERNENGINEERING.COM | 970.221.4158 FINAL DRAINAGE REPORT: FORT COLLINS RESCUE MISSION
FORT COLLINS | GREELEY 5 | 11
as 2.63cfs (13.13ac x 0.2cfs/ac). With the Mason Street Infrastructure project, the anticipated
release rate for Lot 2 is 0.64cfs (3.19ac x 0.2cfs/ac) which includes a portion of N Mason Street.
This project proposes to also utilize the Hickory Regional Detention Pond for standard water
quality treatment. The provided water quality storage volume was calculated as 9,346 cu.ft. for
Lots 1, 2, 3, and Tract A with the Mason Street Infrastructure Project.
The site plan is constrained on all sides by the regional detention pond, public roads, and
residential buildings. Existing elevations along the property lines will be maintained.
The Hickory Regional Detention Pond has a planned high-water elevation of 4978. The design of
the Fort Collins Rescue Mission will take this into account and there will not be any
encroachment of the Hickory Detention Pond within the rain gardens.
D. HYDROLOGICAL CRITERIA
The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure
3.4-1 of the FCSCM, serves as the source for all hydrologic computations associated with the
Mason Street Infrastructure development. Tabulated data contained in Table 3.4-1 has been
utilized for Rational Method runoff calculations.
The Rational Method has been employed to compute stormwater runoff utilizing coefficients
contained in Tables 3.2-1, 3.2-2, and 3.2-3 of the FCSCM.
The Rational Method will be used to estimate peak developed stormwater runoff from drainage
basins within the developed site for the 2-year, 10-year, and 100-year design storms. Peak
runoff discharges determined using this methodology have been used to check the street
capacities, inlets, swales, and storm drain lines.
Three separate design storms have been utilized to address distinct drainage scenarios. The
first event analyzed is the "Minor" or "Initial" Storm, with a 2-year recurrence interval. The
second event considered is the "Major Storm," which has a 100-year recurrence interval. The
final event analyzed was the 10-year recurrence interval for comparative analysis only.
E. HYDRAULIC CRITERIA
The hydraulic analyses of street capacities, inlets, storm drain lines, culverts, and swales are
per the FCSM criteria and provided during Final Plan. The following computer programs and
methods were utilized:
The storm drain lines were analyzed using Hydraflow Storm Sewer Extension for AutoCAD
Civil 3D.
The inlets were analyzed using the manufacturers capacity charts for Nyloplast basins and
grates (Advanced Drainage Systems).
Swales and street capacities were analyzed using the Urban Drainage Channels
spreadsheets.
As stated in Section I. B. 7. above, the subject property is not located within a FEMA 100-year or
a City of Fort Collins designated floodplain.
F. MODIFICATIONS OF CRITERIA
No formal modifications are requested at this time.
NORTHERNENGINEERING.COM | 970.221.4158 FINAL DRAINAGE REPORT: FORT COLLINS RESCUE MISSION
FORT COLLINS | GREELEY 6 | 11
G. CONFORMANCE WITH WATER QUAILTY TREATMENT CRITERIA
The City Code requires that 100% of runoff from a project site must receive some sort of
water quality treatment. The Hickory Regional Detention Pond will provide standard water
quality treatment for any area of Lot 2 that will not be treated with LID methods. With the
Mason Street Infrastructure project an anticipated water quality volume of 9,346 cu.ft. was
anticipated with Lots 1, 2, 3, Tract A and a portion of N Mason Street. This project will utilize
a small fraction of this anticipated water quality volume.
H. CONFORMANCE WITH LOW IMPACT DEVELOPMENT (LID)
The project site will conform with the requirement to treat a minimum of 75% of the project site
using a LID technique. LID treatment will be provided by rain gardens prior to discharge into the
Hickory Regional Detention Pond. Please see Appendix B for LID design information, table, and
exhibits.
DRAINAGE FACILITY DESIGN
A. GENERAL CONCEPT
The main objective of the Fort Collins Rescue Mission drainage design is to maintain existing
drainage patterns and to not adversely impact downstream infrastructure.
Detention and water quality treatment for Lot 2 and a portion of N Mason Street will be
provided in the Hickory Detention Pond. Detention and water quality volumes were calculated
with the Mason Street Infrastructure project. The Rescue Mission Project will utilize a very small
portion of the calculated standard water quality. The Majority of treatment will be provided
through LID facilities.
The emergency overflow for the two proposed rain gardens will be into the Hickory Regional
Detention Pond. The interim regional detention pond HWSEL of 4978 and will not encroach into
the proposed rain gardens. Per the Mason Street Infrastructure project, the regional pond
emergency spillway is located south along N Mason Street adjacent to the pond outfall
location.
A list of tables and figures used within this report can be found in the Table of Contents at the
front of this document. The tables and figures are located within the sections to which the
content best applies.
Drainage for the project site has been analyzed using four (4) Major Drainage Basins, designated
as Basins A, B, C & R. These basins have associated sub-basins. The drainage patterns
anticipated for the basins are further described below. More detail on specific sub-basins will
be included with Final.
Major Basin A
Major Basin A has 8 sub-basins (A1-A7) and has a total area of 1.30 acres. All sub-basins discharge
to Rain Garden 1, located in basin A1. These sub-basins primarily consist of asphalt paving of the
south parking area, courtyards along the west side of the building, concrete, and landscaping.
Runoff is generally conveyed via concrete rundown or storm drain to Rain Garden 1. This rain
garden will provide water quality treatment for these basins and discharge to the Hickory Regional
Detention Pond.
Major Basin B
Major Basin A has 4 sub-basins (B1-B4) and has a total area of 0.73 acres. All sub-basins discharge
to Rain Garden 2, located in basin B1. These sub-basins primarily consist of asphalt paving of the
NORTHERNENGINEERING.COM | 970.221.4158 FINAL DRAINAGE REPORT: FORT COLLINS RESCUE MISSION
FORT COLLINS | GREELEY 7 | 11
north parking area, concrete, and landscaping. Runoff is generally conveyed via concrete rundown
or storm drain to Rain Garden 2. This rain garden will provide water quality treatment for these
basins and discharge to the Hickory Regional Detention Pond.
Major Basin C
Major Basin C has 1 sub-basin (C1) and has a total area of 0.35 acres. This basin primarily consists
of landscaping and a concrete trail along the west property line. All sub-basins within major basin
C will not be routed to any LID treatment areas and will overland flow off-site directly into the
Hickory Regional Detention Pond. This Basin The regional pond will provide detention and
standard water quality for this basin.
Major Basin R
Major Basin R has 4 sub-basins (R1-R12) and has a total area of 0.81 acres. These basins make up
the rooftop of the Rescue Mission. Runoff from these basins will be conveyed via roof drain
connection or area inlet to either Rain Garden 1 or 2. These rain gardens will provide water quality
treatment for these basins and discharge them to the Hickory Regional Detention Pond.
A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report.
In addition, excerpts from earlier drainage reports referenced in this Section can be found in
Appendix E.
B. SPECIFIC DETAILS
As mentioned in Section III.C The detention requirements for this project site are to release at
or below the allowable runoff rate of 0.20 cfs per acre, per the Dry Creek Master Plan. The table
below summarizes the LID treatment requirements for the project site and two proposed rain
gardens. The Hickory Regional Detention Pond will provide 100% of the detention and standard
water quality treatment for this project.
Table 1 – Detention & WQCV Summary
Description
Hickory Det. Pond
(See Note 1) Notes
Lot 2 Required Detention Volume n/a ac. ft. n/a ac. ft. Volume provided in Hickory Regional Detention Pond (See Note 1)
Lot 2 Release Rate n/a cfs
n/a cfs Release Rate provided in Hickory Regional Detentin Pond (See Note 1)
Description
Volume
Provided Notes
Rain Garden 1 1,405 cu. ft. 1870 cu. ft. LID for Major Basin A and Roof Connections
Rain Garden 2 682 cu. ft. 915 cu.ft. LID for Major Basin B and Roof Connections
Standard Water Quailty (Hickory Regional Pond) n/a cu. ft. n/a cu. ft.
Standard water quailty treatment provided in Hickory Regional Detention Pond (See
Note 1)
Notes:
Summary of Water Quality Volumes
Volume
Required
Summary of Detention Volumes
Required
1) Detention and standard water quailty volumes shown above are per the Mason Street Infrastructure project. See the Mason Street infrastructure project for detailed design
of the Hickory Regional Detention Pond. See Appendix E
NORTHERNENGINEERING.COM | 970.221.4158 FINAL DRAINAGE REPORT: FORT COLLINS RESCUE MISSION
FORT COLLINS | GREELEY 8 | 11
CONCLUSIONS
A. COMPLIANCE WITH STANDARDS
The design elements comply without the need for variances.
The drainage design proposed for the Fort Collins Rescue Mission project complies with the City
of Fort Collins Stormwater Criteria Manual as well as the associated master drainage plan.
There are no City or FEMA 100-year regulatory floodplains associated with the Fort Collins
Rescue Mission Project.
The drainage plan and stormwater management measures proposed with the Fort Collins
Rescue Mission project are compliant with all applicable State and Federal regulations
governing stormwater discharge.
B. DRAINAGE CONCEPT
The drainage design proposed with this project will ensure that all downstream infrastructure
is not adversely impacted by this development. All existing downstream drainage facilities are
expected to not be impacted negatively by this development.
The Fort Collins Rescue Mission project will not impact the Master Drainage Plan
recommendations for the Dry Creek Major Drainage Basin and the Mason Street Infrastructure
Overall Development Plan.
The drainage design will improve existing drainage facilities and bring immediate offsite storm
infrastructure into compliance with the current Fort Collins water quality and LID standards.
REFERENCES
1. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, adopted by Ordinance No.
159, 2018, and referenced in Section 26-500 of the City of Fort Collins Municipal Code.
2. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service,
United States Department of Agriculture.
3. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District,
Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008.
4. Geotechnical Investigation Hibdon/Mason 24/7 shelter SWC Hibdon Court and Mason Street Fort
Collins, Colorado, CTL Thompson, Fort Collins, Colorado, October 2022
NORTHERNENGINEERING.COM | 970.221.4158 FINAL DRAINAGE REPORT: FORT COLLINS RESCUE MISSION
FORT COLLINS | GREELEY APPENDIX
APPENDIX A
HYDROLOGIC COMPUTATIONS
Runoff Coefficient1
Percent
Impervious1 Project:
Location:
0.95 100%Calc. By:
0.95 90%Date:
0.50 40%
0.20 2%
0.20 2%
Basin ID Basin Area
(sq.ft.)
Basin Area
(acres)
Asphalt, Concrete
(acres)Rooftop (acres) Gravel (acres)
Undeveloped:
Greenbelts,
Agriculture (acres)
Lawns, Clayey Soil,
Flat Slope < 2%
(acres)
Percent
Impervious
C2*Cf
Cf = 1.00
C5*Cf
Cf = 1.00
C10*Cf
Cf = 1.00
C100*Cf
Cf = 1.25
R1 3,986 0.09 0.00 0.09 0.00 0.00 0.00 90% 0.95 0.95 0.95 1.00
R2 1,069 0.02 0.00 0.02 0.00 0.00 0.00 90% 0.95 0.95 0.95 1.00
R3 3,995 0.09 0.00 0.09 0.00 0.00 0.00 90% 0.95 0.95 0.95 1.00
R4 7,543 0.17 0.00 0.17 0.00 0.00 0.00 90% 0.95 0.95 0.95 1.00
R5 4,961 0.11 0.00 0.11 0.00 0.00 0.00 90% 0.95 0.95 0.95 1.00
R6 1,712 0.04 0.00 0.04 0.00 0.00 0.00 90% 0.95 0.95 0.95 1.00
R7 741 0.02 0.00 0.02 0.00 0.00 0.00 90% 0.95 0.95 0.95 1.00
R8 1,263 0.03 0.00 0.03 0.00 0.00 0.00 90% 0.95 0.95 0.95 1.00
R9 3,017 0.07 0.00 0.07 0.00 0.00 0.00 90% 0.95 0.95 0.95 1.00
R10 4,555 0.10 0.00 0.10 0.00 0.00 0.00 90% 0.95 0.95 0.95 1.00
R11 1,765 0.04 0.00 0.04 0.00 0.00 0.00 90% 0.95 0.95 0.95 1.00
R12 716 0.02 0.00 0.02 0.00 0.00 0.00 90% 0.95 0.95 0.95 1.00
A1 14,111 0.32 0.01 0.00 0.00 0.00 0.32 4% 0.22 0.22 0.22 0.27
A2 15,606 0.36 0.23 0.00 0.02 0.00 0.11 66% 0.69 0.69 0.69 0.86
A3 16,118 0.37 0.32 0.00 0.00 0.00 0.05 88% 0.86 0.86 0.86 1.00
A4 4,575 0.11 0.09 0.00 0.00 0.00 0.01 90% 0.87 0.87 0.87 1.00
A5 1,783 0.04 0.04 0.00 0.00 0.00 0.00 90% 0.87 0.87 0.87 1.00
A6 1,902 0.04 0.04 0.00 0.00 0.00 0.00 90% 0.87 0.87 0.87 1.00
A7 2,487 0.06 0.05 0.00 0.00 0.00 0.01 90% 0.87 0.87 0.87 1.00
B1 11,834 0.27 0.02 0.00 0.00 0.00 0.25 10% 0.26 0.26 0.26 0.33
B2 8,356 0.19 0.10 0.00 0.00 0.00 0.09 52% 0.59 0.59 0.59 0.73
B3 10,356 0.24 0.17 0.00 0.01 0.00 0.06 73% 0.74 0.74 0.74 0.93
B4 1,206 0.03 0.00 0.00 0.00 0.00 0.03 2% 0.20 0.20 0.20 0.25
C1 15,259 0.35 0.04 0.00 0.00 0.00 0.31 13% 0.29 0.29 0.29 0.36
Rain Garden 1 (A) 77,894 1.79 0.78 0.49 0.02 0.00 0.50 69% 0.73 0.73 0.73 0.92
Rain Garden 2 (B) 45,763 1.05 0.29 0.32 0.01 0.00 0.43 56% 0.64 0.64 0.64 0.80
Total 138,916 3.19 1.11 0.81 0.03 0.00 1.24 59% 0.65 0.65 0.65 0.82
Lawns and Landscaping:
Combined Basins
2) Composite Runoff Coefficient adjusted per Table 3.2-3 of the Fort Collins
Stormwater Manual (FCSM).
