HomeMy WebLinkAboutPONDEROSA PARK PUD REPLAT - FINAL - 17-87A - LEGAL DOCS - DRAINAGE RELATED DOCUMENTPROPOSAL FO A RM DRAINAGE ACCESS TO SKYLINE &ILE PARK II, INC.
Flirt PONDEROSA PARK P.U.D. PHASES III AND IV
1) An easement for 165 lineal feet of 10 inch P.V.C. pipe running from the Ponderosa
Park P.U.D. Development to the existing pump basin in Skyline Mobile Park II, Inc.
will be provided by Skyline Mobile Park II, Inc. This easement must be properly
surveyed and recorded at the expense of Ponderosa Park P.U.D.
2) Ponderosa Park P.U.D. will pay a one time fee of $600.00 to Skyline Mobile Park
II, Inc. This fee will help defer the costs of pump electricity and maintenance.
The fee is expressly for the hook up of Detention Ponds #1 and #2 and does not include
the hook up of Pond #3 or any additional load on the system.
3) All designs and installations must have the written approval of Skyline Mobile
Park II, Inc.
4) No work will be performed on Skyline Mobile Park II, Inc.'s property without
r obtaining proper insurance and contractor payment guarantees so as to hold Skyline
Mobile Park II, Inc. harmless of any liabilities incurred during installation.
5) All inlets to the storm sewer system will include some type of screening so as
to preclude the passage of anything larger than 3/4 inch square.
6) All pipeline maintenance remains the responsibility of Ponderosa Park P.U.D. and/or
it's Homeowner's Association and must be handled in a timely manner, so as not to
hinder the drainage of the South end of Skyline Mobile Park II, Inc. Ponderosa Park
P.U.D. and/or it's Homeowner's Association will assume liability for any damages
incurred due to improper maintenance of the pipeline or the inlet screens. Should
it become necessary for Skyline Mobile Park II, Inc. to perform any pipeline
maintenance, Ponderosa Park P.U.D. and/or it's Homeowner's Association will be
responsible for all costs incurred, including collection and attorney's fees.
THIS AGREEMENT
ENTERED
INTO THIS
l- DAY OF 1987 by
SKYLINE MOBILE
PARK II,
INC.
PONDEROSA PARK P.U.D.
Charles Spike Hoffman, President John D. Martin, Developer
State of Colorado)
)ss
County of Larimer)
The foregoing instrument was acknowledged before me this day of ,
A.D. 198 by Charles Spike Hoffman as President of Skyline Mobile Park II, Inc.
and by John D. Martin as Developer of Ponderosa Park P.U.D.
Notary Public
My notarial commission expires:
My business address is: