LF 0 $0.00 $0.00 $2.25 $0.00
EACH 0 $0.00 $0.00 $170.00 $0.00
EACH 0 $0.00 $0.00 $150.00 $0.00
EACH 0 $0.00 $0.00 $230.00 $0.00
Sanitary Sewer Inspection Fees $0.00
LF 0 $0.00 $0.00 $2.45 $0.00
EACH 0 $0.00 $0.00 $255.00 $0.00
EACH 0 $0.00 $0.00 $150.00 $0.00
EACH 0 $0.00 $0.00 $105.00 $0.00
EACH 0 $0.00 $0.00 $85.00 $0.00
EACH 0 $0.00 $0.00 $130.00 $0.00
EACH 0 $0.00 $0.00 $130.00 $0.00
EACH 0 $0.00 $0.00 $130.00 $0.00
EACH 0 $0.00 $0.00 $400.00 $0.00
EACH 0 $0.00 $0.00 $400.00 $0.00
EACH 0 $0.00 $0.00 $255.00 $0.00
LF 0 $0.00 $0.00 $2.45 $0.00
EACH 0 $0.00 $0.00 $85.00 $0.00
Water Inspection Fees $0.00
LF 0 $0.00 $0.00 $1.50 $0.00
LF 0 $0.00 $0.00 $2.95 $0.00
LF 0 $0.00 $0.00 $2.95 $0.00
EACH 2 $0.00 $0.00 $230.00 $460.00
EACH 0 $0.00 $0.00 $230.00 $0.00
EACH 0 $0.00 $0.00 $170.00 $0.00
Public Storm Inspection Fees $460.00
LS 0 $0.00 $0.00
SY 188 $44.00 $8,280.80 $2.55 $479.91
SY 29 $7.00 $200.20 $2.55 $72.93
LF 30 $20.00 $600.00 $2.55 $76.50
LF 3,708 $5.00 $18,538.50 $2.55 $9,454.64
EACH 2 $1,050.00 $2,100.00 $100.00 $200.00
SY 0 $0.00 $0.00 $0.65 $0.00
SY 0 $0.00 $0.00 $1.40 $0.00
SY 0 $0.00 $0.00 $2.55 $0.00
SY 0 $0.00 $0.00 $1.40 $0.00
LF 0 $0.00 $0.00 $2.95 $0.00
LF 0 $0.00 $0.00 $2.30 $0.00
LF 29 $1.80 $53.06 $2.30 $67.80
LF 20 $1.60 $32.19 $2.30 $50.00
Street System Inspection Fees $10,401.78
LS 1 $45.00 $45.00
EACH 2 $0.00 $0.00 $30.00 $60.00
LF 0 $0.00 $0.00 $0.40 $0.00
SF 1,694 $3,726.80
Pavement Age 10 Excavation Permit Fees $3,831.80
TOTAL INSPECTION FEES $14,693.58
$29,804.76
Water Meter Pit (1 1/2")
Water Meter Pit (3" )
INFRASTRUCTURE
CONSTRUCTION COST
PER UNIT
(COST ESTMATE APPROVED BY THE
CITY)
TOTAL ESTIMATED
INFRASTRUCTURE COST
INSPECTION FEE PER
UNIT
(SET BY THE CITY)
Water Connection/Disconnect
Sanitary Sewer System
Sewer Main
Sewer Manhole
Sewer Service Line Stub
Sewer Main Connection/Disconnect
Water System
Water Main
Water Service Line Stub
TOTAL INSPECTION FEE
8/8/2023
Ridgewood Hills Fifth Filing - MA
UNIT OF
MEASURE
ESTIMATED
QUANTITY
(PROVIDED BY PROJECT
ENGINEER)
DESCRIPTION
(ALL PUBLIC & APPLICABLE PRIVATE* IMPROVEMENTS)
TOTAL PUBLIC INFRASTRUCTURE COST
Boring
Concrete Pavement
Application
Potholing
Pavement Impact Fees
Curb & Gutter
Drive Approach
Trench - Storm
Trench - Sewer
Trench - Water
Excavation Permit
Retaining Wall (Concrete, Masonry, Stone)
Asphalt Pavement
Sidewalk**
Pedestrian Ramps
Apron
Gutter Cross Pan
Fire Access Grass Crete
Storm Chase
Storm Inlet All Types
Storm Manhole
Street System & Trenching
Water Fire Hydrant
Water Valves
Water Meter Pit (3/4" )
* PRIVATE IMPROVEMENTS REQUIRING CITY INSPECTIONS WILL NEED TO BE INCLUDED. HOWEVER PRIVATE IMPROVEMENTS WILL NOT BE INCLUDED IN THE TOTAL
INFRASTRUCTURE COST FOR BONDING
** INCREASE SIDEWALK LENGTH FOR ANY SIDEWALKS WIDER THAN 4.5' IN WIDTH. STANDARD SIDEWALK INSPECTION FEE WIDTH IS 4.5'
Water Main (Fire Line)*
Water Meter Pit (2" )
Water Meter Pit (1")
Water Fitting (Bend/Tee/Cross)
Grading
Fire Line Fitting (Bend/Tee/Cross)*
Public Storm Sewer System
Storm Reinforced Concrete Pipe
Storm Concrete Headwall/Wing Walls
Box Culvert