Loading...
HomeMy WebLinkAboutFORT COLLINS RESCUE MISSION - FDP230022 - SUBMITTAL DOCUMENTS - ROUND 3 - Traffic StudyPrevious Submittal Dates: Dec. 21, 2022 & Oct. 25, 2023  Updated Date: March 20, 2024 Submitted To: Denver Rescue Mission 6100 Smith Road Denver, CO 80216 Submitted By: Fox Tuttle Transportation Group, LLC 1580 Logan Street, 6 th Floor Denver, CO 80203 Fort Collins Rescue Mission Traffic Impact Study Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 2 March 20, 2024  TABLE OF CONTENTS  1.0  Introduction ............................................................................................................................ 4  2.0  Project Description .................................................................................................................. 5  3.0  Study Considerations ............................................................................................................... 5  3.1  Data Collection .................................................................................................................... 5  3.2  Evaluation Methodology ..................................................................................................... 6  3.3  Level of Service Definitions ................................................................................................. 6  4.0  Existing Conditions .................................................................................................................. 7  4.1  Roadways ............................................................................................................................ 7  4.2  Intersections ....................................................................................................................... 8  4.3  Pedestrian and Bicycle Facilities ......................................................................................... 8  4.4  Transit ................................................................................................................................. 9  4.5  Existing Intersection Capacity Analysis ............................................................................... 9  5.0  Future Traffic Conditions ....................................................................................................... 10  5.1  Annual Growth Factor and Future Volume Methodology ................................................ 10  5.2  Future Roadway Assumptions .......................................................................................... 10  5.2  Year 2025 Background Intersection Capacity Analysis ..................................................... 10  6.0  Proposed Fort Collins Rescue Mission Traffic ......................................................................... 11  6.1  Trip Generation ................................................................................................................. 11  6.2  Trip Distribution and Assignment ..................................................................................... 13  7.0  Future Traffic Conditions with site development ................................................................... 13  7.1  Year 2025 Background + Project Intersection Capacity Analysis ...................................... 13  8.0  Future Multi‐Modal Trips and Facilities .................................................................................. 13  9.0  Multi‐Modal Level‐of‐Service ................................................................................................. 15  10.0  Conclusion ............................................................................................................................. 18  Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 3 March 20, 2024  LIST OF TABLES Table 1 – Peak Hour Intersection Level of Service Summary  .............................................................. 20  Table 2 – Peak Hour 95th Percentile Queue Summary  ....................................................................... 21 Table 3 – Trip Generation Summary ................................................................................................ 12    LIST OF FIGURES  Figure 1 – Vicinity Map and Existing Access ............................................................................................... 22  Figure 2 – Site Plan ...................................................................................................................................... 23  Figure 3 – Year 2022 Existing Traffic Volumes ............................................................................................ 24  Figure 4 – Year 2025 Background Traffic Volumes ..................................................................................... 25  Figure 5 – Trip Distribution ......................................................................................................................... 26  Figure 6 – Site‐Generated Trip Volumes ..................................................................................................... 27  Figure 7 – Year 2025 Background + Site‐Generated Traffic Volumes ......................................................... 28    APPENDIX  Transportation Impact Study Base Assumptions Form  Level of Service Definitions  Existing Traffic Data  Intersection Capacity Worksheets  Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 4 March 20, 2024      FORT COLLINS RESCUE MISSION  TRAFFIC IMPACT STUDY    1.0 INTRODUCTION  The Fox Tuttle Transportation Group prepared this traffic impact study for the Denver Rescue Mission,  which is proposing a new Fort Collins Mission campus located in the northern part of the city. The project  proposes to construct a new shelter which will include a day‐use area and an overnight shelter area.  The  current proposal is aimed at serving and aiding men that are currently experiencing homelessness.  The  project is located in the southwest corner of Mason Street and Hibdon Court.  Relative to North College  Avenue, also known as US Highway 287, the project site is approximately one block west of the major  arterial that travels through the city. Figure 1 includes a vicinity map for the proposed project.  The purpose of this study is to assist in identifying potential traffic impacts within the study area as a result  of this project. The traffic study addresses existing and short‐term (Year 2025) peak hour intersection  conditions in the study area with and without the project generated traffic.  The information contained in  this study is anticipated to be used by City of Fort Collins staff to identify any intersection or roadway  deficiencies and potential improvements for the short‐term future conditions. This study focused on the  weekday AM and PM peak hours which are typically the highest traffic volumes for the adjacent roadway  network.   The traffic impact study is consistent with the requirements of the City of Fort Collins’ standards set forth  in Chapter 4 of the Larimer County Urban Area Street Standards (revised 2021). A copy of the approved  Transportation Impact Study Base Assumptions Form is attached in the Appendix for reference.   Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 5 March 20, 2024  2.0 PROJECT DESCRIPTION  The Fort Collins Rescue Mission Project proposes to construct a new 43,000 square foot building along  the west side of Mason Street between Hibdon Court and  the existing property to  the south. It is  understood that there will be up to 200 beds for people experiencing homelessness and the shelter will  also  include  restrooms,  showers,  living  and  dining  areas,  library,  meeting  rooms,  kitchen,  donation  storage,  laundry  rooms,  business  offices,  and  outdoor  space.  The  facility  also  plans  to  include  administrative offices for staff and volunteers.  It is understood the shelter will be opened 24 hours per  day, seven (7) days a week to provide services to those in need.  Currently, the site is vacant and the adjacent land uses include a couple single‐family residents, mobile  home park, lodging, small retail, and light industrial. The new Denver Rescue Mission location is in close  proximity to services across College Avenue including the Food Bank of Larimer County, Larimer County  Department of Human Services, and the Murphy Center for Hope.  Access to the site is planned via two new full‐movement, side‐street stop‐controlled access points on  Mason Street. The north access will become the west leg to the existing intersection of Mason Street at  Hibdon Court. The south access on Mason Street is proposed to be approximately 650 feet south of  Hibdon Court.  Figure 2 includes a conceptual site plan and access for the project.  3.0 STUDY CONSIDERATIONS  3.1  Data Collection   Intersection turning movement volumes were collected by Idax Data Solutions in early December 2022 at  four (4) existing intersections during the weekday AM and PM peak hours. Daily (24‐hour) traffic volumes  were gathered on Hibdon Court east of Mason Street and on Mason Street south of Hibdon Court. Historic  daily volumes and future forecasts along College Avenue (US 287) within the vicinity of the project site  were gathered from the CDOT’s Transportation Data Management System (TDMS).  The existing traffic volumes are illustrated on Figure 3. The existing intersection geometry and traffic  control are also shown on this figure. Count data sheets are provided in the Appendix.      Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 6 March 20, 2024  3.2  Evaluation Methodology  The traffic operations analysis addressed the unsignalized intersection operations using the procedures  and methodologies set forth by the Highway Capacity Manual (HCM) 1.  Existing Peak Hour Factor (PHF)  were applied to the intersections for the existing and short‐term scenarios. Study intersections were  evaluated using Synchro (v11) software.   3.3  Level of Service Definitions   A level of service analysis was conducted to determine the existing and future performance of the study  intersections and to determine the most appropriate traffic control device and need for auxiliary lanes.    To measure and describe the operational status of the study intersections, transportation engineers and  planners commonly use a grading system referred to as “Level of Service” (LOS) that is defined by the  HCM.  LOS characterizes the operational conditions of an intersection’s traffic flow, ranging from LOS A  (indicating very good, free flow operations) and LOS F (indicating congested and sometimes oversaturated  conditions).  These grades represent the perspective of drivers and are an indication of the comfort and  convenience associated with traveling through the intersections. The intersection LOS is represented as a  delay in seconds per vehicle for the intersection as a whole and for each turning movement.  A more  detailed  discussion  of  the  LOS  methodology  is  contained  in  the  Appendix for reference.    The Fort Collins standards within the  Larimer  County  Urban  Area  Street  Standards (LUCASS) consider LOS A  through D to be good for the overall  intersection operations with LOS E or  better as acceptable in peak hours. For  individual movements, LOS E and F may  be acceptable for left‐turns or minor  streets. Specific standards are provided  in Table 4‐2 in LUCASS and as shown to  the right.     1  Highway Capacity Manual, Highway Research Board Special Report 209, Transportation Research Board, National  Research Council, 6th Edition (2016).    Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 7 March 20, 2024  4.0 EXISTING CONDITIONS  4.1  Roadways  The study area boundaries are based on the amount of traffic to be generated by the project and potential  impact to the existing roadway network.  The study area was defined in coordination with the City of Fort  Collins staff and is outlined in the Transportation Impact Study Base Assumptions Form (located in the  Appendix). The primary public roadways that serve the project site are discussed in the following text and  illustrated on Figure 3.  North College Avenue (US 287) is a four‐lane arterial that provides north‐south connectivity  through  the  entirety  of  Fort  Collins  and  connects  to  several  communities  within  Northern  Colorado and Southern Wyoming.  This section of North College Avenue is part of an interstate  commerce  truck  route  and  is  subject  to  access  management  documents  developed  by  the  Colorado  Department  of  Transportation,  Larimer  County,  and  the City  of  Fort  Collins.    The  roadway provides two (2) through lanes in each direction, on‐street bike lanes, a landscaped  parkway, and 8‐foot sidewalks.  Access control is provided via a raised, landscaped median.  The  posted speed limit is 40 mph within the vicinity of the project  site. North College Avenue currently  serves approximately 25,100 vpd north of Hibdon Court (Year 2021, CDOT). North College Avenue  will provide the primary north/south access for the proposed Fort Collins Rescue Mission.   Hickory Street is a collector street that travels west of North College and provides access to the  Hickory Village neighborhood, light industrial businesses, and recreational areas. .  .  At North  College Avenue, Hickory Street is the western leg of an offset intersection with Conifer Street.  In  its current configuration, Hickory Street provides a single through lane per direction, on‐street  parking, and attached sidewalks.   Near the Mason Street intersection,  this roadway  has an  approximately 56‐foot‐wide paved section.  The posted speed limit is 25 mph.  Although Hickory  Street currently terminates at South Gold Park, the City’s Master Street Plan shows Hickory Street  extending west to Shield Street.    Mason Street is a local roadway with a paved 22‐foot section, within the stu dy area, that provides  rear‐lot access to several properties fronting North College Avenue.  This portion of Mason Street  is approximately 0.3‐mile in length starting north of Hickory Street and does not connect to  Midtown.  The roadway is located within a permanent public access easement and provides a  single travel lane per each direction.  Currently, there is no curb and gutter nor sidewalk.  There  is no posted speed limit, but assumed to be 25 miles per hour, a typical speed for local streets.   Mason Street currently serves approximately 140 vpd south of Hibdon Court (Year 2022, Count).  Per the City of Fort Collins’ Master Street Plan and comments provided by City staff in the  Preliminary Development Review Document, Mason Street is classified as a “Collector – With  Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 8 March 20, 2024  Parking”.   This street classification includes one (1) travel lane per direction, on‐street bicycle  lanes, on‐street parking, a landscaped parkway, and 5‐foot sidewalks.      Hibdon Court is a local street that connects Mason Street and North College Avenue.  Starting at  North College Avenue and extending west approximately 300’, Hibdon Court is a 36‐foot‐wide  roadway  with  curb  and  gutter  and accommodates  a  single  travel  lane  in  each  direction.   Pedestrian connectivity is provided via a 5‐foot attached sidewalk on the south side of the road.   Continuing west to Mason Street, Hibdon Court transitions to a 22‐foot‐wide roadway with no  curb and gutter nor sidewalks.  There are no designated on‐street bicycle lanes.  There is no  posted speed limit, however, it is assumed to be 25 miles per hour, a typical speed for local streets.    