Lawns, Clayey Soil, Flat Slope < 2%
USDA SOIL TYPE: C
Undeveloped: Greenbelts, Agriculture Composite Runoff Coefficient2
1) Runoff coefficients per Tables 3.2-1 & 3.2 of the FCSM. Percent impervious per Tables 4.1-2 & 4.1-3 of the FCSM.
DEVELOPED RUNOFF COEFFICIENT CALCULATIONS
Asphalt, Concrete
Rooftop
Gravel
Streets, Parking Lots, Roofs, Alleys, and Drives:
Character of Surface:Fort Collins Rescue Mission
Fort Collins
M. Ruebel
February 14, 2024
Notes:
1) Rain Garden 1 consists of A basins and Basin R4 & R6-R12
2) Rain Garden 2 consists of B basins and Basins R1-R3 & R5
5/18/2022
Where:
Length
(ft)
Slope
(%)
Ti
2-Yr
(min)
Ti
10-Yr
(min)
Ti
100-Yr
(min)
Length
(ft)
Slope
(%)Surface n
Flow
Area3
(sq.ft.)
WP3 (ft)R (ft)V
(ft/s)
Tt
(min)
Max.
Tc
(min)
Comp.
Tc 2-Yr
(min)
Tc
2-Yr
(min)
Comp.
Tc 10-Yr
(min)
Tc
10-Yr
(min)
Comp.
Tc 100-
Yr
(min)
Tc
100-Yr
(min)
r1 R1 55 5.00%1.22 1.22 0.81 0.00%Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.31 1.22 5.00 1.22 5.00 0.81 5.00
r2 R2 18 5.00%0.70 0.70 0.46
0.00%Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.10 0.70 5.00 0.70 5.00 0.46 5.00
r3 R3 55 5.00%1.22 1.22 0.81 0.00%Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.31 1.22 5.00 1.22 5.00 0.81 5.00
r4 R4 85 5.00%1.51 1.51 1.01
0.00%Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.47 1.51 5.00 1.51 5.00 1.01 5.00
r5 R5 80 5.00%1.47 1.47 0.98 0.00%Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.44 1.47 5.00 1.47 5.00 0.98 5.00
r6 R6 26 5.00%0.84 0.84 0.56
0.00%Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.14 0.84 5.00 0.84 5.00 0.56 5.00
r7 R7 26 5.00%0.84 0.84 0.56 0.00%Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.14 0.84 5.00 0.84 5.00 0.56 5.00
r8 R8 22 5.00%0.77 0.77 0.51
0.00%Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.12 0.77 5.00 0.77 5.00 0.51 5.00
r9 R9 62 5.00%1.29 1.29 0.86 0.00%Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.34 1.29 5.00 1.29 5.00 0.86 5.00
r10 R10 62 5.00%1.29 1.29 0.86
0.00%Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.34 1.29 5.00 1.29 5.00 0.86 5.00
r11 R11 20 5.00%0.73 0.73 0.49 0.00%Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.11 0.73 5.00 0.73 5.00 0.49 5.00
r12 R12 10 5.00%0.52 0.52 0.35
0.00%Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.06 0.52 5.00 0.52 5.00 0.35 5.00
a1 A1 60 5.00%7.47 7.47 7.00 0.00%Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.33 7.47 7.47 7.47 7.47 7.00 7.00
a2 A2 40 2.00%3.86 3.86 2.25 225
0.90%Gutter 0.02 3.61 19.18 0.19 3.10 1.21 11.47 5.07 5.07 5.07 5.07 3.46 5.00
a3 A3 40 2.00%2.30 2.30 0.94 130
0.60%Valley Pan 0.02 6.00 10.25 0.59 5.38 0.40 10.94 2.70 5.00 2.70 5.00 1.34 5.00
a4 A4 40 2.00%2.14 2.14 0.94
0.00%Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.22 2.14 5.00 2.14 5.00 0.94 5.00
a5 A5 25 2.00%1.68 1.68 0.74 0.00%Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.14 1.68 5.00 1.68 5.00 0.74 5.00
a6 A6 28 2.00%1.77 1.77 0.79 0.00% Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.16 1.77 5.00 1.77 5.00 0.79 5.00
a7 A7 20 2.00%1.52 1.52 0.66 0.00% Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.11 1.52 5.00 1.52 5.00 0.66 5.00
b1 B1 70 5.00%7.68 7.68 7.08 0.00% Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.39 7.68 7.68 7.68 7.68 7.08 7.08
b2 B2 30 2.00%4.18 4.18 2.98 107 0.50% Gutter 0.02 3.61 19.18 0.19 2.31 0.77 10.76 4.95 5.00 4.95 5.00 3.76 5.00
b3 B3 47 5.00%2.68 2.68 1.29 190 1.50% Gutter 0.02 3.61 19.18 0.19 4.00 0.79 11.32 3.47 5.00 3.47 5.00 2.08 5.00
b4 B4 20 2.00%5.97 5.97 5.64 0.00% Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.11 5.97 5.97 5.97 5.97 5.64 5.64
c1 C1 14 405.00%0.77 0.77 0.70
0.00% Valley Pan 0.02 6.00 10.25 N/A N/A 0.00 10.08 0.77 5.00 0.77 5.00 0.70 5.00
Design
Point Basin ID
Overland Flow Channelized Flow Time of Concentration
DEVELOPED TIME OF CONCENTRATION COMPUTATIONS
Location:
Maximum Tc:Overland Flow, Time of Concentration:
Channelized Flow, Velocity: Channelized Flow, Time of Concentration:
Fort Collins Rescue Mission
Fort Collins
M. Ruebel
February 14, 2024
Project:
Calculations By:
Date:
Notes
S = Longitudinal Slope, feet/feet
R = Hydraulic Radius (feet)
n = Roughness Coefficient
V = Velocity (ft/sec) WP = Wetted Perimeter (ft)
(Equation 3.3-2 per Fort Collins
Stormwater Manual)
𝑇 =1.87 1.1 − 𝐶 ∗ 𝐶𝑓𝐿
𝑆ଵ ଷൗ
𝑉 =
1.49
𝑛∗ 𝑅
ଶ/ଷ ∗𝑆(Equation 5-4 per Fort Collins
Stormwater Manual)
𝑇𝑐 =𝐿
180 + 10
(Equation 3.3-5 per Fort Collins
Stormwater Manual)
𝑇𝑡 =𝐿
𝑉 ∗ 60
(Equation 5-5 per Fort Collins
1)Add 4900 to all elevations.
2) Per Fort Collins Stormwater Manual, minimum Tc = 5 min.
3) Assume a water depth of 6" and a typical curb and gutter per Larimer
County Urban Street Standard Detail 701 for curb and gutter
channelized flow. Assume a water depth of 1', fixed side slopes, and a
triangular swale section for grass channelized flow. Assume a water
depth of 1', 4:1 side slopes, and a 2' wide valley pan for channelized
flow in a valley pan.
Tc2 Tc10 Tc100 C2 C10 C100 I2 I10 I100 QWQ Q2 Q10 Q100
r1 R1 0.09 5.0 5.0 5.0 1.0 1.0 1.0 2.9 4.9 10.0 0.1 0.2 0.4 0.9
r2 R2 0.02 5.0 5.0 5.0 1.0 1.0 1.0 2.9 4.9 10.0 0.0 0.1 0.1 0.2
r3 R3 0.09 5.0 5.0 5.0 1.0 1.0 1.0 2.9 4.9 10.0 0.1 0.2 0.4 0.9
r4 R4 0.17 5.0 5.0 5.0 1.0 1.0 1.0 2.9 4.9 10.0 0.2 0.5 0.8 1.7
r5 R5 0.11 5.0 5.0 5.0 1.0 1.0 1.0 2.9 4.9 10.0 0.2 0.3 0.5 1.1
r6 R6 0.04 5.0 5.0 5.0 1.0 1.0 1.0 2.9 4.9 10.0 0.1 0.1 0.2 0.4
r7 R7 0.02 5.0 5.0 5.0 1.0 1.0 1.0 2.9 4.9 10.0 0.0 0.0 0.1 0.2
r8 R8 0.03 5.0 5.0 5.0 1.0 1.0 1.0 2.9 4.9 10.0 0.0 0.1 0.1 0.3
r9 R9 0.07 5.0 5.0 5.0 1.0 1.0 1.0 2.9 4.9 10.0 0.1 0.2 0.3 0.7
r10 R10 0.10 5.0 5.0 5.0 1.0 1.0 1.0 2.9 4.9 10.0 0.1 0.3 0.5 1.0
r11 R11 0.04 5.0 5.0 5.0 1.0 1.0 1.0 2.9 4.9 10.0 0.1 0.1 0.2 0.4
r12 R12 0.02 5.0 5.0 5.0 1.0 1.0 1.0 2.9 4.9 10.0 0.0 0.0 0.1 0.2
a1 A1 0.32 7.5 7.5 7.0 0.2 0.2 0.3 2.5 4.3 8.8 0.1 0.2 0.3 0.8
a2 A2 0.36 5.1 5.1 5.0 0.7 0.7 0.9 2.9 4.9 10.0 0.4 0.7 1.2 3.1
a3 A3 0.37 5.0 5.0 5.0 0.9 0.9 1.0 2.9 4.9 10.0 0.5 0.9 1.5 3.7
a4 A4 0.11 5.0 5.0 5.0 0.9 0.9 1.0 2.9 4.9 10.0 0.1 0.3 0.4 1.0
a5 A5 0.04 5.0 5.0 5.0 0.9 0.9 1.0 2.9 4.9 10.0 0.1 0.1 0.2 0.4
a6 A6 0.04 5.0 5.0 5.0 0.9 0.9 1.0 2.9 4.9 10.0 0.1 0.1 0.2 0.4
a7 A7 0.06 5.0 5.0 5.0 0.9 0.9 1.0 2.9 4.9 10.0 0.1 0.1 0.2 0.6
b1 B1 0.27 7.7 7.7 7.1 0.3 0.3 0.3 2.5 4.2 8.8 0.1 0.2 0.3 0.8
b2 B2 0.19 5.0 5.0 5.0 0.6 0.6 0.7 2.9 4.9 10.0 0.2 0.3 0.5 1.4
b3 B3 0.24 5.0 5.0 5.0 0.7 0.7 0.9 2.9 4.9 10.0 0.3 0.5 0.9 2.2
b4 B4 0.03 6.0 6.0 5.6 0.2 0.2 0.3 2.8 4.7 9.6 0.0 0.0 0.0 0.1
c1 C1 0.35 5.0 5.0 5.0 0.3 0.3
0.4 2.9 4.9 10.0 0.1 0.3 0.5 1.2
Intensity, I from Fig. 3.4.1 Fort Collins Stormwater Manual
Rational Equation: Q = CiA (Equation 6-1 per MHFD)
DEVELOPED DIRECT RUNOFF COMPUTATIONS
Intensity
Fort Collins Rescue Mission
M. Ruebel
February 14, 2024
Design
Point Basin Area
(acres)
Runoff CTc (Min)
Date:
Fort Collins
Project:
Location:
Calc. By:
Flow (cfs)
FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5)
3.0 Rational Method
3.4 Intensity-Duration-Frequency Curves for Rational Method
Page 8
Table 3.4-1. IDF Table for Rational Method
Duration
(min)
Intensity
2-year
(in/hr)
Intensity
10-year
(in/hr)
Intensity
100-year
(in/hr)
Duration
(min)
Intensity
2-year
(in/hr)
Intensity
10-year
(in/hr)
Intensity
100-year
(in/hr)
5 2.85 4.87 9.95
39 1.09 1.86 3.8
6 2.67 4.56 9.31
40 1.07 1.83 3.74
7 2.52 4.31 8.80
41 1.05 1.80 3.68
8 2.40 4.10 8.38
42 1.04 1.77 3.62
9 2.30 3.93 8.03
43 1.02 1.74 3.56
10 2.21 3.78 7.72
44 1.01 1.72 3.51
11 2.13 3.63 7.42
45 0.99 1.69 3.46
12 2.05 3.50 7.16
46 0.98 1.67 3.41
13 1.98 3.39 6.92
47 0.96 1.64 3.36
14 1.92 3.29 6.71
48 0.95 1.62 3.31
15 1.87 3.19 6.52
49 0.94 1.6 3.27
16 1.81 3.08 6.30
50 0.92 1.58 3.23
17 1.75 2.99 6.10
51 0.91 1.56 3.18
18 1.70 2.90 5.92
52 0.9 1.54 3.14
19 1.65 2.82 5.75
53 0.89 1.52 3.10
20 1.61 2.74 5.60
54 0.88 1.50 3.07
21 1.56 2.67 5.46
55 0.87 1.48 3.03
22 1.53 2.61 5.32
56 0.86 1.47 2.99
23 1.49 2.55 5.20
57 0.85 1.45 2.96
24 1.46 2.49 5.09
58 0.84 1.43 2.92
25 1.43 2.44 4.98
59 0.83 1.42 2.89
26 1.4 2.39 4.87
60 0.82 1.4 2.86
27 1.37 2.34 4.78
65 0.78 1.32 2.71
28 1.34 2.29 4.69
70 0.73 1.25 2.59
29 1.32 2.25 4.60
75 0.70 1.19 2.48
30 1.30 2.21 4.52
80 0.66 1.14 2.38
31 1.27 2.16 4.42
85 0.64 1.09 2.29
32 1.24 2.12 4.33
90 0.61 1.05 2.21
33 1.22 2.08 4.24
95 0.58 1.01 2.13
34 1.19 2.04 4.16
100 0.56 0.97 2.06
35 1.17 2.00 4.08
105 0.54 0.94 2.00
36 1.15 1.96 4.01
110 0.52 0.91 1.94
37 1.16 1.93 3.93
115 0.51 0.88 1.88
38 1.11 1.89 3.87
120 0.49 0.86 1.84
FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5)
3.0 Rational Method
3.4 Intensity-Duration-Frequency Curves for Rational Method
Page 9
Figure 3.4-1. Rainfall IDF Curve – Fort Collins
NORTHERNENGINEERING.COM | 970.221.4158 FINAL DRAINAGE REPORT: FORT COLLINS RESCUE MISSION
FORT COLLINS | GREELEY APPENDIX
APPENDIX B
WATER QUALITY/LID COMPUTATIONS
Project Number:Project:Fort Collins Rescue Mission
Project Location:Date:February 14, 2024
Description
Hickory Det. Pond
(See Note 1) Notes
Lot 2 Required Detention Volume n/a ac. ft.n/a ac. ft. Volume provided in Hickory Regional Detention Pond (See Note 1)
Lot 2 Release Rate n/a cfs n/a cfs Release Rate provided in Hickory Regional Detentin Pond (See Note 1)
Description
Volume
Provided Notes
Rain Garden 1 1,405 cu. ft.1870 cu. ft. LID for Major Basin A and Roof Connections
Rain Garden 2 682 cu. ft.915 cu.ft. LID for Major Basin B and Roof Connections
Standard Water Quailty (Hickory Regional Pond)n/a cu. ft.n/a cu. ft.Standard water quailty treatment provided in Hickory Regional Detention Pond (See
Note 1)
Notes:
Summary of Water Quality Volumes
Volume
Required
RELEASE RATE AND SUMMARY OF DETENTION VOLUMES
1971-001
Fort Collins
Summary of Detention Volumes
Required
1) Detention and standard water quailty volumes shown above are per the Mason Street Infrastructure project. See the Mason Street infrastructure project for detailed design of the
Hickory Regional Detention Pond. See Appendix E
1
FD
C
SC
T
F
E
M
GM
UD
G
ELE
C
CT
V
OH
U
X
X
G
G
G
F
E
S
F
ES
UD
UD
UD
UD
UD
UD
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
b1
a1
HICKORY REGIONAL
DETENTION POND
HI
B
D
O
N
C
O
U
R
T
N MASON S
T
R
E
E
T
0.09 ac.
