Loading...
HomeMy WebLinkAboutFRONT RANGE STORAGE - PDP230011 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORTPRELIMINARY DRAINAGE REPORT FOR Front Range RV and Boat Storage Prepared For: Freedom Homes, LLC 4920 Saddlewood Circle. Johnstown, Colorado 80534 Eric Kelley (970) 405-3961 January 25, 2024 Project No. 39817.00 Prepared By: JR Engineering, LLC 2900 South College Avenue, Suite 3D Fort Collins, CO 80525 Front Range Storage Preliminary Drainage Report ii TABLE OF CONTENTS TABLE OF CONTENTS ......................................................................................................................... ii APPENDIX ..................................................................................................................................... iii Engineer’s Certification Block ........................................................................................................... iv GENERAL DESCRIPTION AND LOCATION ............................................................................................ 1 LOCATION ..................................................................................................................................... 1 DESCRIPTION OF PROPERTY .......................................................................................................... 1 MASTER DRAINAGE BASIN DESCRIPTION ....................................................................................... 1 FLOODPLAIN SUBMITTAL REQUIREMENTS ..................................................................................... 2 DRAINAGE BASINS AND SUB-BASINS ................................................................................................. 2 MAJOR BASINS AND SUB-BASINS ................................................................................................... 2 EXISTING SUB-BASIN DESCRIPTION ................................................................................................ 2 EXISTING OFF-SITE DRAINAGE BASINS ........................................................................................... 2 PROPOSED SUB-BASINS DESCRIPTIONS ......................................................................................... 3 OFFSITE SUB-BASINS DESCRIPTIONS .............................................................................................. 4 PROJECT DESCRIPTION ...................................................................................................................... 4 PROJECT DESCRIPTION .................................................................................................................. 4 PROPOSED DRAINAGE FACILITIES ...................................................................................................... 4 GENERAL CONCEPT ....................................................................................................................... 4 WATER QUALITY/ DETENTION FACILITIES ...................................................................................... 5 LOW IMPACT DEVELOPMENT ........................................................................................................ 5 DRAINAGE DESIGN CRITERIA ............................................................................................................. 6 REGULATIONS ............................................................................................................................... 6 FOUR STEP PROCESS TO PROTECT RECEIVING WATERS ................................................................. 6 DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS ............................................................. 7 HYDROLOGIC CRITERIA .................................................................................................................. 7 HYDRAULIC CRITERIA ..................................................................................................................... 7 FLOODPLAIN REGULATIONS COMPLIANCE ..................................................................................... 7 MODIFICATIONS OF CRITERIA ........................................................................................................ 8 EROSION CONTROL ....................................................................................................................... 8 CONCLUSIONS ................................................................................................................................... 8 COMPLIANCE WITH STANDARDS ................................................................................................... 8 DRAINAGE CONCEPT ..................................................................................................................... 9 Front Range Storage Preliminary Drainage Report iii APPENDIX Appendix A – Figures Appendix B – Hydrologic Calculations Appendix C – Hydraulic Calculations Appendix D – Water Quality Calculations Appendix E – Reference Appendix F – Maps Appendix G – LID Exhibit Front Range Storage Preliminary Drainage Report iv Engineer’s Certification Block I hereby attest that this report for the final drainage design for the Front Range RV Boat and Storage was prepared by me or under my direct supervision, in accordance with the provisions of the Fort Collins Stormwater Criteria Manual. I understand that the City of Fort Collins does not and will not assume liability for drainage facilities designed by others. Joseph Martin Frank, PE Registered Professional Engineer State of Colorado No. 53399 For and on behalf of JR Engineering Front Range Storage Preliminary Drainage Report 1 GENERAL DESCRIPTION AND LOCATION LOCATION The site is located in the North half of the Northwest Quarter and the East Half of Section 3, Township 7 North, Range 68 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. More specifically, the site is a 105-acre property that is zoned I-Industrial. The concept plan proposes approximately 12 acres of outdoor, non-covered recreational vehicle and boat storage. The remaining 95 acres will remain for agricultural use. The site is situated on the NE Frontage Rd on the West side and is bordered by the Larimer and Weld County Canal (“LWCC”) on the south side. To the East, the site abuts four presently vacant parcels of land, while to the North, it borders the land owned by the Colorado Division of Wildlife. DESCRIPTION OF PROPERTY The Front Range Storage area spans approximately 105 acres, with approximately 12 acres designated for development into RV and boat storage, along with off-site detention. The remaining 95 acres will continue to be used as irrigated agricultural land. The site currently features an existing gravel road access located just off the NE Frontage road. Most of the site remains undeveloped and is presently being utilized for agriculture and a U-haul rental service. Two buildings are the only existing structures on site, situated just east of the Frontage Road. Although flow paths are not precisely defined, the general drainage pattern of the site follows a gradual slope ranging from 1% to 4% in the northeast to the southwest direction. According to the Natural Resources Conservation Service (NRCS), approximately half of the soils on the site are composed of type B soils, which have a mild infiltration and runoff rate. The remaining site is made up of Type C soils, which are characterized by a lower infiltration rate and corresponding higher runoff rates. For additional information, refer to the NRCS soil map within Appendix A of this report. Adjacent to the proposed site, a pre-existing 15” corrugated metal pipe facilitates the drainage of any surplus stormwater and irrigation water from the site into the Larimer and Weld Canal. The existing culvert is not capable of conveying large quantities of runoff. MASTER DRAINAGE BASIN DESCRIPTION The site is positioned within the Boxelder Creek Basin and shares borders with the Upper Cooper Slough and Lower Cooper Slough basins. The Boxelder Creek watershed and associated floodplain consists to a large degree of mostly undeveloped land. Based on the 100-year rainfall event, a detention pond will be built southeast of the RV and boat storage facility. Currently, the site drains through a 15” CMP and outfalls into the Larimer and Weld Canal. The detention pond is designed to incorporate a trickle channel and will feature an outfall leading to Boxelder Creek just east of the site. The Larimer and Weld County Canal policy as of 2024 is to not accept stormwater runoff from any new developments. Front Range Storage Preliminary Drainage Report 2 FLOODPLAIN SUBMITTAL REQUIREMENTS The Front Range RV Boat and Storage site is on FEMA FIRM panels 08069C0982F and 08069C1001F. The Front Range RV Boat and Storage site lies within FEMA Zone X, areas that are determined to be outside the 0.2% annual chance floodplain. The Front Range RV Boat and Storage site is not located within a FEMA regulated floodplain, as shown in Appendix A in the FEMA attachments. The site is also not located in the City of Fort Collins Floodplain, as shown in Appendix A in the City of Fort Collins Flood map. The site does drain into the Boxelder Creek Floodplain Zone AE. DRAINAGE BASINS AND SUB-BASINS MAJOR BASINS AND SUB-BASINS The Front Range RV Boat and Storage site is located in the Boxelder Creek Basin. The Upper and Lower Cooper Slough Basins exist to the west of the site. Covering approximately 265 square miles, the Boxelder Creek extends from north of the Colorado/Wyoming border and stretch southward into the eastern part of Fort Collins. These basins are predominantly characterized by farmland, with occasional pockets of mixed-use residential development and limited commercial development. EXISTING SUB-BASIN DESCRIPTION Basin EO1, 12.51 acres and 8.2% impervious this basin, is composed of the proposed RV Boat and storage site. Basin EX2, 36.9 acres and 2% impervious this basin, is composed the portion of the site east of the proposed RV Boat and Storage site. Basin EX3, 19.8 acres and 2% impervious this basin, is composed the portion of the site east of the proposed RV Boat and Storage site. EXISTING OFF-SITE DRAINAGE BASINS Currently, the site collects off-site runoff from the north from the Colorado Division of Wildlife property just north of the 1435 NE Frontage Road that drains onto the site via sheet flow. That runoff drains directly into the Larimer and Weld Canal. Runoff from the eastern off-site basin drains south and into the Larimer and Weld Canal. A ridgeline