Loading...
HomeMy WebLinkAboutBLUE SKY SELF STORAGE AT RUDOLPH FARM - PDP230013 - SUBMITTAL DOCUMENTS - ROUND 3 - RESPONSE TO STAFF REVIEW COMMENTS AAApppeeerrriiiooo Property Consultants, llc   December 13, 2023    City of Fort Collins  Community Development & Neighborhood Services  281 N. College Ave.  Fort Collins, CO 80522‐0580    Re:  Blue Sky Self‐Storage at Rudolph Farm  Preliminary Development Plan  Response to 2nd PDP Comments issued 11/17/2023    Comment Summary: Department: Development Review Coordinator Contact: Brandy Bethurem Harras bbethuremharras@fcgov.com 970-416-2744 Topic: General Comment Number: 1 09/18/2023: INFORMATION: I will be your primary point of contact throughout the development review and permitting process. If you have any questions, need additional meetings with the project reviewers, or need assistance throughout the process, please let me know and I can assist you and your team. Please include me in all email correspondencewith other reviewers and keep me informed of any phone conversations. Thank you! Comment Number: 2 09/18/2023: SUBMITTAL: As part of your resubmittal, you will respond to the comments provided in this letter. This letter is provided to you in Microsoft Word format. Please use this document to insert responses to each comment for your submittal, using a different font color. When replying to the comment letter please be detailed in your responses, as all comments should be thoroughly addressed. Comments requiring action should NOT have a response such as noted or acknowledged. You will need to provide references to specific project plans, pages, reports, or explanations of why comments have not been addressed [when applicable]. Comment Number: 3 09/18/2023: SUBMITTAL: Correct file naming is required as part of a complete submittal. Please follow the Electronic Submittal Requirements and File Naming Standards found here: https://www.fcgov.com/developmentreview/files/electronic-submittal-requirements-and-file-naming-stan dards_v1_8-1-19.pdf?1680306305. File names should have the corresponding number, followed by the file type prefix, project information, and round number. For example: 1_SITE PLAN Project Name_FDP_Rd1. A list of numbers and prefixes for each file can be found at the link above. 4032 Defoe St., Strasburg, CO 80136  Phone 303.317.3000  aaron@aperiopc.com Blue Sky Self‐Storage at Rudolph Farm  Preliminary Development Plan  Response to 2nd Submittal Comments  December 13, 2023  2 Comment Number: 4 11/13/2023: SUBMITTAL - UPDATE: Please do not flatten redline responses - Thank you! Left unflattened. 09/18/2023: SUBMITTAL: All plans should be saved as optimized/flattened PDFs to reduce file size and remove layers. Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be removed from the PDF’s. AutoCAD turns drawing text into comments that appear in the PDF plan set, and these must be removed prior to submittal as they can cause issues with the PDF file. The default setting is "1" ("on") in AutoCAD. To change the setting and remove this feature, type "EPDFSHX" (version 2016.1) or “PDFSHX (version 2017 and newer) in the command line and enter "0". Read this article at Autodesk.com for more on this topic: https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarticles/sfdcarticles/Drawin g-text-appears-as-Comments-in-a-PDF-created-by-AutoCAD.html Comment Number: 5 09/18/2023: SUBMITTAL: Resubmittals are accepted any day of the week, with Wednesday at noon being the cut-off for routing the same week. When you are preparing to resubmit your plans, please notify me with an expected submittal date with as much advanced notice as possible. Comment Number: 6 09/18/2023: INFORMATION: Please resubmit within 180 days, approximately 6 months, to avoid the expiration of your project. Comment Number: 7 09/18/2023: NOTICE: A Development Review sign will be posted on the property. This sign will be posted through the final decision and appeal process. A request for the removal of signs will be made by your Development Review Coordinator at the appropriate time. Comment Number: 8 09/18/2023: FOR HEARING: All "For Hearing" comments need to be addressed and resolved prior to moving forward with scheduling the Hearing. Staff will need to agree the project is ready for Hearing approximately 4 to 8 weeks prior to the hearing. Noted, “For Hearing” comments have been addressed, at a minimum.  