R1
0.09 ac.
R3
0.11 ac.
R5
0.27 ac.
B1
0.36 ac.
A2
0.32 ac.
A1
0.37 ac.
A3
0.11 ac.
A4
0.04 ac.
A5
0.35 ac.
C1
0.03 ac.
B4
0.19 ac.
B2
0.04 ac.
A6
0.06 ac.
A7
0.24 ac.
B3
0.02 ac.
R2
0.17 ac.
R4
0.02 ac.
R12
0.04 ac.
R6
0.02 ac.
R7
0.03 ac.
R8
0.10 ac.
R10
0.07 ac.
R9
0.04 ac.
R11
RAIN GARDEN 1
CURB CUT &
SIDEWALK CHASE
INTERIM DETENTION
POND OUTFALL
PROPOSED
STORM DRAIN
RAIN GARDEN 2
CURB CUT
CURB CUT
DRAWN BY:
SCALE:
DATE:
WQ EXHIBIT
SHEET NO:
P:
\
1
9
7
1
-
0
0
1
\
D
W
G
\
E
N
G
I
N
E
E
R
\
M
A
S
O
N
\
2
0
2
4
-
0
2
-
1
2
\
M
A
S
O
N
S
T
R
E
E
T
\
M
A
S
O
N
\
U
P
D
A
T
E
D
D
R
A
I
N
A
G
E
\
1
9
7
1
-
0
0
1
_
L
I
D
E
X
H
I
B
I
T
.
D
W
G
FORT COLLINS RESCUE MISSION
FORT COLLINS
COLORADO
MCR
1" = 70'
02/14/2024
LID 1
PROPOSED STORM SEWER
PROPERTY BOUNDARY
ADESIGN POINT
DRAINAGE BASIN LABEL
DRAINAGE BASIN BOUNDARY
A
LEGEND:
FOR DRAINAGE REVIEW ONLY
NOT FOR CONSTRUCTION
( IN FEET )
1 inch = ft.
Feet07070
70
Project Number:
Project Location:
Calculations By:
Sq. Ft.Acres
R1 3,986 0.09 90% 3,587
R2 1,069 0.02 90% 962
R3 3,995 0.09 90% 3,596
R4 7,543 0.17 90% 6,789
R5 4,961 0.11 90% 4,465
R6 1,712 0.04 90% 1,541
R7 741 0.02 90% 667
R8 1,263 0.03 90% 1,137
R9 3,017 0.07 90% 2,715
R10 4,555 0.10 90% 4,100
R11 1,765 0.04 90% 1,589
R12 716 0.02 90% 644
A1 14,111 0.32 4% 627
A2 15,606 0.36 66% 10,268
A3 16,118 0.37 88% 14,127
A4 4,575 0.11 90% 4,110
A5 1,783 0.04 90% 1,604
A6 1,902 0.04 90% 1,714
A7 2,487 0.06 90% 2,230
B1 11,834 0.27 10% 1,177
B2 8,356 0.19 52% 4,385
B3 10,356 0.24 73% 7,545
B4 1,206 0.03 2% 24
C1 15,259 0.35 13% 2,027
Total 138,916 3.19 81,628
Sq. Ft.Acres
Rain Garden 1 77,894 1.79 69% Rain Garden 1,405 53,860
Rain Garden 2 45,763 1.05 56% Rain Garden 682 25,741
Total 123,657 2.84 79,601
138,916 ft2
79,601 ft3
2,027 ft2
81,628 ft2
61,221 ft3
79,601 ft2
98%
Rain Garden 2
Rain Garden 2
Rain Garden 2
n/a
LID TREATMENT ID
Rain Garden 2
Rain Garden 2
Rain Garden 2
Rain Garden 1
Rain Garden 1
Rain Garden 2
Rain Garden 1
Rain Garden 1
Rain Garden 1
Rain Garden 1
Rain Garden 1
Rain Garden 1
Rain Garden 1
Rain Garden 1
Rain Garden 1
Rain Garden 2
Rain Garden 1
Rain Garden 1
Rain Garden 1
Rain Garden 1
LID SUMMARY
AreaBasin ID Percent
Impervious
Fort Collins Rescue Mission
February 14, 2024
1971-001
Fort Collins, Colorado
M. Ruebel
Total
Impervious
Area (ft2)
LID Summary per Basin
Weighted %
Impervious
LID Summary per LID Structure
Impervious
Area (ft2)Treatment TypeLID ID Required
Volume (ft3)
Area
Total Impervious Area
75% Requried Minium Area to be Treated
Total Treated Area
Percent Impervious Treated by LID
`
LID Site Summary
Total Site Area
Total Impervious Area with LID Treatment
Total Impervious Area without LID Treatment
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =69.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.690
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.22 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area) Area = 77,894 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 =0.43 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER =1,405 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =12 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =1075 sq ft
D) Actual Flat Surface Area AActual =1421 sq ft
E) Area at Design Depth (Top Surface Area)ATop =1852 sq ft
F) Rain Garden Total Volume VT=1,637 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =cu ft
iii) Orifice Diameter, 3/8" Minimum DO = in
Design Procedure Form: Rain Garden (RG)
Mason Ruebel
Northern Engineering
February 13, 2024
Fort Collins Rescue Mission
Rain Garden 1
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
Raingarden 1, RG 2/13/2024, 1:49 PM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
Mason Ruebel
Northern Engineering
February 13, 2024
Fort Collins Rescue Mission
Rain Garden 1
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
Raingarden 1, RG 2/13/2024, 1:49 PM
Project:
Date:
Pond No.:
4,978.00 1,405.00 cu. ft.
4,979.00 4,978.86
1,870.40 cu. ft.
4,980.00
Max. Elev. Min. Elev. cu. ft. acre ft cu. ft. acre ft
4,978.00 N/A 1,313 0.00 0.00 0.00 0.00 0.00
4,978.20 4,978.00 1,591 0.20 290.40 0.01 290.40 0.01
4,978.40 4,978.20 1,775 0.20 336.60 0.01 627.00 0.01
4,978.60 4,978.40 1,966 0.20 374.10 0.01 1,001.10 0.02
4,978.80 4,978.60 2,168 0.20 413.40 0.01 1,414.50 0.03
4,979.00 4,978.80 2,391 0.20 455.90 0.01 1,870.40 0.04
Crest of Pond Elev.:
Volume at Grate:
Grate Elevation:
RAIN GARDEN 1
Project Number:
Project Location:
Calculations By:Rain Garden 1
Required LID Provided LID
STAGE STORAGE CURVE
Contour Contour
Surface Area
(ft2)
Depth (ft)
Incremental Volume Cummalitive Volume
Pond Stage Storage Curve
1971-001
Fort Collins, CO
M. Ruebel
Elev at Req. LID Volume:
Fort Collins Rescue Mission
February 14, 2024
Pond Outlet and Volume Data
Outlet Elevation: Required LID Volume:
1
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1. Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =56.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.560
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.18 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area) Area = 45,763 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 =0.43 in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER =682 cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2. Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =6 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =513 sq ft
D) Actual Flat Surface Area AActual =1250 sq ft
E) Area at Design Depth (Top Surface Area)ATop =2666 sq ft
F) Rain Garden Total Volume VT=979 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3. Growing Media
4. Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =cu ft
iii) Orifice Diameter, 3/8" Minimum DO = in
Design Procedure Form: Rain Garden (RG)
Mason Ruebel
Northern Engineering
February 13, 2024
Fort Collins Rescue Mission
Rain Garden 2
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
Raingarden 2, RG 2/13/2024, 1:49 PM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5. Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6. Inlet / Outlet Control
A) Inlet Control
7. Vegetation
8. Irrigation
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
Mason Ruebel
Northern Engineering
February 13, 2024
Fort Collins Rescue Mission
Rain Garden 2
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
Raingarden 2, RG 2/13/2024, 1:49 PM
Project:
Date:
Pond No.:
4,978.16 682.00 cu. ft.
4,978.66 4,978.55
915.04 cu. ft.