divides portions of the northeast and southeast off-site basins. This ridgeline divides the water such that everything west of the ridgeline drains into the Larimer and Weld Canal while everything east of the ridgeline drains into the Boxelder Creek. In the 100-year event, it is anticipated that the runoff from the North and along the NE Frontage Road and sheet drain onto the site. This runoff has been previously modeled as part of the Boxelder Creek LOMR as built SWMM model. An exhibit showing the corresponding model has been provided in Appendix D of this report. JR Engineering is not changing the upstream hydrology and is modeling the offsite runoff adjacent to the Frontage based Front Range Storage Preliminary Drainage Report 3 on the average from between SWMM link elements 299 and 99, as shown in the Existing SWMM exhibit provided in Appendix F of this report. PROPOSED SUB-BASINS DESCRIPTIONS Basin C1, 0.36 acres and 61.5% impervious this basin, is composed of the access to the site off the I-25 North East Frontage Road. Basin C2 is 0.96 acres and 70.0% impervious. This basin is composed of the site entrance on the frontage road, and access improvements. The runoff from this basin drains to an onsite at design point C2 where it goes to the onsite detention pond. Basin C3 is 2.52 acres and 71.9% impervious. This basin is composed of uncovered parking, paved drive isles, and some vegetation. The runoff from this basin will be conveyed to a rain garden at design point 3. Basin C4 is 1.20 acres and 78.5% impervious. This basin is composed of uncovered parking, paved drive isles, and some vegetation. The runoff will go into a rain garden at design point 3 where it will then be conveyed to the detention pond. Basin C5 is 1.19 acres and 78.2% impervious. This basin is composed of uncovered parking and paved drive isles. The runoff will go into a rain garden at design point 5 where it will then be conveyed to the detention pond. Basin C6 is 1.31 acres and 77.3% impervious. This basin is composed of uncovered parking and paved drive isles. The runoff will go into a rain garden at design point 6 where it will then be conveyed to the detention pond. Basin C7 is 0.42 acres and 67.5% impervious. This basin is composed of uncovered parking and paved drive isles. The runoff will go into a rain garden at design point 7, where it will then be conveyed to the detention pond. Basin C8, 1.73 acres and 77.4% impervious this basin will be composed of uncovered parking and paved drive isles. The runoff will go into a rain garden at design point 8, where it will then be conveyed to the detention pond. Basin C9, 0.42 acres and 38.0% impervious this basin will be composed of the drainage swale on the southern portion of the site. Front Range Storage Preliminary Drainage Report 4 Basin C10, 2.18 acres and 4% impervious this basin will be composed the detention / water quality pond. OFFSITE SUB-BASINS DESCRIPTIONS Basin OS1, 0.42 acres and 100.0% impervious this basin, is composed of the I-25 North East Frontage Road. Basin OS2 is 1.02 acres and 8.2% impervious. This basin is composed of walk and a grass lined channel that conveys offsite runoff that drains historically drains to the Larimer and Weld Canal. Basin OS3 is 37.23 acres and 2.1% impervious. This basin drains to a pond where it then outfalls into Box Elder Creek, by overtopping the weir from the outlet structure. Basin OS4 is 20.31 acres and 2% impervious. This basin drains to a swale, where it then outfalls into Box Elder Creek. PROJECT DESCRIPTION PROJECT DESCRIPTION Front Range RV & Boat Storage site is a recreational vehicle and boat storage facility at 1312 NE Frontage Road. The previously undeveloped portion of the 105-acre property, approximately 12 acres, is for outdoor covered and uncovered recreational vehicle and boat storage. The remaining 95 acres will remain for agricultural use. The property will hold detention and water quality for the Front Range RV & Boat Storage development. PROPOSED DRAINAGE FACILITIES GENERAL CONCEPT The proposed development to the Front Range RV & Boat Storage site will result in the developed condition being treated for water quality and detained. Low-impact development best management practices are proposed to improve the quality of runoff and aid in reducing peak flows. Specifically, a linear bio-retention swale will be used in the southern portion of the site to treat and provide water quality, while the remaining portion of the site will be treated in the proposed detention pond. Runoff from the site sheet drains down the drive isles on the south side of the site. From then on, the runoff is conveyed in a swale to the detention pond. Surface overflow paths will be provided such that the 100-year storm flows remain at least one foot below the finished floor elevation at the time of the final drainage report. Front Range Storage Preliminary Drainage Report 5 WATER QUALITY/ DETENTION FACILITIES The site includes a Rain Garden designed to capture and address 82% of the total water quality capture volume on the site. The Rain Garden will be maintained to ensure the ongoing protection of the receiving waters. An additional 12% of the water quality capture volume on the site will undergo water quality treatment in the water quality/detention pond. The detention pond will release at the 2- year historic event the 100 year event. Currently, the runoff from the I-25 Frontage Road is untreated and flows into a swale, leading to the LWCC. Approximately 6% of the impervious area along the I-25 Frontage Road remains untreated due to the existing grade of the road. However, the runoff from this road will be directed into a swale, functioning similarly to a bio-retention swale during water quality events due to its shallow slope and low flow. Refer to the water quality map in Appendix G for more details. It is important to note that the site does not treat 100% of the modified/added impervious areas. Specifically, around 0.20 acres of new impervious area resulting from the frontage road widening and adjacent sidewalk in basins OS1 & OS2 will not be conveyed through the proposed development for water quality treatment. Nonetheless, the proposed development plans to treat approximately 0.21 acres of existing frontage road impervious area runoff in basins C1 & C2, which would have originally followed its historic drainage path into the Larimer and Weld Canal. By addressing these areas, the total treated impervious area meets the modified/added impervious areas, as illustrated in the LID exhibit in Appendix G of this report. LOW IMPACT DEVELOPMENT A minimum of 75% - percent of the new impervious surface area is treated by a Low-Impact Development (LID) best management practice (BMP) in accordance with City criteria. An illustrative LID/ Surface Map is provided in Appendix G, and the sizing of the LID methods is provided in Appendix D. Front Range Storage Preliminary Drainage Report 6 DRAINAGE DESIGN CRITERIA REGULATIONS This report was prepared to meet or exceed the City of Fort Collins stormwater criteria. The City of Fort Collins Stormwater Criteria Manual (dated 2018)(FCSCM) and the Urban Drainage Flood Control District’s (UDFCD) Drainage Criteria Manual (USDCM) Volumes 1, 2 and 3 were referenced as guidelines for this design. FOUR STEP PROCESS TO PROTECT RECEIVING WATERS The City of Fort Collins requires the Four Step Process to protect receiving waters. The four- step process incorporates reducing runoff volume, treating water quality capture volume, stabilizing streams, and implementing long-term source controls. Volume reduction is an important part of the Four Step Process and is fundamental to effective stormwater management. Per City criteria, a minimum of 75 percent of new impervious surface area must be treated by a Low-Impact Development (LID) best management practice (BMP). The site incorporates a Rain Garden and a water quality pond designed to capture and treat at least 75% of the site’s water quality capture volume. The Rain Garden needs to be properly cleaned and maintained to allow for long-term protection of the receiving waters. The proposed LID BMPs will have the effect of slowing runoff through the site lot and increasing infiltration and rainfall interception by encouraging infiltration and careful selection of vegetative cover. The LID exhibit is shown within Appendix G of this report. Step 1 – Employ Runoff Reduction Practices The majority of the developed runoff through the site will be routed through the site. The detention pond will restrict the flow rate of stormwater leaving the site and reduce the impact on downstream drainage areas. Additionally, the design will allow for greater that 75% of the project is added impervious area to be routed through an approved LID water quality treatment train. The onsite water quality BMPs include a Rain Garden and a water-quality pond. Step 2 – Implement BMPS that Provides Water Quality Capture Volume The site incorporates a Rain Garden designed to capture and treat 82% of the site’s water quality capture volume. The Rain Garden will need to be properly cleaned and maintained to allow for long-term protection of the receiving waters. 12% of the site’s water quality capture volume will be treated in the water quality/detention pond. In the existing condition, the runoff from the I- 25 Frontage Road is untreated and drains into a swale to the LWCC. 6% of the site’s impervious area along the I-25 Frontage Road will be untreated due to the existing grade of the Frontage Road. However, the runoff from the frontage road will drain into a swale, which will act similarly to a bio-retention swale in a water quality event due to the shallow slope and low amount of flow. For additional information, see the water quality map in Appendix G of this Report. Front Range Storage Preliminary Drainage Report 7 Step three –Stabilize Drainage ways The stormwater improvements for the Front Range RV Boat and Storage improve the existing condition by eliminating, reducing, and detaining flows. Step four – Implement site-specific and other source control BMPs Water quality will ultimately treated in the Rain Garden for 82% of the site. The remaining treated portion of the site will then be treated in the water quality / detention facility, which will serve to treat a portion of the site for water quality. An erosion control plan and Stormwater Management Plan will be implemented to prevent erosion and control sediment on the project site and downstream drainage ways during and after construction. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS The as-built SWMM model from the 2018 Boxelder LOMR was used to determine the existing runoff going through the site. The 2018 as-built SWMM model takes into account improvements that have been built upstream of the site i.e. (the East Side Detention Facility). JR Engineering verified the 100-year water surface elevation of the Larimer and Weld Canal by running the L&W Canal HEC_RAS model from the 2018 LOMR by Ayres and Associates at an unsteady 100-year analysis and modeled the results with the same version of HEC-RAS 5.02 that was utilized to generate the results for the LOMR. The 100-year wselv. of the canal is contained within the canal. For more additional information regarding the canal and pond invert, refer to the annotated Figure 5.1 in Appendix E. Groundwater measurements were taken throughout the site over a period from the fall of 2022 to the spring of 2023 to determine the ground water level. The invert of the pond is approximately 2’ above the groundwater, as shown in the attached experts from the geotechnical report in Appendix E of this report. JR Engineering designed the pond to detain the proposed 100-year event. JR Engineering calculated the required detention volume by detaining the 100-year event and releasing at the 2-year event by modeling the release rate with the FFA method, as shown in Appendix C. For the preliminary design of the outlet structure, JR Engineering used the MHFD-Detention Workbook to size the orifices for the water quality portion of the site treated in the detention pond. The outlet structure was preliminary sized and a rating curve was developed, as shown in Appendix C. Table 1, as shown below, shows the 100-year volume. Table 1:Required Pond Volume Pond ID 100-YR_Vol. (Acre-Ft) WQ Capture -Pond (Acre-Ft) Total Volume (Acre-Ft) PEAK_POND RELEASE (CFS)POND INVERT P1 2.173 0.049 2.222 4.5 4977.43 Front Range Storage Preliminary Drainage Report 7 Table 2: Pond Stage Discharge The pond detains the proposed 100-year event and releases at or below the 2-year historic release rate. The Detention volume was calculated using the FFA method. The spillway for the pond will be designed at time of final. HYDROLOGIC CRITERIA Weighted percent imperviousness was calculated for each basin using the Fort Collins Stormwater Criteria Manual Table 3.2-2 for each basin. The FFA method was used to determine the detention volume since the site is less than 20 acres. The City of Fort Collins area has rainfall depths associated with the table below, as shown in Chapter 5 of the Fort Collins Stormwater Criteria Manual. HYDRAULIC CRITERIA At time of the Final Plan (FP) StormCAD will be utilized to determine the hydraulic capacity of the storm sewer system on site. Additionally, hydraulic calculations for items such as street capacity, inlet capacity, swales, channels, and the emergency spillway will be provided within the Final Drainage Report. FLOODPLAIN REGULATIONS COMPLIANCE As previously stated, the Front Range RV and Boat Storage site lies within FEMA Zone X, areas that are determined to be outside the 0.2% annual chance floodplain. The site is not located within a FEMA- regulated floodplain, as shown in Appendix A in the FEMA attachments. The site is also not located in the Cities of Fort Collins Floodplain, as shown in Appendix A in the City of Fort Collins Flood map. Stage Area Area Volume Volume Total Outflow [ft][ft 2][acres][ft 3][ac-ft][cfs] 0.00 37 0.001 0 0.000 0.00 0.50 4,211 0.097 1,062 0.024 0.02 0.66 9,441 0.217 2,154 0.049 0.02 1.00 20,556 0.472 7,253 0.167 0.23 1.50 44,063 1.012 23,408 0.537 1.53 2.00 62,966 1.445 50,165 1.152 2.87 2.50 76,326 1.752 84,988 1.951 3.66 2.68 78,712 1.807 98,942 2.271 3.97 2.75 79,641 1.828 104,484 2.399 5.45 3.00 82,955 1.904 124,808 2.865 12.96 3.25 85,628 1.966 145,881 3.349 13.64 3.30 86,163 1.978 150,176 3.448 13.77 3.40 87,232 2.003 158,846 3.647 14.03 3.50 88,302 2.027 167,623 3.848 14.29 Invert - 4977.47 WQ Volume -4978.13 Outlet Structure Overflow Weir - 4980.15 Stage - Storage Description Front Range Storage Preliminary Drainage Report 8 MODIFICATIONS OF CRITERIA The site does not treat 100% of modified/added impervious areas. Approximately 0.20 acres of new impervious area from the frontage road widening and adjacent sidewalk located within basins OS1 & OS2 is not being conveyed through the proposed development and treated for water quality. However, the proposed development will be treating approximately 0.21 acres of existing frontage road impervious area runoff located within basins C1 & C2 that would have otherwise been directed along its historic drainage path and into the Larimer and Weld Canal. By offsetting these areas, the total amount of impervious area being treated exceeds the modified/added impervious areas, as shown in the LID exhibit in Appendix G of this report. No new developments are being allowed to discharge developed runoff into the Larimer and Weld Canal. As a result, the only outfall option for the site is Boxelder Creek, which is located just east of the site. In order to retain the existing house as is, an open swale with a slope less than the minimum 0.50% is being proposed. The swale running along the south side of the storage facility has a longitudinal slope of 0.40%. The slope of the swale from the southeast corner of the facility all the way to the outfall in Boxelder Creek is 0.25%. These swales do have a concrete trickle pan at the bottom. The open swale will make routine maintenance easier and create a future outfall option for the remaining undeveloped portions of the site. JR Engineering is proposing that the detention pond storm outfall go underneath a 24" water transmission line owned by ELCO via an inverted siphon. This 24” waterline is a water transmission line, and therefore lowering it is not a feasible option. The sediment built up within the storm line will be cleaned by a Jet- Vac, and the owner of the site will be responsible for the maintenance of the storm outfall pipe. The outfall will primarily be driven by head from the onsite detention facility. EROSION CONTROL A statement of compliance with Erosion Control Criteria and all Erosion Control Materials will be provided with the Final Drainage Report. CONCLUSIONS COMPLIANCE WITH STANDARDS The hydrologic and water quality calculations were performed using the required methods as outlined in the City of Fort Collins Storm Water Criteria Manual. The proposed drainage improvements meet or exceed the City’s requirements except for the parameters presented in the Modification to Criteria section of this Report. Front Range Storage Preliminary Drainage Report 9 DRAINAGE CONCEPT The proposed concept for the development of the RV Boat storage site involves surface flows and running swales. The site runoff will be treated at the detention facility onsite. All the off-site flows will be conveyed through the site. The existing conditions drainage patterns are maintained in the proposed. The proposed improvements will have no adverse impacts on the flow rate, character, or quality of runoff leaving the site. Front Range Storage Preliminary Drainage Report 10 REFERENCES Fort Collins Stormwater Criteria Manual; City of Fort Collins, Colorado, December 2018. Urban Storm Drainage Criteria Manual (Volumes 1, 2, and 3); Urban Drainage and Flood Control District, June 2001. Hydrologic Analysis of the Box Elder Creek/ Cooper Slough Watershed Icon Engineering, Apr. 2014. Boxelder and Cooper Slough Letter of Map Revision (LOMR) for the Boxelder 6 Project."AYRES & ASSOCIATES, 5 Nov. 2018. Front Range Storage Preliminary Drainage Report 11 APPENDIX A – FIGURES A Westrian Company Hydrologic Soil Group—Larimer County Area, Colorado (Mountain Vista Property) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/17/2023 Page 1 of 4 44 9 4 3 0 0 44 9 4 4 0 0 44 9 4 5 0 0 44 9 4 6 0 0 44 9 4 7 0 0 44 9 4 8 0 0 44 9 4 9 0 0 44 9 5 0 0 0 44 9 5 1 0 0 44 9 4 3 0 0 44 9 4 4 0 0 44 9 4 5 0 0 44 9 4 6 0 0 44 9 4 7 0 0 44 9 4 8 0 0 44 9 4 9 0 0 44 9 5 0 0 0 44 9 5 1 0 0 499700 499800 499900 500000 500100 500200 500300 500400 500500 500600 500700 500800 500900 501000 499700 499800 499900 500000 500100 500200 500300 500400 500500 500600 500700 500800 500900 501000 40° 36' 26'' N 10 5 ° 0 ' 1 5 ' ' W 40° 36' 26'' N 10 4 ° 5 9 ' 1 7 ' ' W 40° 35' 57'' N 10 5 ° 0 ' 1 5 ' ' W 40° 35' 57'' N 10 4 ° 5 9 ' 1 7 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 300 600 1200 1800 Feet 0 50 100 200 300 Meters Map Scale: 1:6,250 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 17, Sep 7, 2022 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 2, 2021—Aug 25, 2021 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (Mountain Vista Property) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/17/2023 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 7 Ascalon sandy loam, 0 to 3 percent slopes B 14.8 14.5% 53 Kim loam, 1 to 3 percent slopes B 26.5 25.9% 54 Kim loam, 3 to 5 percent slopes B 16.6 16.2% 73 Nunn clay loam, 0 to 1 percent slopes C 23.8 23.2% 74 Nunn clay loam, 1 to 3 percent slopes C 10.1 9.9% 94 Satanta loam, 0 to 1 percent slopes C 0.2 0.2% 95 Satanta loam, 1 to 3 percent slopes C 10.2 10.0% 105 Table Mountain loam, 0 to 1 percent slopes B 0.1 0.1% Totals for Area of Interest 102.4 100.0% Hydrologic Soil Group—Larimer County Area, Colorado Mountain Vista Property Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/17/2023 Page 3 of 4 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Mountain Vista Property Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 7/17/2023 Page 4 of 4 18,056 3,009.3 FCMaps This map is a user generated static output from the City of Fort Collins FCMaps Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. City of Fort Collins - GIS 2,286.0 1: WGS_1984_Web_Mercator_Auxiliary_Sphere Feet2,286.001,143.00 Notes Legend 13,719 FEMA Floodplain FEMA High Risk - Floodway FEMA High Risk - 100 Year FEMA Moderate Risk - 100 / 500 Year City Floodplains City High Risk - Floodway City High Risk - 100 Year City Moderate Risk - 100 Year City Limits World Hillshade National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A, V, A99 With BFE or DepthZone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mileZone X Future Conditions 1% Annual Chance Flood HazardZone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to LeveeZone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood HazardZone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 7/21/2023 at 10:33 AM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. 