Loading...
HomeMy WebLinkAboutPlans - Utility Plan - 11/15/2023MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S CO V E R S H E E T C1.0 UTILITY PLANS FOR MONTAVA SUBDIVISION PHASE G A PARCEL OF LAND SITUATED IN SECTION 32, TOWNSHIP 8 NORTH, RANGE 68 WEST OF THE SIXTH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO # 811 VICINITY MAP SITE ” MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S GE N E R A L N O T E S C1.1 ” “” MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S GE N E R A L N O T E S C1.2 “” “” – MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S GE N E R A L N O T E S C1.3 ” ’ ’ “" “” · · · · · · · · MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S GE N E R A L N O T E S C1.4 “” “” “” “ ” MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S GE N E R A L N O T E S C1.5 “ ” MONTAVA PHASE G MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S EX I S T I N G C O N D I T I O N S & D E M O P L A N C1.6 ER O S I O N C O N T R O L C O V E R S H E E T C2.0 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S STORMWATER MANAGEMENT PLANS FOR MONTAVA - PHASE G A PARCEL OF LAND SITUATED IN THE SOUTH HALF OF SECTION 32, TOWNSHIP 8 NORTH, RANGE 68 WEST OF THE SIXTH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO 811 VICINITY MAP SITE ” MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ER O S I O N C O N T R O L N O T E S “” “” “ ” C2.1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S IN I T I A L E R O S I O N C O N T R O L P L A N C2.2 SE E S H E E T C2 . 3 SEE SHEET C2.4 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S IN I T I A L E R O S I O N C O N T R O L P L A N C2.3 SE E S H E E T C2 . 2 SEE SHEET C2.5 SE E S H E E T C2 . 4 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S IN I T I A L E R O S I O N C O N T R O L P L A N C2.4 SEE SHEET C2.2 SE E S H E E T C2 . 5 SE E S H E E T C2 . 5 SE E S H E E T C2 . 3 SEE SHEET C2.7 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S IN I T I A L E R O S I O N C O N T R O L P L A N C2.5SEE SHEET C2.3 SE E S H E E T C2 . 4 SE E S H E E T C2 . 4 SEE SHEET C2.6 SE E S H E E T C2 . 7 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S IN I T I A L E R O S I O N C O N T R O L P L A N C2.6 SEE SHEET C2.5 SE E S H E E T C2 . 7 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S IN I T I A L E R O S I O N C O N T R O L P L A N C2.7 SEE SHEET C2.4 SE E S H E E T C2 . 5 SE E S H E E T C2 . 6 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S IN T E R I M E R O S I O N C O N T R O L P L A N C2.8 SE E S H E E T C2 . 9 SEE SHEET C2.10 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S IN T E R I M E R O S I O N C O N T R O L P L A N C2.9 SE E S H E E T C2 . 8 SEE SHEET C2.11 SE E S H E E T C2 . 1 0 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S IN T E R I M E R O S I O N C O N T R O L P L A N C2.10 SEE SHEET C2.8 SE E S H E E T C2 . 1 1 SE E S H E E T C2 . 1 1 SE E S H E E T C2 . 9 SEE SHEET C2.13 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S IN T E R I M E R O S I O N C O N T R O L P L A N C2.11SEE SHEET C2.9 SE E S H E E T C2 . 1 0 SE E S H E E T C2 . 1 0 SEE SHEET C2.12 SE E S H E E T C2 . 1 3 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S IN T E R I M E R O S I O N C O N T R O L P L A N C2.12 SEE SHEET C2.11 SE E S H E E T C2 . 1 3 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S IN T E R I M E R O S I O N C O N T R O L P L A N C2.13 SEE SHEET C2.10 SE E S H E E T C2 . 1 1 SE E S H E E T C2 . 1 2 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S FI N A L E R O S I O N C O N T R O L P L A N C2.14 SE E S H E E T C2 . 1 5 SEE SHEET C2.16 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S FI N A L E R O S I O N C O N T R O L P L A N C2.15 SE E S H E E T C2 . 1 4 SEE SHEET C2.17 SE E S H E E T C2 . 1 6 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S FI N A L E R O S I O N C O N T R O L P L A N C2.16 SEE SHEET C2.14 SE E S H E E T C2 . 1 7 SE E S H E E T C2 . 1 7 SE E S H E E T C2 . 1 5 SEE SHEET C2.19 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S FI N A L E R O S I O N C O N T R O L P L A N C2.17SEE SHEET C2.15 SE E S H E E T C2 . 1 6 SE E S H E E T C2 . 1 6 SEE SHEET C2.18 SE E S H E E T C2 . 1 9 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S FI N A L E R O S I O N C O N T R O L P L A N C2.18 SEE SHEET C2.17 SE E S H E E T C2 . 1 9 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S FI N A L E R O S I O N C O N T R O L P L A N C2.19 SEE SHEET C2.16 SE E S H E E T C2 . 1 7 SE E S H E E T C2 . 1 8 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S C2.20 OF F S I T E E R O S I O N C O N T R O L P L A N - O V E R A L L MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OF F S I T E E R O S I O N C O N T R O L P L A N - I N I T I A L & I N T E R I M C2.21 SE E S H E E T C2 . 2 2 SEE SHEET C2.23 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OF F S I T E E R O S I O N C O N T R O L P L A N - I N I T I A L & I N T E R I M C2.22 SEE SHEET C2.24 SE E S H E E T C2 . 2 1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OF F S I T E E R O S I O N C O N T R O L P L A N - I N I T I A L & I N T E R I M C2.23 SEE SHEET C2.21 SE E S H E E T C2 . 2 4 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OF F S I T E E R O S I O N C O N T R O L P L A N - I N I T I A L & I N T E R I M C2.24 SEE SHEET C2.22 SE E S H E E T C2 . 2 3 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OF F S I T E E R O S I O N C O N T R O L P L A N - F I N A L C2.25 SE E S H E E T C2 . 2 6 SEE SHEET C2.27 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OF F S I T E E R O S I O N C O N T R O L P L A N - F I N A L C2.26 SEE SHEET C2.28 SE E S H E E T C2 . 2 5 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OF F S I T E E R O S I O N C O N T R O L P L A N - F I N A L C2.27 SEE SHEET C2.25 SE E S H E E T C2 . 2 8 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OF F S I T E E R O S I O N C O N T R O L P L A N - F I N A L C2.28 SEE SHEET C2.26 SE E S H E E T C2 . 2 7 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ER O S I O N C O N T R O L D E T A I L S C2.29 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ER O S I O N C O N T R O L D E T A I L S C2.30 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ER O S I O N C O N T R O L D E T A I L S C2.31 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ER O S I O N C O N T R O L D E T A I L S C2.32 SEDIMENT BASIN INFORMATION SEDIMENT BASIN DISTURBED TRIBUTARY AREA (ACRES) UNDISTURBED TRIBUTARY AREA (ACRES)REQUIRED STORAGE (ACRE-FT)PROVIDED STORAGE (ACRE-FT) E T AA B2 B2 B2 B2 B2 B2 T TB1B1B1B1B1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S AR E A G R A D I N G P L A N S C3.0 SEE SHEET C3.2 SE E S H E E T C3 . 1 B1/B2 T *** ” T T B2 B2 TB2B2B2B2B2 B2 B2 B2 B2 B2 T MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S AR E A G R A D I N G P L A N S C3.1 SEE SHEET C3.3 SE E S H E E T C3 . 0 A B T *** ” B2 B2 T T T^B1 B1 B1 B1 B1 B2 T B1 T B2 B2 T B1 B1 B1 T B2 B2 T T B1 B1 T T T^B1 B1 B1 B1 T^ B2 B2 B2 B2 B2 B2 T B1 B1 TAA BB MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S AR E A G R A D I N G P L A N S C3.2 SEE SHEET C3.5 SEE SHEET C3.0 SE E S H E E T C3 . 3 *** ” B1/B2 T T B1 B2 T B2 B2 T B1 B1 B1 T T^B1 B1 T^ T^B1 B1 T^ T^B1 T^ B1 B1 B1 B1 B1 B1 B1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S AR E A G R A D I N G P L A N S C3.3 SEE SHEET C3.6 SEE SHEET C3.1 SE E S H E E T C3 . 7 SE E S H E E T C3 . 2 *** ” B1/B2 T B1 T B2 B2 B2 B2 B2 B1 B1 B1 T T B2 T B1T^ T^ T B1 B1 B1 B1 B1 B1 B1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S AR E A G R A D I N G P L A N S C3.4 SEE SHEET C3.7 SE E S H E E T C3 . 3 ” B1/B2 T T B2 B2 B2 T B2 T B1 B1 T T B1 T B1 B1 B1 B1 B1 B1 B1 T AA T MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S AR E A G R A D I N G P L A N S C3.5 SEE SHEET C3.2 S E E S H E E T C 3 . 6 *** ” B1/B2 T B1 B1 T T B1 T T B1 B1 B1 B2 T T B1 B2 T B2 B2 B2 B2 B2 T T^ T B1 B1 B1 B1 B1 T^ AR E A G R A D I N G P L A N S C3.6 SEE SHEET C3.3 SE E S H E E T C3 . 7 SE E S H E E T C3 . 5 *** ” B1/B2 T MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S T B1 B1 B1 T T B1 B1 T B2 B2 T B1 B1 B1 B1 B1 B1 B1 B1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S AR E A G R A D I N G P L A N S C3.7 SEE SHEET C3.4 SE E S H E E T C3 . 6 *** ” B1/B2 T MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S AR E A G R A D I N G P L A N S C3.8 ” CHESAPEAKE DR MA T C H L I N E S T A . 1 6 + 5 0 SE E S H E E T C4 . 1 MA T C H L I N E S T A . 1 6 + 5 0 SE E S H E E T C4 . 1 BELLFIELD AVENUE SEE SHEET C4.2 GOLLINGS STREET SEE SHEET C4.9 ALLEY 11 SEE SHEET C4.17 BELLFIELD AVENUE SEE SHEET C4.3 GOLLINGS STREET SEE SHEET C4.9 ALLEY 9 SEE SHEET C4.15 ALLEY 13 SEE SHEET C4.17 ALLEY 10 SEE SHEET C4.16 REFER TO SHEET C4.22 FOR INTERSECTION DETAIL REFER TO SHEET C4.22 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S CH E S A P E A K E D R ( S T A 1 0 + 0 0 T O 1 6 + 5 0 ) P L A N A N D P R O F I L E C4.0 CHESAPEAKE LEFT FL PROFILE CHESAPEAKE RIGHT FL PROFILE CHESAPEAKE RIGHT FL PROFILE (2)CHESAPEAKE RIGHT FL PROFILE (3) MA T C H L I N E SE E S H E E T C4 . 1 A MA T C H L I N E SE E S H E E T C4 . 1 A MA T C H L I N E S T A . 1 6 + 5 0 SE E S H E E T C4 . 1 A REFER TO SHEET C4.22 FOR INTERSECTION DETAIL REFER TO SHEET C4.22 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S CH E S A P E A K E D R ( S T A 1 0 + 0 0 T O 1 6 + 5 0 ) F L O W L I N E P L A N A N D P R O F I L E C4.0A CHESAPEAKE DR MA T C H L I N E S T A . 1 6 + 5 0 SE E S H E E T C4 . 0 MA T C H L I N E S T A . 1 6 + 5 0 SE E S H E E T C4 . 0 PEACHLEAF STREET SEE SHEET C4.10 PEACHLEAF STREET SEE SHEET C4.11 WADE S T R E E T SEE SHE E T C4.4 WADE STREET SEE SHEET C4.5 ALLEY 19 SEE SHEET C4.19REFER TO SHEET C4.22 FOR INTERSECTION DETAIL REFER TO SHEET C4.23 FOR INTERSECTION DETAIL REFER TO SHEET C4.24 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S CH E S A P E A K E D R ( S T A 1 6 + 5 0 T O E N D ) PL A N A N D P R O F I L E C4.1 CHESAPEAKE LEFT FL PROFILE CHESAPEAKE LEFT FL PROFILE (2) CHESAPEAKE RIGHT FL PROFILE (3)CHESAPEAKE RIGHT FL PROFILE (4) MA T C H L I N E SE E S H E E T C4 . 0 A MA T C H L I N E SE E S H E E T C4 . 0 A MA T C H L I N E S T A . 1 6 + 5 0 SE E S H E E T C4 . 0 A REFER TO SHEET C4.22 FOR INTERSECTION DETAIL REFER TO SHEET C4.23 FOR INTERSECTION DETAIL REFER TO SHEET C4.24 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S CH E S A P E A K E D R ( S T A 1 6 + 5 0 T O E N D ) FL O W L I N E P L A N A N D P R O F I L E C4.1A BELLFIELD AVE MA T C H L I N E S T A . 1 6 + 0 0 SE E S H E E T C4 . 3 MA T C H L I N E S T A . 1 6 + 0 0 SE E S H E E T C4 . 3 SUMMERSIDE DRIVE SEE SHEET C4.8 SUMMERSIDE DRIVE SEE SHEET C4.8 ALLEY 2 SEE SHEET C4.12 ALLEY 14 SEE SHEET C4.17 ALLEY 1 SEE SHEET C4.12 ALLEY 12 SEE SHEET C4.17 REFER TO SHEET C4.23 FOR INTERSECTION DETAIL REFER TO SHEET C4.23 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S BE L L F I E L D A V E ( S T A 1 0 + 0 0 T O 1 6 + 0 0 ) PL A N A N D P R O F I L E C4.2 BELLFIELD LEFT FL PROFILE BELLFIELD RIGHT FL PROFILEBELLFIELD RIGHT FL PROFILE (3) MA T C H L I N E SE E S H E E T C4 . 3 A MA T C H L I N E SE E S H E E T C4 . 3 A MA T C H L I N E S T A . 1 6 + 0 0 SE E S H E E T C4 . 3 A REFER TO SHEET C4.23 FOR INTERSECTION DETAIL REFER TO SHEET C4.23 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S BE L L F I E L D A V E ( S T A 1 0 + 0 0 T O 1 6 + 0 0 ) FL O W L I N E P L A N A N D P R O F I L E C4.2A BELLFIELD AVE MA T C H L I N E S T A . 1 6 + 0 0 SE E S H E E T C4 . 2 MA T C H L I N E S T A . 1 6 + 0 0 SE E S H E E T C4 . 2 CHESAPEAKE DRIVE SEE SHEET C4.0 LONG W O O D D R I V E SEE SH E E T C4.6 CHESAPEAKE DRIVE SEE SHEET C4.0 LONGWO O D D R I V E SEE SHEE T C4.6 REFER TO SHEET C4.22 FOR INTERSECTION DETAIL REFER TO SHEET C4.21 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S BE L L F I E L D A V E ( S T A 1 6 + 0 0 T O E N D ) PL A N A N D P R O F I L E C4.3 BELLFIELD LEFT FL PROFILE BELLFIELD LEFT FL PROFILE (2) BELLFIELD RIGHT FL PROFILE BELLFIELD RIGHT FL PROFILE (2) MA T C H L I N E SE E S H E E T C4 . 2 A MA T C H L I N E SE E S H E E T C4 . 2 A MA T C H L I N E S T A . 1 6 + 0 0 SE E S H E E T C4 . 2 A REFER TO SHEET C4.22 FOR INTERSECTION DETAIL REFER TO SHEET C4.21 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S BE L L F I E L D A V E ( S T A 1 6 + 0 0 T O E N D ) FL O W L I N E P L A N A N D P R O F I L E C4.3A WADE ST MA T C H L I N E S T A . 1 7 + 0 0 SE E S H E E T C4 . 5 MA T C H L I N E S T A . 1 7 + 0 0 SE E S H E E T C4 . 5 ALLEY 3 SEE SHEET C4.13 SUMMERSIDE DRIVE SEE SHEET C4.8 CHESAPEAK E D R I V E SEE SHEET C4.1 CHESAPEAK E D R I V E SEE SHEET C4.1 REFER TO SHEET C4.23 FOR INTERSECTION DETAIL REFER TO SHEET C4.24 FOR INTERSECTION DETAIL REFER TO SHEET C4.24 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA D E S T ( S T A 1 0 + 0 0 T O 1 7 + 0 0 ) PL A N A N D P R O F I L E C4.4 WADE LEFT FL PROFILE WADE RIGHT FL PROFILE WADE RIGHT FL PROFILE (2) MA T C H L I N E SE E S H E E T C4 . 5 A MA T C H L I N E SE E S H E E T C4 . 5 A MA T C H L I N E S T A . 1 7 + 0 0 SE E S H E E T C4 . 5 A REFER TO SHEET C4.23 FOR INTERSECTION DETAIL REFER TO SHEET C4.24 FOR INTERSECTION DETAIL REFER TO SHEET C4.24 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA D E S T ( S T A 1 0 + 0 0 T O 1 7 + 0 0 ) FL O W L I N E P L A N A N D P R O F I L E C4.4A WADE ST MA T C H L I N E S T A . 1 7 + 0 0 SE E S H E E T C4 . 4 MA T C H L I N E S T A . 1 7 + 0 0 SE E S H E E T C4 . 4 ALLEY 4 SEE SHEET C4.13 ALLEY 15 SEE SHEET C4.18 LONGWOOD DRIVE SEE SHEET C4.7 ALLEY 18 SEE SHEET C4.19 ALLEY 20 SEE SHEET C4.20 LONGWOOD DRIVE SEE SHEET C4.7 REFER TO SHEET C4.21 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA D E S T ( S T A 1 7 + 0 0 T O E N D ) PL A N A N D P R O F I L E C4.5 WADE LEFT FL PROFILE WADE RIGHT FL PROFILE (2) MA T C H L I N E SE E S H E E T C4 . 4 A MA T C H L I N E SE E S H E E T C4 . 4 A MA T C H L I N E S T A . 1 7 + 0 0 SE E S H E E T C4 . 4 A REFER TO SHEET C4.21 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA D E S T ( S T A 1 7 + 0 0 T O E N D ) FL O W L I N E P L A N A N D P R O F I L E C4.5A LONGWOOD DR MA T C H L I N E S T A . 3 0 + 5 0 SE E S H E E T C4 . 7 BELLFIELD AVENUE SEE SHEET C4.3 GO L L I N G S S T R E E T SE E S H E E T C4. 9 M A T C H L I N E S T A . 3 0 + 5 0 S E E S H E E T C 4 . 7 PEAC H L E A F S T R E E T SEE S H E E T C4.11 REFER TO SHEET C4.21 FOR INTERSECTION DETAIL REFER TO SHEET C4.21 FOR INTERSECTION DETAIL REFER TO SHEET C4.21 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S LO N G W O O D D R ( S T A 2 3 + 0 0 T O 3 0 + 5 0 ) PL A N A N D P R O F I L E C4.6 LONGWOOD RIGHT FL PROFILE LONGWOOD LEFT FL PROFILE MA T C H L I N E SE E S H E E T C4 . 7 A MA T C H L I N E SE E S H E E T C4 . 7 A M A T C H L I N E S T A . 3 0 + 5 0 S E E S H E E T C 4 . 7 A REFER TO SHEET C4.21 FOR INTERSECTION DETAIL REFER TO SHEET C4.21 FOR INTERSECTION DETAIL REFER TO SHEET C4.21 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S LO N G W O O D D R ( S T A 2 3 + 0 0 T O 3 0 + 5 0 ) FL O W L I N E P L A N A N D P R O F I L E C4.6A LONGWOOD DR MA T C H L I N E S T A . 3 0 + 5 0 SE E S H E E T C4 . 6 WADE STREET SEE SHEET C4.5 M A T C H L I N E S T A . 3 0 + 5 0 S E E S H E E T C 4 . 6 REFER TO SHEET C4.21 FOR INTERSECTION DETAIL REFER TO SHEET C4.21 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S LO N G W O O D D R ( S T A 3 0 + 5 0 T O E N D ) PL A N A N D P R O F I L E C4.7 LONGWOOD RIGHT FL PROFILE LONGWOOD LEFT FL PROFILE MA T C H L I N E SE E S H E E T C4 . 6 A MA T C H L I N E SE E S H E E T C4 . 6 A M A T C H L I N E S T A . 3 0 + 5 0 S E E S H E E T C 4 . 6 A REFER TO SHEET C4.21 FOR INTERSECTION DETAIL REFER TO SHEET C4.21 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S LO N G W O O D D R ( S T A 3 0 + 5 0 T O E N D ) FL O W L I N E P L A N A N D P R O F I L E C4.7A SUMMERSIDE DR & GOLLINGS ST MA T C H L I N E S T A . 1 9 + 0 0 SE E S H E E T C4 . 9 PEACHLEAF STREET SEE SHEET C4.10 WADE STREET SEE SHEET C4.4 WADE STREET SEE SHEET C4.4 BELLFIELD AVENUE SEE SHEET C4.2 BELLFIELD AVENUE SEE SHEET C4.2 AL L E Y 5 SE E S H E E T C4 . 1 2 GOLLINGS STREET MATCHLINE STA. 19+00 SEE SHEET C4.9 REFER TO SHEET C4.24 FOR INTERSECTION DETAIL REFER TO SHEET C4.23 FOR INTERSECTION DETAIL REFER TO SHEET C4.23 FOR INTERSECTION DETAIL REFER TO SHEET C4.23 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SU M M E R S I D E D R & G O L L I N G S S T (S T A . 