Hibdon Court currently serves approximately 260 vpd east of Mason Street (Year 2022, Count).  4.2  Intersections  The study area includes four intersections that are listed below with the current traffic control and were  analyzed for existing and future background year traffic operations:  1. Mason Street at Hibdon Court (side‐street stop‐controlled)  2. North College Avenue at Hibdon Court (side‐street stop‐controlled)  3. Mason Street at Hickory Street (side‐street stop‐controlled)   4. North College Avenue at Hickory Street (signalized)  The existing lane configuration at each of the study locations is illustrated on Figure 3.    4.3  Pedestrian and Bicycle Facilities  The City of Fort Collins adheres to the Larimer County Urban Area Street Standards (LUCASS) and the  roadway cross sections defined therein.  All of the study roadways are identified as “complete streets”  and are anticipated to provide amenities promoting and encouraging multimodal activity while balancing  with the vehicular needs.    North College Avenue provides on‐street bicycle lanes and 8‐foot sidewalk on both sides of the roadway.   These improvements extend along North College Avenue, connecting Old Town Fort Collins to the city  limits at Highway 1.  These facilities serve as the multimodal backbone for North Fort Collins and provide  access to various commercial, residential, recreational, and community services.  Hickory Street also  provides defined multimodal connectivity though on‐street bicycle lanes and variable width, attached  sidewalks.  Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 9 March 20, 2024  There is currently a 5‐foot sidewalk on Hibdon Court on the south side for approximately 300 feet west of  North College Avenue.  The remaining segment of Hibdon Court does not have sidewalks.  As is typical on  local streets, on‐street bike lanes are not striped; however, bicyclists are permitted to ride with traffic.    In its current configuration, Mason Street does not have dedicated multimodal improvements.    4.4  Transit   The  City  of  Fort  Collins  has  a  dedicated  transit  service,  Transfort,  that  serves  the  community.    Transfort’s primary hub is the Downtown Transit  Center (DTC), located on the east side of Mason  Street between Maple Street and Laporte Avenue.   For a fee, community members can access various  destinations throughout Fort Collins from the DTC.   Two  routes,  #8  and  #81,  serve  Northern  Fort  Collins and the project area  Routes #8 and #81 utilize the same loop, but travel  in opposite directions. Both routes utilize the same  transit stops, including stops located  on the far  sides  of  the  Hibdon  Court  intersection  which  is  anticipated to be useful for future patrons of the  Fort Collins Rescue Mission.  4.5  Existing Intersection Capacity Analysis  The existing volumes, lane configuration, and traffic control are illustrated on Figure 3. The results of the  LOS calculations for the study intersections are summarized in Table 1. The 95th percentile queues are  summarized in Table 2. The intersection level of service worksheets and queue reports are attached in  the Appendix.  All study intersections are currently operating at LOS A in the AM and PM peak hours,  with all approaches operating at LOS D or better. The 95th percentile queues were calculated to be  maintained within the existing storage lengths at all of the study intersections.    Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 10 March 20, 2024  5.0 FUTURE TRAFFIC CONDITIONS  5.1  Annual Growth Factor and Future Volume Methodology  In order to forecast the future peak hour traffic volumes, background traffic growth assumptions were  based on the Colorado Department of Transportation’s (CDOT) 20‐year factors, and discussed with City of  Fort Collins staff. Based on the CDOT forecasts on North College Avenue, it was assumed there will be an  annual growth rate of 1.0% within the study area. Using these assumptions, the Year 2025 background  traffic was estimated and summarized on Figure 4.     5.2  Future Roadway Assumptions  It was assumed that the study roadways will remain the same as existing in the near‐term future. Although  Mason Street is defined as a Collector roadway in the future per the City’s Master Street Plan, the Year  2025  background  analysis  assumed  the  existing  lane  configuration  and  traffic  control  at  the  study  intersections due to the low volumes. The currently proposed changes to the City’s Land Use Code, Mason  Street may be downgraded to a local street. The traffic analysis assumed that Mason Street would include  one travel lane per direction, which will be the case regardless of the roadway classification (local or  collector).   5.2  Year 2025 Background Intersection Capacity Analysis  The  study  area  intersections  were  evaluated  to  determine  baseline  operations  for  the  Year  2025  background scenario and to identify any capacity constraints associated with background traffic. The  background volumes, lane configuration, and traffic control are illustrated on Figure 4.    The level of service criteria discussed previously was applied to the study area intersections to determine  the  impacts  with  the  short‐term  background  volumes.  The  results of the LOS calculations for the  intersections are summarized in Table 1. The intersection level of service worksheets and queue reports  are attached in the Appendix.    The study intersections were shown to operate similarly to the existing conditions with LOS A overall in  the AM and PM peak hours in Year 2025 Background.  Similarly, looking at individual approach legs, all  approaches operate at LOS D or better.  The 95th percentile queues for 2025 Background traffic also  remain essentially unchanged as identified in Table 2 and continue to be maintained within the existing  storage lengths.     Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 11 March 20, 2024  6.0 PROPOSED FORT COLLINS RESCUE MISSION TRAFFIC  6.1  Trip Generation  With no comparable trip generation category within Institute of Transportation Engineers’ (ITE) Trip  Generation Manual, local data from a comparable shelter was gathered and utilized to estimate the  number of vehicular trips associated with the proposed Fort Collins Rescue Mission. Denver Rescue  Mission provided detailed information on the staffing, operational needs, and anticipated number of  people served on a daily basis for the new shelter. The new she lter will be opened 24 hours per day, seven  (7) days a week, year‐round. The summary of future operations is listed below:    Employees – 34 people daily  o Three (3) staffing shifts:    Daytime Shift (8:30 am to 4:30 pm): 16 employees   Swing Shift (2:00 pm to 10:30 pm): 11 employees   Overnight shift (10:00 pm to 8:30 am): 7 employees    o Majority of staff drives to the facility.    o Once on site, staff cannot leave the site.    o Based on the peak commuting hours, the Daytime Shift and the Overnight Shift will  contribute to the AM and PM peak hour trips.   Interns/Volunteers – 27 people daily    o Similar work shifts to employees.   Daytime Shift (8:30 am to 4:30 pm): 2 interns, 12 volunteers   Swing Shift (2:00 pm to 10:30 pm): 0 interns, 13 volunteers   Overnight shift (10:00 pm to 8:30 am): 0 interns, 0 volunteers  o Majority arriving to the site via driving a vehicle.    o Once on site, interns and volunteers cannot leave the site.     Visitors – 10 people daily  o This is community members who visit the site but are not users of the facility.    o Typically arrive during the Daytime shift and not within the AM or PM peak hours.    o Majority of visitors arrive by vehicle.   Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 12 March 20, 2024   Deliveries – 2 per day    o These deliveries support the facility’s operational needs with supplies and donations.    o Typically arrive during the Daytime shift but not within the AM or PM peak hours.    o All deliveries arrive by vehicle.    Partner Organization Visitors – up to 5 vehicles per day  o These are people visiting the site to provide services for patrons.    o Typically arrive during the Daytime shift but not within the AM or PM peak hours.    o All Partner Organization Visitors arrive by vehicle.   Patrons (Users of the Facility) – typically 100 per day and 40 per night  o These are the people who are served by the shelter as they are currently experiencing  homelessness.   o Typically arrive by walking, biking, or transit.  It is rare a patron arrives by vehicle.   o Patrons arrive and depart at any time during the day or night, typically before and after a  meal. Some stay for a short period of time while others remain for days.     The trip generation estimates are summarized in Table 3. It is estimated that the facility will generate  156 new trips per day, with 35 trips occurring in the AM peak hour and 26 trips occurring in the PM peak  hour.    Table 3. Trip Generation Summary  Users of Facility Quantity Unit Total In Out Total In Out Total In Out Employees 34People6834342316 7 16 0 16 Volunteers/Interns 27 People 54 27 27 12 8 4 10 10 0 Visitors* 10People201010000000 Deliveries* 2Veh.422000000 Partner Organization  Visitors*5Veh.1055000000 Patrons * 100People000000000 1567878352411261016 Source: Data from Denver Rescue Mission facilities of similar size and operations, as well as expected operations for new facilitie * Trips not included as they do not occur during the Peak Hours Average Daily  Trips AM Peak Hour Trips PM Peak Hour  Trips Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 13 March 20, 2024  6.2  Trip Distribution and Assignment  The estimated trip volumes presented in Table 3 were distributed onto the study area roadway network  based on existing traffic characteristics of the area, existing and future land uses, and the relationship of  this project to the greater Fort Collins community.  Based on information provided by Denver Rescue  Mission, it was assumed that 25% of vehicular traffic will come from North College Avenue and the  remaining 75% will come from South College Avenue. The trip distribution through the study intersections  is shown on Figure 5.    The projected site traffic was assigned to the study area roadway network and proposed accesses for the  weekday AM and PM peak hour periods.  The site generated volumes are shown on Figure 6.  7.0 FUTURE TRAFFIC CONDITIONS WITH SITE DEVELOPMENT   This section projects the future traffic conditions with the completion of the proposed Fort Collins Rescue  Mission project.     7.1  Year 2025 Background + Project Intersection Capacity Analysis  The Fort Collins Rescue Mission is anticipated to be constructed and in use in Year 2025.  The site‐ generated volumes were added to the projected Year 2025 background volumes and are illustrated on  Figure 7. The results of the LOS calculations for the intersections are summarized on Table 1. The 95th  percentile queues are summarized in Table 2. The intersection level of service worksheets and queue  reports are attached in the Appendix.   The project trips have little to no impact on the operations of the study intersections as compared to  the background scenario. All intersections continue to operate at a LOS A overall in the AM and PM Peak  hours.  The 95th percentile queues were calculated to be maintained within the existing storage lengths  at all of the study intersections.  8.0 FUTURE MULTI‐MODAL TRIPS AND FACILITIES   In discussions with the Denver Rescue Mission, it is anticipated that all users of the shelter will be arriving  and departing to/from the site by walking, biking, or using transit. It is likely they will utilize the existing  multi‐modal facilities through Fort Collins.  The proposed northern shelter will add 200 beds for men  currently experiencing homelessness and the numbers of patrons at one time can vary greatly by time of  day, day of week, weather, or season of the year.  It is challe nging to calculate the number of multi‐modal  trips and the pattern at which they would occur. However, it is anticipated that the sidewalks, bike lanes,  trails, and bus routes connected to the study area will have an increase in people utilizing them.    Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 14 March 20, 2024  The City of Fort Collins endorses “complete streets” for all roadway classifications, which are streets that  serve both vehicular and multi‐modal traffic.  With Hibdon Court being defined as a local street and Mason  Street being currently defined as a collector level street, both streets will be able to accommodate and  provide multimodal use. Hibdon Court will need the south sidewalk to be continued to Mason Street.  Mason Street will need a sidewalk on at least one side of the roadway to connect to existing sidewalks;  however, there are portions of Mason Street that are adjacent to other property owners that are not  currently developing. If the Hibdon Court sidewalk is completed, then at a minimum people who walk,  bike, or use transit can easily connect between North College Avenue and the proposed shelter.    It is our understanding that the City’s Municipal Code obligates the owner of a parcel to construct local  street improvements adjacent to the parcel’s frontage at the time of development.  With the new Fort  Collins Rescue Mission project, Mason Street will likely need to be upgraded along the property frontage.  The City’s Master Street Plan currently would require Mason Street to be constructed as a collector,  however, this traffic study indicates the projected volumes can be accommodated with a local street  cross‐section.   LCUASS does not provide functional parameters for Fort Collins but includes parameters for Loveland,  which were used for comparison purposes. The standards state that “Major Collectors” are intended to  serve between 3,000 and 7,000 vpd. Existing counts on Mason Street, south of Hibdon Court, indicated  there are approximately 140 vpd. With background growth and the proposed project, the daily vehicle  volume was calculated to increase to 215 vpd. The estimated future volumes on Mason Street are  significantly lower than the collector volume threshold; therefore, the city may consider changing the  roadway classification to “local” for this segment of Mason Street.  To reach the bottom of the collector  volume range, other properties on Mason Street would have to redevelop and generate to traffic. For  informational purposes, this would be a minimum of 300 single‐family detached homes or 420 multi‐ family units (market‐rate) or 42,000 square feet of commercial retail.   The property in the southeast corner of Hibdon Court and Mason Street is owned by the Denver Rescue  Mission but will remain vacant until future expansion is needed, or other services or opportunities arise.  The current project does not have frontage along Hibdon Court. It is understood that the extent of  improvements to Hibdon Court will be clarified as the project continues through the Development Review  process.    Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 15 March 20, 2024  9.0 MULTI‐MODAL LEVEL‐OF‐SERVICE  The pedestrian LOS is based on five (5) criteria: directness, continuity, street crossings, visual interest and  amenity, and security as outlined in the Fort Collins Pedestrian Plan2. The City’s plan describes the  categories as follows:   Directness is the measurement of walking trip length and how well the environment provides  direct pedestrian connections to destinations such as transit stops, schools, parks, commercial  areas, or activity areas.    