HomeMy WebLinkAboutFORT COLLINS RESCUE MISSION - FDP230022 - SUBMITTAL DOCUMENTS - ROUND 3 - PlansDETAIL NOTE DESIGNATION
MECHANICAL EQUIPMENT DESIGNATION
CONDUIT DOWN
CONDUIT UP
CONDUIT CAP
ELECTRICAL WIRE SIZE
DELTA REVISION NOTE
HOMERUN ARROWS
CONDUIT CONTINUATION
.
.
.
.
WEATHER PROOF/GROUND FAULT INTERRUPTING
PARTIAL CIRCUIT USED IN MULTIPLE LOCATIONS
EXISTING TO BE REMOVED
EXISTING TO BE RELOCATED
INSTA HOT
HOUSE PHONE
SAME AS (P)
UNLESS OTHERWISE NOTED
GROUND FAULT INTERRUPTING
ELECTRICAL WATER COOLER
TELEPHONE TERMINAL BOARD
WEATHER PROOF
UON
WG
WP
HP
(PART)
TTB
(P)
IH
ER
EX
GFCI
EWC
GROUNDED SINGLE RECEPTACLE
GROUNDED SWITCHED DUPLEX/QUAD RECEPTACLE
GROUNDED DUPLEX RECEPTACLE
SUBSCRIPT = AMPACITY.
GROUNDED SPLIT-WIRED RECEPTACLE
FLOOR MOUNTED FOUR PLEX RECEPTACLE
FLOOR MOUNTED SPECIAL PURPOSE RECEPTACLE
SPECIAL PURPOSE RECEPTACLE
FOUR PLEX RECEPTACLE
FLOOR MOUNTED RECEPTACLE
TELEPHONE/DATA OUTLET
FLOOR MOUNTED TELEPHONE/DATA OUTLET
FLOOR MOUNTED TELEPHONE OUTLET
ELECTRICAL LEGEND
ELECTRICAL PANELBOARD RECESSED MOUNTING
ELECTRICAL PANELBOARD SURFACE MOUNTING
EQUIPMENT NON-FUSED DISCONNECT SWITCH
MOTOR CONTROL CENTER
MAIN DISTRIBUTION PANEL
TELEPHONE TERMINAL BOARD
MAGNETIC CONTROLLER (STARTER)
EQUIPMENT FUSED DISCONNECT SWITCH
COMBINATION STARTER/DISCONNECT SWITCH
FLOOR MOUNTED JUNCTION BOX
SWITCH & RECEPTACLE COMBINATION
FLOOR MOUNTED DATA OUTLET
SPEAKER - PAGING AND OR SOUND SYSTEM
CURRENT TRANSFORMER
NORMALLY CLOSED CONTACT
NORMALLY OPEN CONTACT
BREAKER WITH DRAWOUT FEATURE
PHOTOCELL
FUSED SWITCH
GROUND
POWER TRANSFORMER
CIRCUIT BREAKER
P
METER
CONTACTOR
RELAY
TRANSFORMER
THERMOSTAT
BATTERY
SOLENOID VALVE
C
S
B
T
SV
T
R
MCC
M
PULL BOXPB
DATA OUTLET
JUNCTION BOX
WALL MOUNTED J-BOX
1, 2, OR 3 BUTTON STATION
J
J
J
MOTOR
PLUG MOLD
CLOCK RECEPTACLE
TELEPHONE OUTLET
HP
PM
ABOVE COUNTER/GROUND FAULT INTERRUPTING
BATTERY PACK EMERGENCY LIGHT
EXIT LIGHT - SHADED INDICATES FACE
3-WAY SWITCH
4-WAY SWITCH
DIMMER SWITCH
SINGLE POLE SWITCH
DOUBLE POLE SWITCH
WALL MOUNTED VACANCY SENSOR SWITCH
KEY OPERATED SWITCH
THERMAL OVERLOAD SWITCH
ABOVE FINISH FLOOR
CIRCUIT
EXHAUST FAN
ARC-FAULT CIRCUIT INTERRUPTER
ABOVE COUNTER - VERIFY HEIGHT
EXISTING TO REMAIN
ELECTRICAL CONTRACTOR
AG
CCT
EC
EF
E
TO
AFF
AC
AFCI
3
4
K
D
P
2
DUCT FIRE DETECTOR (SUPPLY)
REMOTE INDICATING LIGHT
VOLUME CONTROL