1 0 + 0 0 T O 1 9 + 0 0 ) PL A N A N D P R O F I L E C4.8 SUMMERSIDE & GOLLINGS RIGHT FL PROFILE SUMMERSIDE & GOLLINGS RIGHT FL PROFILE (2) SUMMERSIDE & GOLLINGS LEFT FL PROFILE REFER TO SHEET C4.24 FOR INTERSECTION DETAIL REFER TO SHEET C4.23 FOR INTERSECTION DETAIL REFER TO SHEET C4.23 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SU M M E R S I D E D R & G O L L I N G S S T (S T A . 1 0 + 0 0 T O 1 9 + 0 0 ) FL O W L I N E P L A N A N D P R O F I L E C4.8A SE E S H E E T C4 . 8 B FO R C O N T I N U A T I O N SUMMERSIDE & GOLLINGS RIGHT FL PROFILE (3) SUMMERSIDE & GOLLINGS LEFT FL PROFILE (2) MA T C H L I N E SE E S H E E T C4 . 9 A MA T C H L I N E SE E S H E E T C4 . 9 A GOLLINGS STREET MATCHLINE STA. 19+00 SEE SHEET C4.9A REFER TO SHEET C4.23 FOR INTERSECTION DETAIL REFER TO SHEET C4.23 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SU M M E R S I D E D R & G O L L I N G S S T (S T A . 1 0 + 0 0 T O 1 9 + 0 0 ) FL O W L I N E P L A N A N D P R O F I L E C4.8B SE E S H E E T C4 . 8 A FO R C O N T I N U A T I O N SUMMERSIDE DR & GOLLINGS ST MA T C H L I N E S T A . 1 9 + 0 0 SE E S H E E T C4 . 8 MA T C H L I N E S T A . 1 9 + 0 0 SE E S H E E T C4 . 8 ALLEY 7 SEE SHEET C4.14 ALL E Y 8 SE E S H E E T C4. 1 4 ALLEY 9 SEE SH E E T C4.15 LON G W O O D D R I V E SEE S H E E T C4.6 L O N G W O O D D R I V E S E E S H E E T C 4 . 6 ALLEY 1 SEE SHEET C4.12 ALLEY 12 SEE SHEET C4.17 CHESAPEAKE DRIVE SEE SHEET C4.0 ALLEY 6 SEE SHEET C4.14 CHESAPEAKE DRIVE SEE SHEET C4.0 REFER TO SHEET C4.21 FOR INTERSECTION DETAIL REFER TO SHEET C4.22 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S GO L L I N G S S T ( S T A 1 9 + 0 0 T O E N D ) PL A N A N D P R O F I L E C4.9 SUMMERSIDE & GOLLINGS RIGHT FL PROFILE (3)SUMMERSIDE & GOLLINGS RIGHT FL PROFILE (4) SUMMERSIDE & GOLLINGS LEFT FL PROFILE (2)SUMMERSIDE & GOLLINGS LEFT FL PROFILE (3) MA T C H L I N E SE E S H E E T C4 . 8 B MA T C H L I N E SE E S H E E T C4 . 8 B MA T C H L I N E S T A . 1 9 + 0 0 SE E S H E E T C4 . 8 B REFER TO SHEET C4.21 FOR INTERSECTION DETAIL REFER TO SHEET C4.22 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S GO L L I N G S S T ( S T A 1 9 + 0 0 T O E N D ) FL O W L I N E P L A N A N D P R O F I L E C4.9A PEACHLEAF ST MA T C H L I N E S T A . 1 4 + 5 0 SE E S H E E T C4 . 1 1 MA T C H L I N E S T A . 1 4 + 5 0 SE E S H E E T C4 . 1 1 ALLEY 3 SEE SHEET C4.13 ALLEY 2 SEE SHEET C4.12 SUMMERSIDE DRIVE SEE SHEET C4.8 SUMMERSIDE DRIVE SEE SHEET C4.8 ALLEY 14 SEE SHEET C4.17 REFER TO SHEET C4.23 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S PE A C H L E A F S T ( S T A 1 0 + 0 0 T O 1 4 + 5 0 ) PL A N A N D P R O F I L E C4.10 PEACHLEAF LEFT FL PROFILE PEACHLEAF RIGHT FL PROFILE MA T C H L I N E SE E S H E E T C4 . 1 1 A MA T C H L I N E SE E S H E E T C4 . 1 1 A MA T C H L I N E S T A . 1 4 + 5 0 SE E S H E E T C4 . 1 1 A REFER TO SHEET C4.23 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S PE A C H L E A F S T ( S T A 1 0 + 0 0 T O 1 4 + 5 0 ) FL O W L I N E P L A N A N D P R O F I L E C4.10A PEACHLEAF ST MA T C H L I N E S T A . 1 4 + 5 0 SE E S H E E T C4 . 1 0 MA T C H L I N E S T A . 1 4 + 5 0 SE E S H E E T C4 . 1 0 CHESAPEAKE DRIVE SEE SHEET C4.1 ALLEY 4 SEE SHEET C4.13 ALLEY 1 5 & A L L E Y 1 6 SEE SHE E T C4.18 LON G W O O D D R I V E SEE S H E E T C4.7 LONG W O O D D R I V E SEE S H E E T C4.6 ALLEY 10 SEE SHEE T C4.16 CHESAPEAKE DRIVE SEE SHEET C4.0 REFER TO SHEET C4.21 FOR INTERSECTION DETAIL REFER TO SHEET C4.22 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S PE A C H L E A F S T ( S T A 1 4 + 5 0 T O E N D ) PL A N A N D P R O F I L E C4.11 PEACHLEAF LEFT FL PROFILE PEACHLEAF LEFT FL PROFILE (2) PEACHLEAF RIGHT FL PROFILE PEACHLEAF RIGHT FL PROFILE (2) MA T C H L I N E SE E S H E E T C4 . 1 0 A MA T C H L I N E SE E S H E E T C4 . 1 0 A MA T C H L I N E S T A . 1 4 + 5 0 SE E S H E E T C4 . 1 0 A REFER TO SHEET C4.21 FOR INTERSECTION DETAIL REFER TO SHEET C4.22 FOR INTERSECTION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S PE A C H L E A F S T ( S T A 1 4 + 5 0 T O E N D ) FL O W L I N E P L A N A N D P R O F I L E C4.11A ALLEY 1 BELLFIELD AVENUE SEE SHEET C4.2 GOLLINGS STREET SEE SHEET C4.8 PEACHLEAF STREET SEE SHEET C4.10 BELLFIELD AVENUE SEE SHEET C4.2 PEACHLEAF STREET SEE SHEET C4.10GOLLINGS STREET SEE SHEET C4.9 AL L E Y 3 SE E S H E E T C4 . 1 3 ALLEY 2ALLEY 5 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S AL L E Y 1 , 2 & 5 PL A N A N D P R O F I L E C4.12 ALLEY 3 PEACHLEAF STREET SEE SHEET C4.10 PEACHLEAF STREET SEE SHEET C4.10 WADE STREET SEE SHEET C4.4 WADE STREET SEE SHEET C4.4 AL L E Y 2 SE E S H E E T C4 . 1 2 PEACHLEAF STREET SEE SHEET C4.11 PEACHLEAF STREET SEE SHEET C4.11 WADE STREET SEE SHEET C4.5 WADE STREET SEE SHEET C4.4 AL L E Y 2 0 SE E S H E E T C4 . 2 0 ALLEY 4 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S AL L E Y 3 & 4 PL A N A N D P R O F I L E C4.13 ALLEY 6 GOLLINGS STREET SEE SHEET C4.9 GOLLINGS STREET SEE SHEET C4.9 GOLLINGS STREET SEE SHEET C4.9 GOLLINGS STREET SEE SHEET C4.9 GOLLINGS ST R E E T SEE SHEET C4.9 G O L L I N G S S T R E E T S E E S H E E T C4 . 9 AL L E Y 9 SE E S H E E T C4 . 1 5 ALLEY 7 ALLEY 8 ALLEY 8-2 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S AL L E Y 6 , 7 & 8 PL A N A N D P R O F I L E C4.14 ALLEY 9 CHESAPEAKE DRIVE SEE SHEET C4.0 CHESAPEAKE DRIVE SEE SHEET C4.0 GO L L I N G S S T R E E T SE E S H E E T C4 . 9 GO L L I N G S S T R E E T SE E S H E E T C4 . 9 ALLEY 8 SEE SH E E T C4.14 AL L E Y 1 1 SE E S H E E T C4 . 1 7 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S AL L E Y 9 PL A N A N D P R O F I L E C4.15 ALLEY 10 CHESAPEAKE DRIVE SEE SHEET C4.1 CHESAPEAKE DRIVE SEE SHEET C4.0 AL L E Y 1 3 SE E S H E E T C4 . 1 7 P E A C H L E A F S T R E E T S E E S H E E T C 4 . 1 1 PE A C H L E A F S T R E E T SE E S H E E T C4 . 1 1 ALLEY 1 5 SEE SHE E T C4.18 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S AL L E Y 1 0 PL A N A N D P R O F I L E C4.16 ALLEY 11 BELLFIELD AVENUE SEE SHEET C4.2 BELLFIELD AVENUE SEE SHEET C4.3 CH E S A P E A K E D R I V E SE E S H E E T C4 . 0 CH E S A P E A K E D R I V E SE E S H E E T C4 . 1 ALLEY 9 SEE SHEET C4.15 ALLEY 10 SEE SHEET C4.16 ALLEY 12 ALLEY 13 ALLEY 14 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S AL L E Y 1 1 , 1 2 , 1 3 & 1 4 PL A N A N D P R O F I L E C4.17 ALLEY 15 PEACHLEAF STREET SEE SHEET C4.11 PEA C H L E A F S T R E E T SEE S H E E T C4.1 1 WADE STREET SEE SHEET C4.5 WADE STREET SEE SHEET C4.5 A L L E Y 1 0 S E E S H E E T C 4 . 1 6 AL L E Y 1 8 SE E S H E E T C4 . 1 9 ALLEY 16 ALLEY 17 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S AL L E Y 1 5 , 1 6 & 1 7 PL A N A N D P R O F I L E C4.18 ALLEY 18ALLEY 19 WA D E S T R E E T SE E S H E E T C4 . 5 WA D E S T R E E T SE E S H E E T C4 . 5 ALLEY 20 SEE SHEET C4.20 CHESAPEAK E D R I V E SEE SHEET C4.1 CHESAPEAK E D R I V E SEE SHEET C4.1 ALLEY 15 SEE SHEET C4.18 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S AL L E Y 1 8 & 1 9 PL A N A N D P R O F I L E C4.19 ALLEY 20 WADE STREET SEE SHEET C4.4 ALLEY 19 SEE SHEET C4.19 ALLEY 19 SEE SHEET C4.19 WADE STREET SEE SHEET C4.5 AL L E Y 4 SE E S H E E T C4 . 1 3 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S AL L E Y 2 0 PL A N A N D P R O F I L E C4.20 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S IN T E R S E C T I O N D E T A I L S C4.21 1 1 43 4 3 5 2 2 5 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S C4.22 6 6 7 7 8 8 IN T E R S E C T I O N D E T A I L S MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S C4.23 10 11 12 10 11 12 9 9 IN T E R S E C T I O N D E T A I L S MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S C4.24 14 14 13 13 IN T E R S E C T I O N D E T A I L S MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S C4.25 8 9 10 11 12 13 8 9 10 11 12 13 RA M P D E T A I L S MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S C4.26 1 2 3 4 5 6 7 1 2 3 4 6 75 RA M P D E T A I L S ST MH F2 ST INLET F3.2 ST INLET F3.1 ST INLET F4.1 ST MH F5 ST MH F6 ST INLET F6.1 ST MH F7 ST INLET F5.1 ST INLET F5.2 ST INLET F8 ST MH F3 ST MH F4 STORMLINE F ST M H F 6 ST M H F 7 ST M H F 2 ST M H F 3 ST M H F 4 ST M H F 5 ST I N L E T F 8 LATERAL F3 ST I N L E T F 3 . 1 ST I N L E T F 3 . 2 ST M H F 3 LATERAL F4 ST I N L E T F 4 . 1 ST M H F 4 LATERAL F5 ST M H F 5 ST I N L E T F 5 . 1 ST I N L E T F 5 . 2 LATERAL F6 ST I N L E T F 6 . 1 ST M H F 6 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E F PL A N A N D P R O F I L E C4.27 IR-MH-04 ST MH E10 ST MH E11 ST OS E12 CITY OF FORT COLLINS OUTLET STRUCTURE (RE: C4.44) ST INLET P3 ST INLET P4 ST MH E9 ST INLET E3 ST MH E2 CONTINUOUS DEFLECTIVE SEPARATOR OR APPROVED EQUIVALENT ST MH E8 ST MH E4 ST MH E5 ST MH E7 STORMLINE E IR - M H - 0 4 ST O S E 1 2 ST M H E 2 ST M H E 4 ST M H E 5 ST M H E 7 ST M H E 9 ST M H E 8 ST M H E 1 0 ST M H E 1 1 ST I N L E T E 3 STORMLINE P ST I N L E T P 4 ST I N L E T P 3 ST M H P 2 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E E & P PL A N A N D P R O F I L E C4.28 ST INLET E4.1 ST INLET E3 ST INLET E8.1 ST MH E7 ST INLET E2.2 ST INLET E2.1 ST MH E4 ST MH E6 ST INLET E6.2 ST INLET E6.1 ST MH E8 ST INLET E7.2 ST INLET E7.1 LATERAL E8 ST M H E 8 ST I N L E T E 8 . 1 LATERAL E4 ST I N L E T E 4 . 1 ST M H E 4 LATERAL E2 ST I N L E T E 2 . 1 ST I N L E T E 2 . 2 ST M H E 2 LATERAL E6 ST I N L E T E 6 . 2 ST M H E 6 ST I N L E T E 6 . 1 LATERAL E7 ST I N L E T E 7 . 2 ST M H E 7 ST I N L E T E 7 . 1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E E L A T E R A L S PL A N A N D P R O F I L E C4.29 ST MH G4 ST INLET G3.2 ST INLET G5.1 ST INLET G5 (SPECIAL) ST MH G7 ST MH G3.1 ST MH G3 ST MH G6 ST MH C2 ST INLET G9 ST MH G8 ST INLET G3.1.1 STORMLINE G ST I N L E T G 5 ( S P E C I A L ) ST M H G 7 ST M H C 2 ST M H G 3 ST M H G 4 ST I N L E T G 9 ST M H G 6 ST M H G 8 LATERAL G3 ST I N L E T G 3 . 2 ST M H G 3 ST M H G 3 . 1 LATERAL G5 ST I N L E T G 5 ST I N L E T G 5 . 1 LATERAL G3.1 ST M H G 3 . 1 ST I N L E T G 3 . 1 . 1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E G PL A N A N D P R O F I L E C4.30 ST MH C2 ST MH C3 ST INLET C4 ST MH C5 ST INLET C6 ST MH C8 ST MH C9 ST INLET C10 ST INLET C7 STORMLINE C ST I N L E T C 6 ST I N L E T C 7 ST I N L E T C 1 0 ST M H C 3 ST M H C 5 ST M H C 9 ST M H C 2 ST I N L E T C 4 ST M H C 8 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E C PL A N A N D P R O F I L E C4.31 ST MH J2 IR-MH-10 ST MH C3 ST INLET C3.2.1 ST INLET C3.1 ST MH C3.3 ST INLET C3.5 ST MH C3.2 LATERAL C3 ST M H C 3 ST I N L E T C 3 . 1 ST M H C 3 . 3 ST I N L E T C 3 . 5 ST M H C 3 . 2 ST M H C 3 . 4 STORMLINE J ST M H J 2 ST O S J 3 IR - M H - 1 1 LATERAL C3.2 ST I N L E T C 3 . 2 . 1 ST M H C 3 . 2 STORMLINE U ST S T R C 3 3 7 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E J , U , & C L A T E R A L S PL A N A N D P R O F I L E C4.32 ST MH C5 ST MH C9 ST INLET C5.6 ST INLET C5.7.1 ST MH C5.8 ST INLET C5.1 (SPECIAL) ST INLET C5.2.1 ST MH C5.3ST MH C9.3 ST INLET C9.2.1 ST INLET C9.1 ST INLET C9.6 (SPECIAL) ST INLET C9.7.1 ST MH C9.2 ST MH C9.7 ST MH C9.8 ST MH C5.7 ST MH C5.2 ST INLET C9.5 ST INLET C5.5 ST MH C9.9 ST INLET C9.11 ST MH C9.10 ST MH C9.4 ST MH C5.4 ST MH C5.9 ST INLET C5.10 LATERAL C5 ST M H C 5 . 8 ST I N L E T C 5 . 6 ST M H C 5 ST I N L E T C 5 . 1 ( S P E C I A L ) ST M H C 5 . 3 ST I N L E T C 5 . 1 0 ST I N L E T C 5 . 5 ST M H C 5 . 7 ST M H C 5 . 2 ST M H C 5 . 4 ST M H C 5 . 9 LATERAL C9 ST M H C 9 . 9 ST I N L E T C 9 . 6 ( S P E C I A L ) ST M H C 9 ST I N L E T C 9 . 1 ST M H C 9 . 3 ST I N L E T C 9 . 1 1 ST I N L E T C 9 . 5 ST M H C 9 . 2 ST M H C 9 . 7 ST M H C 9 . 8 ST M H C 9 . 1 0 ST M H C 9 . 4 LATERAL C5.2 ST I N L E T C 5 . 2 . 1 ST M H C 5 . 2 LATERAL C5.7 ST I N L E T C 5 . 7 . 1 ST M H C 5 . 7 LATERAL C9.2 ST I N L E T C 9 . 2 . 1 ST M H C 9 . 2 LATERAL C9.7 ST M H C 9 . 7 ST I N L E T C 9 . 7 . 1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E L A T E R A L S C 9 & C 5 PL A N A N D P R O F I L E C4.33 ST INLET D7 ST INLET D8.1 ST MH D9 ST INLET D9.2 MA T C H L I N E S T A . 1 3 + 5 0 SE E S H E E T C4 . 3 5 ST MH D10 ST INLET D11.1 ST INLET D10.4 ST INLET D10.2 ST MH A6 ST MH D8 ST INLET D9.1 ST MH D11 ST MH D10.1 ST MH D10.3 STORMLINE D ST I N L E T D 7 ST M H D 8 ST M H D 9 ST M H D 1 0 ST M H A 6 ST M H D 1 1 MA T C H L I N E S T A . 1 3 + 5 0 SE E S H E E T C4 . 3 5 LATERAL D8 ST M H D 8 ST I N L E T D 8 . 1 LATERAL D9 ST I N L E T D 9 . 1 ST I N L E T D 9 . 2 ST M H D 9 LATERAL D10 ST M H D 1 0 ST I N L E T D 1 0 . 2 ST I N L E T D 1 0 . 4 ST M H D 1 0 . 1 ST M H D 1 0 . 3 LATERAL D11 ST M H D 1 1 ST I N L E T D 1 1 . 1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E D PL A N A N D P R O F I L E C4.34 ST MH D12 ST INLET D12.1 ST INLET D12.2 ST MH D14 ST INLET D13.2 ST INLET D13.1 ST INLET D16 MA T C H L I N E S T A . 1 3 + 5 0 SE E S H E E T C4 . 3 4 ST MH D13 ST MH D15 STORMLINE D ST M H D 1 4 ST M H D 1 3 ST M H D 1 2 ST I N L E T D 1 6 ST M H D 1 5 MA T C H L I N E S T A . 1 3 + 5 0 SE E S H E E T C4 . 3 4 LATERAL D13 ST I N L E T D 1 3 . 2 ST I N L E T D 1 3 . 1 ST M H D 1 3 LATERAL D12 ST I N L E T D 1 2 . 1 ST I N L E T D 1 2 . 2 ST M H D 1 2 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E D PL A N A N D P R O F I L E C4.35 STORMLINE A ST I N L E T A 2 4 ST M H A 2 2 ST M H A 2 1 ST M H A 1 4 ST I N L E T A 1 5 ST I N L E T A 1 7 ST I N L E T A 1 6 ( S P E C I A L ) ST M H A 2 0 ST M H A 1 9 ST M H A 1 8 ST M H A 1 3 ST M H A 1 2 ST M H A 2 3 MA T C H L I N E S T A . 1 8 + 5 0 SE E S H E E T C4 . 3 7 LATERAL A19 ST M H A 1 9 ST I N L E T A 1 9 . 2 ST M H A 1 9 . 1 LATERAL A20 ST M H A 2 0 ST I N L E T A 2 0 . 1 LATERAL A13 ST M H A 1 3 ST I N L E T A 1 3 . 1 LATERAL A18 ST M H A 1 8 ST I N L E T A 1 8 . 2 ST M H A 1 8 . 1 ST MH A14 ST MH A22 ST MH A20 ST MH A19 ST INLET A20.1 ST INLET A18.2 ST INLET A19.2 ST MH A13 ST INLET A13.1 ST MH A12 MA T C H L I N E S T A . 1 8 + 5 0 SE E S H E E T C4 . 3 7 ST INLET A24 ST INLET A15 ST MH A21 ST INLET A16 (SPECIAL)ST MH A19.1 ST MH A23 ST MH A18 ST INLET A17 ST MH A18.1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E A PL A N A N D P R O F I L E C4.36 STORMLINE A ST M H A 1 1 ST M H A 1 0 ST M H A 9 ST M H A 8 ST M H A 7 ST M H A 6 ST D I V E R S I O N M H A 5 ST M H A 4 ST M H A 3 MA T C H L I N E S T A . 1 8 + 5 0 SE E S H E E T C4 . 3 6 ST MH A11 ST MH A9 ST MH A8 ST MH A7 ST MH A6 ST DIVERSION MH A5 ST MH A4 ST MH A10 MA T C H L I N E S T A . 1 8 + 5 0 SE E S H E E T C4 . 3 6 ST MH A3 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E A PL A N A N D P R O F I L E C4.37 LATERAL A10 ST M H A 1 0 ST M H A 1 0 . 3 ST M H A 1 0 . 4 ST M H A 1 0 . 5 ST I N L E T A 1 0 . 1 ST I N L E T A 1 0 . 2 ST I N L E T A 1 0 . 6 LATERAL A12 ST I N L E T A 1 2 . 1 ST I N L E T A 1 2 . 2 ST I N L E T A 1 2 . 3 ST M H A 1 2 LATERAL A10.3 ST I N L E T A 1 0 . 3 . 1 ST M H A 1 0 . 3 LATERAL A11 ST I N L E T A 1 1 . 1 ST M H A 1 1 ST INLET A12.1 ST INLET A12.2 ST INLET A12.3 ST MH A10.5 ST INLET A10.6 ST MH A10.4 ST INLET A10.3.1 ST MH A10.3 ST INLET A10.1 ST MH A10 ST MH A11 ST INLET A11.1 ST MH A12 ST INLET A10.2 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E A L A T E R A L S PL A N A N D P R O F I L E C4.38 ST O H1 ST MH A3 ST MH H2 ST MH Q ST DIVERSION MH A5 ST INLET H4 ST INLET H6 ST INLET H5 ST DIVERSION MH H3 ST INLET H4.1 STORMLINE Q ST D I V E R S I O N M H A 5 ST M H Q ST D I V E R S I O N M H H 3 STORMLINE H ST O R M D I V E R S I O N M H M H H 3 ST I N L E T H 4 ST M H H 2 ST I N L E T H 6 ST I N L E T H 5 LATERAL Q2 ST M H A 3 ST M H Q LATERAL H4 ST I N L E T H 4 ST I N L E T H 4 . 1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E Q & H PL A N A N D P R O F I L E C4.39 IR-MH-02 BOX BASE MH ST MH B2 ST INLET B3 ST INLET B5 ST MH B6 ST INLET L3 ST INLET L2 ST MH B4 IR-MH-01 BOX BASE MH M A T C H L I N E S T A . 1 7 + 5 0 S E E S H E E T C 4 . 4 1 STORMLINE B ST M H B 2 ST I N L E T B 3 ST M H B 4 ST I N L E T B 5 ST M H B 6 IR - M H - 0 2 MA T C H L I N E S T A . 1 7 + 5 0 SE E S H E E T C4 . 4 1 STORMLINE L ST I N L E T L 2 ST I N L E T L 3 STORMLINE R MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E B L & R PL A N A N D P R O F I L E C4.40 ST MH B7 ST INLET N2 ST FES N4 ST INLET B10 ST MH B8 M A T C H L I N E S T A . 