Continuity is the measurement of the completeness of the sidewalk system by looking at the  physical consistency, type of sidewalk, and visual connection from block to block. This category  also evaluates if the pedestrian facility meets the current design standards.   Street Crossings is the evaluation of safe crossings that encourages people to walk. There are  four (4) street crossing types that are based on traffic control and roadway classification (minor  or major). Street crossing LOS is based on pedestrian exposure and design elements that increase  awareness  of  pedestrian  presence,  including  number  of  lanes,  crosswalk  markings,  signal  indication, lighting level, pedestrian signal indication, pedestrian character, sight distance, and  corner ramps.    Visual Interest and Amenity considers the attractiveness and features of the pedestrian system  and compatibility with local architecture.   Security is the evaluation of a pedestrian’s perspective of security with  visual  sight  lines,  separation from vehicles, and lighting level.  Each of the areas was evaluated for the study area and the LOS for each is discussed on the following  pages.  DIRECTNESS – LOS B  The directness LOS is based on six (6) destinations anticipated to be visited by patrons of the proposed  project. Only one (1) of the listed destinations is within the recommended 0.25‐mile radius, which is the  southbound bus stop on College Road. The remaining destinations are within 0.7‐miles in actual walking  distance. Table 5 contains the actual walking distance, minimum distance, comparison ratios, and LOS for  2 Fort Collins Pedestrian Plan, https://www.fcgov.com/fcmoves/files/ped‐plan.pdf?1592323966, 2011.  Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 16 March 20, 2024  each destination as measured from the intersection of Mason Street and Hibdon Court. The LOS letter  grade was determined from information provided in Table P.1 of the Fort Collins Pedestrian Plan.  Table 5. Directness Level‐of‐Service    Destination Actual Distance Minimum Distance Ratio LOS  Bus Stop ‐ Northbound College Road 1,797 ft. (0.45 mi) 1,236 ft. (0.23 mi) 1.45 C  Bus Stop ‐ Southbound College Road 1,203 ft. (0.23 mi) 1,203 ft. (0.23 mi) 1.00 A  Grocery ‐ King Soopers 3,247 ft. (0.61 mi) 3,376 ft. (0.64 mi) 0.96 A  Food Bank of Larimer County 3,700 ft. (0.70 mi) 2,407 ft. (0.46 mi) 1.54 C  Larimer County Department of Human  Services 3,371 ft. (0.64 mi) 2,208 ft. (0.42 mi) 1.53 C  Murphy Center for Hope 3,329 ft. (0.63 mi) 2,821 ft. (0.53 mi) 1.18 A  Average 2,775 ft. (0.53 mi) 2,209 ft. (0.42 mi) 1.26 B    CONTINUITY – LOS D  In the study area, there are quality sidewalks on some of the streets. Unfortunately, neither of the  adjacent streets, Mason Street and Hibdon Court, have sidewalks currently. Per the City standards, LOS D  reflects areas where sidewalks are not provided on both sides of the street or there are breaches in the  system. Therefore, the continuity of the study area is considered LOS D.  STREET CROSSINGS (SIGNALIZED) – LOS C  There are two (2) signalized intersections in the study area: North College Road at Hickory Court/Conifer  Street and North College Road at Willox Lane. Both intersections include curb ramps, colored crosswalks,  pedestrian push buttons and signals, pedestrian and roadway level lighting, and good sight distance.    At both intersections, crossing North College Road requires pedestrians to walk across six (6) lanes  including  a  wide  median  and  directional  bike  lanes.  Therefore, both  signalized  intersections  were  determined to be LOS C for street crossings due to the number of lanes.   VISUAL INTEREST AND AMENITY – LOS D  Although some of the neighboring streets could be classified as a LOS B others are classified as LOS D. The  lowest level of service was selected for this category.    Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 17 March 20, 2024  North College Road within the study area is classified as LOS B due to generous sidewalks, landscaping,  street furniture, and lighting.  Hickory Street is classified as LOS C since the sidewalks are functional but  there is little to no visual interest or amenities. Mason Street and Hibdon Court are classified as LOS D  since there are limited or no pedestrian facilities. These adjacent roadways have no visual interest for  amenities for pedestrians and there is a lack of comfort.   SECURITY ‐ LOS E  The streets adjacent to the project side, Mason Street and Hibdon Court, have a low level of pedestrian  security. The majority of these streets do not have sidewalks which does not create separation between  pedestrians and vehicles. There is minimal lighting and large recreational vehicles were observed to be  parked along the limited portions of sidewalk along Hibdon Court. Additionally, Mason Street contains  breaches in pedestrian visibility due to horizontal curvature and fencing. SUMMARY  In summary, the existing pedestrian facilities meet some of the minimum LOS by category while others  are not met, as shown on Table 6.   Table 6. Pedestrian Level‐of‐Service Summary     Directness Continuity Street Crossing Visual Interest  and Amenity Security  Minimum LOS  Threshold C C C C C  Existing Facilities B D C D E  Met? Yes No Yes No No    The Rescue Mission is part of the North College 1311 ODP, which plans to construct multimodal facilities  adjacent to the project site, which is anticipated to improve the pedestrian LOS. As Hibdon Court’s  continuity, visual interest, and security improve with the site completion, it will provide a direct pedestrian  route to North College Road. It should be noted that Mason Street will not meet the minimum LOS  thresholds  until  properties  south  of  the  project  properties  are  redeveloped  to  include  upgraded  multimodal facilities.    Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 18 March 20, 2024  10.0 CONCLUSION  The Fort Collins Rescue Mission proposes to construct a new 24/7 shelter to provide people experiencing  homelessness with basic needs and resources to enter permanent housing and self‐sufficiency.  It is  understood that there will be 200 beds and the shelter will also include restrooms, showers, living and  dining areas, library, meeting rooms, kitchen, donation storage, laundry rooms, business offices, and  outdoor space. The facility also plans to include administrative offices for staff and volunteers. Access to  the site is planned via two full movement, side‐street stop‐controlled intersections on Mason Street.  Vehicular traffic volumes associated with the Fort Collins Rescue Mission have been developed through  in‐depth conversations with Denver Rescue Mission staff to account  for  anticipated  staff,  interns,  volunteers, visitors, and operational services at full build out.  These volumes have been analyzed for the  existing and short‐term (Year 2025, anticipated construction year) scenarios.  The project is anticipated  to generate approximately 156 trips daily, 35 AM peak hour, and 26 PM peak hour trips at buildout during  the weekday.      In summary, the existing roadways and intersections within the study area can accommodate the trips  associated with the proposed Fort Collins Rescue Mission. There are no mitigation measures needed to  support the vehicular traffic. It is recommended that multi‐modal connectivity be provided along the  project frontage to support the patrons that are likely to arrive/depart via walking, biking, or using transit.   Although the City’s Master Street Plan identifies Mason Street as a collector roadway, the volumes  associated with the site are well below the capacity threshold for a local street.  Unless significant  development occurs (or is anticipated to occur), Mason Street could functionally operate as a local street.      Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC Page 19 March 20, 2024    Tables and Figures:   Table 1 – Peak Hour Intersection LOS Summary  Table 2 – Peak Hour 95th Percentile Queue Summary  Table 3 –Trip Generation Summary [IN REPORT] Figure 1 – Vicinity Map and Existing Access  Figure 2 – Site Plan  Figure 3 – Year 2022 Existing Traffic Volumes  Figure 4 – Year 2025 Background Traffic Volumes  Figure 5 – Trip Distribution  Figure 6 – Site‐Generated Trip Volumes  Figure 7 – Year 2025 Background + Site‐Generated Traffic Volumes   FT# 22099 Fort Collins Rescue Mission Traffic Impact Study 12/20/22 Table 1 ‐ Peak Hour Intersection Level of Service Summary Intersection and  AM Peak PM Peak AM Peak PM Peak AM Peak PM Peak Critical Movements/Approaches Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS STOP SIGN CONTROL 1. Mason Street & Hibdon  Court 4A5A4A5A8A6A Eastbound Left+Through+Right 9A9A Westbound Left+Right 10 A 9 A 10 A 9 A Westbound Left+Through+Right 10 A 9 A Northbound Through+Right 0A0A0A0A Northbound Left+Through+Right 7A7A Southbound Left+Through 0A7A0A7A Southbound Left+Through+Right 0A7A 2. North College Avenue &  Hibdon Court 0A0A0A0A1A1A Eastbound Left+Through+Right 25 C 22 C 26 D 23 C 30 D 29 D Northbound Left 11 B 10 B 11 A 10 B 12 B 10 B Northbound Through 0A0A0A0A0A0A Southbound Through+Right 0A11B0A11B0A11B 3. Mason Street & Hickory  Street 0A1A0A1A0A1A Eastbound Left+Through 8A8A8A8A8A8A Westbound Through+Right 0A0A0A0A0A0A Southbound Left+Right 11 B 11 B 11 B 11 B 11 B 11 B 5. Mason Street & South  Access Project Intersection  Project Intersection 3A3A Eastbound Left+Right 9A9A Northbound Left+Through 7A7A Southbound Through+Right 0A0A SIGNAL CONTROL 4. North College Avenue &  Hickory Street 6A8A7A8A7A8A Eastbound Left 33 C 45 D 33 C 45 D 33 C 45 D Eastbound Right 43 D 54 D 43 D 54 D 42 D 54 D Northbound Left 7A7A8A7A9A7A Northbound Through 3A4A3A4A3A4A Southbound Through 4A4A4A4A4A4A Southbound Right 3A3A3A3A3A3A Note:  Delay represented in average seconds per vehicle. Existing Year 2025 Background Year 2025 Background + Project FT# 22099 Fort Collins Rescue Mission Traffic Impact Study 12/20/22 AM PM AM PM AM PM 1. Mason Street & Hibdon Court Eastbound Left+Through+Right ‐0' 0' Westbound Left+Right ‐ 0' 3' 0' 3' Westbound Left+Through+Right ‐5'3' Northbound Through+Right ‐ 0' 0' 0' 0' Northbound Left+Through+Right ‐3' 0' Southbound Left+Through ‐ 0' 0' 0' 0' Southbound Left+Through+Right ‐0'0' 2. North College Avenue &  Hibdon Court Eastbound Left+Through+Right ‐ 8' 8' 8' 10' 13'18' Northbound Left 95' 3' 3' 3' 3' 3' 3' Northbound Through ‐ 0' 0' 0' 0'0' 0' Southbound Through+Right ‐ 0' 0' 0' 0'0' 0' 3. Mason Street & Hickory  Street Eastbound Left+Through ‐ 0' 0' 0' 0' 0' 0' Westbound Through+Right ‐ 0' 0'0' 0' 0' 0' Southbound Left+Right ‐ 0' 3' 0' 3'3'5' 4. North College Avenue &  Hickory Street Eastbound Left ‐ 29' 81' 30' 82' 32' 84' Eastbound Right 100' 39' 35' 44' 35' 47' 35' Northbound Left 125' 53' 57' 56' 60' 67' 63' Northbound Through ‐ 91' 188' 94' 196' 95' 197' Southbound Through ‐ 153' 140' 158' 145' 160' 146' Southbound Right 95' 12' 12' 13' 12' 13' 12' 5. Mason Street & South Access Eastbound Left+Right ‐ 0' 0' Northbound Left+Through ‐0' 0' Southbound Through+Right ‐0'0' Stop‐Control Stop‐Control Stop‐Control Existing  Storage Table 2 - Peak Hour 95th Percentile Queues Intersections and Lane Groups Year 2022 Existing Year 2025  Background Year 2025 with  Project Stop‐Control Stop‐Control Stop‐Control Stop‐Control Stop‐Control Project Intersection Project Intersection Stop‐Control Stop‐Control Signalized Signalized Signalized PROJECT SITE N O R T H C O L L E G E A V E . FORT COLLINS MIDTOWNCOLORADO STATE UNIVERSITY Original ScaleProject #Date Drawn by Figure # T r a n s p o r o puGrnoiatt FOX TUTTLE VICINITY MAP FORT COLLINS RESCUE MISSION TRAFFIC IMPACT STUDY 22099 NTS 12/14/22 JKL 1 HIBDON CT. HICKORY ST. M A S O N S T . N O R T H C O L L E G E A V E . additional project property Original ScaleProject #Date Drawn by Figure # T r a n s p o r o puGrnoiatt FOX TUTTLE CONCEPTUAL SITE PLAN FORT COLLINS RESCUE MISSION TRAFFIC IMPACT STUDY 22099 NTS 12/14/2022 JKL 2 New Full Movement Access; Side-street stop controlled New Full Movement Access; Side-street stop controlled M A S O N S T R E E T & H I B D O N COURT N O R T H C O L L E G E A V E & H I C K ORY STREET M A S O N S T R E E T & H I C K O R Y S T REET N O RT H C O L L E G E A V E & H I B D O N COURT HIBDON CT. HICKORY ST. N O R T H C O L L E G E A V E . M A S O N S T . Original ScaleProject #Date Drawn by Figure # T r a n s p o r o puGrnoiatt FOX TUTTLE YEAR 2022 EXISTING TRAFFIC VOLUMES FORT COLLINS RESCUE MISSION TRAFFIC IMPACT STUDY 22099 NTS 12/14/2022 JKL 3 HIBDON CT. HICKORY ST. M A S O N S T R E E T & H I B D O N COURT N O R T H C O L L E G E A V E & H I C K ORY STREET M A S O N S T R E E T & H I C K O R Y S T REET N O RT H C O L L E G E A V E & H I B D O N COURT N O R T H C O L L E G E A V E . M A S O N S T . Original ScaleProject #Date Drawn by Figure # T r a n s p o r o puGrnoiatt FOX TUTTLE YEAR 2025 BACKGROUND TRAFFIC VOLUMES FORT COLLINS RESCUE MISSION TRAFFIC IMPACT STUDY 22099 NTS 12/14/2022 JKL 4 25% To/From North via North College Ave. 75% To/From South via North College Ave. HIBDON CT. HICKORY ST. M A S O N S T R E E T & H I B D O N COURT N O R T H C O L L E G E A V E & H I C K ORY STREET M A S O N S T R E E T & H I C K O R Y S T REET N O RT H C O L L E G E A V E & H I B D O N COURT N O R T H C O L L E G E A V E . M A S O N S T R E E T & SO U T H A C C E S S M A S O N S T . PROJECT SITE Original ScaleProject #Date Drawn by Figure # T r a n s p o r o puG rnoiatt FOX TUTTLE SITE TRIP DISTRIBUTION FORT COLLINS RESCUE MISSION TRAFFIC IMPACT STUDY 22099 NTS 12/19/22 JKL 5 HIBDON CT. HICKORY ST. M A S O N S T R E E T & H I B D O N COURT N O R T H C O L L E G E A V E & H I C K ORY STREET M A S O N S T R E E T & H I C K O R Y S T REET N O RT H C O L L E G E A V E & H I B D O N COURT N O R T H C O L L E G E A V E . M A S O N S T R E E T & SO U T H A C C E S S M A S O N S T . PROJECT SITE Original ScaleProject #Date Drawn by Figure # T r a n s p o r o puG rnoiatt FOX TUTTLE SITE-GENERATED TRIP VOLUMES DENVER RESCUE MISSION TRAFFIC IMPACT STUDY - FORT COLLINS, CO 22099 NTS 12/20/22 CRS 6 HIBDON CT. HICKORY ST. M A S O N S T R E E T & H I B D O N COURT N O R T H C O L L E G E A V E & H I C K ORY STREET M A S O N S T R E E T & H I C K O R Y S T REET N O RT H C O L L E G E A V E & H I B D O N COURT N O R T H C O L L E G E A V E . M A S O N S T R E E T & SO U T H A C C E S S M A S O N S T . PROJECT SITE Original ScaleProject #Date Drawn by Figure # T r a n s p o r o puG rnoiatt FOX TUTTLE SITE-GENERATED TRIP VOLUMES FORT COLLINS RESCUE MISSION TRAFFIC IMPACT STUDY 22099 NTS 12/20/22 CRS 7 HIBDON CT. HICKORY ST. M A S O N S T R E E T & H I B D O N COURT N O R T H C O L L E G E A V E & H I C K ORY STREET M A S O N S T R E E T & H I C K O R Y S T REET N O RT H C O L L E G E A V E & H I B D O N COURT N O R T H C O L L E G E A V E . M A S O N S T R E E T & SO U T H A C C E S S M A S O N S T . PROJECT SITE Original ScaleProject #Date Drawn by Figure # T r a n s p o r o puGrnoiatt FOX TUTTLE YEAR 2025 BACKGROUND + SITE-GENERATED TRAFFIC VOLUMES FORT COLLINS RESCUE MISSION TRAFFIC IMPACT STUDY 22099 NTS 12/20/2022 CRS 8 Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC March 20, 2024      Appendix:    Transportation Impact Study Base Assumptions Form  Level of Service Definitions  Existing Traffic Data  Intersection Capacity Worksheets             Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC March 20, 2024            Transportation Impact Study   Base Assumptions Form    Chapter 4 – Attachments Larimer County Urban Area Street Standards – Repealed and Reenacted August 1, 2021 Page 4-35 Adopted by Larimer County, City of Loveland, City of Fort Collins Attachment A Transportation Impact Study Base Assumptions Project Information Project Name Project Location TIS Assumptions Type of Study Full: Intermediate: MTIS: Memo: Study Area Boundaries North: South: East: West: Study Years Short Range: Long Range: Future Traffic Growth Rate Study Intersections 1. All access drives 5. 