CEILING FIXTURE
120V. MOTORIZED SMOKE DAMPER
FIRE / SMOKE DAMPER
WALL MOUNTED FIXTURE
RECESSED LIGHT FIXTURE
SURFACE MOUNTED LIGHT FIXTURE
STRIP LIGHT FIXTURE
WALL WASHER
PORCELAIN LAMP HOLDER
SURFACE CEILING FIXTURE
POLE MOUNTED FIXTURE
WALL PACK FIXTURE
EMERGENCY FIXTURE - SHADED
TRACK HEAD FIXTURE
K
V
M
S
FIRE ALARM HORN
FIRE STROBE
FIRE ALARM HORN & LIGHT
FIRE HORN OR SPEAKER WITH STROBE
MANUAL PULL STATION
FIRE ALARM ANNUNCIATOR
FIRE ALARM PANEL
TAMPER SWITCH
I = IONIZATION
SMOKE DETECTOR
FIRE ALARM FLOW SWITCH
MAGNETIC DOOR HOLDER
FIRE THERMAL DETECTOR
P = PHOTOELECTRIC
DUCT FIRE DETECTOR (RETURN)
FIRE ALARM ANNUNCIATOR CONTROL PANEL
TS
S
R
T
FS
MH
FAP
FAA
S
FACP
CEILING MOUNTED OCCUPANCY SENSOR
WALL MOUNTED OCCUPANCY SENSOR
SWITCH WITH INTEGRATED OCCUPANCY SENSOROS
M
SWITCH & PILOT LAMP
VS
CEILING MOUNTED VACANCY SENSORVS
POWER/DATA POKE-THRU
POWER ONLY POKE-THRU
KITCHEN EQUIPMENT DESIGNATIONK-XXX
POWER/TELEPHONE POLETP
TELEVISION OUTLET
BUZZER
CHIME
B
FLOOR MOUNTED TELEVISION OUTLET
RESIDENTIAL COMMUNICATION CENTER
CARD READERCR
TRACK WITH TRACK HEAD FIXTURE
COMBO GROUNDED DUPLEX RECEPTACLE AND
USB / USB-C CHARGING PORTUSB
TWO WAY COMMUNICATIONTWC
WIRELESS ACCESS POINTWAP
COMBINATION CO/SMOKE DETECTOR
S/CO
CC
NOTE: NOT ALL SYMBOLS ARE
NECESSARILY USED ON THIS PROJECT.
SURFACE MOUNTED DEVICE(S)
XXXX/W
CEILING MOUNTED DAYLIGHT SENSORDS
DETAIL NOTES
1 PROVIDE GROUNDING ELECTRODE SYSTEM AS REQUIRED PER 2023
NEC 250, INCLUDING METAL UNDERGROUND WATER PIPE, METAL
FRAME OF THE BUILDING, CONCRETE-ENCASED ELECTRODE, AND
ROD AND PIPE ELECTRODES.
2 SURGE PROTECTION DEVICE. PROVIDE CIRCUIT BREAKER AND
WIRE AS SIZED BY MANUFACTURER.
3 PANEL SHALL BE PROVIDED WITH METERING BREAKERS AS
REQUIRED TO COMPLY WITH 2021 IECC C405.12. HVAC LOADS,
INTERIOR LIGHTING, EXTERIOR LIGHTING, PLUG LOADS, PROCESS
LOADS, AND REMAINING LOADS SHALL BE SEPARATELY METERED
AND METER DATA SHALL BE ACQUIRED AND STORED IN
COMPLIANCE WITH IECC C405.12.5. BASIS OF DESIGN IS SIEMENS
SEM3 SERIES METERING SYSTEM. ALTERNATE APPROVED EQUALS
ARE ACCEPTABLE. PROVIDE THROUGH- WIRING AND
COMMUNICATION LINES AS REQUIRED. COORDINATE WITH
MANUFACTURER.
4 CIRCUIT BREAKER MOUNTING SPACE FOR FUTURE PV SYSTEM. PER
2023 NEC 705.12(B)(2)(3)(B) PV SYSTEM CIRCUIT BREAKER SHALL BE
INSTALLED AT THE END OF THE BUS. PROVIDE PERMANENT
WARNING LABEL.