1:6,000 105°0'6"W 40°36'26"N 104°59'29"W 40°35'58"N Basemap Imagery Source: USGS National Map 2023 9,028 1,504.7 FCMaps This map is a user generated static output from the City of Fort Collins FCMaps Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. City of Fort Collins - GIS 1,143.0 1: WGS_1984_Web_Mercator_Auxiliary_Sphere Feet1,143.00571.50 Notes Legend 6,859 Street Names FEMA Floodplain FEMA High Risk - Floodway FEMA High Risk - 100 Year FEMA Moderate Risk - 100 / 500 Year City Floodplains City High Risk - Floodway City High Risk - 100 Year City Moderate Risk - 100 Year City Limits Front Range Storage Preliminary Drainage Report 12 APPENDIX B – HYDROLOGIC CALCULATIONS Subdivision:RV & Boat Storage Project Name:Mountain Vista Property Location:Fort Collins Project No.: Calculated By:JSC Checked By:ARJ Date:1/30/23 EO1 12.51 40%1.88 6.0%90%0.05 0.4%2%10.57 1.7%90%0.02 0.1%8.2% EX2 36.90 40%0.00 0.0%90%0.00 0.0%2%36.90 2.0%90%0.00 0.0%2.0% EX3 19.80 40%0.00 0.0%90%0.00 0.0%2%19.80 2.0%90%0.00 0.0%2.0% TOTAL 49.41 40%1.88 1.5%90%0.05 0.1%2%47.47 1.9%90%0.02 0.0%3.6% Basins Total Weighted % Imp. Asphalt/Concrete % Imp.Area (ac)Weighted % Imp. COMPOSITE % IMPERVIOUS CALCULATIONS Weighted % Imp.Basin ID Total Area (ac) % Imp. Area (ac) Landscape or Previous Surface % Imp. Area (ac)Weighted % Imp. Gravel Rooftop Weighted % Imp.% Imp. Area (ac) 39817.00 X:\3980000.all\3981700\Excel\Drainage\3981700 EX. Drainage_Calcs_Template_v2.07.xlsm Page 1 of 2 1/30/2024 UPDATED BASIN ASPHALT/CONCRETE X:\3980000.all\3981700\Excel\Drainage\3981700 EX. Drainage_Calcs_Template_v2.07.xlsm Page 2 of 2 1/30/2024 Subdivision:RV & Boat Storage Project Name:Mountain Vista Property Location:Fort Collins Project No.: Calculated By:JSC Checked By:ARJ Date:1/30/23 EO1 12.51 0.50 1.88 0.08 0.09 0.95 0.05 0.00 0.00 0.20 10.57 0.17 0.21 0.95 0.02 0.00 0.00 0.17 0.22 EX2 36.90 0.50 0.00 0.00 0.00 0.95 0.00 0.00 0.00 0.20 36.90 0.20 0.25 0.95 0.00 0.00 0.00 0.20 0.25 EX3 19.80 0.50 0.00 0.00 0.00 0.95 0.00 0.00 0.00 0.20 19.80 0.20 0.25 0.95 0.00 0.00 0.00 0.20 0.25 Basin ID Basins Total Weighted 100 YEAR C COMPOSITE RUNOFF COEFFICIENT CALCULATIONS Basins Total Weighted 2 YEAR CArea (ac)2 - YEAR C 100 - YEAR C Runoff Coefficient Area (ac)2 - YEAR C 100 - YEAR C 39817.00 Total Area (ac)Runoff Coefficient Area (ac)Area (ac) Gravel Rooftop Landscape or Previous Surface Runoff Coefficient Asphalt/Concrete 2 - YEAR C 100 - YEAR C 2 - YEAR C 100 - YEAR C Runoff Coefficient X:\3980000.all\3981700\Excel\Drainage\3981700 EX. Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 1/30/2024 Subdivision:RV & Boat Storage Project Name:Mountain Vista Property Location:Fort Collins Project No.: Calculated By:JSC Checked By:ARJ Date:1/30/23 BASIN D.A. Hydrologic Impervious C2 C100 L S o t i - 2 Year t i - 100 Year L t S t K VEL.t t COMP.t c-2 Year COMP.t c 100 - Year TOTAL Tc t i - 2 Year t c- 100 Year ID (ac) Soils Group (%)(ft)(%)(min)(min)(ft)(%)(ft/s)(min)(min)(min)LENGTH (ft)Check (min)(min) EO1 12.51 B/C 8%0.17 0.22 100 0.6%93.6 89.2 200 1.0%5.0 0.5 6.7 100.3 95.9 300.0 11.7 12.0 12.0 EX2 36.9 B/C 2%0.20 0.25 100 1.0%76.9 72.7 800 1.8%5.0 0.7 19.9 96.8 92.5 900.0 15.0 15.0 15.0 EX3 19.8 B/C 2%0.20 0.25 100 1.0%76.9 72.7 713 1.0%5.0 0.5 24.0 100.9 96.7 813.0 14.5 15.0 15.0 Notes: Velocity V = K*St^0.5 STANDARD FORM SF-2 TIME OF CONCENTRATION SUB-BASIN 39817.00 FINAL(URBANIZED BASINS) tc CHECK DATA INITIAL/OVERLAND (Ti) TRAVEL TIME (Tt) X:\3980000.all\3981700\Excel\Drainage\3981700 EX. Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 1/30/2024 Project Name:Mountain Vista Property Subdivision:RV & Boat Storage Project No.: Location:Fort Collins Calculated By:JSC Design Storm:Checked By:ARJ Date: TRAVEL TIME STREET De s i g n P o i n t Ba s i n I D Ar e a ( A c ) Ru n o f f C o e f f . tc ( m i n ) - 2 Y E A R C* A ( A c ) I ( i n / h r ) Q ( c f s ) tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) Qst r e e t ( c f s ) C* A ( a c ) Sl o p e ( % ) Qpi p e ( c f s ) C* A ( a c ) Sl o p e ( % ) Pi p e S i z e ( i n c h e s ) Le n g t h ( f t ) Ve l o c i t y ( f p s ) tt ( m i n ) REMARKS 1 EO1 12.51 0.17 12.0 2.18 2.05 4.5 1 EX2 36.90 0.20 15.0 7.38 1.87 13.8 1.1 12.0 9.56 2.05 19.6 3 EX3 19.80 0.20 15.0 3.96 1.87 7.4 Notes: Street and Pipe C*A values are determined by Q/I using the catchment's intensity value. DIRECT RUNOFF TOTAL RUNOFF STREET PIPE STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) 2-Year 39817.00 1/30/23 X:\3980000.all\3981700\Excel\Drainage\3981700 EX. Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 1/30/2024 Project Name:Mountain Vista Property Subdivision:RV & Boat Storage Project No.: Location:Fort Collins Calculated By:JSC Design Storm:Checked By:ARJ Date: TRAVEL TIME STREET De s i g n P o i n t Ba s i n I D Ar e a ( a c ) Ru n o f f C o e f f . tc ( m i n ) - 1 0 0 Y e a r C* A ( a c ) I ( i n / h r ) Q ( c f s ) tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) Qst r e e t ( c f s ) C* A ( a c ) Sl o p e ( % ) Qpi p e ( c f s ) C* A ( a c ) Sl o p e ( % ) Pi p e S i z e ( i n c h e s ) Le n g t h ( f t ) Ve l o c i t y ( f p s ) tt ( m i n ) REMARKS 1 EO1 12.51 0.22 12.0 2.73 7.16 19.5 1 EX2 36.90 0.25 15.0 9.23 6.52 60.2 1.1 12.0 11.96 7.16 85.6 3 EX3 19.80 0.25 15.0 4.95 6.52 32.3 Notes: Street and Pipe C*A values are determined by Q/I using the catchment's intensity value. STORM DRAINAGE SYSTEM DESIGN STANDARD FORM SF-3 (RATIONAL METHOD PROCEDURE) 39817.00 PIPE 100-Year DIRECT RUNOFF TOTAL RUNOFF 1/30/23 STREET X:\3980000.all\3981700\Excel\Drainage\3981700 EX. Drainage_Calcs_Template_v2.07.xlsm Page 1 of 1 1/30/2024 Subdivision:RV, Boat & Storage Project Name:Front Range RV Boat and Storage Location:Fort Collins Project No.: Calculated By:ARJ Checked By:0 Date:1/24/24 C1 0.36 100%0.22 60.8%80%0.00 0.0%90%0.00 0.0%2%0.14 0.8%61.5% C2 0.96 100%0.65 67.5%80%0.00 0.0%90%0.02 1.8%2%0.29 0.6%70.0% C3 2.42 100%0.01 0.4%80%2.15 71.2%90%0.00 0.0%2%0.26 0.2%71.9% C4 1.20 100%0.00 0.0%80%1.17 78.5%90%0.00 0.0%2%0.02 0.0%78.5% C5 1.19 100%0.00 0.0%80%1.16 78.2%90%0.00 0.0%2%0.03 0.0%78.2% C6 1.31 100%0.00 0.0%80%1.26 77.2%90%0.00 0.0%2%0.05 0.1%77.3% C7 0.42 100%0.00 0.00 80%0.35 67.1%90%0.00 0.0%2%0.07 0.3%67.5% C8 1.73 100%0.00 0.00 80%1.64 75.8%90%0.00 0.0%2%0.09 0.1%75.9% C9 0.42 100%0.15 0.37 80%0.00 0.0%90%0.00 0.0%2%0.26 1.3%38.0% C10 2.18 100%0.04 0.02 80%0.00 0.0%90%0.00 0.0%2%2.13 2.0%4.0% Onsite Basins 12.18 60.4% OS1 0.43 100%0.43 1.00 100%0.00 0.0%90%0.00 0.0%2%0.00 0.0%100.0% OS2 1.01 100%0.06 0.06 100%0.00 0.0%90%0.00 0.0%2%1.01 2.0%8.2% OS3 37.23 100%0.04 0.00 100%0.00 0.0%90%0.00 0.0%2%37.23 2.0%2.1% OS4 20.31 100%0.00 0.00 100%0.00 0.0%90%0.00 0.0%2%20.31 2.0%2.0% Asphalt, Concrete 39817.00 Weighted % Imp. Basins Total Weighted % Imp.Area (ac)Weighted % Imp. Recycled Asphalt Roofs Weighted % Imp. COMPOSITE % IMPERVIOUS CALCULATIONS % Imp. Area (ac)% Imp.Area (ac)Weighted % Imp.Basin ID Total Area (ac)% Imp.Area (ac) Lawns % Imp. X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 1 of 2 1/30/2024 X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 2 of 2 1/30/2024 Subdivision:RV, Boat & Storage Project Name:Front Range RV Boat and Storage Location:Fort Collins Project No.: Calculated By:ARJ Checked By:0 Date:1/24/24 C1 0.36 0.80 0.00 0.00 0.00 0.95 0.22 0.58 0.72 0.20 0.14 0.08 0.10 0.66 0.82 C2 0.96 0.80 0.00 0.00 0.00 0.95 0.67 0.66 0.83 0.20 0.29 0.06 0.08 0.72 0.90 C3 2.42 0.80 2.15 0.71 0.89 0.95 0.01 0.00 0.01 0.20 0.26 0.02 0.03 0.74 0.92 C4 1.20 0.80 1.17 0.78 0.98 0.95 0.00 0.00 0.00 0.20 0.02 0.00 0.00 0.79 0.99 C5 1.19 0.80 1.16 0.78 0.98 0.95 0.00 0.00 0.00 0.20 0.03 0.00 0.01 0.79 0.98 C6 1.31 0.80 1.26 0.77 0.97 0.95 0.00 0.00 0.00 0.20 0.05 0.01 0.01 0.78 0.97 C7 0.42 0.80 0.35 0.67 0.84 0.95 0.00 0.00 0.00 0.20 0.07 0.03 0.04 0.70 0.88 C8 1.73 0.80 1.64 0.76 0.95 0.95 0.00 0.00 0.00 0.20 0.09 0.01 0.01 0.77 0.96 C9 0.42 0.80 0.00 0.00 0.00 0.95 0.15 0.35 0.44 0.10 0.26 0.06 0.08 0.41 0.52 C10 2.18 0.80 0.00 0.00 0.00 0.95 0.04 0.02 0.02 0.10 2.13 0.10 0.12 0.12 0.15 Weighted 12.18 0.63 0.76 OS1 0.43 0.80 0.00 0.00 0.00 0.95 0.43 0.95 1.00 0.15 0.00 0.00 0.00 0.95 1.00 OS2 1.01 0.80 0.00 0.00 0.00 0.95 0.06 0.06 0.07 0.15 1.01 0.15 0.19 0.21 0.26 OS3 37.23 0.80 0.00 0.00 0.00 0.95 0.04 0.00 0.00 0.15 37.23 0.15 0.19 0.15 0.19 OS4 20.31 0.80 0.00 0.00 0.00 0.95 0.00 0.00 0.00 0.15 20.31 0.15 0.19 0.15 0.19 Basins Total Weighted 100 YEAR CRunoff Coefficient Area (ac)2 - YEAR C 100 - YEAR C Asphalt, Concrete, Roofs Lawns Basins Total Weighted 2 YEAR C Recycled Asphalt Total Area (ac) COMPOSITE RUNOFF COEFFICIENT CALCULATIONS Basin ID Area (ac)2 - YEAR C 100 - YEAR C 39817.00 Runoff Coefficient Area (ac)2 - YEAR C 100 - YEAR C Runoff Coefficient X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 1 of 2 1/30/2024 X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 2 of 2 1/30/2024 Subdivision:RV, Boat & Storage Project Name:Front Range RV Boat and Storage Location:Fort Collins Project No.: Calculated By: Checked By:0 Date:1/24/24 BASIN D.A.Hydrologic Impervious C2 C100 L S o t i - 2Year t i - 100 Year L t S t K VEL.t t COMP.t c-2 Year COMP.t c 100 - Year TOTAL Tc t c-2 Year t c-100 Year ID (ac)Soils Group (%)(ft)(%)(min)(min)(ft)(%)(ft/s)(min)(min)(min)LENGTH (ft)Check (min)(min) C1 0.36 C 2%0.66 0.82 10 2.0%9.6 6.0 10 1.0%20.0 2.0 0.1 9.6 6.1 20.0 10.1 10.0 6.0 C2 0.96 C 2%0.72 0.90 50 2.0%18.2 9.5 481 0.6%20.0 1.5 5.4 23.6 14.9 531.0 13.0 13.0 13.0 C3 2.42 C 2%0.74 0.92 50 2.0%17.4 8.6 568 0.5%20.0 1.4 6.7 24.1 15.3 617.8 13.4 13.0 13.0 C4 1.20 C 2%0.79 0.99 50 2.0%15.0 5.5 587 0.5%20.0 1.4 6.9 21.9 12.4 637.0 13.5 14.0 12.0 C5 1.19 C 2%0.79 0.98 50 2.0%15.1 5.6 612 0.5%20.0 1.4 7.2 22.3 12.8 662.0 13.7 14.0 13.0 C6 1.31 C 2%0.78 0.97 50 2.0%15.4 6.1 653 0.5%20.0 1.4 7.7 23.1 13.8 703.0 13.9 14.0 14.0 C7 0.42 C 2%0.70 0.88 30 1.5%16.2 9.0 206 0.5%20.0 1.5 2.4 18.6 11.4 236.0 11.3 11.0 11.0 C8 1.73 C 2%0.77 0.96 50 2.0%15.9 6.7 727 0.5%20.0 1.4 8.6 24.5 15.3 776.6 14.3 14.0 14.0 C9 0.42 C 2%0.41 0.52 20 20.0%9.8 8.3 520 0.4%20.0 1.3 6.9 16.6 15.2 540.0 13.0 13.0 13.0 C10 2.18 C/B 2%0.12 0.15 20 2.0%29.9 29.0 310 0.3%21.0 1.1 4.9 34.8 33.9 330.0 11.8 12.0 12.0 OS1 0.43 C/B 2%0.95 1.00 17 1.0%5.3 3.5 376 0.5%15.0 1.1 5.9 11.2 9.4 393.0 12.2 11.0 9.0 OS2 1.01 C/B 2%0.21 0.26 100 1.0%76.2 71.7 421 1.0%15.0 1.5 4.7 80.8 76.4 520.8 12.9 13.0 13.0 OS3 37.23 C/B 2%0.15 0.19 100 