2. 6. 3. 7. 4. 8. Time Period for Study AM: 7:00-9:00 PM: 4:00-6:00 Sat Noon: Trip Generation Rates Trip Adjustment Factors Passby: Captive Market: Overall Trip Distribution SEE ATTACHED SKETCH Mode Split Assumptions Design Vehicle Information Committed Roadway Improvements Other Traffic Studies Areas Requiring Special Study Date: Traffic Engineer: Local Entity Engineer: Chapter 4 – Attachments Page 4-36 Larimer County Urban Area Street Standards – Repealed and Reenacted August 1, 2021 Adopted by Larimer County, City of Loveland, City of Fort Collins Attachment B Transportation Impact Study Pedestrian Analysis Worksheet DESTINATION Or i g i n ( p r o j e c t l a n d u s e ) Rec. Res. Inst. Ofc/Bus. Com. Ind. Other (Specify) Recreation 1) Residential Institution (school, church, civic) Office/Business Commercial Industrial Other (specify) INSTRUCTIONS: Identify the pedestrian destinations within 1320’ (1.5 miles for schools) of the project boundary in the spaces above. The pedestrian Level of Service for the facility/corridor linking these destinations to the project site will be based on the directness, continuity, types of street crossings, walkway surface condition, visual interest/amenity, and security of the selected route(s).  12 Dwelling units or more. Transportation Impact Study Pedestrian Analysis Worksheet Recreation Residential Inst. Ofc/Bus. Com. Ind. Other Recreation Residential Institution Office/Business Commercial Industrial Other (Fort Collins Rescue Mission Hickory Trail, Soft Gold Park, Salyer Natural Area North College Mobile Home Park, Revive, Hickory Village, Stonecrest Mobile Home Park, single family home adjacent to site. Food Bank for Larimer County* Various auto oriented repair services Various Businesses off North College, JAX, banks, the Lyric, touches Country Club Corners Development** Rocky Mountain Recycling, Valley Steel and Wire, Several North College Hotels fall within the 1320' radius. *Other services, including Larimer County Services off Willox, the Murphy Center, Homeward Alliance, the Health District Family Dental Clinic, WIC, and Salud are near the site but outside the 1320' radius. ** North College Marketplace near the development but outside the 1320' radius. FT #22099 Fort Collins Rescue Mission Traffic Impact Study 12/19/2022 Users of Facility Unit Rate Total In Out Rate Total In Out Rate Total In Out Employees (16 total) People 1.00 68 34 34 23 16 7 16 0 16 Volunteers/Interns (10 Total)People 1.00 44 22 22 10 10 0 10 0 10 Visitors* People1.00 201010 000 000 Deliveries* People1.00 422 000 000 Partner Organization Visitors*People1.00 1055 000 000 Patrons * People0.00 000 000 000 Total New Trips 146 73 73 33 26 7 26 0 26 Source: Data from Denver Rescue Mission facilities of similar siz and operations. * Trips not included as they do not occur during the Peak Hours Table 3 - Trip Generation Summary Non-Auto Factor Average Daily Trips AM Peak Hour Trips PM Peak Hour Trips 22099 Volumes - Trip Gen 25% To/From North via North College Ave. 75% To/From South via North College Ave. M A S ON S T R E E T & S O U T H E R N A CCESS N O R T H C O L L E G E A V E & H I C K ORY STREET M A S O N S T R E E T & H I C K O R Y S T REET HIBDON CT. N O R T H C O L L E G E A V E . HICKORY ST. N O RT H C O L L E G E A V E & H I B D O N COURT M A S O N S T . PROJECT SITE M A S O N S T R E E T & H I B D O N C OURT Original ScaleProject #Date Drawn by Figure # T r a n s p o r o puGrnoiatt FOX TUTTLE SITE TRIP DISTRIBUTION FORT COLLINS RESCUE MISSION TRAFFIC ANALYSIS STUDY - FORT COLLINS, CO 22099 NTS 12/19/22 JKL 6 Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC March 20, 2024      Level of Service   Definitions  LEVEL OF SERVICE DEFINITIONS In rating roadway and intersection operating conditions with existing or future traffic volumes, “Levels of Service” (LOS) A through F are used, with LOS A indicating very good operation and LOS F indicating poor operation. Levels of service at signalized and unsignalized intersections are closely associated with vehicle delays experienced in seconds per vehicle. More complete level of service definitions and delay data for signal and stop sign controlled intersections are contained in the following table for reference. Level of Service Rating Delay in seconds per vehicle (a) Definition Signalized Unsignalized A 0.0 to 10.0 0.0 to 10.0 Low vehicular traffic volumes; primarily free flow operations. Density is low and vehicles can freely maneuver within the traffic stream. Drivers are able to maintain their desired speeds with little or no delay. B 10.1 to 20.0 10.1 to 15.0 Stable vehicular traffic volume flow with potential for some restriction of operating speeds due to traffic conditions. Vehicle maneuvering is only slightly restricted. The stopped delays are not bothersome and drivers are not subject to appreciable tension. C 20.1 to 35.0 15.1 to 25.0 Stable traffic operations, however the ability for vehicles to maneuver is more restricted by the increase in traffic volumes. Relatively satisfactory operating speeds prevail, but adverse signal coordination or longer vehicle queues cause delays along the corridor. D 35.1 to 55.0 25.1 to 35.0 Approaching unstable vehicular traffic flow where small increases in volume could cause substantial delays. Most drivers are restricted in ability to maneuver and selection of travel speeds due to congestion. Driver comfort and convenience are low, but tolerable. E 55.1 to 80.0 35.1 to 50.0 Traffic operations characterized by significant approach delays and average travel speeds of one-half to one-third the free flow speed. Vehicular flow is unstable and there is potential for stoppages of brief duration. High signal density, extensive vehicle queuing, or corridor signal progression/timing are the typical causes of vehicle delays at signalized corridors. F > 80.0 > 50.0 Forced vehicular traffic flow and operations with high approach delays at critical intersections. Vehicle speeds are reduced substantially, and stoppages may occur for short or long periods of time because of downstream congestion. (a) Delay ranges based on Highway Capacity Manual (6th Edition, 2016) criteria. Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC March 20, 2024       Existing   Traffic Data       www.idaxdata.com to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 0 0 0 0 0 0 0 0 0 00002000 0 0 Peak Hr 0 2 0 0 2 0 2 2 3 0 5 0 0Count Total 0 3 0 0 3 0 0 0 00030308:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:15 AM 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 0 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 AM 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 EB WB NB SB Total East 7:45 AM 0 0 0 0 0 0 2 0 --0%HV%----- 0 0 7:15 AM 0 1 0 0 1 0 0 0 0 0 0 0 0 West North South 7:00 AM 0 0 0 2 0 1 1 0 0 0002000 0 Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total 0%----50%100%-- Peak Hour All 0 0 0 0 0 0 1 1 0 0 0 0 0 2 0000000 0 4 0 HV 0 0 0 0 0 Count Total 0 0 0 0 0 3 0 0 0 0 5 0 0 2000000000000 0 0 0 0 4 8:45 AM 0 0 0 0 0 0 0 0 0 0 2 4 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0020000 0 0 0 0 3 8:15 AM 0 0 0 0 0 0 0 0 0 0 2 3 8:00 AM 0 0 0 0 0 0 0 1 1 0 0 0 0000000 0 0 0 0 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 1 0 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0010000 0 0 0 0 0 7:15 AM 0 0 0 0 0 0 0 0 0 07:00 AM 0 0 0 0 0 0 0 Rolling One HourEastboundWestboundNorthboundSouthbound UT LT TH RT Interval Start n/a Hibdon Ct Mason St Mason St 15-min TotalUTLTTHRT SB -- TOTAL 50.0%0.50 TH RTUTLTTHRTUTLT WB 100.0%0.25 NB 0.0%0.25 Peak Hour: 7:30 AM 8:30 AM HV %:PHF EB -- Date: 12/07/2022 Peak Hour Count Period: 7:00 AM 9:00 AMN Mason St Hibdon Ct Hibdon Ct Ma s o n S t Ma s o n S t 4TEV: 0.5PHF: 0 0 0 1 0 0 2 2 1 0 11 22 0 0 0 00 0 2 0 0 0 0 Garrett Strang 720-646-1008 garrett.strang@idax.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles Two-Hour Count Summaries - Bikes Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 2 0000000Peak Hour 0 0 0 2 0 3 0 0 0 5 0Count Total 0 0 0 2 0 0 0 0 3030003 0 0 8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 08:15 AM 0 0 0 0 0 0 0 0 0 0 2 2 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 AM 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 TH RT LT TH RT 7:00 AM 0 0 0 0 Westbound Northbound Southbound LT TH RT LT TH RT LT 2 0 Interval Start n/a Hibdon Ct Mason St Mason St 15-min Total Rolling One HourEastbound 0 0 0 0 0 0020000 0 0 0 3 0 Peak Hour 0 0 0 0 0 0 0 0 0 0Count Total 0 0 0 0 0 3 0 0 2000000000000 0 0 0 0 2 8:45 AM 0 0 0 0 0 0 0 0 0 0 2 2 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0020000 0 0 0 0 1 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 1 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0000000 0 0 0 0 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 1 0 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0010000 0 0 0 0 0 7:15 AM 0 0 0 0 0 0 0 0 0 0 TH RT 7:00 AM 0 0 0 0 0 0 0 UT LT TH RT UT LT Northbound Southbound UT LT TH RT UT LT TH RT Interval Start n/a Hibdon Ct Mason St Mason St 15-min Total Rolling One HourEastboundWestbound Garrett Strang 720-646-1008 garrett.strang@idax.com www.idaxdata.com to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 0 0 0 0 0 0 0 0 0 00113000 0 0 Peak Hr 0 2 0 1 3 0 1 1 1 1 3 0 0Count Total 0 2 0 1 3 0 0 0 00000005:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5:00 PM 0 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 2 0 EB WB NB SB Total East 4:45 PM 0 0 0 0 0 1 1 0 ---HV%----- 0 0 4:15 PM 0 1 0 0 1 0 0 1 0 0 1 0 0 West North South 4:00 PM 0 1 0 0 0 0 7 0 3 40012060 0 Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total 0%-0%25%-9%0%-33% Peak Hour All 0 0 0 10 0 0 1 7 0 0 0 1 0 3 0020000 0 32 0 HV 0 0 0 0 0 Count Total 0 0 0 0 0 16 0 4 7 0 45 0 3 13100000010100 0 1 0 3 19 5:45 PM 0 0 0 0 1 0 0 0 0 0 5 27 5:30 PM 0 0 0 0 0 1 0 0 0 0 1 2 0000200 0 0 0 2 29 5:15 PM 0 0 0 0 0 0 0 0 0 0 9 32 5:00 PM 0 0 0 0 0 2 0 0 2 0 1 0 0060000 2 2 0 11 0 4:45 PM 0 0 0 0 2 0 0 0 2 0 7 0 4:30 PM 0 0 0 0 0 3 0 0 0 0 0 1 0030300 0 1 0 5 0 4:15 PM 0 0 0 0 1 0 0 0 3 04:00 PM 0 0 0 0 0 0 0 Rolling One HourEastboundWestboundNorthboundSouthbound UT LT TH RT Interval Start n/a Hibdon Ct Mason St Mason St 15-min TotalUTLTTHRT SB 14.3%0.44 TOTAL 9.4%0.73 TH RTUTLTTHRTUTLT WB 11.1%0.75 NB 0.0%0.58 Peak Hour: 4:00 PM 5:00 PM HV %:PHF EB -- Date: 12/07/2022 Peak Hour Count Period: 4:00 PM 6:00 PMN Mason St Hibdon Ct Hibdon Ct Ma s o n S t Ma s o n S t 32TEV: 0.73PHF: 4 3 7 6 0 6 12 18 10 0 70 716 0 1 0 01 0 1 0 0 0 0 Garrett Strang 720-646-1008 garrett.strang@idax.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles Two-Hour Count Summaries - Bikes Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 3 0001001Peak Hour 0 0 0 1 0 0 0 1 0 3 0Count Total 0 0 0 1 0 0 0 1 0000000 0 1 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 05:15 PM 0 0 0 0 0 0 0 0 0 0 2 3 5:00 PM 0 0 0 0 0 0 0 0 1 0 0 0 0 1 1 0 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 TH RT LT TH RT 4:00 PM 0 0 0 1 Westbound Northbound Southbound LT TH RT LT TH RT LT 3 0 Interval Start n/a Hibdon Ct Mason St Mason St 15-min Total Rolling One HourEastbound 0 0 0 0 1 0000200 0 1 0 3 0 Peak Hour 0 0 0 0 2 0 0 0 0 0Count Total 0 0 0 0 0 0 0 0 0000000000000 0 0 0 0 0 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0000000 0 0 0 0 1 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 3 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0000000 0 0 0 0 0 4:45 PM 0 0 0 0 0 0 0 0 0 0 1 0 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0000100 0 1 0 2 0 4:15 PM 0 0 0 0 1 0 0 0 0 0 TH RT 4:00 PM 0 0 0 0 0 0 0 UT LT TH RT UT LT Northbound Southbound UT LT TH RT UT LT TH RT Interval Start n/a Hibdon Ct Mason St Mason St 15-min Total Rolling One HourEastboundWestbound Garrett Strang 720-646-1008 garrett.strang@idax.com www.idaxdata.com to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 2 3 1 0 1 2 4 7 20 40000040 1 0 Peak Hour 3 0 48 66 117 0 0 0 1 2 3 5 14Count Total 5 0 102 119 226 0 4 1 00010128:45 AM 0 0 10 20 30 0 0 2 2 0 0 0 8:30 AM 2 0 14 14 30 0 0 0 0 0 0 0 2 0 0 0 8:15 AM 1 0 16 18 35 0 0 0 0 0 0 0 1 0 0 0 8:00 AM 0 0 8 21 29 0 0 0 0 0 0 0 1 0 0 0 7:30 AM 1 0 13 12 26 0 0 0 0 2 2 0 3 0 15 26 0 EB WB NB SB Total East 7:45 AM 1 0 11 15 27 0 0 0 0%9%9%HV%-25%0%29%- 0 0 7:15 AM 0 0 19 4 23 0 0 0 0 0 0 1 1 West North South 7:00 AM 0 0 11 0 11 514 0 0 0 866700003 0 Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total ---7%33%8%--- Peak Hour All 0 4 1 1 4 16 963 0 1 0 0 63 3 117 00001470 9 1,415 0 HV 0 1 0 2 0 Count Total 0 8 2 10 0 1 0 0 1,567 19 2,592 0 346 1,3081390101964010102 0 188 2 316 1,384 8:45 AM 0 1 1 0 0 1 1 120 0 0 353 1,415 8:30 AM 0 2 0 2 0 0 0 139 0 0 0 205 3000002 0 160 1 293 1,352 8:15 AM 0 0 1 3 0 1 5 123 0 0 422 1,284 8:00 AM 0 1 0 2 0 0 0 140 0 0 0 271 2000024 0 230 3 347 0 7:45 AM 0 1 0 2 0 0 0 112 0 0 290 0 7:30 AM 0 2 0 0 0 0 0 104 0 0 0 182 1000001 0 135 3 225 0 7:15 AM 0 1 0 1 0 0 1 86 0 07:00 AM 0 0 0 0 0 0 0 UT LT TH RT UT LT Rolling One HourEastboundWestboundNorthboundSouthbound UT LT TH RT Interval Start Hibdon Ct Driveway College Ave College Ave 15-min TotalUTLTTHRT Date: 12/07/2022 Peak Hour Count Period: 7:00 AM 9:00 AM SB 7.5%0.80 TOTAL 8.3%0.84 TH RT WB -- NB 9.1%0.90 Peak Hour: 7:30 AM 8:30 AM HV %:PHF EB 25.0%0.75 0 0 0 0 0 0 000 0 0 0 0 0 4 0 N College Ave Hibdon Ct Driveway Co l l e g e A v e Hibdon Ct Co l l e g e A v e 1,415TEV: 0.84PHF: 9 86 6 0 87 5 51 8 0 0 0 0 0 10 0 51 411 52 8 87 6 3 7 1 4 12 20 0 Garrett Strang 720-646-1008 garrett.strang@idax.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles Two-Hour Count Summaries - Bikes Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000 0 0 0 000 0 0 0 0000 0 0 0 00 0 THLT 00000000 0 00 0 0 0 0 0 0 0 0 0 THLT 0000000 3 02010 0 0 0 0 Peak Hour 0 0Count Total 0 110010000 0 0 8:45 AM 0 0 0 0 0 8:30 AM 0000000 0 2 8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 2 8:00 AM 0000 0 0 7:45 AM 0 0 0 0 0 7:30 AM 20002007:15 AM 0 0 0 0 0 0 0 07:00 AM RT 117 0 Interval Start Hibdon Ct Driveway College Ave College Ave 15-min Total Rolling One Hour 47 0 0 0 63 3000001 RTTHLT RTTHLTRT 0 115 4 226 0 Peak Hour 0 1 0 2 0 0 2 100 0 0Count Total 0 1 0 4 0 0 0 30 12410000200000000 0 14 0 30 121 8:45 AM 0 0 0 0 0 0 1 13 0 0 35 117 8:30 AM 0 0 0 2 0 0 0 15 0 0 0 16 2000001 0 21 0 29 105 8:15 AM 0 0 0 1 0 0 0 8 0 0 27 102 8:00 AM 0 0 0 0 0 0 0 11 0 0 0 14 1000000 0 12 0 26 0 7:45 AM 0 0 0 1 0 0 0 13 0 0 23 0 7:30 AM 0 1 0 0 0 0 0 19 0 0 0 3 1000000 0 15 0 26 0 7:15 AM 0 0 0 0 0 0 0 11 0 0 TH RT 7:00 AM 0 0 0 0 0 0 0 UT LT TH RT UT LT Northbound Southbound UT LT TH RT UT LT TH RT Interval Start Hibdon Ct Driveway College Ave College Ave 15-min Total Rolling One HourEastboundWestbound SouthboundNorthboundWestboundEastbound Garrett Strang 720-646-1008 garrett.strang@idax.com www.idaxdata.com to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 9 2 4 2 3 2 3 8 33 110224470 1 4 Peak Hour 0 0 38 42 80 0 0 0 2 2 4 7 21Count Total 0 0 82 81 163 0 4 0 40000005:45 PM 0 0 2 5 7 0 0 1 2 0 0 0 5:30 PM 0 0 13 10 23 0 0 0 0 0 0 1 1 0 0 0 5:15 PM 0 0 7 11 18 0 0 0 0 1 1 0 3 2 0 0 5:00 PM 0 0 4 6 10 0 0 0 1 0 1 0 2 0 0 0 4:30 PM 0 0 13 11 24 0 0 0 1 0 1 2 0 0 13 35 0 EB WB NB SB Total East 4:45 PM 0 0 7 14 21 1 1 2 0%4%4%HV%-0%-0%- 1 0 4:15 PM 0 0 14 11 25 0 0 0 0 0 0 1 7 West North South 4:00 PM 0 0 22 0 25 1,054 0 2 1 8281000012 0 Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total -0%0%5%0%4%--0% Peak Hour All 0 5 0 1 7 43 2,034 1 2 0 0 42 0 80 00001370 15 1,943 0 HV 0 0 0 0 0 Count Total 0 11 0 22 0 0 0 1 1,586 27 3,735 0 383 1,8042061001653000002 0 200 4 475 1,915 5:45 PM 0 2 0 4 0 1 5 261 0 0 470 1,934 5:30 PM 0 1 0 3 0 0 0 263 0 0 0 196 2000024 0 197 2 476 1,943 5:15 PM 0 1 0 2 0 0 8 267 0 0 494 1,931 5:00 PM 0 0 0 2 0 0 0 259 0 2 0 221 3000102 1 211 4 494 0 4:45 PM 0 2 0 4 0 0 7 266 0 0 479 0 4:30 PM 0 1 0 4 0 0 0 262 0 0 0 199 6000028 0 197 3 464 0 4:15 PM 0 2 0 0 0 2 7 250 0 04:00 PM 0 2 0 3 0 0 0 UT LT TH RT UT LT Rolling One HourEastboundWestboundNorthboundSouthbound UT LT TH RT Interval Start Hibdon Ct Driveway College Ave College Ave 15-min TotalUTLTTHRT Date: 12/07/2022 Peak Hour Count Period: 4:00 PM 6:00 PM SB 5.0%0.94 TOTAL 4.1%0.98 TH RT WB 0.0%0.25 NB 3.5%0.98 Peak Hour: 4:15 PM 5:15 PM HV %:PHF EB 0.0%0.63 0 0 0 0 1 1 020 0 0 0 0 0 7 4 N College Ave Hibdon Ct Driveway Co l l e g e A v e Hibdon Ct Co l l e g e A v e 1,943TEV: 0.98PHF: 15 82 8 1 84 6 1, 0 6 2 2 1 0 0 1 10 0 1, 0 5 4 25 1, 0 8 1 84 0 2 10 0 5 15 40 0 Garrett Strang 720-646-1008 garrett.strang@idax.