5 LIGHTING CONTROL PANEL (LCP). PROVIDE A FEED THROUGH
LIGHTING CONTROL PANEL. PANEL SHALL HAVE DIMMING MODULES
FOR CONTROL OF EXTERIOR LIGHT FIXTURES. MODULES SHALL BE
SUITABLE FOR LED, 0-10V, ELV, MLV AND FLUORESCENT LIGHT
FIXTURES. LCP SHALL HAVE PHOTOCELL AND ASTRONOMIC
TIMECLOCK CONTROL.
6 ROUTE CONDUIT TO SOLAR READY ZONE AT ROOF. BENDS NOT TO
EXCEED 270° WITHOUT ACCESSIBLE PULL BOX. FIELD COORDINATE
ROUTING WITH ARCHITECT PRIOR TO ROUGH-IN.
7 PROVIDE A REMOTE GENERATOR ANNUCIATOR/CONTROLLER.
CONFIRM LOCATION WITH FIRE DEPARTMENT PRIOR TO ROUGH-IN.
PROVIDE CONTROL PANEL IN GENERATOR WITH TCP/IP INTERFACE
FOR MONITORING AND CONTROL.
GENERAL NOTES
1.PROVIDE INCREASED FEEDER CONDUCTOR SIZES AS REQUIRED TO
ACCOMMODATE VOLTAGE DROP. MAXIMUM VOLTAGE DROP
ALLOWED AT PANELS IS 3%. PROVIDE ALL NECESSARY JUNCTION
BOXES AND SPLICES AS REQUIRED TO REDUCE OVERSIZED
CONDUCTORS IN ORDER TO TERMINATE ON PANELBOARD LUGS.
2.PROVIDE SLEEVES AS REQUIRED FOR VERTICAL ROUTING OF
FEEDERS. RACEWAYS ON LEVELS ABOVE THE PARKING GARAGE
SHALL BE CONCEALED. ROUTE THROUGH WALLS AS REQUIRED.
COORDINATE SLEEVE LOCATIONS AND RACEWAY ROUTING WITH
STRUCTURAL ENGINEER AND GENERAL CONTRACTOR PRIOR TO
ROUGH-IN.
3.MAINTAIN FIRE RATING OF ALL PENETRATIONS.
4.ELECTRICAL EQUIPMENT MUST FIT IN THE SPACE PROVIDED WHILE
MAINTAINING ALL CLEARANCE AND WORKING SPACE
REQUIREMENTS.
5.ALUMINUM ALLOY CONDUCTORS SHALL BE PERMITTED WHERE
ALLOWED BY THE NEC EXCEPT TO ROTATING EQUIPMENT INCLUDING
MECHANICAL EQUIPMENT AND ELEVATORS.
6.ALUMINUM BUSSING IS PERMITTED IN ALL ELECTRICAL EQUIPMENT.
7.APPLICABLE OVERCURRENT PROTECTION DEVICES SHALL COMPLY
WITH ARC ENERGY REDUCTION REQUIREMENTS OF NEC 240.87.
UTILITY
METER
5
T1
M
SPD
3000/3
2 600/3
4
MAIN SWITCHBOARD 1 - MSB-1: 3000A, 120/208V, 3Ø, 4-WIRE, 65,000 AIC, NEMA-3R
1
E0.1
ELECTRICAL ONE-LINE DIAGRAM
NO SCALE
(3)3"C.6
LEVEL 2
PAD MOUNTED UTILITY
TRANSFORMER
120/208V SECONDARY
1000/3
PANEL
M2N
3
400/3
PANEL
K
3
400/3
PANEL
L1SA
3
PANEL
LTG.
5
LCP-L1PANEL
L1NA
3
PANEL
LTG.
5
LCP-L1
PANEL
L2NA
3
FEEDER SCHEDULE ALUMINUM
4000/W
3000/W
2500/W
2000/W
1600/W
1200/W
1000/W
800/W
750/W
600/W
500/W
400/W
350/W
300/W
250/W
225/W
200/W
175/W
150/W
125/W
100/W
90/W
80/W
70/W
60/W
50/W
40/W
THIS TABLE INDICATES MINIMUM CONDUCTOR SIZE
FOR FEEDERS OF THE AMPACITY INDICATED
WHERE #/W INDICATES THE #-AMPACITY AND
W-NUMBERS OF WIRE, #S/W INDICATES NO
GROUND. ALL CONDUCTORS SHALL BE ALUMINUM
UNLESS NOTED OTHERWISE.