1 7 + 5 0 S E E S H E E T C 4 . 4 0 ST INLET N3 ST MH B9 STORMLINE B ST M H B 7 ST M H B 8 ST M H B 9 ST I N L E T B 1 0 MA T C H L I N E S T A . 1 7 + 5 0 SE E S H E E T C4 . 4 0 STORMLINE N ST I N L E T N 2 ST I N L E T N 3 ST F E S N 4 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E B & N PL A N A N D P R O F I L E C4.41 VAULT VA U L T VAULT VA U L T INLET B10 FTC DOUBLE CURB INLET MH SB 5'Ø STRM MH INLET N4 18" FES INLET N3 FTC SINGLE CURB INLET INLET N2 FTC SINGLE CURB INLET MH B8 5'Ø STRM MH VAULT VA U L T VA U L T E X . N O . 8 D I T C H A A A A MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S PO N D A 1 P L A N C4.42 MA T C H L I N E - S E E B E L O W MA T C H L I N E - S E E A B O V E BASIN 4 RAINGARDEN SUMMARY RAIN GARDEN TRIB. AREA (AC) % IMP.WQ WSEL DEPTH (IN) REQUIRED WQCV VOL. (FT3) PROVIDED WQCV VOL. (FT3) REQUIRED SURFACE AREA (FT2) PROVIDED SURFACE AREA (FT2) A1.1 4.95 61%5006.00 12 4787 6707 2619 5589 A1.2 2.83 39%5011.56 12 2028 3111 958 2128 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S PO N D A 1 D E T A I L S C4.43 “” “” VA U L T VA U L T VAULT MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S PO N D A 2 P L A N C4.44 POND A2 SUMMARY Q2 IN (CFS)16 Q2 OUT (CFS)3.4 Q100 IN (CFS)91 Q100 OUT (CFS)21 WQ VOL REQ (AC-FT)0.3 WQ VOL PROVIDED (AC-FT)0.4 2YR VOL (AC-FT)0.46 100YR VOL (AC-FT)1.6 WQ WSEL 5002.79 2YR WSEL 5002.98 100YR WSEL 5005.63 BOTTOM OF POND 4999.69 OVERFLOW CREST 5007.12 TOP OF POND 5008.12 5-YEAR DRAIN TIME (HOURS)51 100-YEAR DRAIN TIME (HOURS)52 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S PO N D A 2 D E T A I L S C4.45 CC A A B B SECTION C-C SECTION A-A SECTION B-B WELL SCREEN FLOW CONTROL PLATE PLAN GENERAL NOTES SECTION D-D D D A A ABBREVIATIONS LEGEND POND A2 OUTLET STRUCTURE Pond A2 Summary Elev A (BOP)4999.69 El B (WQCV)5002.79 El C (top of structure)5003.77 100-year WSEL 5005.63 Spill El 5007.02 Ls (length of structure) FT.4.0 Ws (width of structure) FT.4.0 Wp (INCHES)26.00 W0 (INCHES)12.00 WQ Hole 7/8" WQ # of rows 9 WQ # fo columns 1 Hole spacing (INCHES)4 VAU L T VAULT VA U L T VAULT V A U L T MONTAVA PHASE G CITY OF FORT COLLINS PARKS POND E 42" FES INV.OUT=4996.54 POND D MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S PO N D E P L A N C4.46 POND E SUMMARY Q2 IN (CFS)34 Q2 OUT (CFS)1.8 Q100 IN (CFS)198 Q100 OUT (CFS)3.0 2YR VOL (AC-FT)1.5 100YR VOL (AC-FT)16.5 2YR WSEL 4997.43 100YR WSEL 5002.20 100YR DET AREA (AC)5.6 BOTTOM OF POND 4993.92 OVERFLOW CREST 5003.44 TOP OF POND 5004.44 5-YEAR DRAIN TIME (HOURS)28 100-YEAR DRAIN TIME (HOURS)94 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S PO N D E D E T A I L S C4.47 BB A A SECTION B-B SECTION A-A WELL SCREEN PLAN GENERAL NOTES SECTION C-C C C A A ABBREVIATIONS LEGEND POND E OUTLET STRUCTURE POND E SUMMARY El A (BOP)4993.92 El B (2YR WSEL)4997.43 El C (Top of Strcture)4997.82 100-YEAR WSEL 5002.20 Spill El 5003.44 Ls (Length of Structure) FT.4.0 Ws (Width of Structure) FT.4.0 W0 (INCHES)12.00 A A A A TYPICAL SECTION MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S CE N T R A L R A I N G A R D E N S A 2 . 1 & A 2 . 4 C4.48 BASIN 3 RAINGARDENS RAIN GARDEN TRIB. AREA (AC) % IMP.WQ WSEL DEPTH (IN) REQUIRED WQCV VOL. (FT3) PROVIDED WQCV VOL. (FT3) REQUIRED SURFACE AREA (FT2) PROVIDED SURFACE AREA (FT2) A2.1 0.61 63%5011.22 6 436 752 334 1089 A2.2 0.32 65%5012.60 6 237 260 182 290 A2.3 0.32 65%5013.70 6 237 357 182 275 A2.4 0.38 64%5015.83 6 275 479 211 567 C C A A B B SECTION B-B TYPICAL SECTION A-ASECTION C-C MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S CE N T R A L R A I N G A R D E N S A 2 . 2 & A 2 . 3 C4.49 BASIN 3 RAINGARDENS RAIN GARDEN TRIB. AREA (AC) % IMP.WQ WSEL DEPTH (IN) REQUIRED WQCV VOL. (FT3) PROVIDED WQCV VOL. (FT3) REQUIRED SURFACE AREA (FT2) PROVIDED SURFACE AREA (FT2) A2.1 0.61 63%5011.22 6 436 752 334 1089 A2.2 0.32 65%5012.60 6 237 260 182 290 A2.3 0.32 65%5013.70 6 237 357 182 275 A2.4 0.38 64%5015.83 6 275 479 211 567 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M T E C H U N D E R G R O U N D W A T E R Q U A L I T Y C4.50 STORMTECH SUMMARY TRIBUTARY AREA (AC)12.92 % IMP.62% REQUIRED WQCV VOL. (FT3)9109 PROVIDED WQCV VOL. (FT3)9855 SYSTEM AREA (FT2)2956 Q2 (CFS)20.86 Q PROVIDED (CFS)25.50 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M T E C H D E T A I L C4.51 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M T E C H D E T A I L C4.52 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M T E C H D E T A I L C4.53 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M T E C H D E T A I L C4.54 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M T E C H D E T A I L C4.55 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M T E C H D E T A I L C4.56 B B A A MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WE S T D I V E R S I O N M H D E T A I L C4.57 A A B B MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S EA S T D I V E R S I O N M H D E T A I L C4.58 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S RA I N G A R D E N D E T A I L S C4.59 BASIN 4 RAINGARDEN SUMMARY RAIN GARDEN TRIB. AREA (AC) % IMP.WQ WSEL DEPTH (IN) REQUIRED WQCV VOL. (FT3) PROVIDED WQCV VOL. (FT3) REQUIRED SURFACE AREA (FT2) PROVIDED SURFACE AREA (FT2) A1.1 4.95 61%5006.00 12 4787 6707 2619 5589 A1.2 2.83 39%5011.56 12 2028 3111 958 2128 BASIN 3 RAINGARDENS RAIN GARDEN TRIB. AREA (AC) % IMP.WQ WSEL DEPTH (IN) REQUIRED WQCV VOL. (FT3) PROVIDED WQCV VOL. (FT3) REQUIRED SURFACE AREA (FT2) PROVIDED SURFACE AREA (FT2) A2.1 0.61 63%5011.22 6 436 752 334 1089 A2.2 0.32 65%5012.60 6 237 260 182 290 A2.3 0.32 65%5013.70 6 237 357 182 275 A2.4 0.38 64%5015.83 6 275 479 211 567 TYPICAL WINGWALL SECTION TYPICAL 90° WALL CORNER DETAIL RCP WALL PENETRATION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST R U C T U R A L N O T E S - F O R E B A Y A N D DI V E R S I O N S T R U C T U R E S C4.60 RAILING NOTES RAILING ELEVATION BASE PLATE DETAIL STRUCTURAL NOTES - FOREBAY AND DIVERSION STRUCTURES DESIGN DATA FOREBAY STRUCTURE BACKFILL DETAIL FOREBAY LAYOUT PLAN - POND A1 FOREBAY LONGITUDINAL SECTION - POND A1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S PO N D A 1 F O R E B A Y S T R U C T U R A L D E T A I L S C4.61 POND A1 FOREBAY CONTROL POINTS FOREBAY LONGITUDINAL SECTION - POND A2 FOREBAY LAYOUT PLAN - POND A2 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S PO N D A 2 F O R E B A Y S T R U C T U R A L D E T A I L S C4.62 POND A2 FOREBAY CONTROL POINTS SECTION DIVERSION MH A5 LAYOUT PLAN N SECTION N DIVERSION MANHOLE MH H3 LAYOUT PLAN SECTION DIVERSION MH A5 REINFORCING PLAN MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST R U C T U R A L D E T A I L S - DI V E R S I O N M A N H O L E S MH A 5 A N D M H H 3 C4.63 V A U L T VA U L T VA U L T VAUL T VA U L T VAULT VA U L T VAUL T VA U L T VA U L T VA U L T VAULT VAULT VAULT VA U L T VAULT VAULT VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VAULT VA U L T VAULT VAULT VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VAULT VAULT VAULT VAULT V A U L T VAULT VA U L T VAULT VA U L T VA U L T MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OV E R A L L U T I L I T Y L A Y O U T C5.0 VAULT VA U L T VA U L T MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OV E R A L L U T I L I T Y L A Y O U T C5.1 SEE SHEET C5.3 SE E S H E E T C5 . 2 SEE SHEET C5.3 VAULT VAULT VA U L T VA U L T VA U L T MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OV E R A L L U T I L I T Y L A Y O U T C5.2 SEE SHEET C5.4 SE E S H E E T C5 . 1 SEE SHEET C5.4 VA U L T VA U L T VA U L T VAULT VA U L T VA U L T VA U L T VA U L T VA U L T MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OV E R A L L U T I L I T Y L A Y O U T C5.3 SEE SHEET C5.6 SEE SHEET C5.1 SE E S H E E T C5 . 4 SEE SHEET C5.1 SEE SHEET C5.6 VA U L T VA U L T VA U L T VA U L T VA U L T VAULT VA U L T VAULT VA U L T VA U L T VAULT VA U L T MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OV E R A L L U T I L I T Y L A Y O U T C5.4 SEE SHEET C5.2 SE E S H E E T C5 . 5 SE E S H E E T C5 . 3 SEE SHEET C5.7 SEE SHEET C5.2 SEE SHEET C5.7 VA U L T VAULT VAULT VA U L T VAULT VAULT VAULT MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OV E R A L L U T I L I T Y L A Y O U T C5.5 SEE SHEET C5.8 SE E S H E E T C5 . 4 SEE SHEET C5.8 VA U L T VAU L T VA U L T VA U L T V A U L T MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OV E R A L L U T I L I T Y L A Y O U T C5.6 SE E S H E E T C5 . 7 SEE SHEET C5.3 SE E S H E E T C5 . 7 V A U L T VA U L T VAU L T VA U L T VA U L T VA U L T VA U L T VA U L T VAULT VA U L T VA U L T MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OV E R A L L U T I L I T Y L A Y O U T C5.7SEE SHEET C5.4 SE E S H E E T C5 . 8 SE E S H E E T C5 . 6 SEE SHEET C5.4 SE E S H E E T C5 . 6 VA U L T VAULT VA U L T VA U L T VA U L T VAULT VAULT VAULT VA U L T MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OV E R A L L U T I L I T Y L A Y O U T C5.8 SE E S H E E T C5 . 7 SEE SHEET C5.5 SEE SHEET C5.5 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S OV E R A L L F I R E H Y D R A N T P L A N C5.9 WATER LINE A 8" G V 8" G V 8" 4 5 ° B E N D 8" 4 5 ° B E N D 8" x 6 " S W I V E L T E E 8" 4 5 ° B E N D 6" 9 0 ° B E N D 8" x 6 " S W I V E L T E E 8" x 8 " T E E 8" 4 5 ° B E N D 8" x 6 " R E D U C E R 8" G V 8" x 6 " T E E 8" G V MA T C H L I N E S T A 1 4 + 5 0 SE E S H E E T C5 . 1 1 MA T C H L I N E S T A 1 4 + 5 0 SE E S H E E T C5 . 1 1 WATER LINE D SEE SHEET C5.16 WATER LINE L 6" 9 0 ° B E N D FH Y A S S E M B L Y WATER LINE M FH Y A S S E M B L Y 6" G V 8" x 6 " T E E MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA T E R L I N E A , L , & M PL A N & P R O F I L E C5.10 WATER LINE A 8" x 6 " T E E 8" x 8 " C R O S S 8" 1 1 . 2 5 ° B E N D 8" x 6 " T E E 8" x 6 " S W I V E L T E E 8" 2 2 . 5 ° B E N D 8" x 6 " S W I V E L T E E TE M P . F H A S S E M B L Y 8" G V 8" G V 8" G V MA T C H L I N E S T A 1 4 + 5 0 SE E S H E E T C5 . 1 0 MA T C H L I N E S T A 1 4 + 5 0 SE E S H E E T C5 . 1 0 WA T E R L I N E K SEE S H E E T C5.2 2 W A T E R L I N E K S E E S H E E T C 5 . 2 2 WATER LINE N 8" x 6 " T E E FH Y A S S E M B L Y 6" G V WATER LINE O 8" x 6 " T E E 6" 2 2 . 5 ° B E N D FH Y A S S E M B L Y 6" G V MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA T E R L I N E A , N , & O PL A N & P R O F I L E C5.11 WATER LINE B 8" x 6 " S W I V E L T E E 8" x 6 " C R O S S 8" G V 8" x 6 " S W I V E L T E E 8" x 8 " C R O S S EX I S T . 8 " C A P 8" G V 8" 4 5 ° B E N D 8" 4 5 ° B E N D MA T C H L I N E S T A 1 5 + 5 0 SE E S H E E T C5 . 1 3 MA T C H L I N E S T A 1 5 + 5 0 SE E S H E E T C5 . 1 3 WATER LINE D SEE SHEET C5.16 WATER LINE D SEE SHEET C5.16 WATER LINE E SEE SHEET C5.18 WATER LINE E SEE SHEET C5.18 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA T E R L I N E B PL A N & P R O F I L E C5.12 WATER LINE B 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" x 8 " T E E 8" G V 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" G V 8" x 6 " S W I V E L T E E 8" G V AI R R E L E A S E V A L V E AI R R E L E A S E V A L V E 8" 4 5 ° B E N D 8" 4 5 ° B E N D MA T C H L I N E S T A 1 5 + 5 0 SE E S H E E T C5 . 1 2 MA T C H L I N E S T A 1 5 + 5 0 SE E S H E E T C5 . 1 2 WATER L I N E K SEE SH E E T C5.22 WATER LI N E K SEE SHE E T C5.22 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA T E R L I N E B PL A N & P R O F I L E C5.13 WATER LINE C 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" x 6 " S W I V E L T E E 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D AI R R E L E A S E V A L V E 8" G V 8" x 8 " T E E MA T C H L I N E S T A 1 4 + 5 0 SE E S H E E T C5 . 1 5 MA T C H L I N E S T A 1 4 + 5 0 SE E S H E E T C5 . 1 5 WATER LINE D SEE SHEET C5.17 WATER LINE D SEE SHEET C5.16 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA T E R L I N E C PL A N & P R O F I L E C5.14 WATER LINE C 8" x 6 " S W I V E L T E E 8" x 8 " T E E 8" G V 8" 1 1 . 2 5 ° B E N D 8" G V 8" x 8 " T E E 8" G V 8" 2 2 . 5 ° B E N D 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" x 8 " T E E AI R R E L E A S E V A L V E 8" G V MA T C H L I N E S T A 1 4 + 5 0 SE E S H E E T C5 . 1 4 MA T C H L I N E S T A 1 4 + 5 0 SE E S H E E T C5 . 1 4 WATER LINE F SEE SHEET C5.19 WATER L I N E I SEE SHE E T C5.21 WAT E R L I N E K SEE S H E E T C5.2 2 WATER L I N E K SEE S H E E T C5.22 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA T E R L I N E C PL A N & P R O F I L E C5.15 WATER LINE D 8" x 8 " T E E 8" G V 8" G V 8" G V 8" x 8 " C R O S S 8" x 8 " T E E MA T C H L I N E S T A 1 5 + 5 0 SE E S H E E T C5 . 1 7 WA T E R L I N E N SE E S H E E T C5 . 1 0 WATER LINE A SEE SHEET C5.10 WATER LINE B SEE SHEET C5.12 WATER LINE C SEE SHEET C5.14 MA T C H L I N E S T A 1 5 + 5 0 SE E S H E E T C5 . 1 7 WATER LINE B SEE SHEET C5.12 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA T E R L I N E D PL A N & P R O F I L E C5.16 WATER LINE D 8" G V 8" 9 0 ° B E N D 8" x 6 " S W I V E L T E E 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D EX I S T . 8 " C A P AI R R E L E A S E V A L V E 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D MA T C H L I N E S T A 1 5 + 5 0 SE E S H E E T C5 . 1 6 MA T C H L I N E S T A 1 5 + 5 0 SE E S H E E T C5 . 1 6 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA T E R L I N E D PL A N & P R O F I L E C5.17 WATER LINE E 8" x 6 " C R O S S 6" G V 6" G V 6" 9 0 ° B E N D 6" 9 0 ° B E N D FH A S S E M B L Y FH A S S E M B L Y 6" G V 6" G V 6" 4 5 ° V E R T . B E N D 6" 4 5 ° V E R T . B E N D WATER LINE B SEE SHEET C5.12 WATER LINE B SEE SHEET C5.12 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA T E R L I N E E PL A N & P R O F I L E C5.18 WATER LINE F 8" x 8 " T E E 8" G V 8" x 6 " S W I V E L T E E 8" 9 0 ° B E N D 8" G V 8" 9 0 ° B E N D 8" 1 1 . 2 5 ° B E N D 8" x 8 " T E E 8" G V WATER LINE C SEE SHEET C5.15 WATER LINE C SEE SHEET C5.15 WATER LINE G SEE SHEET C5.20 WATER LINE G SEE SHEET C5.20 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA T E R L I N E F PL A N & P R O F I L E C5.19 WATER LINE G 8" G V 8" x 8 " T E E 8" G V 8" 1 1 . 2 5 ° B E N D 8" x 6 " S W I V E L T E E 8" x 8 " T E E 8" G V 8" x 6 " R E D U C E R FH Y A S S E M B L Y 8" x 8 " T E E WATER LINE F SEE SHEET C5.19 WATER LINE I SEE SHEET C5.21 WATER LINE H 6" G V 8" G V 8" G V FH A S S E M B L Y 6" 9 0 ° B E N D 8" x 6 " R E D U C E R 8" x 8 " T E E 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" 1 1 . 2 5 ° B E N D WATER LINE P 12 " 1 1 . 2 5 ° B E N D 12 " B F V TE M P . 1 2 " x 6 " R E D U C E R TE M P . F H A S S E M B L Y 12 " 4 5 ° V E R T . B E N D 12 " 9 0 ° B E N D 12 " 4 5 ° V E R T . B E N D MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA T E R L I N E G , H , & P PL A N & P R O F I L E C5.20 WATER LINE I 8" 1 1 . 2 5 ° B E N D 8" 2 2 . 5 ° B E N D 8" 1 1 . 2 5 ° B E N D 8" G V 8" x 8 " T E E 8" G V 8" x 8 " T E E 8" G V 8" G V 8" x 8 " T E E 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D WATER LINE I SEE SHEET C5.20 WATER LINE I SEE SHEET C5.20 WA T E R L I N E M SE E S H E E T C5 . 2 3 WA T E R L I N E M SE E S H E E T C5 . 2 3 WATER LI N E C SEE SHE E T C5.15 WATE R L I N E C SEE S H E E T C5.15 WATER LINE J 8" x 8 " T E E 8" G V 8" x 8 " T E E 8" x 6 " S W I V E L T E E 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D AI R R E L E A S E V A L V E MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA T E R L I N E I & J PL A N & P R O F I L E C5.21 WATER LINE K 8" x 8 " T E E 8" x 8 " C R O S S 8" x 8 " T E E 8" 1 1 . 2 5 ° B E N D 8" 1 1 . 2 5 ° B E N D 8" 1 1 . 2 5 ° B E N D 8" x 6 " S W I V E L T E E 8" 1 1 . 2 5 ° B E N D 8" x 6 " S W I V E L T E E 8" 1 1 . 2 5 ° B E N D 8" x 6 " S W I V E L T E E 8" 1 1 . 2 5 ° B E N D 8" G V 8" G V 8" G V 8" G V 8" G V 8" C A P AI R R E L E A S E V A L V E MA T C H L I N E S T A 1 7 + 5 0 SE E S H E E T C5 . 2 3 18 WATE R L I N E C SEE S H E E T C5.15 WATER LINE B SEE SHEET C5.13 WA T E R L I N E A SE E S H E E T C5. 1 1 M A T C H L I N E S T A 1 7 + 5 0 S E E S H E E T C 5 . 2 3 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA T E R L I N E K PL A N & P R O F I L E C5.22 WATER LINE K 8" x 8 " T E E 8" 2 2 . 5 ° B E N D 8" x 6 " S W I V E L T E E 8" 1 1 . 2 5 ° B E N D 8" 1 1 . 2 5 ° B E N D 8" G V 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" G V 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" 2 2 . 