HomeMy WebLinkAboutFRONT RANGE STORAGE - PDP230011 - SUBMITTAL DOCUMENTS - ROUND 2 - RESPONSE TO STAFF REVIEW COMMENTSPRELIMINARY DRAINAGE REPORT
FOR
Front Range RV and Boat Storage
Prepared For:
Freedom Homes, LLC
4920 Saddlewood Circle.
Johnstown, Colorado 80534
Eric Kelley
(970) 405-3961
July 27th 2023
Project No. 39817.00
Prepared By:
JR Engineering, LLC
2900 South College Avenue, Suite 3D
Fort Collins, CO 80525
Front Range Storage
Preliminary Drainage Report
ii
TABLE OF CONTENTS
GENERAL DESCRIPTION AND LOCATION ............................................................................................ 1
LOCATION ..................................................................................................................................... 1
DESCRIPTION OF PROPERTY .......................................................................................................... 1
MASTER DRAINAGE BASIN DESCRIPTION ....................................................................................... 1
FLOODPLAIN SUBMITTAL REQUIREMENTS ..................................................................................... 2
DRAINAGE BASINS AND SUB-BASINS ................................................................................................. 2
MAJOR BASINS AND SUB-BASINS ................................................................................................... 2
EXISTING SUB-BASIN DESCRIPTION ................................................................................................ 2
EXISTING OFFSITE DRAINAGE BASINS ............................................................................................ 2
PROPOSED SUB-BASINS DESCRIPTIONS ......................................................................................... 3
OFFSITE SUB-BASINS DESCRIPTIONS .............................................................................................. 4
PROJECT DESCRIPTION ...................................................................................................................... 4
PROJECT DESCRIPTION .................................................................................................................. 4
PROPOSED DRAINAGE FACILITIES ...................................................................................................... 4
GENERAL CONCEPT ....................................................................................................................... 4
WATER QUALITY/ DETENTION FACILITIES ...................................................................................... 5
LOW IMPACT DEVELOPMENT ........................................................................................................ 5
DRAINAGE DESIGN CRITERIA ............................................................................................................. 6
REGULATIONS ............................................................................................................................... 6
FOUR STEP PROCESS TO PROTECT RECEIVING WATERS ................................................................. 6
DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS ............................................................. 7
HYDROLOGIC CRITERIA .................................................................................................................. 7
HYDRAULIC CRITERIA ..................................................................................................................... 7
FLOODPLAIN REGULATIONS COMPLIANCE ..................................................................................... 8
MODIFICATIONS OF CRITERIA ........................................................................................................ 8
EROSION CONTROL ....................................................................................................................... 8
CONCULSIONS ................................................................................................................................... 8
COMPLIANCE WITH STANDARDS ................................................................................................... 8
DRAINAGE CONCEPT ..................................................................................................................... 8
Front Range Storage
Preliminary Drainage Report
iii
APPENDIX
Appendix A – Figures
Appendix B – Hydrologic Calculations
Appendix C – Hydraulic Calculations
Appendix D – Water Quality Calculations
Appendix E – Reference
Appendix F – Maps
Appendix G – LID Exhibit
Front Range Storage
Preliminary Drainage Report
iv
Engineer’s Certification Block
I hereby attest that this report for the final drainage design for the Front Range RV Boat and Storage was
prepared by me or under my direct supervision, in accordance with the provisions of the Fort Collins
Stormwater Criteria Manual. I understand that the City of Fort Collins does not and will not assume
liability for drainage facilities designed by others.
Joseph Martin Frank, PE
Registered Professional Engineer
State of Colorado No. 53399
For and on behalf of JR Engineering
Front Range Storage
Preliminary Drainage Report
1
GENERAL DESCRIPTION AND LOCATION
LOCATION
The site is located in the North half of the Northwest Quarter and the East Half of Section 3, Township
7 North, Range 68 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of
Colorado. More specifically, the site is a 105-acre property that is zoned I-industrial. The concept plan
proposes approximately 10 acres of outdoor covered and non-covered recreational vehicle and boat
storage. The remaining 95 acres will remain for agricultural use. The site is situated on NE Frontage Rd
on the West side and is bordered by the Larimer and Weld County Canal on the south side. To the East,
the site abuts four presently vacant parcels of land, while to the North, it borders the Colorado Division
of Wildlife.
DESCRIPTION OF PROPERTY
The Front Range Storage area spans approximately 105 acres, with approximately 10 acres designated for
development into RV and boat storage, along with offsite detention. The remaining 95 acres will continue
to be used as irrigated land. The site currently features an existing gravel road access located just off the
NE Frontage road. Most of the site remains undeveloped and is presently being utilized for agriculture and
a U-haul rental service. Two buildings are the only existing structures on site, situated just east of the
Frontage road. Although flow paths are not precisely defined, the general drainage pattern of the site
follows a gradual slope ranging from 1% to 4% in the northeast to the southwest direction. According to
the Natural Resources Conservation Service (NRCS) soil survey shows that approximately half of the
soils on the site are composed of type B soils, which have a mild infiltration and runoff rate. The remaining
site is made up of Type C soils, which are characterized by a lower infiltration rate and corresponding
higher runoff rates. For additional information, refer to the NRCS soil map within Appendix A of this
report. Adjacent to the proposed site, a pre-existing 15” corrugated metal pipe facilitate the drainage of
any surplus stormwater and irrigation water from the site into the Larimer and Weld Canal. The existing
culvert is not capable of conveying large quantities of runoff.
MASTER DRAINAGE BASIN DESCRIPTION
The site is positioned within the Boxelder Creek Basin and shares borders with the Upper Cooper Slough
and Lower Cooper Slough basins. The Boxelder Creek watershed and associated floodplain is unique in
that it consists to a large degree of mostly undeveloped land. Based on the 100-year rainfall event, a
detention pond will be built southeast of the RV and boat storage facility. Currently, the site drains through
a 15” CMP and outfalls into the Larimer and Weld Canal. The south CMP will need to be updated based
on the detention pond dimensions. The detention pond is designed to incorporate a trickle channel and
will feature an outfall leading to the Larimer and Weld Canal. The detention pond situated to the southeast
of our site cannot be used to redirect water flow to the existing Boxelder Creek. This is due to the
minimal elevation grade of approximately 0.2% from the proposed detention pond location to Boxelder
Creek, making it insufficient to facilitate water transfer through piping into the creek. Consequently, the
water from the detention pond will need to be directly piped into the Larimer and Weld Canal instead.
Front Range Storage
Preliminary Drainage Report
2
FLOODPLAIN SUBMITTAL REQUIREMENTS
The site is on FEMA FIRM panels 08069C0982F and 08069C1001F. The flood map for this location has a
status of "Effective". This means that the entire area of the panel is outside the Special Flood Hazard Area
(SFHA). SFHA is defined as the area that will be inundated during the 100-yr flood. The site lies within
FEMA Zone X, areas that are determined to be outside the 0.2% annual chance floodplain. The site is not
located within a FEMA regulated floodplain, as shown in Appendix A in the FEMA attachments. The site
is also not located in the City of Fort Collins Floodplain, as shown in Appendix A in the City of Fort
Collins Flood map.
DRAINAGE BASINS AND SUB-BASINS
MAJOR BASINS AND SUB-BASINS
The site is located in the Boxelder Creek Basin. The Upper and Lower Cooper Slough Basins exist to the
west of the site. Covering approximately 265 square miles, the Boxelder Creek extends from north of
the Colorado/Wyoming border and stretch southward into the eastern part of Fort Collins. These basins
are predominantly characterized by farmland, with occasional pockets of mixed-use residential
development and limited commercial development.
EXISTING SUB-BASIN DESCRIPTION
The existing site modeled within SWMM basin EO1 is approximately 11.8 acres and 6.2% impervious. The
site currently has an existing gravel staging area with an existing building.
EXISTING OFFSITE DRAINAGE BASINS
Currently, the site collects offsite runoff from one location: Runoff from the Colorado Division of Wildlife
property just north of the 1435 NE Frontage Road drains onto the site via sheet draining. That runoff
drain directly into the Larimer and Weld Canal. Runoff from the eastern offsite basin drains south and
into the Larimer and Weld Canal. Runoff from the southeastern portion of the site drains into the Larimer
and Weld Canal. A ridgeline divides portions of the northeast and southeast offsite basins. This ridgeline
divides the water such that everything west of the ridgeline drains into the Larimer and Weld Canal while
everything east of the ridgeline drains into the Boxelder Creek. In the 100-year event, it is anticipated that
the runoff from the Colorado Division of Wildlife will overflow the 1435 NE Frontage Road and sheet
drain onto the site. The estimated runoff from the offsite drainage basin has been modeled in SWMM.
Front Range Storage
Preliminary Drainage Report
3
PROPOSED SUB-BASINS DESCRIPTIONS
Basin C1, 0.70 acres and 64.0% impervious this basin, is composed of an existing gravel access,
two existing buildings, a proposed drive isle with parking, and some proposed canopy parking
spots. A type C inlet will be conveyed to design point 1, where it will drain southeast into
proposed isolator rows. From the isolator rows, the stormwater will drain into the proposed
detention pond.
Basin C2, 2.74 acres and 74.9% impervious this basin is composed of canopy and uncovered
parking, paved drive isles, and some vegetation. The runoff from this basin will be conveyed to a
Type C inlet at design point 2.
Basin C3, 2.24 acres and 75.0% impervious this basin is composed of canopy and uncovered
parking, paved drive isles, and some vegetation. The runoff from this basin will be conveyed to a
type C inlet at design point 3.
Basin C4, 2.22 acres and 67.4% impervious this basin is composed of canopy and uncovered
parking, paved drive isles, and some vegetation. The runoff from this basin will be conveyed to a
type C inlet at design point 4.
Basin C5, 0.33 acres and 68.8% impervious this basin is composed of uncovered parking and
paved drive isles. The runoff from this basin will be conveyed to a type C inlet at design point 5.
Basin C6, 0.68 acres and 77.4% impervious this basin is composed of uncovered parking and paved
drive isles. The runoff from this basin will be conveyed to a type C inlet at design point 6.
Basin C7, 1.06 acres and 67.9% impervious this basin is composed of uncovered parking and paved
drive isles. The runoff from this basin will be conveyed to type C inlet at design point 7.
Basin C8, 1.79 acres and 3.4% impervious this basin will be composed of the detention pond for
the site. The runoff from this basin will be conveyed to an outlet structure at design point 8.
Basin O1 11.8 acres and 61.3% impervious is the composite basin for the site and was used to
model the site’s runoff in SWMM and to calculate the detention requirements for the site.
Front Range Storage
Preliminary Drainage Report
4
OFFSITE SUB-BASINS DESCRIPTIONS
The as-built SWMM model from the 2018 Boxelder LOMR was truncated for the site and used
to model the existing off site drainage. The 2018 as-built SWMM model takes into account
improvements that have been built upstream of the site (the East Side Detention Facility).
Basin EX2, 50.1 acres and 11% percent impervious. This basin includes area owned by the
Colorado Division of Wildlife. The basin is directly north of the site and is bounded to the north
by East County Road 50.
Basin EX3, 21.9 acres and 2% percent impervious. This basin includes a ridgeline located east of
the RV and Boat Storage site. The runoff from this basin drains toward the site.
Basin SB102, 285.3 and 5% impervious. This basin is comprised of farmland and is bounded to the
north by East County Road 52 and to the south by East County Road 50.
PROJECT DESCRIPTION
PROJECT DESCRIPTION
Front Range RV & Boat Storage is a recreational vehicle and boat storage facility at 1312 NE
Frontage Rd. The previously undeveloped portion of the 105 acre property, approximately 11.8
acres, for outdoor covered and uncovered recreational vehicle and boat storage. The remaining
95 acres will remain for agricultural use. The property will hold detention and water quality for
the Front Range RV & Boat Storage development.
PROPOSED DRAINAGE FACILITIES
GENERAL CONCEPT
The proposed development to the Front Range RV & Boat Storage site will result in the
developed condition being treated for water quality and detained. Low-impact development best
management practices are proposed to improve the quality of runoff and aid in reducing peak
flows. Specifically, ADS isolator rows are proposed in the southeast corner of the site to treat
and provide water quality for the entire development. Runoff from the site is captured in inlets
located in the drive isles on the south side of the site. From the inlets the runoff is conveyed in
storm sewers to the detention pond. Surface overflow paths will be provided, such that the 100-
year storm flows remain at least one foot below the finished floor elevation at time of the final
drainage report.
Front Range Storage
Preliminary Drainage Report
5
WATER QUALITY/ DETENTION FACILITIES
The majority of the water quality is treated within the onsite ADS isolator rows directly adjacent
to the detention pond.
LOW IMPACT DEVELOPMENT
A minimum of 75 percent of new impervious surface area is treated by a Low-Impact
Development (LID) best management practice (BMP) in accordance with City criteria. An
illustrative LID/ Surface Map is provided in Appendix G, and the sizing of the LID methods is
provided in Appendix D.
Front Range Storage
Preliminary Drainage Report
6
DRAINAGE DESIGN CRITERIA
REGULATIONS
This report was prepared to meet or exceed the City of Fort Collins stormwater criteria. The
City of Fort Collins Stormwater Criteria Manual (dated 2018)(FCSCM) and the Urban Drainage
Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were
referenced as guidelines for this design.
FOUR STEP PROCESS TO PROTECT RECEIVING WATERS
City of Fort Collins requires the Four Step Process to protect receiving waters. The four-step
process incorporates reducing runoff volume, treating water quality capture volume, stabilizing
streams, and implementing long-term source controls. Volume reduction is an important part of
the Four Step Process and is fundamental to effective stormwater management. Per City criteria,
a minimum of 75 percent of new impervious surface area must be treated by a Low-Impact
Development (LID) best management practice (BMP). The site incorporates an underground ADS
isolator rows, a rain garden and a water quality pond designed to capture and treat at least 75%
of the site’s water quality capture volume. The isolator rows need to be properly cleaned and
maintained to allow for long-term protection of the receiving waters. The proposed LID BMPs
will have the effect of slowing runoff through the site lot and increasing infiltration and rainfall
interception by encouraging infiltration and careful selection of vegetative cover. The LID exhibit
is shown within Appendix G of this report.
Step 1 – Employ Runoff Reduction Practices
The majority of the developed runoff through the site will be routed through the onsite detention pond
at pond. The detention pond will restrict the flow rate of storm water leaving the site and reduce the
impact on downstream drainage areas. Additionally, the design will allow for greater that 75% of the
project is added impervious area to be routed through an approved LID water quality treatment train.
The onsite water quality BMPs includes a raingarden, water quality pond, and underground ADS
StormTech isolator rows for water quality.
Step 2 – Implement BMPS that Provide a Water Quality Capture Volume
The site incorporates an underground ADS isolator rows, a rain garden and a water quality pond designed
to capture and treat at least 75% of the site’s water quality capture volume. The isolator rows need to be
properly cleaned and maintained to allow for long-term protection of the receiving waters.
Step three –Stabilize Drainage ways
The storm water improvements for the Front Range RV Boat and Storage improve the existing condition
by eliminating reducing and detaining flows
Front Range Storage
Preliminary Drainage Report
7
Step four – Implement site specific and other source control BMPs
Water quality will ultimately treated in the underground ADS StormTech isolator rows for 75% of the
site. The remaining portion of the site will bypass the ADS isolator rows and then be treated in the
detention facility. An erosion control plan and Storm water Management Plan will be implemented to
prevent erosion and control sediment on the project site and downstream drainage ways during and after
construction.
DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS
The as-built SWMM model from the 2018 Boxelder LOMR was truncated and used to model the existing
site and the proposed hydrology due to offsite tributary area upstream of the site. The 2018 as-built
SWMM model takes into account improvements that have been built upstream of the site i.e. (the East
Side Detention Facility).