*CONDUCTOR AMPACITIES SHALL BE BASED ON
TABLE 310.15(B)(16) 60 DEGREE COLUMN UP TO
100 AMPS AND 75 DEGREE COLUMN ABOVE 100
AMPS UNLESS OTHERWISE PERMITTED BY NEC.
AMPACITY RATING SHALL BE SELECTED IN
ACCORDANCE WITH NEC 110.14 (C).
THE MASTER ELECTRICIAN SHALL BE RESPONSIBLE
FOR ENSURING THAT NO FEEDERS OR BRANCH
CIRCUITS ARE INSTALLED IN A MANNER OR SIZED
IN SUCH A WAY AS TO VIOLATE NEC
SERVICE
GROUND
TABLE
150G/CU #6
200G/CU #4
300G/CU 2
500G/CU 1/0
1000G/CU 2/0
>1000G/CU 3/0
SERVICE GROUND CONDUCTORS SIZED PER NEC
TABLE 250.66 EQUIPMENT GROUND CONDUCTORS
SIZED PER NEC TABLE 250.122 ALL CONDUCTORS
SHALL BE ALUMINUM UNLESS NOTED OTHERWISE
THE SERVICE GROUND CHART INDICATES THE
MINIMUM SERVICE GROUND CONDUCTOR BASED
ON #G WHERE # IS THE AMPACITY FROM THE
CHART ABOVE, AND THE EQUIPMENT GROUND
CHART INDICATES THE MINIMUM EQUIPMENT
GROUNDING CONDUCTOR SIZE #EG WHERE # IS
THE RATING/SETTING OF THE OVERCURRENT
DEVICE PROTECTING THE CONDUCTORS
AND EQUIPMENT
WHERE DISCREPANCIES OCCUR BETWEEN THE
FEEDER SCHEDULE SCHEDULE AND THE
GROUNDING TABLES, THE LARGER CONDUCTOR
SHALL BE USED UNLESS OTHERWISE PERMITTED
BY THE NEC.
THE INSTALLATION SHALL MEET ALL NEC 250
GROUNDING AND BONDING REQUIREMENTS
INCLUDING 250.4 PATH FOR FAULT CURRENT.
PROVIDE COMPLETE RACEWAY SYSTEMS
METALLICALLY JOINED, CONNECTED, AND
FITTINGS AS REQUIRED FOR ELECTRICAL
CONTINUITY PER NEC 300.10
13[W-500kcmil, 750kcmilG, 4"C]
8[W-700kcmil, 600kcmilG, 4"C]
7[W-700kcmil, 600kcmilG, 4"C]
6[W-600kcmil, 400kcmilG, 4"C]
5[W-600kcmil, 350kcmilG, 4"C]
4[W-500kcmil, 250kcmilG, 3-1/2"C]
4[W-350kcmil, 4/0G, 3"C]
3[W-400kcmil, 3/0G, 3"C]
3[W-350kcmil, 3/0G, 3"C]
2[W-500kcmil, 2/0G, 3-1/2"C]
2[W-350kcmil, 1/0G, 3"C]
2[W-250kcmil, #1G, 3"C]
2[W-4/0, #1G, 2-1/2"C]
W-500kcmil, #2G, 3-1/2"C
W-350kcmil, #2G, 3"C
W-300kcmil, #2G, 3"C
W-250kcmil, #4G, 3"C
W- 4/0, #4G, 2-1/2"C
W- 3/0, #4G, 2"C
W- 2/0, #4G, 2"C
W-1/0, #6G, 2"C
W-1/0, #6G, 2"C
W#1, #6G, 1-1/2"C
W#2, #6G, 1-1/4"C
W#2, #8G, 1-1/4"C
W#4, #8G, 1-1/4"C
W#6, #8G, 1"C
EQUIPMENT
GROUND
TABLE
20EG #10
60EG #8
100EG #6
200-1200A PER ABOVE
1600EG 350KCMIL
2000EG 400KCMIL
(2)400/3
SPARE
3000S/4
1000/4 400/4 400/4 400/4
1 2
3
4
5
6 7
SHORT CIRCUIT CALCULATIONS BASED ON BUSSMAN POINT TO POINT METHOD.