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles Two-Hour Count Summaries - Bikes Note: U-Turn volumes for bikes are included in Left-Turn, if any. 1 0 0 0 0 1 0 0 0 0 0 0 0 0 000 0 0 0 000 0 0 0 0000 0 0 0 00 0 THLT 00000000 0 00 0 0 0 0 0 0 0 0 0 THLT 4011002 4 00020 0 0 0 0 Peak Hour 1 1Count Total 0 100000000 0 2 5:45 PM 0 0 0 0 3 5:30 PM 0000000 1 4 5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 3 5:00 PM 1001 1 0 4:45 PM 0 0 0 0 0 4:30 PM 10000014:15 PM 0 0 0 0 0 0 0 04:00 PM RT 80 0 Interval Start Hibdon Ct Driveway College Ave College Ave 15-min Total Rolling One Hour 37 0 0 0 42 0000001 RTTHLT RTTHLTRT 0 81 0 163 0 Peak Hour 0 0 0 0 0 0 2 80 0 0Count Total 0 0 0 0 0 0 0 7 58200050000000 0 10 0 23 72 5:45 PM 0 0 0 0 0 0 0 13 0 0 18 73 5:30 PM 0 0 0 0 0 0 0 7 0 0 0 11 0000000 0 6 0 10 80 5:15 PM 0 0 0 0 0 0 0 4 0 0 21 105 5:00 PM 0 0 0 0 0 0 0 7 0 0 0 14 0000000 0 11 0 24 0 4:45 PM 0 0 0 0 0 0 0 13 0 0 25 0 4:30 PM 0 0 0 0 0 0 0 13 0 0 0 11 0000001 0 13 0 35 0 4:15 PM 0 0 0 0 0 0 1 21 0 0 TH RT 4:00 PM 0 0 0 0 0 0 0 UT LT TH RT UT LT Northbound Southbound UT LT TH RT UT LT TH RT Interval Start Hibdon Ct Driveway College Ave College Ave 15-min Total Rolling One HourEastboundWestbound SouthboundNorthboundWestboundEastbound Garrett Strang 720-646-1008 garrett.strang@idax.com www.idaxdata.com to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 1 0 1 1 1 1 0 1 6 30000003 6 0 Peak Hr 4 5 0 3 12 0 0 1 0 2 7 0 0Count Total 9 7 0 4 20 4 0 1 04000408:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 8:30 AM 3 2 0 0 5 0 0 0 0 0 0 0 0 1 1 0 8:15 AM 1 2 0 2 5 0 0 0 0 0 0 0 0 0 1 0 8:00 AM 0 0 0 1 1 0 0 0 0 0 0 0 0 1 0 0 7:30 AM 1 0 0 0 1 0 0 0 0 0 1 0 0 0 0 3 0 EB WB NB SB Total East 7:45 AM 0 1 0 0 1 2 2 0 ---HV%-0%3%-- 1 0 7:15 AM 2 1 0 1 4 0 1 0 0 0 0 0 0 West North South 7:00 AM 2 1 0 0 0 0 0 0 5 000012710 0 Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total --20%-100%4%-3%100% Peak Hour All 0 1 136 1 0 0 0 0 0 0 1 0 2 12 0410000 2 272 0 HV 0 0 4 0 0 Count Total 0 1 238 0 1 0 211 6 0 3 461 0 50 2520000001023000 1 0 0 78 272 8:45 AM 0 0 26 0 0 0 0 0 0 0 58 254 8:30 AM 0 0 53 0 0 0 24 0 0 0 0 0 20024000 2 0 0 66 240 8:15 AM 0 0 32 0 0 0 0 0 0 0 70 209 8:00 AM 0 0 24 0 0 0 40 0 0 0 2 0 00039100 0 0 0 60 0 7:45 AM 0 1 27 0 0 0 0 0 0 0 44 0 7:30 AM 0 0 33 0 0 0 27 0 0 0 1 0 10020000 0 0 0 35 0 7:15 AM 0 0 22 0 0 0 0 0 0 07:00 AM 0 0 21 0 0 0 14 Rolling One HourEastboundWestboundNorthboundSouthbound UT LT TH RT Interval Start Hickory St Hickory St N/A Mason St 15-min TotalUTLTTHRT SB 42.9%0.88 TOTAL 4.4%0.87 TH RTUTLTTHRTUTLT WB 3.9%0.80 NB -- Peak Hour: 7:45 AM 8:45 AM HV %:PHF EB 2.9%0.65 Date: 12/07/2022 Peak Hour Count Period: 7:00 AM 9:00 AM 0 0 0 0 0 0 3 0 0 0 N Mason St Hickory St Hickory St Ma s o n S t Hickory St 272TEV: 0.87PHF: 2 5 7 2 0 1 127 128 141 0 136 1137 129 0 Garrett Strang 720-646-1008 garrett.strang@idax.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles Two-Hour Count Summaries - Bikes Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0 0000000Peak Hour 0 0 0 0 0 0 0 0 2 7 0Count Total 3 1 0 0 1 0 0 0 4000004 0 0 8:45 AM 3 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 08:15 AM 0 0 0 0 0 0 0 0 0 0 3 3 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 2 0 1 0 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 AM 0 0 0 0 1 0 0 0 0 0 0 TH RT LT TH RT 7:00 AM 0 0 0 0 Westbound Northbound Southbound LT TH RT LT TH RT LT 12 0 Interval Start Hickory St Hickory St N/A Mason St 15-min Total Rolling One HourEastbound 0 0 0 1 0 2004100 1 0 3 20 0 Peak Hour 0 0 4 0 1 0 0 0 0 0Count Total 0 0 9 0 0 0 6 0 11000000000000 0 0 0 5 12 8:45 AM 0 0 0 0 0 0 0 0 0 0 5 8 8:30 AM 0 0 3 0 0 0 2 0 0 0 0 0 2002000 1 0 0 1 7 8:15 AM 0 0 1 0 0 0 0 0 0 0 1 9 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0000100 0 0 0 1 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 4 0 7:30 AM 0 0 1 0 0 0 0 0 0 0 0 0 1001000 0 0 0 3 0 7:15 AM 0 0 2 0 0 0 0 0 0 0 TH RT 7:00 AM 0 0 2 0 0 0 1 UT LT TH RT UT LT Northbound Southbound UT LT TH RT UT LT TH RT Interval Start Hickory St Hickory St N/A Mason St 15-min Total Rolling One HourEastboundWestbound Garrett Strang 720-646-1008 garrett.strang@idax.com www.idaxdata.com to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 0 2 1 1 1 0 7 2 14 31025101 3 1 Peak Hr 3 3 0 0 6 3 0 1 0 2 9 10 0Count Total 5 3 0 2 10 6 0 0 00100125:45 PM 0 0 0 0 0 0 2 6 0 1 0 0 5:30 PM 0 0 0 0 0 2 0 0 0 1 1 0 0 0 1 0 5:15 PM 1 1 0 0 2 0 0 0 0 0 0 0 0 0 0 0 5:00 PM 0 0 0 0 0 0 1 0 0 0 1 1 0 0 1 0 4:30 PM 1 1 0 0 2 2 0 0 0 0 1 1 0 1 2 4 0 EB WB NB SB Total East 4:45 PM 1 1 0 0 2 1 3 0 ---HV%-0%2%-0% 0 0 4:15 PM 0 0 0 0 0 1 0 0 0 0 0 0 0 West North South 4:00 PM 2 0 0 0 0 0 0 0 11 0010142100 0 Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total --0%-0%2%-2%0% Peak Hour All 0 1 167 18 0 0 0 0 0 0 0 0 0 6 0300000 2 334 0 HV 0 0 3 0 0 Count Total 0 3 272 0 1 0 294 19 0 6 613 0 62 2810001010037100 2 0 0 55 310 5:45 PM 0 0 22 0 2 0 0 0 0 0 85 334 5:30 PM 0 0 19 0 0 0 32 0 0 0 1 0 01039000 3 0 0 79 321 5:15 PM 0 0 44 0 2 0 0 0 0 0 91 332 5:00 PM 0 0 45 0 0 0 29 0 0 0 2 0 20038600 5 0 0 79 0 4:45 PM 0 0 43 0 2 0 0 0 0 0 72 0 4:30 PM 0 1 35 0 0 0 36 0 0 0 4 0 20040200 1 0 1 90 0 4:15 PM 0 0 24 0 3 0 0 0 0 04:00 PM 0 2 40 0 0 0 43 Rolling One HourEastboundWestboundNorthboundSouthbound UT LT TH RT Interval Start Hickory St Hickory St N/A Mason St 15-min TotalUTLTTHRT SB 0.0%0.65 TOTAL 1.8%0.92 TH RTUTLTTHRTUTLT WB 2.0%0.87 NB -- Peak Hour: 4:30 PM 5:30 PM HV %:PHF EB 1.8%0.93 Date: 12/07/2022 Peak Hour Count Period: 4:00 PM 6:00 PM 2 1 2 0 0 0 1 1 0 1 N Mason St Hickory St Hickory St Ma s o n S t Hickory St 334TEV: 0.92PHF: 2 11 13 11 0 10 142 153 179 1 167 1168 144 0 Garrett Strang 720-646-1008 garrett.strang@idax.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles Two-Hour Count Summaries - Bikes Note: U-Turn volumes for bikes are included in Left-Turn, if any. 2 5 0000000Peak Hour 1 2 0 0 0 0 0 0 2 9 0Count Total 1 5 0 0 1 0 0 0 4000001 2 4 5:45 PM 0 0 0 0 1 0 0 0 0 0 0 0 0 1 1 5 5:30 PM 0 2 0 0 0 0 0 0 0 0 0 05:15 PM 0 0 0 0 0 0 0 0 0 0 5 5 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 1 3 0 4:45 PM 1 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 4:30 PM 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:15 PM 0 1 0 0 0 0 0 0 0 0 0 TH RT LT TH RT 4:00 PM 0 0 0 0 Westbound Northbound Southbound LT TH RT LT TH RT LT 6 0 Interval Start Hickory St Hickory St N/A Mason St 15-min Total Rolling One HourEastbound 0 0 0 0 0 0003000 1 0 1 10 0 Peak Hour 0 0 3 0 0 0 0 0 0 0Count Total 0 0 5 0 0 0 3 0 2000000000000 0 0 0 0 4 5:45 PM 0 0 0 0 0 0 0 0 0 0 2 6 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0001000 0 0 0 0 4 5:15 PM 0 0 1 0 0 0 0 0 0 0 2 8 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0001000 0 0 0 2 0 4:45 PM 0 0 1 0 0 0 0 0 0 0 0 0 4:30 PM 0 0 1 0 0 0 1 0 0 0 0 0 0000000 1 0 1 4 0 4:15 PM 0 0 0 0 0 0 0 0 0 0 TH RT 4:00 PM 0 0 2 0 0 0 0 UT LT TH RT UT LT Northbound Southbound UT LT TH RT UT LT TH RT Interval Start Hickory St Hickory St N/A Mason St 15-min Total Rolling One HourEastboundWestbound Garrett Strang 720-646-1008 garrett.strang@idax.com www.idaxdata.com to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 0 2 0 0 1 5 4 4 16 60000222 2 0 Peak Hr 3 0 52 62 117 0 0 0 0 0 1 4 10Count Total 10 0 107 117 234 1 4 0 01000108:45 AM 0 0 8 21 29 0 0 2 2 0 0 0 8:30 AM 3 0 18 17 38 0 0 0 0 0 0 2 1 2 0 0 8:15 AM 1 0 18 17 36 0 0 0 0 0 0 0 1 0 0 0 8:00 AM 1 0 7 20 28 0 0 0 0 0 0 0 0 0 0 0 7:30 AM 1 0 14 11 26 0 0 0 0 0 0 0 2 0 14 28 0 EB WB NB SB Total East 7:45 AM 0 0 13 14 27 0 0 0 0%2%10%HV%-0%-3%- 0 0 7:15 AM 2 0 17 3 22 0 0 0 0 0 0 0 0 West North South 7:00 AM 2 0 12 0 85 512 0 0 0 8099100001 0 Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total ---8%0%7%--- Peak Hour All 0 25 0 0 2 141 940 0 0 0 0 62 0 117 00002500 50 1,573 0 HV 0 0 0 3 0 Count Total 0 53 0 186 0 0 0 0 1,468 88 2,878 0 370 1,467138000179130000012 0 183 8 384 1,563 8:45 AM 0 6 0 22 0 1 21 117 0 0 384 1,573 8:30 AM 0 15 0 39 0 0 0 136 0 0 0 197 70000015 0 143 17 329 1,505 8:15 AM 0 6 0 23 0 0 22 122 0 0 466 1,411 8:00 AM 0 6 0 19 0 0 0 138 0 0 0 254 130000132 0 215 13 394 0 7:45 AM 0 8 0 20 0 0 16 116 0 0 316 0 7:30 AM 0 5 0 29 0 0 0 98 0 0 0 172 100000015 0 125 7 235 0 7:15 AM 0 4 0 17 0 0 8 75 0 07:00 AM 0 3 0 17 0 0 0 Rolling One HourEastboundWestboundNorthboundSouthbound UT LT TH RT Interval Start Hickory St N/A College Ave College Ave 15-min TotalUTLTTHRT SB 7.2%0.80 TOTAL 7.4%0.84 TH RTUTLTTHRTUTLT WB -- NB 8.7%0.87 Peak Hour: 7:30 AM 8:30 AM HV %:PHF EB 2.6%0.85 Date: 12/07/2022 Peak Hour Count Period: 7:00 AM 9:00 AM 0 0 0 0 00 2 0 2 2 N College Ave Hickory St Co l l e g e A v e Co l l e g e A v e Hickory St 1,573TEV: 0.84PHF: 50 80 9 85 9 53 7 0 51 285 59 8 90 1 1 91 25116 135 0 Garrett Strang 720-646-1008 garrett.strang@idax.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles Two-Hour Count Summaries - Bikes Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 0 0000000Peak Hour 0 0 0 0 0 0 0 0 0 1 0Count Total 1 0 0 0 0 0 0 0 1000001 0 0 8:45 AM 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8:30 AM 0 0 0 0 0 0 0 0 0 0 0 08:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7:15 AM 0 0 0 0 0 0 0 0 0 0 0 TH RT LT TH RT 7:00 AM 0 0 0 0 Westbound Northbound Southbound LT TH RT LT TH RT LT 117 0 Interval Start Hickory St N/A College Ave College Ave 15-min Total Rolling One HourEastbound 50 0 0 0 62 0000002 0 116 1 234 0 Peak Hour 0 0 0 3 0 0 6 101 0 0Count Total 0 2 0 8 0 0 0 29 1318000210000000 0 17 0 38 129 8:45 AM 0 0 0 0 0 0 3 15 0 0 36 117 8:30 AM 0 1 0 2 0 0 0 16 0 0 0 17 0000002 0 20 0 28 103 8:15 AM 0 0 0 1 0 0 0 7 0 0 27 103 8:00 AM 0 0 0 1 0 0 0 13 0 0 0 14 0000000 0 11 0 26 0 7:45 AM 0 0 0 0 0 0 0 14 0 0 22 0 7:30 AM 0 0 0 1 0 0 0 16 0 0 0 3 0000001 0 13 1 28 0 7:15 AM 0 1 0 1 0 0 0 12 0 0 TH RT 7:00 AM 0 0 0 2 0 0 0 UT LT TH RT UT LT Northbound Southbound UT LT TH RT UT LT TH RT Interval Start Hickory St N/A College Ave College Ave 15-min Total Rolling One HourEastboundWestbound Garrett Strang 720-646-1008 garrett.strang@idax.com www.idaxdata.com to to Two-Hour Count Summaries Note: Two-hour count summary volumes include heavy vehicles but exclude bicycles in overall count. Total 6 3 4 1 8 3 2 0 27 140011590 4 0 Peak Hr 5 0 58 49 112 0 0 0 0 1 1 8 15Count Total 6 0 87 80 173 0 0 0 00000005:45 PM 0 0 2 5 7 0 0 0 1 1 0 0 5:30 PM 0 0 13 11 24 0 0 0 0 0 0 2 1 0 3 0 5:15 PM 1 0 9 8 18 0 0 0 0 0 0 1 4 1 0 0 5:00 PM 0 0 5 7 12 0 0 0 0 0 0 0 1 0 0 0 4:30 PM 1 0 12 13 26 0 0 0 0 0 0 2 1 0 13 38 0 EB WB NB SB Total East 4:45 PM 1 0 9 13 23 1 1 3 0%3%5%HV%-2%-4%- 0 0 4:15 PM 0 0 15 10 25 0 0 0 0 0 0 0 6 West North South 4:00 PM 3 0 22 0 114 1,048 0 2 0 7919700003 0 Interval Start Heavy Vehicle Totals Bicycles Pedestrians (Crossing Leg) EB WB NB SB Total -0%-6%0%5%--- Peak Hour All 0 66 0 0 9 224 2,008 0 3 0 0 49 0 112 00003550 54 2,175 0 HV 0 1 0 4 0 Count Total 0 113 0 198 0 0 0 0 1,524 103 4,182 0 441 2,00721700016190000130 0 193 15 503 2,125 5:45 PM 0 4 0 19 0 1 23 245 0 0 540 2,171 5:30 PM 0 14 0 12 0 0 0 246 0 0 0 198 140000230 0 181 11 523 2,158 5:15 PM 0 17 0 33 0 2 27 252 0 1 559 2,175 5:00 PM 0 12 0 37 0 0 0 247 0 0 0 220 100000229 0 201 15 549 0 4:45 PM 0 20 0 31 0 0 25 269 0 0 527 0 4:30 PM 0 14 0 25 0 0 0 266 0 0 0 188 130000027 0 182 16 540 0 4:15 PM 0 20 0 13 0 1 33 266 0 24:00 PM 0 12 0 28 0 0 0 Rolling One HourEastboundWestboundNorthboundSouthbound UT LT TH RT Interval Start Hickory St N/A College Ave College Ave 15-min TotalUTLTTHRT SB 5.8%0.92 TOTAL 5.1%0.97 TH RTUTLTTHRTUTLT WB -- NB 5.0%0.97 Peak Hour: 4:00 PM 5:00 PM HV %:PHF EB 3.1%0.80 Date: 12/07/2022 Peak Hour Count Period: 4:00 PM 6:00 PM 0 0 0 1 00 0 0 9 5 N College Ave Hickory St Co l l e g e A v e Co l l e g e A v e Hickory St 2,175TEV: 0.97PHF: 54 79 1 84 7 1, 1 1 6 2 1, 0 4 8 11 4 1, 1 6 5 89 1 3 97 66163 168 0 Garrett Strang 720-646-1008 garrett.strang@idax.com www.idaxdata.com Two-Hour Count Summaries - Heavy Vehicles Two-Hour Count Summaries - Bikes Note: U-Turn volumes for bikes are included in Left-Turn, if any. 0 1 0000001Peak Hour 0 0 0 0 0 0 0 1 0 1 0Count Total 0 0 0 0 0 0 0 0 0000000 0 0 5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 5:30 PM 0 0 0 0 0 0 0 0 0 0 0 05:15 PM 0 0 0 0 0 0 0 0 0 0 1 1 5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 4:45 PM 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4:15 PM 0 0 0 0 0 0 0 0 0 0 0 TH RT LT TH RT 4:00 PM 0 0 0 0 Westbound Northbound Southbound LT TH RT LT TH RT LT 112 0 Interval Start Hickory St N/A College Ave College Ave 15-min Total Rolling One HourEastbound 55 0 0 0 49 0000003 0 79 1 173 0 Peak Hour 0 1 0 4 0 0 5 82 0 0Count Total 0 1 0 5 0 0 0 7 61200050000000 0 11 0 24 77 5:45 PM 0 0 0 0 0 0 1 12 0 0 18 79 5:30 PM 0 0 0 0 0 0 0 8 0 0 0 7 1000001 0 7 0 12 86 5:15 PM 0 0 0 1 0 0 0 5 0 0 23 112 5:00 PM 0 0 0 0 0 0 0 8 0 0 0 13 0000001 0 13 0 26 0 4:45 PM 0 0 0 1 0 0 1 11 0 0 25 0 4:30 PM 0 1 0 0 0 0 0 14 0 0 0 10 0000001 0 13 0 38 0 4:15 PM 0 0 0 0 0 0 0 22 0 0 TH RT 4:00 PM 0 0 0 3 0 0 0 UT LT TH RT UT LT Northbound Southbound UT LT TH RT UT LT TH RT Interval Start Hickory St N/A College Ave College Ave 15-min Total Rolling One HourEastboundWestbound Garrett Strang 720-646-1008 garrett.strang@idax.com Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC March 20, 2024      Intersection Capacity Worksheets:  2022 Existing   HCM 6th TWSC 1: Mason St & Hibdon Ct 12/21/2022 2022 Existing - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 1 Intersection Int Delay, s/veh 4.4 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 2 01100 Future Vol, veh/h 2 01100 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 25 25 25 25 92 92 Heavy Vehicles, % 100 100 0022 Mvmt Flow 8 04400 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 7 60080 Stage 1 6 ----- Stage 2 1 ----- Critical Hdwy 7.4 7.2 - - 4.12 - Critical Hdwy Stg 1 6.4 ----- Critical Hdwy Stg 2 6.4 ----- Follow-up Hdwy 4.4 4.2 - - 2.218 - Pot Cap-1 Maneuver 810 850 - - 1612 - Stage 1 812 ----- Stage 2 817 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 810 850 - - 1612 - Mov Cap-2 Maneuver 810 ----- Stage 1 812 ----- Stage 2 817 ----- Approach WB NB SB HCM Control Delay, s 9.5 0 0 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 810 1612 - HCM Lane V/C Ratio - - 0.01 - - HCM Control Delay (s) - - 9.5 0 - HCM Lane LOS - - A A - HCM 95th %tile Q(veh) - - 0 0 - HCM 6th TWSC 2: North College Ave & Hibdon Ct 12/21/2022 2022 Existing - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 2 Intersection Int Delay, s/veh 0.