JR Engineering verified the 100-year water surface elevation of the Larimer and Weld Canal by running
the L&W Canal HEC_RAS model from the 2018 LOMR by Ayres and Associates at an unsteady 100-year
analysis and modeled the results with the same version of HEC-RAS 5.02 that was utilized to generate the
results for the LOMR. The 100-year wselv of the canal is below the proposed pond invert. For more
additional information regarding the canal and pond invert, refer to the annotated Figure 5.1 in Appendix
E. To prevent seepage from the irrigation canal, the onsite detention facility is located more than 20 feet
away from the L&W canal.
Groundwater measurements were taken throughout the site over a period from the fall of 2022 to the
spring of 2023. The invert of the pond is approximately 2’ above the groundwater, as shown in the attached
experts from the geotechnical report in Appendix E of this report.
JR Engineering designed the pond to detain the proposed 100-year event. JR Engineering calculated the
required detention volume by subtracting the 100-year total proposed runoff from the 2-year historic
runoff, as shown in Appendix C. Due to the large amount of offsite runoff going through the site; the pond
was designed to pass the existing offsite runoff via a spillway. The detention pond mitigates the total
release into the L&W canal and releases at a rate of 257.62 cfs compared to the historic release rate in
the 100-year event of 259.38 cfs.
Table 1, as shown below, shows the 100-year volume.
Table 1: Pond Volumes
Pond ID 100-YR_Vol.
(Acre-Ft)
100-YR
WSELV
PEAK_POND
RELEASE
(CFS)
POND
INVERT
P1 5.79 4981.47 257.62 4975.89
The pond meets Colorado Revised Statute (CRS) §37-92-602 (8). The pond drains in just over 100 hours
of the 100 year storm.
Front Range Storage
Preliminary Drainage Report
7
The pond, detains the proposed 100-year event. Detention volume was calculated by subtracting 100-year
proposed runoff from 2-year historic runoff to get 2.82 Acre-ft. Since substantial offsite runoff passes
through, the pond allows existing runoff to pass through a spillway. The pond releases at a rate of 257.62
cfs, lower than the 100-year historic release rate of 259.38 cfs. The pond complies with Colorado Revised
Statute §37-92-602 (8), draining in just over 100 hours of a 100-year storm. Meeting the requirement of
continuously releases or infiltrates as quickly as practicable, but in all cases releases or infiltrates at least
99% of the runoff within 120 hours after the end of events greater than a 5-year storm.
HYDROLOGIC CRITERIA
Weighted percent imperviousness were calculated for each basin using the Fort Collins Stormwater
Criteria Manual Table 3.2-2 for each basin. EPA SWMM version 5.2 was used to model the runoff for the
site since the corresponding tributary area of the site is over 20 acres. The City of Fort Collins area has
rainfall depths associated with the table below as shown in Chapter 5 of the Fort Collins Stormwater
Criteria Manual. The corresponding site and tributary area were modeled in SWMM for the 2-year storm
and the 100-year storm and are shown within table 4.1-4 below.
HYDRAULIC CRITERIA
At time of the Final Plan (FP) StormCAD will be utilized to determine the hydraulic capacity of the storm
sewer system on site. Additionally, hydraulic calculations for items such as; street capacity, inlet capacity,
swales, channels and the emergency spillway will be provide within the Final Drainage Report.
Front Range Storage
Preliminary Drainage Report
8
FLOODPLAIN REGULATIONS COMPLIANCE
As previously stated, the site lies within FEMA Zone X, areas which are determined to be outside the
0.2% annual chance floodplain. The site is not located within a FEMA regulated floodplain, as shown in
Appendix A in the FEMA attachments. The site is also not located in the Cities of Fort Collins Floodplain,
as shown in Appendix A in the City of Fort Collins Flood map.
MODIFICATIONS OF CRITERIA
The site does not treat 100% of modified/ added impervious areas. A small amount, less than an acre of
the site’s modified impervious area, drains into the I-25 frontage road drainage swale as shown in the LID
exhibit in Appendix G.
EROSION CONTROL
A statement of compliance with Erosion Control Criteria and all Erosion Control Materials will be
provided with the Final Drainage Report.
CONCULSIONS
COMPLIANCE WITH STANDARDS
The hydrologic and water quality calculations were performed using the required methods as outlined in
the City of Fort Collins Storm water Criteria Manual. The proposed drainage improvements meet or
exceed the City’s requirements except for the detention requirement and recommendations set forth
within the Boxelder drainage master plan.
DRAINAGE CONCEPT
The proposed concept for the development of the RV Boat storage site involves surface flows and piping
of developed condition to the ADS isolator rows. The runoff for the site will be treated at detention
facility P1 onsite. All the offsite flows will be conveyed through the site and directly released at a rate
lower than what has historically passed through the site. The existing conditions drainage patterns are
maintained in the proposed. The proposed improvements will have no adverse impacts on the flow rate,
character, or quality of runoff leaving the site. The proposed improvements will have no adverse impacts
on adjacent properties or to the adjacent L&W canal.
Front Range Storage
Preliminary Drainage Report
9
REFERENCES
Fort Collins Storm water Criteria Manual; City of Fort Collins, Colorado, December 2018.
Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3); Urban Drainage and Flood Control District,
June 2001.
Hydrologic Analysis of the Box Elder Creek/ Cooper Slough Watershed Icon Engineering, Apr. 2014.
Boxelder and Cooper Slough Letter of Map Revision (LOMR) for the Boxelder 6 Project."AYRES &
ASSOCIATES, 5 Nov. 2018.
Front Range Storage
Preliminary Drainage Report
10
APPENDIX A – FIGURES
A Westrian Company
Hydrologic Soil Group—Larimer County Area, Colorado
(Mountain Vista Property)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/17/2023
Page 1 of 4
44
9
4
3
0
0
44
9
4
4
0
0
44
9
4
5
0
0
44
9
4
6
0
0
44
9
4
7
0
0
44
9
4
8
0
0
44
9
4
9
0
0
44
9
5
0
0
0
44
9
5
1
0
0
44
9
4
3
0
0
44
9
4
4
0
0
44
9
4
5
0
0
44
9
4
6
0
0
44
9
4
7
0
0
44
9
4
8
0
0
44
9
4
9
0
0
44
9
5
0
0
0
44
9
5
1
0
0
499700 499800 499900 500000 500100 500200 500300 500400 500500 500600 500700 500800 500900 501000
499700 499800 499900 500000 500100 500200 500300 500400 500500 500600 500700 500800 500900 501000
40° 36' 26'' N
10
5
°
0
'
1
5
'
'
W
40° 36' 26'' N
10
4
°
5
9
'
1
7
'
'
W
40° 35' 57'' N
10
5
°
0
'
1
5
'
'
W
40° 35' 57'' N
10
4
°
5
9
'
1
7
'
'
W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 300 600 1200 1800
Feet
0 50 100 200 300
Meters
Map Scale: 1:6,250 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 17, Sep 7, 2022
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jul 2, 2021—Aug 25,
2021
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Hydrologic Soil Group—Larimer County Area, Colorado
(Mountain Vista Property)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/17/2023
Page 2 of 4
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
7 Ascalon sandy loam, 0
to 3 percent slopes
B 14.8 14.5%
53 Kim loam, 1 to 3 percent
slopes
B 26.5 25.9%
54 Kim loam, 3 to 5 percent
slopes
B 16.6 16.2%
73 Nunn clay loam, 0 to 1
percent slopes
C 23.8 23.2%
74 Nunn clay loam, 1 to 3
percent slopes
C 10.1 9.9%
94 Satanta loam, 0 to 1
percent slopes
C 0.2 0.2%
95 Satanta loam, 1 to 3
percent slopes
C 10.2 10.0%
105 Table Mountain loam, 0
to 1 percent slopes
B 0.1 0.1%
Totals for Area of Interest 102.4 100.0%
Hydrologic Soil Group—Larimer County Area, Colorado Mountain Vista Property
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/17/2023
Page 3 of 4
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Larimer County Area, Colorado Mountain Vista Property
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/17/2023
Page 4 of 4
18,056
3,009.3
FCMaps
This map is a user generated static output from the City of Fort Collins FCMaps
Internet mapping site and is for reference only. Data layers that appear on this
map may or may not be accurate, current, or otherwise reliable.
City of Fort Collins - GIS
2,286.0
1:
WGS_1984_Web_Mercator_Auxiliary_Sphere
Feet2,286.001,143.00
Notes
Legend
13,719
FEMA Floodplain
FEMA High Risk - Floodway
FEMA High Risk - 100 Year
FEMA Moderate Risk - 100 / 500 Year
City Floodplains
City High Risk - Floodway
City High Risk - 100 Year
City Moderate Risk - 100 Year
City Limits
World Hillshade
National Flood Hazard Layer FIRMette
0 500 1,000 1,500 2,000250
Feet
Ü
SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT
SPECIAL FLOOD
HAZARD AREAS
Without Base Flood Elevation (BFE)
Zone A, V, A99
With BFE or DepthZone AE, AO, AH, VE, AR
Regulatory Floodway
0.2% Annual Chance Flood Hazard, Areas
of 1% annual chance flood with average
depth less than one foot or with drainage
areas of less than one square mileZone X
Future Conditions 1% Annual
Chance Flood HazardZone X
Area with Reduced Flood Risk due to
Levee. See Notes.Zone X
Area with Flood Risk due to LeveeZone D
NO SCREEN Area of Minimal Flood Hazard Zone X
Area of Undetermined Flood HazardZone D
Channel, Culvert, or Storm Sewer
Levee, Dike, or Floodwall
Cross Sections with 1% Annual Chance
17.5 Water Surface Elevation
Coastal Transect
Coastal Transect Baseline
Profile Baseline
Hydrographic Feature
Base Flood Elevation Line (BFE)
Effective LOMRs
Limit of Study
Jurisdiction Boundary
Digital Data Available
No Digital Data Available
Unmapped
This map complies with FEMA's standards for the use of
digital flood maps if it is not void as described below.
The basemap shown complies with FEMA's basemap
accuracy standards
The flood hazard information is derived directly from the
authoritative NFHL web services provided by FEMA. This map
was exported on 7/21/2023 at 10:33 AM and does not
reflect changes or amendments subsequent to this date and
time. The NFHL and effective information may change or
become superseded by new data over time.
This map image is void if the one or more of the following map
elements do not appear: basemap imagery, flood zone labels,
legend, scale bar, map creation date, community identifiers,
FIRM panel number, and FIRM effective date. Map images for
unmapped and unmodernized areas cannot be used for
regulatory purposes.
Legend
OTHER AREAS OF
FLOOD HAZARD
OTHER AREAS
GENERAL
STRUCTURES
OTHER
FEATURES
MAP PANELS
8
B 20.2
The pin displayed on the map is an approximate
point selected by the user and does not represent
an authoritative property location.
1:6,000
105°0'6"W 40°36'26"N
104°59'29"W 40°35'58"N
Basemap Imagery Source: USGS National Map 2023
9,028
1,504.7
FCMaps
This map is a user generated static output from the City of Fort Collins FCMaps
Internet mapping site and is for reference only. Data layers that appear on this
map may or may not be accurate, current, or otherwise reliable.
City of Fort Collins - GIS
1,143.0
1:
WGS_1984_Web_Mercator_Auxiliary_Sphere
Feet1,143.00571.50
Notes
Legend
6,859
Street Names
FEMA Floodplain
FEMA High Risk - Floodway
FEMA High Risk - 100 Year
FEMA Moderate Risk - 100 / 500 Year
City Floodplains
City High Risk - Floodway
City High Risk - 100 Year
City Moderate Risk - 100 Year
City Limits
Front Range Storage
Preliminary Drainage Report
11
APPENDIX B – HYDROLOGIC CALCULATIONS
Subdivision:RV & Boat Storage Project Name:Front Range RV Boat and Storage
Location:Fort Collins Project No.:
Calculated By:ARJ
Checked By:0
Date:7/27/23
Tributary Area Width L=A/W Slope % Imperv N-Imperv N-Perv Store Imperv.Dstore perv.Zero % imperv. Storage (max) Storage (min)Decay Rate
Sub-basin
EO1 11.8 658.98 780.00 0.63%7.2%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48
EX2 50.1 2929.34 745.00 0.80%6.2%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48
EX3 21.9 1059.96 900.00 1.00%2.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48
SB102 285.3 13436 924.95 0.60%5.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48
Tributary Area Width L=A/W Slope % Imperv N-Imperv N-Perv Store Imperv.Dstore perv.Zero % imperv. Storage (max) Storage (min)Decay Rate
Sub-basin
O1 11.8 856.68 600.00 0.55%61.3%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48
EX2 50.1 2929.34 745.00 0.80%11.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48
EX3 21.9 1059.96 900.00 1.00%2.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48
SB102 285.3 13436 924.95 0.60%5.0%0.016 0.25 0.1 0.3 1 0.51 0.5 6.48
SWMM INPUTS
39817.00
Basin inputs City of Fort Collins Default Inputs City of Fort Collins Horton inputs
Existing SWMM INPUTS
Basin inputs City of Fort Collins Default Inputs City of Fort Collins Horton inputs
Proposed SWMM INPUTS
X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 1 of 1 7/28/2023
Subdivision:RV & Boat Storage Project Name: Mountain Vista Property
Location:Fort Collins Project No.:
Calculated By: JSC
Checked By: 0
Date: 7/17/23
EO1 12.92 40%1.38 4.3%90%0.04 0.3%2%11.49 1.8%90%0.00 0.0%6.4%
EX2 32.30 40%0.00 0.0%90%0.93 2.6%2%27.21 1.7%90%4.16 11.6%15.9%
TOTAL 45.22 40%1.38 1.2%90%0.97 1.9%2%38.71 1.7%90%4.16 8.3%13.1%
Basins Total
Weighted %
Imp.
Asphalt/Concrete
% Imp.Area (ac)Weighted
% Imp.
COMPOSITE % IMPERVIOUS CALCULATIONS
Weighted
% Imp.Basin ID Total Area (ac)% Imp.Area (ac)
Landscape or Previous Surface
% Imp.Area (ac)Weighted %
Imp.