SHORT CIRCUIT SCHEDULE
POINT
X1
X2
X3
X4
X5
X6
X7
X8
X9
X10
X11
X12
X13
X14
X15
Three (3) phase Line to Line Short Circuit Calculations:
The same calculations for single (1) phase Line to Line, F value changes:
The same calculations for the fault current at the secondary side of a transformer, F value changes:
For multiple conductors per phase, the single conductor C value from the table is multiplied by the number of conductors per phase.
NOTES:
1.
DESCRIPTION
UTILITY TRANSFORMER
MAIN SWITCHBOARD MSB-1
PANEL M2N
PANEL K
PANEL L2NA
PANEL L1NA
PANEL L1SA
DP-ST1
PANEL ST1
PANEL ST2
DOAS S
DOAS HEAT
ELEVATOR 1
ELEVATOR 2
ATS
Is.c = (Iavailable)*M
M = 1/(1+F)
F = (1.732 x L x Iavailable3Ø)/(C x V)
C = values found in BUSSMANN SPD Handbook for conductors and busway
V = the line to line voltage
L = length of run in feet
F = (2 x L x Iavailable1Ø)/(C x V)
F = (IscPrimary x Vprimary x 1.732 x %Z)/(100,000 x kVAtrans)
"Length of Run" is shown for calculations only, and should not be used for bidding purposes.
Short
Circuit
ISC SYM RMS
52,190
45,525
22,719
16,090
8,990
7,827
11,934
43,096
8,282
7,591
3,399
7,367
2,395
2,344
37,845
Multiplier
M
0.872
0.499
0.353
0.197
0.172
0.262
0.947
0.192
0.176
0.079
0.171
0.056
0.054
0.831
F factor
F
0.146
1.004
1.830
4.064
4.816
2.815
0.056
4.204
4.678
11.679
4.850
16.997
17.383
0.203
Constant
C
207,808
61,936
24,244
15,484
12,122
24,244
67,252
12,122
12,122
5,777
13,910
4,645
4,645
67,252
Line-Line
Voltage
V
208
208
208
208
208
208
208
208
208
208
208
208
208
208
Length
of run
L
70
164
117
166
154
180
10
142
158
188
188
220
225
36
I
available
I
52,190
45,525
45,525
45,525
45,525
45,525
45,525
43,096
43,096
43,096
43,096
43,096
43,096
45,525
Xfmer
Rated
kVA
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
Xfmer
Imped
%Z
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
G 1000/3
300kW/375kVA RATED DIESEL
NON-EMERGENCY GENERATOR.
7
N
G
BOND TO
SERVICE
GROUND
PANEL
ST1
SPD
3
1000/3
1000/41000/4
800/4
200/4
DESIGNED UNDER THE FOLLOWING CODES:
CITY OF FT. COLLINS REQUIREMENTS AND CODE AMENDMENTS AND
FPD REQUIREMENTS
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL ENERGY CONSERVATION CODE
2021 INTERNATIONAL FIRE CODE
2023 NATIONAL ELECTRICAL CODE
CODES:
200/3 90/3 80/3200/3 80/3
DP-ST1000A, 120/208V, 3Ø,
4-WIRE, 65,000 AIC, NEMA-3R
PANEL
ST2
SPD
200/4
2
32
DOAS
S
ELEV
1
ELEV
2
225/3
DOAS
HEAT
400/3
SPARE
200/3
SPARE
200/3
SPARE
8
9
10
11 12 13 14
90/4
15
ATS-ST
1000/4
4-POLE
42,AIC
400/3
400/4
400/3
GROUNDING ELECTRODE SYSTEM NOTES
1 MAIN BONDING JUMPER WITHIN THE SERVICE ENTRANCE LISTED
SWITCHBOARD/PANELBOARD. THE MAIN BONDING JUMPER SHALL BE SIZED,
SUPPLIED AND INSTALLED BY THE EQUIPMENT MANUFACTURER.
2 SUPPLY SIDE SYSTEM BONDING JUMPER WITHIN THE SERVICE ENTRANCE LISTED
SWITCHBOARD/PANELBOARD. THE SUPPLY SIDE SYSTEM BONDING JUMPER SHALL
BE SIZED, SUPPLIED AND INSTALLED BY THE EQUIPMENT MANUFACTURER.
3 3/0 CU. GROUNDING ELECTRODE CONDUCTOR ROUTED FROM THE SERVICE
ENTRANCE SWITCHBOARD TO GROUND BUS IN EACH ELECTRICAL ROOM.