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 1700014514008669 Future Vol, veh/h 4 1700014514008669 Conflicting Peds, #/hr 0 00000400004 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length ------97----- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 75 75 75 25 25 25 90 90 90 80 80 80 Heavy Vehicles, % 25 25 25 000999888 Mvmt Flow 5 1900016571001083 11 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1411 1696 551 1098 0 - - - 0 Stage 1 1093 1093 ------- Stage 2 318 603 ------- Critical Hdwy 7.3 7 7.4 4.28 ----- Critical Hdwy Stg 1 6.3 6 ------- Critical Hdwy Stg 2 6.3 6 ------- Follow-up Hdwy 3.75 4.25 3.55 2.29 ----- Pot Cap-1 Maneuver 105 72 423 592 - 0 0 - - Stage 1 237 244 - - - 0 0 - - Stage 2 646 433 - - - 0 0 - - Platoon blocked, % - - - Mov Cap-1 Maneuver 101 0 421 590 ----- Mov Cap-2 Maneuver 101 0 ------- Stage 1 230 0 ------- Stage 2 643 0 ------- Approach EB NB SB HCM Control Delay, s 25 0.3 0 HCM LOS D Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 590 - 196 - - HCM Lane V/C Ratio 0.026 - 0.082 - - HCM Control Delay (s) 11.3 - 25 - - HCM Lane LOS B - D - - HCM 95th %tile Q(veh) 0.1 - 0.3 - - HCM 6th TWSC 3: Hickory St & Mason St 12/21/2022 2022 Existing - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 3 Intersection Int Delay, s/veh 0.3 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 136 127 1 5 2 Future Vol, veh/h 1 136 127 1 5 2 Conflicting Peds, #/hr 3 00300 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 65 65 80 80 88 88 Heavy Vehicles, % 3 3 4 4 43 43 Mvmt Flow 2 209 159 1 6 2 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 163 0 - 0 376 163 Stage 1 - - - - 163 - Stage 2 - - - - 213 - Critical Hdwy 4.13 - - - 6.83 6.63 Critical Hdwy Stg 1 - - - - 5.83 - Critical Hdwy Stg 2 - - - - 5.83 - Follow-up Hdwy 2.227 - - - 3.887 3.687 Pot Cap-1 Maneuver 1410 - - - 552 785 Stage 1 - - - - 776 - Stage 2 - - - - 734 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1406 - - - 548 783 Mov Cap-2 Maneuver - - - - 548 - Stage 1 - - - - 772 - Stage 2 - - - - 732 - Approach EB WB SB HCM Control Delay, s 0.1 0 11.1 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1406 - - - 599 HCM Lane V/C Ratio 0.001 - - - 0.013 HCM Control Delay (s) 7.6 0 - - 11.1 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0 - - - 0 Timings 4: North College Ave & Hickory St 12/21/2022 2022 Existing - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 4 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 25 91 86 512 809 50 Future Volume (vph) 25 91 86 512 809 50 Turn Type Prot Perm Perm NA NA Perm Protected Phases 4 6 2 Permitted Phases 4 6 2 Detector Phase 446622 Switch Phase Minimum Initial (s) 7.0 7.0 10.0 10.0 10.0 10.0 Minimum Split (s) 25.5 25.5 24.5 24.5 24.5 24.5 Total Split (s) 30.0 30.0 50.0 50.0 50.0 50.0 Total Split (%) 37.5% 37.5% 62.5% 62.5% 62.5% 62.5% Yellow Time (s) 3.5 3.5 4.5 4.5 4.5 4.5 All-Red Time (s) 2.0 2.0 3.0 3.0 3.0 3.0 Lost Time Adjust (s) -1.0 0.0 -1.0 -1.0 -1.0 -1.0 Total Lost Time (s) 4.5 5.5 6.5 6.5 6.5 6.5 Lead/Lag Lead-Lag Optimize? Recall Mode None None C-Max C-Max C-Max C-Max Act Effct Green (s) 10.8 9.8 62.0 62.0 62.0 62.0 Actuated g/C Ratio 0.14 0.12 0.78 0.78 0.78 0.78 v/c Ratio 0.12 0.39 0.27 0.23 0.39 0.05 Control Delay 29.0 13.2 7.5 4.2 5.1 2.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 29.0 13.2 7.5 4.2 5.1 2.0 LOS CBAAAA Approach Delay 16.6 4.7 4.9 Approach LOS B A A Intersection Summary Cycle Length: 80 Actuated Cycle Length: 80 Offset: 47 (59%), Referenced to phase 2:SBT and 6:NBTL, Start of Red Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.39 Intersection Signal Delay: 5.7 Intersection LOS: A Intersection Capacity Utilization 51.1% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 4: North College Ave & Hickory St Queues 4: North College Ave & Hickory St 12/21/2022 2022 Existing - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 5 Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow (vph) 29 107 99 589 1011 63 v/c Ratio 0.12 0.39 0.27 0.23 0.39 0.05 Control Delay 29.0 13.2 7.5 4.2 5.1 2.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 29.0 13.2 7.5 4.2 5.1 2.0 Queue Length 50th (ft) 14 8 11 34 68 1 Queue Length 95th (ft) 29 39 53 91 153 12 Internal Link Dist (ft) 250 150 860 Turn Bay Length (ft) 98 125 95 Base Capacity (vph) 558 543 369 2565 2613 1152 Starvation Cap Reductn 000000 Spillback Cap Reductn 000000 Storage Cap Reductn 000000 Reduced v/c Ratio 0.05 0.20 0.27 0.23 0.39 0.05 Intersection Summary HCM 6th Signalized Intersection Summary 4: North College Ave & Hickory St 12/21/2022 2022 Existing - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 6 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (veh/h) 25 91 86 512 809 50 Future Volume (veh/h) 25 91 86 512 809 50 Initial Q (Qb), veh 000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1856 1856 1767 1767 1796 1796 Adj Flow Rate, veh/h 29 107 99 589 1011 62 Peak Hour Factor 0.85 0.85 0.87 0.87 0.80 0.80 Percent Heavy Veh, %339977 Cap, veh/h 183 143 416 2547 2590 1154 Arrive On Green 0.10 0.09 0.76 0.76 0.76 0.76 Sat Flow, veh/h 1767 1572 497 3445 3503 1520 Grp Volume(v), veh/h 29 107 99 589 1011 62 Grp Sat Flow(s),veh/h/ln 1767 1572 497 1678 1706 1520 Q Serve(g_s), s 1.2 5.3 6.8 4.1 8.1 0.8 Cycle Q Clear(g_c), s 1.2 5.3 14.9 4.1 8.1 0.8 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 183 143 416 2547 2590 1154 V/C Ratio(X) 0.16 0.75 0.24 0.23 0.39 0.05 Avail Cap(c_a), veh/h 563 482 416 2547 2590 1154 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 32.7 35.5 5.9 2.8 3.3 2.4 Incr Delay (d2), s/veh 0.4 7.5 1.3 0.2 0.4 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 2.3 0.7 0.8 1.6 0.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 33.1 43.0 7.2 3.0 3.7 2.5 LnGrp LOS C D AAAA Approach Vol, veh/h 136 688 1073 Approach Delay, s/veh 40.9 3.6 3.7 Approach LOS D A A Timer - Assigned Phs 2 4 6 Phs Duration (G+Y+Rc), s 67.2 12.8 67.2 Change Period (Y+Rc), s 7.5 5.5 7.5 Max Green Setting (Gmax), s 42.5 24.5 42.5 Max Q Clear Time (g_c+I1), s 10.1 7.3 16.9 Green Ext Time (p_c), s 4.8 0.4 3.6 Intersection Summary HCM 6th Ctrl Delay 6.3 HCM 6th LOS A HCM 6th TWSC 1: Mason St & Hibdon Ct 12/21/2022 2022 Existing - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 1 Intersection Int Delay, s/veh 5 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 12 60734 Future Vol, veh/h 12 60734 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 75 75 58 58 44 44 Heavy Vehicles, % 11 11 0 0 14 14 Mvmt Flow 16 8 0 12 7 9 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 29 6 0 0 12 0 Stage 1 6 ----- Stage 2 23 ----- Critical Hdwy 6.51 6.31 - - 4.24 - Critical Hdwy Stg 1 5.51 ----- Critical Hdwy Stg 2 5.51 ----- Follow-up Hdwy 3.599 3.399 - - 2.326 - Pot Cap-1 Maneuver 963 1051 - - 1532 - Stage 1 994 ----- Stage 2 977 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 958 1051 - - 1532 - Mov Cap-2 Maneuver 958 ----- Stage 1 994 ----- Stage 2 972 ----- Approach WB NB SB HCM Control Delay, s 8.7 0 3.2 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 987 1532 - HCM Lane V/C Ratio - - 0.024 0.004 - HCM Control Delay (s) - - 8.7 7.4 0 HCM Lane LOS - - A A A HCM 95th %tile Q(veh) - - 0.1 0 - HCM 6th TWSC 2: North College Ave & Hibdon Ct 12/21/2022 2022 Existing - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 2 Intersection Int Delay, s/veh 0.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 5 0 10 0 0 1 27 1054 0 3 828 15 Future Vol, veh/h 5 0 10 0 0 1 27 1054 0 3 828 15 Conflicting Peds, #/hr 0 00000704407 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length ------97----- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 63 63 63 25 25 25 98 98 98 94 94 94 Heavy Vehicles, % 0 00000444555 Mvmt Flow 8 0 16 0 0 4 28 1076 0 3 881 16 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1496 2038 456 904 0 - 1080 0 0 Stage 1 902 902 ------- Stage 2 594 1136 ------- Critical Hdwy 6.8 6.5 6.9 4.18 - - 4.2 - - Critical Hdwy Stg 1 5.8 5.5 ------- Critical Hdwy Stg 2 5.8 5.5 ------- Follow-up Hdwy 3.5 4 3.3 2.24 - - 2.25 - - Pot Cap-1 Maneuver 116 57 557 736 - 0 624 - - Stage 1 361 359 - - - 0 - - - Stage 2 520 279 - - - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 109 0 553 731 - - 624 - - Mov Cap-2 Maneuver 109 0 ------- Stage 1 345 0 ------- Stage 2 511 0 ------- Approach EB NB SB HCM Control Delay, s 22 0.3 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBL SBT SBR Capacity (veh/h) 731 - 235 624 - - HCM Lane V/C Ratio 0.038 - 0.101 0.005 - - HCM Control Delay (s) 10.1 - 22 10.8 - - HCM Lane LOS B - C B - - HCM 95th %tile Q(veh) 0.1 - 0.3 0 - - HCM 6th TWSC 3: Hickory St & Mason St 12/21/2022 2022 Existing - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 3 Intersection Int Delay, s/veh 0.6 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 167 142 10 11 2 Future Vol, veh/h 1 167 142 10 11 2 Conflicting Peds, #/hr 1 00110 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 93 93 87 87 65 65 Heavy Vehicles, % 2 22200 Mvmt Flow 1 180 163 11 17 3 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 175 0 - 0 353 170 Stage 1 - - - - 170 - Stage 2 - - - - 183 - Critical Hdwy 4.12 - - - 6.4 6.2 Critical Hdwy Stg 1 - - - - 5.4 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy 2.218 - - - 3.5 3.3 Pot Cap-1 Maneuver 1401 - - - 649 879 Stage 1 - - - - 865 - Stage 2 - - - - 853 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1400 - - - 647 878 Mov Cap-2 Maneuver - - - - 647 - Stage 1 - - - - 863 - Stage 2 - - - - 852 - Approach EB WB SB HCM Control Delay, s 0 0 10.5 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1400 - - - 674 HCM Lane V/C Ratio 0.001 - - - 0.03 HCM Control Delay (s) 7.6 0 - - 10.5 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0 - - - 0.1 Timings 4: North College Ave & Hickory St 12/21/2022 2022 Existing - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 4 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 66 97 117 1048 791 54 Future Volume (vph) 66 97 117 1048 791 54 Turn Type Prot Perm Perm NA NA Perm Protected Phases 4 2 6 Permitted Phases 4 2 6 Detector Phase 442266 Switch Phase Minimum Initial (s) 7.0 7.0 10.0 10.0 10.0 10.0 Minimum Split (s) 25.5 25.5 24.5 24.5 24.5 24.5 Total Split (s) 31.0 31.0 74.0 74.0 74.0 74.0 Total Split (%) 29.5% 29.5% 70.5% 70.5% 70.5% 70.5% Yellow Time (s) 3.5 3.5 4.5 4.5 4.5 4.5 All-Red Time (s) 2.0 2.0 3.0 3.0 3.0 3.0 Lost Time Adjust (s) -1.0 0.0 -1.0 -1.0 -1.0 -1.0 Total Lost Time (s) 4.5 5.5 6.5 6.5 6.5 6.5 Lead/Lag Lead-Lag Optimize? Recall Mode None None C-Max C-Max C-Max C-Max Act Effct Green (s) 12.6 11.6 81.4 81.4 81.4 81.4 Actuated g/C Ratio 0.12 0.11 0.78 0.78 0.78 0.78 v/c Ratio 0.40 0.43 0.27 0.41 0.33 0.05 Control Delay 46.7 12.2 6.0 4.9 4.4 1.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 46.7 12.2 6.0 4.9 4.4 1.3 LOS DBAAAA Approach Delay 26.2 5.0 4.2 Approach LOS C A A Intersection Summary Cycle Length: 105 Actuated Cycle Length: 105 Offset: 64 (61%), Referenced to phase 2:NBTL and 6:SBT, Start of Yellow Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.43 Intersection Signal Delay: 6.5 Intersection LOS: A Intersection Capacity Utilization 50.6% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 4: North College Ave & Hickory St Queues 4: North College Ave & Hickory St 12/21/2022 2022 Existing - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 5 Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow (vph) 83 121 121 1080 860 59 v/c Ratio 0.40 0.43 0.27 0.41 0.33 0.05 Control Delay 46.7 12.2 6.0 4.9 4.4 1.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 46.7 12.2 6.0 4.9 4.4 1.3 Queue Length 50th (ft) 53 0 17 94 68 0 Queue Length 95th (ft) 81 35 57 188 140 12 Internal Link Dist (ft) 250 150 860 Turn Bay Length (ft) 98 125 95 Base Capacity (vph) 442 472 449 2665 2640 1138 Starvation Cap Reductn 000000 Spillback Cap Reductn 000000 Storage Cap Reductn 000000 Reduced v/c Ratio 0.19 0.26 0.27 0.41 0.33 0.05 Intersection Summary HCM 6th Signalized Intersection Summary 4: North College Ave & Hickory St 12/21/2022 2022 Existing - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 6 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (veh/h) 66 97 117 1048 791 54 Future Volume (veh/h) 66 97 117 1048 791 54 Initial Q (Qb), veh 000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1856 1856 1826 1826 1811 1811 Adj Flow Rate, veh/h 82 121 121 1080 860 59 Peak Hour Factor 0.80 0.80 0.97 0.97 0.92 0.92 Percent Heavy Veh, %335566 Cap, veh/h 192 156 493 2729 2707 1200 Arrive On Green 0.11 0.10 0.79 0.79 0.79 0.79 Sat Flow, veh/h 1767 1572 593 3561 3532 1526 Grp Volume(v), veh/h 82 121 121 1080 860 59 Grp Sat Flow(s),veh/h/ln 1767 1572 593 1735 1721 1526 Q Serve(g_s), s 4.6 7.9 7.7 10.1 7.5 0.9 Cycle Q Clear(g_c), s 4.6 7.9 15.1 10.1 7.5 0.9 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 192 156 493 2729 2707 1200 V/C Ratio(X) 0.43 0.78 0.25 0.40 0.32 0.05 Avail Cap(c_a), veh/h 446 382 493 2729 2707 1200 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 43.7 46.2 5.3 3.5 3.2 2.5 Incr Delay (d2), s/veh 1.5 8.0 1.2 0.4 0.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.1 3.4 0.9 2.4 1.8 0.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 45.2 54.2 6.5 3.9 3.5 2.6 LnGrp LOS D D AAAA Approach Vol, veh/h 203 1201 919 Approach Delay, s/veh 50.6 4.2 3.4 Approach LOS D A A Timer - Assigned Phs 2 4 6 Phs Duration (G+Y+Rc), s 89.1 15.9 89.1 Change Period (Y+Rc), s 7.5 5.5 7.5 Max Green Setting (Gmax), s 66.5 25.5 66.5 Max Q Clear Time (g_c+I1), s 17.1 9.9 9.5 Green Ext Time (p_c), s 6.8 0.6 4.0 Intersection Summary HCM 6th Ctrl Delay 7.9 HCM 6th LOS A Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC March 20, 2024      Intersection Capacity Worksheets:  Year 2025 Background  HCM 6th TWSC 1: Mason St & Hibdon Ct 12/21/2022 2025 Background - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 1 Intersection Int Delay, s/veh 4.4 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 2 01100 Future Vol, veh/h 2 01100 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 25 25 25 25 92 92 Heavy Vehicles, % 100 100 0022 Mvmt Flow 8 04400 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 7 60080 Stage 1 6 ----- Stage 2 1 ----- Critical Hdwy 7.4 7.2 - - 4.12 - Critical Hdwy Stg 1 6.4 ----- Critical Hdwy Stg 2 6.4 ----- Follow-up Hdwy 4.4 4.2 - - 2.218 - Pot Cap-1 Maneuver 810 850 - - 1612 - Stage 1 812 ----- Stage 2 817 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 810 850 - - 1612 - Mov Cap-2 Maneuver 810 ----- Stage 1 812 ----- Stage 2 817 ----- Approach WB NB SB HCM Control Delay, s 9.5 0 0 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 810 1612 - HCM Lane V/C Ratio - - 0.01 - - HCM Control Delay (s) - - 9.5 0 - HCM Lane LOS - - A A - HCM 95th %tile Q(veh) - - 0 0 - HCM 6th TWSC 2: North College Ave & Hibdon Ct 12/21/2022 2025 Background - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 2 Intersection Int Delay, s/veh 0.