Gravel Rooftop
Weighted
% Imp.% Imp.Area (ac)
39817.00
X:\3980000.all\3981700\Excel\Drainage\3981700 EX. Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 7/27/2023
Subdivision:RV & Boat Storage Project Name: Mountain Vista Property
Location:Fort Collins Project No.:
Calculated By: JSC
Checked By: 0
Date: 7/17/23
EO1 12.92 0.50 1.38 0.05 0.07 0.95 0.04 0.00 0.00 0.20 11.49 0.18 0.22 0.95 0.00 0.00 0.00 0.18 0.23
EX2 32.30 0.50 0.00 0.00 0.00 0.95 0.93 0.03 0.03 0.20 27.21 0.17 0.21 0.95 4.16 0.12 0.15 0.32 0.40
Basin ID
Basins Total
Weighted 100
YEAR C
COMPOSITE RUNOFF COEFFICIENT CALCULATIONS
Basins Total
Weighted 2
YEAR CArea (ac)2 - YEAR
C
100 - YEAR
C
Runoff
Coefficient Area (ac)2 - YEAR C 100 - YEAR
C
39817.00
Total Area
(ac)Runoff
Coefficient Area (ac)Area (ac)
Gravel Rooftop Landscape or Previous Surface
Runoff
Coefficient
Asphalt/Concrete
2 - YEAR C 100 -
YEAR C2 - YEAR C 100 -
YEAR C
Runoff
Coefficient
X:\3980000.all\3981700\Excel\Drainage\3981700 EX. Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 7/27/2023
Subdivision:RV & Boat Storage Project Name: Mountain Vista Property
Location:Fort Collins Project No.:
Calculated By: JSC
Checked By: 0
Date: 7/17/23
FINAL
BASIN D.A.Hydrologic Impervious C2 C100 L S o t i L t S t K VEL.t t COMP. t c TOTAL Urbanized t c t c
ID (ac)Soils Group (%)(ft)(%)(min)(ft)(%)(ft/s)(min)(min)LENGTH (ft)(min)(min)
EO1 12.92 B/C 6%0.18 0.23 250 0.6%31.0 780 0.6%15.0 1.2 10.9 42.0 1030.0 41.5 41.0
EX2 32.3 B/C 16%0.32 0.40 100 1.0%14.1 800 1.8%15.0 2.0 6.6 20.7 900.0 32.2 21.0
Notes:
(URBANIZED BASINS)DATA
INITIAL/OVERLAND
(Ti)
TRAVEL TIME
(Tt)
STANDARD FORM SF-2
TIME OF CONCENTRATION
SUB-BASIN tc CHECK
39817.00
X:\3980000.all\3981700\Excel\Drainage\3981700 EX. Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 7/28/2023
Project Name: Mountain Vista Property
Subdivision:RV & Boat Storage Project No.:
Location:Fort Collins Calculated By: JSC
Design Storm:Checked By: 0
Date:
TRAVEL TIME
STREET
De
s
i
g
n
P
o
i
n
t
Ba
s
i
n
I
D
Ar
e
a
(
A
c
)
Ru
n
o
f
f
C
o
e
f
f
.
tc
(
m
i
n
)
C*
A
(
A
c
)
I
(
i
n
/
h
r
)
Q
(
c
f
s
)
tc
(
m
i
n
)
C*
A
(
a
c
)
I
(
i
n
/
h
r
)
Q
(
c
f
s
)
Qst
r
e
e
t
(
c
f
s
)
C*
A
(
a
c
)
Sl
o
p
e
(
%
)
Qpi
p
e
(
c
f
s
)
C*
A
(
a
c
)
Sl
o
p
e
(
%
)
Pi
p
e
S
i
z
e
(
i
n
c
h
e
s
)
Le
n
g
t
h
(
f
t
)
Ve
l
o
c
i
t
y
(
f
p
s
)
tt
(
m
i
n
)
REMARKS
1 EO1 12.92 0.18 41.0 2.34 1.05 2.5
1 EX2 32.30 0.32 21.0 10.28 1.56 16.0
1.1 21.0 12.62 1.56 19.7
Notes:
Street and Pipe C*A values are determined by Q/I using the catchment's intensity value.
DIRECT RUNOFF TOTAL RUNOFF STREET PIPE
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
2-Year
39817.00
7/17/23
X:\3980000.all\3981700\Excel\Drainage\3981700 EX. Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 7/28/2023
Project Name: Mountain Vista Property
Subdivision:RV & Boat Storage Project No.:
Location:Fort Collins Calculated By: JSC
Design Storm:Checked By: 0
Date:
TRAVEL TIME
STREET
De
s
i
g
n
P
o
i
n
t
Ba
s
i
n
I
D
Ar
e
a
(
a
c
)
Ru
n
o
f
f
C
o
e
f
f
.
tc
(
m
i
n
)
C*
A
(
a
c
)
I
(
i
n
/
h
r
)
Q
(
c
f
s
)
tc
(
m
i
n
)
C*
A
(
a
c
)
I
(
i
n
/
h
r
)
Q
(
c
f
s
)
Qst
r
e
e
t
(
c
f
s
)
C*
A
(
a
c
)
Sl
o
p
e
(
%
)
Qpi
p
e
(
c
f
s
)
C*
A
(
a
c
)
Sl
o
p
e
(
%
)
Pi
p
e
S
i
z
e
(
i
n
c
h
e
s
)
Le
n
g
t
h
(
f
t
)
Ve
l
o
c
i
t
y
(
f
p
s
)
tt
(
m
i
n
)
REMARKS
1 EO1 12.92 0.23 41.0 2.92 3.68 10.7
1 EX2 32.30 0.40 21.0 12.85 5.46 70.2
1.1 21.0 15.77 5.46 86.1
Notes:
Street and Pipe C*A values are determined by Q/I using the catchment's intensity value.
STORM DRAINAGE SYSTEM DESIGN
STANDARD FORM SF-3
(RATIONAL METHOD PROCEDURE)
39817.00
PIPE
100-Year
DIRECT RUNOFF TOTAL RUNOFF
7/17/23
STREET
X:\3980000.all\3981700\Excel\Drainage\3981700 EX. Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 7/28/2023
Subdivision:RV & Boat Storage Project Name:Front Range RV Boat and Storage
Location:Fort Collins Project No.:
Calculated By:ARJ
Checked By:0
Date:7/27/23
C1 0.70 80%0.41 46.9%90%0.13 16.7%2%0.16 0.5%64.0%
C2 2.74 80%2.56 74.7%90%0.00 0.0%2%0.18 0.1%74.9%
C3 2.24 80%2.10 74.9%90%0.00 0.0%2%0.14 0.1%75.0%
C4 2.22 80%1.86 67.0%90%0.00 0.0%2%0.36 0.3%67.4%
C5 0.33 80%0.28 68.5%90%0.00 0.0%2%0.05 0.3%68.8%
C6 0.68 80%0.66 77.3%90%0.00 0.0%2%0.02 0.1%77.4%
C7 1.06 80%0.90 67.6%90%0.00 0.0%2%0.16 0.3%67.9%
C8 1.79 100%0.03 1.4%90%0.00 0.0%2%1.76 2.0%3.4%
Onsite Basins 11.76 61.3%
OS1 21.90 100%0.00 0.0%90%0.00 0.0%2%21.90 2.0%2.0%
COMPOSITE % IMPERVIOUS CALCULATIONS
% Imp. Area (ac)
39817.00
Weighted
% Imp.
Basins Total Weighted
% Imp.Basin ID Total Area (ac)% Imp.Area (ac)
Lawns
% Imp. Area (ac)Weighted % Imp.
Recycled Asphalt/Concrete Roofs
Weighted
% Imp.
X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 1 of 1 7/28/2023
Subdivision:RV & Boat Storage Project Name:Front Range RV Boat and Storage
Location:Fort Collins Project No.:
Calculated By:ARJ
Checked By:0
Date:7/27/23
C1 0.70 0.95 0.41 0.56 0.70 0.95 0.13 0.18 0.22 0.15 0.16 0.03 0.04 0.77 0.96
C2 2.74 0.95 2.56 0.89 1.00 0.95 0.00 0.00 0.00 0.15 0.18 0.01 0.01 0.90 1.00
C3 2.24 0.95 2.10 0.89 1.00 0.95 0.00 0.00 0.00 0.15 0.14 0.01 0.01 0.90 1.00
C4 2.22 0.95 1.86 0.80 0.99 0.95 0.00 0.00 0.00 0.15 0.36 0.02 0.03 0.82 1.00
C5 0.33 0.95 0.28 0.81 1.00 0.95 0.00 0.00 0.00 0.15 0.05 0.02 0.03 0.84 1.00
C6 0.68 0.95 0.66 0.92 1.00 0.95 0.00 0.00 0.00 0.15 0.02 0.01 0.01 0.92 1.00
C7 1.06 0.95 0.90 0.80 1.00 0.95 0.00 0.00 0.00 0.15 0.16 0.02 0.03 0.83 1.00
Weighted 9.97 0.86 1.00
C8 1.79 0.95 0.03 0.01 0.02 0.95 0.00 0.00 0.00 0.15 1.76 0.15 0.18 0.16 0.20
OS1 21.90 0.95 0.00 0.00 0.00 0.95 0.00 0.00 0.00 0.15 21.90 0.15 0.19 0.15 0.19
COMPOSITE RUNOFF COEFFICIENT CALCULATIONS
Basin ID Area (ac)2 - YEAR C 100 - YEAR C
39817.00
Total Area
(ac)Runoff
Coefficient Area (ac)2 - YEAR C 100 - YEAR C Runoff Coefficient
Basins Total Weighted
100 YEAR CRunoff
Coefficient Area (ac)2 - YEAR C 100 - YEAR C
Recycled Asphalt/Concrete Roofs Lawns
Basins Total Weighted 2
YEAR C
X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 1 of 1 7/28/2023
Subdivision:RV & Boat Storage Project Name:Front Range RV Boat and Storage
Location:Fort Collins Project No.:
Calculated By:ARJ
Checked By:0
Date:7/27/23
FINAL
BASIN D.A.Hydrologic Impervious C2 C100 L S o t i L t S t K VEL.t t COMP.t c TOTAL Urbanized t c t c
ID (ac)Soils Group (%)(ft)(%)(min)(ft)(%)(ft/s)(min)(min)LENGTH (ft)(min)(min)
C1 0.70 C 64%0.77 0.96 10 1.5%1.7 10 1.0%20.0 2.0 0.1 1.7 20.0 15.2 5.0
C2 2.74 C 75%0.90 1.00 50 2.0%2.1 481 0.6%20.0 1.5 5.4 7.5 531.0 18.8 7.0
C3 2.24 C 75%0.90 1.00 50 2.0%2.0 481 0.6%20.0 1.5 5.4 7.4 531.0 18.8 7.0
C4 2.22 C 67%0.82 1.00 50 2.0%2.8 481 0.6%20.0 1.5 5.4 8.2 531.0 20.4 8.0
C5 0.33 C 69%0.84 1.00 50 0.6%4.0 44 0.6%20.0 1.5 0.5 4.5 94.0 14.8 5.0
C6 0.68 C 77%0.92 1.00 45 2.0%1.7 81 0.5%20.0 1.5 0.9 2.6 126.0 13.8 5.0
C7 1.06 C 68%0.83 1.00 30 1.5%2.4 109 0.5%20.0 1.5 1.2 3.6 139.0 15.8 5.0
C8 1.79 C 3%0.16 0.20 50 2.0%9.5 228 0.5%20.0 1.4 2.7 12.2 278.0 31.1 12.0
OS1 21.90 C 2%0.15 0.19 100 1.0%17.2 300 0.5%15.0 1.1 4.7 21.9 400.0 33.3 22.0
Notes:
(URBANIZED BASINS)DATA
INITIAL/OVERLAND
(Ti)
TRAVEL TIME
(Tt)
STANDARD FORM SF-2
TIME OF CONCENTRATION
SUB-BASIN tc CHECK
39817.00
X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 1 of 1 7/28/2023
Project Name:Front Range RV Boat and Storage
Subdivision:RV & Boat Storage Project No.:
Location:Fort Collins Calculated By:ARJ
Design Storm:Checked By:0
Date:
TRAVEL TIME
STREET
De
s
i
g
n
P
o
i
n
t
Ba
s
i
n
I
D
Ar
e
a
(
A
c
)
Ru
n
o
f
f
C
o
e
f
f
.
tc
(
m
i
n
)
C*
A
(
A
c
)
I
(
i
n
/
h
r
)
Q
(
c
f
s
)
tc
(
m
i
n
)
C*
A
(
a
c
)
I
(
i
n
/
h
r
)
Q
(
c
f
s
)
Qst
r
e
e
t
(
c
f
s
)
C*
A
(
a
c
)
Sl
o
p
e
(
%
)
Qpi
p
e
(
c
f
s
)
C*
A
(
a
c
)
Sl
o
p
e
(
%
)
Pi
p
e
S
i
z
e
(
i
n
c
h
e
s
)
Le
n
g
t
h
(
f
t
)
Ve
l
o
c
i
t
y
(
f
p
s
)
tt
(
m
i
n
)
REMARKS
Type C inlet Basin C1
1 C1 0.70 0.77 5.0 0.54 2.85 1.5
Type C inlet Basin C2
2 C2 2.74 0.90 7.0 2.46 2.52 6.2
Type C inlet Basin C5
5 C5 0.33 0.84 5.0 0.28 2.85 0.8
Piped runoff basin C1,C2, and C5
5.1 7.0 3.28 2.52 8.3 8.3 0.5 150 1.4 1.8
Type C inlet Basin C3
3 C3 2.24 0.90 7.0 2.01 2.52 5.1
Type C inlet Basin C6
6 C6 0.68 1.00 5.0 0.68 2.85 1.9
Piped runoff basin C1,C2, C5, C3 and C6
6.1 9.0 5.97 2.30 13.7 13.7 0.5 215 1.4 2.5
Type C inlet Basin C4
4 C4 2.22 0.82 8.0 1.82 2.40 4.4
Type C inlet Basin C7
7 C7 1.06 0.83 5.0 0.88 2.85 2.5
Piped runoff basin C1,C2, C5, C3, C6, C4 AND C7
7.1 11.0 8.67 2.13 18.5
Basin OS1
9 OS1 21.90 0.15 22.0 3.29 1.53 5.0
Basin C8
8 C8 1.79 0.16 12.0 0.29 2.05 0.6
Notes:
Street and Pipe C*A values are determined by Q/i using the catchment's intensity value.
DIRECT RUNOFF TOTAL RUNOFF STREET PIPE
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
2-Year
39817.00
7/27/23
X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 1 of 1 7/28/2023
Project Name:Front Range RV Boat and Storage
Subdivision:RV & Boat Storage Project No.:
Location:Fort Collins Calculated By:ARJ
Design Storm:Checked By:0
Date:
TRAVEL TIME
STREET
De
s
i
g
n
P
o
i
n
t
Ba
s
i
n
I
D
Ar
e
a
(
a
c
)
Ru
n
o
f
f
C
o
e
f
f
.
tc
(
m
i
n
)
C*
A
(
a
c
)
I
(
i
n
/
h
r
)
Q
(
c
f
s
)
tc
(
m
i
n
)
C*
A
(
a
c
)
I
(
i
n
/
h
r
)
Q
(
c
f
s
)
Qst
r
e
e
t
(
c
f
s
)
C*
A
(
a
c
)
Sl
o
p
e
(
%
)
Qpi
p
e
(
c
f
s
)
C*
A
(
a
c
)
Sl
o
p
e
(
%
)
Pi
p
e
S
i
z
e
(
i
n
c
h
e
s
)
Le
n
g
t
h
(
f
t
)
Ve
l
o
c
i
t
y
(
f
p
s
)
tt
(
m
i
n
)
REMARKS
Type C inlet Basin C1
1 C1 0.70 0.96 5.0 0.67 9.95 6.7
Type C inlet Basin C2
2 C2 2.74 1.00 7.0 2.74 8.80 24.1
Type C inlet Basin C5
5 C5 0.33 1.00 5.0 0.33 9.95 3.3
Piped runoff basin C1,C2, and C5
5.1 7.0 3.74 8.80 32.9 32.9 0.5 150 1.4 1.8
Type C inlet Basin C3
3 C3 2.24 1.00 7.0 2.24 8.80 19.7
Type C inlet Basin C6
6 C6 0.68 1.00 5.0 0.68 9.95 6.8
Piped runoff basin C1,C2, C5, C3 and C6
6.1 9.0 6.66 8.03 53.5 53.5 0.5 215 1.4 2.5
Type C inlet Basin C4
4 C4 2.22 1.00 8.0 2.22 8.38 18.6
Type C inlet Basin C7
7 C7 1.06 1.00 5.0 1.06 9.95 10.5
Piped runoff basin C1,C2, C5, C3, C6, C4 AND C7
7.1 11.0 9.94 7.42 73.8
Basin OS1
9 OS1 21.90 0.19 22.0 4.11 5.32 21.9
Basin C8
8 C8 1.79 0.20 12.0 0.36 7.16 2.6
Notes:
Street and Pipe C*A values are determined by Q/i using the catchment's intensity value.