1.0%81.1 77.9 1100 0.6%5.0 0.4 47.3 128.4 125.2 1200.0 16.7 17.0 17.0 OS4 20.31 C/B 2%0.15 0.19 100 1.0%81.2 78.0 1935 0.3%16.0 0.8 40.3 121.5 118.3 2035.0 21.3 21.0 21.0 Notes: Velocity V = K*St^0.5 STANDARD FORM SF-2 TIME OF CONCENTRATION SUB-BASIN 39817.00 FINAL Time of Concentration -Check ARJ (Tc)DATA INITIAL/OVERLAND (Ti) TRAVEL TIME (Tt) X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 1 of 1 1/30/2024 Project Name:Front Range RV Boat and Storage Subdivision:RV, Boat & Storage Project No.: Location:Fort Collins Calculated By:ARJ Design Storm:Checked By:0 Date: TRAVEL TIME STREET De s i g n P o i n t Ba s i n I D Ar e a ( a c ) Ru n o f f C o e f f . tc ( m i n ) - 1 0 0 Y e a r C* A ( a c ) I ( i n / h r ) Q ( c f s ) tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) Qst r e e t ( c f s ) C* A ( a c ) Sl o p e ( % ) Qpi p e ( c f s ) C* A ( a c ) Sl o p e ( % ) Pi p e S i z e ( i n c h e s ) Le n g t h ( f t ) Ve l o c i t y ( f p s ) tt ( m i n ) REMARKS sheet drains over RIPRAP on the site 1 C1 0.36 0.66 10.0 0.24 2.21 0.5 drains into swale 2 C2 0.96 0.72 13.0 0.69 1.98 1.4 3 C3 2.42 0.74 13.0 1.78 1.98 3.5 13.0 2.02 1.98 4.0 drains into RG- Basin C1 and C3 3.1 13.0 2.71 1.98 5.4 Basins C1,C2 and C3 4 C4 1.20 0.79 14.0 0.94 1.92 1.8 drains into RG 4.1 14.0 3.65 1.92 7.0 Basins C1,C2, C3 and C4 5 C5 1.19 0.79 14.0 0.94 1.92 1.8 drains into RG 5.1 14.0 4.59 1.92 8.8 Basins C1,C2, C3, C4, and C5 6 C6 1.31 0.78 14.0 1.02 1.92 2.0 drains into RG 6.1 14.0 5.61 1.92 10.8 Basins C1,C2, C3, C4, C5, and C6 7 C7 0.42 0.70 11.0 0.29 2.13 0.6 drains into RG 7.1 14.0 5.90 1.92 11.3 Basins C1,C2, C3, C4, C5,C6 andC7 8 C8 1.73 0.77 14.0 1.33 1.92 2.6 drains into RG into pond 8.1 14.0 7.23 1.92 13.9 Basins C1,C2, C3, C4, C5,C6, C7 and C8 9 C9 0.42 0.41 13.0 0.17 1.98 0.3 14.0 7.40 1.92 14.2 Basins C1,C2, C3, C4, C5,C6, C7, C8, C9 Total Flow into pond 10 C10 2.18 0.12 12.0 0.26 2.05 0.5 14.0 7.66 1.92 14.7 Basins C1,C2, C3, C4, C5,C6, C7, C8, C9 O3 OS3 37.23 0.15 17.0 5.63 1.75 9.9 Total Flow into pond 11 Total flow out of the site 12 OS4 20.31 0.15 21.0 3.05 1.56 4.8 4.8 Flow from SWMM avg of element 299 and 99 O1 19.5 from boxelder AB swmm model OS1 0.43 0.95 11.0 0.40 2.13 0.9 Offsite flow O2 OS2 1.01 0.21 13.0 0.21 1.98 0.4 20.8 Notes: Street and Pipe C*A values are determined by Q/i using the catchment's intensity value. DIRECT RUNOFF TOTAL RUNOFF STREET PIPE STANDARD FORM SF-3 STORM DRAINAGE SYSTEM DESIGN (RATIONAL METHOD PROCEDURE) 2-Year 39817.00 1/24/24 X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 1 of 1 1/30/2024 Project Name:Front Range RV Boat and Storage Subdivision:RV, Boat & Storage Project No.: Location:Fort Collins Calculated By:ARJ Design Storm:Checked By:0 Date: TRAVEL TIME STREET De s i g n P o i n t Ba s i n I D Ar e a ( a c ) Ru n o f f C o e f f . tc ( m i n ) - 1 0 0 Y e a r C* A ( a c ) I ( i n / h r ) Q ( c f s ) tc ( m i n ) C* A ( a c ) I ( i n / h r ) Q ( c f s ) Qst r e e t ( c f s ) C* A ( a c ) Sl o p e ( % ) Qpi p e ( c f s ) C* A ( a c ) Sl o p e ( % ) Pi p e S i z e ( i n c h e s ) Le n g t h ( f t ) Ve l o c i t y ( f p s ) tt ( m i n ) REMARKS sheet drains over RIPRAP on the site 1 C1 0.36 0.82 6.0 0.30 9.31 2.8 drains into swale 2 C2 0.96 0.90 13.0 0.87 6.92 6.0 3 C3 2.42 0.92 13.0 2.23 6.92 15.4 13.0 2.53 6.92 17.5 drains into RG- Basin C1 and C3 3.1 13.0 3.40 6.92 23.5 Basins C1,C2 and C3 4 C4 1.20 0.99 12.0 1.18 7.16 8.4 drains into RG 4.1 13.0 4.58 6.92 31.7 Basins C1,C2, C3 and C4 5 C5 1.19 0.98 13.0 1.17 6.92 8.1 drains into RG 5.1 13.0 5.75 6.92 39.8 Basins C1,C2, C3, C4, and C5 6 C6 1.31 0.97 14.0 1.27 6.71 8.5 drains into RG 6.1 14.0 7.02 6.71 47.1 Basins C1,C2, C3, C4, C5, and C6 7 C7 0.42 0.88 11.0 0.37 7.42 2.7 drains into RG 7.1 14.0 7.39 6.71 49.6 Basins C1,C2, C3, C4, C5,C6 andC7 8 C8 1.73 0.96 14.0 1.66 6.71 11.1 drains into RG into pond 8.1 14.0 9.05 6.71 60.7 Basins C1,C2, C3, C4, C5,C6, C7 and C8 9 C9 0.42 0.52 13.0 0.22 6.92 1.5 14.0 9.27 6.71 62.2 Basins C1,C2, C3, C4, C5,C6, C7, C8, C9 Total Flow into pond 10 C10 2.18 0.15 12.0 0.32 7.16 2.3 14.0 9.59 6.71 64.3 Basins C1,C2, C3, C4, C5,C6, C7, C8, C9 O3 OS3 37.23 0.19 17.0 7.03 6.10 42.9 Total Flow into pond 11 4.0 Total flow out of the site 12 OS4 20.31 0.19 21.0 3.81 5.46 20.8 24.8 Flow from SWMM avg of element 299 and 99 O1 229.9 from boxelder AB swmm model OS1 0.43 1.00 9.0 0.43 8.03 3.5 Offsite flow O2 OS2 1.01 0.26 13.0 0.26 6.92 1.8 235.2 Notes: Street and Pipe C*A values are determined by Q/i using the catchment's intensity value. STORM DRAINAGE SYSTEM DESIGN STANDARD FORM SF-3 (RATIONAL METHOD PROCEDURE) 39817.00 PIPE 100-Year DIRECT RUNOFF TOTAL RUNOFF 1/24/24 STREET X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 1 of 1 1/30/2024 Subdivision:RV, Boat & Storage Project Name:Front Range RV Boat and Storage Location:Fort Collins Project No.:39817.00 Calculated By:ARJ Checked By:0 Date:1/24/24 O1 DESIGN POINT O2 DESIGN POINT DESIGN POINT Notes Q100 (cfs):229.9 235.2 Flows are the greater of proposed vs. future Conduit Box Culvert Box Culvert D c , Pipe Diameter (in):N/A N/A W , Box Width (ft):10 10 H , Box Height (ft):3 3 Y t , Tailwater Depth (ft):1.20 1.20 If unknown, use Y t /D c (or H )=0.4 Y t /Dc or Y t /H 0.40 0.40 Q/D2.5 or Q/(WH3/2)4.43 4.53 Supercritical?Yes Yes Y n , Normal Depth (ft) [Supercritical]:1.00 1.00 D a ,H a (in) [Supercritical]:2.00 2.00 D a =(D c +Y n )/2 Riprap d 50 (in) [Supercritical]:4.55 4.66 Riprap d 50 (in) [Subcritical]:N/A N/A Required Riprap Size:L L Fig. 9-38 or Fig. 9-36 d 50 (in):9 9 Expansion Factor, 1/(2 tan):5.00 5.00 Read from Fig. 9-35 or 9-36 0.10 0.10 Erosive Soils?No No Area of Flow,A t (ft2):32.85 33.60 A t =Q/V Length of Protection, L p (ft):86.9 90.0 L=(1/(2 tan ))(At/Yt - D) Min Length (ft)30.0 30.0 Min L=3D or 3H Max Length (ft)30.0 30.0 Max L=10D or 10H Min Bottom Width,T (ft):20.3 20.9 T=2*(Lp*tan)+W Design Length (ft)30.0 30.0 Design Width (ft)20.3 20.9 Riprap Depth (in)18 18 Depth=2(d50) Type II Bedding Depth (in)*6 6 *Not used if Soil Riprap Cutoff Wall No No Cutoff Wall Depth (ft)Depth of Riprap and Base Cutoff Wall Width (ft) Note: No Type II Base to be used if Soil Riprap is specified within the plans * For use when the flow in the culvert is supercritical (and less than full). STORM DRAIN SYSTEM PIPE OUTFALL RIPRAP SIZING CALCULATIONS X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 1 of 2 1/30/2024 X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 2 of 2 1/30/2024 Front Range Storage Preliminary Drainage Report 13 APPENDIX C – HYDRAULIC CALCULATIONS 100 Year This is to convert % imp. to a C value 100-year (must insert % imp. and C pervious). ft3 acre-ft. 'C' value 0.63 (2 yr)94671.5 2.173 'C' * 1.25 0.7875 (100 yr) Area 12.18 acres Modified Modified Release Rate 4.5 (2- yr Historic)M. FATER D. JUDISH C. LI May-95 Nov-97 Nov-98 DETENTION POND SIZING TIME TIME INTENSITY Q 100 Runoff Release Required Required cum 100 year Volume Cum total Detention Detention (mins)(secs)(in/hr)(cfs)(ft^3)(ft^3)(ft^3)(ac-ft) 0 0 0 0.00 0 0.0 0.0 0.0000 5 300 9.950 95.44 28631.37 1350.0 27281.4 0.6263 10 600 7.720 74.05 44428.99 2700.0 41729.0 0.9580 15 900 6.520 62.54 56284.39 4050.0 52234.4 1.1991 20 1200 5.600 53.71 64456.56 5400.0 59056.6 1.3558 25 1500 4.980 47.77 71650.37 6750.0 64900.4 1.4899 30 1800 4.520 43.35 78038.48 8100.0 69938.5 1.6056 35 2100 4.080 39.13 82182.11 9450.0 72732.1 1.6697 40 2400 3.740 35.87 86095.55 10800.0 75295.5 1.7285 45 2700 3.460 33.19 89606.13 12150.0 77456.1 1.7781 50 3000 3.230 30.98 92944.06 13500.0 79444.1 1.8238 55 3300 3.030 29.06 95907.91 14850.0 81057.9 1.8608 60 3600 2.860 27.43 98756.66 16200.0 82556.7 1.8952 65 3900 2.720 26.09 101749.3 17550.0 84199.3 1.9329 70 4200 2.590 24.84 104339.1 18900.0 85439.1 1.9614 75 4500 2.480 23.79 107043.9 20250.0 86793.9 1.9925 80 4800 2.380 22.83 109576.2 21600.0 87976.2 2.0197 85 5100 2.290 21.97 112022 22950.0 89072.0 2.0448 90 5400 2.210 21.20 114467.9 24300.0 90167.9 2.0700 95 5700 2.130 20.43 116453.4 25650.0 90803.4 2.0846 100 6000 2.060 19.76 118554 27000.0 91554.0 2.1018 105 6300 2.000 19.18 120856.1 28350.0 92506.1 2.1236 110 6600 1.940 18.61 122812.8 29700.0 93112.8 2.1376 115 6900 1.890 18.13 125086 31050.0 94036.0 2.1588 120 7200 1.840 17.65 127071.5 32400.0 94671.5 2.1734 125 7500 1.790 17.17 128769.2 33750.0 95019.2 2.1813 130 7800 1.750 16.79 130927.4 35100.0 95827.4 2.1999 135 8100 1.710 16.40 132855.3 36450.0 96405.3 2.2132 140 8400 1.670 16.02 134553.1 37800.0 96753.1 2.2211 145 8700 1.630 15.63 136020.6 39150.0 96870.6 2.2238 150 9000 1.600 15.35 138121.2 40500.0 97621.2 2.2411 155 9300 1.570 15.06 140049.1 41850.0 98199.1 2.2543 160 9600 1.540 14.77 141804.4 43200.0 98604.4 2.2636 165 9900 1.510 14.48 143387.1 44550.0 98837.1 2.2690 170 10200 1.480 14.20 144797.1 45900.0 98897.1 2.2704 175 10500 1.450 13.91 146034.4 47250.0 98784.4 2.2678 180 10800 1.420 13.62 147099.1 48600.0 98499.1 2.2612 185 11100 1.400 13.43 149055.8 49950.0 99105.8 2.2752 190 11400 1.380 13.24 150897.4 51300.0 99597.4 2.2864 195 11700 1.360 13.04 152623.9 52650.0 99973.9 2.2951 200 12000 1.340 12.85 154235.3 54000.0 100235.3 2.3011 205 12300 1.320 12.66 155731.7 55350.0 100381.7 2.3044 210 12600 1.300 12.47 157112.9 56700.0 100412.9 2.3052 215 12900 1.280 12.28 158379 58050.0 100329.0 2.3032 220 13200 1.260 12.09 159530 59400.0 100130.0 2.2987 225 13500 1.240 11.89 160565.9 60750.0 99815.9 2.2915 230 13800 1.220 11.70 161486.7 62100.0 99386.7 2.2816 235 14100 1.210 11.61 163644.8 63450.0 100194.8 2.3002 240 14400 1.200 11.51 165745.4 64800.0 100945.4 2.3174 Required detention DETENTION - FAA 100 YEAR Page 1 Project: Basin ID: Depth Increment =0.50 ft Watershed Information Top of Micropool --0.00 ------37 0.001 Selected BMP Type =EDB 4977.97 --0.50 ------4,211 0.097 1,062 0.024 Watershed Area =4.27 acres 4978.47 --1.00 ------20,556 0.472 7,253 0.167 Watershed Length =550 ft 4978.97 --1.50 ------44,063 1.012 23,408 0.537 Watershed Length to Centroid =330 ft 4979.47 --2.00 ------62,966 1.445 50,165 1.152 Watershed Slope =0.009 ft/ft 4979.97 --2.50 ------76,326 1.752 84,988 1.951 Watershed Imperviousness =25.80%percent 4980.47 --3.00 ------82,955 1.904 124,808 2.865 Percentage Hydrologic Soil Group A =0.0%percent 4980.97 --3.50 ------88,302 2.027 167,623 3.848 Percentage Hydrologic Soil Group B =0.0%percent -------- Percentage Hydrologic Soil Groups C/D =100.0%percent -------- Target WQCV Drain Time =40.0 hours -------- Location for 1-hr Rainfall Depths = User Input -------- -------- -------- Optional