4,980.00
Max. Elev. Min. Elev. cu. ft. acre ft cu. ft. acre ft
4,978.16 N/A 1,550 0.00 0.00 0.00 0.00 0.00
4,978.40 4,978.16 1,783 0.24 399.96 0.01 399.96 0.01
4,978.60 4,978.40 2,028 0.20 381.10 0.01 781.06 0.02
4,978.66 4,978.60 2,438 0.06 133.98 0.00 915.04 0.02
STAGE STORAGE CURVE
Contour Contour
Surface Area
(ft2)
Depth (ft)
Incremental Volume Cummalitive Volume
Pond Stage Storage Curve
1971-001
Fort Collins, CO
M. Ruebel
Elev at Req. LID Volume:
Fort Collins Rescue Mission
February 14, 2024
Pond Outlet and Volume Data
Outlet Elevation: Required LID Volume:
Crest of Pond Elev.:
Volume at Grate:
Grate Elevation:
RAIN GARDEN 2
Project Number:
Project Location:
Calculations By:Rain Garden 2
Required LID Provided LID
1
1971-001 Fort Collins Rescue Mission
Fort Collins Rescue Mission
Fort Collins, CO
M. Ruebel Date:2/13/2024
Forebay
ID
Storm Conveyance
ID
Basin ID
Total Undetained
Area Contributing
to Pond
Total Undetained
100-yr Discharge
Percent
Impervious
Forebay
Depth
Required
Forebay
Area
Provided
Length
Provided
Width
Provided
Area
(ac) (cfs) (%)(ft3)1% of WQCV (ft)(ft2)(ft) (ft)(ft2)
Forebay 1-1
Curb Cut 1
(South Parking Lot)
A3 0.39 3.9 83% 394.06 3.94 1 3.9 2.0 4.0 8.0
Forebay 1-2
Curb Cut 2
(N Mason Street)A2 0.36 3.1 66% 269.78 2.70 1 2.7 2.0 4.0 8.0
Forebay 1-3 Storm A R4, R6-10, R12, A4-7 0.76 7.53 90% 886.10 8.86 1 8.9 2.0 5.0 10.0
Forebay 1-4 Storm R3 R11 0.04 0.9 90% 46.64 0.47 1 0.5 2.0 2.0 4.0
Forebay 2-1
Curb Cut 3
(North Parking Lot)
B2, B3, R3, R5 0.6 5.6 72% 495.47 4.95 1 5.0 2.0 4.0 8.0
Forebay 2-2 Storm R1 R1 0.09 0.9 90% 104.93 1.05 1 1.0 2.0 2.0 4.0
Forebay 2-3 Storm R2 R2 0.02 0.9 90% 23.32 0.23 1 0.2 2.0 2.0 4.0
Project Number:
Project Location:
Calculations By:
WQCV
Forebay Calculations
NORTHERNENGINEERING.COM | 970.221.4158 FINAL DRAINAGE REPORT: FORT COLLINS RESCUE MISSION
FORT COLLINS | GREELEY APPENDIX
APPENDIX C
HYDRAULIC CALCULATIONS
Project #:
Project Name:
Project Loc.:
Design
Flowrate
Upstream
Flowrate
Total
Flowrate
Allowable
Flowrate Overflow Design
Flowrate
Upstream
Flowrate
Total
Flowrate
Allowable
Flowrate Overflow
Inlet A9 (1/3) of Basin A7, Basin R12 15" Nyloplast Basin 0.10 cfs 0.00 cfs 0.10 cfs 4.00 cfs 0.00 cfs 0.30 cfs 0.00 cfs 0.30 cfs 4.00 cfs 0.00 cfs
Inlet A13 (1/3) of Basin A7 12" Nyloplast Basin 0.10 cfs 0.00 cfs 0.10 cfs 2.50 cfs 0.00 cfs 0.20 cfs 0.00 cfs 0.20 cfs 2.50 cfs 0.00 cfs
Inlet A3-1 Basin A4 12" Nyloplast Basin 0.30 cfs 0.00 cfs 0.30 cfs 2.50 cfs 0.00 cfs 1.00 cfs 0.00 cfs 1.00 cfs 2.50 cfs 0.00 cfs
Inlet A3-2 Basin A4 (Nuisance Flows)12" Nyloplast Basin 0.10 cfs 0.00 cfs 0.10 cfs 2.50 cfs 0.00 cfs 0.10 cfs 0.00 cfs 0.10 cfs 2.50 cfs 0.00 cfs
Inlet A10-1 (1/3) of Basin A7 8" Nyloplast Basin 0.10 cfs 0.00 cfs 0.10 cfs 1.00 cfs 0.00 cfs 0.20 cfs 0.00 cfs 0.20 cfs 1.00 cfs 0.00 cfs
Inlet A7-3 Basin A5 (Nuisance Flows)12" Nyloplast Basin 0.10 cfs 0.00 cfs 0.10 cfs 2.50 cfs 0.00 cfs 0.10 cfs 0.00 cfs 0.10 cfs 2.50 cfs 0.00 cfs
Inlet A10-2 Basin A6 (Nuisance Flows)8" Nyloplast Basin 0.10 cfs 0.00 cfs 0.10 cfs 1.00 cfs 0.00 cfs 0.10 cfs 0.00 cfs 0.10 cfs 1.00 cfs 0.00 cfs
Inlet A7-4.1 Basin A6 (Nuisance Flows)8" Nyloplast Basin 0.10 cfs 0.00 cfs 0.10 cfs 1.00 cfs 0.00 cfs 0.10 cfs 0.00 cfs 0.10 cfs 1.00 cfs 0.00 cfs
Inlet A7-2.1 Basin A6 8" Nyloplast Basin 0.10 cfs 0.00 cfs 0.10 cfs 1.00 cfs 0.00 cfs 0.40 cfs 0.00 cfs 0.40 cfs 1.00 cfs 0.00 cfs
Inlet A7-1.1 Basin A5 8" Nyloplast Basin 0.10 cfs 0.00 cfs 0.10 cfs 1.00 cfs 0.00 cfs 0.40 cfs 0.00 cfs 0.40 cfs 1.00 cfs 0.00 cfs
Inlet B2 Outlet Structure for Rain Garden 1 Type C Inlet 3.70 cfs 0.00 cfs 3.70 cfs 18.66 cfs 0.00 cfs 7.60 cfs 0.00 cfs 14.90 cfs 18.66 cfs 0.00 cfs
Inlet C4 Outlet Structure for Rain Garden 2 30" Nyloplast Basin 1.90 cfs
0.00 cfs 1.90 cfs 14.00 cfs 0.00 cfs 14.90 cfs
0.00 cfs 7.60 cfs 14.00 cfs 0.00 cfs
INLET CAPACITIES SUMMARY
Inlet Type
Inlet and Area Drain Capacities
2-Year 100-Year
1971-001
Mason Street Infrastructure
Fort Collins, Colorado
Basins / Design Notes
3130 Verona Avenue • Buford, GA 30518
(866) 888-8479 / (770) 932-2443 • Fax: (770) 932-2490
© Nyloplast Inlet Capacity Charts June 2012
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
1.10
1.20
0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55 0.60 0.65 0.70 0.75 0.80 0.85 0.90 0.95 1.00 1.05 1.10
Ca
p
a
c
i
t
y
(
c
f
s
)
Head (ft)
Nyloplast 8" Dome Grate Inlet Capacity Chart
Inlet A7-2.1 = Q(REQ) 0.4 CFS
w/ 50% Clogging Q = 0.6 CFS
NOTE:
Inlets A10-1, A10-2, A7-4.1, & A7-1.1 are
designed to collect nuisance flows in
landscaped areas. The majority of flows within
these basin are collected in other inlets. See
Inlet Capacity Summary for more information
See Note
3130 Verona Avenue • Buford, GA 30518
(866) 888-8479 / (770) 932-2443 • Fax: (770) 932-2490
© Nyloplast Inlet Capacity Charts June 2012
0.00
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50
2.75
0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55 0.60 0.65 0.70 0.75 0.80 0.85 0.90 0.95 1.00 1.05 1.10
Ca
p
a
c
i
t
y
(
c
f
s
)
Head (ft)
Nyloplast 12" Dome Grate Inlet Capacity Chart
Inlet A3-1 = Q(REQ) 1.0 CFS
w/ 50% Clogging Q = 1.5 CFS
NOTE:
Inlets A13, A3-2, A7-3 are designed to collect
nuisance flows in landscaped areas. The are
sized mainly due to the pipe sizing requirements.
The majority of flows within these basin are
collected in other inlets. See Inlet Capacity
Summary for more information
See Note
3130 Verona Avenue • Buford, GA 30518
(866) 888-8479 / (770) 932-2443 • Fax: (770) 932-2490
© Nyloplast Inlet Capacity Charts June 2012
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55 0.60 0.65 0.70 0.75 0.80 0.85 0.90 0.95 1.00 1.05 1.10
Ca
p
a
c
i
t
y
(
c
f
s
)
Head (ft)
Nyloplast 15" Dome Grate Inlet Capacity Chart
Inlet A9 = Q(REQ) 0.3 CFS
w/ 50% Clogging Q = 0.45 CFS
NOTE:
Inlet A9 is sized mainly due to pipe sizing
requirements
3130 Verona Avenue • Buford, GA 30518
(866) 888-8479 / (770) 932-2443 • Fax: (770) 932-2490
© Nyloplast Inlet Capacity Charts June 2012
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55 0.60 0.65 0.70 0.75 0.80 0.85 0.90 0.95 1.00 1.05 1.10
Ca
p
a
c
i
t
y
(
c
f
s
)
Head (ft)
Nyloplast 30" Dome Grate Inlet Capacity Chart
Inlet C4 = Q(REQ) 7.6 CFS
w/ 50% Clogging Q = 11.4 CFS
Area Inlet Performance Curve:
Inlet B2
Governing Equations:
At low flow depths, the inlet will act like a weir governed by the following equation:
* where P = 2(L + W)
* where H corresponds to the depth of water above the flowline
At higher flow depths, the inlet will act like an orifice governed by the following equation:
* where A equals the open area of the inlet grate
* where H corresponds to the depth of water above the centroid of the cross-sectional area (A)
The exact depth at which the inlet ceases to act like a weir, and begins to act like an orifice is unknown.
However, what is known, is that the stage-discharge curves of the weir equation and the orifice equation
will cross at a certain flow depth. The two curves can be found below:
If H > 1.792 (A/P), then the grate operates like an orifice; otherwise it operates like a weir.
Input Parameters:
Type of Grate: CDOT TYPE C
Length of Grate (ft): 2.79
Width of Grate (ft): 3.43
Open Area of Grate (ft2):8.13
Flowline Elevation (ft): 4979.00
Allowable Capacity: 0.50
Depth vs. Flow:
Depth Above Inlet (ft)
Elevation
(ft)
Shallow
Weir Flow
(cfs)
Orifice
Flow
(cfs)
Actual
Flow
(cfs)
0.00 4979.00 0.00 0.00 0.00
0.10 4979.10 0.59 6.91 0.59
0.20 4979.20 1.67 9.78 1.67
0.30 4979.30 3.07 11.97 3.07
0.40 4979.40 4.72 13.82 4.72
0.50 4979.50 6.60 15.46 6.60
0.60 4979.60 8.67 16.93 8.67
0.70 4979.70 10.93 18.29 10.93
0.80 4979.80 13.35 19.55 13.35
0.90 4979.90 15.93 20.74 15.93
1.00 4980.00 18.66 21.86 18.66
<-Overflow
100-Year Design Flow = 14.9 cfs
<-100-Year
0.00
5.00
10.00
15.00
20.00
25.00
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00
Di
s
c
h
a
r
g
e
(
c
f
s
)
Stage (ft)
Stage - Discharge Curves
Weir Flow
Orifice Flow
5.10.3 HPQ
5.0)2(67.0 gHAQ
19
26
20
25
STORM A
STORM A
STORM A7
STORM B
STORM B
STORM C
STORM C
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Feb 14 2024
Curb Cut 1 (South Parking Lot)
Rectangular
Bottom Width (ft) = 4.00
Total Depth (ft) = 0.50
Invert Elev (ft) = 80.80
Slope (%) = 3.60
N-Value = 0.015
Calculations
Compute by: Known Q
Known Q (cfs) = 4.90
Highlighted
Depth (ft) = 0.21
Q (cfs) = 4.900
Area (sqft) = 0.84
Velocity (ft/s) = 5.83
Wetted Perim (ft) = 4.42
Crit Depth, Yc (ft) = 0.37
Top Width (ft) = 4.00
EGL (ft) = 0.74
0 .5 1 1.5 2 2.5 3 3.5 4 4.5 5
Elev (ft) Depth (ft)Section
80.00 -0.80
80.50 -0.30
81.00 0.20
81.50 0.70
82.00 1.20
Reach (ft)
Req Q = 3.7cfs x 1.33 (Freeboard) = 4.9 cfs
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Feb 14 2024
Curb Cut 2 (Mason Street)
Rectangular
Bottom Width (ft) = 4.00
Total Depth (ft) = 0.50
Invert Elev (ft) = 79.88
Slope (%) = 3.60
N-Value = 0.015
Calculations
Compute by: Known Q
Known Q (cfs) = 4.12
Highlighted
Depth (ft) = 0.19
Q (cfs) = 4.120
Area (sqft) = 0.76
Velocity (ft/s) = 5.42
Wetted Perim (ft) = 4.38
Crit Depth, Yc (ft) = 0.33
Top Width (ft) = 4.00
EGL (ft) = 0.65
0 .5 1 1.5 2 2.5 3 3.5 4 4.5 5
Elev (ft) Depth (ft)Section
79.00 -0.88
79.50 -0.38
80.00 0.12
80.50 0.62
81.00 1.12
Reach (ft)
Req Q = 3.1cfs x 1.33 (Freeboard) = 4.12 cfs
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Wednesday, Feb 14 2024
Curb Cut 3 (North Parking Lot)
Rectangular
Bottom Width (ft) = 4.00
Total Depth (ft) = 0.50
Invert Elev (ft) = 78.67
Slope (%) = 5.00
N-Value = 0.015
Calculations
Compute by: Known Q
Known Q (cfs) = 5.98
Highlighted
Depth (ft) = 0.21
Q (cfs) = 5.980
Area (sqft) = 0.84
Velocity (ft/s) = 7.12
Wetted Perim (ft) = 4.42
Crit Depth, Yc (ft) = 0.42
Top Width (ft) = 4.00
EGL (ft) = 1.00
0 .5 1 1.5 2 2.5 3 3.5 4 4.5 5
Elev (ft) Depth (ft)Section
78.00 -0.67
78.50 -0.17
79.00 0.33
79.50 0.83
80.00 1.33
Reach (ft)
Req Q = 4.5cfs x 1.33 (Freeboard) = 5.98 cfs
NORTHERNENGINEERING.COM | 970.221.4158 FINAL DRAINAGE REPORT: FORT COLLINS RESCUE MISSION
FORT COLLINS | GREELEY APPENDIX
APPENDIX C
WATER QUALITY/LID COMPUTATIONS
NORTHERNENGINEERING.COM | 970.221.4158 FINAL DRAINAGE REPORT: FORT COLLINS RESCUE MISSION
FORT COLLINS | GREELEY APPENDIX
APPENDIX D
EROSION CONTROL REPORT
NORTHERNENGINEERING.COM | 970.221.4158 FINAL DRAINAGE REPORT: FORT COLLINS RESCUE MISSION
FORT COLLINS | GREELEY EROSION CONTROL REPORT
EROSION CONTROL REPORT
A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the
final construction drawings. It should be noted; however, any such Erosion and Sediment Control Plan serves
only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or
different BMPs from those included may be necessary during construction, or as required by the authorities
having jurisdiction.
It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and
followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to
site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed, or
modified in conjunction with construction activities. It is imperative to appropriately reflect the current site
conditions at all times.
The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during
construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3,
Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing and/or
wattles along the disturbed perimeter, gutter protection in the adjacent roadways, and inlet protection at
existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures,
designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor.
Grading and Erosion Control Notes can be found on Sheet CS3 of the Utility Plans. The Final Utility Plans will also
contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In
addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the
applicable requirements outlined in any existing Development Agreement(s) of record, as well as the
Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the
Site Contractor for this project may be required to secure a Stormwater Construction General Permit from the
Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater
Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor
shall develop a comprehensive Storm Water Management Plan (SWMP) pursuant to CDPHE requirements and
guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance
of construction BMPs.
Specification Sheet
TMax™ High-Performance
Turf Reinforcement Mat
RMX_MPDS_TMAX_1.19
Material Content
Woven Structure
100% UV stable
Polypropylene
Monofilament
yarns
Black/Green or
Black/Tan
Standard Roll Sizes
Width 11.5 ft (3.5 m) 11.5 ft (3.5 m)
Length 78 ft (23.8 m) 156 ft (47.5 m)
Weight ± 10%72 lbs (32.7 kg)143.5 lbs (65.1 kg)
Area 100 yd2 (83.6 m2)200 yd2 (167 m2)
DESCRIPTION
The TMax™ high-performance turf reinforcement mat (HP-TRM)
shall be a machine-produced mat of 100% UV-stabilized, high
denier polypropylene monofilament yarns woven into permanent,
high-strength, three-dimensional turf reinforcement matting.