STORM DRAINAGE SYSTEM DESIGN
STANDARD FORM SF-3
(RATIONAL METHOD PROCEDURE)
39817.00
PIPE
100-Year
DIRECT RUNOFF TOTAL RUNOFF
7/27/23
STREET
X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 1 of 1 7/28/2023
Subdivision:RV & Boat Storage Project Name:Mountain Vista Property
Location:Fort Collins Project No.:39817.00
Calculated By:JSC/ARJ
Checked By:0
Date:7/19/23
7.1 DESIGN POINT DESIGN POINT DESIGN POINT Notes
Q100 (cfs):73.8 Flows are the greater of proposed
vs. future
Conduit Pipe
D c , Pipe Diameter (in):42
W , Box Width (ft):N/A
H , Box Height (ft):N/A
Y t , Tailwater Depth (ft):1.00 If unknown, use Y t /D c (or H )=0.4
Y t /Dc or Y t /H 0.29
Q/D2.5 or Q/(WH3/2)3.22
Supercritical?No
Y n , Normal Depth (ft) [Supercritical]:1.00
D a ,H a (in) [Supercritical]:N/A D a =(D c +Y n )/2
Riprap d 50 (in) [Supercritical]:N/A
Riprap d 50 (in) [Subcritical]:13.98
Required Riprap Size:H Fig. 9-38 or Fig. 9-36
d 50 (in):15
Expansion Factor, 1/(2 tan):6.00 Read from Fig. 9-35 or 9-36
0.08
Erosive Soils?No
Area of Flow,A t (ft2):10.54 A t =Q/V
Length of Protection, L p (ft):42.2 L=(1/(2 tan ))(At/Yt - D)
Min Length (ft)10.5 Min L=3D or 3H
Max Length (ft)35.0 Max L=10D or 10H
Min Bottom Width,T (ft):10.5 T=2*(Lp*tan)+W
Design Length (ft)35.0
Design Width (ft)10.5
Riprap Depth (in)30 Depth=2(d50)
Type II Bedding Depth (in)*8 *Not used if Soil Riprap
Cutoff Wall No
Cutoff Wall Depth (ft)Depth of Riprap and Base
Cutoff Wall Width (ft)
Note: No Type II Base to be used if Soil Riprap is specified within the plans
* For use when the flow in the culvert is supercritical (and less than full).
STORM DRAIN SYSTEM
PIPE OUTFALL RIPRAP SIZING CALCULATIONS
X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 1 of 2 7/26/2023
X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 2 of 2 7/26/2023
Front Range Storage
Preliminary Drainage Report
12
APPENDIX C – HYDRAULIC CALCULATIONS
Project:
Basin ID:
Depth Increment =ft
Watershed Information Top of Micropool --0.00 ------0 0.000
Selected BMP Type =EDB --0.11 ------168 0.004 9 0.000
Watershed Area =2.4 acres --1.11 ------13,523 0.310 6,855 0.157
Watershed Length =400 ft --2.11 ------38,778 0.890 33,005 0.758
Watershed Length to Centroid =240 ft --3.11 ------60,619 1.392 82,703 1.899
Watershed Slope =0.009 ft/ft --4.11 ------68,450 1.571 147,238 3.380
Watershed Imperviousness =75.00%percent --5.11 ------72,346 1.661 217,636 4.996
Percentage Hydrologic Soil Group A =0.0%percent --6.11 ------76,477 1.756 292,047 6.704
Percentage Hydrologic Soil Group B =0.0%percent --------
Percentage Hydrologic Soil Groups C/D =100.0%percent --------
Target WQCV Drain Time =40.0 hours --------
Location for 1-hr Rainfall Depths = User Input --------
--------
--------
Optional User Overrides --------
Water Quality Capture Volume (WQCV) =0.060 acre-feet acre-feet --------
Excess Urban Runoff Volume (EURV) =0.176 acre-feet acre-feet --------
2-yr Runoff Volume (P1 = 0.82 in.) =0.110 acre-feet 0.82 inches --------
5-yr Runoff Volume (P1 = 1.09 in.) =0.156 acre-feet inches --------
10-yr Runoff Volume (P1 = 1.4 in.) =0.215 acre-feet 1.40 inches --------
25-yr Runoff Volume (P1 = 1.69 in.) =0.277 acre-feet inches --------
50-yr Runoff Volume (P1 = 1.99 in.) =0.337 acre-feet inches --------
100-yr Runoff Volume (P1 = 2.86 in.) =0.517 acre-feet 2.86 inches --------
500-yr Runoff Volume (P1 = 3.14 in.) =0.574 acre-feet inches --------
Approximate 2-yr Detention Volume =0.109 acre-feet --------
Approximate 5-yr Detention Volume =0.159 acre-feet --------
Approximate 10-yr Detention Volume =0.201 acre-feet --------
Approximate 25-yr Detention Volume =0.225 acre-feet --------
Approximate 50-yr Detention Volume =0.242 acre-feet --------
Approximate 100-yr Detention Volume =0.331 acre-feet --------
--------
Define Zones and Basin Geometry --------
Zone 1 Volume (WQCV) =0.060 acre-feet --------
Zone 2 Volume (User Defined - Zone 1) =0.000 acre-feet --------
Zone 3 Volume (100-year - Zones 1 & 2) =0.272 acre-feet --------
Total Detention Basin Volume =0.331 acre-feet --------
Initial Surcharge Volume (ISV) =user ft 3 --------
Initial Surcharge Depth (ISD) =user ft --------
Total Available Detention Depth (Htotal) =user ft --------
Depth of Trickle Channel (HTC) =user ft --------
Slope of Trickle Channel (STC) =user ft/ft --------
Slopes of Main Basin Sides (Smain) =user H:V --------
Basin Length-to-Width Ratio (RL/W) =user --------
--------
Initial Surcharge Area (AISV) =user ft 2 --------
Surcharge Volume Length (LISV) =user ft --------
Surcharge Volume Width (WISV) =user ft --------
Depth of Basin Floor (HFLOOR) =user ft --------
Length of Basin Floor (LFLOOR) =user ft --------
Width of Basin Floor (WFLOOR) =user ft --------
Area of Basin Floor (AFLOOR) =user ft 2 --------
Volume of Basin Floor (VFLOOR) =user ft 3 --------
Depth of Main Basin (HMAIN) =user ft --------
Length of Main Basin (LMAIN) =user ft --------
Width of Main Basin (WMAIN) =user ft --------
Area of Main Basin (AMAIN) =user ft 2 --------
Volume of Main Basin (VMAIN) =user ft 3 --------
Calculated Total Basin Volume (Vtotal) =user acre-feet --------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
--------
DETENTION BASIN STAGE-STORAGE TABLE BUILDER
Optional
Override
Area (ft 2)
Length
(ft)
Optional
Override
Stage (ft)
Stage
(ft)
Stage - Storage
Description
Area
(ft 2)
Width
(ft)
Front Range RV Boat and Storage
Note and Impervious area were adjusted to Calc. WQCV to equal 0.06 Acre-ft
MHFD-Detention, Version 4.06 (July 2022)
Volume
(ft 3)
Volume
(ac-ft)
Area
(acre)
After providing required inputs above including 1-hour rainfall
depths, click 'Run CUHP' to generate runoff hydrographs using
the embedded Colorado Urban Hydrograph Procedure.
ExampleZone Configuration (Retention Pond)
3981700 MHFD-Detention_v4-06 (9).xlsm, Basin 7/28/2023, 2:48 PM
1 User Defined Stage-Area Booleans for Message
1 Equal Stage-Area Inputs Watershed L:W
1 CountA Watershed Lc:L
Watershed Slope
0 Calc_S_TC Booleans for CUHP
1 CUHP Inputs Complete
H_FLOOR 1 CUHP Results Calculated
L_FLOOR_OTHER
0.00 ISV 0.00 ISV
0.00 Floor 0.00 Floor
0.73 Zone 1 (WQCV)0.73 Zone 1 (WQCV)
0.73 Zone 2 (User)0.73 Zone 1 (WQCV)
1.52 Zone 3 (100-year)1.52 Zone 3 (100-year)
DETENTION BASIN STAGE-STORAGE TABLE BUILDER
MHFD-Detention, Version 4.06 (July 2022)
0.000
1.680
3.360
5.040
6.720
0.000
0.440
0.880
1.320
1.760
0.00 2.00 4.00 6.00 8.00
Vo
l
u
m
e
(
a
c
-
f
t
)
Ar
e
a
(
a
c
r
e
s
)
Stage (ft.)
Area (acres)Volume (ac-ft)
0
19200
38400
57600
76800
0
5
10
15
20
0.00 2.00 4.00 6.00 8.00
Ar
e
a
(
s
q
.
f
t
.
)
Le
n
g
t
h
,
W
i
d
t
h
(
f
t
.
)
Stage (ft)
Length (ft)Width (ft)Area (sq.ft.)
3981700 MHFD-Detention_v4-06 (9).xlsm, Basin 7/28/2023, 2:48 PM
Project:
Basin ID:
Estimated Estimated
Stage (ft)Volume (ac-ft)Outlet Type
Zone 1 (WQCV)0.73 0.060 Orifice Plate
Zone 2 (User)0.73 0.000
Zone 3 (100-year)1.52 0.272
Total (all zones)0.331
User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain
Underdrain Orifice Invert Depth =N/A ft (distance below the filtration media surface)Underdrain Orifice Area =N/A ft2
Underdrain Orifice Diameter =N/A inches Underdrain Orifice Centroid =N/A feet
User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP)Calculated Parameters for Plate
Centroid of Lowest Orifice =0.00 ft (relative to basin bottom at Stage = 0 ft)WQ Orifice Area per Row =3.056E-03 ft2
Depth at top of Zone using Orifice Plate =0.73 ft (relative to basin bottom at Stage = 0 ft)Elliptical Half-Width =N/A feet
Orifice Plate: Orifice Vertical Spacing =2.90 inches Elliptical Slot Centroid =N/A feet
Orifice Plate: Orifice Area per Row =0.44 sq. inches (diameter = 3/4 inch)Elliptical Slot Area =N/A ft2
User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest)
Row 1 (required)Row 2 (optional)Row 3 (optional)Row 4 (optional)Row 5 (optional)Row 6 (optional)Row 7 (optional)Row 8 (optional)
Stage of Orifice Centroid (ft)0.00 0.24 0.49
Orifice Area (sq. inches)0.44 0.44 0.44
Row 9 (optional)Row 10 (optional)Row 11 (optional)Row 12 (optional)Row 13 (optional)Row 14 (optional)Row 15 (optional)Row 16 (optional)
Stage of Orifice Centroid (ft)
Orifice Area (sq. inches)
User Input: Vertical Orifice (Circular or Rectangular)Calculated Parameters for Vertical Orifice
Not Selected Not Selected Not Selected Not Selected
Invert of Vertical Orifice =0.75 1.10 ft (relative to basin bottom at Stage = 0 ft)Vertical Orifice Area =0.05 0.05
Depth at top of Zone using Vertical Orifice =1.00 1.35 ft (relative to basin bottom at Stage = 0 ft)Vertical Orifice Centroid =0.13 0.13
Vertical Orifice Diameter =3.00 3.00 inches
User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir and No Outlet Pipe)Calculated Parameters for Overflow Weir
grate Not Selected Not Selected Not Selected Not Selected
Overflow Weir Front Edge Height, Ho =3.25 ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =3.25
Overflow Weir Front Edge Length =5.00 feet Overflow Weir Slope Length =5.00
Overflow Weir Grate Slope =0.00 H:V Grate Open Area / 100-yr Orifice Area =9.85
Horiz. Length of Weir Sides =5.00 feet Overflow Grate Open Area w/o Debris =17.40
Overflow Grate Type =Type C Grate Overflow Grate Open Area w/ Debris =17.40
Debris Clogging % =0%%
User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice)Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate
Not Selected Not Selected Not Selected Not Selected
Depth to Invert of Outlet Pipe =0.00 ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area =1.77
Circular Orifice Diameter =18.00 inches Outlet Orifice Centroid =0.75
Half-Central Angle of Restrictor Plate on Pipe =N/A N/A
User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway
Spillway Invert Stage=5.11 ft (relative to basin bottom at Stage = 0 ft)Spillway Design Flow Depth=0.05 feet
Spillway Crest Length =239.00 feet Stage at Top of Freeboard =5.16 feet
Spillway End Slopes =4.00 H:V Basin Area at Top of Freeboard =1.67 acres
Freeboard above Max Water Surface =feet Basin Volume at Top of Freeboard =5.08 acre-ft
Max Ponding Depth of Target Storage Volume =1.73 feet Discharge at Top of Freeboard =17.87 cfs
Routed Hydrograph Results
Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year
One-Hour Rainfall Depth (in) =N/A N/A 0.82 1.09 1.40 1.69 1.99 2.86
CUHP Runoff Volume (acre-ft) =0.060 0.176 0.110 0.156 0.215 0.277 0.337 0.517
Inflow Hydrograph Volume (acre-ft) =N/A N/A 0.110 0.156 0.215 0.277 0.337 0.517
CUHP Predevelopment Peak Q (cfs) =N/A N/A 0.0 0.2 0.7 1.4 2.0 3.7
OPTIONAL Override Predevelopment Peak Q (cfs) =N/A N/A
Predevelopment Unit Peak Flow, q (cfs/acre) =N/A N/A 0.01 0.08 0.28 0.60 0.83 1.56
Peak Inflow Q (cfs) =N/A N/A 1.8 2.6 3.5 4.6 5.6 8.7
Peak Outflow Q (cfs) =0.0 0.2 0.1 0.1 0.2 0.3 0.3 0.4
Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 0.7 0.3 0.2 0.2 0.1
Structure Controlling Flow =Plate Vertical Orifice 2 Vertical Orifice 1 Vertical Orifice 1 Vertical Orifice 2 Vertical Orifice 2 Vertical Orifice 2 Vertical Orifice 2
Max Velocity through Grate 1 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A
Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A
Time to Drain 97% of Inflow Volume (hours) =38 52 50 52 54 55 55 56
Time to Drain 99% of Inflow Volume (hours) =40 57 54 57 60 61 62 65
Maximum Ponding Depth (ft) =0.73 1.17 0.91 1.05 1.21 1.34 1.45 1.73
Area at Maximum Ponding Depth (acres) =0.19 0.35 0.25 0.29 0.36 0.44 0.50 0.66
Maximum Volume Stored (acre-ft) =0.062 0.177 0.099 0.139 0.188 0.240 0.291 0.455
DETENTION BASIN OUTLET STRUCTURE DESIGN
MHFD-Detention, Version 4.06 (July 2022)
Front Range RV Boat and Storage
Note and Impervious area were adjusted to Calc. WQCV to equal 0.06 Acre-ft
The user can override the default CUHP hydrographs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF).