Comment Number: 9 09/18/2023: FOR HEARING: This proposed project is processing as a Type 2 Development Plan. The decision maker for Type 2 is the Planning and Zoning (P&Z) Commission. For the hearing, we will formally notify surrounding property owners within 800 feet (excluding public right-of-way and publicly owned open space). Noted. Blue Sky Self‐Storage at Rudolph Farm  Preliminary Development Plan  Response to 2nd Submittal Comments  December 13, 2023  3 Department: Planning Services Contact: Kai Kleer kkleer@fcgov.com 970-416-4284 Topic: General Comment Number: 2 11/14/2023 FOR HEARING - UPDATED: Thank you for changing the body colors of phase two buildings to better match the primary storage building that is part of phase one.There still remains compliance issues with a the base treatment. Please extend the tan stone veneer as a base treatment to all highly visible sides of the building. See 3.5.3(E)(6) which requires a recognizable base that consists of thicker walls, leges, or sills, stone or other masonry. The stucco texture metal panels are a prohibited as a primary external surface material. 3.9.5(C)(3) states, Metal is prohibited as a primary exterior surface material. It may be used as trim material covering no more than ten (10) percent of the facade or as a roof material. There is some question from the planning group of the grey vertical banding and the high contrast between the dark grey and light tan colors of the building. Staff is suggesting making the dark gray lighter in color or only utilizing the darker banding when there is a significant change in wall plane. Let's chat more about this comment. Following our discussions with City Staff held by phone as a follow‐up to the second round  PDP review comments, we've made several revisions to Building A in order to balance out  the purpose and intent of the Land Use Code requirements. The color palette has been  shifted to generally more warmer tones towards brown/tan/buff and reduction of the  cooler grey colors previously submitted. We've added articulation to the exterior walls by  creating recessed bays on the facade which provides depth. Additional projecting  elements such as sunshades and other items have been added. A detail for the stucco  band has been added to the drawings.  09/26/2023 FOR HEARING: Regarding building architecture, the vision and guidance from the I-25 Subarea Plan speaks about creating a distinctive identity for interchange areas of the City. This generally translates to utilizing natural tones that are local and authentic to Fort Collins, such as buff sandstone. This is a theme that is pervasive at several interchanges such as the 392/I-25 and Harmony interchange seen to the right. Staff recommends utilizing a buff sandstone veneer and complementary colors wherever possible on the site. Comment Number: 3 11/14/2023 FOR HEARING - UNRESOLVED: A person door is still needed for the trash enclosure. Acknowledged. A walk door/gate has been added to the side of the trash enclosure and is  shown on the revised elevations.    9/26/2023 FOR HEARING A person door is required for enclosures. Comment Number: 5 Blue Sky Self‐Storage at Rudolph Farm  Preliminary Development Plan  Response to 2nd Submittal Comments  December 13, 2023  4 11/14/2023: FOR HEARING: It appears that the Phase 2 building roof form has not changed from Round 1 comments. For clarity, the I-25 Standards require that buildings less than 10,000 square feet be peaked or mansard with a minimum of a 5:12 pitch and one of these four treatments every 50 lineal feet: projecting gable/dormer, hip, horizontal or vertical break, or three or more roof planes. Please refer to 3.9.5(A) for more information. We've made substantial modifications to the Phase 2 buildings which face adjacent  developments and Carriage Parkway. The roof forms have been revised and we've  incorporated building forms, materials and features which address the requirements  found in the I‐25 Corridor Design Standards. Please refer to the revised elevation sheets  for further details. Note also that Building E does just exceed 10,000 sf and therefore  should not require a pitched roof. We did investigate this during redesign, however the  depth of the structure in conjunction with the minimum slope resulted in a very large roof  adjacent to the east property line and a ridge that was approaching the height of Building  A. It was not felt that this spoke to the intent of the standards, so we've prepared a  design for Building E which draws upon elements from Building A but also has pitched  roof features which provide articulation, changes in parapet height and other visual  interest while minimizing scale and impact. Materials have also been significantly revised  for the outer Phase 2 buildings, as have the colors to consolidate the palette across the  project.  