Available in either a green/black or a tan/black coloring, the mat
shall be composed of polypropylene yarns woven into a uniform
configuration of resilient, pyramid-like projections. The mat
provides sufficient thickness, optimum open area, and three-
dimensionality for effective erosion control and vegetation
reinforcement against high flow induced shear forces. The mat
has high tensile strength for excellent damage resistance and for
increasing the bearing capacity of vegetated soils subject to heavy
loads from maintenance equipment and other vehicular traffic.
The material has very high interlock and reinforcement capacities
with both soil and root systems, and is designed for erosion
control applications on steep slopes and vegetated waterways.
Index Property Test Method Typical
Thickness ASTM D6525 0.4 in (10 mm)
Resiliency ASTM D6524 75%
Mass/Unit Area ASTM D6566 11.3 oz/yd2 (382 g/m2)
Tensile Strength
– MD ASTM D6818 4,400 lbs/ft (64 kN/m)
Elongation – MD ASTM D6818 35%
Tensile Strength
– TD ASTM D6818 3,300 lbs/ft
(48.2 kN/m)
Elongation – TD ASTM D6818 30%
Light Penetration ASTM D6567 75% coverage
UV Stability ASTM D4355 >90% @ 3000 hr
Design Permissible Shear Stress*
Vegetated Shear 16 psf (766 Pa)
Vegetated Velocity 25 fps (7.6 m/s)
+ Minimum Average Roll VAlue
*Design values extrapolated from large scale ASTM D6460 testing
©2019, North American Green is a registered trademark from Western Green. Certain
products and/or applications described or illustrated herein are protected under one
or more U.S. patents. Other U.S. patents are pending, and certain foreign patents and
patent applications may also exist.Trademark rights also apply as indicated herein.
Final determination of the suitability of any information or material for the use
contemplated, and its manner of use, is the sole responsibility of the user. Printed in
the U.S.A.
Western Green
4609 E. Boonville-New Harmony Rd.
Evansville, IN 47725
nagreen.com
800-772-2040
Disclaimer: The information contained herein may represent product index data, performance ratings, bench
scale testing or other material utility quantifications. Each representation may have unique utility and
limitations. Every effort has been made to ensure accuracy, however, no warranty is claimed and no liability shall
be assumed by North American Green (NAG) or its affiliates regarding the completeness, accurracy or fitness of
these values for any particular application or interpretation. While testing methods are provided for reference,
values shown may be derived from intrpolation or adjustment to be representatvie of intended use. For further
information, please feel free to contact NAG.
4609 E Boonville-New Harmony Rd
Evansville, IN 47725
866-540-9810
12/7/21
Technical Bulletin: Comparison of TRM Design Life Estimates
In the process of design, a relative frame of reference for the estimation of design life for Turf Reinforcement Mats
(TRMs) and High Performance TRMS (HPTRMs) is often desired. To that end, this document has been developed to
provide context and recommendations for a series of Western Excelsior and North American Green materials.
Specifically, the longevity of a TRM in the field is a function of factors that are intrinsic to the material and many
factors that are site specific. TRMs are typically constructed of any variety of filaments that may be bonded, woven
or bound to create a cohesive matrix that is formed into a rolled product. The base synthetic product (ie polyester,
nylon or polypropylene), chemical additives and dimensions can all, among other factors, influence the longevity of
the material. Once installed in the field, degradation is a function of:
• Exposure to ultra-violet (UV) radiation (sunlight)
• Moisture
• Mechanical Loading
• Temperature
• Exposure to chemicals and/or pollution
• Definition of acceptable performance (i.e. tensile strength, coverage, etc.)
Further, exposure to UV radiation naturally varies by:
• Location
• Facing Direction (North, East, West, South)
• Elevation
• Inclination (slope angle)
• Coverage by soil, debris, foliage, vegetation or other shade
Based on these factors, any material will degrade at different rates, depending on the field-specific situation. Even
within a given project, the direction and inclination of one area compared to another may reduce the lifespan by
fifty percent. Thus, it is important to realize that, absent a detailed, site-specific analysis, any design life estimate
should be considered an estimate for informational purposes.
With this background, general guidance for North American Green (NAG) and Western Excelsior (WEC) produced
TRMs are provided for consideration in product selection:
• S200, SC250, C350 – Up to ten years (synthetic portion)
• PP5-8, PP5-10, PP5-12, P300 – Up to ten years
• P550 – Up to fifteen years
• PP5-Pro, TMax 3k – Up to fifty years
• PP5-Xtreme, TMax – Up to seventy-five years
These estimates may or may not be reasonable for any specific condition or location and represent a maximum
duration where it would be reasonable to expect acceptable performance. This estimation is exclusive of fastener
performance. Consult Western Green or NAG directly for more specific recommendations.
Emergency Spillway
NNORTHERNENGINEERING.COM | 970.221.4158 FINAL DRAINAGE REPORT: FORT COLLINS RESCUE MISSION
FORT COLLINS | GREELEY APPENDIX
APPENDIX E
EXCERPTS FROM PREVIOUS REPORTS
AND USDA SOILS REPORT
FINAL DRAINAGE REPORT
MASON STREET INFRASTRUCTURE
FORT COLLINS, COLORADO
JANUARY 31ST, 2024
NORTHERNENGINEERING.COM
970.221.4158
FORT COLLINS
GREELEY
This Drainage Report is consciously provided as a PDF. Please
consider the environment before printing this document in its entirety.
When a hard copy is necessary, we recommend double-sided printing.
Approved Drainage report
will be included prior to
FCRM approval
Project Number:Project:Mason Infrastructure
Project Location:Date:January 31, 2024
Description Provided Notes
Interim Hickory Regional Detention Pond 1.84 ac. ft. 9.99 ac. ft.Volume for Mason Street Infrastructre project and development of Lot 2 in the
Interim Hickory Regional Detention Pond
Interim Hickory Pond Release Rate 2.63 cfs
Release rate for on-site flows per Dry Creek Basin Criteria
(13.13 acres * 0.2 cfs/acre)
Description
Volume
Provided Notes
Interim Standard Water Quailty 9,346 cu. ft. 9,346 cu. ft. Standard water quailty treatment for lots 1, 2, 3 & Tract A
Notes:
Summary of Water Quality Volumes
Volume
Required
RELEASE RATE AND SUMMARY OF DETENTION VOLUMES
1971-001
Fort Colins
Summary of Detention Volumes
Required
1)LID Treatment for Lot 2, 3 and Mason Street will be provided with future development of lots.
1
ELEC
FES
M VAULTELEC
CABLE ELEC
X
CT
V
CT
V
CTVCTV
OHU
XXXX
X
X
CTVCTVCTVGGG
SS SS SS
H2O H2O
ARV
H2O H2O
H Y D
S
FES
FES
W W W W W W W W W
XXXXXX
OHU OHU
X
X
X
X
X
S
W W
D
UDUDUD
UD
U
D
U
D
UD
UD
a1
SITE OUTFALL
LOCATION
6.98 ac.
A1
0.40 ac.
A4
1.32 ac.
A2
0.32 ac.
B3
0.35 ac.
B4
0.06 ac.
B6
0.23 ac.
A7
0.18 ac.
A6
1.39 ac.
B1
0.64 ac.
A5
0.41 ac.
A3
0.09 ac.
B7
0.13 ac.
B5
0.86 ac.
C1
0.08 ac.
B2
LOT 1
HICKORY REGIONAL
DETENTION POND
LOT 2 LOT 3
TRACT A
HIBDON COURT
N
M
A
S
O
N
S
T
R
E
E
T
DRAWN BY:
SCALE:
DATE:
WQ EXHIBIT
SHEET NO:
FORT COLLINS: 301 North Howes Street, Suite 100, 80521
GREELEY: 820 8th Street, 80631
E N G I N E E R N GI
EHTRON R N
970.221.4158
northernengineering.com
P:
\
1
9
7
1
-
0
0
1
\
D
W
G
\
S
H
E
E
T
S
_
M
A
S
O
N
S
T
R
E
E
T
\
D
R
A
I
N
A
G
E
\
1
9
7
1
-
0
0
1
_
L
I
D
.
D
W
G
MASON STREET INFRASTRUCTURE
FORT COLLINS
COLORADO
MCR
1" = 100'
01/31/2024
LID 1
PROPOSED STORM SEWER
PROPOSED CURB & GUTTER
PROPERTY BOUNDARY
PROPOSED INLET
ADESIGN POINT
DRAINAGE BASIN LABEL
DRAINAGE BASIN BOUNDARY
A
LEGEND:
FOR DRAINAGE REVIEW ONLY
NOT FOR CONSTRUCTION ( IN FEET )
1 inch = ft.
Feet0100100
100
LOT 1 (BASINS A1-A7, B1-B7)
·STANDARD WATER QUALITY
AREA OF WATER QUALITY RESPONSIBILITY
LOT 2 (BASINS A2-A7)
·LOW IMPACT DEVELOPMENT
LOT 3 (BASINS B1, B2, B3)
·LOW IMPACT DEVELOPMENT
S
ELEC
F ES
M VAULT
ELEC
VAULT
CABLEVAULT
ELEC
VAULT
ELEC
VAULT
ELEC
CABLE
CABLE
VAULT
ELEC
CELEC
ELEC
ELEC
CTV CTV CTV
OH
U
OH
U
OH
U
OH
U
E
E
E
E
OHU
E
E
X
X X
X
X
X
CT
V
CT
V
CT
V
CT
V
CTV
CT
V
CTV CTV CTV
OHU OHU
X X
X X X X X X X
X
X
X
X
X
CTV CTV CTV
CT
V
CTV CTV
CT
V
CTV CTV
G G
G G G G G G
CTV CTV
G G
SS SS SS SS SS SS
SS
SS
SS
SS
SS
SS
H2O
H2O
ARV
H2O H2O
H Y D
S
F E S
FE S
W W W W W W W W W W W W W W W W W W W
XXXXXXXXXXXXX
OHU OHU OHU OHU OHU
X
X
X
X
X
X
X
X
X
X
S
W W W W
S
S
SS
SS
SS
SS
SS
SS
SS
D
ELEC
X
X
X
X
XX
X
X
X
X
W W W W W
XXX X X
X
X
X
X
SS
SS
SS
SS
SS
SS
SS
SS
8" W
X
SSSS
UDUDUDUDUDUDUD
UD
UD
UD
UD
U
D
U
D
UD
UD
UD
UD
UD
NCFS LLC
300 HICKORY STREET
FORT COLLINS, CO
QR INC.
280 HICKORY STREET
FORT COLLINS, CO
QR INC.
200 HICKORY STREET
FORT COLLINS, CO
R AND S HOLDINGS
1235 N. COLLEGE AVENUE
FORT COLLINS, CO
HAINES BRANDON KUHRT 1295
N. COLLEGE AVENUE FORT
COLLINS, CO
GRATITUDE LLC
1303 N. COLLEGE AVENUE
FORT COLLINS, CO
HOYT JOHN R
1307 N. COLLEGE AVENUE
FORT COLLINS, CO
1311 N. COLLEGE LLC
HIBON CT.
FORT COLLINS, CO
1311 N. COLLEGE LLC
1311 N. COLLEGE AVENUE
FORT COLLINS, CO
WANKIER LANCE
1401 N. COLLEGE AVENUE
FORT COLLINS, CO
WOOD RONALD G/ JENNIFER
L/ WILLARD E
122 HIBDON COURT
FORT COLLINS, CO
THOMPSON PROPERTIES LLC
1319 N. COLLEGE AVENUE
FORT COLLINS, CO
D AND S MOTELS INC
1405 N. COLLEGE AVENUE
FORT COLLINS, CO
RI
C
H
E
Y
A
D
D
I
E
16
0
1
N
.
C
O
L
L
E
G
E
A
V
E
N
U
E
FO
R
T
C
O
L
L
I
N
S
,
C
O
MA
S
O
N
S
T
R
E
E
T
N
M
A
S
O
N
S
T
R
E
E
T
HICKORY STREET
HIBDON COURT
UNION PACIFIC RAILROAD
80
.
1
8
80
.
7
7
b4
a1
b7
b5
a6
b3
a3
b6
a4
a2
a7
b2
2' CONCRETE
PAN
WATER QUALITY OUTLET
STRUCTURE WITH
RESTRICTOR PLATE
SWALE
4' CURB CUT &
SIDEWALK CHASE
ROW AGREEMENT WITH UNION
PACIFIC RAILROAD FOR THE
PURPOSE OF IRRIGATION DITCH
& IRRIGATION WATER
UNSPECIFIED WIDTH BK 813 PG
27 TO BE VACATED PER
LANGUAGE FOUND ON PAGE 28
OF SAID DOCUMENT
STORM DRAIN A
SEE SHEET 16
STORM DRAIN B
SEE SHEET 19
ULTIMATE PLANNED WSEL
(4978) PER THE CITY OF
FORT COLLINS
ULTIMATE PLANNED WSEL
(4978) PER THE CITY OF
FORT COLLINS
ONSITE 100-YR
REQUIRED WSEL
(4976.47)
ONSITE 100-YR
REQUIRED WSEL
(4976.47)
PROPOSED NATURAL
HABITAT BUFFER ZONE
STORM DRAIN C
SEE SHEET 18
DRAINAGE
EASEMENT
4222 SQ. FT. of
TMAX
1030 SQ. FT. of
TMAX
HICKORY REGIONAL DETENTION POND
(INTERIM)
REQUIRED VOLUME= 89,588 CU.FT.
REQUIRED WSEL = 4976.47
WATER QUALITY VOLUME = 9,346 CU.FT.
WATER QUALITY WSEL = 4975.27
PROVIDED VOLUME = 9.99 AC.FT.
LOT 1
LOT 2
LOT 3
6.98 ac.
A1
0.40 ac.
A4
1.32 ac.
A2
0.32 ac.
B3
0.35 ac.
B4
0.06 ac.
B6
0.23 ac.
A7
0.18 ac.
A6
1.39 ac.
B1
0.64 ac.
A5
0.41 ac.
A3
0.09 ac.
B7
0.13 ac.
B5
0.86 ac.
C1
0.08 ac.