User Overrides -------- Water Quality Capture Volume (WQCV) =0.049 acre-feet acre-feet -------- Excess Urban Runoff Volume (EURV) =0.099 acre-feet acre-feet -------- 2-yr Runoff Volume (P1 = 0.82 in.) =0.058 acre-feet 0.82 inches -------- 5-yr Runoff Volume (P1 = 1.09 in.) =0.107 acre-feet inches -------- 10-yr Runoff Volume (P1 = 1.4 in.) =0.198 acre-feet 1.40 inches -------- 25-yr Runoff Volume (P1 = 1.69 in.) =0.318 acre-feet inches -------- 50-yr Runoff Volume (P1 = 1.99 in.) =0.422 acre-feet inches -------- 100-yr Runoff Volume (P1 = 2.86 in.) =0.756 acre-feet 2.86 inches -------- 500-yr Runoff Volume (P1 = 3.14 in.) =0.857 acre-feet inches -------- Approximate 2-yr Detention Volume =0.058 acre-feet -------- Approximate 5-yr Detention Volume =0.106 acre-feet -------- Approximate 10-yr Detention Volume =0.137 acre-feet -------- Approximate 25-yr Detention Volume =0.165 acre-feet -------- Approximate 50-yr Detention Volume =0.181 acre-feet -------- Approximate 100-yr Detention Volume =0.290 acre-feet -------- -------- Define Zones and Basin Geometry -------- Zone 1 Volume (WQCV) =0.049 acre-feet -------- Zone 2 Volume (User Defined - Zone 1) =0.000 acre-feet -------- Zone 3 Volume (User Defined - Zones 1 & 2) =2.173 acre-feet -------- Total Detention Basin Volume =2.222 acre-feet -------- Initial Surcharge Volume (ISV) =user ft 3 -------- Initial Surcharge Depth (ISD) =user ft -------- Total Available Detention Depth (Htotal) =user ft -------- Depth of Trickle Channel (HTC) =user ft -------- Slope of Trickle Channel (STC) =user ft/ft -------- Slopes of Main Basin Sides (Smain) =user H:V -------- Basin Length-to-Width Ratio (RL/W) =user -------- -------- Initial Surcharge Area (AISV) =user ft 2 -------- Surcharge Volume Length (LISV) =user ft -------- Surcharge Volume Width (WISV) =user ft -------- Depth of Basin Floor (HFLOOR) =user ft -------- Length of Basin Floor (LFLOOR) =user ft -------- Width of Basin Floor (WFLOOR) =user ft -------- Area of Basin Floor (AFLOOR) =user ft 2 -------- Volume of Basin Floor (VFLOOR) =user ft 3 -------- Depth of Main Basin (HMAIN) =user ft -------- Length of Main Basin (LMAIN) =user ft -------- Width of Main Basin (WMAIN) =user ft -------- Area of Main Basin (AMAIN) =user ft 2 -------- Volume of Main Basin (VMAIN) =user ft 3 -------- Calculated Total Basin Volume (Vtotal) =user acre-feet -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- -------- DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft 2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft 2) Width (ft) Front Range RV Boat and Storage Note - area was adjusted to Calc. WQCV to equal 0.049 Acre-ft - by 20% MHFD-Detention, Version 4.06 (July 2022) Volume (ft 3) Volume (ac-ft) Area (acre) After providing required inputs above including 1-hour rainfall depths, click 'Run CUHP' to generate runoff hydrographs using the embedded Colorado Urban Hydrograph Procedure. ExampleZone Configuration (Retention Pond) 3981700 MHFD-Detention_v4-06 (9).xlsm, Basin 1/30/2024, 4:22 PM 1 User Defined Stage-Area Booleans for Message 1 Equal Stage-Area Inputs Watershed L:W 1 CountA Watershed Lc:L Watershed Slope 0 Calc_S_TC Booleans for CUHP 1 CUHP Inputs Complete H_FLOOR 1 CUHP Results Calculated L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor 0.00 Floor 0.66 Zone 1 (WQCV)0.66 Zone 1 (WQCV) 0.66 Zone 2 (User)0.66 Zone 1 (WQCV) 2.66 Zone 3 (User)2.66 Zone 3 (User) DETENTION BASIN STAGE-STORAGE TABLE BUILDER MHFD-Detention, Version 4.06 (July 2022) 0.000 0.965 1.930 2.895 3.860 0.000 0.510 1.020 1.530 2.040 0.00 1.00 2.00 3.00 4.00 Vo l u m e ( a c - f t ) Ar e a ( a c r e s ) Stage (ft.) Area (acres)Volume (ac-ft) 0 22100 44200 66300 88400 0 5 10 15 20 0.00 1.00 2.00 3.00 4.00 Ar e a ( s q . f t . ) Le n g t h , W i d t h ( f t . ) Stage (ft) Length (ft)Width (ft)Area (sq.ft.) 3981700 MHFD-Detention_v4-06 (9).xlsm, Basin 1/30/2024, 4:22 PM Project: Basin ID: Estimated Estimated Stage (ft)Volume (ac-ft)Outlet Type Zone 1 (WQCV)0.66 0.049 Orifice Plate Zone 2 (User)0.66 0.000 Weir&Pipe (Restrict) Zone 3 (User)2.66 2.173 Weir&Pipe (Restrict) Total (all zones)2.222 User Input: Orifice at Underdrain Outlet (typically used to drain WQCV in a Filtration BMP)Calculated Parameters for Underdrain Underdrain Orifice Invert Depth =ft (distance below the filtration media surface)Underdrain Orifice Area =ft2 Underdrain Orifice Diameter =inches Underdrain Orifice Centroid =feet User Input: Orifice Plate with one or more orifices or Elliptical Slot Weir (typically used to drain WQCV and/or EURV in a sedimentation BMP)Calculated Parameters for Plate Centroid of Lowest Orifice =0.00 ft (relative to basin bottom at Stage = 0 ft)WQ Orifice Area per Row =3.056E-03 ft2 Depth at top of Zone using Orifice Plate =1.00 ft (relative to basin bottom at Stage = 0 ft)Elliptical Half-Width =N/A feet Orifice Plate: Orifice Vertical Spacing =N/A inches Elliptical Slot Centroid =N/A feet Orifice Plate: Orifice Area per Row =0.44 sq. inches (diameter = 3/4 inch)Elliptical Slot Area =N/A ft2 User Input: Stage and Total Area of Each Orifice Row (numbered from lowest to highest) Row 1 (required)Row 2 (optional)Row 3 (optional)Row 4 (optional)Row 5 (optional)Row 6 (optional)Row 7 (optional) Row 8 (optional) Stage of Orifice Centroid (ft)0.00 0.20 Orifice Area (sq. inches)0.44 0.44 Row 9 (optional)Row 10 (optional)Row 11 (optional)Row 12 (optional)Row 13 (optional)Row 14 (optional)Row 15 (optional) Row 16 (optional) Stage of Orifice Centroid (ft) Orifice Area (sq. inches) User Input: Vertical Orifice (Circular or Rectangular)Calculated Parameters for Vertical Orifice Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice =0.75 N/A ft (relative to basin bottom at Stage = 0 ft)Vertical Orifice Area =0.79 N/A Depth at top of Zone using Vertical Orifice =1.75 N/A ft (relative to basin bottom at Stage = 0 ft)Vertical Orifice Centroid =0.50 N/A Vertical Orifice Diameter =12.00 N/A inches User Input: Overflow Weir (Dropbox with Flat or Sloped Grate and Outlet Pipe OR Rectangular/Trapezoidal Weir and No Outlet Pipe)Calculated Parameters for Overflow Weir grate Zone 2 Weir Zone 3 Weir Zone 2 Weir Zone 3 Weir Overflow Weir Front Edge Height, Ho =2.67 ft (relative to basin bottom at Stage = 0 ft)Height of Grate Upper Edge, Ht =2.67 Overflow Weir Front Edge Length =5.00 feet Overflow Weir Slope Length =5.00 Overflow Weir Grate Slope =0.00 H:V Grate Open Area / 100-yr Orifice Area =9.85 Horiz. Length of Weir Sides =5.00 feet Overflow Grate Open Area w/o Debris =17.40 Overflow Grate Type =Type C Grate Overflow Grate Open Area w/ Debris =17.40 Debris Clogging % =0%% User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Plate, or Rectangular Orifice)Calculated Parameters for Outlet Pipe w/ Flow Restriction Plate Zone 2 Restrictor Zone 3 Restrictor Zone 2 Restrictor Zone 3 Restrictor Depth to Invert of Outlet Pipe =0.07 ft (distance below basin bottom at Stage = 0 ft)Outlet Orifice Area =1.77 Outlet Pipe Diameter =18.00 inches Outlet Orifice Centroid =0.75 Restrictor Plate Height Above Pipe Invert =18.00 inches Half-Central Angle of Restrictor Plate on Pipe =3.14 User Input: Emergency Spillway (Rectangular or Trapezoidal)Calculated Parameters for Spillway Spillway Invert Stage=ft (relative to basin bottom at Stage = 0 ft)Spillway Design Flow Depth=feet Spillway Crest Length =feet Stage at Top of Freeboard =feet Spillway End Slopes =H:V Basin Area at Top of Freeboard =acres Freeboard above Max Water Surface =feet Basin Volume at Top of Freeboard =acre-ft Max Ponding Depth of Target Storage Volume =#REF!feet Discharge at Top of Freeboard =cfs Routed Hydrograph Results Design Storm Return Period =WQCV EURV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year One-Hour Rainfall Depth (in) =N/A N/A 0.82 1.09 1.40 1.69 1.99 2.86 CUHP Runoff Volume (acre-ft) =0.049 0.099 0.058 0.107 0.198 0.318 0.422 0.756 Inflow Hydrograph Volume (acre-ft) =N/A N/A 0.058 0.107 0.198 0.318 0.422 0.756 CUHP Predevelopment Peak Q (cfs) =N/A N/A 0.0 0.3 1.2 2.5 3.4 6.5 OPTIONAL Override Predevelopment Peak Q (cfs) =N/A N/A Predevelopment Unit Peak Flow, q (cfs/acre) =N/A N/A 0.01 0.08 0.27 0.58 0.80 1.52 Peak Inflow Q (cfs) =N/A N/A 0.6 1.1 2.0 3.4 4.5 7.7 Peak Outflow Q (cfs) =0.0 0.1 0.0 0.1 0.2 0.6 0.8 1.7 Ratio Peak Outflow to Predevelopment Q =N/A N/A N/A 0.2 0.2 0.2 0.2 0.3 Structure Controlling Flow =Plate Vertical Orifice 1 Plate Vertical Orifice 1 Vertical Orifice 1 Vertical Orifice 1 Vertical Orifice 1 Vertical Orifice 1 Max Velocity through Grate 1 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A Max Velocity through Grate 2 (fps) =N/A N/A N/A N/A N/A N/A N/A N/A Time to Drain 97% of Inflow Volume (hours) =37 56 42 59 61 60 58 53 Time to Drain 99% of Inflow Volume (hours) =40 61 45 63 68 68 67 65 Maximum Ponding Depth (ft) =0.66 0.84 0.68 0.83 1.00 1.16 1.26 1.51 Area at Maximum Ponding Depth (acres) =0.22 0.35 0.22 0.34 0.47 0.63 0.74 1.02 Maximum Volume Stored (acre-ft) =0.049 0.101 0.052 0.097 0.167 0.249 0.318 0.548 DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) Front Range RV Boat and Storage Note - area was adjusted to Calc. WQCV to equal 0.049 Acre-ft - by 20% The user can override the default CUHP hydrographs and runoff volumes by entering new values in the Inflow Hydrographs table (Columns W through AF). Example Zone Configuration (Retention Pond) 3981700 MHFD-Detention_v4-06 (9).xlsm, Outlet Structure 1/30/2024, 4:22 PM COUNTA for Basin Tab =1 Ao Dia WQ Plate Type Vert Orifice 1Vert Orifice 2 Count_Underdrain =0 0.11(diameter = 3/8 inch)2 2 1 Count_WQPlate =1 0.14(diameter = 7/16 inch) Count_VertOrifice1 =1 0.18(diameter = 1/2 inch)Outlet Plate 1 Outlet Plate 2 Drain Time Message Boolean Count_VertOrifice2 =0 0.24(diameter = 9/16 inch)4 4 5yr, <72hr 0 Count_Weir1 =1 0.29(diameter = 5/8 inch)>5yr, <120hr 0 Count_Weir2 =0 0.36(diameter = 11/16 inch)Max Depth Row Count_OutletPipe1 =1 0.42(diameter = 3/4 inch)WQCV 67 Count_OutletPipe2 =0 0.50(diameter = 13/16 inch)2 Year 69 COUNTA_2 (Standard FSD Setup)=1 0.58(diameter = 7/8 inch)EURV 85 Hidden Parameters & Calculations 0.67(diameter = 15/16 inch)5 Year 84 MaxPondDepth_Error?FALSE 0.76 (diameter = 1 inch)10 Year 101 Spillway Depth Cd_Broad-Crested Weir 3.00 0.86(diameter = 1-1/16 inches)25 Year 117 WQ Plate Flow at 100yr depth =0.03 0.97(diameter = 1-1/8 inches)50 Year 127 CLOG #1=100%1.08(diameter = 1-3/16 inches)100 Year 152 1 Z1_Boolean n*Cdw #1 =0.60 1.20(diameter = 1-1/4 inches)500 Year 159 1 Z2_Boolean n*Cdo #1 =0.74 1.32(diameter = 1-5/16 