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 1700014530008909 Future Vol, veh/h 4 1700014530008909 Conflicting Peds, #/hr 0 00000400004 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length ------97----- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 75 75 75 25 25 25 90 90 90 80 80 80 Heavy Vehicles, % 25 25 25 000999888 Mvmt Flow 5 1900016589001113 11 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1450 1744 566 1128 0 - - - 0 Stage 1 1123 1123 ------- Stage 2 327 621 ------- Critical Hdwy 7.3 7 7.4 4.28 ----- Critical Hdwy Stg 1 6.3 6 ------- Critical Hdwy Stg 2 6.3 6 ------- Follow-up Hdwy 3.75 4.25 3.55 2.29 ----- Pot Cap-1 Maneuver 98 67 413 576 - 0 0 - - Stage 1 228 235 - - - 0 0 - - Stage 2 639 425 - - - 0 0 - - Platoon blocked, % - - - Mov Cap-1 Maneuver 94 0 411 574 ----- Mov Cap-2 Maneuver 94 0 ------- Stage 1 221 0 ------- Stage 2 636 0 ------- Approach EB NB SB HCM Control Delay, s 26.3 0.3 0 HCM LOS D Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 574 - 185 - - HCM Lane V/C Ratio 0.027 - 0.086 - - HCM Control Delay (s) 11.4 - 26.3 - - HCM Lane LOS B - D - - HCM 95th %tile Q(veh) 0.1 - 0.3 - - HCM 6th TWSC 3: Hickory St & Mason St 12/21/2022 2025 Background - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 3 Intersection Int Delay, s/veh 0.3 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 140 131 1 5 2 Future Vol, veh/h 1 140 131 1 5 2 Conflicting Peds, #/hr 3 00300 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 65 65 80 80 88 88 Heavy Vehicles, % 3 3 4 4 43 43 Mvmt Flow 2 215 164 1 6 2 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 168 0 - 0 387 168 Stage 1 - - - - 168 - Stage 2 - - - - 219 - Critical Hdwy 4.13 - - - 6.83 6.63 Critical Hdwy Stg 1 - - - - 5.83 - Critical Hdwy Stg 2 - - - - 5.83 - Follow-up Hdwy 2.227 - - - 3.887 3.687 Pot Cap-1 Maneuver 1404 - - - 544 780 Stage 1 - - - - 771 - Stage 2 - - - - 729 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1400 - - - 540 778 Mov Cap-2 Maneuver - - - - 540 - Stage 1 - - - - 767 - Stage 2 - - - - 727 - Approach EB WB SB HCM Control Delay, s 0.1 0 11.2 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1400 - - - 592 HCM Lane V/C Ratio 0.001 - - - 0.013 HCM Control Delay (s) 7.6 0 - - 11.2 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0 - - - 0 Timings 4: North College Ave & Hickory St 12/21/2022 2025 Background - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 4 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 26 94 89 528 834 52 Future Volume (vph) 26 94 89 528 834 52 Turn Type Prot Perm Perm NA NA Perm Protected Phases 4 6 2 Permitted Phases 4 6 2 Detector Phase 446622 Switch Phase Minimum Initial (s) 7.0 7.0 10.0 10.0 10.0 10.0 Minimum Split (s) 25.5 25.5 24.5 24.5 24.5 24.5 Total Split (s) 30.0 30.0 50.0 50.0 50.0 50.0 Total Split (%) 37.5% 37.5% 62.5% 62.5% 62.5% 62.5% Yellow Time (s) 3.5 3.5 4.5 4.5 4.5 4.5 All-Red Time (s) 2.0 2.0 3.0 3.0 3.0 3.0 Lost Time Adjust (s) -1.0 0.0 -1.0 -1.0 -1.0 -1.0 Total Lost Time (s) 4.5 5.5 6.5 6.5 6.5 6.5 Lead/Lag Lead-Lag Optimize? Recall Mode None None C-Max C-Max C-Max C-Max Act Effct Green (s) 11.0 10.0 61.8 61.8 61.8 61.8 Actuated g/C Ratio 0.14 0.12 0.77 0.77 0.77 0.77 v/c Ratio 0.13 0.41 0.29 0.24 0.40 0.06 Control Delay 29.0 15.3 8.0 4.3 5.2 2.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 29.0 15.3 8.0 4.3 5.2 2.1 LOS CBAAAA Approach Delay 18.3 4.8 5.1 Approach LOS B A A Intersection Summary Cycle Length: 80 Actuated Cycle Length: 80 Offset: 47 (59%), Referenced to phase 2:SBT and 6:NBTL, Start of Red Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.41 Intersection Signal Delay: 5.9 Intersection LOS: A Intersection Capacity Utilization 51.8% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 4: North College Ave & Hickory St Queues 4: North College Ave & Hickory St 12/21/2022 2025 Background - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 5 Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow (vph) 31 111 102 607 1043 65 v/c Ratio 0.13 0.41 0.29 0.24 0.40 0.06 Control Delay 29.0 15.3 8.0 4.3 5.2 2.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 29.0 15.3 8.0 4.3 5.2 2.1 Queue Length 50th (ft) 15 13 12 35 72 1 Queue Length 95th (ft) 30 44 56 94 158 13 Internal Link Dist (ft) 250 150 860 Turn Bay Length (ft) 98 125 95 Base Capacity (vph) 558 538 354 2560 2608 1150 Starvation Cap Reductn 000000 Spillback Cap Reductn 000000 Storage Cap Reductn 000000 Reduced v/c Ratio 0.06 0.21 0.29 0.24 0.40 0.06 Intersection Summary HCM 6th Signalized Intersection Summary 4: North College Ave & Hickory St 12/21/2022 2025 Background - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 6 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (veh/h) 26 94 89 528 834 52 Future Volume (veh/h) 26 94 89 528 834 52 Initial Q (Qb), veh 000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1856 1856 1767 1767 1796 1796 Adj Flow Rate, veh/h 31 111 102 607 1042 65 Peak Hour Factor 0.85 0.85 0.87 0.87 0.80 0.80 Percent Heavy Veh, %339977 Cap, veh/h 189 148 402 2537 2579 1149 Arrive On Green 0.11 0.09 0.76 0.76 0.76 0.76 Sat Flow, veh/h 1767 1572 481 3445 3503 1520 Grp Volume(v), veh/h 31 111 102 607 1042 65 Grp Sat Flow(s),veh/h/ln 1767 1572 481 1678 1706 1520 Q Serve(g_s), s 1.3 5.5 7.6 4.3 8.6 0.9 Cycle Q Clear(g_c), s 1.3 5.5 16.2 4.3 8.6 0.9 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 189 148 402 2537 2579 1149 V/C Ratio(X) 0.16 0.75 0.25 0.24 0.40 0.06 Avail Cap(c_a), veh/h 563 482 402 2537 2579 1149 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 32.5 35.3 6.3 2.9 3.4 2.5 Incr Delay (d2), s/veh 0.4 7.4 1.5 0.2 0.5 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 2.4 0.8 0.8 1.7 0.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 32.9 42.7 7.8 3.1 3.9 2.6 LnGrp LOS C D AAAA Approach Vol, veh/h 142 709 1107 Approach Delay, s/veh 40.5 3.8 3.8 Approach LOS D A A Timer - Assigned Phs 2 4 6 Phs Duration (G+Y+Rc), s 67.0 13.0 67.0 Change Period (Y+Rc), s 7.5 5.5 7.5 Max Green Setting (Gmax), s 42.5 24.5 42.5 Max Q Clear Time (g_c+I1), s 10.6 7.5 18.2 Green Ext Time (p_c), s 5.0 0.4 3.8 Intersection Summary HCM 6th Ctrl Delay 6.5 HCM 6th LOS A HCM 6th TWSC 1: Mason St & Hibdon Ct 12/21/2022 2025 Background - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 1 Intersection Int Delay, s/veh 5 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 12 60734 Future Vol, veh/h 12 60734 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 75 75 58 58 44 44 Heavy Vehicles, % 11 11 0 0 14 14 Mvmt Flow 16 8 0 12 7 9 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 29 6 0 0 12 0 Stage 1 6 ----- Stage 2 23 ----- Critical Hdwy 6.51 6.31 - - 4.24 - Critical Hdwy Stg 1 5.51 ----- Critical Hdwy Stg 2 5.51 ----- Follow-up Hdwy 3.599 3.399 - - 2.326 - Pot Cap-1 Maneuver 963 1051 - - 1532 - Stage 1 994 ----- Stage 2 977 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 958 1051 - - 1532 - Mov Cap-2 Maneuver 958 ----- Stage 1 994 ----- Stage 2 972 ----- Approach WB NB SB HCM Control Delay, s 8.7 0 3.2 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 987 1532 - HCM Lane V/C Ratio - - 0.024 0.004 - HCM Control Delay (s) - - 8.7 7.4 0 HCM Lane LOS - - A A A HCM 95th %tile Q(veh) - - 0.1 0 - HCM 6th TWSC 2: North College Ave & Hibdon Ct 12/21/2022 2025 Background - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 2 Intersection Int Delay, s/veh 0.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 5 0 10 0 0 1 28 1086 0 3 853 15 Future Vol, veh/h 5 0 10 0 0 1 28 1086 0 3 853 15 Conflicting Peds, #/hr 0 00000704407 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length ------97----- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 63 63 63 25 25 25 98 98 98 94 94 94 Heavy Vehicles, % 0 00000444555 Mvmt Flow 8 0 16 0 0 4 29 1108 0 3 907 16 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1540 2098 469 930 0 - 1112 0 0 Stage 1 928 928 ------- Stage 2 612 1170 ------- Critical Hdwy 6.8 6.5 6.9 4.18 - - 4.2 - - Critical Hdwy Stg 1 5.8 5.5 ------- Critical Hdwy Stg 2 5.8 5.5 ------- Follow-up Hdwy 3.5 4 3.3 2.24 - - 2.25 - - Pot Cap-1 Maneuver 108 53 546 719 - 0 607 - - Stage 1 350 349 - - - 0 - - - Stage 2 509 269 - - - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 101 0 542 714 - - 607 - - Mov Cap-2 Maneuver 101 0 ------- Stage 1 333 0 ------- Stage 2 500 0 ------- Approach EB NB SB HCM Control Delay, s 23.2 0.3 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBL SBT SBR Capacity (veh/h) 714 - 221 607 - - HCM Lane V/C Ratio 0.04 - 0.108 0.005 - - HCM Control Delay (s) 10.3 - 23.2 11 - - HCM Lane LOS B - C B - - HCM 95th %tile Q(veh) 0.1 - 0.4 0 - - HCM 6th TWSC 3: Hickory St & Mason St 12/21/2022 2025 Background - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 3 Intersection Int Delay, s/veh 0.6 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 172 146 10 11 2 Future Vol, veh/h 1 172 146 10 11 2 Conflicting Peds, #/hr 1 00110 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 93 93 87 87 65 65 Heavy Vehicles, % 2 22200 Mvmt Flow 1 185 168 11 17 3 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 180 0 - 0 363 175 Stage 1 - - - - 175 - Stage 2 - - - - 188 - Critical Hdwy 4.12 - - - 6.4 6.2 Critical Hdwy Stg 1 - - - - 5.4 - Critical Hdwy Stg 2 - - - - 5.4 - Follow-up Hdwy 2.218 - - - 3.5 3.3 Pot Cap-1 Maneuver 1396 - - - 640 874 Stage 1 - - - - 860 - Stage 2 - - - - 849 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1395 - - - 638 873 Mov Cap-2 Maneuver - - - - 638 - Stage 1 - - - - 858 - Stage 2 - - - - 848 - Approach EB WB SB HCM Control Delay, s 0 0 10.6 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1395 - - - 666 HCM Lane V/C Ratio 0.001 - - - 0.03 HCM Control Delay (s) 7.6 0 - - 10.6 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0 - - - 0.1 Timings 4: North College Ave & Hickory St 12/21/2022 2025 Background - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 4 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 68 100 121 1080 815 56 Future Volume (vph) 68 100 121 1080 815 56 Turn Type Prot Perm Perm NA NA Perm Protected Phases 4 2 6 Permitted Phases 4 2 6 Detector Phase 442266 Switch Phase Minimum Initial (s) 7.0 7.0 10.0 10.0 10.0 10.0 Minimum Split (s) 25.5 25.5 24.5 24.5 24.5 24.5 Total Split (s) 31.0 31.0 74.0 74.0 74.0 74.0 Total Split (%) 29.5% 29.5% 70.5% 70.5% 70.5% 70.5% Yellow Time (s) 3.5 3.5 4.5 4.5 4.5 4.5 All-Red Time (s) 2.0 2.0 3.0 3.0 3.0 3.0 Lost Time Adjust (s) -1.0 0.0 -1.0 -1.0 -1.0 -1.0 Total Lost Time (s) 4.5 5.5 6.5 6.5 6.5 6.5 Lead/Lag Lead-Lag Optimize? Recall Mode None None C-Max C-Max C-Max C-Max Act Effct Green (s) 12.7 11.7 81.3 81.3 81.3 81.3 Actuated g/C Ratio 0.12 0.11 0.77 0.77 0.77 0.77 v/c Ratio 0.40 0.44 0.29 0.42 0.34 0.05 Control Delay 46.9 12.1 6.3 5.0 4.5 1.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 46.9 12.1 6.3 5.0 4.5 1.3 LOS DBAAAA Approach Delay 26.1 5.1 4.3 Approach LOS C A A Intersection Summary Cycle Length: 105 Actuated Cycle Length: 105 Offset: 64 (61%), Referenced to phase 2:NBTL and 6:SBT, Start of Yellow Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.44 Intersection Signal Delay: 6.6 Intersection LOS: A Intersection Capacity Utilization 51.3% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 4: North College Ave & Hickory St Queues 4: North College Ave & Hickory St 12/21/2022 2025 Background - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 5 Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow (vph) 85 125 125 1113 886 61 v/c Ratio 0.40 0.44 0.29 0.42 0.34 0.05 Control Delay 46.9 12.1 6.3 5.0 4.5 1.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 46.9 12.1 6.3 5.0 4.5 1.3 Queue Length 50th (ft) 54 0 18 98 71 0 Queue Length 95th (ft) 82 35 60 196 145 12 Internal Link Dist (ft) 250 150 860 Turn Bay Length (ft) 98 125 95 Base Capacity (vph) 442 475 436 2663 2638 1138 Starvation Cap Reductn 000000 Spillback Cap Reductn 000000 Storage Cap Reductn 000000 Reduced v/c Ratio 0.19 0.26 0.29 0.42 0.34 0.05 Intersection Summary HCM 6th Signalized Intersection Summary 4: North College Ave & Hickory St 12/21/2022 2025 Background - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 6 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (veh/h) 68 100 121 1080 815 56 Future Volume (veh/h) 68 100 121 1080 815 56 Initial Q (Qb), veh 000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1856 1856 1826 1826 1811 1811 Adj Flow Rate, veh/h 85 125 125 1113 886 61 Peak Hour Factor 0.80 0.80 0.97 0.97 0.92 0.92 Percent Heavy Veh, %335566 Cap, veh/h 197 160 478 2720 2697 1196 Arrive On Green 0.11 0.10 0.78 0.78 0.78 0.78 Sat Flow, veh/h 1767 1572 578 3561 3532 1526 Grp Volume(v), veh/h 85 125 125 1113 886 61 Grp Sat Flow(s),veh/h/ln 1767 1572 578 1735 1721 1526 Q Serve(g_s), s 4.7 8.1 8.4 10.7 7.9 0.9 Cycle Q Clear(g_c), s 4.7 8.1 16.3 10.7 7.9 0.9 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 197 160 478 2720 2697 1196 V/C Ratio(X) 0.43 0.78 0.26 0.41 0.33 0.05 Avail Cap(c_a), veh/h 446 382 478 2720 2697 1196 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 43.6 46.0 5.7 3.6 3.3 2.6 Incr Delay (d2), s/veh 1.5 8.0 1.3 0.5 0.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.2 3.6 1.0 2.6 1.9 0.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 45.1 54.0 7.0 4.1 3.6 2.6 LnGrp LOS D D AAAA Approach Vol, veh/h 210 1238 947 Approach Delay, s/veh 50.4 4.4 3.6 Approach LOS D A A Timer - Assigned Phs 2 4 6 Phs Duration (G+Y+Rc), s 88.8 16.2 88.8 Change Period (Y+Rc), s 7.5 5.5 7.5 Max Green Setting (Gmax), s 66.5 25.5 66.5 Max Q Clear Time (g_c+I1), s 18.3 10.1 9.9 Green Ext Time (p_c), s 7.1 0.6 4.1 Intersection Summary HCM 6th Ctrl Delay 8.1 HCM 6th LOS A Fort Collins Rescue Mission Traffic Impact Study (FT #22099)      Fox Tuttle Transportation Group, LLC March 20, 2024      Intersection Capacity Worksheets:  Year 2025 Background+  Project       HCM 6th TWSC 1: Mason St & Northern Access 12/21/2022 2025 Back & Site - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 1 Intersection Int Delay, s/veh 7.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 44580812000 Future Vol, veh/h 0 44580812000 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 25 25 25 25 25 25 92 92 92 Heavy Vehicles, % 2 22222200222 Mvmt Flow 0 4 4 20 32 0 32 48000 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 89 77 1 77 73 81001200 Stage 1 1 1 - 72 72 ------- Stage 2 88 76 - 5 1 ------- Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - - Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 ------- Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 ------- Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - - Pot Cap-1 Maneuver 896 813 1084 912 817 1074 1622 - - 1607 - - Stage 1 1022 895 - 938 835 ------- Stage 2 920 832 - 1017 895 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 856 797 1084 891 801 1074 1622 - - 1607 - - Mov Cap-2 Maneuver 856 797 - 891 801 ------- Stage 1 1002 895 - 919 818 ------- Stage 2 866 815 - 1008 895 ------- Approach EB WB NB SB HCM Control Delay, s 9 9.6 5.3 0 HCM LOS A A Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1622 - - 919 833 1607 - - HCM Lane V/C Ratio 0.02 - - 0.009 0.062 - - - HCM Control Delay (s) 7.3 0 - 9 9.6 0 - - HCM Lane LOS A A - A A A - - HCM 95th %tile Q(veh) 0.1 - - 0 0.2 0 - - HCM 6th TWSC 2: North College Ave & Private Drive 12/21/2022 2025 Back & Site - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 2 Intersection Int Delay, s/veh 0.