B2
20' WATERLINE AND
ROW EASEMENT
REC. NO. 85040113
6' UTILITY
EASEMENT
BK 1658 PG 746
6' UTILITY EASEMENT
PER PLAT OF BREW
SUB. FIRST FILING
10' UTILITY EASEMENT
BK 1658 PG 746
45' ROW
BK 1743 PG 632
10' UTILITY
EASEMENT
BK 1572 PG 322
45' ROW
BK 1743 PG 632
10' UTILITY
EASEMENT
BK 1572 PG 321
53.5' PERPETUAL EASEMENT FOR
ELECTRIC POWER TRANSMISSION LINE
BK 923 PG 282
30' EASEMENT FOR ROAD PURPOSES
BK 1143 PG 187
(EXCEPTION PARCEL PIB FCIF25205400)
30' UPRR TRACK EASEMENT
BK 2027 PG 988
REC. NO. 98091992
REC. NO. 20060019203
20' UTILITY EASEMENT
PER VALLEY STEEL &
WIRE SUBDIVISION PLAT
10' UTILITY
EASEMENT
10' UTILITY
EASEMENT
3' POWER LINE EASEMENT TO
CITY OF FORT COLLINS
BK 1475 PG 941
30' STORMWATER
EASEMENT
60' DRAINAGE
EASEMENT
S
CO
L
L
E
G
E
A
V
E
EXISTING
36" PIPE
STORM DRAIN A
SEE SHEET 16
DR1
DR
A
I
N
A
G
E
E
X
H
I
B
I
T
37
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
NORTH
( IN FEET )
1 inch = ft.
Feet05050
50
100 150
Sheet
Th
e
s
e
d
r
a
w
i
n
g
s
a
r
e
in
s
t
r
u
m
e
n
t
s
o
f
s
e
r
v
i
c
e
pr
o
v
i
d
e
d
b
y
N
o
r
t
h
e
r
n
En
g
i
n
e
e
r
i
n
g
S
e
r
v
i
c
e
s
,
I
n
c
.
an
d
a
r
e
n
o
t
t
o
b
e
u
s
e
d
f
o
r
an
y
t
y
p
e
o
f
c
o
n
s
t
r
u
c
t
i
o
n
un
l
e
s
s
s
i
g
n
e
d
a
n
d
s
e
a
l
e
d
b
y
a
P
r
o
f
e
s
s
i
o
n
a
l
E
n
g
i
n
e
e
r
i
n
th
e
e
m
p
l
o
y
o
f
N
o
r
t
h
e
r
n
En
g
i
n
e
e
r
i
n
g
S
e
r
v
i
c
e
s
,
I
n
c
.
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
R
E
V
I
E
W
S
E
T
of 37
MA
S
O
N
S
T
R
E
E
T
I
N
F
R
A
S
T
R
U
C
T
U
R
E
KEYMAP
PROPOSED CONTOUR
PROPOSED STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
PROPOSED CURB & GUTTER
PROPERTY BOUNDARY
PROPOSED INLET
A
DESIGN POINT
FLOW ARROW
DRAINAGE BASIN LABEL
DRAINAGE BASIN BOUNDARY
PROPOSED SWALE SECTION
11
NOTES:
1.REFER TO THE FINAL DRAINAGE REPORT, DATED JANUARY 31, 2024 FOR
ADDITIONAL INFORMATION.
2.THE VOLUME SHOWN FOR THE INTERIM HICKORY REGIONAL DETENTION POND DO
NOT ACCOUNT FOR OFFSITE RUNOFF. THE CITY OF FORT COLLINS IS RESPONSIBLE
FOR THE ANALYSIS OF OFFSITE BASINS AND THE ULTIMATE DESIGN OF THE
HICKORY REGIONAL DETENTION POND.
A
LEGEND:
FOR DRAINAGE REVIEW ONLY
NOT FOR CONSTRUCTION
EMERGENCY OVERFLOW PATH
PROPOSED NATURAL HABITAT BUFFER ZONE
GRAVEL GEOGRID
TURF REINFORCEMENT (TMAX)
MA
T
C
H
L
I
N
E
-
S
E
E
B
O
T
T
O
M
L
E
F
T
MA
T
C
H
L
I
N
E
-
S
E
E
T
O
P
R
I
G
H
T
A
A
BB
SWALE SECTIONS
SWALE SUMMARY TABLE
DEVELOPED DRAINAGE SUMMARY
Design
Point Basin ID
Total
Area
(acres)
C2 C100 2-Yr Tc
(min)
100-Yr Tc
(min)
Q2
(cfs)
Q100
(cfs)
a1 A1 6.985 0.20 0.25 16.67 16.67 2.49 10.83
a2 A2 1.321 0.86 1.00 5.00 5.00 3.25 13.14
a3 A3 0.411 0.86 1.00 5.00 5.00 1.01 4.09
a4 A4 0.396 0.86 1.00 5.00 5.00 0.97 3.94
a5 A5 0.644 0.87 1.00 5.00 5.00 1.59 6.41
a6 A6 0.175 0.77 0.96 5.00 5.00 0.38 1.68
a7 A7 0.234 0.84 1.00 5.00 5.00 0.56 2.33
b1 B1 1.392 0.87 1.00 8.99 8.99 2.86 13.85
b2 B2 0.081 0.95 1.00 5.00 5.00 0.22 0.80
b3 B3 0.315 0.69 0.86 5.00 5.00 0.62 2.69
b4 B4 0.346 0.23 0.29 5.00 5.00 0.23 1.00
b5 B5 0.134 0.95 1.00 5.00 5.00 0.36 1.33
b6 B6 0.057 0.95 1.00 5.00 5.00 0.15 0.56
b7 B7 0.092 0.79 0.98 5.00 5.00 0.21 0.90
c1 C1 0.864 0.29 0.36 7.61 7.61 0.61 2.83
Interim Hickory Regional Detention Pond Volume
Contour Elev.Contour Surface Area (ft2)
Cummalitive Volume
cu. ft.acre ft
4,974.80 125 0 0.0
4,975.00 3,010 313 0.0
4,976.00 60,990 32313 0.7
4,977.00 171,880 148749 3.4
4,978.00 221,264 345321 7.9
4,978.40 226,940 434961 10.0
XX X
X
X
X
X
SS
SS
SS
SS
SS
SS
SS
S
ELEC
F ES
M VAULT
ELEC
VAULT
ELEC
VAULT
ELEC
TRAFFICVAULT
CONTROL
IRR
CONTROL
IRR
CONTROL
IRR
VAULT
F.O.
CONTROL
IRR
VAULT
CABLE
VAULT
ELEC
VAULT
ELEC
VAULT
ELEC
CABLE
CABLE
CS
W
H Y D
VAULT
ELEC
CELEC
ELEC
ELEC
CTV CTV
OH
U
OH
U
OH
U
E
E
E
E
E
OHU
E
X X
X
X
X
CT
V
CT
V
CT
V
CT
V
CTVCTVCTVOHUOHUOHUOHUOHUOHUOHUOHU
X X
X X X X X X
X
X
X
X
CTV CTVCTVCTVCTVCTV
G G G G G G G
CTV CTV
G G G
W
SS SS SS SS SS SS SS
SS
SS
SS
SS
MW
H2O H2O
A RV
H2O H2O
D
H Y D
S
S
F ES
F E
S
W W W W W W W W W W W W W W W
OH
U
OH
U
OH
U
OH
U
OH
U
XXXXXXXXXX
OHU OHU OHU OHU
X
X
X
X
X
X
X
W W W W W W W W W W W W W W W
X
S
W W W W
S
S
SS
SS
SS
SS
SS
SS
D
ELEC
X
X
X
X
X
X
X
W W W W
S
EXISTING OWNER: NORTH
COLLEGE 1311 LLC
OWNER: VALLEY
STEEL & QR INC
(C-S DISTRICT)
OWNER: NORTH
COLLEGE 1311 LLC
(C-S DISTRICT)
OWNER: HOYT JOHN R
(C-S DISTRICT)
OWNER: THOMPSON
PROPERTIES LLC
(C-S DISTRICT)
OWNER: D AND S
MOTELS INC
(C-S DISTRICT)OWNER: WOOD RONALD
G/JENNIFERL/WILLARD E
(C-S DISTRICT)
OWNER: WANKIER LANCE
(C-S DISTRICT)
OWNER: STONECREST INC
(C-S DISTRICT)
OWNER: R AND S
HOLDINGS LLC
(C-S DISTRICT)
OWNER: VALLEY STEEL &
WIRE SUBDIVISION
(C-S DISTRICT)
OWNER:HAINES BRANDON KUHRT
MUSTANG SUBDIVISION
(C-S DISTRICT)
HICKORY STREET
HIBDON COURT
N
M
A
S
O
N
S
T
R
E
E
T
N
M
A
S
O
N
S
T
R
E
E
T
EXISTING OWNER: CITY OF
FORT COLLINS
R.O.W AGREEMENT WITH UNION
PACIFIC RAILROAD FOR THE PURPOSE
OF IRRIGATION DITCH & IRRIGATION
WATER UNSPECIFIED WIDTH
AGREEMENT
BK 813 PG 27
UNI
O
N
P
A
C
I
F
I
C
R
A
I
L
R
O
A
D
OWNER: NORTHERN COLORADO
FEEDERS SUPPLY SUB., 1ST
(C-S DISTRICT)
OWNER: GINKY TRUST
(L-M-N DISTRICT)
N
C
O
L
L
E
G
E
A
V
E
N
U
E
OWNER: R AND S
HOLDINGS LLC
(C-S DISTRICT)
EXISTING
PROPERTY LINE
TO BE VACATED EXISTING
PROPERTY LINE
TO BE VACATED
C-S DISTRICT
HICKORY REGIONAL
DETENTION POND
±7.79 ACRES
C-S DISTRICT
±2.77 ACRES
C-S DISTRICT
±1.32 ACRES
EXISTING OWNER: NORTH
COLLEGE 1311 LLC
2
7.79
1
EXISTING SITE
OUTFALL
EXISTING DETENTION
POND OUTFALL
EXISTING
CULVERT
EXISTING STORM
DRAIN2.77 ac.
2
1.32 ac.
3
1
3
EXISTING IRRIGATION
DITCH
DETENTION POND
DETENTION POND
DETENTION POND
20' WATERLINE AND
ROW EASEMENT
REC. NO. 85040113
20' UTILITY EASEMENT BK
1430 PG 930
20' UTILITY
EASEMENT PER
PLAT OF BREW SUB.
FIRST FILING
RIGHT OF WAY EASEMENT
BK 929 PG 30
(WIDTH VARIES)
6' UTILITY
EASEMENT
BK 1658 PG 746
6' UTILITY
EASEMENT PER
PLAT OF BREW SUB.
FIRST FILING
EXISTING 10' UTILTIY
EASEMENT
BK 1658 PG 746
3' POWER LINE EASEMENT
TO CITY OF FORT COLLINS
BK 1475 PG 941
45' ROW
BK 1743 PG 632
10' UTILITY
EASEMENT
BK 1572 PG 322
45' ROW
BK 1743 PG 632
10' UTILITY
EASEMENT
BK 1572 PG 321
30' UPRR TRACK EASEMENT
BOOK 2027 PAGE 988
REC. NO. 98091992 &
REC. NO. 20060019203
D
R
Y
C
R
E
E
K
EXISTING STORM
INLETS
SECTION LINE
SECTION LINE
LOT 2
LOT 1
LOT 3
30' UPRR TRACK EASEMENT
BOOK 2027 PAGE 988
REC. NO. 98091992 &
REC. NO. 20060019203
NON-EXCLUSIVE
ACCESS EASEMENT
REC. NO. 20140030921
53.5' PERPETUAL EASEMENT FOR
ELECTRIC POWER TRANSMISSION LINE
BK 923 PG 282
24' ACCESS EASEMENT
REC. NO. 20140036292
20 IRRIGATION DITCH
EASEMENT
BK 1429 PG 750
30 EASEMENT FOR ROAD PURPOSES
BK 1143 PG 187
(EXCEPTION PARCEL PIB FCIF25205400)
20 RIGHT OF WAY EASEMENT
BK 1114 PG 555
6' UTILITY EASEMENT
REC. NO. 2006-0068858 &
REC. NO. 2006-0068859
20' UTILITY EASEMENT
PER VALLEY STEEL &
WIRE SUBDIVISION PLAT
INTERIM SITE
OUTFALL
RAIN
GARDEN
RAIN
GARDEN
RAIN
GARDEN
DETENTION
POND
EXISTING DETENTION
POND
0.35
4
EXISTING
CULVERT
S
T
4
EXISTING 36"
WATER LINEEXISTING 36"
WATER LINE
ST
ST ST
S
T
S
T
S
T
ST
ST
ST
ST
STSTSTST
STORM CONNECTION
TO EXISTING
ROADSIDE DITCH
INTERIM HICKORY
REGIONAL DETENTION
POND OUTFALL
ULTIMATE HICKORY
REGIONAL DETENTION
POND OUTFALL
TRACT A
PROPOSED
NATURAL
HABITAT BUFFER
ZONE
PROPOSED
NATURAL
HABITAT BUFFER
ZONE
MDP
MA
S
T
E
R
D
R
A
I
N
A
G
E
P
L
A
N
Sheet
Th
e
s
e
d
r
a
w
i
n
g
s
a
r
e
in
s
t
r
u
m
e
n
t
s
o
f
s
e
r
v
i
c
e
pr
o
v
i
d
e
d
b
y
N
o
r
t
h
e
r
n
En
g
i
n
e
e
r
i
n
g
S
e
r
v
i
c
e
s
,
I
n
c
.
an
d
a
r
e
n
o
t
t
o
b
e
u
s
e
d
f
o
r
an
y
t
y
p
e
o
f
c
o
n
s
t
r
u
c
t
i
o
n
un
l
e
s
s
s
i
g
n
e
d
a
n
d
s
e
a
l
e
d
b
y
a
P
r
o
f
e
s
s
i
o
n
a
l
E
n
g
i
n
e
e
r
i
n
th
e
e
m
p
l
o
y
o
f
N
o
r
t
h
e
r
n
En
g
i
n
e
e
r
i
n
g
S
e
r
v
i
c
e
s
,
I
n
c
.