5 ° B E N D 8" 2 2 . 5 ° B E N D 8" G V 8" x 6 " S W I V E L T E E MA T C H L I N E S T A 1 7 + 5 0 SE E S H E E T C5 . 2 2 M A T C H L I N E S T A 1 7 + 5 0 S E E S H E E T C 5 . 2 2 WATER LINE J SEE SHEET C5.21 WATER LINE Q 8" G V 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D AI R R E L E A S E V A L V E 8" 9 0 ° B E N D 8" 4 5 ° V E R T . B E N D 8" 4 5 ° V E R T . B E N D 8" 9 0 ° B E N D 8" C A P MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S WA T E R L I N E K & Q PL A N & P R O F I L E C5.23 PROPOSED WATER LINE R EX I S T . 8 " x 8 " C R O S S 8" 4 5 D V E R T . B E N D 8" 4 5 D V E R T . B E N D 8" x 8 " T E E WATER LINE A SEE SHEET C5.11 WATER LINE A SEE SHEET C5.10 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S PR O P O S E D W A T E R L I N E R PL A N & P R O F I L E C5.24 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO N - P O T A B L E W A T E R P L A N S C5.25 SEE SHEET C5.27 SE E S H E E T C5 . 2 6 SEE SHEET C5.27 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO N - P O T A B L E W A T E R P L A N S C5.26 SEE SHEET C5.28 SE E S H E E T C5 . 2 5 SEE SHEET C5.28 SEE SHEET C5.28 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO N - P O T A B L E W A T E R P L A N S C5.27 SEE SHEET C5.30 SEE SHEET C5.25 SE E S H E E T C5 . 2 8 SEE SHEET C5.25 SEE SHEET C5.30 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO N - P O T A B L E W A T E R P L A N S C5.28 SEE SHEET C5.26 SE E S H E E T C5 . 2 9 SE E S H E E T C5 . 2 7 SEE SHEET C5.31 SEE SHEET C5.26 SEE SHEET C5.31 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO N - P O T A B L E W A T E R P L A N S C5.29 SEE SHEET C5.32 SE E S H E E T C5 . 2 8 SEE SHEET C5.32 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO N - P O T A B L E W A T E R P L A N S C5.30 S E E S H E E T C 5 . 3 1 SEE SHEET C5.27 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO N - P O T A B L E W A T E R P L A N S C5.31SEE SHEET C5.28 SE E S H E E T C5 . 3 2 SE E S H E E T C5 . 3 0 SEE SHEET C5.28 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO N - P O T A B L E W A T E R P L A N S C5.32 SE E S H E E T C5 . 3 1 SEE SHEET C5.29 SEE SHEET C5.29 SAN LINE A INV.OUT(E)=4987.69 SS M H A 3 SS M H A 2 SS M H A 1 SE E S H E E T C6 . 1 S E E S H E E T C 6 . 1 SA N L I N E A 3 SE E S H E E T C6 . 5 SA N L I N E A 3 . 1 SE E S H E E T C6 . 3 SA N L I N E B SE E S H E E T C6 . 6 SS MH A1 SS MH A2 SS MH A3 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SA N L I N E A PL A N A N D P R O F I L E C6.0 SAN LINE A SS M H A 3 SS M H A 4 SS M H A 6 SS M H A 5 SE E S H E E T C6 . 0 SE E S H E E T C6 . 2 SAN LINE D SEE SHEET C6.10SAN LINE A4 SEE SHEET C6.3 SAN LINE A3.1 SEE SHEET C6.3 SAN LINE A3 SEE SHEET C6.5 SAN LINE A5 SEE SHEET C6.4 SE E S H E E T C6 . 2 SE E S H E E T C6 . 0 SS MH A3 SS MH A4 SS MH A6 SS MH A5 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SA N L I N E A PL A N A N D P R O F I L E C6.1 SAN LINE A SS M H A 6 SS M H A 8 SS M H A 9 SS M H A 1 0 SS M H A 7 SE E S H E E T C6 . 1 SE E S H E E T C6 . 1 SAN LINE D SEE SHEET C6.10 SAN LINE C SEE SHEET C6.8 SS MH A6 SS MH A8 SS MH A9 SS MH A7 SS MH A10 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SA N L I N E A PL A N A N D P R O F I L E C6.2 SAN LINE A3.1 SS M H A 3 SS M H A 3 . 1 - 1 SS M H A 3 . 1 - 2 SS M H A 3 . 1 - 3 SAN LINE A SEE SHEET C6.1 SAN LINE A SEE SHEET C6.0 SA N L I N E A 3 SE E S H E E T C6 . 5 SS MH A3.1-3 SS MH A3.1-2 SS MH A3.1-1 SS MH A3 SAN LINE A SEE SHEET C6.1 SAN LINE A SEE SHEET C6.1 SS MH A4-1 SS MH A4 SA N L I N E A 5 SE E S H E E T C6 . 4 SAN LINE A4 SS M H A 4 - 1 SS M H A 4 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SA N L I N E A 3 . 1 & A 4 PL A N A N D P R O F I L E C6.3 SAN LINE A3-1 SS M H A 3 - 1 . 1 SS M H A 3 - 1 SAN LINE A SEE SHEET C6.1 SAN LINE A SEE SHEET C6.1 SA N L I N E A 4 SE E S H E E T C6 . 3 SS MH A5 SS MH A4-3 SAN LINE A3 SEE SHEET C6.5 SA N L I N E A 3 SE E S H E E T C6 . 5 SS MH A3-1 SS MH A3-1.1 SAN LINE A5 SS M H A 5 SS M H A 4 - 3 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SA N L I N E A 3 - 1 & A 5 PL A N A N D P R O F I L E C6.4 SAN LINE A3 SS M H A 3 SS M H A 3 - 1 SS M H A 3 - 2 SS M H A 3 - 3 SA N L I N E A SE E S H E E T C6 . 0 SA N L I N E A SE E S H E E T C6 . 1 SAN LINE A3.1 SEE SHEET C6.3 SAN LINE A5 SEE SHEET C6.4 SS MH A3 SS MH A3-1 SS MH A3-2 SS MH A3-3 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SA N L I N E A 3 PL A N A N D P R O F I L E C6.5 SAN LINE B SS M H B 3 SS M H A 2 SS M H B 1 SS M H B 2 SS M H B 5 SS M H B 4 SE E S H E E T C6 . 7 SA N L I N E A SE E S H E E T C6. 1 SS MH A2 SS MH B1 SS MH B2 SS MH B5 SE E S H E E T C6 . 7 SA N L I N E A SE E S H E E T C6 . 0 SS MH B3 SS MH B4 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SA N L I N E B PL A N A N D P R O F I L E C6.6 SAN LINE B SS M H B 5 SS M H B 7 SS M H B 8 SS M H B 9 SS M H B 6 SE E S H E E T C6 . 6 S E E S H E E T C 6 . 6 SS MH B5 SS MH B7 SS MH B8 SS MH B6-1 SS MH B6-2 SS MH B6-3 SS MH B6-4 SS MH B9 SS MH B6 SAN LINE B6 SS M H B 6 - 1 SS M H B 6 - 2 SS M H B 6 - 3 SS MH B6-4 SS M H B 8 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SA N L I N E B & B 6 PL A N A N D P R O F I L E C6.7 SAN LINE C SS M H C 1 SS M H C 2 SS M H A 9 SE E S H E E T C6 . 9 SAN LINE A SEE SHEET C6.2 SAN LINE A SEE SHEET C6.2 SE E S H E E T C6 . 9 SS MH C1 SS MH C2SS MH A9 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SA N L I N E C PL A N A N D P R O F I L E C6.8 SAN LINE C SS M H C 2 SS M H C 3 SS M H C 4 SS M H C 5 SE E S H E E T C6 . 8 SE E S H E E T C6 . 8 SS MH C2 SS MH C3 SS MH C4 SS MH C5 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SA N L I N E C PL A N A N D P R O F I L E C6.9 SAN LINE D SS M H D 1 SS M H D 2 SS M H A 6 SS M H D 3 SS M H D 4 SAN LINE D2-1 SEE SHEET C6.13 SAN LINE D2 SEE SHEET C6.11 SAN LINE D3.1 SEE SHEET C6.12 SAN LINE D3 SEE SHEET C6.11 SAN LINE D4.1 SEE SHEET C6.11 SAN LINE D4 SEE SHEET C6.12 SS MH D4SS MH D3SS MH D2SS MH D1SS MH A6 SAN LINE A SEE SHE E T C6.2 SAN LINE A SEE SHEET C6.1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SA N L I N E D PL A N A N D P R O F I L E C6.10 SAN LINE D2 SS M H D 2 - 1 SS M H D 2 SAN LINE D SEE SHEET C6.10 SAN LINE D SEE SHEET C6.10 SAN LINE A4 SEE SHEET C6.3 SA N L I N E D 2 - 1 SE E S H E E T C6 . 1 3 SS MH D2 SS MH D2-1 SAN LINE D3 SS M H D 3 - 1 SS M H D 3 SAN LINE D4.1 SS M H D 4 . 1 - 1 SS M H D 4 . 1 - 2 SS M H D 4 SAN LINE D SEE SHEET C6.10 SAN LINE D SEE SHEET C6.10 SS MH D3-1SS MH D3 SA N L I N E D 3 . 1 SE E S H E E T C6 . 1 2 SAN LINE D SEE SHEET C6.10 SA N L I N E D 4 SE E S H E E T C6 . 1 2 SS MH D4 SS MH D4.1-1 SS MH D4.1-2 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SA N L I N E D 2 D 3 D 4 . 1 PL A N A N D P R O F I L E C6.11 SAN LINE D SEE SHEET C6.10 SAN LINE D3-2 SEE SHEET C6.13 SAN LINE D SEE SHEET C6.10 SS MH D3 SS MH D3-3 SA N L I N E D 3 SE E S H E E T C6 . 1 1 SS MH D3-2 SAN LINE D3.1 SS M H D 3 - 2 SS M H D 3 - 3 SS M H D 3 SAN LINE D4 SS D 4 - 1 SS D 4 - 2 SS M H D 4 SAN LINE D4-1 SS D 4 - 1 SS M H D 4 - 1 . 1 SAN LINE D SEE SHEET C6.10 SA N L I N E D 4 . 1 SE E S H E E T C6 . 1 1 SS MH D4 SS D4-1 SS D4-2 SS MH D4-1.1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SA N L I N E D 3 . 1 D 4 D4 - 1 PL A N A N D P R O F I L E C6.12 SAN LINE D3-2 SS M H D 3 - 2 SS M H D 3 - 2 . 1 SAN LINE D3 SEE SHEET C6.12 SA N L I N E D 3 . 1 SE E S H E E T C6 . 1 2 SS MH D3-2.1 SS MH D3-2 SAN LINE D2-1 SS M H D 2 - 2 SS M H D 2 SS MH D2 SS MH D2-2 SAN LINE D SEE SHEET C6.10 SAN LINE D SEE SHEET C6.10 SA N L I N E D 2 SE E S H E E T C6 . 1 1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SA N L I N E D 3 - 2 D 2 - 1 PL A N A N D P R O F I L E C6.13 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SI G N I N G & S T R I P I N G C7.0 SE E S H E E T C7 . 1 SEE SHEET C7.2 2 5 S T R E E T R A I S E D C R O S S I N G A H E A D ST 1 0 0 S T R E E T ST 1 0 0 P R I V A T E L Y M A I N T A I N E D MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SI G N I N G & S T R I P I N G C7.1 SE E S H E E T C7 . 0 SEE SHEET C7.3 2 5 R A I S E D C R O S S I N G A H E A D S T R E E T ST 1 0 0 S T R E E T ST 1 0 0 P R I V A T E L Y M A I N T A I N E D MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SI G N I N G & S T R I P I N G C7.2 SEE SHEET C7.0 SE E S H E E T C7 . 3 2 5 R A I S E D C R O S S I N G A H E A D S T R E E T ST 1 0 0 S T R E E T ST 1 0 0 P R I V A T E L Y M A I N T A I N E D MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S SI G N I N G & S T R I P I N G C7.3 SEE SHEET C7.1 SE E S H E E T C7 . 2 2 5 R A I S E D C R O S S I N G A H E A D S T R E E T ST 1 0 0 S T R E E T ST 1 0 0 P R I V A T E L Y M A I N T A I N E D MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST A N D A R D D E T A I L S C8.0 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST A N D A R D D E T A I L S C8.1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S EL C O W A T E R D E T A I L S C8.2 PH A S E G D R A I N A G E P L A N MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S D1 BASIN 2 RUNOFF SUMMARY BASIN AREA (ACRES)% IMP.C2 C100 Q2 (CFS)Q100 (CFS) 2.1 0.27 0.85 0.85 0.90 0.55 2.34 2.2 0.22 0.33 0.47 0.53 0.25 1.15 2.3 0.33 0.23 0.40 0.46 0.30 1.38 2.4 1.01 0.24 0.41 0.47 0.87 4.02 2.5 0.93 0.14 0.33 0.39 0.55 2.63 2.7 25.53 0.02 0.25 0.31 9.52 47.52 2.8 0.85 0.77 0.74 0.85 1.44 6.68 2.9 0.44 0.79 0.76 0.86 0.79 3.62 2.10 0.46 0.75 0.72 0.84 0.69 3.24 2.10.1 0.08 0.51 0.60 0.66 0.12 0.52 2.11 0.37 0.79 0.74 0.87 0.66 3.11 2.12 0.16 0.74 0.74 0.82 0.28 1.27 2.13 0.34 0.80 0.75 0.87 0.54 2.51 2.14 0.36 0.73 0.71 0.82 0.62 2.90 2.15 0.27 0.72 0.69 0.82 0.43 2.08 2.16 0.12 0.74 0.73 0.82 0.20 0.91 BASIN 2 RUNOFF SUMMARY BASIN AREA (ACRES)% IMP.C2 C100 Q2 (CFS)Q100 (CFS) 2.17 0.46 0.77 0.72 0.86 0.71 3.42 2.18 0.16 0.77 0.74 0.84 0.29 1.31 2.19 0.12 0.77 0.78 0.84 0.22 0.97 2.20 0.64 0.74 0.72 0.83 1.12 5.20 2.21 1.08 0.73 0.70 0.82 1.60 7.57 2.22 0.87 0.60 0.60 0.74 1.09 5.44 2.22.1 0.11 0.82 0.81 0.87 0.22 0.94 2.23 0.50 0.78 0.73 0.87 0.89 4.28 2.24 0.10 0.80 0.80 0.86 0.20 0.85 2.25 0.10 0.80 0.80 0.86 0.20 0.85 2.26 0.81 0.46 0.52 0.63 0.78 3.79 2.27 0.52 0.56 0.57 0.70 0.55 2.73 2.27.1 0.23 0.83 0.82 0.88 0.46 1.99 2.28 0.60 0.82 0.77 0.88 1.12 5.14 2.29 0.37 0.76 0.73 0.84 0.66 3.06 OVERALL BASIN COMPOSITE SUMMARY BASINS AC IMP.C2 C100 Q2 Q100 2.1-2.29 (POND E)38.41 22.1%0.38 0.45 27.92 133.40 3.1-3.34 (POND A2)14.60 69.1%0.67 0.78 21.52 105.60 4.1-4.42 (POND A1 & NO. 8) 20.99 58.0%0.61 0.71 27.31 126.28 SITE TOTAL 74.00 41.6%0.50 0.59 76.75 365.28 POND E SUMMARY Q2 IN (CFS)34 Q2 OUT (CFS)1.8 Q100 IN (CFS)198 Q100 OUT (CFS)3.0 2YR VOL (AC-FT)1.5 100YR VOL (AC-FT)16.5 2YR WSEL 4997.43 100YR WSEL 5002.20 1 1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S PH A S E G D R A I N A G E P L A N D2 BASIN AREA (ACRES)% IMP.C2 C100 Q2 (CFS)Q100 (CFS) 3.1 0.71 0.73 0.72 0.82 1.09 5.01 3.2 0.47 0.76 0.71 0.85 0.76 3.67 3.3 0.85 0.74 0.72 0.83 1.42 6.59 3.4 0.49 0.76 0.71 0.85 0.83 3.99 3.5 1.05 0.74 0.71 0.83 1.63 7.66 3.6 0.40 0.74 0.73 0.82 0.71 3.23 3.7 0.27 0.77 0.74 0.85 0.49 2.26 3.8 0.52 0.79 0.74 0.87 0.93 4.39 3.9 0.45 0.74 0.73 0.82 0.80 3.63 3.10 0.27 0.78 0.76 0.85 0.41 1.85 3.11 0.45 0.79 0.74 0.87 0.66 3.11 3.12 0.34 0.72 0.69 0.82 0.57 2.74 3.13 0.13 0.77 0.78 0.84 0.25 1.07 3.14 0.38 0.78 0.78 0.84 0.69 2.99 3.15 1.13 0.02 0.20 0.31 0.48 3.00 3.16 0.24 0.88 0.86 0.91 0.51 2.16 3.17 0.22 0.87 0.85 0.91 0.46 1.97 BASIN 3 RUNOFF SUMMARY BASIN AREA (ACRES)% IMP.C2 C100 Q2 (CFS)Q100 (CFS) 3.18 0.38 0.78 0.73 0.86 0.68 3.21 3.19 0.38 0.64 0.63 0.76 0.47 2.26 3.20 0.32 0.65 0.63 0.77 0.40 1.98 3.20.1 0.32 0.65 0.63 0.77 0.46 2.28 3.21 0.61 0.63 0.61 0.76 0.70 3.52 3.22 0.38 0.59 0.59 0.73 0.51 2.53 3.23 0.27 0.79 0.74 0.87 0.44 2.07 3.24 0.27 0.83 0.82 0.88 0.53 2.30 3.25 0.32 0.77 0.75 0.85 0.50 2.28 3.26 0.58 0.82 0.77 0.89 1.01 4.70 3.27 0.18 0.80 0.79 0.86 0.35 1.52 3.28 0.19 0.80 0.78 0.86 0.36 1.61 3.29 0.58 0.76 0.71 0.85 0.98 4.74 3.30 0.47 0.75 0.73 0.83 0.73 3.35 3.31 0.13 0.54 0.55 0.70 0.16 0.83 3.32 0.59 0.76 0.71 0.85 1.00 4.83 3.33 0.13 0.85 0.83 0.89 0.26 1.14 3.34 0.13 0.85 0.83 0.89 0.26 1.14 BASIN AREA (ACRES)% IMP.C2 C100 Q2 (CFS)Q100 (CFS) 4.1 0.94 0.22 0.34 0.46 0.57 3.08 4.2 0.36 0.72 0.72 0.81 0.57 2.61 4.3 0.13 0.62 0.66 0.73 0.21 0.93 4.4 0.83 0.09 0.25 0.36 0.38 2.21 4.5 0.57 0.84 0.80 0.89 1.09 4.90 4.6 0.09 0.67 0.70 0.77 0.15 0.68 4.7 2.88 0.71 0.66 0.82 3.56 17.81 4.8 0.73 0.65 0.68 0.75 1.09 4.82 4.9 0.38 0.65 0.65 0.77 0.55 2.62 4.10 0.71 0.02 0.20 0.31 0.26 1.64 4.11 0.69 0.81 0.76 0.88 1.19 5.53 4.12 0.92 0.47 0.54 0.63 0.91 4.27 4.13 2.09 0.41 0.50 0.58 1.86 8.71 4.14 0.07 0.72 0.74 0.80 0.13 0.55 4.15 0.19 0.54 0.59 0.67 0.26 1.17 4.16 0.54 0.62 0.63 0.74 0.71 3.38 4.17 0.59 0.44 0.52 0.60 0.61 2.83 BASIN 4 RUNOFF SUMMARY BASIN AREA (ACRES)% IMP.C2 C100 Q2 (CFS)Q100 (CFS) 4.18 0.12 0.66 0.66 0.77 0.19 0.88 4.19 0.10 0.41 0.50 0.59 0.11 0.52 4.20 0.19 0.66 0.67 0.77 0.31 1.44 4.21 0.22 0.47 0.54 0.62 0.26 1.18 4.22 0.03 0.35 0.45 0.54 0.03 0.14 4.23 0.78 0.56 0.61 0.69 1.02 4.63 4.24 1.34 0.83 0.82 0.88 2.68 11.60 4.25 0.34 0.65 0.69 0.76 0.56 2.49 4.26 0.24 0.63 0.67 0.74 0.37 1.64 4.27 0.65 0.71 0.73 0.80 1.08 4.77 4.28 0.53 0.69 0.71 0.78 0.85 3.74 4.29 0.63 0.69 0.71 0.78 0.98 4.35 4.30 0.92 0.72 0.74 0.81 1.41 6.23 4.31 1.15 0.57 0.62 0.69 1.46 6.52 4.32 0.21 0.86 0.84 0.90 0.43 1.86 4.33 0.16 0.88 0.86 0.91 0.34 1.43 4.34 0.09 0.78 0.78 0.85 0.17 0.75 OVERALL BASIN COMPOSITE SUMMARY BASINS AC IMP.C2 C100 Q2 Q100 2.1-2.29 (POND E)38.41 22.1%0.38 0.45 27.92 133.40 3.1-3.34 (POND A2)14.60 69.1%0.67 0.78 21.52 105.60 4.1-4.42 (POND A1 & NO. 8) 20.99 58.0%0.61 0.71 27.31 126.28 SITE TOTAL 74.00 41.6%0.50 0.59 76.75 365.28 RAIN GARDEN TRIB. AREA (AC)% IMP.WQ WSEL DEPTH (IN)REQUIRED WQCV VOL. (FT3) PROVIDED WQCV VOL. (FT3) REQUIRED SURFACE AREA (FT2) PROVIDED SURFACE AREA (FT2) A2.1 0.61 63%5011.22 6 436 752 334 1089 A2.2 0.32 65%5012.60 6 237 260 182 290 A2.3 0.32 65%5013.70 6 237 357 182 275 A2.4 0.38 64%5015.83 6 275 479 211 567 A1.1 4.95 61%5006.00 12 4787 6707 2619 5589 A1.2 2.83 39%5011.56 12 2028 3111 958 2128 POND A2 SUMMARY Q2 IN (CFS)16 Q2 OUT (CFS)3.4 Q100 IN (CFS)91 Q100 OUT (CFS)21 WQ VOL REQ (AC-FT)0.3 WQ VOL PROVIDED (AC-FT)0.4 2YR VOL (AC-FT)0.46 100YR VOL (AC-FT)1.6 WQ WSEL 5002.79 2YR WSEL 5002.98 100YR WSEL 5005.63 BASIN 4 RUNOFF SUMMARY BASIN AREA (ACRES)% IMP.C2 C100 Q2 (CFS)Q100 (CFS) 4.35 0.04 0.51 0.58 0.66 0.05 0.24 4.36 0.07 0.58 0.63 0.70 0.11 0.48 4.37 0.05 1.00 0.95 1.00 0.12 0.49 4.38 0.10 0.66 0.64 0.78 0.14 0.68 4.39 0.18 0.73 0.74 0.81 0.33 1.43 4.40 0.04 0.51 0.58 0.66 0.06 0.26 4.41 0.03 1.00 0.95 1.00 0.07 0.30 4.42 0.07 0.58 0.63 0.70 0.11 0.48 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S PH A S E G D R A I N A G E P L A N D3 BASIN AREA (ACRES)% IMP.C2 C100 Q2 (CFS)Q100 (CFS) 3.1 0.71 0.73 0.72 0.82 1.09 5.01 3.2 0.47 0.76 0.71 0.85 0.76 3.67 3.3 0.85 0.74 0.72 0.83 1.42 6.59 3.4 0.49 0.76 0.71 0.85 0.83 3.99 3.5 1.05 0.74 0.71 0.83 1.63 7.66 3.6 0.40 0.74 0.73 0.82 0.71 3.23 3.7 0.27 0.77 0.74 0.85 0.49 2.26 3.8 0.52 0.79 0.74 0.87 0.93 4.39 3.9 0.45 0.74 0.73 0.82 0.80 3.63 3.10 0.27 0.78 0.76 0.85 0.41 1.85 3.11 0.45 0.79 0.74 0.87 0.66 3.11 3.12 0.34 0.72 0.69 0.82 0.57 2.74 3.13 0.13 0.77 0.78 0.84 0.25 1.07 3.14 0.38 0.78 0.78 0.84 0.69 2.99 3.15 1.13 0.02 0.20 0.31 0.48 3.00 3.16 0.24 0.88 0.86 0.91 0.51 2.16 3.17 0.22 0.87 0.85 0.91 0.46 1.97 BASIN 3 RUNOFF SUMMARY BASIN AREA (ACRES)% IMP.C2 C100 Q2 (CFS)Q100 (CFS) 3.18 0.38 0.78 0.73 0.86 0.68 3.21 3.19 0.38 0.64 0.63 0.76 0.47 2.26 3.20 0.32 0.65 0.63 0.77 0.40 1.98 3.20.1 0.32 0.65 0.63 0.77 0.46 2.28 3.21 0.61 0.63 0.61 0.76 0.70 3.52 3.22 0.38 0.59 0.59 0.73 0.51 2.53 3.23 0.27 0.79 0.74 0.87 0.44 2.07 3.24 0.27 0.83 0.82 0.88 0.53 2.30 3.25 0.32 0.77 0.75 0.85 0.50 2.28 3.26 0.58 0.82 0.77 0.89 1.01 4.70 3.27 0.18 0.80 0.79 0.86 0.35 1.52 3.28 0.19 0.80 0.78 0.86 0.36 1.61 3.29 0.58 0.76 0.71 0.85 0.98 4.74 3.30 0.47 0.75 0.73 0.83 0.73 3.35 3.31 0.13 0.54 0.55 0.70 0.16 0.83 3.32 0.59 0.76 0.71 0.85 1.00 4.83 3.33 0.13 0.85 0.83 0.89 0.26 1.14 3.34 0.13 0.85 0.83 0.89 0.26 1.14 BASIN AREA (ACRES)% IMP.C2 C100 Q2 (CFS)Q100 (CFS) 4.1 0.94 0.22 0.34 0.46 0.57 3.08 4.2 0.36 0.72 0.72 0.81 0.57 2.61 4.3 0.13 0.62 0.66 0.73 0.21 0.93 4.4 0.83 0.09 0.25 0.36 0.38 2.21 4.5 0.57 0.84 0.80 0.89 1.09 4.90 4.6 0.09 0.67 0.70 0.77 