Comment Number: 6 11/14/2023 FOR HEARING: It was originally thought that the center modules of the primary building provided articulation in massing, however, it appears that the north facing facade is largely flat. Standards require (3.5.3(D)(1)) that horizontal masses shall not exceed a height:width ratio of 1:3 without substantial variation in massing that includes a change in height and a projecting or recessed elements. Please revise this elevation. This comment somewhat dovetails with a color banding comment found earlier. Please also see the facade treatment standards found under 3.5.3(E)(2). We've revised the exterior elevations on Building A to add recessed bays on the north and  east sides to address the massing variation concern.  Department: Engineering Development Review Contact: Sophie Buckingham sbuckingham@fcgov.com Topic: General Comment Number: 5 11/14/2023: FOR HEARING: Please adjust the sight triangles on the landscape plan. I have sketched sight triangles that are more accurate based on LCUASS Figure 7-16. Ensure that all vegetation in the sight triangles has a maximum mature height of 24 inches, except deciduous trees, which are permitted as long as no branches or leaves hang less than 6 feet above the ground. Take care to preserve sight lines with tree Blue Sky Self‐Storage at Rudolph Farm  Preliminary Development Plan  Response to 2nd Submittal Comments  December 13, 2023  5 placements. Please add a sight distance note to the landscape plan, containing this information in your own words.   Sight distance triangles have been added to the landscape plan and site plan. Comment Number: 6 11/14/2023: FOR HEARING: Within the sight distance triangles, please sign these sections of Carriage Parkway as No Parking. No Parking signs have been added. Comment Number: 7 11/14/2023: FOR FINAL PLAN: You will need to dedicate one emergency access easement and two sight distance easements with this project. These easements will need to be prepared by a Colorado licensed Professional Land Surveyor and submitted with the first round of FDP. Information about easement dedications, including fees, process guidelines, and deed templates, is available at https://www.fcgov.com/engineering/devrev.php#cb-38308-6601. Department: Traffic Operation Contact: Steve Gilchrist sgilchrist@fcgov.com 970-224-6175 Topic: General Comment Number: 1 09/25/2023: FOR INFORMATION: In order for this project to move forward, the Rudolph Farm Infrastructure project must be finalized prior to this project going to hearing. If any changes occur within the infrastructure project, they will need to be reflected in this project. Comment Number: 3 11/13/2023: FOR HEARING - UPDATED: The southern access is still a concern. Are larger trucks able to navigate the turns in and out of the access without hitting the median and signage? Can you confirm that there aren't any gates being proposed internal to the site at the entrances? A turning movement diagram is included in the resubmittal items, demonstrating both an  aerial fire truck and a WB 40 are able to negotiate the entrance with no conflicts.  No  fencing or gates are proposed with this development project.  09/25/2023: FOR HEARING: The proposed southern access is within close proximity to the trail crossing to the south. This is a signalized (RRFB) crossing and may require this access to be restricted to a right in, right out. It may be helpful to include the design of this crossing within this plan set. We would also like to verify that the northern access is in alignment with the potential access across Carriage. This may require further Blue Sky Self‐Storage at Rudolph Farm  Preliminary Development Plan  Response to 2nd Submittal Comments  December 13, 2023  6 coordination. Comment Number: 4 11/13/2023: FOR INFORMATION - UPDATED: These marked crosswalks are still shown within the Utility/Site Plans. Removed.  