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
R
E
V
I
E
W
S
E
T
NO
R
T
H
M
A
S
O
N
S
T
R
E
E
T
OV
E
R
A
L
L
D
E
V
E
L
O
P
M
E
N
T
P
L
A
N
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what's below.
before you dig.Call
R
NORTH
( IN FEET )
0
1 INCH = 60 FEET
60 60 120 180
LEGEND:
NOTES:
1.ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL DATUM; NAVD88.
SEE OVERALL DEVELOPMENT PLAN FOR BENCHMARK REFERENCES.
2.ACCESS POINTS SHOWN ON THE ODP ARE APPROXIMATE. EXACT LOCATIONS TO BE
DETERMINED DURING THE PDP PROCESS. TWO POINTS OF FIRE ACCESS HAVE BEEN
PLANNED TO SERVICE DEVELOPMENT.
3.PLANNING AREA ACREAGE AND BOUNDARIES ARE PRELIMINARY AND SUBJECT TO
CHANGE WITH DETAILED PLANNING.
5.PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN
THE NATURAL HABITAT BUFFER ZONE
6.REFER TO ODP AND OVERALL DRAINAGE REPORT FOR ADDITIONAL INFORMATION.
C
3
Phasing Schedule
Drainage Phasing Schedule
Phase Description Required Improvement
Mason Street Infrastructure Interim Hickory Regional Detention Pond, Interim Standard Water Quailty & Reconstruction of Offsite Storm Outfall
Lot 1 Ultimate Hickory Regional Pond sizing and outfall
Lot 2 Low-Impact Development
Lot 3 Detention & Low-Impact Development
Tract A (City Owned)n/a
Site Phasing Schedule
Phase Description Required Improvements
Mason Street Infrastructure Mason St. (42'FL-FL & 6' West Sidewalk)
Lot 1 n/a
Lot 2 n/a
Lot 3 Hibdon Ct. (Ultimate Street Section) & Mason St. (6' East Sidewalk)
Tract A (City Owned)Mason St. (6' East Sidewalk)
United States
Department of
Agriculture
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource
Report for
Larimer County
Area, ColoradoNatural
Resources
Conservation
Service
September 27, 2023
Preface
Soil surveys contain information that affects land use planning in survey areas.
They highlight soil limitations that affect various land uses and provide information
about the properties of the soils in the survey areas. Soil surveys are designed for
many different users, including farmers, ranchers, foresters, agronomists, urban
planners, community officials, engineers, developers, builders, and home buyers.
Also, conservationists, teachers, students, and specialists in recreation, waste
disposal, and pollution control can use the surveys to help them understand,
protect, or enhance the environment.
Various land use regulations of Federal, State, and local governments may impose
special restrictions on land use or land treatment. Soil surveys identify soil
properties that are used in making various land use or land treatment decisions.
The information is intended to help the land users identify and reduce the effects of
soil limitations on various land uses. The landowner or user is responsible for
identifying and complying with existing laws and regulations.
Although soil survey information can be used for general farm, local, and wider area
planning, onsite investigation is needed to supplement this information in some
cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/
portal/nrcs/main/soils/health/) and certain conservation and engineering
applications. For more detailed information, contact your local USDA Service Center
(https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil
Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/?
cid=nrcs142p2_053951).
Great differences in soil properties can occur within short distances. Some soils are
seasonally wet or subject to flooding. Some are too unstable to be used as a
foundation for buildings or roads. Clayey or wet soils are poorly suited to use as
septic tank absorption fields. A high water table makes a soil poorly suited to
basements or underground installations.
The National Cooperative Soil Survey is a joint effort of the United States
Department of Agriculture and other Federal agencies, State agencies including the
Agricultural Experiment Stations, and local agencies. The Natural Resources
Conservation Service (NRCS) has leadership for the Federal part of the National
Cooperative Soil Survey.
Information about soils is updated periodically. Updated information is available
through the NRCS Web Soil Survey, the site for official soil survey information.
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its
programs and activities on the basis of race, color, national origin, age, disability,
and where applicable, sex, marital status, familial status, parental status, religion,
sexual orientation, genetic information, political beliefs, reprisal, or because all or a
part of an individual's income is derived from any public assistance program. (Not
all prohibited bases apply to all programs.) Persons with disabilities who require
2
alternative means for communication of program information (Braille, large print,
audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice
and TDD). To file a complaint of discrimination, write to USDA, Director, Office of
Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or
call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity
provider and employer.
3
Contents
Preface....................................................................................................................2
How Soil Surveys Are Made..................................................................................5
Soil Map..................................................................................................................8
Soil Map................................................................................................................9
Legend................................................................................................................10
Map Unit Legend................................................................................................11
Map Unit Descriptions.........................................................................................11
Larimer County Area, Colorado......................................................................13
22—Caruso clay loam, 0 to 1 percent slope...............................................13
73—Nunn clay loam, 0 to 1 percent slopes.................................................14
References............................................................................................................16
4
How Soil Surveys Are Made
Soil surveys are made to provide information about the soils and miscellaneous
areas in a specific area. They include a description of the soils and miscellaneous
areas and their location on the landscape and tables that show soil properties and
limitations affecting various uses. Soil scientists observed the steepness, length,
and shape of the slopes; the general pattern of drainage; the kinds of crops and
native plants; and the kinds of bedrock. They observed and described many soil
profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The
profile extends from the surface down into the unconsolidated material in which the
soil formed or from the surface down to bedrock. The unconsolidated material is
devoid of roots and other living organisms and has not been changed by other
biological activity.
Currently, soils are mapped according to the boundaries of major land resource
areas (MLRAs). MLRAs are geographically associated land resource units that
share common characteristics related to physiography, geology, climate, water
resources, soils, biological resources, and land uses (USDA, 2006). Soil survey
areas typically consist of parts of one or more MLRA.
The soils and miscellaneous areas in a survey area occur in an orderly pattern that
is related to the geology, landforms, relief, climate, and natural vegetation of the
area. Each kind of soil and miscellaneous area is associated with a particular kind
of landform or with a segment of the landform. By observing the soils and
miscellaneous areas in the survey area and relating their position to specific
segments of the landform, a soil scientist develops a concept, or model, of how they
were formed. Thus, during mapping, this model enables the soil scientist to predict
with a considerable degree of accuracy the kind of soil or miscellaneous area at a
specific location on the landscape.
Commonly, individual soils on the landscape merge into one another as their
characteristics gradually change. To construct an accurate soil map, however, soil
scientists must determine the boundaries between the soils. They can observe only
a limited number of soil profiles. Nevertheless, these observations, supplemented
by an understanding of the soil-vegetation-landscape relationship, are sufficient to
verify predictions of the kinds of soil in an area and to determine the boundaries.
Soil scientists recorded the characteristics of the soil profiles that they studied. They
noted soil color, texture, size and shape of soil aggregates, kind and amount of rock
fragments, distribution of plant roots, reaction, and other features that enable them
to identify soils. After describing the soils in the survey area and determining their
properties, the soil scientists assigned the soils to taxonomic classes (units).
Taxonomic classes are concepts. Each taxonomic class has a set of soil
characteristics with precisely defined limits. The classes are used as a basis for
comparison to classify soils systematically. Soil taxonomy, the system of taxonomic
classification used in the United States, is based mainly on the kind and character
of soil properties and the arrangement of horizons within the profile. After the soil
5
scientists classified and named the soils in the survey area, they compared the
individual soils with similar soils in the same taxonomic class in other areas so that
they could confirm data and assemble additional data based on experience and
research.
The objective of soil mapping is not to delineate pure map unit components; the
objective is to separate the landscape into landforms or landform segments that
have similar use and management requirements. Each map unit is defined by a
unique combination of soil components and/or miscellaneous areas in predictable
proportions. Some components may be highly contrasting to the other components
of the map unit. The presence of minor components in a map unit in no way
diminishes the usefulness or accuracy of the data. The delineation of such
landforms and landform segments on the map provides sufficient information for the
development of resource plans. If intensive use of small areas is planned, onsite
investigation is needed to define and locate the soils and miscellaneous areas.
Soil scientists make many field observations in the process of producing a soil map.
The frequency of observation is dependent upon several factors, including scale of
mapping, intensity of mapping, design of map units, complexity of the landscape,
and experience of the soil scientist. Observations are made to test and refine the
soil-landscape model and predictions and to verify the classification of the soils at
specific locations. Once the soil-landscape model is refined, a significantly smaller
number of measurements of individual soil properties are made and recorded.
These measurements may include field measurements, such as those for color,
depth to bedrock, and texture, and laboratory measurements, such as those for
content of sand, silt, clay, salt, and other components. Properties of each soil
typically vary from one point to another across the landscape.
Observations for map unit components are aggregated to develop ranges of
characteristics for the components. The aggregated values are presented. Direct
measurements do not exist for every property presented for every map unit
component. Values for some properties are estimated from combinations of other
properties.
While a soil survey is in progress, samples of some of the soils in the area generally
are collected for laboratory analyses and for engineering tests. Soil scientists
interpret the data from these analyses and tests as well as the field-observed
characteristics and the soil properties to determine the expected behavior of the
soils under different uses. Interpretations for all of the soils are field tested through
observation of the soils in different uses and under different levels of management.
Some interpretations are modified to fit local conditions, and some new
interpretations are developed to meet local needs. Data are assembled from other
sources, such as research information, production records, and field experience of
specialists. For example, data on crop yields under defined levels of management
are assembled from farm records and from field or plot experiments on the same
kinds of soil.
Predictions about soil behavior are based not only on soil properties but also on
such variables as climate and biological activity. Soil conditions are predictable over
long periods of time, but they are not predictable from year to year. For example,
soil scientists can predict with a fairly high degree of accuracy that a given soil will
have a high water table within certain depths in most years, but they cannot predict
that a high water table will always be at a specific level in the soil on a specific date.
After soil scientists located and identified the significant natural bodies of soil in the
survey area, they drew the boundaries of these bodies on aerial photographs and
Custom Soil Resource Report
6
identified each as a specific map unit. Aerial photographs show trees, buildings,
fields, roads, and rivers, all of which help in locating boundaries accurately.
Custom Soil Resource Report
7
Soil Map
The soil map section includes the soil map for the defined area of interest, a list of
soil map units on the map and extent of each map unit, and cartographic symbols
displayed on the map. Also presented are various metadata about data used to
produce the map, and a description of each soil map unit.
8
9
Custom Soil Resource Report
Soil Map
44
9
4
8
3
0
44
9
4
8
7
0
44
9
4
9
1
0
44
9
4
9
5
0
44
9
4
9
9
0
44
9
5
0
3
0
44
9
4
8
3
0
44
9
4
8
7
0
44
9
4
9
1
0
44
9
4
9
5
0
44
9
4
9
9
0
44
9
5
0
3
0
493090 493130 493170 493210 493250 493290 493330 493370 493410 493450
493090 493130 493170 493210 493250 493290 493330 493370 493410 493450
40° 36' 22'' N
10
5
°
4
'
5
4
'
'
W
40° 36' 22'' N
10
5
°
4
'
3
8
'
'
W
40° 36' 14'' N
10
5
°
4
'
5
4
'
'
W
40° 36' 14'' N
10
5
°
4
'
3
8
'
'
W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 50 100 200 300
Feet
0 25 50 100 150
Meters
Map Scale: 1:1,730 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 17, Sep 7, 2022
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jul 2, 2021—Aug 25,
2021
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
10
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
22 Caruso clay loam, 0 to 1
percent slope
2.4 16.7%
73 Nunn clay loam, 0 to 1 percent
slopes
11.9 83.3%
Totals for Area of Interest 14.2 100.0%
Map Unit Descriptions
The map units delineated on the detailed soil maps in a soil survey represent the
soils or miscellaneous areas in the survey area. The map unit descriptions, along
with the maps, can be used to determine the composition and properties of a unit.
A map unit delineation on a soil map represents an area dominated by one or more
major kinds of soil or miscellaneous areas. A map unit is identified and named
according to the taxonomic classification of the dominant soils. Within a taxonomic
class there are precisely defined limits for the properties of the soils. On the
landscape, however, the soils are natural phenomena, and they have the
characteristic variability of all natural phenomena. Thus, the range of some
observed properties may extend beyond the limits defined for a taxonomic class.
Areas of soils of a single taxonomic class rarely, if ever, can be mapped without
including areas of other taxonomic classes. Consequently, every map unit is made
up of the soils or miscellaneous areas for which it is named and some minor
components that belong to taxonomic classes other than those of the major soils.
Most minor soils have properties similar to those of the dominant soil or soils in the
map unit, and thus they do not affect use and management. These are called
noncontrasting, or similar, components. They may or may not be mentioned in a
particular map unit description. Other minor components, however, have properties
and behavioral characteristics divergent enough to affect use or to require different
management. These are called contrasting, or dissimilar, components. They
generally are in small areas and could not be mapped separately because of the
scale used. Some small areas of strongly contrasting soils or miscellaneous areas
are identified by a special symbol on the maps. If included in the database for a
given area, the contrasting minor components are identified in the map unit
descriptions along with some characteristics of each. A few areas of minor
components may not have been observed, and consequently they are not
mentioned in the descriptions, especially where the pattern was so complex that it
was impractical to make enough observations to identify all the soils and
miscellaneous areas on the landscape.
The presence of minor components in a map unit in no way diminishes the
usefulness or accuracy of the data. The objective of mapping is not to delineate
pure taxonomic classes but rather to separate the landscape into landforms or
landform segments that have similar use and management requirements. The
delineation of such segments on the map provides sufficient information for the
development of resource plans. If intensive use of small areas is planned, however,
Custom Soil Resource Report
11
onsite investigation is needed to define and locate the soils and miscellaneous
areas.