0.15 0.68 4.7 2.88 0.71 0.66 0.82 3.56 17.81 4.8 0.73 0.65 0.68 0.75 1.09 4.82 4.9 0.38 0.65 0.65 0.77 0.55 2.62 4.10 0.71 0.02 0.20 0.31 0.26 1.64 4.11 0.69 0.81 0.76 0.88 1.19 5.53 4.12 0.92 0.47 0.54 0.63 0.91 4.27 4.13 2.09 0.41 0.50 0.58 1.86 8.71 4.14 0.07 0.72 0.74 0.80 0.13 0.55 4.15 0.19 0.54 0.59 0.67 0.26 1.17 4.16 0.54 0.62 0.63 0.74 0.71 3.38 4.17 0.59 0.44 0.52 0.60 0.61 2.83 BASIN 4 RUNOFF SUMMARY BASIN AREA (ACRES)% IMP.C2 C100 Q2 (CFS)Q100 (CFS) 4.18 0.12 0.66 0.66 0.77 0.19 0.88 4.19 0.10 0.41 0.50 0.59 0.11 0.52 4.20 0.19 0.66 0.67 0.77 0.31 1.44 4.21 0.22 0.47 0.54 0.62 0.26 1.18 4.22 0.03 0.35 0.45 0.54 0.03 0.14 4.23 0.78 0.56 0.61 0.69 1.02 4.63 4.24 1.34 0.83 0.82 0.88 2.68 11.60 4.25 0.34 0.65 0.69 0.76 0.56 2.49 4.26 0.24 0.63 0.67 0.74 0.37 1.64 4.27 0.65 0.71 0.73 0.80 1.08 4.77 4.28 0.53 0.69 0.71 0.78 0.85 3.74 4.29 0.63 0.69 0.71 0.78 0.98 4.35 4.30 0.92 0.72 0.74 0.81 1.41 6.23 4.31 1.15 0.57 0.62 0.69 1.46 6.52 4.32 0.21 0.86 0.84 0.90 0.43 1.86 4.33 0.16 0.88 0.86 0.91 0.34 1.43 4.34 0.09 0.78 0.78 0.85 0.17 0.75 OVERALL BASIN COMPOSITE SUMMARY BASINS AC IMP.C2 C100 Q2 Q100 2.1-2.29 (POND E)38.41 22.1%0.38 0.45 27.92 133.40 3.1-3.34 (POND A2)14.60 69.1%0.67 0.78 21.52 105.60 4.1-4.42 (POND A1 & NO. 8) 20.99 58.0%0.61 0.71 27.31 126.28 SITE TOTAL 74.00 41.6%0.50 0.59 76.75 365.28 RAIN GARDEN TRIB. AREA (AC)% IMP.WQ WSEL DEPTH (IN)REQUIRED WQCV VOL. (FT3) PROVIDED WQCV VOL. (FT3) REQUIRED SURFACE AREA (FT2) PROVIDED SURFACE AREA (FT2) A2.1 0.61 63%5011.22 6 436 752 334 1089 A2.2 0.32 65%5012.60 6 237 260 182 290 A2.3 0.32 65%5013.70 6 237 357 182 275 A2.4 0.38 64%5015.83 6 275 479 211 567 A1.1 4.95 61%5006.00 12 4787 6707 2619 5589 A1.2 2.83 39%5011.56 12 2028 3111 958 2128 POND A2 SUMMARY Q2 IN (CFS)16 Q2 OUT (CFS)3.4 Q100 IN (CFS)91 Q100 OUT (CFS)21 WQ VOL REQ (AC-FT)0.3 WQ VOL PROVIDED (AC-FT)0.4 2YR VOL (AC-FT)0.46 100YR VOL (AC-FT)1.6 WQ WSEL 5002.79 2YR WSEL 5002.98 100YR WSEL 5005.63 1 BASIN 4 RUNOFF SUMMARY BASIN AREA (ACRES)% IMP.C2 C100 Q2 (CFS)Q100 (CFS) 4.35 0.04 0.51 0.58 0.66 0.05 0.24 4.36 0.07 0.58 0.63 0.70 0.11 0.48 4.37 0.05 1.00 0.95 1.00 0.12 0.49 4.38 0.10 0.66 0.64 0.78 0.14 0.68 4.39 0.18 0.73 0.74 0.81 0.33 1.43 4.40 0.04 0.51 0.58 0.66 0.06 0.26 4.41 0.03 1.00 0.95 1.00 0.07 0.30 4.42 0.07 0.58 0.63 0.70 0.11 0.48 PH A S E G D R A I N A G E P L A N MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S D4 BASIN 2 RUNOFF SUMMARY BASIN AREA (ACRES)% IMP.C2 C100 Q2 (CFS)Q100 (CFS) 2.1 0.27 0.85 0.85 0.90 0.55 2.34 2.2 0.22 0.33 0.47 0.53 0.25 1.15 2.3 0.33 0.23 0.40 0.46 0.30 1.38 2.4 1.01 0.24 0.41 0.47 0.87 4.02 2.5 0.93 0.14 0.33 0.39 0.55 2.63 2.7 25.53 0.02 0.25 0.31 9.52 47.52 2.8 0.85 0.77 0.74 0.85 1.44 6.68 2.9 0.44 0.79 0.76 0.86 0.79 3.62 2.10 0.46 0.75 0.72 0.84 0.69 3.24 2.10.1 0.08 0.51 0.60 0.66 0.12 0.52 2.11 0.37 0.79 0.74 0.87 0.66 3.11 2.12 0.16 0.74 0.74 0.82 0.28 1.27 2.13 0.34 0.80 0.75 0.87 0.54 2.51 2.14 0.36 0.73 0.71 0.82 0.62 2.90 2.15 0.27 0.72 0.69 0.82 0.43 2.08 2.16 0.12 0.74 0.73 0.82 0.20 0.91 BASIN 2 RUNOFF SUMMARY BASIN AREA (ACRES)% IMP.C2 C100 Q2 (CFS)Q100 (CFS) 2.17 0.46 0.77 0.72 0.86 0.71 3.42 2.18 0.16 0.77 0.74 0.84 0.29 1.31 2.19 0.12 0.77 0.78 0.84 0.22 0.97 2.20 0.64 0.74 0.72 0.83 1.12 5.20 2.21 1.08 0.73 0.70 0.82 1.60 7.57 2.22 0.87 0.60 0.60 0.74 1.09 5.44 2.22.1 0.11 0.82 0.81 0.87 0.22 0.94 2.23 0.50 0.78 0.73 0.87 0.89 4.28 2.24 0.10 0.80 0.80 0.86 0.20 0.85 2.25 0.10 0.80 0.80 0.86 0.20 0.85 2.26 0.81 0.46 0.52 0.63 0.78 3.79 2.27 0.52 0.56 0.57 0.70 0.55 2.73 2.27.1 0.23 0.83 0.82 0.88 0.46 1.99 2.28 0.60 0.82 0.77 0.88 1.12 5.14 2.29 0.37 0.76 0.73 0.84 0.66 3.06 OVERALL BASIN COMPOSITE SUMMARY BASINS AC IMP.C2 C100 Q2 Q100 2.1-2.29 (POND E)38.41 22.1%0.38 0.45 27.92 133.40 3.1-3.34 (POND A2)14.60 69.1%0.67 0.78 21.52 105.60 4.1-4.42 (POND A1 & NO. 8) 20.99 58.0%0.61 0.71 27.31 126.28 SITE TOTAL 74.00 41.6%0.50 0.59 76.75 365.28 POND E SUMMARY Q2 IN (CFS)34 Q2 OUT (CFS)1.8 Q100 IN (CFS)198 Q100 OUT (CFS)3.0 2YR VOL (AC-FT)1.5 100YR VOL (AC-FT)16.5 2YR WSEL 4997.43 100YR WSEL 5002.20 1 907904 438 426 430 436 435 437 425 432 427 MAPLE HILL SUBDIVISION STORYBOOK SUBDIVISION SOD FARM ANHEUSER BUSCH WATERGLEN SUBDIVISION TRAIL HEAD SUBDIVISION L&W C A N A L NO . 8 D I T C H L&W CANAL N. G I D D I N G S R D . C& S R A I L R O A D I- 2 5 RICHARDS LAKE RD. (CR 52) 242 74 73 7 7 36 35 23 5 29 22 9 25 75 72 2 6 9 4 1 23 4 23 1 3 4 237 2 2 7 2 3 2 2 7 22 8 3 2 73 0 30 31 7435 729 7431 725 841 891 37 941942 834 940 7438 726 826 842 829 730 828 822 2 2 3 24 833433 428 8312887 723 23 424 823 MOUNTAIN VISTA DR. (CR 50) 830 32 727 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S CO O P E R S L O U G H E X I S T I N G D R A I N A G E P L A N D5 ---- 907904 438 POND A2 426 424 430 436 435 437 POND D 425 427 MAPLE HILL SUBDIVISION STORYBOOK SUBDIVISION SOD FARM ANHEUSER BUSCH WATERGLEN SUBDIVISION TRAIL HEAD SUBDIVISION L&W C A N A L NO . 8 D I T C H L&W CANAL N. G I D D I N G S R D . C& S R A I L R O A D I- 2 5 RICHARDS LAKE RD. (CR 52) MOUNTAIN VISTA DR. (CR 50) 242 74 . 2 74 . 1 7 7 73 . 2 36 35 23 5 29 22 9 25 75 72 . 2 2 6 3 2 . 1 9 4 1 23 4 23 1 3 4 237 2 2 7 2 3 2 2 6 . 1 2 6 . 2 73 0 30 31 833.1 7435 729 7431 725 841 891 37 822.1 941942 834 940 7438 726 833.2 842 829 730 831 828 822.2 72 . 1 73 . 1 POND E POND F POND G2 3 2 826 432 32 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S CO O P E R S L O U G H I N T E R I M D R A I N A G E P L A N D6 ---- POND SUMMARY SWMM ELEMENT EX. Q100 IN (CFS) INT. Q100 IN (CFS) EX. Q100 OUT (CFS) INT. Q100 OUT (CFS) EX. VOL. (AC-FT) INT. VOL. (AC-FT) 4241 280 280 26 26 6 6 4251 693 693 479 479 62 62 4261 1379 1378 677 676 241 241 4271 137 159 8 7 6 15 4281 103 N/A 0 N/A 13 N/A 4301 231 231 29 29 6 6 4321 176 205 2 2 20 105 4331 1299 N/A 10 N/A 47 N/A 4371 369 369 245 245 7 7 4381 916 916 1 1 124 124 A22 N/A 90 N/A 21 N/A 2 D2 N/A 174 N/A 5 N/A 9 E2 N/A 198 N/A 3 N/A 17 F2 N/A 218 N/A 13 N/A 10 G22 N/A 52 N/A 8.7 N/A 1.1 CO O P E R S L O U G H I N T E R I M D R A I N A G E P L A N D7 ---- MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S BASIN SUMMARY BASIN ID AREA (AC)% IMP Q100 (CFS) 17 52 5 140 22 11 5 33 23 31 5 52 24 34 45 280 25 129 5 140 26 155 5 226 27 73 5 139 28 82 10 108 29 269 29 1000 30 34 49 231 31 185 7 309 32 120 6 100 34 129 9 213 37 35 23 148 38 291 5 469 200 34 5 46 201 15 5 61 A1.1 5 61 23 A1.2 3 39 11 A1.3 10 76 57 A2 15 69 91 D 44 60 174 E 15 71 71 F_E 21 60 76 F_D 35 60 141 G1 34 80 130 G1_EX 40 5 31 G2 8 80 52 OS-1 45 20 71 CONVEYANCE SUMMARY SWMM ELEMENT EX. Q100 (CFS) INT. Q100 (CFS) 23 51 N/A 24 10 N/A 24of 13 N/A 25 693 639 26 318 317 26.1 N/A 13 26.2 N/A 5 27 137 N/A 28 N/A 42 29 662 662 30 308 308 31 319 319 32.1 176 101 32.2 176 163 34 1708 1708 37 136 136 38 479 479 72 362 N/A 73 365 N/A 74 398 N/A 72.1 362 283 72.2 362 266 73.1 365 266 73.2 365 263 74.1 398 250 74.2 398 399 75 402 400 76 346 346 77 956 956 87 48 N/A 223 32 N/A 227 32 32 228 3 N/A 229 684 684 231 1313 1313 232 0 0 234 1332 1332 235 414 414 236 1547 1547 237 199 199 242 665 665 244 317 317 730 32 32 828D 3 N/A 828L 362 N/A 842D 654 654 842L 346 346 940D 310 310 940L 1335 1335 941 312 312 DESIGN POINT SUMMARY SWMM ELEMENT EX. Q100 (CFS) INT. Q100 (CFS) 28 71 71 31 309 309 32 213 164 37 148 148 38 469 469 723 52 N/A 725 693 693 726 237 237 727 139 N/A 729 1000 1000 730 318 318 822 397 N/A 822.1 N/A 358 822.2 N/A 283 823 58 N/A 826 49 49 828 362 266 829 701 701 830 3 N/A 831 365 266 833 409 N/A 833.1 N/A 263 833.2 N/A 399 834 1777 1777 839 404 404 841 405 403 842 1002 1002 843 654 654 844 346 346 904 677 676 907 479 479 940 1708 1708 941 310 310 942 1335 1335 7430 29 29 7431 1375 1375 7435 415 415 7436 1547 1547 7437 245 245 OUTFALL SUMMARY SWMM ELEMENT EX. Q100 (CFS) INT. Q100 (CFS) 822 397 N/A 822.1 N/A 358 904 677 676 907 479 479 AA B B A A DR A I N A G E D E T A I L S MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S D8 AA B B A A MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S DR A I N A G E D E T A I L S D9 AA B B A A MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S DR A I N A G E D E T A I L S D10 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S DR A I N A G E D E T A I L S D11 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S DR A I N A G E D E T A I L S D12 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S DR A I N A G E D E T A I L S D13 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S DR A I N A G E D E T A I L S D14 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S DR A I N A G E D E T A I L S D15 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S DR A I N A G E D E T A I L S D16 SECTION C-C SECTION B-B SECTION A-A DETAIL 1 PLAN A A B C C B MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S DR A I N A G E D E T A I L S D17 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S DR A I N A G E D E T A I L S D18 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S DR A I N A G E D E T A I L S D19 FL O W MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S DR A I N A G E D E T A I L S D20 STANDARD CONCRETE NOTES MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S 811 R1.0 CO V E R # UTILITY PLANS FOR MONTAVA SUBDIVISION PHASE G ROADWAY AND INFRASTRUCTURE A PARCEL OF LAND SITUATED IN SECTION 32, TOWNSHIP 8 NORTH, RANGE 68 WEST OF THE SIXTH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO VICINITY MAP SITE ” MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R1.1 GE N E R A L N O T E S ” MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R1.2 GE N E R A L N O T E S “" “” · · · · · · · · “ ” MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R1.3 GE N E R A L N O T E S “” “ ” MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R1.4 TY P I C A L S E C T I O N S MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R1.5 GE O M E T R I C L A Y O U T 811 MOUNTAIN VISTA DR. TI M B E R L I N E R D . MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R1.6 GE O M E T R I C C O N T R O L P L A N - RO U N D A B O U T 811 MOUNTAIN VISTA DR. TI M B E R L I N E R D . MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R1.7 GE O M E T R I C C O N T R O L P L A N - RO U N D A B O U T E D G E O F P A V E M E N T 811 CHESAPEAKE DR. TI M B E R L I N E R D . CHESAPEAKE D R . MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R1.8 GE O M E T R I C C O N T R O L P L A N - KI D N E Y B E A N @ C H E S A P E A K E 811 LONGWOOD DR. TI M B E R L I N E R D . MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R1.9 GE O M E T R I C C O N T R O L P L A N - KI D N E Y B E A N @ L O N G W O O D 811 TIMBERLINE RD. CH E S A P E A K E D R . MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R1.10 R1 . 1 0 - G E O M E T R I C C O N T R O L P L A N - T I M B E R L I N E F L O W L I N E S 811 TIMBERLINE RD. LO N G W O O D D R . CH E S A P E A K E D R . MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R1.11 R1 . 1 1 - G E O M E T R I C C O N T R O L P L A N - T I M B E R L I N E F L O W L I N E S 811 LO N G W O O D D R . TIMBERL I N E R D . MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R1.12 R1 . 1 2 - G E O M E T R I C C O N T R O L P L A N - T I M B E R L I N E F L O W L I N E S 811 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R1.13 DE M O L I T I O N P L A N - M O U N T A I N V I S T A D R . 811 SE E B E L O W L E F T SE E B E L O W L E F T SE E A B O V E R I G H T SE E A B O V E R I G H T SEE SHEET R1.14 SEE SHEET R1.14 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R1.14 DE M O L I T I O N P L A N - N . T I M B E R L I N E R D . SE E S H E E T R1 . 1 3 SE E S H E E T R1 . 1 3 SE E B E L O W L E F T SE E A B O V E R I G H T 811 VA U L T VA U L T VA U L T VAULT VA U L T VAULT VA U L T VAUL T VA U L T VA U L T VA U L T VAULT VAULT VAULT VA U L T VAULT VAULT VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VAULT VA U L T VAULT VAULT VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VAULT VAULT VAULT VAULT VA U L T VAULT VA U L T VAULT VA U L T VA U L T MONTAVA PHASE G # MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S 811 R1.15 OV E R A L L U T I L I T Y P L A N MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S STORMWATER MANAGEMENT PLANS FOR MONTAVA - PHASE G ROADWAY & INFRASTRUCTURE PLANS A PARCEL OF LAND SITUATED IN THE SOUTH HALF OF SECTION 32, TOWNSHIP 8 NORTH, RANGE 68 WEST OF THE SIXTH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO 811 VICINITY MAP SITE # ER O S I O N C O N T R O L C O V E R S H E E T R2.0 ” MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S “” “” “ ” ER O S I O N C O N T R O L N O T E S R2.1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R2.2 IN I T I A L E R O S I O N C O N T R O L P L A N - MO U N T A I N V I S T A D R . 811 SE E B E L O W L E F T SE E B E L O W L E F T SE E A B O V E R I G H T SE E A B O V E R I G H T SEE SHEET R2.3 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R2.3 IN I T I A L E R O S I O N C O N T R O L P L A N - N . TI M B E R L I N E R D . 811 SE E B E L O W L E F T SE E A B O V E R I G H T SE E A B O V E R I G H T SE E B E L O W L E F T SE E A B O V E R I G H T SEE SHEET R2.2 SEE SHEET R2.2 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R2.4 IN I T I A L E R O S I O N C O N T R O L P L A N - N . TI M B E R L I N E R D . 811 SE E S H E E T R2 . 3 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R2.5 IN T E R I M E R O S I O N C O N T R O L P L A N - MO U N T A I N V I S T A D R . 811 SE E B E L O W L E F T SE E B E L O W L E F T SE E A B O V E R I G H T SE E A B O V E R I G H T SEE SHEET R2.6 SEE SHEET R2.6 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R2.6 IN T E R I M E R O S I O N C O N T R O L P L A N - N. T I M B E R L I N E R D . 811 SE E B E L O W L E F T SE E A B O V E R I G H T SE E A B O V E R I G H T SEE SHEET R2.5 SE E B E L O W L E F T SEE SHEET R2.5 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R2.7 IN T E R I M E R O S I O N C O N T R O L P L A N - N. T I M B E R L I N E R D . 811 SE E S H E E T R2 . 6 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R2.8 FI N A L E R O S I O N C O N T R O L P L A N - MO U N T A I N V I S T A D R . 811 SE E B E L O W L E F T SE E B E L O W L E F T SE E A B O V E R I G H T SE E A B O V E R I G H T SEE SHEET R2.9 SEE SHEET R2.9 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R2.9 FI N A L E R O S I O N C O N T R O L P L A N - N . TI M B E R L I N E R D . 811 SE E B E L O W L E F T SE E A B O V E R I G H T SE E A B O V E R I G H T SEE SHEET __ SE E B E L O W L E F T SE E A B O V E R I G H T SEE SHEET R2.8 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R2.10 FI N A L E R O S I O N C O N T R O L P L A N - N . TI M B E R L I N E R D . 811 SE E S H E E T R2 . 9 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S ER O S I O N C O N T R O L D E T A I L S R2.11 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S ER O S I O N C O N T R O L D E T A I L S R2.12 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S ER O S I O N C O N T R O L D E T A I L S R2.13 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S ER O S I O N C O N T R O L D E T A I L S R2.14 MOUNTAIN VISTA DR MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.0 MO U N T A I N V I S T A D R . P L A N A N D P R O F I L E ST A . 9 + 0 0 T O 1 5 + 0 0 SE E S H E E T R3 . 1 811 MOUNTAIN VISTA DR MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.1 MO U N T A I N V I S T A D R . P L A N A N D P R O F I L E ST A . 1 5 + 0 0 T O 2 1 + 5 0 SE E S H E E T R3 . 2 SE E S H E E T R3 . 0 811 MOUNTAIN VISTA DR MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.2 MO U N T A I N V I S T A D R . P L A N A N D P R O F I L E ST A . 2 1 + 5 0 T O 2 8 + 0 0 SE E S H E E T R3 . 3 SE E S H E E T R3 . 1 811 SEE SHEET R3.6 SEE SHEET R3.6 MOUNTAIN VISTA DR MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.3 MO U N T A I N V I S T A D R . P L A N A N D P R O F I L E ST A . 2 8 + 0 0 T O 3 4 + 5 0 SE E S H E E T R3 . 2 SE E S H E E T R 3 . 4 811 MOUNTAIN VISTA DR MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.4 MO U N T A I N V I S T A D R . P L A N A N D P R O F I L E ST A . 3 4 + 5 0 T O 4 1 + 0 0 SE E S H E E T R 3 . 3 811 TIMBERLINE MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.5 N. T I M B E R L I N E R D . P L A N A N D P R O F I L E ST A . 5 1 + 0 0 T O 5 7 + 0 0 37 811 SE E S H E E T R3 . 6 & R3 . 2 7 TIMBERLINE MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.6 N. T I M B E R L I N E R D . P L A N A N D PR O F I L E S T A . 5 7 + 0 0 T O 6 4 + 0 0 38 SE E S H E E T R3 . 5 SE E S H E E T R3 . 7 SEE SHEET R3.2 SEE SHEET R3.2 811 TIMBERLINE MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.7 N. T I M B E R L I N E R D . P L A N A N D PR O F I L E S T A . 6 4 + 0 0 T O 7 0 + 5 0 39 SE E S H E E T R3 . 6 SE E S H E E T R3 . 6 811 TIMBERLINE MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.8 N. T I M B E R L I N E R D . P L A N A N D PR O F I L E S T A . 7 0 + 5 0 8 4 + 0 0 40 S E E S H E E T R 3 . 6 811 HCL - ROUNDABOUT INSIDE EOP MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.9 RO U N D A B O U T P L A N & P R O F I L E -I N S I D E E O P 811 HCL - ROUNDABOUT MOUNTAIN VISTA DR WEST MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.10 RO U N D A B O U T P L A N & P R O F I L E - WE S T L E G 811 HCL - ROUNDABOUT MOUNTAIN VISTA DR EAST MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.11 RO U N D A B O U T P L A N & P R O F I L E - EA S T L E G 811 HCL - ROUNDABOUT TIMBERLINE RD SOUTH MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.12 RO U N D A B O U T P L A N & P R O F I L E - SO U T H L E G 811 ROUNDABOUT TIMBERLINE RD NORTH MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.13 RO U N D A B O U T P L A N & P R O F I L E - NO R T H L E G 811 NW QUAD EOP MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.14 RO U N D A B O U T P L A N & P R O F I L E - NW Q U A D 811 NE QUAD EOP MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.15 RO U N D A B O U T P L A N & P R O F I L E - NE Q U A D 811 HCL - SE QUAD EOP MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.16 RO U N D A B O U T P L A N & P R O F I L E - S E QU A D 811 HCL - SW QUAD EOP MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.17 RO U N D A B O U T P L A N & P R O F I L E - SW Q U A D 811 MOUNTAIN VISTA DR. MOUNTAIN VISTA LT FL 1 FTC DOUBLE CURB INLET MOUNTAIN VISTA LT FL 2 MOUNTAIN VISTA DR. MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.18 MO U N T A I N V I S T A F L O W L I N E S 811 MOUNTAIN V I S T A D R TI M B E R L I N E R D . RAB NW FL FTC DOUBLE CURB INLET FTC SINGLE CURB INLET MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.19 RO U N D A B O U T N W F L O W L I N E 811 TI M B E R L I N E R D . RAB NE FL FTC SINGLE CURB INLET FTC SINGLE CURB INLET MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.20 RO U N D A B O U T N E F L O W L I N E 811 TI M B E R L I N E R D . RAB SE FL TRIPLE TYPR 16 COMBO INLET FTC DOUBLE CURB INLET MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.21 RO U N D A B O U T S E F L O W L I N E 811 TI M B E R L I N E R D . MOUNTAIN VISTA DR RAB SW FL FTC TRIPLE CURB INLET TRIPLE TYPR 16 COMBO INLET MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.22 RO U N D A B O U T S W F L O W L I N E 811 TIMBERLINE RD. TIMBERLINE LT FL 1 SINGLE TYPE 16 VALLEY INLET SINGLE TYPE 16 VALLEY INLET TIMBERLINE RT FL 1 DOUBLE TYPE 16 VALLEY INLET SINGLE TYPE 16 VALLEY INLET MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.23 TI M B E R L I N E F L O W L I N E S 811 TIMBERLINE LT FL 2 SINGLE TYPE 16 COMBO INLET SINGLE TYPE 16 COMBO INLET FTC SINGLE CURB INLET SINGLE TYPE 16 VALLEY INLET TIMBERLINE RT FL 2 FTC DOUBLE CURB INLET DOUBLE TYPE 16 COMBO INLET DOUBLE TYPE 16 COMBO INLET SINGLE TYPE 16 VALLEY INLET SINGLE TYPE 16 VALLEY INLET MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.24 TI M B E R L I N E F L O W L I N E S 811 TIMBERLINE LT FL 3 FTC SINGLE CURB INLET TIMBERLINE RT FL 3 FTC DOUBLE CURB INLETSINGLE TYPE 16 VALLEY INLET SINGLE TYPE 16 VALLEY INLET MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.25 TI M B E R L I N E F L O W L I N E S 811 BE L L F I E L D A V E . MOUNTAIN VISTA DR. MOUNTAIN VISTA DR. PA S E O D R . MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.26 MO U N T A I N V I S T A D R . A N D R O A D S 5 AN D 7 I N T E R S E C T I O N D E T A I L S 811 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.27 MO U N T A I N V I S T A D R . A N D N . TI M B E R L I N E R D . I N T E R S E C T I O N D E T A I L 811 SE E S H E E T R3 . 2 & R3 . 2 8 SE E S H E E T R3 . 2 & R3 . 2 8 SEE SHEET R3.7 & R3.29 SEE SHEET R3.7 & R3.29 MOUNTAIN VISTA D R PA S E O D R WA D E S T . MOUNTAIN VISTA D R MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.28 MO U N T A I N V I S T A D R . I S L A N D DE T A I L S 811 T I M B E R L I N E R D . T I M B E R L I N E R D . MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.29 TI M B E R L I N E I S L A N D D E T A I L S 811 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.30 TI M B E R L I N E I N T E R S E C T I O N DE T A I L S 811 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.31 TI M B E R L I N E I N T E R S E C T I O N DE T A I L S 811 TIMBERLINE TRAIL 1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.32 TR A I L P L A N & P R O F I L E 811 TIMBERLINE TRAIL 2 TIMBERLINE TRAIL 3 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.33 TR A I L P L A N & P R O F I L E 811 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.34 RO A D W A Y D E T A I L S STORMLINE I ST O I 1 ST I N L E T I 2 ST INLET I2 ST O I1 ST INLET K4 ST INLET K3 ST MH K2 (CONTINUOUS DEFLECTIVE SEPARATOR OR APPROVED EQUIVILANT) ST O K1 STORMLINE K ST I N L E T K 3 ST I N L E T K 4 ST M H K 2 ST O K 1 ST INLET S3 ST INLET S4 IR-MH-06 ST MH S2 (CONTINUOUS DEFLECTIVE SEPARATOR OR APPROVED EQUIVILANT) IR - M H - 0 6 STORMLINE S ST I N L E T S 4 ST I N L E T S 3 ST M H S 2 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E I K & S PL A N A N D P R O F I L E R3.35 ST MH W2 (CONTINUOUS DEFLECTIVE SEPARATOR OR APPROVED EQUIVILANT) ST MH W3 ST MH W4 ST INLET W6 ST MH O2 (CONTINUOUS DEFLECTIVE SEPARATOR OR APPROVED EQUIVILANT) ST INLET O3 ST INLET O4 ST MH 236 ST INLET W5 STORMLINE W ST I N L E T W 6 ST M H W 2 ST M H W 3 ST M H W 4 ST I N L E T W 5 IR - M H - 0 4 STORMLINE O ST I N L E T O 3 ST I N L E T O 4 ST M H O 2 IR - M H - 0 3 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E W & O PL A N A N D P R O F I L E R3.36 ST INLET M2 ST INLET M3 STORMLINE M ST I N L E T M 2 ST I N L E T M 3 IR-MH-07 ST INLET H5 ST INLET T3 ST INLET T4 ST INLET X3 ST MH X2 ST MH X1 (CONTINUOUS DEFLECTIVE SEPARATOR OR APPROVED EQUIVILANT) ST INLET X1.1 ST INLET X1.2 STORMLINE T ST M H T 2 ST I N L E T T 3 ST I N L E T T 4 IR - M H - 0 8 STORMLINE X IR - M H - 0 7 ST M H X 1 ST M H X 2 ST I N L E T X 3 LATERAL X1 ST M H X 1 ST I N L E T X 1 . 1 ST I N L E T X 1 . 2 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E M , T , & X PL A N A N D P R O F I L E R3.37 IR-MH-05 ST MH V2 ST INLET V3 (SPECIAL) ST INLET V4.1 ST MH V5 ST INLET V5.1 ST MH V4 ST INLET V6 LATERAL V4 LATERAL V5 ST M H V 4 ST M H V 5 ST I N L E T V 5 . 1 ST I N L E T V 4 . 1 STORMLINE V ST I N L E T V 3 ( S P E C I A L ) ST M H V 2 ST M H V 5 ST I N L E T V 6 ST M H V 4 IR - M H - 0 5 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S ST O R M L I N E V PL A N A N D P R O F I L E R3.38 TYPICAL SECTION - SOIL RIPRAP WITH EROSION CONTROL FABRIC SLOPE VARIES (SEE PLANS) EROSION CONTROL BLANKET ON SLOPES 4 HORIZ. TO 1 VERT OR STEEPER (SEE PLANS) DESIGN RIPRAP GRADE FINISH GRADE SOIL RIPRAP MIX SOIL AND RIPRAP COMPLETELY (SEE NOTES) COMPACT SUBGRADE TO 95% STANDARD PROCTOR (ASTM D698) FILL RIPRAP VOIDS COMPLETELY WITH APPROVED FILL MATERIAL 9+00.00 9+50.00 10+00.00 10+50.00 11+00.00 11+50.00 12+00.00 12+50.00 13+00.00 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.39 MO U N T A I N V I S T A D R . C R O S S - S E C T I O N S (I N T E R I M C O N D I T I O N ) 13+50.00 14+00.00 14+50.00 15+00.00 15+50.00 16+00.00 16+50.00 17+00.00 17+50.00 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.40 MO U N T A I N V I S T A D R . C R O S S - S E C T I O N S (I N T E R I M C O N D I T I O N ) 20+00.00 20+50.00 21+00.00 21+50.00 22+00.00 18+00.00 18+50.00 19+00.00 19+50.00 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.41 MO U N T A I N V I S T A D R . C R O S S - S E C T I O N S (I N T E R I M C O N D I T I O N ) 22+50.00 23+00.00 23+50.00 24+00.00 24+50.00 25+00.00 25+50.00 26+00.00 26+50.00 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.42 MO U N T A I N V I S T A D R . C R O S S - S E C T I O N S (I N T E R I M C O N D I T I O N ) 27+00.00 27+50.00 28+00.00 28+50.00 29+00.00 29+50.00 30+00.00 30+50.00 31+00.00 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.43 MO U N T A I N V I S T A D R . C R O S S - S E C T I O N S (I N T E R I M C O N D I T I O N ) 31+50.00 32+00.00 32+50.00 33+00.00 33+50.00 34+00.00 34+50.00 35+00.00 35+50.00 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.44 MO U N T A I N V I S T A D R . C R O S S - S E C T I O N S (I N T E R I M C O N D I T I O N ) 36+00.00 36+50.00 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.45 MO U N T A I N V I S T A D R . C R O S S - S E C T I O N S (I N T E R I M C O N D I T I O N ) 55+00.00 55+50.00 56+00.00 56+50.00 57+00.00 57+50.00 58+00.00 58+50.00 59+00.00 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.46 N. T I M B E R L I N E R D . CR O S S - S E C T I O N S 59+50.00 60+00.00 60+50.00 61+00.00 61+50.00 62+00.00 62+50.00 63+00.00 63+50.00 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.47 N. T I M B E R L I N E R D . CR O S S - S E C T I O N S 64+00.00 64+50.00 65+00.00 65+50.00 66+00.00 66+50.00 67+00.00 67+50.00 68+00.00 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.48 N. T I M B E R L I N E R D . CR O S S - S E C T I O N S 68+50.00 69+00.00 69+50.00 70+00.00 70+50.00 71+00.00 71+50.00 72+00.00 72+50.00 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.49 N. T I M B E R L I N E R D . C R O S S - S E C T I O N S 73+00.00 73+50.00 74+00.00 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.50 N. T I M B E R L I N E R D . C R O S S - S E C T I O N S 11+50.00 12+00.00 12+50.00 13+00.00 13+50.00 14+00.00 14+50.00 15+00.00 15+50.00 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.51 MO U N T A I N V I S T A D R . C R O S S - S E C T I O N S (U L T I M A T E C O N D I T I O N ) 16+00.00 16+50.00 17+00.00 17+50.00 18+00.00 18+50.00 19+00.00 19+50.00 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.52 MO U N T A I N V I S T A D R . C R O S S - S E C T I O N S (U L T I M A T E C O N D I T I O N ) 32+50.0031+50.00 32+00.00 33+00.00 33+50.00 34+00.00 34+50.00 35+00.00 35+50.00 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.53 MO U N T A I N V I S T A D R . C R O S S - S E C T I O N S (U L T I M A T E C O N D I T I O N ) 36+00.00 36+50.00 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R3.54 MO U N T A I N V I S T A D R . C R O S S - S E C T I O N S (U L T I M A T E C O N D I T I O N ) 811 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R4.1 MO U N T A I N V I S T A D R . S I G N I N G A N D ST R I P I N G SE E S H E E T R4 . 5 SE E S H E E T R4 . 5 SE E B E L O W SE E A B O V E 4 5 L A N E R I G H T E N D S MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R4.2 N. T I M B E R L I N E R D . S I G N I N G A N D ST R I P I N G S T A . 5 1 + 5 0 T O 6 1 + 5 0 811 SE E S H E E T R4 . 5 4 5 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R4.3 N. T I M B E R L I N E R D . S I G N I N G A N D ST R I P I N G S T A . 6 1 + 5 0 T O 6 9 + 5 0 811 SE E S H E E T R4 . 5 SE E S H E E T R4 . 4 3 0 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R4.4 N T I M B E R L I N E R D . S I G N I N G A N D ST R I P I N G S T A T I O N 6 9 + 5 0 T O E N D 811 SE E S H E E T R4 . 3 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R4.5 RO U N D A B O U T S I G N I N G A N D ST R I P I N G 811 SE E S H E E T R4 . 1 SE E S H E E T R4 . 1 SEE SHEET R4.3 SEE SHEET R4.2 L A N E R I G H T E N D S MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S R4.6 KI D N E Y B E A N I N T E R S E C T I O N A L T E R N A T I V E S · · · · · ·· · · · N ARCHED UNDERPASS TYPICAL SECTION A A B5.0 MO U N T A I N V I S T A U N D E R P A S S G E N E R A L NO T E S A N D I N F O R M A T I O N MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G FU T U R E P R E L I M I N A R Y UN D E R P A S S P L A N S PRELIMINARY PLANS PREPARED TO SHOW FUTURE UNDERPASS AT MOUNTAIN VISTA DRIVE NOVEMBER 15, 2023 NOT FOR CONSTRUCTION STRUCTURAL NOTES - MOUNTAIN VISTA UNDERPASS DESIGN DATA JOINT SECTION A-A M O U N T A I N V I S T A D R I V E LONGITUDINAL SECTION B5.1 MO U N T A I N V I S T A U N D E R P A S S GE N E R A L L A Y O U T MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G FU T U R E P R E L I M I N A R Y UN D E R P A S S P L A N S PRELIMINARY PLANS PREPARED TO SHOW FUTURE UNDERPASS AT MOUNTAIN VISTA DRIVE NOVEMBER 15, 2023 NOT FOR CONSTRUCTION N UNDERPASS LAYOUT PLAN UTILITY NOTES: SOUTH PEDESTRIAN HEADWALL ELEVATION SOUTH PEDESTRIAN HEADWALL PLAN WINGWALL A ELEVATION B5.2 MO U N T A I N V I S T A U N D E R P A S S CO N S T R U C T I O N L A Y O U T - S O U T H MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G FU T U R E P R E L I M I N A R Y UN D E R P A S S P L A N S PRELIMINARY PLANS PREPARED TO SHOW FUTURE UNDERPASS AT MOUNTAIN VISTA DRIVE NOVEMBER 15, 2023 NOT FOR CONSTRUCTION UNDERDRAIN DETAIL FOOTING STEP DETAIL N ARCHITETURAL FORMLINER DETAIL NORTH PEDESTRIAN HEADWALL ELEVATION NORTH PEDESTRIAN HEADWALL PLAN B5.3 MO U N T A I N V I S T A U N D E R P A S S CO N S T R U C T I O N L A Y O U T - N O R T H MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G FU T U R E P R E L I M I N A R Y UN D E R P A S S P L A N S PRELIMINARY PLANS PREPARED TO SHOW FUTURE UNDERPASS AT MOUNTAIN VISTA DRIVE NOVEMBER 15, 2023 NOT FOR CONSTRUCTION N HEADWALL REINFORCING ELEVATION SECTION SECTION SECTIONSECTION SECTION SECTION B5.4 MO U N T A I N V I S T A U N D E R P A S S HE A D W A L L D E T A I L S MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G FU T U R E P R E L I M I N A R Y UN D E R P A S S P L A N S PRELIMINARY PLANS PREPARED TO SHOW FUTURE UNDERPASS AT MOUNTAIN VISTA DRIVE NOVEMBER 15, 2023 NOT FOR CONSTRUCTION SECTION SECTION EXCAVATION AND BACKFILL DETAILS WINGWALL DETAILUNDERPASS DETAIL B5.5 MO U N T A I N V I S T A U N D E R P A S S WI N G W A L L D E T A I L S MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G FU T U R E P R E L I M I N A R Y UN D E R P A S S P L A N S PRELIMINARY PLANS PREPARED TO SHOW FUTURE UNDERPASS AT MOUNTAIN VISTA DRIVE NOVEMBER 15, 2023 NOT FOR CONSTRUCTION NORTH SECURITY GRATE (TEMPORARY) AND FENCE PLAN SOUTH SECURITY GRATE (TEMPORARY) AND FENCE PLAN TYPICAL SECURITY GRATE (TEMPORARY) ELEVATION TEMPORARY SECURITY FENCE BASE PLATE PLAN TIMBER FENCE RAILING DETAIL TIMBER FENCE ELEVATION TIMBER FENCE SECTION A-A A A B5.6 TE M P O R A R Y G R A T E A N D TI M B E R R A I L D E T A I L S MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G FU T U R E P R E L I M I N A R Y UN D E R P A S S P L A N S PRELIMINARY PLANS PREPARED TO SHOW FUTURE UNDERPASS AT MOUNTAIN VISTA DRIVE NOVEMBER 15, 2023 NOT FOR CONSTRUCTION IR-MH-02 BOX BASE MH IR-MH-04 BOX BASE MH IR-MH-03 BOX BASE MH IR-MH-01 BOX BASE MH 822.1 822.2 NO.8 DITCH PIPE IR - M H - 0 2 12 8 " C D O T BO X B A S E M H IR - M H - 0 3 12 8 " C D O T BO X B A S E M H IR - M H - 0 1 12 8 " C D O T BO X B A S E M H ∅ A C C E S S M A N H O L E W/ 3 6 " R I N G A N D C O V E R IR - M H - 0 4 12 8 " C D O T BO X B A S E M H W/ 3 ' D I A . A C C E S S M H R6.0 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H P L A N A N D P R O F I L E ST A . 1 0 + 0 0 T O 2 1 + 0 0 IR-MH-06 BOX BASE MH IR-MH-08 BOX BASE MH IR-MH-09 BOX BASE MH 831 828 IR-MH-07 BOX BASE MH IR-MH-05 BOX BASE MH NO.8 DITCH PIPE IR - M H - 0 8 12 8 " C D O T BO X B A S E M H IR - M H - 0 5 12 8 " C D O T BO X B A S E M H IR - M H - 0 9 IR - M H - 0 7 12 8 " C D O T BO X B A S E M H IR - M H - 0 6 12 8 " C D O T BO X B A S E M H ∅ A C C E S S M A N H O L E W/ 3 6 " R I N G A N D C O V E R ∅ A C C E S S M A N H O L E W/ 3 6 " R I N G A N D C O V E R R6.1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H P L A N A N D P R O F I L E ST A . 2 1 + 0 0 T O 3 2 + 0 0 IR-MH-10 BOX BASE MH IR-MH-11 BOX BASE MH MAPLE HILL SUBDIVISION 833.1 NO.8 DITCH PIPE IR - M H - 1 0 IR - M H - 1 1 4' C D O T T - B A S E M H ∅ A C C E S S M A N H O L E W/ 3 6 " R I N G A N D C O V E R MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H P L A N A N D P R O F I L E ST A . 