09/25/2023: FOR INFORMATION: The proposed marked crosswalks across the driveway accesses are not required, and if installed, would be the sole responsibility of the property owner to maintain. Signing and Pavement Markings will be reviewed in FDP. Comment Number: 5 09/25/2023: FOR INFORMATION: The Site Plan provides details for the Accessible Parking Signs and utilizes a t-post versus a standard telespar or u-channel post. Any signs installed in public right of way will need to be telespar. Would also recommend the use of telespar internal to your sight. Details on sign posts can be found in the Larimer County Urban Area Street Standards. Appendix A, Drawing 1401. Comment Number: 6 11/13/2023: FOR INFORMATION: The sight distance triangles provided in the Plan Set do not look like they are consistent with Larimer County Urban Area Street Standards, Figure 7-16. Please update and detail any potential conflicts that might occur with landscaping/parked vehicles on the east side of the roadway. If necessary we may require the developer to restrict parking adjacent to the access points, via additional signs. Department: Stormwater Engineering Contact: Dan Mogen dmogen@fcgov.com 970-305-5989 Topic: General Comment Number: 1 11/13/2023: FOR HEARING: Please see updated redlines. Fort Collins Stormwater Criteria is not being used in some of the calculations; please contact me with any questions about necessary updates. The coefficient spreadsheet has been updated.  Please see the runoff calculation  spreadsheets for response to comment.  09/22/2023: Please see redlines. I encourage you to reach out with any questions or to review potential revisions, and I’d be happy to set up a meeting or conference call to do so. Comment Number: 2 11/13/2023: FOR HEARING: Ultimately, Blue Sky plans will need to align with the approved Rudolph Farm plans, and I cannot verify the two sets are in alignment until the infrastructure project is approved and recorded. I will not review further Blue Sky submittals until after Rudolph Farm is approved so I am able to verify conformance as Blue Sky Self‐Storage at Rudolph Farm  Preliminary Development Plan  Response to 2nd Submittal Comments  December 13, 2023  7 necessary. 09/27/2023: There are some discrepancies between what is shown in the Rudolph Farm Infrastructure plan set and the plans submitted for this project - notably the storm sewer stub to this lot to be used as the outfall. Please review and align plans. The difference in the storm sewer stub on the FDP plans has been coordinated with the  overall site engineer (Northern Engineering) to reflect our more detailed site design.    Department: Water Conservation Contact: Emma Pett epett@fcgov.com Topic: General Comment Number: 1 09/19/2023: FOR FINAL PLAN: Preliminary irrigation plans are due at FDP should include a landscape plan, a water budget and hydrozone map. Your water budget must be under 15 gallons/square foot for the property annually. Final irrigation plans are due at building permit application, but we encourage you to submit them earlier in case changes need to be made. Detailed irrigation submittal requirements can be found here: https://www.fcgov.com/utilities//img/site_specific/uploads/irrigation-plan-submittal-reqs.pdf?164926026 7 Department: Light And Power Contact: Cody Snowdon csnowdon@fcgov.com 970-416-2306 Topic: General Comment Number: 1 11/14/2023: FOR HEARING - UPDATED: Please show the transformer location on the Landscape Plan to ensure minimum separations. The transformer is shown on the plan.  09/26/2023: FOR HEARING: The proposed transformer location is above Light & Power’s minimum distance from a drivable surface. The transformer must be placed within 10 ft of a drivable surface for installation and maintenance purposes. The transformer must also have a front clearance of 10 ft and side/rear clearance of 3 ft minimum. When located close to a building, please provide required separation from building openings as defined in Figures ESS4 - ESS7 within the Electric Service Standards. Please show all proposed transformer locations on the Utility Plans. Comment Number: 2 11/14/2023: FOR HEARING - UPDATED: The conductor on the east side of Carriage Parkway is only secondary wire for streetlights. Primary cable for single-phase or three-phase power is located on the west side of Carriage Parkway. A vault will be required to intercept the primary feed at this location. Please update the utility plans to reflect a vault on the west side of the road and extend the primary Blue Sky Self‐Storage at Rudolph Farm  Preliminary Development Plan  Response to 2nd Submittal Comments  December 13, 2023  8 feed to that location. The plan has been updated with a vault and line extending to the west side of Carriage  Parkway.  