HomeMy WebLinkAboutCHILI'S PUD - FINAL - 6-87E - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEW.
City of Fort Collins
Developn�[t Services
•
Planning Department
March 31, 1992
Mr. Rhys Christensen
c/o Realtec
1136 East Stuart Street, Suite 4207
Fort Collins, CO 80526
Dear Mr. Christensen,
For your information, attached is a copy of the Staff s comments concerning the Chili's
Restaurant and Retail on Pad 5 of The Square, that was presented before the Conceptual
Review Team on March 30, 1992.
The comments are offered informally by Staff to assist you in preparing the detailed
components of the project application. Modifications and additions to these comments may be
made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the review
process, please feel free to call me at 221-6750.
Sincerely,
��
Ted Shepard
Project Planner
Attachment
xc: Bruce Deifik, 3520 Diane Place, Greeley, CO 80631
Tom Peterson, Planning Director
Kerrie Ashbeck, Civil Engineer
Transportation Department
Project Planner
���^��ile ' ..
281 North College Avenue • P.O. Box �80 • For± Collins, CO 80�22-0�80 •(303) �21-h� �(1
u
CONCEPTUAL KEVIEW STAF� COMMENTS
MEETING DATE: March 30, 1992
ITEM: Chili's Restaurant and Retail on Pad 5 of The Square
APPLICANT: Bruce Deifik, Integrated Property Management, Inc. c/o
Rhys Christensen, Realtec, 1136 East Stuart Street, Suite 4207,
Fort Collins, CO. 80525.
LAND USE DATA: Request for 5,600 to 6,000 square foot standard
restaurant and 5,000 to 6,000 square feet of general retail located
on Pad 5 of The Square, northeast corner of College and Horsetooth.
COMMENTB:
1. Electrical power is available along College Avenue. One
transformer can feed both uses. At your option, there can one
service to two customers, if separated by a two-hour fire wall.
Or, two separate services and meters can be installed.
2. The location of the transformer will require coordination
k�etween Light and Power, the Planning Department, and your
landscape designer. Pad sites usually pose a transformer location
and design challenge by virtue of the structure not having a
"service side". It is strongly encouraged that the transformer not
be located along College Avenue or Horsetooth Road in the
landscaped setback area. Rather, the transformer should be located
internally and screened by landscaping or fencing from public view.
It is required that the transformer be accessible from one side by
hard surface by a boom truck with a 15 foot swing. If you select
a screen wall or fence for screening, there must be a minimum
clearance of two feet on three sides only. The fourth side must be
equipped with a gate.
3. Please consult the hand-out regarding electrical fees.
Generally, fees are assessed on the square footage of the lot,
anticipated load of the buildings, and linear front footage along
public streets. A plat, filed for review concurrently with the
P.U.D., will be fundamental in assessing electrical fees. For
further information regarding electrical issues, please contact
Bruce Vogel, 221-6700.
4. Both water and sewer mains are available along College Avenue
to serve the site. If either of these mains are located in the
College Avenue right-of-way, then permits are required from the
State Department of Highways in order to perform the work.
,
�
u
5. The restaurant will need a grease trap, located outside the
building, in concrete, on the sanitary sewer line. The Water and
Wastewater Department has details on this grease trap.
6. If the restaurant and retail are contained within one
building, the developer has the option providing one water and
sewer service (one meter) or two. If one service is provided, then
the developer is advised to set up an association among the
tenants/owners to administer the shared service. For any further
information regarding water and sewer issues, please call Mark
Taylor, 221-6681.
7. As indicated on the sketch plan, the building will be required
to have an approved fire sprinkler system. The reason is because
the building exceeds 5,000 square feet, and is considered one
building for fire fighting purposes. If you have any questions
regarding the City's local amendments to the 1988 U.B.C., or the
Fire Code, please contact Sharon Get2, Plans Examiner, 221-6760,
and Warren Jones, Fire Marshal, 221-6570.
8. The site is located in the Foothills drainage basin. The
drainage fees in this basin are $5,024 per acre. No on-site
detention is required as storm flows are directly conveyed into
Warren Lake. The existing Drainage Report should be updated, and
new drainage patterns established. Erosion control during
construction must be a component of the Drainage Report.