3 2 + 0 0 T O 4 3 + 0 0 R6.2 A A 833.2 NO. 8 DITCH DIVERSION A-A MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H D I V E R S I O N P L A N A N D PR O F I L E R6.3 1 DESIGN POINT Q100 PROP. (CFS) Q100 EX. (CFS) 833.2 399 409 833.1 263 409 831 266 365 828 266 362 822.2 283 362 822.1 358 397 DIVERSION TABLE Q100 DIVERTED AT DP 833.2 164 CFS Q100 REMAINING IN NO.8 AFTER DP 833.2 235 CFS 833.1 IR-MH-01 BOX BASE MH MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 H E A D W A L L T I E - I N B L O W U P S R6.4TYPICAL SECTION - VOID FILLED RIPRAP WITH EROSION CONTROL FABRIC MIX REQUIREMENTS FOR UDFCD TYPE-M AND TYPE-H VOID-FILLED RIPRAP (D50 = 12 TO 18 INCH) APPROPRIATE PROPORTIONS (BY VOLUME) MATERIAL TYPE MATERIAL DESCRIPTION 6 PARTS RIPRAP D50 = 12-INCH (UDFCD TYPE-M) OR D50 = 18-INCH (UDFCD TYPE-H) 2 PARTS VOID-FILL MATERIAL 7-INCH MINUS CRUSHED ROCK SURGE (100% PASSING 7-INCH SIEVE, 80-100% PASSING 6-INCH SIEVE, 35-50% PASSING 3-INCH SIEVE, 10-20% PASSING 1½-INCH SIEVE) 1 PART VOID-FILL MATERIAL VTC (VEHICLE TRACKING CONTROL) ROCK (CRUSHED ROCK WITH 100% PASSING 4-INCH SIEVE, 50-70% PASSING 3-INCH SIEVE, 0-10% PASSING 2-INCH SIEVE) 1 PART VOID-FILL MATERIAL 4-INCH MINUS PIT RUN SURGE (ROUND RIVER ROCK AND SAND, WELL GRADED, 90-100% PASSING 4-INCH SIEVE, 70-80% PASSING 1½-INCH SIEVE, 40-60% PASSING ⅜-INCH SIEVE, 10-30% PASSING #16 SIEVE) 1 PART VOID-FILL MATERIAL TYPE II BEDDING (CRUSHED ROCK WITH 100% PASSING 3-INCH SIEVE, 20-90% PASSING ¾-INCH SIEVE, 0-20% PASSING #4 SIEVE, 0-3% PASSING #200 SIEVE) 1/2 TO 1 PART VOID-FILL MATERIAL NATIVE TOPSOIL VOID-FILLED RIPRAP PLACEMENT AND GRADATION RIRAP DESIGNATION % SMALLER THAN GIVEN SIZE BY WEIGHT INTERMEDIATE ROCK DIMENSION (INCHES) D50* (INCHES) TYPE VL 70 - 100 12 6 50 - 70 9 35 - 50 6 2 - 10 2 TYPE L 70 - 100 15 9 50 - 70 12 35 - 50 9 2 - 10 3 TYPE M 70 - 100 21 12 50 - 70 18 35 - 50 12 2 - 10 4 TYPE H 70 - 100 30 18 50 - 70 24 35 - 50 18 2 - 10 6 *D50 = MEAN ROCK SIZE MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S R6.5 NO . 8 A C C E S S T R A I L H O R I Z O N T A L C O N T R O L NO. 8 ACCESS TRAIL TIMBERLINE TO NORTH HEADWALL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 A C C E S S T R A I L P L A N & P R O F I L E R6.6 NO. 8 ACCESS TRAIL TIMBERLINE TO NORTH HEADWALL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 A C C E S S T R A I L P L A N & P R O F I L E R6.7 NO. 8 ACCESS TRAIL TIMBERLINE TO SOUTH HEADWALL NO. 8 ACCESS TRAIL TO NORTH HEADWALL NO. 8 ACCESS TRAIL TIMBERLINE TO NORTH HEADWALL R6.8 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 A C C E S S T R A I L P L A N & P R O F I L E A A B B FUTURE UNDERPASS DRAIN AND WET WELL A: FUTURE NORTH TRENCH DRAIN B: FUTURE SOUTH TRENCH DRAIN R6.9 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S FU T U R E U N D E R P A S S T R E N C H D R A I N P N P (F O R I N F O R M A T I O N O N L Y ) FUTURE PEDESTRIAN UNDERPASS (NOT FOR CONSTRUCTION) TIMBER FENCE RAILING DETAIL TIMBER FENCE ELEVATION TIMBER FENCE SECTION A-A A A TIMBER FENCE GATE ELEVATION MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H S T R U C T U R A L N O T E S R7.0 STRUCTURAL NOTES - NO. 8 IRRIGATION DITCH STRUCTURES DESIGN DATA EXCAVATION AND BACKFILL DETAILS MANHOLE DETAIL WINGWALL DETAIL N SOUTH HEADWALL PLAN SOUTH HEADWALL ELEVATION UNDERDRAIN DETAIL FOOTING STEP DETAIL TYPICAL CONTROL JOINT MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H S O U T H H E A D W A L L L A Y O U T R7.1 SECTION SECTION NO . 8 D I T C H S O U T H H E A D W A L L D E T A I L S R7.2 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NORTH HEADWALL PLAN NORTH HEADWALL ELEVATION N RESTRICTOR PLATE ELEVATION MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H N O R T H H E A D W A L L L A Y O U T R7.3 SECTION SECTION SECTION SECTION SAFETY GRATE ELEVATIONA A SECTION A-A NO . 8 D I T C H N O R T H H E A D W A L L D E T A I L S R7.4 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S · · · N MANHOLE IR-MH-01 LAYOUT PLAN SECTION SECTION BOX BASE WALL REINFORCING PLAN LATERAL RCP PENETRATION DETAIL MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H S P E C I A L I R - M H - 0 1 R7.5 N MANHOLE IR-MH-02 LAYOUT PLAN SECTION SECTION BOX BASE WALL REINFORCING PLAN MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H S P E C I A L I R - M H - 0 2 R7.6 N MANHOLE IR-MH-03 LAYOUT PLAN SECTION SECTION BOX BASE WALL REINFORCING PLAN MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H S P E C I A L I R - M H - 0 3 R7.7 N MANHOLE IR-MH-04 LAYOUT PLAN SECTION BOX BASE WALL REINFORCING PLAN SECTION MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H S P E C I A L I R - M H - 0 4 R7.8 N MANHOLE IR-MH-05 LAYOUT PLAN SECTION SECTION BOX BASE WALL REINFORCING PLAN MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H S P E C I A L I R - M H - 0 5 R7.9 N MANHOLE IR-MH-06 LAYOUT PLAN SECTION SECTION BOX BASE WALL REINFORCING PLAN MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H S P E C I A L I R - M H - 0 6 R7.10 N MANHOLE IR-MH-07 LAYOUT PLAN SECTION SECTION BOX BASE WALL REINFORCING PLAN MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H S P E C I A L I R - M H - 0 7 R7.11 N MANHOLE IR-MH-08 LAYOUT PLAN SECTION SECTION BOX BASE WALL REINFORCING PLAN MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H S P E C I A L I R - M H - 0 8 R7.12 N MANHOLE IR-MH-09 LAYOUT PLAN SECTION SECTION BOX BASE WALL REINFORCING PLAN MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H S P E C I A L I R - M H - 0 9 R7.13 N MANHOLE IR-MH-10 LAYOUT PLAN SECTION SECTION BOX BASE WALL REINFORCING PLAN MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H S P E C I A L I R - M H - 1 0 R7.14 N MANHOLE IR-MH-11 LAYOUT PLAN SECTION SECTION BOX BASE WALL REINFORCING PLAN MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S NO . 8 D I T C H S P E C I A L I R - M H - 1 1 R7.15 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G UT I L I T Y P L A N S PR E C A S T C B C D E T A I L S R7.16 CULVERT END SECTION CONNECT TO EXIST. 16" WATER MAIN 16" 45D BEND W/T.B. 16" 45D BEND W/T.B. 16" 45D BEND W/T.B. 16" 45D BEND W/T.B. 16"x8" TEE W/T.B. AIR VAC COMBO W/VALVE 8" CAP W/T.B. 8" GATE VALVE 8"x6" TEE W/T.B. & 6" GATE VALVE FHY ASSEMBLY MOUNTAIN VISTA WATERLINE A CO N N E C T T O E X I S T . 16 " W A T E R M A I N 16 " 4 5 D B E N D W / T . B . 16 " 4 5 D B E N D W / T . B . 16 " 4 5 D B E N D W / T . B . 16 " 4 5 D B E N D W / T . B . 16 " x 8 " T E E W / T . B . MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S W1.0 MO U N T A I N V I S T A W A T E R P L A N A N D P R O F I L E 811 SE E S H E E T R3 . 1 SE E S H E E T R3 . 1 CONNECT TO EXIST. WATER STUB WITH 24"X16" REDUCER 16"x8" TEE W/T.B VA U L T 8" CAP W/T.B. 8" GATE VALVE 16"x6" TEE W/T.B & 6" GATE VALVE FHY ASSEMBLY 16" 45D BEND W/T.B. 16" 45D BEND W/T.B. MOUNTAIN VISTA WATERLINE A CO N N E C T T O E X I S T . W A T E R ST U B W I T H 2 4 " X 1 6 " R E D U C E R 16 " x 8 " T E E W / T . B 16 " x 6 " T E E W / T . B & 6 " G A T E V A L V E 16 " 4 5 D B E N D W / T . B . 16 " 4 5 D B E N D W / T . B . MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S W1.1 MO U N T A I N V I S T A W A T E R P L A N A N D P R O F I L E SE E S H E E T R3 . 0 811SE E S H E E T R3 . 0 VA U L T VAUL T V A U L T V A U L T VAUL T VAULT VAUL T SSWR MH #X-11 4'Ø SSWR MH SSWR MH #X-7 4'Ø SSWR MH SSWR MH #X-6 4'Ø SSWR MH SSWR MH #A1 4'Ø SSWR MH SSWR MH #X-2 4'Ø SSWR MH SSWR MH #X-1 5'Ø SSWR MH CONNECT TO EXIST. BOXELDER SANITARY SSWR MH #X-5 4'Ø SSWR MH PHASE E PHASE G 8" STUB & CAP 8" STUB & CAP 8" STUB & CAP 8" STUB & CAP 8" STUB & CAP SSWR MH #X-4 4'Ø SSWR MH SSWR MH #X-8 4'Ø SSWR MH SSWR MH #X-9 4'Ø SSWR MH SSWR MH #X-10 4'Ø SSWR MH 8" STUB & CAP SSWR MH #X-3 4'Ø SSWR MH SAN LINE X SS W R M H # X - 1 5' Ø S S W R M H CO N N E C T T O E X I S T . BO X E L D E R S A N I T A R Y SS W R M H # X - 4 4' Ø S S W R M H SS W R M H # X - 6 4' Ø S S W R M H SS W R M H # X - 7 4' Ø S S W R M H SS W R M H # X - 8 4' Ø S S W R M H SS W R M H # X - 1 1 4' Ø S S W R M H SS W R M H # A 1 4' Ø S S W R M H SS W R M H # X - 5 4' Ø S S W R M H SS W R M H # X - 9 4' Ø S S W R M H SS W R M H # X - 1 0 4' Ø S S W R M H SS W R M H # X - 3 4' Ø S S W R M H SS W R M H # X - 2 4' Ø S S W R M H MOUNTAIN VISTA TI M B E R L I N E SS1.0 SA N I T A R Y S E W E R X P L A N & P R O F I L E 811 SS-1.1 MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S SS1.2 SA N I T A R Y S E W E R D E T A I L S H E E T MAR T I N /M AR T I N C O N S U L T I N G E N G I N E E R S 12 4 9 9 W E S T C O L F A X A V E N U E , L A K E W O O D , C O L O R A D O 8 0 2 1 5 30 3 . 4 3 1 . 6 1 0 0 M A R T I N M A R T I N . C O M NO T F O R C O N S T R U C T I O N MO N T A V A S U B D I V I S I O N PH A S E G RO A D W A Y & IN F R A S T R U C T U R E P L A N S VA U L T MOUNTAIN VISTA DRIVE N. T I M B E R L I N E R O A D N. T I M B E R L I N E R O A D 2 SY RE 2 SY RE 2 SY RE 2 SY RE 2 SY RE 2 SY RE 2 PR SP 2 GY DI 10 EP MI 5 EP MI 5 SY AL 3 PR PB 6 PR PB 3 YU GL 15 GE TI 7 GE TI 6 AR NO 5 EP MI 7 BO GR LANDSCAPE BOULDER, TYP. 8 SO NU 8 SO NU 10 BO CU 6 BO CU 15 BO CU 15 BO CU 4 AR LU 5 AR LU 6 OE CA 9 SP CO 9 SP CO6 ER UM 3 ER UM 6 BE LY 7 SP CO 6 BE LY 7 MA SS 3 YU GL 3 YU GL 4 YU GL 7 YU GL 3 PR PB 9 PR PB 9 PR PB 6 AR CO 7 AR NO 8 AR NO 8 AR NO 8 AR NO 7 AR NO 7 AR NO 8 SY AL 4 PR PB 4 PR PB 10 SY AL 19 GE TI 13 YU GL 22 CH NA 3 AT GA 8 CH NA 16 KR LA 2 PR SP 6 EP MI 11 BO CU DECISION SIGHT DISTANCE (DSD) TRIANGLE BOUNDARY LINE. ISD AREA LIMITS PLANTING HEIGHT TO 30" DECISION SIGHT DISTANCE (DSD) TRIANGLE BOUNDARY LINE. ISD AREA LIMITS PLANTING HEIGHT TO 30" DECISION SIGHT DISTANCE (DSD) TRIANGLE BOUNDARY LINE. ISD AREA LIMITS PLANTING HEIGHT TO 30" INTERSECTION SIGHT DISTANCE (ISD) TRIANGLE BOUNDARY LINE. ISD AREA LIMITS PLANTING HEIGHT TO 30" ON MEDIAN NOSES, TREE LAWN EDGES, AND RAB PLANT BED ADJACENT TRUCK APRON WITHIN BOUNDARY LINE. PLANTING HEIGHT RESTRICTION DO NOT APPLY TO CENTER PLANTING AREA OF RAB PER LUCASS STANDARDS APPENDIX i - FIGURE 4 DECISION SIGHT DISTANCE (DSD) TRIANGLE BOUNDARY LINE. ISD AREA LIMITS PLANTING HEIGHT TO 30" CRUSHER FINES VEHICLE PULL-OFF, TYP. VAU L T VAULT VAULT VAUL T VAU L T VAUL T VAU L T VAU L T Sheet Number: Project Number: Pr o j e c t : Cl i e n t : 1603 Oakridge Drive, Suite 100 Fort Collins, CO 80525 p. (970) 223-7577 www.bhadesign.com Landscape Architecture Urban Design Master Planning C: \ U S E R S \ M O L L I E S I M P S O N \ O N E D R I V E - B H A D E S I G N \ P R O J E C T S \ M O N T A V A P H A S E O N E P D P \ D R A W I N G S \ A C A D \ B D R \ D W G \ 1 7 3 4 - L A N D S C A P E _ R A B . D W G Pl o t D a t e : 11 / 1 5 / 2 0 2 3 1 1 : 4 6 A M P l o t t e d B y : Mo l l i e B r e d e h o f t Da t e C r e a t e d : 11 / 1 5 / 2 0 2 3 Produced by: Date: Revision: L1 Date: MO N T A V A S U B D I V I S I O N P H A S E G RO A D W A Y & I N F R A S T R U C T U R E P L A N MO N T A V A D E V E L O P M E N T & C O N S T R U C T I O N L L C PH A S E G 11/15/2023 1734 0N O R T H 60'15'30' S C A L E : 1''= 3 0' A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR SHRUBS AS NOTED ON THIS PLAN ARE PLANTED, PRUNED OR REMOVED IN THE PUBLIC RIGHT-OF-WAY. THIS INCLUDES ZONES BETWEEN THE SIDEWALK AND CURB, MEDIANS AND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVE THE LOCATION AND SPECIES TO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT IS A VIOLATION OF THE CITY OF FORT COLLINS CODE SUBJECT TO CITATION (SECTION 27-31) AND MAY ALSO RESULT IN REPLACING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF OCCUPANCY. LEGEND DECIDUOUS TREE ORNAMENTAL TREE SHRUBS SEE SHEET L3 FOR MULCH SEE NOTES SHEET L14 STANDARD GREY CONCRETE EVERGREEN SHRUBS ORNAMENTAL GRASSES PERENNIALS MA T C H L I N E , S E E S H E E T L 2 NOTE: THE DEVELOPER AND ITS SUCCESSOR(S) IN INTEREST WILL BE RESPONSIBLE FOR THE MAINTENANCE OF THE MEDIANS AND ROUNDABOUT. SEE DEVELOPMENT AGREEMENT FOR ALTERNATIVES RO A D W A Y A N D I N F R A S T R U C T U R E P L A N S RO U N D A B O U T L A N D S C A P E P L A N BA S I C D E V E L O P M E N T R E V I E W KEY MAP L1 L2 STREETSCAPE PROJECT DESCRIPTION: DESIGN BASED ON THE 2021 URBAN STREETSCAPE STANDARDS WITH THE FOLLOWING NOTES. PROJECT UTILIZED SALT TOLERANT PLANTS. MEDIAN DESIGN MOVED UTILIZED 90% BARK MULCH, WITH LIMITED COBBLE MULCH, TO ALLOW THE ABILITY FOR PLANTS TO SPREAD NATURALLY, AND FOR THE SOIL TO BE AMENDED AS NEEDED. AND BOULDER TYPES MOUNTAIN VISTA DRIVE 1 PR SP 3 PR SP 3 PR SP 2 AC SA 2 GY DI 2 AC SA 8 BO GR 14 BO GR 7 SP CO 5 BE LY 11 SP CO 7 ER UM 7 SP CO 5 ER UM 7 GE TI 5 YU GL 8 GE TI 2 YU GL 4 YU GL 9 GE TI 19 AR CO 10 AR CO 7 SY AL 5 CH NA 5 CH NA 8 CH NA 7 KR LA 5 AT GA 6 AT GA 9 BO GR 9 BO GR DECISION SIGHT DISTANCE (DSD) TRIANGLE BOUNDARY LINE. ISD AREA LIMITS PLANTING HEIGHT TO 30" MULCH PER PLANSPECIFIED BACKFILL MATERIAL, WATER AND TAMP TO REMOVE AIR POCKETS CONSTRUCT WATERING RING AROUND SHRUB AT EDGE OF PLANTING PIT TO CONTAIN WATER TO A DEPTH OF 2" 2X ROOTBALL DIAMETER SCARIFY SIDES AND BOTTOM PROVIDE FERTILIZER PACKETS, AS / IF SPECIFIED PLANT ROOT BALL SLIGHTLY ABOVE GRADE INSTALL WOOD MULCH RING TO EXTENTS OF AROUND BASE TO A DEPTH OF 4". DISH MULCH AWAY FROM PLANT STEMS. MULCH SHALL NOT CONTACT LEAVES OR STEMS OF PLANT. 36 " T O 4 8 " 6' M I N . 2 TIMES ROOTBALL DIA. 1" WIDE FABRIC WEBBING WITH GROMMETS & GALVANIZED WIRE OR CABLE, TWIST WIRE TO TIGHTEN. BREATHABLE PAPER OF FABRIC TREE WRAP APPLIED FROM TRUNK FLARE TO FIRST BRANCH. WRAP PAPER FROM BOTTOM UP WITH SUFFICIENT OVERLAP TO COVER BARK. USE MASKING TAPE TO SECURE. INSTALL 3' DIA. WOOD MULCH RING AROUND BASE TO A DEPTH OF 4". BACKFILL MATERIAL REMOVE TWINE, ROPE, WIRE, AND BURLAP FROM ENTIRE ROOT BALL. TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOT PRESSURE SO THAT ROOT BALL DOES NOT SHIFT UNEXCAVATED OR COMPACTED MOUND UNDER THE ROOT BALL TO PREVENT SETTLING. (3) 2"Ø x 6' LODGEPOLE WOODEN TREE STAKES. ADJUST TREE STAKE SO THAT TOP IS LEVEL WITH, OR JUST BELOW, FIRST BRANCHES. TREE STAKES TO BE DRIVEN OUTSIDE OF ROOT BALL. TREES NOT WITHIN IRRIGATED TURF SHALL HAVE A 6" HIGH EARTHEN SAUCER BEYOND EDGE OF ROOT BALL. VAU L T VAULT VAULT VAU L T VAU L T VAUL T VAUL T VAUL T Sheet Number: Project Number: Pr o j e c t : Cl i e n t : 1603 Oakridge Drive, Suite 100 Fort Collins, CO 80525 p. (970) 223-7577 www.bhadesign.com Landscape Architecture Urban Design Master Planning C: \ U S E R S \ M O L L I E S I M P S O N \ O N E D R I V E - B H A D E S I G N \ P R O J E C T S \ M O N T A V A P H A S E O N E P D P \ D R A W I N G S \ A C A D \ B D R \ D W G \ 1 7 3 4 - L A N D S C A P E _ R A B . D W G Pl o t D a t e : 11 / 1 5 / 2 0 2 3 1 1 : 4 6 A M P l o t t e d B y : Mo l l i e B r e d e h o f t Da t e C r e a t e d : 11 / 1 5 / 2 0 2 3 Produced by: Date: Revision: L2 Date: MO N T A V A S U B D I V I S I O N P H A S E G RO A D W A Y & I N F R A S T R U C T U R E P L A N MO N T A V A D E V E L O P M E N T & C O N S T R U C T I O N L L C PH A S E G 11/15/2023 1734 1.A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR SHRUBS AS NOTED ON THIS PLAN ARE PLANTED, PRUNED OR REMOVED IN THE PUBLIC RIGHT-OF-WAY. THIS INCLUDES ZONES BETWEEN THE SIDEWALK AND CURB, MEDIANS AND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVE THE LOCATION AND SPECIES TO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT IS A VIOLATION OF THE CITY OF FORT COLLINS CODE SUBJECT TO CITATION (SECTION 27-31) AND MAY ALSO RESULT IN REPLACING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF OCCUPANCY. 2.CONTACT THE CITY FORESTER TO INSPECT ALL STREET TREE PLANTINGS AT THE COMPLETION OF EACH PHASE OF THE DEVELOPMENT. ALL MUST BE INSTALLED AS SHOWN ON THE LANDSCAPE PLAN. APPROVAL OF STREET TREE PLANTING IS REQUIRED BEFORE FINAL APPROVAL OF EACH PHASE. 3.STREET LANDSCAPING, INCLUDING STREET TREES, SHALL BE SELECTED IN ACCORDANCE WITH ALL CITY CODES AND POLICIES. ALL TREE PRUNING AND REMOVAL WORKS SHALL BE PERFORMED BY A CITY OF FORT COLLINS LICENSED ARBORS WHERE REQUIRED BY CODE.STREET TREES SHALL BE SUPPLIED AND PLANTED BY THE DEVELOPER USING A QUALIFIED LANDSCAPE CONTRACTOR. 4.THE DEVELOPER SHALL REPLACE DEAD OR DYING STREET TREES AFTER PLANTING UNTIL FINAL MAINTENANCE INSPECTION AND ACCEPTANCE BY THE CITY OF FORT COLLINS FORESTRY DIVISION. ALL STREET TREES IN THE PROJECT MUST BE ESTABLISHED, WITH AN APPROVED SPECIES AND OF ACCEPTABLE CONDITION PRIOR TO ACCEPTANCE. 