09/26/2023: FOR HEARING: The primary feed for the subdivision is currently designed on the west side of Carriage Parkway and will be required to cross Carriage Parkway into the site. Please reflect this on the Utility Plans. Comment Number: 10 09/26/2023: FOR FINAL PLAN: Please coordinate meter locations with Light and Power and show on the utility plans during Final Design. These locations will need to comply with our electric metering standards. Electric meter locations will need to be coordinated with Light and Power Engineering. Reference Section 8 of our Electric Service Standards for electric metering standards. A link has been provided below. https://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandards_FINAL_18Novembe r2016_Amendment.pdf Comment Number: 11 09/26/2023: FOR FINAL PLAN: A Customer Owned Service Information Form (C-1 Form) and a one-line diagram for all commercial meters will need to be completed and submitted to Light & Power Engineering for review prior to Final Plan. A link to the C-1 Form is below: https://www.fcgov.com/utilities/img/site_specific/uploads/c-1_form.pdf?1597677310 Comment Number: 12 09/26/2023: FOR FINAL PLAN: On the one-line diagram, please show the main disconnect size and meter sequencing. A copy of our meter sequencing can be found in our electric policies practices and procedures below. http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guidelines-regulati ons Comment Number: 15 09/26/2023: NFORMATION: Electric capacity fees, development fees, building site charges and any system modification charges necessary to feed the site will apply to this development. Please contact me or visit the following website for an estimate of charges and fees related to this project: http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees Department: Environmental Planning Contact: Kristie Raymond kraymond@fcgov.com Topic: General Comment Number: 3 11/08/2023: FOR HEARING - UPDATED: 09/06/2023: FOR HEARING: Blue Sky Self‐Storage at Rudolph Farm  Preliminary Development Plan  Response to 2nd Submittal Comments  December 13, 2023  9 The Natural Habitat Buffer Zone needs to be delineated and labeled on the site, grading, utility, photometric, and landscape plan. Thanks for noting the NHBZ on most plans, please label it on the utility plan as well. Added to the Utility Plan.  Comment Number: 7 11/08/2023: FOR FINAL PLAN - UPDATED: 09/06/2023: FOR FINAL PLAN: Please include a water budget chart and hydrozone diagram with the next submittal that identifies all hydrozones and total annual water use on the site, per LUC section 3.2.1(E)(3). Total annual water use should not exceed 15 gallons/square foot over the site, including all hydrozones used on the landscape plan. Where are the different hydrozones located? Comment Number: 9 11/08/2023: FOR HEARING - UPDATED: 09/06/2023: FOR HEARING: Thank you for providing a photometric plan with this PDP submittal. Current plans illustrate light spillage into the natural habitat buffer zone. With respect to lighting, the City of Fort Collins Land Use Code, in Article 3.2.4(D)(6) requires that "natural areas and natural features shall be protected from light spillage from off-sitesources." Please update the lighting fixtures and photometric plan to remove this light spillage. Light spillage is still shown in the Natural Habitat Buffer Zone. Revised for zero light spillage onto the NHBZ..  Comment Number: 11 09/26/2023: FOR FINAL PLAN: Please ensure plantings next to the NHBZ are intentional, and are native species to provide a good transition from the NHBZ to development. Please refer to the City of Fort Collins Vegetation database (https://www.fcgov.com/vegetation/), and the Rudolph Farm infrastructure plan for approved seed lists and plantings that would compliment this project. Department: Forestry Contact: Christine Holtz choltz@fcgov.com Topic: General Comment Number: 3 11/09/2023: INFORMATION: The metro district will be planting a limited number of trees with the infrastructure project and will be waiting to plant other trees as developments occur. If the Metro District will be responsible for the planting of the trees in the ROW in front of your development, please ensure they follow your proposed tree planting schedule. Department: PFA Blue Sky Self‐Storage at Rudolph Farm  Preliminary Development Plan  Response to 2nd Submittal Comments  December 13, 2023  10 Contact: Marcus Glasgow marcus.glasgow@poudre-fire.org 970-416-2869 Topic: General Comment Number: 2 