Example Zone Configuration (Retention Pond)
3981700 MHFD-Detention_v4-06 (9).xlsm, Outlet Structure 7/28/2023, 3:53 PM
Calculated Parameters for Vertical Orifice
ft2
feet
Calculated Parameters for Overflow Weir
feet
feet
ft2
ft2
Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate
ft2
feet
radians
500 Year
3.14
0.574
0.574
4.3
1.78
9.6
0.5
0.1
Vertical Orifice 2
N/A
N/A
56
66
1.80
0.71
0.510
3981700 MHFD-Detention_v4-06 (9).xlsm, Outlet Structure 7/28/2023, 3:53 PM
COUNTA for Basin Tab =1 Ao Dia WQ Plate Type Vert Orifice 1Vert Orifice 2
Count_Underdrain =0 0.11(diameter = 3/8 inch)2 2 2
Count_WQPlate =1 0.14(diameter = 7/16 inch)
Count_VertOrifice1 =1 0.18(diameter = 1/2 inch)Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean
Count_VertOrifice2 =1 0.24(diameter = 9/16 inch)2 1 5yr, <72hr 0
Count_Weir1 =1 0.29(diameter = 5/8 inch)>5yr, <120hr 0
Count_Weir2 =0 0.36(diameter = 11/16 inch)Max Depth Row
Count_OutletPipe1 =1 0.42(diameter = 3/4 inch)WQCV 74
Count_OutletPipe2 =0 0.50(diameter = 13/16 inch)2 Year 92
COUNTA_2 (Standard FSD Setup)=1 0.58(diameter = 7/8 inch)EURV 118
Hidden Parameters & Calculations 0.67(diameter = 15/16 inch)5 Year 106
MaxPondDepth_Error?FALSE 0.76 (diameter = 1 inch)10 Year 122 Spillway Depth
Cd_Broad-Crested Weir 3.00 0.86(diameter = 1-1/16 inches)25 Year 135 0.05
WQ Plate Flow at 100yr depth =0.05 0.97(diameter = 1-1/8 inches)50 Year 146
CLOG #1=100%1.08(diameter = 1-3/16 inches)100 Year 174 1 Z1_Boolean
n*Cdw #1 =0.60 1.20(diameter = 1-1/4 inches)500 Year 181 0 Z2_Boolean
n*Cdo #1 =0.74 1.32(diameter = 1-5/16 inches)Zone3_Pulldown Message 0 Z3_Boolean
Overflow Weir #1 Angle =0.000 1.45(diameter = 1-3/8 inches)1 Opening Message
CLOG #2=100%1.59(diameter = 1-7/16 inches)Draintime Running
n*Cdw #2 =0.00 1.73(diameter = 1-1/2 inches)Outlet Boolean Outlet Rank Total (1 to 4)
n*Cdo #2 =0.00 1.88(diameter = 1-9/16 inches)Vertical Orifice 1 1 1 3
Overflow Weir #2 Angle =0.000 2.03(diameter = 1-5/8 inches)Vertical Orifice 2 1 2 Boolean
Underdrain Q at 100yr depth =0.00 2.20(diameter = 1-11/16 inches)Overflow Weir 1 1 3 0 Max Depth
VertOrifice1 Q at 100yr depth =0.22 2.36(diameter = 1-3/4 inches)Overflow Weir 2 0 0 0 500yr Depth
VertOrifice2 Q at 100yr depth =0.17 2.54(diameter = 1-13/16 inches)Outlet Pipe 1 1 3 0 Freeboard
2.72(diameter = 1-7/8 inches)Outlet Pipe 2 0 0 0 Spillway
Count_User_Hydrographs 0 2.90(diameter = 1-15/16 inches)0 Spillway Length
CountA_3 (EURV & 100yr) =1 3.09(diameter = 2 inches)FALSE Time Interval
CountA_4 (100yr Only) =1 3.29(use rectangular openings)Button Visibility Boolean
COUNTA_5 (FSD Weir Only)=0 0 WQCV Underdrain
COUNTA_6 (EURV Weir Only)=1 1 WQCV Plate
0 EURV-WQCV Plate
Outlet1_Pulldown_Boolean 0 EURV-WQCV VertOriice
Outlet2_Pulldown_Boolean 0 Outlet 90% Qpeak
Outlet3_Pulldown_Boolean 0 Outlet Undetained
0 Weir Only 90% Qpeak
0 Five Year Ratio Plate
0 Five Year Ratio VertOrifice
EURV_draintime_user
Spillway Options
Offset
Overlapping
Vertical Orifice 2
S-A-V-D Chart Axis Default X-axis Left Y-Axis Right Y-Axis
minimum bound 0.00 0 0
maximum bound 6.00 230,000 20
S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis
minimum bound
maximum bound
DETENTION BASIN OUTLET STRUCTURE DESIGN
MHFD-Detention, Version 4.06 (July 2022)
0
2
4
6
8
10
12
0.1 1 10
FL
O
W
[
c
f
s
]
TIME [hr]
500YR IN
500YR OUT
100YR IN
100YR OUT
50YR IN
50YR OUT
25YR IN
25YR OUT
10YR IN
10YR OUT
5YR IN
5YR OUT
2YR IN
2YR OUT
EURV IN
EURV OUT
WQCV IN
WQCV OUT
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2
0.1 1 10 100
PO
N
D
I
N
G
D
E
P
T
H
[
f
t
]
DRAIN TIME [hr]
500YR
100YR
50YR
25YR
10YR
5YR
2YR
EURV
WQCV
0
2
4
6
8
10
12
14
16
18
20
0
50,000
100,000
150,000
200,000
0.00 1.00 2.00 3.00 4.00 5.00 6.00
OU
T
F
L
O
W
[
c
f
s
]
AR
E
A
[
f
t
^
2
]
,
V
O
L
U
M
E
[
f
t
^
3
]
PONDING DEPTH [ft]
User Area [ft^2]
Interpolated Area [ft^2]
Summary Area [ft^2]
Volume [ft^3]
Summary Volume [ft^3]
Outflow [cfs]
Summary Outflow [cfs]
3981700 MHFD-Detention_v4-06 (9).xlsm, Outlet Structure 7/28/2023, 3:53 PM
Outflow Hydrograph Workbook Filename:
Inflow Hydrographs
The user can override the calculated inflow hydrographs from this workbook with inflow hydrographs developed in a separate program.
SOURCE CUHP CUHP CUHP CUHP CUHP CUHP CUHP CUHP CUHP
Time Interval TIME WQCV [cfs]EURV [cfs]2 Year [cfs] 5 Year [cfs] 10 Year [cfs] 25 Year [cfs] 50 Year [cfs] 100 Year [cfs] 500 Year [cfs]
5.00 min 0:00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0:05:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0:10:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.07 0.13
0:15:00 0.00 0.00 0.09 0.28 0.47 0.32 0.47 0.70 0.81
0:20:00 0.00 0.00 0.71 1.03 1.38 0.91 1.14 1.70 1.92
0:25:00 0.00 0.00 1.57 2.27 3.17 2.03 2.51 3.82 4.32
0:30:00 0.00 0.00 1.82 2.56 3.48 4.33 5.32 7.89 8.77
0:35:00 0.00 0.00 1.64 2.28 3.08 4.60 5.60 8.69 9.62
0:40:00 0.00 0.00 1.44 1.95 2.64 4.31 5.23 8.03 8.88
0:45:00 0.00 0.00 1.18 1.64 2.24 3.74 4.53 7.17 7.93
0:50:00 0.00 0.00 0.98 1.39 1.86 3.28 3.96 6.22 6.88
0:55:00 0.00 0.00 0.85 1.20 1.62 2.69 3.25 5.26 5.82
1:00:00 0.00 0.00 0.75 1.06 1.45 2.30 2.79 4.63 5.13
1:05:00 0.00 0.00 0.67 0.93 1.28 2.00 2.43 4.16 4.60
1:10:00 0.00 0.00 0.54 0.81 1.13 1.65 2.01 3.32 3.68
1:15:00 0.00 0.00 0.44 0.68 1.00 1.35 1.64 2.63 2.91
1:20:00 0.00 0.00 0.38 0.58 0.87 1.05 1.28 1.93 2.14
1:25:00 0.00 0.00 0.34 0.53 0.75 0.86 1.05 1.46 1.62
1:30:00 0.00 0.00 0.32 0.50 0.67 0.71 0.86 1.17 1.30
1:35:00 0.00 0.00 0.32 0.47 0.61 0.61 0.74 0.99 1.10
1:40:00 0.00 0.00 0.31 0.42 0.57 0.55 0.66 0.86 0.96
1:45:00 0.00 0.00 0.30 0.39 0.54 0.51 0.61 0.78 0.87
1:50:00 0.00 0.00 0.30 0.36 0.52 0.48 0.57 0.72 0.80
1:55:00 0.00 0.00 0.26 0.34 0.49 0.46 0.55 0.68 0.76
2:00:00 0.00 0.00 0.23 0.31 0.44 0.44 0.53 0.66 0.74
2:05:00 0.00 0.00 0.16 0.23 0.32 0.32 0.38 0.48 0.53
2:10:00 0.00 0.00 0.12 0.16 0.23 0.23 0.27 0.34 0.38
2:15:00 0.00 0.00 0.08 0.11 0.16 0.16 0.19 0.24 0.27
2:20:00 0.00 0.00 0.06 0.08 0.11 0.11 0.13 0.17 0.19
2:25:00 0.00 0.00 0.04 0.05 0.07 0.07 0.09 0.11 0.13
2:30:00 0.00 0.00 0.02 0.03 0.05 0.05 0.06 0.08 0.09
2:35:00 0.00 0.00 0.01 0.02 0.03 0.03 0.04 0.05 0.05
2:40:00 0.00 0.00 0.01 0.01 0.02 0.02 0.02 0.03 0.03
2:45:00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.01 0.01
2:50:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2:55:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:05:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:10:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:15:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:20:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:25:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:30:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:35:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:40:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:45:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:50:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3:55:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:05:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:10:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:15:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:20:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:25:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:30:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:35:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:40:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:45:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:50:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4:55:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5:00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5:05:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5:10:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5:15:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5:20:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5:25:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5:30:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5:35:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5:40:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5:45:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5:50:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5:55:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6:00:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DETENTION BASIN OUTLET STRUCTURE DESIGN
3981700 MHFD-Detention_v4-06 (9).xlsm, Outlet Structure 7/28/2023, 3:53 PM
Summary Stage-Area-Volume-Discharge Relationships
The user can create a summary S-A-V-D by entering the desired stage increments and the remainder of the table will populate automatically.
The user should graphically compare the summary S-A-V-D table to the full S-A-V-D table in the chart to confirm it captures all key transition points.
Stage Area Area Volume Volume Total
Outflow
[ft][ft 2][acres][ft 3][ac-ft][cfs]
For best results, include the
stages of all grade slope
changes (e.g. ISV and Floor)
from the S-A-V table on
Sheet 'Basin'.
Also include the inverts of all
outlets (e.g. vertical orifice,
overflow grate, and spillway,
where applicable).
DETENTION BASIN OUTLET STRUCTURE DESIGN
Stage - Storage
Description
MHFD-Detention, Version 4.06 (July 2022)
3981700 MHFD-Detention_v4-06 (9).xlsm, Outlet Structure 7/28/2023, 3:53 PM
Project Name:Polestar
Subdivision:Polestar Project No.:
Location:Fort Collins Calculated By:ARJ
Checked By:0
Date:7/26/23
Head (ft)Discharge (cfs)
0 0.00
0.5 0.02
0.9 0.07
1 0.12
1.5 0.36
2 0.52
2.5 0.63
3 0.73
3.5 8.87
4 15.34
4.5 16.48
5 17.54
5.5 18.54
6 19.50
6.11 19.70
Orifice plate, 18" Pipe and Overflow Structure
O1_OUTLET
Stage Discharge
39797.01
Channel Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Thursday, Jul 27 2023
OVERFLOW CHANNEL
Trapezoidal
Bottom Width (ft)= 35.00
Side Slopes (z:1)= 4.00, 4.00
Total Depth (ft)= 3.00
Invert Elev (ft)= 4980.00
Slope (%)= 0.50
N-Value = 0.040
Calculations
Compute by:Known Q
Known Q (cfs)= 228.26
Highlighted
Depth (ft)= 1.66
Q (cfs)= 228.26
Area (sqft)= 69.12
Velocity (ft/s)= 3.30
Wetted Perim (ft)= 48.69
Crit Depth, Yc (ft)= 1.06
Top Width (ft)= 48.28
EGL (ft)= 1.83
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70
Elev (ft)Depth (ft)Section
4979.00 -1.00
4980.00 0.00
4981.00 1.00
4982.00 2.00
4983.00 3.00
4984.00 4.00
Reach (ft)
REQUIRED FRONT RANGE RV BOAT STORAGE - DETENTION POND VOLUME
The onsite detention for the site i.e. the required runoff difference between the 100 year
developed inflow rate and the 2-year historic runoff is 2.82 Acre-ft.
O1 - 100 year developed inflow 0.94*106 Gallons of total runoff
EO1 - 2-year existing inflow 0.02*106 Gallons of total runoff
(0.94*106 - 0.02*106) gallons (𝟎𝒆𝒓𝟑
𝟑.𝟑𝟑𝟎𝟑𝒆𝒂𝒍𝒍𝒏𝒏𝒓)* (𝟎𝒂𝒄𝒓𝒆
𝟑𝟑,𝟑𝟑𝟎𝒆𝒓𝟑) = 2.82 Acre-ft.
O1 -100 year Peak Runoff – 71.32 CFS
EO1 - 2 year Peak Runoff – 2.07 CFS
100 yr Proposed
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.1)
------------------------------------------------------------
INP file created on 12/26/2013 2:17:35 PM by tmartin with inpPINS
version 0.0.2.0
Title/Notes:
*************
Element Count
*************
Number of rain gages ...... 3
Number of subcatchments ... 4
Number of nodes ........... 8
Number of links ........... 7
Number of pollutants ...... 0
Number of land uses ....... 0
****************
Raingage Summary
****************
Data
Recording
Name Data Source Type Interval
-----------------------------------------------------------------------
-
1 1-2yr INTENSITY 5 min.
2 2 INTENSITY 5 min.
3 3 INTENSITY 5 min.
********************
Subcatchment Summary
********************
Name Area Width %Imperv %Slope Rain Gage
Outlet
-----------------------------------------------------------------------
------------------------------------
SB102 285.30 13436.00 5.00 0.6000 1
7102
EX3 31.40 1059.96 2.00 1.0000 1
914
EX2 50.10 2929.34 11.00 0.8000 1
799
EO1 11.80 658.98 6.20 0.6300 1
914
************
Node Summary
************
Invert Max. Ponded
External
100 yr Proposed
Name Type Elev. Depth Area
Inflow
-----------------------------------------------------------------------
--------
547 JUNCTION 4991.83 12.00 0.0
548 JUNCTION 4992.64 5.00 0.0
559 JUNCTION 5009.90 12.00 0.0
799 JUNCTION 4986.42 12.00 0.0
7102 JUNCTION 5006.05 12.00 0.0
913 OUTFALL 4972.72 5.00 0.0
914 OUTFALL 4972.49 12.00 0.0
608 DIVIDER 4993.01 12.00 0.0
************
Link Summary
************
Name From Node To Node Type
Length %Slope Roughness
-----------------------------------------------------------------------
----------------------
99 799 914 CONDUIT
951.6 1.4640 0.0400
102 7102 608 CONDUIT
2957.0 0.4410 0.0400
299 547 799 CONDUIT
1291.7 0.4188 0.0350
302 559 7102 CONDUIT
2436.8 0.1580 0.0400
567 548 913 CONDUIT
2331.3 0.8545 0.0350
608D 608 547 CONDUIT
383.7 0.3075 0.0100
608L 608 548 CONDUIT
500.0 0.0740 0.0100
*********************
Cross Section Summary
*********************
Full Full Hyd. Max.
