Loading...
HomeMy WebLinkAboutRIDGEWOOD HILL AMENDMENT TRACT B - MA210028 - SUBMITTAL DOCUMENTS - ROUND 4 - SUPPORTING DOCUMENTATIONPROJECT NAME: DATE: LF 0 $0.00 $0.00 $2.25 $0.00 EACH 0 $0.00 $0.00 $170.00 $0.00 EACH 0 $0.00 $0.00 $150.00 $0.00 EACH 0 $0.00 $0.00 $230.00 $0.00 Sanitary Sewer Inspection Fees $0.00 LF 0 $0.00 $0.00 $2.45 $0.00 EACH 0 $0.00 $0.00 $255.00 $0.00 EACH 0 $0.00 $0.00 $150.00 $0.00 EACH 0 $0.00 $0.00 $105.00 $0.00 EACH 0 $0.00 $0.00 $85.00 $0.00 EACH 0 $0.00 $0.00 $130.00 $0.00 EACH 0 $0.00 $0.00 $130.00 $0.00 EACH 0 $0.00 $0.00 $130.00 $0.00 EACH 0 $0.00 $0.00 $400.00 $0.00 EACH 0 $0.00 $0.00 $400.00 $0.00 EACH 0 $0.00 $0.00 $255.00 $0.00 LF 0 $0.00 $0.00 $2.45 $0.00 EACH 0 $0.00 $0.00 $85.00 $0.00 Water Inspection Fees $0.00 LF 0 $0.00 $0.00 $1.50 $0.00 LF 0 $0.00 $0.00 $2.95 $0.00 LF 0 $0.00 $0.00 $2.95 $0.00 EACH 2 $0.00 $0.00 $230.00 $460.00 EACH 0 $0.00 $0.00 $230.00 $0.00 EACH 0 $0.00 $0.00 $170.00 $0.00 Public Storm Inspection Fees $460.00 LS 0 $0.00 $0.00 SY 188 $44.00 $8,280.80 $2.55 $479.91 SY 29 $7.00 $200.20 $2.55 $72.93 LF 30 $20.00 $600.00 $2.55 $76.50 LF 3,708 $5.00 $18,538.50 $2.55 $9,454.64 EACH 2 $1,050.00 $2,100.00 $100.00 $200.00 SY 0 $0.00 $0.00 $0.65 $0.00 SY 0 $0.00 $0.00 $1.40 $0.00 SY 0 $0.00 $0.00 $2.55 $0.00 SY 0 $0.00 $0.00 $1.40 $0.00 LF 0 $0.00 $0.00 $2.95 $0.00 LF 0 $0.00 $0.00 $2.30 $0.00 LF 29 $1.80 $53.06 $2.30 $67.80 LF 20 $1.60 $32.19 $2.30 $50.00 Street System Inspection Fees $10,401.78 LS 1 $45.00 $45.00 EACH 2 $0.00 $0.00 $30.00 $60.00 LF 0 $0.00 $0.00 $0.40 $0.00 SF 1,694 $3,726.80 Pavement Age 10 Excavation Permit Fees $3,831.80 TOTAL INSPECTION FEES $14,693.58 $29,804.76 Water Meter Pit (1 1/2") Water Meter Pit (3" ) INFRASTRUCTURE CONSTRUCTION COST PER UNIT (COST ESTMATE APPROVED BY THE CITY) TOTAL ESTIMATED INFRASTRUCTURE COST INSPECTION FEE PER UNIT (SET BY THE CITY) Water Connection/Disconnect Sanitary Sewer System Sewer Main Sewer Manhole Sewer Service Line Stub Sewer Main Connection/Disconnect Water System Water Main Water Service Line Stub TOTAL INSPECTION FEE 8/8/2023 Ridgewood Hills Fifth Filing - MA UNIT OF MEASURE ESTIMATED QUANTITY (PROVIDED BY PROJECT ENGINEER) DESCRIPTION (ALL PUBLIC & APPLICABLE PRIVATE* IMPROVEMENTS) TOTAL PUBLIC INFRASTRUCTURE COST Boring Concrete Pavement Application Potholing Pavement Impact Fees Curb & Gutter Drive Approach Trench - Storm Trench - Sewer Trench - Water Excavation Permit Retaining Wall (Concrete, Masonry, Stone) Asphalt Pavement Sidewalk** Pedestrian Ramps Apron Gutter Cross Pan Fire Access Grass Crete Storm Chase Storm Inlet All Types Storm Manhole Street System & Trenching Water Fire Hydrant Water Valves Water Meter Pit (3/4" ) * PRIVATE IMPROVEMENTS REQUIRING CITY INSPECTIONS WILL NEED TO BE INCLUDED. HOWEVER PRIVATE IMPROVEMENTS WILL NOT BE INCLUDED IN THE TOTAL INFRASTRUCTURE COST FOR BONDING ** INCREASE SIDEWALK LENGTH FOR ANY SIDEWALKS WIDER THAN 4.5' IN WIDTH. STANDARD SIDEWALK INSPECTION FEE WIDTH IS 4.5' Water Main (Fire Line)* Water Meter Pit (2" ) Water Meter Pit (1") Water Fitting (Bend/Tee/Cross) Grading Fire Line Fitting (Bend/Tee/Cross)* Public Storm Sewer System Storm Reinforced Concrete Pipe Storm Concrete Headwall/Wing Walls Box Culvert