9. The existing Traffic Impact Analysis should be updated
reflecting the new uses and the accounting for the full occupancy
of The Square. The study should investigate the Mitchell Drive
access to Horsetooth Road. Since this intersection is so close to
Horsetooth/College intersection, it will not be signalized. The
City may require that outbound left turn exits from this
intersection not be allowed. In addition, straight southbound
exits across Horsetooth Road will also likely be prohibited.
Mitchell Drive will be built to the south as development occurs, no
sooner. Please contact Eric Bracke, Transportation Planner, 221-
6681 for further details.
10. The amended Overall Development Plan will require a detailed
investigation into the parking allowances for entire shopping
eenter. Previous master plans assumed a generous amount of "shared
parking" among the tenants and pad owners. The City Planning
Department has recommended guidelines for parking allowances. Any
shared parking arrangements will be car.efully examined and require
written permission from the various owners.
ll. The Engineering Department will require a utility plan and
development agreement. Erosion control plans should be indicated
on these plans. Any improvements recommended in the Traffic Impact
Analysis should be included on the utility plans. Please contact
Kerrie Ashbeck, Civil Engineer, 221-6750, for details.
�
�
�
�
12. Both the retail use and restaurant will be assessed a Street
Oversizing Fee of $14,005 per acre. The plat will assist in the
final calculation of this fee. The fee is collected at the time of
building permit issuance.
13. Building elevations for the retail building are required for
submittal. It is suggested that the retail building borrow design
elements from both The Square and Chili's in order to blend into
the shopping center. The design intent is unify the center as much
as possible to avoid the "strip center" or haphazard appearance.
Staff will assist with ideas on how this relatively subjective
criterion can be accomplished.
14. As a pad site, Chili's has four visible elevations. There is
no back side or service side. Consequently, the service area,
loading zone, trash dumpsters, mechanical equipment, and employee
entrance must be screened from view. Rooftop mechanical equipment
must be screened as well.
15. Landscaping along the arterials will be important. The City
has worked diligently with previous and present owners of The
Square to ensure that the landscaping promote City design policies.
The streetscape along College Avenue is considered the most
important urban design element in the City of Fort Collins. Parking
lot landscaping must be in islands at the ends of rows.
16. The building setback along College will be important.
Presently, the Black-Eyed Pea, and Applebee's, two pad restaurants
at the Pavilion Shopping Center, are setback 40 feet from property
line. Anything less tends to crowd the street unless special
landscaping measures are taken. Staff is willing to work with the
developer on these parameters so that our mutual objectives can be
met.
17. Pedestrian circulation between The Square and the pad must be
safe and direct. Perhaps special pavers can be used to demarcate
the crosswalk to minimize vehicle - pedestrian conflicts. Also,
sidewalk connections to the public streets should be made.
18. Signage will be looked at as part of the overall design
element of the P.U.D. One monument sign, directly on the corner,
at 45 degrees to the intersection is preferred rather than two
signs on each frontage. The monument sign should be placed in a
landscaped shrub bed. The base should match the building's
exterior material. The size of the sign will be reviewed for
appropriate scale and proportion. Staff is willing to offer
assistance in signage design for both uses so that tenants gain
visibility in a tasteful fashion.
19. In terms of process, the Master Plan will have to amended.
These are now referred to as "Overall Development Plans" and should
indicate the latest changes to the parcel. It is our unders�anding
that there are four owners of property within The Square shopping
,. .
�J
�
center, and that new property lines have been drawn describing the
new arrangement. These new boundaries should be indicated on the
amended O.D.P.
20. It is advised that the new boundaries be indicated, for all
new owners, on one subdivision plat. City records.do not indicate
any of the parcelization that has occurred in the recent past. It
is our experience that it is beneficial for all owners to have
their property legally described and recorded on a single plat for
City records. This documentation will assist various City
departments in terms of determining signage allowance, building
permit fees, utility fees, as well as creating a simple method to
describe property boundary and area. Without such a document, the
City is unable to provide assistance to property owners, title
companies, appraisers, real estate professionals, and other
interested citizens on issues dealing with this parcel. Since such
a plat requires the cooperation of all owners, Staff is willing to
facilitate the process and answer any questions the owners may
have. A plat can be processed concurrently with a P.U.D. for an
additional fee of $10.00 for recording.
21. The request will have to be processed as a P.U.D. Staff must
determine the issues relating to utility plans and the development
agreement before allowing a combined submittal. Staff will respond
to the request for a combined submittal under separate cover.