No. of Full
Conduit Shape Depth Area Rad. Width
Barrels Flow
-----------------------------------------------------------------------
----------------
99 2:2:2:0.04:2:10:60:100:0.06:10 12.00 8112.00
2.79 1610.00 1 72273.16
102 2:2:2:0.04:2:10:100:100:0.06:10 12.00 10112.00
2.77 2010.00 1 49259.10
299 5:2:2:0.035:2:13:10:10:0.06:10 12.00 1148.00
3.04 213.00 1 6617.38
302 2:2:2:0.04:2:10:100:100:0.06:10 12.00 10112.00
2.77 2010.00 1 29484.37
100 yr Proposed
567 TRAPEZOIDAL 5.00 155.00 2.51 61.00
1 1122.63
608D DUMMY 0.00 0.00 0.00 0.00
1 0.00
608L DUMMY 0.00 0.00 0.00 0.00
1 0.00
****************
Analysis Options
****************
Flow Units ............... CFS
Process Models:
Rainfall/Runoff ........ YES
RDII ................... NO
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... YES
Ponding Allowed ........ YES
Water Quality .......... NO
Infiltration Method ...... HORTON
Flow Routing Method ...... KINWAVE
Starting Date ............ 01/28/2013 00:00:00
Ending Date .............. 01/30/2013 06:00:00
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:01:00
Wet Time Step ............ 00:01:00
Dry Time Step ............ 01:00:00
Routing Time Step ........ 5.00 sec
************************** Volume Depth
Runoff Quantity Continuity acre-feet inches
************************** --------- -------
Total Precipitation ...... 30.866 0.978
Evaporation Loss ......... 0.000 0.000
Infiltration Loss ........ 29.070 0.921
Surface Runoff ........... 1.623 0.051
Final Storage ............ 0.174 0.006
Continuity Error (%) ..... -0.005
************************** Volume Volume
Flow Routing Continuity acre-feet 10^6 gal
************************** --------- ---------
Dry Weather Inflow ....... 0.000 0.000
Wet Weather Inflow ....... 1.623 0.529
Groundwater Inflow ....... 0.000 0.000
RDII Inflow .............. 0.000 0.000
External Inflow .......... 0.000 0.000
External Outflow ......... 1.805 0.588
Flooding Loss ............ 0.000 0.000
Evaporation Loss ......... 0.000 0.000
100 yr Proposed
Exfiltration Loss ........ 0.000 0.000
Initial Stored Volume .... 0.000 0.000
Final Stored Volume ...... 0.026 0.008
Continuity Error (%) ..... -12.754
********************************
Highest Flow Instability Indexes
********************************
All links are stable.
*************************
Routing Time Step Summary
*************************
Minimum Time Step : 5.00 sec
Average Time Step : 5.00 sec
Maximum Time Step : 5.00 sec
% of Time in Steady State : 0.00
Average Iterations per Step : 1.00
% of Steps Not Converging : 0.00
***************************
Subcatchment Runoff Summary
***************************
-----------------------------------------------------------------------
-------------------------------------------------------
Total Total Total Total
Imperv Perv Total Total Peak Runoff
Precip Runon Evap Infil
Runoff Runoff Runoff Runoff Runoff Coeff
Subcatchment in in in in
in in in 10^6 gal CFS
-----------------------------------------------------------------------
-------------------------------------------------------
SB102 0.98 0.00 0.00 0.93
0.04 0.00 0.05 0.36 40.42 0.047
EX3 0.98 0.00 0.00 0.96
0.02 0.00 0.02 0.02 1.82 0.020
EX2 0.98 0.00 0.00 0.87
0.10 0.00 0.10 0.14 15.21 0.102
EO1 0.98 0.00 0.00 0.92
0.05 0.00 0.06 0.02 2.07 0.058
******************
Node Depth Summary
******************
-----------------------------------------------------------------------
----------
100 yr Proposed
Average Maximum Maximum Time of Max
Reported
Depth Depth HGL Occurrence
Max Depth
Node Type Feet Feet Feet days hr:min
Feet
-----------------------------------------------------------------------
----------
547 JUNCTION 0.02 1.10 4992.93 0 06:47
1.10
548 JUNCTION 0.01 0.58 4993.22 0 06:47
0.58
559 JUNCTION 0.00 0.00 5009.90 0 00:00
0.00
799 JUNCTION 0.20 1.23 4987.65 0 06:55
1.23
7102 JUNCTION 0.23 2.17 5008.22 0 06:40
2.17
913 OUTFALL 0.02 0.51 4973.23 0 07:04
0.51
914 OUTFALL 0.03 1.22 4973.71 0 06:57
1.22
608 DIVIDER 0.04 1.75 4994.76 0 06:47
1.75
*******************
Node Inflow Summary
*******************
-----------------------------------------------------------------------
--------------------------
Maximum Maximum
Lateral Total Flow
Lateral Total Time of Max
Inflow Inflow Balance
Inflow Inflow Occurrence
Volume Volume Error
Node Type CFS CFS days hr:min 10^6
gal 10^6 gal Percent
-----------------------------------------------------------------------
--------------------------
547 JUNCTION 0.00 18.66 0 06:47
0 0.309 0.000
548 JUNCTION 0.00 4.84 0 06:47
0 0.0801 0.000
559 JUNCTION 0.00 0.00 0 00:00
0 0 0.000 gal
799 JUNCTION 15.21 19.94 0 06:55
0.136 0.462 0.000
7102 JUNCTION 40.42 40.42 0 06:40
0.358 0.358 0.000
913 OUTFALL 0.00 3.62 0 07:04
0 0.0925 0.000
100 yr Proposed
914 OUTFALL 3.89 20.40 0 06:57
0.0351 0.496 0.000
608 DIVIDER 0.00 23.50 0 06:47
0 0.389 0.000
*********************
Node Flooding Summary
*********************
No nodes were flooded.
***********************
Outfall Loading Summary
***********************
-----------------------------------------------------------
Flow Avg Max Total
Freq Flow Flow Volume
Outfall Node Pcnt CFS CFS 10^6 gal
-----------------------------------------------------------
913 13.86 0.46 3.62 0.092
914 8.87 3.84 20.40 0.496
-----------------------------------------------------------
System 11.36 4.30 23.69 0.588
********************
Link Flow Summary
********************
-----------------------------------------------------------------------
------
Maximum Time of Max Maximum Max/
Max/
|Flow| Occurrence |Veloc| Full
Full
Link Type CFS days hr:min ft/sec Flow
Depth
-----------------------------------------------------------------------
------
99 CHANNEL 19.64 0 06:57 3.74 0.00
0.10
102 CHANNEL 23.50 0 06:47 3.11 0.00
0.14
299 CHANNEL 16.67 0 06:55 2.43 0.00
0.09
302 CHANNEL 0.00 0 00:00 0.00 0.00
0.00
567 CONDUIT 3.62 0 07:04 2.11 0.00
0.10
608D DUMMY 18.66 0 06:47
608L DUMMY 4.84 0 06:47
100 yr Proposed
*************************
Conduit Surcharge Summary
*************************
No conduits were surcharged.
Analysis begun on: Tue Aug 22 08:41:49 2023
Analysis ended on: Tue Aug 22 08:41:50 2023
Total elapsed time: 00:00:01
2 Year Proposed
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.1)
------------------------------------------------------------
INP file created on 12/26/2013 2:17:35 PM by tmartin with inpPINS
version 0.0.2.0
Title/Notes:
*************
Element Count
*************
Number of rain gages ...... 3
Number of subcatchments ... 4
Number of nodes ........... 9
Number of links ........... 9
Number of pollutants ...... 0
Number of land uses ....... 0
****************
Raingage Summary
****************
Data
Recording
Name Data Source Type Interval
-----------------------------------------------------------------------
-
1 2-Year INTENSITY 5 min.
2 2 INTENSITY 5 min.
3 3 INTENSITY 5 min.
********************
Subcatchment Summary
********************
Name Area Width %Imperv %Slope Rain Gage
Outlet
-----------------------------------------------------------------------
------------------------------------
SB102 285.30 13436.00 5.00 0.6000 1
7102
EX3 21.90 1059.96 2.00 1.0000 1
P1
EX2 50.10 2929.34 11.00 0.8000 1
799
O1 11.80 856.68 61.30 0.5500 1
P1
************
Node Summary
************
Invert Max. Ponded
External
2 Year Proposed
Name Type Elev. Depth Area
Inflow
-----------------------------------------------------------------------
--------
547 JUNCTION 4991.83 12.00 0.0
548 JUNCTION 4992.64 5.00 0.0
559 JUNCTION 5009.90 12.00 0.0
799 JUNCTION 4986.42 12.00 0.0
7102 JUNCTION 5006.05 12.00 0.0
913 OUTFALL 4972.72 5.00 0.0
914 OUTFALL 4972.49 0.00 0.0
608 DIVIDER 4993.01 12.00 0.0
P1 STORAGE 4975.89 6.11 0.0
************
Link Summary
************
Name From Node To Node Type
Length %Slope Roughness
-----------------------------------------------------------------------
----------------------
M99 799 P1 CONDUIT
951.6 0.7661 0.0400
102 7102 608 CONDUIT
2957.0 0.4410 0.0400
299 547 799 CONDUIT
1291.7 0.4188 0.0350
302 559 7102 CONDUIT
2436.8 0.1580 0.0400
567 548 913 CONDUIT
2331.3 0.8545 0.0350
608D 608 547 CONDUIT
383.7 0.3075 0.0100
608L 608 548 CONDUIT
500.0 0.0740 0.0100
Weir P1 914 WEIR
O1 P1 914 OUTLET
*********************
Cross Section Summary
*********************
Full Full Hyd. Max.
No. of Full
Conduit Shape Depth Area Rad. Width
Barrels Flow
-----------------------------------------------------------------------
----------------
M99 TRAPEZOIDAL 4.00 204.00 3.00 67.00
1 1379.99
102 2:2:2:0.04:2:10:100:100:0.06:10 12.00 10112.00
2.77 2010.00 1 49259.10
2 Year Proposed
299 5:2:2:0.035:2:13:10:10:0.06:10 12.00 1148.00
3.04 213.00 1 6617.38
302 2:2:2:0.04:2:10:100:100:0.06:10 12.00 10112.00
2.77 2010.00 1 29484.37
567 TRAPEZOIDAL 5.00 155.00 2.51 61.00
1 1122.63
608D DUMMY 0.00 0.00 0.00 0.00
1 0.00
608L DUMMY 0.00 0.00 0.00 0.00
1 0.00
****************
Analysis Options
****************
Flow Units ............... CFS
Process Models:
Rainfall/Runoff ........ YES
RDII ................... NO
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... YES
Ponding Allowed ........ YES
Water Quality .......... NO
Infiltration Method ...... HORTON
Flow Routing Method ...... KINWAVE
Starting Date ............ 01/28/2013 00:00:00
Ending Date .............. 02/02/2013 06:00:00
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:01:00
Wet Time Step ............ 00:01:00
Dry Time Step ............ 01:00:00
Routing Time Step ........ 5.00 sec
************************** Volume Depth
Runoff Quantity Continuity acre-feet inches
************************** --------- -------
Total Precipitation ...... 30.092 0.978
Evaporation Loss ......... 0.000 0.000
Infiltration Loss ........ 27.781 0.903
Surface Runoff ........... 2.086 0.068
Final Storage ............ 0.226 0.007
Continuity Error (%) ..... -0.005
************************** Volume Volume
Flow Routing Continuity acre-feet 10^6 gal
************************** --------- ---------
Dry Weather Inflow ....... 0.000 0.000
Wet Weather Inflow ....... 2.086 0.680
Groundwater Inflow ....... 0.000 0.000
RDII Inflow .............. 0.000 0.000
2 Year Proposed
External Inflow .......... 0.000 0.000
External Outflow ......... 2.355 0.767
Flooding Loss ............ 0.000 0.000
Evaporation Loss ......... 0.000 0.000
Exfiltration Loss ........ 0.000 0.000
Initial Stored Volume .... 0.062 0.020
Final Stored Volume ...... 0.020 0.007
Continuity Error (%) ..... -10.577
********************************
Highest Flow Instability Indexes
********************************
All links are stable.
*************************
Routing Time Step Summary
*************************
Minimum Time Step : 5.00 sec
Average Time Step : 5.00 sec
Maximum Time Step : 5.00 sec
% of Time in Steady State : 0.00
Average Iterations per Step : 1.00
% of Steps Not Converging : 0.00
***************************
Subcatchment Runoff Summary
***************************
-----------------------------------------------------------------------
-------------------------------------------------------
Total Total Total Total
Imperv Perv Total Total Peak Runoff
Precip Runon Evap Infil
Runoff Runoff Runoff Runoff Runoff Coeff
Subcatchment in in in in
in in in 10^6 gal CFS
-----------------------------------------------------------------------
-------------------------------------------------------
SB102 0.98 0.00 0.00 0.93
0.04 0.00 0.05 0.36 40.42 0.047
EX3 0.98 0.00 0.00 0.96
0.02 0.00 0.02 0.01 1.28 0.021
EX2 0.98 0.00 0.00 0.87
0.10 0.00 0.10 0.14 15.21 0.102
O1 0.98 0.00 0.00 0.38
0.54 0.00 0.54 0.17 13.29 0.554
******************
Node Depth Summary
******************
2 Year Proposed
-----------------------------------------------------------------------
----------
Average Maximum Maximum Time of Max
Reported
Depth Depth HGL Occurrence
Max Depth
Node Type Feet Feet Feet days hr:min
Feet
-----------------------------------------------------------------------
----------
547 JUNCTION 0.01 1.10 4992.93 0 06:47
1.10
548 JUNCTION 0.01 0.58 4993.22 0 06:47
0.58
559 JUNCTION 0.00 0.00 5009.90 0 00:00
0.00
799 JUNCTION 0.01 1.03 4987.45 0 06:55
1.03
7102 JUNCTION 0.24 2.17 5008.22 0 06:40
2.17
913 OUTFALL 0.01 0.51 4973.23 0 07:04
0.51
914 OUTFALL 0.00 0.00 4972.49 0 00:00
0.00
608 DIVIDER 0.02 1.75 4994.76 0 06:47
1.75
P1 STORAGE 0.97 3.04 4978.93 0 08:55
3.04
*******************
Node Inflow Summary
*******************
-----------------------------------------------------------------------
--------------------------
Maximum Maximum
Lateral Total Flow
Lateral Total Time of Max
Inflow Inflow Balance
Inflow Inflow Occurrence
Volume Volume Error
Node Type CFS CFS days hr:min 10^6
gal 10^6 gal Percent
-----------------------------------------------------------------------
--------------------------
547 JUNCTION 0.00 18.66 0 06:47
0 0.309 0.000
548 JUNCTION 0.00 4.84 0 06:47
0 0.0801 0.000
559 JUNCTION 0.00 0.00 0 00:00
0 0 0.000 gal
2 Year Proposed
799 JUNCTION 15.21 19.94 0 06:55
0.136 0.462 0.000
7102 JUNCTION 40.42 40.42 0 06:40
0.358 0.358 0.000
913 OUTFALL 0.00 3.62 0 07:04
0 0.0925 0.000
914 OUTFALL 0.00 1.43 0 08:55
0 0.675 0.000
608 DIVIDER 0.00 23.50 0 06:47
0 0.389 0.000
P1 STORAGE 14.57 23.70 0 06:59
0.186 0.675 0.000
*********************
Node Flooding Summary
*********************
No nodes were flooded.
**********************
Storage Volume Summary
**********************
-----------------------------------------------------------------------
---------------------------
Average Avg Evap Exfil Maximum
Max Time of Max Maximum
Volume Pcnt Pcnt Pcnt Volume
Pcnt Occurrence Outflow
Storage Unit 1000 ft³ Full Loss Loss 1000 ft³
Full days hr:min CFS
-----------------------------------------------------------------------
---------------------------
P1 13.670 5 0 0 78.676
27 0 08:55 1.43
***********************
Outfall Loading Summary
***********************
-----------------------------------------------------------
Flow Avg Max Total
Freq Flow Flow Volume
Outfall Node Pcnt CFS CFS 10^6 gal
-----------------------------------------------------------
913 5.94 0.46 3.62 0.092
914 78.50 0.25 1.43 0.675
-----------------------------------------------------------
System 42.22 0.71 4.19 0.767
2 Year Proposed
********************
Link Flow Summary
********************
-----------------------------------------------------------------------
------
Maximum Time of Max Maximum Max/
Max/
|Flow| Occurrence |Veloc| Full
Full
Link Type CFS days hr:min ft/sec Flow
Depth
-----------------------------------------------------------------------
------
M99 CONDUIT 19.09 0 07:01 1.61 0.01
0.08
102 CHANNEL 23.50 0 06:47 3.11 0.00
0.14
299 CHANNEL 16.67 0 06:55 2.43 0.00
0.09
302 CHANNEL 0.00 0 00:00 0.00 0.00
0.00
567 CONDUIT 3.62 0 07:04 2.11 0.00
0.10
608D DUMMY 18.66 0 06:47
608L DUMMY 4.84 0 06:47
Weir WEIR 0.00 0 00:00
0.00
O1 DUMMY 1.43 0 08:55
*************************
Conduit Surcharge Summary
*************************
No conduits were surcharged.
