Loading...
HomeMy WebLinkAboutBLOOM FILING SIX - PDP230017 - SUBMITTAL DOCUMENTS - ROUND 1 - PROJECT NARRATIVE LOVELAND, COLORADO WWW.PLANSCAPESDESIGNGROUP.COM PLANSCAPES DESIGN GROUP Land Planning | Landscape Architecture 970-988-5301 | 303-585-1055 Date: December 16, 2023 To: Development Review Center 281 N College Ave Fort Collins CO 80522 Re: Project Narrative Bloom Tract II The site is located north of East Mulberry Street, on the east side of Delozier Drive and is roughly 5 acres in size. Described as Tract II of the Bloom Filing One subdivision, the site is zoned C-G General Commercial. The proposal includes development of the site into 4 commercial lots ranging in size from 1.2 acres to 0.6 acres. The anticipated land uses are listed below. However, please keep in mind these may change as the developer is only proposing the Project Development Plan and Subdivision of the site at this time: • Retail • Fast Food • Car Wash • Coffee Shop The site will provide a singular access point from the Frontage Road, a private drive is shown on the interior of the development traveling N/S with a central roundabout feature. The northern edge of the site serves as detention as well as the A Natural Habitat Buffer Zone that is required along the ditch. The proposed project is attempting to meet all requirements of the Land Use Code and no known deviations or variations are being requested at this stage. Currently, the land owner is Mulberry SF LLC. Prior to the Project Development Plan and Subdivision Plat being approved and completed with the City, the ownership will transfer to MIC TDC Mulberry St Fort Collins, LLC. It is the developer’s intent to sell or lease the commercial lots to future businesses/land users that will ultimately fully 2 develop each lot, although at this time we do not have confirmation of the new ownership. As part of the Project Development Plan, a Subdivision Plat with the associated Civil Construction Plans is being provided. The applicant has attended meetings and exchanged several communications via email and/or virtual meetings with city staff as well, the milestone meetings are listed below: • Conceptual Design Review Meeting: April 14, 2023. • Preliminary Design Review Meeting: A formalized meeting was not conducted, although this was completed over several email exchanges with City staff and the applicant team. • Neighborhood Meeting: November 29, 2023. Sincerely, Planscapes Design Group