4 PROVIDE A 3/0 COPPER GROUNDING ELECTRODE TO THE MAIN METAL
UNDERGROUND WATER PIPE. MAIN WATER PIPE MUST BE IN DIRECT CONTACT WITH
THE EARTH FOR 10 FEET OR MORE AND ELECTRICALLY CONTINUOUS. CONDUCTOR
SHALL BE THE SIZE CALLED FOR ON THE ELECTRICAL ONE-LINE AND FEEDER
SCHEDULE. IF THE WATER PIPE IS OF THE DUCTILE TYPE OR NON-ELECTRICALLY
CONTINUOUS, IT MUST BE MADE CONTINUOUS BY BONDING AROUND INSULATED
PORTIONS OF THE PIPE.
5 PROVIDE A #6AWG COPPER GROUNDING ELECTRODE CONDUCTOR TO A COPPER
CLAD DRIVEN GROUND ROD.
6 PROVIDE A #4AWG COPPER GROUNDING ELECTRODE TO A CONCRETE ENCASED
ELECTRODE.
7 PROVIDE A 3/0 COPPER GROUNDING ELECTRODE TO BUILDING STEEL. BUILDING
STEEL SHALL CONSIST OF ONE OR MORE METAL IN-GROUND SUPPORT STRUCTURES
IN DIRECT CONTACT WITH THE EARTH VERTICALLY FOR 10 FEET OR MORE AND
ELECTRICALLY CONTINUOUS. CONDUCTOR SHALL BE THE SIZE CALLED FOR ON THE
ELECTRICAL ONE-LINE AND FEEDER SCHEDULE.
G#
GROUNDING ELECTRODE SYSTEM/CONDUCTORS SHALL BE INSTALLED PER NATIONAL
ELECTRICAL CODE (NEC) ARTICLE 250 REQUIREMENTS. REFER TO SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS.
ALL GROUNDING ELECTRODES THAT ARE PRESENT AT EACH STRUCTURE SHALL BE
BONDED TOGETHER TO FORM THE GROUNDING ELECTRODE SYSTEM.
N
G
G1
G2
G3
G4 G6
G5
G7
225/4 80/4 80/4
LOAD SUMMARY - MSB-1
3000A 3Ø, 4W
LOAD
IDENTIFICATION
PANEL ST1
PANEL ST2
DOAS S
DOAS S HEAT
ELEV 1
ELEV 2
TOTAL LOAD ON 1000A BREAKER
PANEL M2N
PANEL K
PANEL L2NA
PANEL L1NA
PANEL L1SA
TOTAL LOAD ON 3000A SERVICE
CONNECTED
LOAD (VA)
53,291
37,320
16,644
33,280
16,644
16,644
173,823
278,916
106,364
85,541
70,618
97,811
813,072
CONNECTED
LOAD (A)
147.9
103.6
46.2
92.4
46.2
46.2
482.5
774.2
295.2
237.4
196.0
271.5
2,257
1/8" = 1'-0"
ELECTRICAL
ONE-LINE
E0.01
E0.01.dwg
PROJECT #:
DRAWN:
REV:
SCALE:
NO.
SHEET TITLE:
REVIEWED:
DATE:
FILE:
12345
A
B
C
D
6
E
7
1234567
A
B
C
D
E
FO
R
T
C
O
L
L
I
N
S
R
E
S
C
U
E
M
I
S
S
I
O
N
13
1
1
N
.
C
O
L
L
E
G
E
F
O
R
T
C
O
L
L
I
N
S
C
O
L
O
R
A
D
O
J:
\
2
0
2
3
\
2
0
2
3
-
0
1
9
-
0
0
\
C
a
d
\
E
l
e
c
\
E
0
.
0
1
.
d
w
g
R
o
b
e
r
t
C
0
3
.
1
1
.
2
4
8
:
5
3
a
m
J:
\
2
0
2
3
\
2
0
2
3
-
0
1
9
-
0
0
\
C
a
d
\
E
l
e
c
\
E
0
.
0
1
.
d
w
g
R
o
b
e
r
t
C
0
3
.
1
1
.
2
4
8
:
5
3
a
m
MTV
100% CD
MTV
3/6/2024
2023-019-00
Consulting, Inc.MV Consulting, Inc.
Marcus Vahling, P.E.
MV Consulting, Inc.
3/11/2024