Analysis begun on: Tue Aug 22 08:44:57 2023
Analysis ended on: Tue Aug 22 08:44:58 2023
Total elapsed time: 00:00:01
2 Year Proposed
100 Year Existing Results
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.1)
------------------------------------------------------------
INP file created on 12/26/2013 2:17:35 PM by tmartin with inpPINS
version 0.0.2.0
Title/Notes:
*************
Element Count
*************
Number of rain gages ...... 3
Number of subcatchments ... 4
Number of nodes ........... 8
Number of links ........... 7
Number of pollutants ...... 0
Number of land uses ....... 0
****************
Raingage Summary
****************
Data
Recording
Name Data Source Type Interval
-----------------------------------------------------------------------
-
1 1-100yr INTENSITY 5 min.
2 2 INTENSITY 5 min.
3 3 INTENSITY 5 min.
********************
Subcatchment Summary
********************
Name Area Width %Imperv %Slope Rain Gage
Outlet
-----------------------------------------------------------------------
------------------------------------
SB102 285.30 13436.00 5.00 0.6000 1
7102
EX3 31.40 1059.96 2.00 1.0000 1
914
EX2 50.10 2929.34 11.00 0.8000 1
799
EO1 11.80 658.98 6.20 0.6300 1
914
************
Node Summary
************
Invert Max. Ponded
External
100 Year Existing Results
Name Type Elev. Depth Area
Inflow
-----------------------------------------------------------------------
--------
547 JUNCTION 4991.83 12.00 0.0
548 JUNCTION 4992.64 5.00 0.0
559 JUNCTION 5009.90 12.00 0.0
799 JUNCTION 4986.42 12.00 0.0
7102 JUNCTION 5006.05 12.00 0.0
913 OUTFALL 4972.72 5.00 0.0
914 OUTFALL 4972.49 12.00 0.0
608 DIVIDER 4993.01 12.00 0.0
************
Link Summary
************
Name From Node To Node Type
Length %Slope Roughness
-----------------------------------------------------------------------
----------------------
99 799 914 CONDUIT
951.6 1.4640 0.0400
102 7102 608 CONDUIT
2957.0 0.4410 0.0400
299 547 799 CONDUIT
1291.7 0.4188 0.0350
302 559 7102 CONDUIT
2436.8 0.1580 0.0400
567 548 913 CONDUIT
2331.3 0.8545 0.0350
608D 608 547 CONDUIT
383.7 0.3075 0.0100
608L 608 548 CONDUIT
500.0 0.0740 0.0100
****************
Analysis Options
****************
Flow Units ............... CFS
Process Models:
Rainfall/Runoff ........ YES
RDII ................... NO
Snowmelt ............... NO
Groundwater ............ NO
Flow Routing ........... YES
Ponding Allowed ........ YES
Water Quality .......... NO
Infiltration Method ...... HORTON
Flow Routing Method ...... KINWAVE
Starting Date ............ 01/28/2013 00:00:00
Ending Date .............. 01/30/2013 06:00:00
100 Year Existing Results
Antecedent Dry Days ...... 0.0
Report Time Step ......... 00:01:00
Wet Time Step ............ 00:01:00
Dry Time Step ............ 01:00:00
Routing Time Step ........ 5.00 sec
************************** Volume Depth
Runoff Quantity Continuity acre-feet inches
************************** --------- -------
Total Precipitation ...... 115.762 3.669
Evaporation Loss ......... 0.000 0.000
Infiltration Loss ........ 66.632 2.112
Surface Runoff ........... 48.965 1.552
Final Storage ............ 0.174 0.006
Continuity Error (%) ..... -0.008
************************** Volume Volume
Flow Routing Continuity acre-feet 10^6 gal
************************** --------- ---------
Dry Weather Inflow ....... 0.000 0.000
Wet Weather Inflow ....... 48.965 15.956
Groundwater Inflow ....... 0.000 0.000
RDII Inflow .............. 0.000 0.000
External Inflow .......... 0.000 0.000
External Outflow ......... 51.555 16.800
Flooding Loss ............ 0.000 0.000
Evaporation Loss ......... 0.000 0.000
Exfiltration Loss ........ 0.000 0.000
Initial Stored Volume .... 0.000 0.000
Final Stored Volume ...... 0.026 0.008
Continuity Error (%) ..... -5.343
********************************
Highest Flow Instability Indexes
********************************
All links are stable.
*************************
Routing Time Step Summary
*************************
Minimum Time Step : 5.00 sec
Average Time Step : 5.00 sec
Maximum Time Step : 5.00 sec
% of Time in Steady State : 0.00
Average Iterations per Step : 1.00
% of Steps Not Converging : 0.00
***************************
Subcatchment Runoff Summary
100 Year Existing Results
***************************
-----------------------------------------------------------------------
-------------------------------------------------------
Total Total Total Total
Imperv Perv Total Total Peak Runoff
Precip Runon Evap Infil
Runoff Runoff Runoff Runoff Runoff Coeff
Subcatchment in in in in
in in in 10^6 gal CFS
-----------------------------------------------------------------------
-------------------------------------------------------
SB102 3.67 0.00 0.00 2.15
0.18 1.34 1.52 11.75 308.89 0.413
EX3 3.67 0.00 0.00 2.27
0.07 1.33 1.40 1.19 26.40 0.381
EX2 3.67 0.00 0.00 1.83
0.39 1.44 1.83 2.49 95.74 0.499
EO1 3.67 0.00 0.00 2.02
0.22 1.42 1.64 0.53 15.58 0.447
******************
Node Depth Summary
******************
-----------------------------------------------------------------------
----------
Average Maximum Maximum Time of Max
Reported
Depth Depth HGL Occurrence
Max Depth
Node Type Feet Feet Feet days hr:min
Feet
-----------------------------------------------------------------------
----------
547 JUNCTION 0.16 3.23 4995.06 0 07:26
3.23
548 JUNCTION 0.07 1.48 4994.12 0 07:26
1.48
559 JUNCTION 0.00 0.00 5009.90 0 00:00
0.00
799 JUNCTION 0.34 3.22 4989.64 0 07:32
3.22
7102 JUNCTION 0.36 3.28 5009.33 0 06:40
3.28
913 OUTFALL 0.08 1.48 4974.20 0 07:35
1.48
914 OUTFALL 0.16 2.82 4975.31 0 07:32
2.82
608 DIVIDER 0.18 3.12 4996.13 0 07:26
3.12
100 Year Existing Results
*******************
Node Inflow Summary
*******************
-----------------------------------------------------------------------
--------------------------
Maximum Maximum
Lateral Total Flow
Lateral Total Time of Max
Inflow Inflow Balance
Inflow Inflow Occurrence
Volume Volume Error
Node Type CFS CFS days hr:min 10^6
gal 10^6 gal Percent
-----------------------------------------------------------------------
--------------------------
547 JUNCTION 0.00 186.01 0 07:26
0 9.94 0.000
548 JUNCTION 0.00 48.20 0 07:26
0 2.58 0.000
559 JUNCTION 0.00 0.00 0 00:00
0 0 0.000 gal
799 JUNCTION 95.74 228.73 0 07:25
2.49 12.5 -0.000
7102 JUNCTION 308.89 308.89 0 06:40
11.7 11.7 0.000
913 OUTFALL 0.00 47.97 0 07:35
0 2.61 0.000
914 OUTFALL 39.92 259.38 0 07:30
1.72 14.2 0.000
608 DIVIDER 0.00 234.21 0 07:26
0 12.5 0.000
*********************
Node Flooding Summary
*********************
No nodes were flooded.
***********************
Outfall Loading Summary
***********************
-----------------------------------------------------------
Flow Avg Max Total
Freq Flow Flow Volume
Outfall Node Pcnt CFS CFS 10^6 gal
-----------------------------------------------------------
913 17.46 10.27 47.97 2.607
914 12.21 79.90 259.38 14.192
-----------------------------------------------------------
System 14.84 90.17 307.08 16.799
100 Year Existing Results
********************
Link Flow Summary
********************
-----------------------------------------------------------------------
------
Maximum Time of Max Maximum Max/
Max/
|Flow| Occurrence |Veloc| Full
Full
Link Type CFS days hr:min ft/sec Flow
Depth
-----------------------------------------------------------------------
------
99 CHANNEL 228.36 0 07:32 4.97 0.00
0.23
102 CHANNEL 234.21 0 07:26 5.08 0.00
0.26
299 CHANNEL 185.67 0 07:32 3.91 0.03
0.27
302 CHANNEL 0.00 0 00:00 0.00 0.00
0.00
567 CONDUIT 47.97 0 07:35 3.32 0.04
0.30
608D DUMMY 186.01 0 07:26
608L DUMMY 48.20 0 07:26
*************************
Conduit Surcharge Summary
*************************
No conduits were surcharged.
Analysis begun on: Mon Aug 21 16:58:27 2023
Analysis ended on: Mon Aug 21 16:58:28 2023
Total elapsed time: 00:00:01
100 Proposed Results
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.2 (Build 5.2.1)
------------------------------------------------------------
INP file created on 12/26/2013 2:17:35 PM by tmartin with inpPINS version 0.0.2.0
Title/Notes:
*************
Element Count
*************
Number of rain gages ...... 3
Number of subcatchments ... 4
Number of nodes ........... 9
Number of links ........... 9
Number of pollutants ...... 0
Number of land uses ....... 0
****************
Raingage Summary
****************
Data Recording
Name Data Source Type Interval
------------------------------------------------------------------------
1 1-100yr INTENSITY 5 min.
2 2 INTENSITY 5 min.
3 3 INTENSITY 5 min.
********************
Subcatchment Summary
********************
Name Area Width %Imperv %Slope Rain Gage
Outlet
-------------------------------------------------------------------------------------
----------------------
SB102 285.30 13436.00 5.00 0.6000 1
7102
EX3 21.90 1059.96 2.00 1.0000 1 P1
EX2 50.10 2929.34 11.00 0.8000 1
799
O1 11.80 856.68 61.30 0.5500 1 P1
************
Node Summary
************
100 Proposed Results
Invert Max. Ponded External
Name Type Elev. Depth Area Inflow
-------------------------------------------------------------------------------
547 JUNCTION 4991.83 12.00 0.0
548 JUNCTION 4992.64 5.00 0.0
559 JUNCTION 5009.90 12.00 0.0
799 JUNCTION 4986.42 12.00 0.0
7102 JUNCTION 5006.05 12.00 0.0
913 OUTFALL 4972.72 5.00 0.0
914 OUTFALL 4972.49 0.00 0.0
608 DIVIDER 4993.01 12.00 0.0
P1 STORAGE 4975.89 6.11 0.0
************
Link Summary
************
Name From Node To Node Type Length %Slope
Roughness
-------------------------------------------------------------------------------------
--------
M99 799 P1 CONDUIT 951.6 0.7661
0.0400
102 7102 608 CONDUIT 2957.0 0.4410
0.0400
299 547 799 CONDUIT 1291.7 0.4188
0.0350
302 559 7102 CONDUIT 2436.8 0.1580
0.0400
567 548 913 CONDUIT 2331.3 0.8545
0.0350
608D 608 547 CONDUIT 383.7 0.3075
0.0100
608L 608 548 CONDUIT 500.0 0.0740
0.0100
Weir P1 914 WEIR
O1 P1 914 OUTLET
*********************
Cross Section Summary
*********************
Full Full Hyd. Max. No. of
Full
Conduit Shape Depth Area Rad. Width Barrels
Flow
100 Proposed Results
-------------------------------------------------------------------------------------
--
M99 TRAPEZOIDAL 4.00 204.00 3.00 67.00 1
1379.99
102 2:2:2:0.04:2:10:100:100:0.06:10 12.00 10112.00 2.77 2010.00
1 49259.10
299 5:2:2:0.035:2:13:10:10:0.06:10 12.00 1148.00 3.04 213.00
1 6617.38
302 2:2:2:0.04:2:10:100:100:0.06:10 12.00 10112.00 2.77 2010.00
1 29484.37
567 TRAPEZOIDAL 5.00 155.00 2.51 61.00 1
1122.63
608D DUMMY 0.00 0.00 0.00 0.00 1
0.00
608L DUMMY 0.00 0.00 0.00 0.00 1
0.00
*************************
Routing Time Step Summary
*************************
Minimum Time Step : 5.00 sec
Average Time Step : 5.00 sec
Maximum Time Step : 5.00 sec
% of Time in Steady State : 0.00
Average Iterations per Step : 1.00
% of Steps Not Converging : 0.00
***************************
Subcatchment Runoff Summary
***************************
-------------------------------------------------------------------------------------
-----------------------------------------
Total Total Total Total Imperv
Perv Total Total Peak Runoff
Precip Runon Evap Infil Runoff
Runoff Runoff Runoff Runoff Coeff
Subcatchment in in in in in
in in 10^6 gal CFS
-------------------------------------------------------------------------------------
-----------------------------------------
SB102 3.67 0.00 0.00 2.15 0.18
1.34 1.52 11.75 308.89 0.413
EX3 3.67 0.00 0.00 2.09 0.07
1.50 1.57 0.94 24.53 0.429
100 Proposed Results
EX2 3.67 0.00 0.00 1.83 0.39
1.44 1.83 2.49 95.74 0.499
O1 3.67 0.00 0.00 0.67 2.19
0.75 2.94 0.94 71.32 0.802
******************
Node Depth Summary
******************
---------------------------------------------------------------------------------
Average Maximum Maximum Time of Max Reported
Depth Depth HGL Occurrence Max Depth
Node Type Feet Feet Feet days hr:min Feet
---------------------------------------------------------------------------------
547 JUNCTION 0.07 3.23 4995.06 0 07:26 3.23
548 JUNCTION 0.03 1.48 4994.12 0 07:26 1.48
559 JUNCTION 0.00 0.00 5009.90 0 00:00 0.00
799 JUNCTION 0.07 3.22 4989.64 0 07:32 3.22
7102 JUNCTION 0.29 3.28 5009.33 0 06:40 3.28
913 OUTFALL 0.03 1.48 4974.20 0 07:35 1.48
914 OUTFALL 0.00 0.00 4972.49 0 00:00 0.00
608 DIVIDER 0.08 3.12 4996.13 0 07:26 3.12
P1 STORAGE 1.17 5.58 4981.47 0 07:26 5.58
*******************
Node Inflow Summary
*******************
-------------------------------------------------------------------------------------
------------
Maximum Maximum Lateral Total
Flow
Lateral Total Time of Max Inflow Inflow
Balance
Inflow Inflow Occurrence Volume Volume
Error
Node Type CFS CFS days hr:min 10^6 gal 10^6 gal
Percent
-------------------------------------------------------------------------------------
------------
547 JUNCTION 0.00 186.01 0 07:26 0 9.94
0.000
548 JUNCTION 0.00 48.20 0 07:26 0 2.58
0.000
100 Proposed Results
559 JUNCTION 0.00 0.00 0 00:00 0 0
0.000 gal
799 JUNCTION 95.74 228.73 0 07:25 2.49 12.5
0.000
7102 JUNCTION 308.89 308.89 0 06:40 11.7 11.7
0.000
913 OUTFALL 0.00 47.97 0 07:35 0 2.61
0.000
914 OUTFALL 0.00 257.62 0 07:26 0 14.4
0.000
608 DIVIDER 0.00 234.21 0 07:26 0 12.5
0.000
P1 STORAGE 92.40 257.76 0 07:25 1.88 14.4
0.010
*********************
Node Flooding Summary
*********************
No nodes were flooded.