11/14/2023: UNRESOLVED - FOR FINAL PLAN: 09/25/2023: FOR FINAL PLAN: FIRE LANE LOADING - IFC Appendix D102.1 amendment Fire lanes shall be designed as a flat, hard, all-weather driving surface capable of supporting 80,000 pounds. Private drives used for fire lanes shall provide information confirming the design can handle fire truck loading. A note shall be added to the civil plans indicating all areas dedicated as EAE are capable of supporting 80,000 pounds. Comment Number: 3 11/14/2023: UPDATED - FOR FINAL PLAN: Fire lane signage is missing in the fire lane on the the East side of the building. Additional signage or striping will be required in this area. 09/25/2023: FOR FINAL PLAN: FIRE LANE SIGNS The limits of the fire lane shall be fully defined and fire lane sign locations should be indicated on future plan sets. Refer to LCUASS detail #1418 & #1419 for sign type, placement, and spacing. Appropriate directional arrows required on all signs. Posting of additional fire lane signage may be determined at time of fire inspection. Code language provided below. - IFC D103.6: Where required by the fire code official, fire apparatus access roads shall be marked with permanent NO PARKING - FIRE LANE signs complying with Figure D103.6. Signs shall have a minimum dimension of 12 inches wide by 18 inches high and have red letters on a white reflective background. Signs shall be posted on one or both sides of the fire apparatus road as required by Section D103.6.1 or D103.6.2. SIGN PLACEMENT - IFC D103.6.1; ROADS 20 TO 26 FEET IN WIDTH: Fire lane signs as specified in Section D103.6 shall be posted on both sides of fire apparatus access roads that are 20 to 26 feet wide. - IFC D103.6.1; ROADS MORE THAN 26 FEET IN WIDTH: Fire lane signs as specified in Section D103.6 shall be posted on one side of fire apparatus access roads more than 26 feet wide and less than 32 feet wide. Comment Number: 4 11/14/2023: UPDATED - FOR FINAL PLAN: Please include generic address to scale on Building Elevations. 09/25/2023: FOR FINAL PLAN: PREMISE IDENTIFICATION: ADDRESS POSTING & WAYFINDING – IFC section 505.1.1 amendment Where possible, the naming of private drives is usually recommended to aid in wayfinding. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be arabic numbers or alphabetical letters. Numbers shall not be spelled out. The address numerals for Blue Sky Self‐Storage at Rudolph Farm  Preliminary Development Plan  Response to 2nd Submittal Comments  December 13, 2023  11 any commercial or industrial buildings shall be placed at a height to be clearly visible from the street. They shall be a minimum of 8 inches in height unless distance from the street or other factors dictate larger numbers. Refer to Table 505.1.3 of the 2021 IFC as amended. If bronze or brass numerals are used, they shall only be posted on a black background for visibility. Monument signs may be used in lieu of address numerals on the building as approved by the fire code official. Buildings, either individually or part of a multi- building complex, that have emergency access lanes on sides other than on the addressed street side, shall have the address numbers and street name on each side that fronts the fire lane. Comment Number: 10 11/14/2023: FOR FINAL PLAN: FIRE LANE The fire lane shown on the plan will need to be dedicated as an Emergency Access Easement. The entrances into the site are less than 25 foot turning radius and a median has been added to the south entrance. Please provide an auto turn exhibit showing no body or wheel overhang for approval. While the curb return radii may be less there is sufficient surface width for a 25’ turning  radius into the site within the ROW and  easement area.  The median is being constructed  as part of the overall development, not specifically with this project.  A turning exhibit has  been prepared using an aerial apparatus and demonstrates that access into and out of the  site is sufficient.    