HomeMy WebLinkAboutENCLAVE AT REDWOOD - FDP220014 - SUBMITTAL DOCUMENTS - ROUND 6 - SUPPORTING DOCUMENTATION (5)Item Unit Quantity Unit Cost Total Cost 1 CY 24 $650.00 $15,600 2 EA 3 $20,000.00 $60,000 3 EA 1 $35,000.00 $35,000 4 LF 498 $18.00 $8,964 5 CY 10 $650.00 $6,500 6 SY 467 $15.00 $7,005 7 LF 22 $54.00 $1,188 8 EA 1 $920.00 $920 9 EA 1 $7,500.00 $7,500 10 Removal of Existing Forebay EA 1 $7,500.00 $7,500 11 LF 102 $20.00 $2,040 12 CY 60 $600.00 $36,000 13 CY 16,475 $4.00 $65,900 $254,117 $25,412 $280,000 Description OPINION OF PROBABLE CONSTRUCTION COSTS FOR ENCLAVE AT REDWOOD POND INFRASTRUCTURE January 31, 2024 Round Total 10% Contingency Connect to Exisiting Infrastruture Removal of Culvert Pipe (D<48") 15' Concrete Maintenance Trail for Pond Access (8" thick) A. Redwood Pond Concrete Spillover Weir (Steel Included) Concrete Forebay Outlet Structure HDPE Channel Underdrain (8" Perforated Pipe) 2' Concrete Trickle Channel (Steel Included) 15" RCP Detention Pond Subtotal 15" FES North American P550 Turf Reinforced Mat Earthwork (High-Range) Note: This Opinion of Probable Costs has been prepared using the best available data known to the engineer at the time the cost estimate was prepared and is provided for informational purposes only. It is not a guarantee of project cost. Page 1 D S DS DS DS DS DS DS DS AA SHEET NUMBER ISSUE DATE: DATE REVISION COMMENTS DESIGNED BY: CHECKED BY: DRAWN BY: PROJECT #: 1120 Lincoln Street, Suite 1000 Denver, Colorado 80203 P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com Know what's below. Call before you dig. ® FI L E P A T H : K : \ 2 0 1 0 1 3 \ E N G I N E E R I N G \ D R A I N A G E \ C D - R E D W O O D P O N D P L A N . D W G L A Y O U T : R E D W O O D P O N D P L A N S 10 X R E F s : c d - d h i c l o g o , c d - s t o r m n o t e s , e - b a s e , e - l e g a l , e - o f f s i t e , e - u t i l , k e y m a p , p - b a s e , p - l e g a l , p - u t i l PL O T T E D : M O N 0 1 / 2 9 / 2 4 3 : 2 3 : 2 0 P B Y : M A R K W E S T 201013 ENCLAVE AT REDWOOD REDWOOD POND - PLAN ST51 140 OF 191 12-18-2023 AML MAW JMR NO C H A N G E S A R E T O B E M A D E T O T H I S D R A W I N G W I T H O U T W R I T T E N P E R M I S S I O N O F H A R R I S K O C H E R S M I T H . KEY MAP SCALE 1" = 500' 0 SCALE: 1" = 30 30 60 30' GENERAL STORM NOTES: 1.THE CONTRACTOR SHALL NOTIFY COLORADO 811 PRIOR TO EXCAVATION, IN ACCORDANCE WITH COLORADO STATE STATUTES. 2.THE LOCATION OF EXISTING UNDERGROUND UTILITIES IS APPROXIMATE AND SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE, AS SUPPLIED BY THE UTILITY OWNERS. PRIOR TO EXCAVATION, THE CONTRACTOR SHALL VERIFY EXISTENCE, SIZE, AND LOCATION OF EXISTING UTILITIES AND IMMEDIATELY NOTIFY HARRIS KOCHER SMITH OF ANY DISCREPANCIES. THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL DAMAGES TO EXISTING UNDERGROUND FACILITIES. 3.PIPE LENGTHS ARE MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE FOR CYLINDRICAL MANHOLES AND TO THE INSIDE FACE OF INLETS AND OTHER BOX STRUCTURES. PIPE LENGTHS ARE MEASURED TO THE END OF THE STRUCTURE FOR ALL FLARED END SECTIONS. 4.STATIONING OF INLETS SHOWN IN STORM SEWER PROFILES IS AT CENTER OF STRUCTURE. 5.ALL COORDINATES ARE AT THE CENTER OF THE STRUCTURE UNLESS OTHERWISE INDICATED. 6.ALL PROPOSED STORM SEWER PIPE SHALL BE CLASS III REINFORCED CONCRETE PIPE (RCP) OR ADS HP STORM - DUAL WALL POLYPROPYLENE PIPE IN ACCORDANCE WITH CITY OF FORT COLLINS REQUIREMENTS, UNLESS OTHERWISE SPECIFIED IN THESE PLANS 7.FOR ALL NON-CONCENTRIC MANHOLES, MANHOLE RINGS/COVERS AND STEPS LIDS SHALL BE ROTATED AS SHOWN IN PLAN VIEW. ALL MANHOLES SHALL BE ECCENTRIC UNLESS OTHERWISE NOTED ON PLANS. 