Loading...
HomeMy WebLinkAboutLIGHT & POWER UTILITY SERVICE CENTER COMMUNICATION TOWER PUD, PRELIMINARY & FINAL - 11-87B - CORRESPONDENCE - STAFF'S PROJECT COMMENTSDeyeld�ent Services � Planning Department of Fort Collins June 24, 1988 Jirn Seheller Light and Power 700 Wood Street Fort Collins, CO 80524 Dear Jim: Staff has reviewed the Light and Power Utility Service Center Communieation Tower PUD and has the following comments to make: . To meet Storm Drainage Requirements, a letter must be submitted by a registered engineer discussing the impact of this site on drainage. Storm Drainage impact is anticipated to be m.inor; however, a request for a variance from full storm drainage submittal requirements and the detention requirement must be submitted. According to the FEMA floodplain maps, the tower site is not in the Poudre River Floodplain. This does need to be erified by the engineer. . The height of the tower should be indicated on the site plan. J3. The distance :of the towe; bas�e to property lines should be shown on the �� plan. 4. Staff is presuming that this is a request for both preliminary and final PUD approval. Therefore, all final plan-required information must be shown on the site plan (see attached sheets). 5. The height review analysis inform:ation needs to be submitted for review (see attached). By noon on Wednesday. Julv 6, 1988, three copies of the revised plans addressing these comments must Ue submitted to this office. By Mondav: Julv 18.1988 ten (10) folded copies of all plans, a colored rendering (unfolded) and an 8-1 '2"x 11" PMT reduction (or similar quality, zerox copies unacceptable) must U� submitted. - 300 LaPorte Avenue � P.O. Box 580 • Fort Collins, CO 80522-0580 •(303) 221-675.0 . C Page 2 n If you have any questions, or would like to meet with me to discuss these comments, please do not hesitate to contact me. Since ly, � � (�9��,,�� Sherry A1 tson-Clark Senior Pla er Attachments :