**********************
Storage Volume Summary
**********************
-------------------------------------------------------------------------------------
-------------
Average Avg Evap Exfil Maximum Max Time of
Max Maximum
Volume Pcnt Pcnt Pcnt Volume Pcnt
Occurrence Outflow
Storage Unit 1000 ft ウ Full Loss Loss 1000 ft ウ Full days
hr:min CFS
-------------------------------------------------------------------------------------
-------------
P1 22.552 8 0 0 252.114 86 0
07:26 257.62
***********************
Outfall Loading Summary
***********************
-----------------------------------------------------------
Flow Avg Max Total
100 Proposed Results
Freq Flow Flow Volume
Outfall Node Pcnt CFS CFS 10^6 gal
-----------------------------------------------------------
913 7.48 10.27 47.97 2.607
914 81.95 5.17 257.62 14.382
-----------------------------------------------------------
System 44.72 15.44 304.91 16.990
********************
Link Flow Summary
********************
-----------------------------------------------------------------------------
Maximum Time of Max Maximum Max/ Max/
|Flow| Occurrence |Veloc| Full Full
Link Type CFS days hr:min ft/sec Flow Depth
-----------------------------------------------------------------------------
M99 CONDUIT 228.62 0 07:29 3.82 0.17 0.37
102 CHANNEL 234.21 0 07:26 5.08 0.00 0.26
299 CHANNEL 185.67 0 07:32 3.91 0.03 0.27
302 CHANNEL 0.00 0 00:00 0.00 0.00 0.00
567 CONDUIT 47.97 0 07:35 3.32 0.04 0.30
608D DUMMY 186.01 0 07:26
608L DUMMY 48.20 0 07:26
Weir WEIR 238.92 0 07:26 0.00
O1 DUMMY 18.69 0 07:26
*************************
Conduit Surcharge Summary
*************************
No conduits were surcharged.
Analysis begun on: Mon Aug 21 17:11:23 2023
Analysis ended on: Mon Aug 21 17:11:24 2023
Total elapsed time: 00:00:01
Front Range Storage
Preliminary Drainage Report
13
APPENDIX D – WATER QUALITY CALCULATIONS
Subdivision:RV & Boat Storage Project Name:Front Range RV Boat and Storage
Location:Fort Collins Project No.:39817.00
Calculated By:ARJ
Checked By:0
Date:7/27/23
Basin
Area
(ac)% Imp.
C1 0.70 64.0%
C2 2.74 74.9%
C3 2.24 75.0%
C4 2.22 67.4%
C5 0.33 68.8%
C6 0.68 77.4%
C7 1.06 67.9%
Total 9.97 71.7%
WQCV Drain Time (hr):12
Coefficient, a (Figure 3.2):0.8
WQCV (in):0.23
WQCV (ac-ft):0.23
WQCV @ 75% (ac-ft)0.18
WQ Pond Tributary Areas
75% - Water Quality ADS ISOLATOR ROWS
X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 1 of 7 7/28/2023
Subdivision:RV & Boat Storage Project Name:Front Range RV Boat and Storage
Location:Fort Collins Project No.:39817.00
Calculated By:ARJ
Checked By:0
Date:7/27/23
Basin
Area
(ac)% Imp.
C1 0.70 64.0%
C2 2.74 74.9%
C3 2.24 75.0%
C4 2.22 67.4%
C5 0.33 68.8%
C6 0.68 77.4%
C7 1.06 67.9%
C8 1.79 3.4%
Total 11.76 61.3%
WQCV Drain Time (hr):40
Coefficient, a (Figure 3.2):1.0
WQCV (in):0.24
WQCV (ac-ft):0.28
WQCV @ 22% (ac-ft)0.06
WQ Pond Tributary Areas
25% of Water Quality in Pond
3% of site left of treated and
drains next to the I-25 %
frontage
X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 2 of 7 7/28/2023
X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 3 of 7 7/28/2023
Front Range Storage
Preliminary Drainage Report
14
APPENDIX E – REFERENCES
Model Scenario:
Duplicate Effective = ICON conversion of
Effective MODSWMM model to EPA SWMM +
Recent Development Updates
Existing = DE + Recent
Hydrology LOMRs
SWMM Element
ICON 2014 Model - Duplicate Effective SWMM
(v 5.0.022 - from Report)
Existing Conditions SWMM
v5.1.012 As-Built v5.1.006
As-Built v5.1.011
(w/ pond problem)
As-Built v5.1.012
(w/ pond problem)
As-Built v5.1.012
(Raised Ponds)
As-Built v5.1.012
(Final)
Difference:
Exist. Cond. (v5.1.012) -
Dup. Eff. Model (ICON)
Difference:
v.011 - v.006
Difference:
v.012 - v.011
Difference:
v.012 Raised Ponds -
v.006
Difference:
v.012 Final - v.006
Model Notes:Eff. Model Conversion/ Update Corrected 'Warning 10' problem by
rasing invert elevation of 16 ponds.
Updated with corrected ponds
(raised inverts) and updated
Larimer-Weld Canal model run
Should be very close to
v5.1.006
Update to LW Canal model (unsteady
HECRAS) caused flow changes. Report
Table 5.7 shows these flow are now close
again to the CLOMR flows.
913 539.5 540.4 47.97 48.0 48.0 48.0 48.0 0.8 0.00 0.00 0.00 0.00
914 3079.6 3090.4 274.21 274.2 274.2 274.2 274.2 10.8 0.00 0.00 0.00 0.00
Node Discharge - 100yr (cfs)Comparison
As-Built
These are the same model input file, run in 3 SWMM versions These are the same model input file, run
in 3 SWMM versions - note differences
beteween v..006 and v.011
TI
M
B
E
R
L
I
N
E
R
O
A
D
COUNTY RD 52
MULBERRY ST
MOUNTAIN VISTA DR
IN
T
E
R
S
T
A
T
E
2
5
CO
U
N
T
Y
R
D
5
CO
U
N
T
Y
R
D
1
3
E. VINE DR
B
O
X
E
L
D
E
R
B
O
X
E
L
D
E
R
CR
E
E
K
L
A
K
E
C
A
N
A
L
D
R
Y
C
R
E
E
K
C
R
E
E
K
NO
R
T
H
G
R
A
Y
RE
S
E
R
V
O
I
R
SO
U
T
H
G
R
A
Y
RE
S
E
R
V
O
I
R
GR
A
Y
RE
S
E
R
V
O
I
R
#
3
COUNTY RD 50
0
32
83
134
195
2800
3230
3699
4950
6075
6152
6194
6215
6275
8210
9025
9713
10230
10600
11615
11635
11663
11672
11681
11723
11756
11945
11897
11892
11875
11832
11790
13050
13415
13643
14297
14550
15360
15974
16550
17225
17318
17341
17425
17985
19405
20080
20330
20670
20705
20801
20950
21990
23680
25281
*
*
*LOCATION OF CONSTRUCTED SIDE SPILL WEIR
0 2000'4000'
SCALE: 1" = 2000'
1000'
FIGURE 5.1
LARIMER & WELD
CANAL
100-YR SPILLS
LEGEND:
CROSS SECTION
LOCATION SECTION ID
(STATION)
APPROXIMATE SPILL LIMITS
Dr
a
w
i
n
g
N
a
m
e
:
F:
\
3
2
-
1
6
6
4
.
3
1
B
O
X
E
L
D
E
R
L
O
M
R
\
R
E
P
O
R
T
\
F
I
G
U
R
E
S
\
F
I
G
U
R
E
5
.
1
.
D
W
G
Th
u
r
s
d
a
y
,
M
a
r
c
h
1
5
,
2
0
1
8
11
:
2
3
A
M
B
y
:
RI
C
K
S
,
R
O
N
A
L
D
SPILL LIMITS ID
25281
Spill
Location
Existing
Condition
Flows
(Pre-Project)
As-built Flows
(Post-Project)Difference
cfs cfs cfs
A 509 166 -344
B 452 105 -347
C 2555 2513 -42
D 2147 2 -2145
E 34 0 -34
F 1731 740 -991
G 65 37 -28
H 108 108 0
TH-12
TH-2
TH-1
TH-4
TH-13
TH-5
TH-3
TH-14
TH-6
TH-15
TH-7
I-
2
5
E Vine DR.
I-
2
5
Can
a
l
N
C
R
5
E CR 50
Site
NE FRONTAGE RDLEGEND:
INDICATES APPROXIMATE
LOCATION OF EXPLORATORY
BORING
INDICATES APPROXIMATE
LOCATION OF EXPLORATORY
BORINGS PERFORMED FOR NEWT
3 PIPELINE PROJECT (FC10581)
TH-1
TH-12
ERIC KELLEY C/O JR ENGINEERING LLC
MOUNTAIN VISTA PROPERTY
CTL I T PROJECT NO. FC10813-115
FIGURE 1
Locations of
Exploratory Borings
VICINITY MAP
(FORT COLLINS, COLORADO)
NOT TO SCALE
550'275'
APPROXIMATE
SCALE: 1" = 550'
0'
0
5
10
15
20
25
30
35
40
0
5
10
15
20
25
30
35
40
6/12
14/12
9/12
11/12
50/10
WC=11.2
DD=109
SW=0.0
SS=0.370
WC=4.7
DD=116
-200=23
WC=8.7
DD=114
SW=-0.1
TH-1
10/12
15/12
WC=19.9
DD=104
SW=0.9
SS=1.300
TH-2
7/12
9/12
9/12
17/12
37/12
WC=10.1
DD=114
-200=45
WC=10.8
DD=116
SW=0.0
TH-3
9/12
26/12
WC=23.2
DD=106
SW=0.4
TH-4
21/12
10/12
29/12
8/12
WC=5.6
DD=114
SW=0.0
SS=0.800
TH-5
7/12
4/12
50/5
WC=25.6
DD=96
-200=83
WC=17.2
DD=111
SW=-0.1
TH-6
7/12
2/12
4/12
WC=17.6
DD=107
SW=0.3
SS=0.040
TH-7
DE
P
T
H
-
F
E
E
T
DE
P
T
H
-
F
E
E
T
Summary Logs of
Exploratory Borings
FIGURE 2
ERIC KELLEY C/O JR ENGINEERING LLC
MOUNTAIN VISTA PROPERTY
CTL | T PROJECT NO. FC10813-115
0
5
10
15
20
25
30
35
40
0
5
10
15
20
25
30
35
40
8/12
42/12
40/12
26/12
WC=0.0DD=102SW=1.3SS=1.600
WC=5.1-200=7
WC=0.0DD=102SW=1.3SS=1.600
WC=5.1-200=7
TH-12
11/12
14/12
12/12
9/12
WC=10.3-200=16WC=10.3-200=16
TH-13
14/12
6/12
15/12
31/12
WC=0.0DD=113SW=0.0SS=0.490
WC=0.0DD=113SW=0.0SS=0.490
TH-14
11/12
5/12
7/12
7/12
WC=30.8DD=91WC=30.8DD=91
TH-15
DRIVE SAMPLE. THE SYMBOL 8/12 INDICATES 8 BLOWS OF A 140-POUND HAMMER
FALLING 30 INCHES WERE REQUIRED TO DRIVE A 2.5-INCH O.D. SAMPLER 12 INCHES.
SAND, CLAYEY, SILTY, SLIGHTLY MOIST TO MOIST, LOOSE TO MEDIUM DENSE, BROWN,
TAN, RUST (SC)
1.
4.
LEGEND:
CLAY, SANDY, MOIST, STIFF, BROWN (CL)
DE
P
T
H
-
F
E
E
T
THESE LOGS ARE SUBJECT TO THE EXPLANATIONS, LIMITATIONS AND CONCLUSIONS IN
THIS REPORT.
NOTES:
WATER LEVEL MEASURED MAY 1, 2023
GRAVEL, SANDY, SLIGHTLY MOIST TO WET,MEDIUM DENSE TO VERY DENSE, REDDISH
BROWN (GP)
INDICATES DEPTH WHERE HOLE CAVED PRIOR TO SECONDARY
GROUNDWATER MEASUREMENTS.
INDICATES MOISTURE CONTENT (%).
INDICATES DRY DENSITY (PCF).
INDICATES SWELL WHEN WETTED UNDER OVERBURDEN PRESSURE (%).
INDICATES PASSING NO. 200 SIEVE (%).
INDICATES LIQUID LIMIT.
INDICATES PLASTICITY INDEX.
INDICATES UNCONFINED COMPRESSIVE STRENGTH (PSF).
INDICATES SOLUBLE SULFATE CONTENT (%).
3.
DE
P
T
H
-
F
E
E
T
WATER LEVEL MEASURED AT TIME OF DRILLING.
Summary Logs of
Exploratory Borings
BORINGS 1-7 WERE DRILLED ON APRIL 21ST, 2023 USING 4-INCH DIAMETER
CONTINUOUS-FLIGHT AUGERS AND A TRUCK-MOUNTED DRILL RIG.
FIGURE 3
WC
DD
SW
-200
LL
PI
UC
SS
-
-
-
-
-
-
-
-
ERIC KELLEY C/O JR ENGINEERING LLC
MOUNTAIN VISTA PROPERTY
CTL | T PROJECT NO. FC10813-115
BORINGS 12-15 WERE PERFORMED ON NOVEMBER 8TH, 2022 AS A PART OF THE NEWT 3
PIPELINE PROJECT (FC10581)
2.
Front Range Storage
Preliminary Drainage Report
15
APPENDIX F – MAPS
A Westrian Company
MOUNTIAN VISTA RV, BOAT AND STORAGE
EXISTING SWMM MAP
A Westrian Company
MOUNTIAN VISTA RV, BOAT AND STORAGE
EXISTING SWMM MAP
A
W
e
s
t
r
i
a
n
C
o
m
p
a
n
y
Know what's below.
before you dig.Call
R
LEGEND
A
W
e
s
t
r
i
a
n
C
o
m
p
a
n
y
Know what's below.
before you dig.Call
R
BASIN SUMMARY TABLE
Tributary Area Percent tc Q2
Q10
0
Sub-basin (acres)Impervious C2 C100 (min)(cfs)(cfs)
C1 0.70 64%0.77 0.96 5.0 1.5 6.7
C2 2.74 75%0.90 1.00 7.0 21.6 24.1
C3 2.24 75%0.90 1.00 7.0 17.7 19.7
C4 2.22 67%0.82 1.00 8.0 15.3 18.6
C5 0.33 69%0.84 1.00 5.0 2.7 3.3
C6 0.68 77%0.92 1.00 5.0 6.2 6.8
C7 1.06 68%0.83 1.00 5.0 8.7 10.5
C8 1.79 3%0.16 0.20 12.0 2.1 2.6
OS1 21.90 2%0.15 0.19 22.0 17.5 21.8
DESIGN POINT
SUMMARY TABLE
DESIGN POINT SUMMARY
TABLE
Total
(CFS)
Total
(CFS)
1 1.5 6.7
2 6.2 24.1
5 0.8 3.3
5.1 8.3 32.9
3 5.1 19.7
6 1.9 6.8
6.1 13.7 53.5
4 4.4 18.6
7 2.5 10.5
7.1 18.5 73.8
9 5.0 21.9
8 0.6 2.6
Front Range Storage
Preliminary Drainage Report
16
APPENDIX G –LID EXHIBIT
A
W
e
s
t
r
i
a
n
C
o
m
p
a
n
y
Know what's below.
before you dig.Call
R
LID TREATMENT