8.ALL TYPE C & D INLETS SHALL HAVE CLOSE MESH GRATES. 9.CONTRACTOR SHALL ADJUST ALL EXISTING RIM ELEVATIONS TO MATCH THE PROPOSED GRADE. 10.CONTRACTOR SHALL MODIFY INLET BASES AS NEEDED IN ORDER TO ENSURE ALL STORM PIPES CONNECT PROPERLY TO THE INLET. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS FOR REVIEW AND APPROVAL BY ENGINEER, OWNER, AND CITY/COUNTY PRIOR TO INSTALLATION. 11.CONTRACTOR SHALL PROVIDE ENGINEERED SHOP DRAWINGS, DESIGNED BY A LICENSED ENGINEER, DETAILING THE STRUCTURAL DESIGN OF ALL POND IMPROVEMENTS (FOREBAYS, ENERGY DISSIPATING BAFFLES, OUTLET STRUCTURES, DIVERSION STRUCTURES, WALLS ETC.) FOR REVIEW AND APPROVAL BY ENGINEERS, OWNER, AND CITY/COUNTY PRIOR TO INSTALLATION. 12.ANY SUBSURFACE DETENTION AND/OR WATER QUALITY SYSTEM DESIGNS SHOWN ON THESE PLANS (IF APPLICABLE) ARE SPECIFICALLY LIMITED TO ELEVATIONS, GRADES AND STORMWATER DETENTION AND/OR WATER QUALITY DESIGN VOLUMES AND RELEASE RATES. THE DESIGN AND PROFESSIONAL ENGINEER’S SEAL SPECIFICALLY EXCLUDES STRUCTURAL DESIGN (INCLUDING, BUT NOT LIMITED TO, BUOYANCY CALCULATIONS AND CONSTRUCTION, TRAFFIC, OR OTHER LOADING), DEWATERING, EXCAVATION, SHORING, AND MATERIALS AND BACKFILL SPECIFICATIONS. IF THE PROPOSED SYSTEM UTILIZES A PROPRIETARY AND/OR PRE-MANUFACTURED DETENTION AND/OR WATER QUALITY SYSTEM, THE OWNER OR CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL REQUIRED SYSTEM DESIGN, CALCULATIONS, MATERIALS AND BACKFILL SPECIFICATIONS WITH THE UNDERGROUND DETENTION AND/OR WATER QUALITY SYSTEM MANUFACTURER AND/OR SUPPLIER. CONSTRUCTION OBSERVATION BY THE MANUFACTURER'S REPRESENTATIVE IS ESSENTIAL FOR PROPER INSTALLATION OF UNDERGROUND DETENTION AND/OR WATER QUALITY SYSTEMS. AT A MINIMUM, THE INSTALLATION SHOULD BE INSPECTED BY THE MANUFACTURER'S REPRESENTATIVE DURING CONSTRUCTION AND ANY DEFICIENCIES OF THE INSTALLATION IDENTIFIED BY THE MANUFACTURER'S INSPECTION SHOULD BE CORRECTED IMMEDIATELY. 13.ALL PUBLIC STORM SEWER LINES TO BE INSPECTED BY THE CITY OF FORT COLLINS. ALL PRIVATE STORM SEWER LINES TO BE INSPECTED BY DEVELOPER. 14.WHERE REQUIRED, UTILITY CROSSINGS SHALL BE ENCASED PER CITY OF FORT COLLINS STANDARDS. SEE FORT COLLINS STANDARDS FOR DETAILS. 15.TYPE R STORMWATER INLETS GREATER THAN 5 FEET IN LENGTH ARE REQUIRED TO HAVE 2 ACCESS POINTS WITH COVERS, AND INLETS GREATER THAN 20 FEET IN LENGTH SHALL HAVE 3 ACCESS POINTS WITH COVERS. ONE COVER SHALL BE INLINE WITH THE OUTLET PIPE. 16.ALL STORMWATER MANOLE AND INLET COVERS MUST BE STAMPED WITH “NO DUMPING DRAINS TO RIVER”. 17.PEDESTRIAN FRIENDLY MANHOLE COVERS SHALL BE ADA COMPLIANT WITH NON-SLIP COVERS MEETING FOR COLLINS UTILITY SPECIFICATIONS IN THE DEVELOPMENT CONSTRUCTION STANDARDS MANUAL. THE NEENAH R-1706-1 SOLID HEAVY-DUTY LID OR APPROVED EQUAL WILL BE ACCEPTABLE. PROPOSED DETENTION POND SUMMARY TABLE POND ID SWMM BASIN ID TRIBUTARY AREA IMPERVIOUSNESS ALLOWABLE RELEASE RATE MODELED PEAK RELEASE RATE POND VOLUME POND VOLUME WQCV WSEL 2-YEAR WSEL 100-YEAR WSEL (-)(#)(AC)(%)(CFS)(CFS)(CF)(AF)(FT)(FT)(FT) POND1 113_21 3.23 58.9%0.65 0.62 82211 1.89 N/A 4956.04 4958.76 UD2 113_22 6.95 55.3%1.39 1.34 60838 1.40 N/A 4951.79 4956.60 POND3 113_23 8.50 50.4%1.70 1.61 345595 7.93 N/A 4955.25 4958.63 REDWOOD*113_24 70.12 63.6%13.05 12.35 569837 13.08 4956.60 4957.15 4960.41 *REDWOOD POND IS A REGIONAL DETENTION POND MANAGING MANY OFFSITE UPSTREAM AREAS. ALL INFORMATION IS TAKEN FROM THE NECCO DESIGN REPORT AND/OR THE MASTER SWMM MODEL.