inches)Zone3_Pulldown Message 0 Z3_Boolean Overflow Weir #1 Angle =0.000 1.45(diameter = 1-3/8 inches)1 Opening Message CLOG #2=100%1.59(diameter = 1-7/16 inches)Draintime Running n*Cdw #2 =0.00 1.73(diameter = 1-1/2 inches)Outlet Boolean Outlet Rank Total (1 to 4) n*Cdo #2 =0.00 1.88(diameter = 1-9/16 inches)Vertical Orifice 1 1 1 2 Overflow Weir #2 Angle =0.000 2.03(diameter = 1-5/8 inches)Vertical Orifice 2 0 0 Boolean Underdrain Q at 100yr depth =0.00 2.20(diameter = 1-11/16 inches)Overflow Weir 1 1 2 0 Max Depth VertOrifice1 Q at 100yr depth =1.63 2.36(diameter = 1-3/4 inches)Overflow Weir 2 0 0 0 500yr Depth VertOrifice2 Q at 100yr depth =0.00 2.54(diameter = 1-13/16 inches)Outlet Pipe 1 1 2 0 Freeboard 2.72(diameter = 1-7/8 inches)Outlet Pipe 2 0 0 0 Spillway Count_User_Hydrographs 0 2.90(diameter = 1-15/16 inches)0 Spillway Length CountA_3 (EURV & 100yr) =1 3.09(diameter = 2 inches)FALSE Time Interval CountA_4 (100yr Only) =1 3.29(use rectangular openings)Button Visibility Boolean COUNTA_5 (FSD Weir Only)=0 0 WQCV Underdrain COUNTA_6 (EURV Weir Only)=1 1 WQCV Plate 0 EURV-WQCV Plate Outlet1_Pulldown_Boolean 0 EURV-WQCV VertOriice Outlet2_Pulldown_Boolean 0 Outlet 90% Qpeak Outlet3_Pulldown_Boolean 0 Outlet Undetained 0 Weir Only 90% Qpeak 0 Five Year Ratio Plate 0 Five Year Ratio VertOrifice EURV_draintime_user Spillway Options Offset Overlapping Vertical Orifice 1 S-A-V-D Chart Axis Default X-axis Left Y-Axis Right Y-Axis minimum bound 0.00 0 0 maximum bound 2.00 50,000 10 S-A-V-D Chart Axis Override X-axis Left Y-Axis Right Y-Axis minimum bound maximum bound DETENTION BASIN OUTLET STRUCTURE DESIGN MHFD-Detention, Version 4.06 (July 2022) 0 1 2 3 4 5 6 7 8 9 10 0.1 1 10 FL O W [ c f s ] TIME [hr] 500YR IN 500YR OUT 100YR IN 100YR OUT 50YR IN 50YR OUT 25YR IN 25YR OUT 10YR IN 10YR OUT 5YR IN 5YR OUT 2YR IN 2YR OUT EURV IN EURV OUT WQCV IN WQCV OUT 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 0.1 1 10 100 PO N D I N G D E P T H [ f t ] DRAIN TIME [hr] 500YR 100YR 50YR 25YR 10YR 5YR 2YR EURV WQCV 0 1 2 3 4 5 6 7 8 9 10 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 OU T F L O W [ c f s ] AR E A [ f t ^ 2 ] , V O L U M E [ f t ^ 3 ] PONDING DEPTH [ft] User Area [ft^2] Interpolated Area [ft^2] Summary Area [ft^2] Volume [ft^3] Summary Volume [ft^3] Outflow [cfs] Summary Outflow [cfs] 3981700 MHFD-Detention_v4-06 (9).xlsm, Outlet Structure 1/30/2024, 4:22 PM Summary Stage-Area-Volume-Discharge Relationships The user can create a summary S-A-V-D by entering the desired stage increments and the remainder of the table will populate automatically. The user should graphically compare the summary S-A-V-D table to the full S-A-V-D table in the chart to confirm it captures all key transition points. Stage Area Area Volume Volume Total Outflow [ft][ft 2][acres][ft 3][ac-ft][cfs] 0.00 37 0.001 0 0.000 0.00 0.50 4,211 0.097 1,062 0.024 0.02 0.69 10,422 0.239 2,452 0.056 0.02 1.00 20,556 0.472 7,253 0.167 0.25 1.50 44,063 1.012 23,408 0.537 1.62 2.00 62,966 1.445 50,165 1.152 3.32 2.50 76,326 1.752 84,988 1.951 4.27 2.68 78,712 1.807 98,942 2.271 4.63 2.75 79,641 1.828 104,484 2.399 6.14 3.00 82,955 1.904 124,808 2.865 12.96 3.25 85,628 1.966 145,881 3.349 13.64 3.30 86,163 1.978 150,176 3.448 13.77 3.40 87,232 2.003 158,846 3.647 14.03 3.50 88,302 2.027 167,623 3.848 14.29 DETENTION BASIN OUTLET STRUCTURE DESIGN Stage - Storage Description MHFD-Detention, Version 4.06 (July 2022) For best results, include the stages of all grade slope changes (e.g. ISV and Floor) from the S-A-V table on Sheet 'Basin'. Also include the inverts of all outlets (e.g. vertical orifice, overflow grate, and spillway, where applicable). Invert - 4977.47 WQ Volume -4978.16 Outlet Structure Overflow Weir - 4980.16 3981700 MHFD-Detention_v4-06 (9).xlsm, Outlet Structure 1/30/2024, 4:22 PM HY-8 Culvert Analysis Report Crossing Discharge Data Discharge Selection Method: Specify Minimum, Design, and Maximum Flow Minimum Flow: 0 cfs Design Flow: 229.9 cfs Maximum Flow: 240 cfs Table 1 - Summary of Culvert Flows at Crossing: 12'X2' BOX CULVERT Headwater Elevation (ft)Total Discharge (cfs)Culvert 1 Discharge (cfs) Roadway Discharge (cfs)Iterations 4981.50 0.00 0.00 0.00 1 4982.46 24.00 24.00 0.00 1 4983.03 48.00 48.00 0.00 1 4983.49 72.00 72.00 0.00 1 4983.90 96.00 96.00 0.00 1 4984.28 120.00 120.00 0.00 1 4984.66 144.00 144.00 0.00 1 4985.06 168.00 168.00 0.00 1 4985.47 192.00 192.00 0.00 1 4986.20 229.90 229.90 0.00 1 4986.41 240.00 240.00 0.00 1 4986.53 245.47 245.47 0.00 Overtopping Rating Curve Plot for Crossing: 12'X2' BOX CULVERT Table 2 - Culvert Summary Table: Culvert 1 ******************************************************************************** Straight Culvert Inlet Elevation (invert): 4981.50 ft, Outlet Elevation (invert): 4981.24 ft Culvert Length: 85.00 ft, Culvert Slope: 0.0031 ******************************************************************************** Total Discharge (cfs) Culvert Discharge (cfs) Headwater Elevation (ft) Inlet Control Depth (ft) Outlet Control Depth (ft) Flow Type Normal Depth (ft) Critical Depth (ft) Outlet Depth (ft) Tailwater Depth (ft) Outlet Velocity (ft/s) Tailwater Velocity (ft/s) 0.00 0.00 4981.50 0.000 0.000 0-NF 0.000 0.000 0.000 0.000 0.000 0.000 24.00 24.00 4982.46 0.965 0.413 1-S2n 0.555 0.563 0.555 0.655 4.326 2.155 48.00 48.00 4983.03 1.531 0.819 1-S2n 0.860 0.894 0.860 1.008 5.584 2.801 72.00 72.00 4983.49 1.989 1.202 1-S2n 1.115 1.172 1.115 1.301 6.456 3.254 96.00 96.00 4983.90 2.399 1.588 1-S2n 1.345 1.420 1.345 1.563 7.137 3.613 120.00 120.00 4984.28 2.785 1.989 1-S2n 1.559 1.648 1.559 1.804 7.700 3.913 144.00 144.00 4984.66 3.164 2.412 5-S2n 1.760 1.860 1.760 2.030 8.182 4.173 168.00 168.00 4985.06 3.555 2.858 5-S2n 1.952 2.062 1.952 2.245 8.606 4.402 192.00 192.00 4985.47 3.970 3.331 5-S2n 2.137 2.254 2.137 2.451 8.983 4.609 229.90 229.90 4986.20 4.698 4.136 5-S2n 2.419 2.541 2.419 2.761 9.506 4.898 240.00 240.00 4986.41 4.911 4.363 5-S2n 2.491 2.615 2.491 2.841 9.633 4.969 Culvert Performance Curve Plot: Culvert 1 Water Surface Profile Plot for Culvert: Culvert 1 Site Data - Culvert 1 Site Data Option: Culvert Invert Data Inlet Station: 0.00 ft Inlet Elevation: 4981.50 ft Outlet Station: 85.00 ft Outlet Elevation: 4981.24 ft Number of Barrels: 1 Culvert Data Summary - Culvert 1 Barrel Shape: Concrete Box Barrel Span: 10.00 ft Barrel Rise: 3.00 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0120 Culvert Type: Straight Inlet Configuration: Square Edge (90º) Headwall Inlet Depression: None Table 3 - Downstream Channel Rating Curve (Crossing: 12'X2' BOX CULVERT) Tailwater Channel Data - 12'X2' BOX CULVERT Tailwater Channel Option: Rectangular Channel Bottom Width: 17.00 ft Channel Slope: 0.0050 Channel Manning's n: 0.0350 Channel Invert Elevation: 4981.24 ft Roadway Data for Crossing: 12'X2' BOX CULVERT Roadway Profile Shape: Constant Roadway Elevation Crest Length: 181.00 ft Crest Elevation: 4986.53 ft Roadway Surface: Paved Roadway Top Width: 71.00 ft Flow (cfs)Water Surface Elev (ft)Depth (ft)Velocity (ft/s)Shear (psf)Froude Number 0.00 4981.24 0.00 0.00 0.00 0.00 24.00 4981.90 0.66 2.16 0.20 0.47 48.00 4982.25 1.01 2.80 0.31 0.49 72.00 4982.54 1.30 3.25 0.41 0.50 96.00 4982.80 1.56 3.61 0.49 0.51 120.00 4983.04 1.80 3.91 0.56 0.51 144.00 4983.27 2.03 4.17 0.63 0.52 168.00 4983.48 2.24 4.40 0.70 0.52 192.00 4983.69 2.45 4.61 0.76 0.52 229.90 4984.00 2.76 4.90 0.86 0.52 240.00 4984.08 2.84 4.97 0.89 0.52 Crossing Discharge Data Discharge Selection Method: Specify Minimum, Design, and Maximum Flow Minimum Flow: 0 cfs Design Flow: 235.2 cfs Maximum Flow: 240 cfs Table 4 - Summary of Culvert Flows at Crossing: 10'X3' BOX CULVERT Headwater Elevation (ft)Total Discharge (cfs)Culvert 2 Discharge (cfs) Roadway Discharge (cfs)Iterations 4976.71 0.00 0.00 0.00 1 4977.75 24.00 24.00 0.00 1 4978.37 48.00 48.00 0.00 1 4978.90 72.00 72.00 0.00 1 4979.38 96.00 96.00 0.00 1 4979.83 120.00 120.00 0.00 1 4980.19 144.00 144.00 0.00 1 4980.78 168.00 168.00 0.00 1 4981.41 192.00 192.00 0.00 1 4982.60 235.20 235.20 0.00 1 4982.74 240.00 240.00 0.00 1 4983.06 251.07 251.07 0.00 Overtopping Rating Curve Plot for Crossing: 10'X3' BOX CULVERT Table 5 - Culvert Summary Table: Culvert 2 ******************************************************************************** Straight Culvert Inlet Elevation (invert): 4976.71 ft, Outlet Elevation (invert): 4976.43 ft Culvert Length: 92.00 ft, Culvert Slope: 0.0030 ******************************************************************************** Total Discharge (cfs) Culvert Discharge (cfs) Headwater Elevation (ft) Inlet Control Depth (ft) Outlet Control Depth (ft) Flow Type Normal Depth (ft) Critical Depth (ft) Outlet Depth (ft) Tailwater Depth (ft) Outlet Velocity (ft/s) Tailwater Velocity (ft/s) 0.00 0.00 4976.71 0.000 0.000 0-NF 0.000 0.000 0.000 0.000 0.000 0.000 24.00 24.00 4977.75 0.965 1.042 1-S1t 0.556 0.563 0.936 0.936 2.563 2.563 48.00 48.00 4978.37 1.531 1.662 1-S1t 0.861 0.894 1.469 1.469 3.267 3.267 72.00 72.00 4978.90 1.989 2.191 1-S1t 1.117 1.172 1.925 1.925 3.739 3.739 96.00 96.00 4979.38 2.399 2.670 1-S1t 1.347 1.420 2.342 2.342 4.098 4.098 120.00 120.00 4979.83 2.785 3.118 1-S1t 1.561 1.648 2.734 2.734 4.389 4.389 144.00 144.00 4980.19 3.164 3.479 4-FFf 1.763 1.860 3.000 3.108 4.800 4.632 168.00 168.00 4980.78 3.555 4.075 4-FFf 1.956 2.062 3.000 3.470 5.600 4.842 192.00 192.00 4981.41 3.970 4.697 4-FFf 2.141 2.254 3.000 3.821 6.400 5.025 235.20 235.20 4982.60 4.809 5.887 4-FFf 2.461 2.580 3.000 4.433 7.840 5.306 240.00 240.00 4982.74 4.911 6.026 4-FFf 2.496 2.615 3.000 4.499 8.000 5.334 Culvert Performance Curve Plot: Culvert 2 Water Surface Profile Plot for Culvert: Culvert 2 Site Data - Culvert 2 Site Data Option: Culvert Invert Data Inlet Station: 0.00 ft Inlet Elevation: 4976.71 ft Outlet Station: 92.00 ft Outlet Elevation: 4976.43 ft Number of Barrels: 1 Culvert Data Summary - Culvert 2 Barrel Shape: Concrete Box Barrel Span: 10.00 ft Barrel Rise: 3.00 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0120 Culvert Type: Straight Inlet Configuration: Square Edge (90º) Headwall Inlet Depression: None Table 6 - Downstream Channel Rating Curve (Crossing: 10'X3' BOX CULVERT) Tailwater Channel Data - 10'X3' BOX CULVERT Tailwater Channel Option: Rectangular Channel Bottom Width: 10.00 ft Channel Slope: 0.0050 Channel Manning's n: 0.0350 Channel Invert Elevation: 4976.43 ft Roadway Data for Crossing: 10'X3' BOX CULVERT Roadway Profile Shape: Constant Roadway Elevation Crest Length: 69.00 