An identifying symbol precedes the map unit name in the map unit descriptions.
Each description includes general facts about the unit and gives important soil
properties and qualities.
Soils that have profiles that are almost alike make up a soil series. Except for
differences in texture of the surface layer, all the soils of a series have major
horizons that are similar in composition, thickness, and arrangement.
Soils of one series can differ in texture of the surface layer, slope, stoniness,
salinity, degree of erosion, and other characteristics that affect their use. On the
basis of such differences, a soil series is divided into soil phases. Most of the areas
shown on the detailed soil maps are phases of soil series. The name of a soil phase
commonly indicates a feature that affects use or management. For example, Alpha
silt loam, 0 to 2 percent slopes, is a phase of the Alpha series.
Some map units are made up of two or more major soils or miscellaneous areas.
These map units are complexes, associations, or undifferentiated groups.
A complex consists of two or more soils or miscellaneous areas in such an intricate
pattern or in such small areas that they cannot be shown separately on the maps.
The pattern and proportion of the soils or miscellaneous areas are somewhat similar
in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example.
An association is made up of two or more geographically associated soils or
miscellaneous areas that are shown as one unit on the maps. Because of present
or anticipated uses of the map units in the survey area, it was not considered
practical or necessary to map the soils or miscellaneous areas separately. The
pattern and relative proportion of the soils or miscellaneous areas are somewhat
similar. Alpha-Beta association, 0 to 2 percent slopes, is an example.
An undifferentiated group is made up of two or more soils or miscellaneous areas
that could be mapped individually but are mapped as one unit because similar
interpretations can be made for use and management. The pattern and proportion
of the soils or miscellaneous areas in a mapped area are not uniform. An area can
be made up of only one of the major soils or miscellaneous areas, or it can be made
up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example.
Some surveys include miscellaneous areas. Such areas have little or no soil
material and support little or no vegetation. Rock outcrop is an example.
Custom Soil Resource Report
12
Larimer County Area, Colorado
22—Caruso clay loam, 0 to 1 percent slope
Map Unit Setting
National map unit symbol: jpvt
Elevation: 4,800 to 5,500 feet
Mean annual precipitation: 13 to 15 inches
Mean annual air temperature: 48 to 50 degrees F
Frost-free period: 135 to 150 days
Farmland classification: Prime farmland if irrigated
Map Unit Composition
Caruso and similar soils:85 percent
Minor components:15 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Caruso
Setting
Landform:Flood-plain steps, stream terraces
Landform position (three-dimensional):Tread
Down-slope shape:Linear
Across-slope shape:Linear
Parent material:Mixed alluvium
Typical profile
H1 - 0 to 35 inches: clay loam
H2 - 35 to 44 inches: fine sandy loam
H3 - 44 to 60 inches: gravelly sand
Properties and qualities
Slope:0 to 1 percent
Depth to restrictive feature:More than 80 inches
Drainage class:Somewhat poorly drained
Runoff class: High
Capacity of the most limiting layer to transmit water (Ksat):Moderately low to
moderately high (0.06 to 0.20 in/hr)
Depth to water table:About 24 to 48 inches
Frequency of flooding:NoneOccasional
Frequency of ponding:None
Calcium carbonate, maximum content:5 percent
Maximum salinity:Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm)
Available water supply, 0 to 60 inches: Moderate (about 8.4 inches)
Interpretive groups
Land capability classification (irrigated): 3w
Land capability classification (nonirrigated): 5w
Hydrologic Soil Group: D
Ecological site: R067BY036CO - Overflow
Hydric soil rating: No
Minor Components
Loveland
Percent of map unit:9 percent
Custom Soil Resource Report
13
Landform:Terraces
Ecological site:R067BY036CO - Overflow
Hydric soil rating: Yes
Fluvaquents
Percent of map unit:6 percent
Landform:Terraces
Hydric soil rating: Yes
73—Nunn clay loam, 0 to 1 percent slopes
Map Unit Setting
National map unit symbol: 2tlng
Elevation: 4,100 to 5,700 feet
Mean annual precipitation: 14 to 15 inches
Mean annual air temperature: 48 to 52 degrees F
Frost-free period: 135 to 152 days
Farmland classification: Prime farmland if irrigated
Map Unit Composition
Nunn and similar soils:85 percent
Minor components:15 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Nunn
Setting
Landform:Terraces
Landform position (three-dimensional):Tread
Down-slope shape:Linear
Across-slope shape:Linear
Parent material:Pleistocene aged alluvium and/or eolian deposits
Typical profile
Ap - 0 to 6 inches: clay loam
Bt1 - 6 to 10 inches: clay loam
Bt2 - 10 to 26 inches: clay loam
Btk - 26 to 31 inches: clay loam
Bk1 - 31 to 47 inches: loam
Bk2 - 47 to 80 inches: loam
Properties and qualities
Slope:0 to 1 percent
Depth to restrictive feature:More than 80 inches
Drainage class:Well drained
Runoff class: Medium
Capacity of the most limiting layer to transmit water (Ksat):Moderately low to
moderately high (0.06 to 0.20 in/hr)
Depth to water table:More than 80 inches
Frequency of flooding:None
Frequency of ponding:None
Custom Soil Resource Report
14
Calcium carbonate, maximum content:7 percent
Maximum salinity:Nonsaline (0.1 to 1.0 mmhos/cm)
Sodium adsorption ratio, maximum:0.5
Available water supply, 0 to 60 inches: High (about 9.1 inches)
Interpretive groups
Land capability classification (irrigated): 3e
Land capability classification (nonirrigated): 4e
Hydrologic Soil Group: C
Ecological site: R067BY042CO - Clayey Plains
Hydric soil rating: No
Minor Components
Heldt
Percent of map unit:10 percent
Landform:Terraces
Landform position (three-dimensional):Tread
Down-slope shape:Linear
Across-slope shape:Linear
Ecological site:R067BY042CO - Clayey Plains
Hydric soil rating: No
Wages
Percent of map unit:5 percent
Landform:Terraces
Landform position (three-dimensional):Tread
Down-slope shape:Linear
Across-slope shape:Linear
Ecological site:R067BY002CO - Loamy Plains
Hydric soil rating: No
Custom Soil Resource Report
15
References
American Association of State Highway and Transportation Officials (AASHTO).
2004. Standard specifications for transportation materials and methods of sampling
and testing. 24th edition.
American Society for Testing and Materials (ASTM). 2005. Standard classification of
soils for engineering purposes. ASTM Standard D2487-00.
Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of
wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife
Service FWS/OBS-79/31.
Federal Register. July 13, 1994. Changes in hydric soils of the United States.
Federal Register. September 18, 2002. Hydric soils of the United States.
Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric
soils in the United States.
National Research Council. 1995. Wetlands: Characteristics and boundaries.
Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service.
U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/
nrcs/detail/national/soils/?cid=nrcs142p2_054262
Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for
making and interpreting soil surveys. 2nd edition. Natural Resources Conservation
Service, U.S. Department of Agriculture Handbook 436. http://
www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577
Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of
Agriculture, Natural Resources Conservation Service. http://
www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580
Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and
Delaware Department of Natural Resources and Environmental Control, Wetlands
Section.
United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of
Engineers wetlands delineation manual. Waterways Experiment Station Technical
Report Y-87-1.
United States Department of Agriculture, Natural Resources Conservation Service.
National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/
home/?cid=nrcs142p2_053374
United States Department of Agriculture, Natural Resources Conservation Service.
National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/
detail/national/landuse/rangepasture/?cid=stelprdb1043084
16
United States Department of Agriculture, Natural Resources Conservation Service.
National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/
nrcs/detail/soils/scientists/?cid=nrcs142p2_054242
United States Department of Agriculture, Natural Resources Conservation Service.
2006. Land resource regions and major land resource areas of the United States,
the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook
296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?
cid=nrcs142p2_053624
United States Department of Agriculture, Soil Conservation Service. 1961. Land
capability classification. U.S. Department of Agriculture Handbook 210. http://
www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf
Custom Soil Resource Report
17
NORTHERNENGINEERING.COM | 970.221.4158 FINAL DRAINAGE REPORT: FORT COLLINS RESCUE MISSION
FORT COLLINS | GREELEY APPENDIX
MAP POCKET
DR1 – PROPOSED DRAINAGE EXHIBIT
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
ELEC
F
CTV
CTV CTV CTV CTV CTV
OHU OHU OHU OHU
CTV
X X X X
X X X X X X X
CTV
G G G
G G G G G G
SS SS SS SS SS SS
HY D
S
FE
S
FE
S
XX
X
X
X
X
S
W W W W W W W
W W
S
UDUDUDUDUDUDUDUDUDUDUDUDUD
UD
UD
UD
U
D
U
D
UD
U
D
U
D
U
D
UD
UD
UD
UD
UD
UD
UD
UD
UD
UD
E
V
UD
S
C
TF
G
G
UDUDUD
G
10' UTILITY EASEMENT
BK 1658 PG 746
45' ROW
BK 1743 PG 632
10' UTILITY EASEMENT
BK 1572 PG 322
N
M
A
S
O
N
S
T
R
E
E
T
a1
HIBDON COURT
45' ROW
BK 1743 PG 632
10' UTILITY
EASEMENT
40' DRAINAGE
EASEMENT
WANKIER LANCE
1401 N. COLLEGE AVENUE
FORT COLLINS, CO
WOOD RONALD G/ JENNIFER
L/ WILLARD E
122 HIBDON COURT
FORT COLLINS, CO
THOMPSON PROPERTIES LLC
1319 N. COLLEGE AVENUE
FORT COLLINS, CO
a2
a3
b3
b2
b1
60' DRAINAGE
EASEMENT
EMERGENCY SPILLWAY
EMERGENCY SPILLWAY
4' CURB CUT AND
SIDEWALK CHASE
STORM DRAIN
(TYP.)
HICKORY REGIONAL
DETENTION POND
LOT 1
LOT 3
LOT 2
RAIN GARDEN 2
REQ VOL. 682 CUFT
PROVIDED VOL. 915 CUFT
PROVIDED FLAT AREA = 1,532 SQFT
RAIN GARDEN 1
REQ VOL. 1,405 CUFT
PROVIDED VOL. 1,870 CUFT
PROVIDED FLAT AREA = 1,442 SQFT
0.09 ac.
R1
0.09 ac.
R3
0.11 ac.
R5
0.27 ac.
B1
0.36 ac.
A2
0.32 ac.
A1
0.37 ac.
A3
0.11 ac.
A4
0.04 ac.
A5
0.35 ac.
C1
0.03 ac.
B4
0.19 ac.
B2
0.04 ac.
A6
0.06 ac.
A7
0.24 ac.
B30.02 ac.
R2
0.17 ac.
R4
0.02 ac.
R12
0.04 ac.
R6
0.02 ac.
R7
0.03 ac.
R8
0.10 ac.
R10
0.07 ac.
R9 0.04 ac.
R11
b1
r1 r3
r2
b4
r5
r4
c1
r10 r11
r9
r8
r7
a5
a6
r6
a7
r12
1' CURB CUT AND
SIDEWALK CHASE
1' CURB CUT AND
SIDEWALK CHASE
CONCRETE RUNDOWN
AND FOREBAY 1-1
SEE DETAIL SHEET 20
CONCRETE FOREBAY 1-3
SEE DETAIL SHEET 20
CONCRETE FOREBAY 1-4
SEE DETAIL SHEET 20 CONCRETE RUNDOWN
AND FOREBAY 1-2
SEE DETAIL SHEET 20
CONCRETE RUNDOWN
AND FOREBAY 2-1
SEE DETAIL SHEET 20
CONCRETE FOREBAY 2-2
SEE DETAIL SHEET 20
CONCRETE FOREBAY 2-3
SEE DETAIL SHEET 20
DR1
DR
A
I
N
A
G
E
E
X
H
I
B
I
T
24
NORTH
( IN FEET )
1 inch = ft.
Feet03030
30
60 90
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
before you dig.Call
R
Sheet
FO
R
T
C
O
L
L
I
N
S
R
E
S
C
U
E
M
I
S
S
I
O
N
Th
e
s
e
d
r
a
w
i
n
g
s
a
r
e
in
s
t
r
u
m
e
n
t
s
o
f
s
e
r
v
i
c
e
pr
o
v
i
d
e
d
b
y
N
o
r
t
h
e
r
n
En
g
i
n
e
e
r
i
n
g
S
e
r
v
i
c
e
s
,
I
n
c
.
an
d
a
r
e
n
o
t
t
o
b
e
u
s
e
d
f
o
r
an
y
t
y
p
e
o
f
c
o
n
s
t
r
u
c
t
i
o
n
un
l
e
s
s
s
i
g
n
e
d
a
n
d
s
e
a
l
e
d
by
a
P
r
o
f
e
s
s
i
o
n
a
l
En
g
i
n
e
e
r
i
n
t
h
e
e
m
p
l
o
y
o
f
No
r
t
h
e
r
n
E
n
g
i
n
e
e
r
i
n
g
Se
r
v
i
c
e
s
,
I
n
c
.
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
R
E
V
I
E
W
S
E
T
of 24
FOR DRAINAGE REVIEW ONLY
NOT FOR CONSTRUCTION
KEYMAP
PROPOSED CONTOUR
PROPOSED STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
PROPOSED CURB & GUTTER
PROPERTY BOUNDARY
PROPOSED INLET
A
DESIGN POINT
FLOW ARROW
DRAINAGE BASIN LABEL
DRAINAGE BASIN BOUNDARY
PROPOSED SWALE SECTION
11
NOTES:
1.REFER TO THE FINAL DRAINAGE REPORT, DATED FEBRUARY 14, 2024 FOR
ADDITIONAL INFORMATION.
2.REFER TO THE MASON STREET INFRASTRUCTURE DRAINAGE REPORT FOR
ADDITIONAL INFORMATION.
A
LEGEND:
EMERGENCY OVERFLOW PATH
C2 C100 Q2
(cfs)
Q100
(cfs)