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 5 1 11 0 0 0 20 532 0 0 893 14 Future Vol, veh/h 5 1 11 0 0 0 20 532 0 0 893 14 Conflicting Peds, #/hr 0 00000400004 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length ------97----- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 75 75 75 92 92 92 90 90 90 80 80 80 Heavy Vehicles, % 10 10 10 000999888 Mvmt Flow 7 1 15 0 0 0 22 591 0 0 1116 18 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1469 1764 571 1194 1773 296 1138 0 - - - 0 Stage 1 1129 1129 - 635 635 ------- Stage 2 340 635 - 559 1138 ------- Critical Hdwy 7.7 6.7 7.1 7.5 6.5 6.9 4.28 ----- Critical Hdwy Stg 1 6.7 5.7 - 6.5 5.5 ------- Critical Hdwy Stg 2 6.7 5.7 - 6.5 5.5 ------- Follow-up Hdwy 3.6 4.1 3.4 3.5 4 3.3 2.29 ----- Pot Cap-1 Maneuver 82 76 444 145 84 706 571 - 0 0 - - Stage 1 204 261 - 438 476 - - - 0 0 - - Stage 2 627 451 - 486 279 - - - 0 0 - - Platoon blocked, % - - - Mov Cap-1 Maneuver 79 73 442 134 80 706 569 ----- Mov Cap-2 Maneuver 79 73 - 134 80 ------- Stage 1 195 260 - 421 457 ------- Stage 2 603 433 - 467 278 ------- Approach EB WB NB SB HCM Control Delay, s 29.9 0 0.4 0 HCM LOS D A Minor Lane/Major Mvmt NBL NBTEBLn1WBLn1 SBT SBR Capacity (veh/h) 569 - 167 - - - HCM Lane V/C Ratio 0.039 - 0.136 - - - HCM Control Delay (s) 11.6 - 29.9 0 - - HCM Lane LOS B - D A - - HCM 95th %tile Q(veh) 0.1 - 0.5 - - - HCM 6th TWSC 3: Hickory St & Mason St 12/21/2022 2025 Back & Site - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 3 Intersection Int Delay, s/veh 0.4 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 140 131 14 11 2 Future Vol, veh/h 1 140 131 14 11 2 Conflicting Peds, #/hr 3 00300 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 65 65 80 80 88 88 Heavy Vehicles, % 3 3 4 4 10 10 Mvmt Flow 2 215 164 18 13 2 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 185 0 - 0 395 176 Stage 1 - - - - 176 - Stage 2 - - - - 219 - Critical Hdwy 4.13 - - - 6.5 6.3 Critical Hdwy Stg 1 - - - - 5.5 - Critical Hdwy Stg 2 - - - - 5.5 - Follow-up Hdwy 2.227 - - - 3.59 3.39 Pot Cap-1 Maneuver 1384 - - - 595 847 Stage 1 - - - - 836 - Stage 2 - - - - 799 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1380 - - - 590 845 Mov Cap-2 Maneuver - - - - 590 - Stage 1 - - - - 832 - Stage 2 - - - - 797 - Approach EB WB SB HCM Control Delay, s 0.1 0 11 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1380 - - - 619 HCM Lane V/C Ratio 0.001 - - - 0.024 HCM Control Delay (s) 7.6 0 - - 11 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0 - - - 0.1 Timings 4: Hickory St & North College Ave 12/21/2022 2025 Back & Site - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 4 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 28 98 101 534 838 53 Future Volume (vph) 28 98 101 534 838 53 Turn Type Prot Perm Perm NA NA Perm Protected Phases 4 6 2 Permitted Phases 4 6 2 Detector Phase 446622 Switch Phase Minimum Initial (s) 7.0 7.0 10.0 10.0 10.0 10.0 Minimum Split (s) 25.5 25.5 24.5 24.5 24.5 24.5 Total Split (s) 30.0 30.0 50.0 50.0 50.0 50.0 Total Split (%) 37.5% 37.5% 62.5% 62.5% 62.5% 62.5% Yellow Time (s) 3.5 3.5 4.5 4.5 4.5 4.5 All-Red Time (s) 2.0 2.0 3.0 3.0 3.0 3.0 Lost Time Adjust (s) -1.0 0.0 -1.0 -1.0 -1.0 -1.0 Total Lost Time (s) 4.5 5.5 6.5 6.5 6.5 6.5 Lead/Lag Lead-Lag Optimize? Recall Mode None None Max Max C-Max C-Max Act Effct Green (s) 11.0 10.0 61.8 61.8 61.8 61.8 Actuated g/C Ratio 0.14 0.12 0.77 0.77 0.77 0.77 v/c Ratio 0.14 0.43 0.33 0.24 0.40 0.06 Control Delay 29.1 16.1 8.9 4.3 5.3 2.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 29.1 16.1 8.9 4.3 5.3 2.1 LOS CBAAAA Approach Delay 19.0 5.1 5.1 Approach LOS B A A Intersection Summary Cycle Length: 80 Actuated Cycle Length: 80 Offset: 47 (59%), Referenced to phase 2:SBT, Start of Red Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.43 Intersection Signal Delay: 6.1 Intersection LOS: A Intersection Capacity Utilization 51.9% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 4: Hickory St & North College Ave Queues 4: Hickory St & North College Ave 12/21/2022 2025 Back & Site - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 5 Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow (vph) 33 115 116 614 1048 66 v/c Ratio 0.14 0.43 0.33 0.24 0.40 0.06 Control Delay 29.1 16.1 8.9 4.3 5.3 2.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 29.1 16.1 8.9 4.3 5.3 2.1 Queue Length 50th (ft) 15 15 14 36 73 1 Queue Length 95th (ft) 32 47 67 95 160 13 Internal Link Dist (ft) 250 150 860 Turn Bay Length (ft) 98 95 Base Capacity (vph) 558 537 351 2557 2604 1149 Starvation Cap Reductn 000000 Spillback Cap Reductn 000000 Storage Cap Reductn 000000 Reduced v/c Ratio 0.06 0.21 0.33 0.24 0.40 0.06 Intersection Summary HCM 6th Signalized Intersection Summary 4: Hickory St & North College Ave 12/21/2022 2025 Back & Site - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 6 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (veh/h) 28 98 101 534 838 53 Future Volume (veh/h) 28 98 101 534 838 53 Initial Q (Qb), veh 000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1856 1856 1767 1767 1796 1796 Adj Flow Rate, veh/h 33 115 116 614 1048 66 Peak Hour Factor 0.85 0.85 0.87 0.87 0.80 0.80 Percent Heavy Veh, %339977 Cap, veh/h 194 153 397 2527 2569 1144 Arrive On Green 0.11 0.10 0.75 0.75 0.75 0.75 Sat Flow, veh/h 1767 1572 478 3445 3503 1520 Grp Volume(v), veh/h 33 115 116 614 1048 66 Grp Sat Flow(s),veh/h/ln 1767 1572 478 1678 1706 1520 Q Serve(g_s), s 1.4 5.7 9.2 4.4 8.8 0.9 Cycle Q Clear(g_c), s 1.4 5.7 17.9 4.4 8.8 0.9 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 194 153 397 2527 2569 1144 V/C Ratio(X) 0.17 0.75 0.29 0.24 0.41 0.06 Avail Cap(c_a), veh/h 563 482 397 2527 2569 1144 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 32.3 35.2 6.7 3.0 3.5 2.6 Incr Delay (d2), s/veh 0.4 7.2 1.9 0.2 0.5 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 2.5 1.0 1.1 1.8 0.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 32.7 42.4 8.6 3.2 4.0 2.7 LnGrp LOS C D AAAA Approach Vol, veh/h 148 730 1114 Approach Delay, s/veh 40.2 4.1 3.9 Approach LOS D A A Timer - Assigned Phs 2 4 6 Phs Duration (G+Y+Rc), s 66.7 13.3 66.7 Change Period (Y+Rc), s 7.5 5.5 7.5 Max Green Setting (Gmax), s 42.5 24.5 42.5 Max Q Clear Time (g_c+I1), s 10.8 7.7 19.9 Green Ext Time (p_c), s 5.0 0.4 4.1 Intersection Summary HCM 6th Ctrl Delay 6.7 HCM 6th LOS A HCM 6th TWSC 5: Mason St & Southern Access 12/21/2022 2025 Back & Site - AM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 7 Intersection Int Delay, s/veh 2.7 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 1 25843 Future Vol, veh/h 1 25843 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 22222 Mvmt Flow 1 25943 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 25 6 7 0 - 0 Stage 1 6 ----- Stage 2 19 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 991 1077 1614 - - - Stage 1 1017 ----- Stage 2 1004 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 988 1077 1614 - - - Mov Cap-2 Maneuver 988 ----- Stage 1 1014 ----- Stage 2 1004 ----- Approach EB NB SB HCM Control Delay, s 8.5 2.8 0 HCM LOS A Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 1614 - 1046 - - HCM Lane V/C Ratio 0.003 - 0.003 - - HCM Control Delay (s) 7.2 0 8.5 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0 - 0 - - HCM 6th TWSC 1: Mason St & Northern Access 12/21/2022 2025 Back & Site - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 1 Intersection Int Delay, s/veh 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 6 6 13 46409340 Future Vol, veh/h 0 6 6 13 46409340 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 75 75 75 58 58 58 44 44 44 Heavy Vehicles, % 2 2 2 11 11 11 2 2 2 10 10 10 Mvmt Flow 0 7 7 17 587016790 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 52 53 9 52 45 89001600 Stage 1 23 23 - 22 22 ------- Stage 2 29 30 - 30 23 ------- Critical Hdwy 7.12 6.52 6.22 7.21 6.61 6.31 4.12 - - 4.2 - - Critical Hdwy Stg 1 6.12 5.52 - 6.21 5.61 ------- Critical Hdwy Stg 2 6.12 5.52 - 6.21 5.61 ------- Follow-up Hdwy 3.518 4.018 3.318 3.599 4.099 3.399 2.218 - - 2.29 - - Pot Cap-1 Maneuver 947 838 1073 925 830 1048 1611 - - 1551 - - Stage 1 995 876 - 974 859 ------- Stage 2 988 870 - 964 858 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 929 830 1073 907 823 1048 1611 - - 1551 - - Mov Cap-2 Maneuver 929 830 - 907 823 ------- Stage 1 991 872 - 970 856 ------- Stage 2 970 867 - 946 854 ------- Approach EB WB NB SB HCM Control Delay, s 8.9 9 2.2 3.1 HCM LOS A A Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1611 - - 936 923 1551 - - HCM Lane V/C Ratio 0.004 - - 0.014 0.033 0.004 - - HCM Control Delay (s) 7.2 0 - 8.9 9 7.3 0 - HCM Lane LOS A A -AAAA - HCM 95th %tile Q(veh) 0 - - 0 0.1 0 - - HCM 6th TWSC 2: North College Ave & Private Drive 12/21/2022 2025 Back & Site - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 2 Intersection Int Delay, s/veh 0.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 7 0 16 0 0 1 31 1088 0 3 854 17 Future Vol, veh/h 7 0 16 0 0 1 31 1088 0 3 854 17 Conflicting Peds, #/hr 0 00000704407 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length ------97----- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 63 63 63 25 25 25 98 98 98 94 94 94 Heavy Vehicles, % 0 00000444555 Mvmt Flow 11 0 25 0 0 4 32 1110 0 3 909 18 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 1550 2109 471 1639 2118 559 934 0 - 1114 0 0 Stage 1 931 931 - 1178 1178 ------- Stage 2 619 1178 - 461 940 ------- Critical Hdwy 7.5 6.5 6.9 7.5 6.5 6.9 4.18 - - 4.2 - - Critical Hdwy Stg 1 6.5 5.5 - 6.5 5.5 ------- Critical Hdwy Stg 2 6.5 5.5 - 6.5 5.5 ------- Follow-up Hdwy 3.5 4 3.3 3.5 4 3.3 2.24 - - 2.25 - - Pot Cap-1 Maneuver 79 52 545 68 51 478 716 - 0 606 - - Stage 1 291 348 - 206 267 - - - 0 - - - Stage 2 448 267 - 555 345 - - - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 75 49 541 62 48 476 711 - - 604 - - Mov Cap-2 Maneuver 75 49 - 62 48 ------- Stage 1 276 342 - 196 254 ------- Stage 2 424 254 - 524 339 ------- Approach EB WB NB SB HCM Control Delay, s 28.9 12.6 0.3 0 HCM LOS D B Minor Lane/Major Mvmt NBL NBTEBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 711 - 187 476 604 - - HCM Lane V/C Ratio 0.044 - 0.195 0.008 0.005 - - HCM Control Delay (s) 10.3 - 28.9 12.6 11 - - HCM Lane LOS B - D B B - - HCM 95th %tile Q(veh) 0.1 - 0.7 0 0 - - HCM 6th TWSC 3: Hickory St & Mason St 12/21/2022 2025 Back & Site - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 3 Intersection Int Delay, s/veh 0.9 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 172 146 15 19 2 Future Vol, veh/h 1 172 146 15 19 2 Conflicting Peds, #/hr 1 00110 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 93 93 87 87 65 65 Heavy Vehicles, % 2 22222 Mvmt Flow 1 185 168 17 29 3 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 186 0 - 0 366 178 Stage 1 - - - - 178 - Stage 2 - - - - 188 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1388 - - - 634 865 Stage 1 - - - - 853 - Stage 2 - - - - 844 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1387 - - - 632 864 Mov Cap-2 Maneuver - - - - 632 - Stage 1 - - - - 851 - Stage 2 - - - - 843 - Approach EB WB SB HCM Control Delay, s 0 0 10.8 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1387 - - - 649 HCM Lane V/C Ratio 0.001 - - - 0.05 HCM Control Delay (s) 7.6 0 - - 10.8 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0 - - - 0.2 Timings 4: Hickory St & North College Ave 12/21/2022 2025 Back & Site - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 4 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 70 106 125 1083 821 57 Future Volume (vph) 70 106 125 1083 821 57 Turn Type Prot Perm Perm NA NA Perm Protected Phases 4 2 6 Permitted Phases 4 2 6 Detector Phase 442266 Switch Phase Minimum Initial (s) 7.0 7.0 10.0 10.0 10.0 10.0 Minimum Split (s) 25.5 25.5 24.5 24.5 24.5 24.5 Total Split (s) 31.0 31.0 74.0 74.0 74.0 74.0 Total Split (%) 29.5% 29.5% 70.5% 70.5% 70.5% 70.5% Yellow Time (s) 3.5 3.5 4.5 4.5 4.5 4.5 All-Red Time (s) 2.0 2.0 3.0 3.0 3.0 3.0 Lost Time Adjust (s) -1.0 0.0 -1.0 -1.0 -1.0 -1.0 Total Lost Time (s) 4.5 5.5 6.5 6.5 6.5 6.5 Lead/Lag Lead-Lag Optimize? Recall Mode None None C-Max C-Max C-Max C-Max Act Effct Green (s) 12.8 11.8 81.2 81.2 81.2 81.2 Actuated g/C Ratio 0.12 0.11 0.77 0.77 0.77 0.77 v/c Ratio 0.42 0.45 0.30 0.42 0.34 0.05 Control Delay 47.1 12.0 6.5 5.0 4.5 1.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 47.1 12.0 6.5 5.0 4.5 1.3 LOS DBAAAA Approach Delay 26.0 5.2 4.3 Approach LOS C A A Intersection Summary Cycle Length: 105 Actuated Cycle Length: 105 Offset: 64 (61%), Referenced to phase 2:NBTL and 6:SBT, Start of Yellow Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.45 Intersection Signal Delay: 6.7 Intersection LOS: A Intersection Capacity Utilization 51.4% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 4: Hickory St & North College Ave Queues 4: Hickory St & North College Ave 12/21/2022 2025 Back & Site - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 5 Lane Group EBL EBR NBL NBT SBT SBR Lane Group Flow (vph) 88 133 129 1116 892 62 v/c Ratio 0.42 0.45 0.30 0.42 0.34 0.05 Control Delay 47.1 12.0 6.5 5.0 4.5 1.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 47.1 12.0 6.5 5.0 4.5 1.3 Queue Length 50th (ft) 56 0 19 100 73 0 Queue Length 95th (ft) 84 35 63 197 146 12 Internal Link Dist (ft) 250 150 860 Turn Bay Length (ft) 98 95 Base Capacity (vph) 442 481 434 2660 2635 1137 Starvation Cap Reductn 000000 Spillback Cap Reductn 000000 Storage Cap Reductn 000000 Reduced v/c Ratio 0.20 0.28 0.30 0.42 0.34 0.05 Intersection Summary HCM 6th Signalized Intersection Summary 4: Hickory St & North College Ave 12/21/2022 2025 Back & Site - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 6 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (veh/h) 70 106 125 1083 821 57 Future Volume (veh/h) 70 106 125 1083 821 57 Initial Q (Qb), veh 000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1856 1856 1826 1826 1811 1811 Adj Flow Rate, veh/h 88 132 129 1116 892 62 Peak Hour Factor 0.80 0.80 0.97 0.97 0.92 0.92 Percent Heavy Veh, %335566 Cap, veh/h 205 167 471 2704 2682 1189 Arrive On Green 0.12 0.11 0.78 0.78 0.78 0.78 Sat Flow, veh/h 1767 1572 574 3561 3532 1526 Grp Volume(v), veh/h 88 132 129 1116 892 62 Grp Sat Flow(s),veh/h/ln 1767 1572 574 1735 1721 1526 Q Serve(g_s), s 4.9 8.6 9.1 11.0 8.1 1.0 Cycle Q Clear(g_c), s 4.9 8.6 17.2 11.0 8.1 1.0 Prop In Lane 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 205 167 471 2704 2682 1189 V/C Ratio(X) 0.43 0.79 0.27 0.41 0.33 0.05 Avail Cap(c_a), veh/h 446 382 471 2704 2682 1189 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 43.2 45.8 6.0 3.8 3.5 2.7 Incr Delay (d2), s/veh 1.4 8.0 1.4 0.5 0.3 0.1 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.2 3.7 1.2 3.1 2.0 0.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 44.6 53.8 7.4 4.2 3.8 2.7 LnGrp LOS D D AAAA Approach Vol, veh/h 220 1245 954 Approach Delay, s/veh 50.1 4.6 3.7 Approach LOS D A A Timer - Assigned Phs 2 4 6 Phs Duration (G+Y+Rc), s 88.3 16.7 88.3 Change Period (Y+Rc), s 7.5 5.5 7.5 Max Green Setting (Gmax), s 66.5 25.5 66.5 Max Q Clear Time (g_c+I1), s 19.2 10.6 10.1 Green Ext Time (p_c), s 7.7 0.6 4.2 Intersection Summary HCM 6th Ctrl Delay 8.4 HCM 6th LOS A HCM 6th TWSC 5: Mason St & Southern Access 12/21/2022 2025 Back & Site - PM Peak Hour Denver Rescue Mission - Fort Collins Traffic Impact Study Synchro 11 Report Fox Tuttle Transportation Group Page 7 Intersection Int Delay, s/veh 2.6 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 2 21461 Future Vol, veh/h 2 21461 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 22222 Mvmt Flow 2 21471 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 14 8 8 0 - 0 Stage 1 8 ----- Stage 2 6 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 1005 1074 1612 - - - Stage 1 1015 ----- Stage 2 1017 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 1004 1074 1612 - - - Mov Cap-2 Maneuver 1004 ----- Stage 1 1014 ----- Stage 2 1017 ----- Approach EB NB SB HCM Control Delay, s 8.5 1.4 0 HCM LOS A Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 1612 - 1038 - - HCM Lane V/C Ratio 0.001 - 0.004 - - HCM Control Delay (s) 7.2 0 8.5 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0 - 0 - -