HomeMy WebLinkAboutMONTAVA PHASE G AND IRRIGATION POND - BDR210013 - SUBMITTAL DOCUMENTS - ROUND 7 - SUPPORTING DOCUMENTATION (8)Sheet Number:
Project Number:
Pr
o
j
e
c
t
:
Cl
i
e
n
t
:
/U
S
E
R
S
/
M
A
T
T
/
E
L
C
/
S
H
A
R
E
D
/
P
R
O
J
E
C
T
S
-
2
0
1
5
_
2
0
1
9
/
1
7
2
5
-
M
O
N
T
A
V
A
/
1
7
2
5
-
0
2
-
F
I
L
E
S
/
1
7
2
5
-
M
A
S
T
E
R
P
L
A
N
/
0
1
-
R
E
S
O
U
R
C
E
/
T
I
T
L
E
_
B
L
O
C
K
/
P
U
D
_
S
U
B
M
I
T
T
A
L
/
2
4
X
3
6_
T
I
T
L
E
_
B
L
O
C
K
_
P
U
D
_
C
O
N
S
U
L
T
A
N
T
.
D
W
G
Pl
o
t
D
a
t
e
:
9/
1
3
/
2
0
1
8
1
0
:
3
4
A
M
P
l
o
t
t
e
d
B
y
:
Ma
t
t
h
e
w
L
a
m
b
e
r
t
Da
t
e
C
r
e
a
t
e
d
:
9/
1
3
/
2
0
1
8
Produced by:
Date:
Revision & Date:
X.X.
X.X.XXX
1734
HF
2
M
MO
N
T
A
V
A
MO
N
T
A
V
A
OV
E
R
A
L
L
U
T
I
L
I
T
Y
P
L
A
N
PU
D
M
A
S
T
E
R
P
L
A
N
DPZ CODESIGN
11/10/23
Regional Trail
Shared 2-way Trail
Potential 2-way Trail
1-way Bike Facility
Future 1-way Bike Facility
Bike Route
Future Bike Route
Key Pedestrian Connections
and Trails
Water Storage Area
Exposed Water Conveyance
Piped Water Conveyance
NOTES: Pedestrian sidewalks are not indicated in this
diagram, however they are provided on both sides of
every street. Pedestrian connections indicated are
special by being enhanced for safety, being in
important locations, or provided special amenities such
as bridges to cross exposed stormwater conveyance.
The size and location of all trail and stormwater
elements a approximate. They are intended to
communicate the general location and interaction of
these elements for diagrammatic purposes.
The City is responsible for the longterm maintenance of
the regional trail within the development. Maintenance
consists of snowplowing of the paved surface,
occasional seasonal mowing 23’ adjacent to the trail
surface, repairing/replacing surface damage of the trail.
The underlying property owner is responsible for all
other landscaping maintenance within the easement.
Landscaping shall be designed in accordance with all
applicable City codes. Spray irrigation, if required,
shall be designed and maintained to avoid spray on
the trail.
PH
A
S
E
E
TR
A
I
L
A
N
D
S
T
O
R
M
W
A
T
E
R
N
E
T
W
O
R
K
The above drawings, ideas and designs are the property of DPZ Partners. No part thereof shall be copied, disclosed to others, or
used in connection with any work other than for the specific project for which they have been prepared without the written consent of
the architects/
town planners. Preliminary-this is a conceptual drawing not to be used for engineering, surveying, or construction.
0
50
10
0
20
0
30
0
40
0
50
0
Fe
e
t
MAPLE HILL SUBDIVISION
FUTURE CITY OF FORT COLLINS PARK
SHARED IRRIGATION POND
FUTURE ELEMENTARY SCHOOL
ST
O
R
Y
B
O
O
K
S
U
B
D
I
V
I
S
I
O
N
MONTAVA FUTURE PHASE D
FUTURE CITY OF FORT COLLINS PARK
Potential future trail connection
to be determined and designed by
the city. This potential alignment
connects Mountain Vista bike
lanes with Phase G shared path
through the future park and north
through Maple Hill and beyond.
Ba
r
H
a
r
b
o
r
D
r
i
v
e
(
w
/
b
i
k
e
l
a
n
e
s
)
Potential future trail connection to
be determined and designed
by the city.
Mountain Vista bicycle lanes.
Mountain Vista bicycle lanes.
MOUNTAIN VISTA MOUNTAIN VISTA
Connection to Maple Hill
shared path.
Regional trail, future connection
to Richard’s Lake.
Phase G shared path connection
from Mountain Vista to the future
city park.
Bicycle Route
Piped stormwater from Storybook,
connected to No. 8 ditch.
WEST MONTAVA OUTFALL SYSTEM
Potential shared path along
the edge of Phase G and
Timberline to be determined
and designed by the city.
No. 8 ditch in below grade pipe.
Potential future trail connection to
be determined and designed by the
city. Alignment to be determined.
Future enhanced
pedestrian-focused crossing
Bike and
pedestrian-
focused
crossings
Shared connection to future
Phase E pedestrian ways.
Pedestrian trails connect through
park north to the elementary
school and south to Phase E and
future Phase D.
Connections to future Phase D.
Detention pond / play fields:
Conveyance continues to
regional detention area.
Potential water quality
Subsurface water quality
Approximate 100
year flood limits
MONTAVA FUTURE PHASE H MONTAVA FUTURE PHASE I
Regional trail coincident with No.
8 ditch pipe easement.
Regional trail diverges
to underpass
Mountain Vista bicycle lanes.
Mountain Vista bicycle lanes.Regional Trail underpass included
in Timberline Drive work
MONTAVA PHASE E
MONTAVA RECREATION PARK