ft Crest Elevation: 4983.06 ft Roadway Surface: Paved Roadway Top Width: 71.00 ft Flow (cfs)Water Surface Elev (ft)Depth (ft)Velocity (ft/s)Shear (psf)Froude Number 0.00 4976.43 0.00 0.00 0.00 0.00 24.00 4977.37 0.94 2.56 0.29 0.47 48.00 4977.90 1.47 3.27 0.46 0.48 72.00 4978.36 1.93 3.74 0.60 0.47 96.00 4978.77 2.34 4.10 0.73 0.47 120.00 4979.16 2.73 4.39 0.85 0.47 144.00 4979.54 3.11 4.63 0.97 0.46 168.00 4979.90 3.47 4.84 1.08 0.46 192.00 4980.25 3.82 5.03 1.19 0.45 235.20 4980.86 4.43 5.31 1.38 0.44 240.00 4980.93 4.50 5.33 1.40 0.44 Label Solve For Friction Method Roughness CoefficientChannel Slope (ft/ft)Water Surface Elevation (ft)Elevation Range Discharge (cfs)Flow Area (ft²)Wetted Perimeter (ft)Hydraulic Radius (in)Top Width (ft)Normal Depth (in)Critical Depth (in)Critical Slope (ft/ft)Velocity (ft/s)Velocity Head (ft)Specific Energy (ft)Froude Number Flow Type Notes Messages 100 YR Section - AA 0.019 0.004 4,981.11 4,980.1 to 4,981.8 ft 23.5 6.7 11.4 7.1 11.19 12.6 11.3 0.007 3.49 0.19 1.24 0.793 Subcritical 100 YR - Section - BB 0.019 0.004 4,980.15 4,978.6 to 4,981.5 ft 61.3 13.4 14.8 10.8 14.42 19.1 17.6 0.006 4.58 0.33 1.92 0.837 Subcritical 100 YR Section - CC 0.019 0.003 4,974.06 4,973.0 to 4,985.7 ft 25.4 8.6 12.9 8 12.61 12.8 10.2 0.007 2.96 0.14 1.2 0.633 Subcritical 100 YR Section - DD 0.02 0.01 4,981.53 4,979.7 to 4,985.6 ft 235.2 32.3 33.3 11.6 33.09 21.7 24.2 0.006 7.28 0.82 2.63 1.299 Supercritical Front Range Storage Preliminary Drainage Report 14 APPENDIX D – WATER QUALITY CALCULATIONS Subdivision:RV, Boat & Storage Project Name:Front Range RV Boat and Storage Location:Fort Collins Project No.:39817.00 Calculated By:ARJ Checked By:0 Date:1/24/24 Basin Area (ac)% Imp. C2 0.96 70.0% C9 0.42 38.0% C10 2.18 4.0% Total 3.56 25.8% WQCV Drain Time (hr):40 Coefficient, a (Figure 3.2):1.0 WQCV (in):0.14 WQCV (ac-ft):0.049 WQCV (cu-ft):2,134.7 WQ Tributary Areas WQCV - POND X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 1 of 3 1/30/2024 Subdivision:RV, Boat & Storage Project Name:Front Range RV Boat and Storage Location:Fort Collins Project No.:39817.00 Calculated By:ARJ Checked By:0 Date:1/24/24 Basin Area (ac)% Imp. C1 0.36 61.5% C3 2.42 71.9% C4 1.20 78.5% C5 1.19 78.2% C6 1.31 77.3% C7 0.42 67.5% C8 1.73 75.9% Total 8.62 74.70% WQCV Drain Time (hr):12 C1, AND C3-C8 Coefficient, a (Figure 3.2):0.8 WQCV (in):0.24 WQCV (ac-ft):0.205 WQCV (cu-ft):8,950.0 WQ Tributary Areas WQCV - RAIN GARDEN X:\3980000.all\3981700\Excel\Drainage\39817.00 Drainage_Calcs_v2.07.xlsm Page 2 of 3 1/30/2024 Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia =74.7 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.747 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV =0.24 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area)Area = 375,487 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 =0.43 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region,VWQCV OTHER =cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =8,950 cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum)DWQCV =12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z =4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin =5610 sq ft D) Actual Flat Surface Area AActual =7028 sq ft E) Area at Design Depth (Top Surface Area)ATop =11134 sq ft F) Rain Garden Total Volume VT=9,081 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided?1 B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y =ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 =cu ft iii) Orifice Diameter, 3/8" Minimum DO = in Design Procedure Form: Rain Garden (RG) ARJ JR ENGINEERING, LLC January 31, 2024 FRONT RANGE RV BOAT & STORAGE C1 AND C3 THROUGH C7 UD-BMP (Version 3.07, March 2018) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO C1 AND C3-C7 RAIN GARDEN UD-BMP_v3.07.xlsm, RG 1/31/2024, 8:46 AM Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) ARJ JR ENGINEERING, LLC January 31, 2024 FRONT RANGE RV BOAT & STORAGE C1 AND C3 THROUGH C7 Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO C1 AND C3-C7 RAIN GARDEN UD-BMP_v3.07.xlsm, RG 1/31/2024, 8:46 AM Front Range Storage Preliminary Drainage Report 15 APPENDIX E – REFERENCES Model Scenario: Duplicate Effective = ICON conversion of Effective MODSWMM model to EPA SWMM + Recent Development Updates Existing = DE + Recent Hydrology LOMRs SWMM Element ICON 2014 Model - Duplicate Effective SWMM (v 5.0.022 - from Report) Existing Conditions SWMM v5.1.012 As-Built v5.1.006 As-Built v5.1.011 (w/ pond problem) As-Built v5.1.012 (w/ pond problem) As-Built v5.1.012 (Raised Ponds) As-Built v5.1.012 (Final) Difference: Exist. Cond. (v5.1.012) - Dup. Eff. Model (ICON) Difference: v.011 - v.006 Difference: v.012 - v.011 Difference: v.012 Raised Ponds - v.006 Difference: v.012 Final - v.006 Model Notes:Eff. Model Conversion/ Update Corrected 'Warning 10' problem by rasing invert elevation of 16 ponds. Updated with corrected ponds (raised inverts) and updated Larimer-Weld Canal model run Should be very close to v5.1.006 Update to LW Canal model (unsteady HECRAS) caused flow changes. Report Table 5.7 shows these flow are now close again to the CLOMR flows. 913 539.5 540.4 47.97 48.0 48.0 48.0 48.0 0.8 0.00 0.00 0.00 0.00 914 3079.6 3090.4 274.21 274.2 274.2 274.2 274.2 10.8 0.00 0.00 0.00 0.00 Node Discharge - 100yr (cfs)Comparison As-Built These are the same model input file, run in 3 SWMM versions These are the same model input file, run in 3 SWMM versions - note differences beteween v..006 and v.011 TI M B E R L I N E R O A D COUNTY RD 52 MULBERRY ST MOUNTAIN VISTA DR IN T E R S T A T E 2 5 CO U N T Y R D 5 CO U N T Y R D 1 3 E. VINE DR B O X E L D E R B O X E L D E R CR E E K L A K E C A N A L D R Y C R E E K C R E E K NO R T H G R A Y RE S E R V O I R SO U T H G R A Y RE S E R V O I R GR A Y RE S E R V O I R # 3 COUNTY RD 50 0 32 83 134 195 2800 3230 3699 4950 6075 6152 6194 6215 6275 8210 9025 9713 10230 10600 11615 11635 11663 11672 11681 11723 11756 11945 11897 11892 11875 11832 11790 13050 13415 13643 14297 14550 15360 15974 16550 17225 17318 17341 17425 17985 19405 20080 20330 20670 20705 20801 20950 21990 23680 25281 * * *LOCATION OF CONSTRUCTED SIDE SPILL WEIR 0 2000'4000' SCALE: 1" = 2000' 1000' FIGURE 5.1 LARIMER & WELD CANAL 100-YR SPILLS LEGEND: CROSS SECTION LOCATION SECTION ID (STATION) APPROXIMATE SPILL LIMITS Dr a w i n g N a m e : F: \ 3 2 - 1 6 6 4 . 3 1 B O X E L D E R L O M R \ R E P O R T \ F I G U R E S \ F I G U R E 5 . 1 . D W G Th u r s d a y , M a r c h 1 5 , 2 0 1 8 11 : 2 3 A M B y : RI C K S , R O N A L D SPILL LIMITS ID 25281 Spill Location Existing Condition Flows (Pre-Project) As-built Flows (Post-Project)Difference cfs cfs cfs A 509 166 -344 B 452 105 -347 C 2555 2513 -42 D 2147 2 -2145 E 34 0 -34 F 1731 740 -991 G 65 37 -28 H 108 108 0 TH-12 TH-2 TH-1 TH-4 TH-13 TH-5 TH-3 TH-14 TH-6 TH-15 TH-7 I- 2 5 E Vine DR. I- 2 5 Can a l N C R 5 E CR 50 Site NE FRONTAGE RDLEGEND: INDICATES APPROXIMATE LOCATION OF EXPLORATORY BORING INDICATES APPROXIMATE LOCATION OF EXPLORATORY BORINGS PERFORMED FOR NEWT 3 PIPELINE PROJECT (FC10581) TH-1 TH-12 ERIC KELLEY C/O JR ENGINEERING LLC MOUNTAIN VISTA PROPERTY CTL I T PROJECT NO. FC10813-115 FIGURE 1 Locations of Exploratory Borings VICINITY MAP (FORT COLLINS, COLORADO) NOT TO SCALE 550'275' APPROXIMATE SCALE: 1" = 550' 0' 0 5 10 15 20 25 30 35 40 0 5 10 15 20 25 30 35 40 6/12 14/12 9/12 11/12 50/10 WC=11.2 DD=109 SW=0.0 SS=0.370 WC=4.7 DD=116 -200=23 WC=8.7 DD=114 SW=-0.1 TH-1 10/12 15/12 WC=19.9 DD=104 SW=0.9 SS=1.300 TH-2 7/12 9/12 9/12 17/12 37/12 WC=10.1 DD=114 -200=45 WC=10.8 DD=116 SW=0.0 TH-3 9/12 26/12 WC=23.2 DD=106 SW=0.4 TH-4 21/12 10/12 29/12 8/12 WC=5.6 DD=114 SW=0.0 SS=0.800 TH-5 7/12 4/12 50/5 WC=25.6 DD=96 -200=83 WC=17.2 DD=111 SW=-0.1 TH-6 7/12 2/12 4/12 WC=17.6 DD=107 SW=0.3 SS=0.040 TH-7 DE P T H - F E E T DE P T H - F E E T Summary Logs of Exploratory Borings FIGURE 2 ERIC KELLEY C/O JR ENGINEERING LLC MOUNTAIN VISTA PROPERTY CTL | T PROJECT NO. FC10813-115 0 5 10 15 20 25 30 35 40 0 5 10 15 20 25 30 35 40 8/12 42/12 40/12 26/12 WC=0.0DD=102SW=1.3SS=1.600 WC=5.1-200=7 WC=0.0DD=102SW=1.3SS=1.600 WC=5.1-200=7 TH-12 11/12 14/12 12/12 9/12 WC=10.3-200=16WC=10.3-200=16 TH-13 14/12 6/12 15/12 31/12 WC=0.0DD=113SW=0.0SS=0.490 WC=0.0DD=113SW=0.0SS=0.490 TH-14 11/12 5/12 7/12 7/12 WC=30.8DD=91WC=30.8DD=91 TH-15 DRIVE SAMPLE. THE SYMBOL 8/12 INDICATES 8 BLOWS OF A 140-POUND HAMMER FALLING 30 INCHES WERE REQUIRED TO DRIVE A 2.5-INCH O.D. SAMPLER 12 INCHES. SAND, CLAYEY, SILTY, SLIGHTLY MOIST TO MOIST, LOOSE TO MEDIUM DENSE, BROWN, TAN, RUST (SC) 1. 4. LEGEND: CLAY, SANDY, MOIST, STIFF, BROWN (CL) DE P T H - F E E T THESE LOGS ARE SUBJECT TO THE EXPLANATIONS, LIMITATIONS AND CONCLUSIONS IN THIS REPORT. NOTES: WATER LEVEL MEASURED MAY 1, 2023 GRAVEL, SANDY, SLIGHTLY MOIST TO WET,MEDIUM DENSE TO VERY DENSE, REDDISH BROWN (GP) INDICATES DEPTH WHERE HOLE CAVED PRIOR TO SECONDARY GROUNDWATER MEASUREMENTS. INDICATES MOISTURE CONTENT (%). INDICATES DRY DENSITY (PCF). INDICATES SWELL WHEN WETTED UNDER OVERBURDEN PRESSURE (%). INDICATES PASSING NO. 200 SIEVE (%). INDICATES LIQUID LIMIT. INDICATES PLASTICITY INDEX. INDICATES UNCONFINED COMPRESSIVE STRENGTH (PSF). INDICATES SOLUBLE SULFATE CONTENT (%). 3. DE P T H - F E E T WATER LEVEL MEASURED AT TIME OF DRILLING. Summary Logs of Exploratory Borings BORINGS 1-7 WERE DRILLED ON APRIL 21ST, 2023 USING 4-INCH DIAMETER CONTINUOUS-FLIGHT AUGERS AND A TRUCK-MOUNTED DRILL RIG. FIGURE 3 WC DD SW -200 LL PI UC SS - - - - - - - - ERIC KELLEY C/O JR ENGINEERING LLC MOUNTAIN VISTA PROPERTY CTL | T PROJECT NO. FC10813-115 BORINGS 12-15 WERE PERFORMED ON NOVEMBER 8TH, 2022 AS A PART OF THE NEWT 3 PIPELINE PROJECT (FC10581) 2. Front Range Storage Preliminary Drainage Report 16 APPENDIX F – MAPS A W e s t r i a n C o m p a n y LEGEND Know what's below. before you dig.Call R A W e s t r i a n C o m p a n y Know what's below. before you dig.Call R A A B B D D KE L L E Y S T R E E T X: \ 3 9 8 0 0 0 0 . a l l \ 3 9 8 1 7 0 0 \ D r a w i n g s \ S h e e t D w g s \ U t i l i t y \ 3 9 8 1 7 0 0 D R 0 1 . d w g , D r a i n a g e P l a n ( 2 ) , 2 / 6 / 2 0 2 4 1 : 4 3 : 4 2 P M , F C A W e s t r i a n C o m p a n y Know what's below. before you dig.Call R B C C A Westrian Company FRONT RANGE RV BOAT AND STORAGE BOX ELDER CREEK - ASBUILT MODEL SWMM EXHIBIT Front Range Storage Preliminary Drainage Report 17 APPENDIX G –LID EXHIBIT A W e s t r i a n C o m p a n y Know what's below. before you dig.Call R LID TREATMENT A A B B D D KELLEY STREET