Comment Number: 11 11/15/2023: FOR HEARING TURNING RADII - IFC 503.2.4 and Local Amendments: The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside. The entrances into the site are less than 25 foot turning radius and a median has been added to the south entrance. Please provide an autoturn exhibit showing no body or wheel overhang for approval. See response above for Comment 10. Department: Technical Services Contact: Jeff County jcounty@fcgov.com 970-221-6588 Topic: General Comment Number: 1 11/13/2023: INFORMATION: Unless required during PDP, a complete review of all plans will be done at FDP. Department: Outside Agencies Contact: Ethan Cozzens, Cache La Poudre Management Company, ecozzens@newcache.com, 970-352-0222 Blue Sky Self‐Storage at Rudolph Farm  Preliminary Development Plan  Response to 2nd Submittal Comments  December 13, 2023  12 Topic: General Comment Number: 1 09/18/2023: FOR HEARING: signed Crossing Agreement and a final signed Stormwater Discharge agreement from Rudolph Farm. These agreements were sent to the engineers of record on 7.17.23 for the developer’s review and approval. An acknowledgment was received of the email on that date but that is the last interaction we have had at this time. Additionally, we have not received payment as per our fees for these agreements. Department: Building Services Contact: Russell Hovland rhovland@fcgov.com 970-416-2341 Topic: Building Insp Plan Review Comment Number: 1 09/22/2023: BUILDING PERMIT: Self storage buildings must built as a S-1 occupancy and meet a 5000 sq.ft. max or be fire sprinkled. These buildings must also be located 20ft away from each other and 10ft to a property line for fire separation distance. They can also be built as a U occupancy with smaller area allowed. A city licensed general contractor is required for any commercial project. Comment Number: 2 09/22/2023: BUILDING PERMIT: Commercial Construction shall comply with adopted codes as amended. Current adopted codes are: 2021 International Building Code (IBC) with local amendments 2021 International Existing Building Code (IEBC) with local amendments 2021 International Energy Conservation Code (IECC) with local amendments 2021 International Mechanical Code (IMC) with local amendments 2021 International Fuel Gas Code (IFGC) with local amendments 2021 International Swimming Pool and Spa Code (ISPSC) with local amendments Colorado Plumbing Code & state amendments (currently 2021 IPC) 2023 National Electrical Code (NEC) as amended by the State of Colorado Projects shall comply with the current adopted building codes, local amendments and structural design criteria can be found here: https://www.fcgov.com/building/codes · Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2017. · Snow Live Load: Ground Snow Load 35 PSF. · Frost Depth: 30 inches. · Wind Loads: Risk Category II (most structures): · 140mph (Ultimate) exposure B or Front Range Gust Map published by The Structural Engineer's Association of Colorado · Seismic Design: Category B. · Climate Zone: Zone 5 · Energy Code: 2021 IECC commercial chapter. INFORMATIONAL ITEMS: · Commercial occupancies must provide 10ft to 30ft of fire separation (setback) from property lines and 20 feet between other buildings or provide fire rated walls and openings per chapter 6 and 7 of Blue Sky Self‐Storage at Rudolph Farm  Preliminary Development Plan  Response to 2nd Submittal Comments  December 13, 2023  13 the IBC.· City of Fort Collins adopted International Fire Code (IFC) and amendments to the 2018/2021 IFC require a full NFPA-13 sprinkler system per IBC chapter 9 or when building exceeds 5000 sq.ft. (or meet fire containment requirements). · Buildings using electric heat, must use heat pump equipment. · A City licensed commercial general contractor is required to construct any new commercial structure. · Plans must be signed and stamped by a Colorado licensed architect or engineer and must be included in the permit application. · Electric vehicle parking spaces are now required per local amendment to the IBC. See section 3604. · For projects located in Metro Districts, there are special additional code requirements for new buildings. Please contact the plan review team to obtain the requirements for each district. Building Permit Pre-Submittal Meeting: For new buildings, please schedule a pre-submittal meeting through your DRC for any new commercial or multi-family building with Building Services for this project. Pre-Submittal meetings assist the designer/builder by assuring, early on in the design, that the new projects are on track to complying with all of the adopted City codes and Standards.   If you should have any questions, or need any additional information, please don’t hesitate  to call me at 303‐317‐300 or email me at Aaron@aperiopc.com .      Sincerely,        Aaron Thompson  Aperio Property Consultants, LLC    Cc:  Tony Ollila, Uplift Development Group, LLC    Innes Henderson/Chris Aronson, VFLA Architecture    Greg Kelly, Kelly Development Services, LLC