October 31, 2023
262 E Mountain Ave
Fort Collins, CO 80524
RE: Mason Street Infrastructure - ODP, ODP230001, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Mason Street Infrastructure - ODP. If you have questions
about any comments, you may contact the individual commenter or direct your questions
through your Development Review Coordinator, Brandy Bethurem Harras via phone at
970-416-2744 or via email at bbethuremharras@fcgov.com.
Comment responses: 11/06/2023
RIPLEY DESIGN:
APPLICANT:
NORTHERN ENGINEERING:
FOX TUTTLE
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras bbethuremharras@fcgov.com 970-416-2744
Topic: General
Comment Number: 1
06/02/2023: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email correspondence
with other reviewers and keep me informed of any phone conversations. Thank you!
RIPLEY DESIGN: Understood, Thank you.
Comment Number: 2
06/02/2023: SUBMITTAL:
2
As part of your resubmittal, you will respond to the comments provided in this
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a different font color.
When replying to the comment letter please be detailed in your responses, as
all comments should be thoroughly addressed. Comments requiring action
should NOT have a response such as noted or acknowledged. You will need to
provide references to specific project plans, pages, reports, or explanations of
why comments have not been addressed [when applicable].
RIPLEY DESIGN: Understood, Thank you.
Comment Number: 3
06/02/2023: SUBMITTAL:
Correct file naming is required as part of a complete submittal. Please follow
the Electronic Submittal Requirements and File Naming Standards found here:
https://www.fcgov.com/developmentreview/files/electronic -submittal-requiremen
ts-and-file-naming-standards_v1_8-1-19.pdf?1680306305.
File names should have the corresponding number, followed by the file type
prefix, project information, and round number. For example: 1_SITE
PLAN_MasonStreet_ODP_Rd1. A list of numbers and prefixes for each file can
be found at the link above.
RIPLEY DESIGN: Understood, Thank you.
Comment Number: 4
06/02/2023: SUBMITTAL:
All plans should be saved as optimized/flattened PDFs to reduce file size and
remove layers.
Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be
removed from the PDF’s.
AutoCAD turns drawing text into comments that appear in the PDF plan set,
and these must be removed prior to submittal as they can cause issues with the
PDF file.
The default setting is "1" ("on") in AutoCAD. To change the setting and remove
this feature, type "EPDFSHX" (version 2016.1) or “PDFSHX (version 2017 and
newer) in the command line and enter "0".
Read this article at Autodesk.com for more on this topic:
https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarti
cles/sfdcarticles/Drawing-text-appears-as-Comments-in-a-PDF-created-by-Aut
oCAD.html
RIPLEY DESIGN: Understood, Thank you.
Comment Number: 5
06/02/2023: SUBMITTAL:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut-off for routing the same week. When you are preparing to resubmit your
plans, please notify me with an expected submittal date with as much advanced
notice as possible.
RIPLEY DESIGN: Understood, Thank you.
3
Comment Number: 6
06/02/2023: INFORMATION:
Please resubmit within 180 days, approximately 6 months, to avoid the
expiration of your project.
RIPLEY DESIGN: Understood, Thank you.
Comment Number: 7
06/02/2023: INFORMATION:
ANY project that requires four or more rounds of review would be subject to an
additional fee of $3,000.00.
RIPLEY DESIGN: Understood, Thank you.
Comment Number: 8
06/02/2023: FOR HEARING:
All "For Hearing" comments need to be addressed and resolved prior to
moving forward with scheduling the Hearing. Staff will need to agree the project
is ready for Hearing approximately 4 to 8 weeks prior to the hearing.
RIPLEY DESIGN: Understood, Thank you.
Department: Engineering Development Review
Contact: Sophie Buckingham sbuckingham@fcgov.com
Topic: General
Comment Number: 2
10/31/2023: FOR HEARING:
The phasing schedule may need to be updated depending on the final
ownership of the properties based on the land swap. If needed, we can discuss
the timing for the ODP hearing in relation to the land swap.
NORTHERN ENGINEERING: Per discussions with city staff Tract A and Lot 1 will be owned by the City of Fort Collins.
Department: Traffic Operation
Contact: Steve Gilchrist sgilchrist@fcgov.com 970-224-6175
Topic: General
Comment Number: 1
10/30/2023: FOR INFORMATION:
The updated TIS has been received, reviewed, and general conclusions accepted.
06/20/2023: FOR HEARING:
The Transportation Impact Study has been received and reviewed. See
subsequent comments regarding content.
FOX TUTTLE: Comments were addressed in the updated TIS.
Comment Number: 6
10/30/2023: FOR INFORMATION:
Thank you for providing the updated MMLOS.
4
06/20/2023: FOR HEARING:
The Multi Modal Level of Service did not fully evaluate the Directness,
Continuity, Street Crossings, Visual Interest and Amenity, and Security of the
location identified within the TIS Base Assumption Form. Details on the Level
of service can be found in Appendix H of the LCUASS (will provide,) or within
the City of Fort Collins Pedestrian Plan 2011- page 33
FOX TUTTLE: The updated TIS includes the additional detail on the MMLOS.
Department: Erosion Control
Contact: Basil Hamdan bhamdan@fcgov.com 970-222-1801
Topic: Erosion Control
Comment Number: 1
06/14/2023: INFORMATION:
No comment from Erosion Control on ODP, all comments will be provided at PDP/FDP level.
NORTHERN ENGINEERING: Thank you. Responses have been added to PDP/FDP comments.
Department: Stormwater Engineering
Contact: Matt Simpson masimpson@fcgov.com (970) 416-2754
Topic: General
Comment Number: 2
10/31/2023: FOR HEARING – UPDATED:
The future storm main on the north end of the site needs to be shown on the ODP plans.
NORTHERN ENGINEERING: A rough alignment of the future storm drain has been added to the ODP plans. This aligns with
the new 30’ easement.
06/20/2023: FOR HEARING:
Please show the existing, proposed, and future storm mains on the Master Utility Plan.
Comment Number: 4
10/31/2023: FOR HEARING:
The rain garden on the north end of the site may not be co-located with in the
30-foot easement and route for the future City storm main.
NORTHERN ENGINEERING: An exclusive storm sewer easement has been added along the north property line. The future
rain garden will be shifted into a dedicated drainage easement.
Comment Number: 5
11/01/2023: FOR HEARING:
See redlines on ODP master drainage plan map and master utility planmap.
NORTHERN ENGINEERING: Responses have been added to redlines.
Department: Environmental Planning
Contact: Kristie Raymond kraymond@fcgov.com
Topic: General
Comment Number: 4
10/23/2023:
5
06/05/2023: INFORMATION ONLY:
If the project progresses to the final development plan stage, Development
Agreement language regarding the natural features on site will be provided.
RIPLEY DESIGN: Noted
APPLICANT: Understood
Department: Technical Services
Contact: Jeff County jcounty@fcgov.com 970-221-6588
Topic: General
Comment Number: 1
10/31/2023: FOR FINAL APPROVAL:
We have no comments, but will need to see any future submittals.
RIPLEY DESIGN: Understood, thank you.
NORTHERN ENGINEERING: Thank you.