5.SUBJECT TO APPROVAL BY THE CITY FORESTER -- STREET TREE LOCATIONS MAY BE ADJUSTED TO ACCOMMODATE DRIVEWAY LOCATIONS, UTILITY SEPARATIONS BETWEEN TREES, STREET SIGNS AND STREET LIGHTS. STREET TREES TO BE CENTERED IN THE MIDDLE OF THE LOT TO THE EXTENT FEASIBLE. QUANTITIES SHOWN ON PLAN MUST BE INSTALLED UNLESS A REDUCTION IS APPROVED BY THE CITY TO MEET SEPARATION STANDARDS. STREET TREE NOTES: A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR SHRUBS AS NOTED ON THIS PLAN ARE PLANTED, PRUNED OR REMOVED IN THE PUBLIC RIGHT-OF-WAY. THIS INCLUDES ZONES BETWEEN THE SIDEWALK AND CURB, MEDIANS AND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVE THE LOCATION AND SPECIES TO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT IS A VIOLATION OF THE CITY OF FORT COLLINS CODE SUBJECT TO CITATION (SECTION 27-31) AND MAY ALSO RESULT IN REPLACING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF OCCUPANCY. 1.PLANT QUALITY: ALL PLANT MATERIAL SHALL BE A-GRADE OR NO. 1 GRADE - FREE OF ANY DEFECTS, OF NORMAL HEALTH, HEIGHT, LEAF DENSITY AND SPREAD APPROPRIATE TO THE SPECIES AS DEFINED BY THE AMERICAN ASSOCIATION OF NURSERYMEN (AAN) STANDARDS. ALL TREES SHALL BE BALL AND BURLAP OR EQUIVALENT. 2.IRRIGATION: ALL LANDSCAPE AREAS WITHIN THE SITE INCLUDING TURF, SHRUB BEDS AND TREE AREAS SHALL BE IRRIGATED WITH AN AUTOMATIC IRRIGATION SYSTEM. THE IRRIGATION PLAN MUST BE REVIEWED AND APPROVED BY THE CITY OF FORT COLLINS WATER UTILITIES DEPARTMENT PRIOR TO THE ISSUANCE OF A BUILDING PERMIT. ALL TURF AREAS SHALL BE IRRIGATED WITH AN AUTOMATIC POP-UP IRRIGATION SYSTEM. ALL SHRUB BEDS AND TREES, INCLUDING IN NATIVE SEED AREAS, SHALL BE IRRIGATED WITH AN AUTOMATIC DRIP (TRICKLE) IRRIGATION SYSTEM, OR WITH AN ACCEPTABLE ALTERNATIVE APPROVED BY THE CITY WITH THE IRRIGATION PLANS. THE IRRIGATION SYSTEM SHALL BE ADJUSTED TO MEET THE WATER REQUIREMENTS OF THE INDIVIDUAL PLANT MATERIAL. IRRIGATION SYSTEMS TO BE TURNED OVER TO THE CITY PARKS DEPARTMENT FOR MAINTENANCE MUST BE APPROVED BY THE PARKS MANAGER AND MEET PARKS IRRIGATION STANDARDS. DESIGN REVIEW SHALL OCCUR DURING UTILITIES DEPARTMENT IRRIGATION REVIEW PRIOR TO THE ISSUANCE OF A BUILDING PERMIT AND CONSTRUCTION OBSERVATION AND INSPECTION BY PARKS SHALL BE INCORPORATED INTO THE CONSTRUCTION PROCESS. \ 3.TOPSOIL: TO THE MAXIMUM EXTENT FEASIBLE, TOPSOIL THAT IS REMOVED DURING CONSTRUCTION ACTIVITY SHALL BE CONSERVED FOR LATER USE ON AREAS REQUIRING REVEGETATION AND LANDSCAPING. 4.SOIL AMENDMENTS: SOIL AMENDMENTS SHALL BE PROVIDED AND DOCUMENTED IN ACCORDANCE WITH CITY CODE SECTION 12-132. THE SOIL IN ALL LANDSCAPE AREAS, INCLUDING PARKWAYS AND MEDIANS, SHALL BE THOUGHLY LOOSENED TO A DEPTH OF NOT LESS THAN EIGHT(8) INCHES AND SOIL AMENDMENT SHALL BE THOROUGHLY INCORPORATED INTO THE SOIL OF ALL LANDSCAPE AREAS TO A DEPTH OF AT LEAST SIX(6) INCHES BY TILLING, DISCING OR OTHER SUITABLE METHOD, AT A RATE OF AT LEAST THREE (3) CUBIC YARDS OF SOIL AMENDMENT PER ONE THOUSAND (1,000) SQUARE FEET OF LANDSCAPE AREA. PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY, A WRITTEN CERTIFICATION MUST BE SUBMITTED TO THE CITY THAT ALL PLANTED AREAS, OR AREAS TO BE PLANTED, HAVE BEEN THOROUGHLY LOOSENED AND THE SOIL AMENDED, CONSISTENT WITH THE REQUIREMENTS SET FORTH IN SECTION 12-132. 5.INSTALLATION AND GUARANTEE: ALL LANDSCAPING SHALL BE INSTALLED ACCORDING TO SOUND HORTICULTURAL PRACTICES IN A MANNER DESIGNED TO ENCOURAGE QUICK ESTABLISHMENT AND HEALTHY GROWTH. ALL LANDSCAPING FOR EACH PHASE MUST BE EITHER INSTALLED OR THE INSTALLATION MUST BE SECURED WITH AN IRREVOCABLE LETTER OF CREDIT, PERFORMANCE BOND, OR ESCROW ACCOUNT FOR 125% OF THE VALUATION OF THE MATERIALS AND LABOR PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY FOR ANY BUILDING IN SUCH PHASE. 6.MAINTENANCE: TREES AND VEGETATION, IRRIGATION SYSTEMS, FENCES, WALLS AND OTHER LANDSCAPE ELEMENTS WITH THESE FINAL PLANS SHALL BE CONSIDERED AS ELEMENTS OF THE PROJECT IN THE SAME MANNER AS PARKING, BUILDING MATERIALS AND OTHER SITE DETAILS. THE APPLICANT, LANDOWNER OR SUCCESSORS IN INTEREST SHALL BE JOINTLY AND SEVERALLY RESPONSIBLE FOR THE REGULAR MAINTENANCE OF ALL LANDSCAPING ELEMENTS IN GOOD CONDITION. ALL LANDSCAPING SHALL BE MAINTAINED FREE FROM DISEASE, PESTS, WEEDS AND LITTER, AND ALL LANDSCAPE STRUCTURES SUCH AS FENCES AND WALLS SHALL BE REPAIRED AND REPLACED PERIODICALLY TO MAINTAIN A STRUCTURALLY SOUND CONDITION. 7.REPLACEMENT: ANY LANDSCAPE ELEMENT THAT DIES, OR IS OTHERWISE REMOVED, SHALL BE PROMPTLY REPLACED IN ACCORDANCE WITH THE REQUIREMENTS OF THESE PLANS. 8.THE FOLLOWING SEPARATIONS SHALL BE PROVIDED BETWEEN TREES/SHRUBS AND UTILITIES: 40 FEET BETWEEN CANOPY TREES AND STREET LIGHTS 15 FEET BETWEEN ORNAMENTAL TREES AND STREETLIGHTS 10 FEET BETWEEN TREES AND PUBLIC WATER, SANITARY AND STORM SEWER MAIN LINES 6 FEET BETWEEN TREES AND PUBLIC WATER, SANITARY AND STORM SEWER SERVICE LINES. 4 FEET BETWEEN SHRUBS AND PUBLIC WATER AND SANITARY AND STORM SEWER LINES 4 FEET BETWEEN TREES AND GAS LINES 9.PLACEMENT OF ALL LANDSCAPING SHALL BE IN ACCORDANCE WITH THE SIGHT DISTANCE CRITERIA AS SPECIFIED BY THE CITY OF FORT COLLINS. NO STRUCTURES OR LANDSCAPE ELEMENTS GREATER THAN 24" SHALL BE ALLOWED WITHIN THE SIGHT DISTANCE TRIANGLE OR EASEMENTS WITH THE EXCEPTION OF DECIDUOUS TREES PROVIDED THAT THE LOWEST BRANCH IS AT LEAST 6' FROM GRADE. ANY FENCES WITHIN THE SIGHT DISTANCE TRIANGLE OR EASEMENT MUST BE NOT MORE THAN 42" IN HEIGHT AND OF AN OPEN DESIGN. 10.THE FINAL LANDSCAPE PLAN SHALL BE COORDINATED WITH ALL OTHER FINAL PLAN ELEMENTS SO THAT THE PROPOSED GRADING, STORM DRAINAGE, AND OTHER DEVELOPMENT IMPROVEMENTS DO NOT CONFLICT WITH NOR PRECLUDE INSTALLATION AND MAINTENANCE OF LANDSCAPE ELEMENTS ON THIS PLAN. 11.MINOR CHANGES IN SPECIES AND PLANT LOCATIONS MAY BE MADE DURING CONSTRUCTION -- AS REQUIRED BY SITE CONDITIONS OR PLANT AVAILABILITY. OVERALL QUANTITY, QUALITY, AND DESIGN CONCEPT MUST BE CONSISTENT WITH THE APPROVED PLANS. IN THE EVENT OF CONFLICT WITH THE QUANTITIES INCLUDED IN THE PLANT LIST, SPECIES AND QUANTITIES ILLUSTRATED SHALL BE PROVIDED. ALL CHANGES OF PLANT SPECIES AND LOCATION MUST HAVE WRITTEN APPROVAL BY THE CITY PARKS DEPARTMENT PRIOR TO INSTALLATION. 12.ALL PLANTING BEDS SHALL BE MULCHED TO A MINIMUM DEPTH OF THREE INCHES. 13.SEE DEVELOPMENT AGREEMENT FOR INSTALLATION, MAINTENANCE, INSPECTION, ETC. REQUIREMENTS FOR MEDIANS AND ROUNDABOUT 14.REGULATORY SIGNS MUST BE LOCATED A MINIMUM OF FIVE (5) FEET AWAY FROM ADJACENT TREES. GENERAL LANDSCAPE NOTES: 1.AS PER THE ECS'S RECOMMENDATION, A GROUND CLEARANCE NESTING SURVEY WILL BE PROVIDED SEVEN DAYS PRIOR TO INITIATION OF CONSTRUCTION. NOTES: LEGEND DECIDUOUS TREE ORNAMENTAL TREE SHRUBS STANDARD GREY CONCRETE EVERGREEN SHRUBS ORNAMENTAL GRASSES PERENNIALS SCALE:NTS2TREE PLANTING DETAIL SCALE:NTS3SHRUB PLANTING DETAIL 0N O R T H 60'15'30' S C A L E : 1''= 3 0' MA T C H L I N E , S E E S H E E T L 1 PLANT LIST - ROUNDABOUT KEY MAP L1 L2 RO A D W A Y A N D I N F R A S T R U C T U R E P L A N S RO U N D A B O U T L A N D S C A P E P L A N BA S I C D E V E L O P M E N T R E V I E W SEE SHEET L3 FOR MULCH AND BOULDER TYPES NOTE: THE DEVELOPER AND ITS SUCCESSOR(S) IN INTEREST WILL BE RESPONSIBLE FOR THE MAINTENANCE OF THE MEDIANS AND ROUNDABOUT. SEE DEVELOPMENT AGREEMENT FOR ALTERNATIVES VA U L T MOUNTAIN VISTA DRIVE N. T I M B E R L I N E R O A D N. T I M B E R L I N E R O A D A AAB B A A A B B A A A B B (3) A (1) B (1) B (3) A (1) B (1) B (3) A (1) B (1) B (2) B (2) A (1) B (1) A (1) A (1) B (1) B (1) A (1) B AA BB A A B A B A B A B A B A B A B A B A (1) B (1) A (1) A (1) B (1) A (1) B (1) A (1) A (1) B (1) A DSD TRIANGLE BOUNDARY LINE, SEE SHEET L1 DSD TRIANGLE BOUNDARY LINE, SEE SHEET L1 DSD TRIANGLE BOUNDARY LINE, SEE SHEET L1 DSD TRIANGLE BOUNDARY LINE, SEE SHEET L1 ISD TRIANGLE BOUNDARY LINE, SEE SHEET L1 MOUNTAIN VISTA DRIVE (2) A (1) B (1) B AAB BAB AABA B A B BAB AAB AABA (2) A (3) B (1) B (2) A (1) B (1) B (3) A (2) A (2) B (1) B (1) A DSD TRIANGLE BOUNDARY LINE, SEE SHEET L1 A B A B Sheet Number: Project Number: Pr o j e c t : Cl i e n t : 1603 Oakridge Drive, Suite 100 Fort Collins, CO 80525 p. (970) 223-7577 www.bhadesign.com Landscape Architecture Urban Design Master Planning C: \ U S E R S \ M O L L I E S I M P S O N \ O N E D R I V E - B H A D E S I G N \ P R O J E C T S \ M O N T A V A P H A S E O N E P D P \ D R A W I N G S \ A C A D \ B D R \ D W G \ 1 7 3 4 - L A N D S C A P E _ R A B . D W G Pl o t D a t e : 11 / 1 5 / 2 0 2 3 1 1 : 4 6 A M P l o t t e d B y : Mo l l i e B r e d e h o f t Da t e C r e a t e d : 11 / 1 5 / 2 0 2 3 Produced by: Date: Revision: L3 Date: MO N T A V A S U B D I V I S I O N P H A S E G RO A D W A Y & I N F R A S T R U C T U R E P L A N MO N T A V A D E V E L O P M E N T & C O N S T R U C T I O N L L C PH A S E G 11/15/2023 1734 0N O R T H 60'15'30' S C A L E : 1''= 3 0' LEGEND ORGANIC MULCH STANDARD GREY CONCRETE MA T C H L I N E , S E E B E L O W MA T C H L I N E , S E E A B O V E 2'x4' (2 TON) BOULDER 2'x3' (1-1/2 TON) BOULDER RO A D W A Y A N D I N F R A S T R U C T U R E P L A N S RO U N D A B O U T L A N D S C A P E P L A N BA S I C D E V E L O P M E N T R E V I E W 1.BOULDERS SHALL BE LOCATED 24” FROM BOC IN MEDIAN AND STREETSCAPES 2.BOULDERS TO HAVE A MAXIMUM HEIGHT OF 18” ABOVE FINISH GRADE IN MEDIAN AND STREETSCAPES 3.PROVIDE 12" MIN. SEPARATION BETWEEN BOULDERS AND IRRIGATION INFRASTRUCTURE NOTES: STABILIZED CRUSHER FINES NOTE: THE DEVELOPER AND ITS SUCCESSOR(S) IN INTEREST WILL BE RESPONSIBLE FOR THE MAINTENANCE OF THE MEDIANS AND ROUNDABOUT. SEE DEVELOPMENT AGREEMENT FOR ALTERNATIVES V A U L T VAU L T VAU L T V A U L T VAULT 3 QU MU 1 CA SP 3 UL DA 2 CE OC 2 GY DI 3 UL JA 2 UL JA 4 QU MU 3 CO CO LONG W O O D D R I V E (CON N E C T O R L O C A L ) STOP 1 MA RR 2 CO CO BENCH TYPE 2 BENCH TYPE 2, TYP. VAULT 3 CE OC 2 QU MU 2 CO CO 3 CO CO 14' BENCH TYPE 2, TYP.STOP 36 " T O 4 8 " 6' M I N . 2 TIMES ROOTBALL DIA. 1" WIDE FABRIC WEBBING WITH GROMMETS & GALVANIZED WIRE OR CABLE, TWIST WIRE TO TIGHTEN. BREATHABLE PAPER OF FABRIC TREE WRAP APPLIED FROM TRUNK FLARE TO FIRST BRANCH. WRAP PAPER FROM BOTTOM UP WITH SUFFICIENT OVERLAP TO COVER BARK. USE MASKING TAPE TO SECURE. INSTALL 3' DIA. WOOD MULCH RING AROUND BASE TO A DEPTH OF 4". BACKFILL MATERIAL REMOVE TWINE, ROPE, WIRE, AND BURLAP FROM ENTIRE ROOT BALL. TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOT PRESSURE SO THAT ROOT BALL DOES NOT SHIFT UNEXCAVATED OR COMPACTED MOUND UNDER THE ROOT BALL TO PREVENT SETTLING. (3) 2"Ø x 6' LODGEPOLE WOODEN TREE STAKES. ADJUST TREE STAKE SO THAT TOP IS LEVEL WITH, OR JUST BELOW, FIRST BRANCHES. TREE STAKES TO BE DRIVEN OUTSIDE OF ROOT BALL. TREES NOT WITHIN IRRIGATED TURF SHALL HAVE A 6" HIGH EARTHEN SAUCER BEYOND EDGE OF ROOT BALL. Sheet Number: Project Number: Pr o j e c t : Cl i e n t : 1603 Oakridge Drive, Suite 100 Fort Collins, CO 80525 p. (970) 223-7577 www.bhadesign.com Landscape Architecture Urban Design Master Planning C: \ U S E R S \ M O L L I E S I M P S O N \ O N E D R I V E - B H A D E S I G N \ P R O J E C T S \ M O N T A V A P H A S E O N E P D P \ D R A W I N G S \ A C A D \ B D R \ D W G \ 1 7 3 4 - L A N D S C A P E _ P A R K F R O N T A G E . D W G Pl o t D a t e : 11 / 1 5 / 2 0 2 3 1 1 : 4 4 A M P l o t t e d B y : Mo l l i e B r e d e h o f t Da t e C r e a t e d : 11 / 1 5 / 2 0 2 3 Produced by: Date: Revision: L1 Date: MO N T A V A S U B D I V I S I O N P H A S E G RO A D W A Y & I N F R A S T R U C T U R E P L A N MO N T A V A D E V E L O P M E N T & C O N S T R U C T I O N L L C PH A S E G 11/15/2023 1734 0N O R T H 60'15'30' S C A L E : 1''= 3 0' A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR SHRUBS AS NOTED ON THIS PLAN ARE PLANTED, PRUNED OR REMOVED IN THE PUBLIC RIGHT-OF-WAY. THIS INCLUDES ZONES BETWEEN THE SIDEWALK AND CURB, MEDIANS AND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVE THE LOCATION AND SPECIES TO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT IS A VIOLATION OF THE CITY OF FORT COLLINS CODE SUBJECT TO CITATION (SECTION 27-31) AND MAY ALSO RESULT IN REPLACING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF OCCUPANCY. LEGEND DECIDUOUS TREE ORNAMENTAL TREE IRRIGATED SOD SEE NOTES SHEET L14 MA T C H L I N E , S E E B E L O W MA T C H L I N E , S E E A B O V E KEY MAP 1 2 SCALE:NTS3TREE PLANTING DETAIL SCALE:1" = 30'-0"2 PARK FRONTAGE SCALE:1" = 30'-0"1 PARK FRONTAGE NOTES 1) TYPE 2 BENCH SHALL BE KENNETH LYNCH & SONS 1939 WORLDS FAIR BENCH OR SIMILAR RO A D W A Y A N D I N F R A S T R U C T U R E P L A N S CO M M U N I T Y P A R K F R O N T A G E L A N D S C A P E BA S I C D E V E L O P M E N T R E V I E W NOTE: LANDSCAPE, IRRIGATION, AND BENCHES ON THE PARK FRONTAGE SHEETS (ADJACENT TO THE FUTURE COMMUNITY PARK SITE) SHALL BE MAINTAINED BY THE DEVLEOPER UNTIL FUTURE COMMUNITY PARK IS COMPLETED. THEN THESE AREAS SHALL BE MAINTAINED BY CITY OF FORT COLLINS PARKS. Sheet Number: Project Number: Pr o j e c t : Cl i e n t : 1603 Oakridge Drive, Suite 100 Fort Collins, CO 80525 p. (970) 223-7577 www.bhadesign.com Landscape Architecture Urban Design Master Planning C: \ U S E R S \ M O L L I E S I M P S O N \ O N E D R I V E - B H A D E S I G N \ P R O J E C T S \ M O N T A V A P H A S E O N E P D P \ D R A W I N G S \ A C A D \ B D R \ D W G \ 1 7 3 4 - L A N D S C A P E _ P A R K F R O N T A G E . D W G Pl o t D a t e : 11 / 1 5 / 2 0 2 3 1 1 : 4 4 A M P l o t t e d B y : Mo l l i e B r e d e h o f t Da t e C r e a t e d : 11 / 1 5 / 2 0 2 3 Produced by: Date: Revision: L2 Date: MO N T A V A S U B D I V I S I O N P H A S E G RO A D W A Y & I N F R A S T R U C T U R E P L A N MO N T A V A D E V E L O P M E N T & C O N S T R U C T I O N L L C PH A S E G 11/15/2023 1734 1.A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR SHRUBS AS NOTED ON THIS PLAN ARE PLANTED, PRUNED OR REMOVED IN THE PUBLIC RIGHT-OF-WAY. THIS INCLUDES ZONES BETWEEN THE SIDEWALK AND CURB, MEDIANS AND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVE THE LOCATION AND SPECIES TO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT IS A VIOLATION OF THE CITY OF FORT COLLINS CODE SUBJECT TO CITATION (SECTION 27-31) AND MAY ALSO RESULT IN REPLACING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF OCCUPANCY. 2.CONTACT THE CITY FORESTER TO INSPECT ALL STREET TREE PLANTINGS AT THE COMPLETION OF EACH PHASE OF THE DEVELOPMENT. ALL MUST BE INSTALLED AS SHOWN ON THE LANDSCAPE PLAN. APPROVAL OF STREET TREE PLANTING IS REQUIRED BEFORE FINAL APPROVAL OF EACH PHASE. 3.STREET LANDSCAPING, INCLUDING STREET TREES, SHALL BE SELECTED IN ACCORDANCE WITH ALL CITY CODES AND POLICIES. ALL TREE PRUNING AND REMOVAL WORKS SHALL BE PERFORMED BY A CITY OF FORT COLLINS LICENSED ARBORS WHERE REQUIRED BY CODE.STREET TREES SHALL BE SUPPLIED AND PLANTED BY THE DEVELOPER USING A QUALIFIED LANDSCAPE CONTRACTOR. 4.THE DEVELOPER SHALL REPLACE DEAD OR DYING STREET TREES AFTER PLANTING UNTIL FINAL MAINTENANCE INSPECTION AND ACCEPTANCE BY THE CITY OF FORT COLLINS FORESTRY DIVISION. ALL STREET TREES IN THE PROJECT MUST BE ESTABLISHED, WITH AN APPROVED SPECIES AND OF ACCEPTABLE CONDITION PRIOR TO ACCEPTANCE. 5.SUBJECT TO APPROVAL BY THE CITY FORESTER -- STREET TREE LOCATIONS MAY BE ADJUSTED TO ACCOMMODATE DRIVEWAY LOCATIONS, UTILITY SEPARATIONS BETWEEN TREES, STREET SIGNS AND STREET LIGHTS. STREET TREES TO BE CENTERED IN THE MIDDLE OF THE LOT TO THE EXTENT FEASIBLE. QUANTITIES SHOWN ON PLAN MUST BE INSTALLED UNLESS A REDUCTION IS APPROVED BY THE CITY TO MEET SEPARATION STANDARDS. STREET TREE NOTES: A PERMIT MUST BE OBTAINED FROM THE CITY FORESTER BEFORE ANY TREES OR SHRUBS AS NOTED ON THIS PLAN ARE PLANTED, PRUNED OR REMOVED IN THE PUBLIC RIGHT-OF-WAY. THIS INCLUDES ZONES BETWEEN THE SIDEWALK AND CURB, MEDIANS AND OTHER CITY PROPERTY. THIS PERMIT SHALL APPROVE THE LOCATION AND SPECIES TO BE PLANTED. FAILURE TO OBTAIN THIS PERMIT IS A VIOLATION OF THE CITY OF FORT COLLINS CODE SUBJECT TO CITATION (SECTION 27-31) AND MAY ALSO RESULT IN REPLACING OR RELOCATING TREES AND A HOLD ON CERTIFICATE OF OCCUPANCY. 1.PLANT QUALITY: ALL PLANT MATERIAL SHALL BE A-GRADE OR NO. 1 GRADE - FREE OF ANY DEFECTS, OF NORMAL HEALTH, HEIGHT, LEAF DENSITY AND SPREAD APPROPRIATE TO THE SPECIES AS DEFINED BY THE AMERICAN ASSOCIATION OF NURSERYMEN (AAN) STANDARDS. ALL TREES SHALL BE BALL AND BURLAP OR EQUIVALENT. 2.IRRIGATION: ALL LANDSCAPE AREAS WITHIN THE SITE INCLUDING TURF, SHRUB BEDS AND TREE AREAS SHALL BE IRRIGATED WITH AN AUTOMATIC IRRIGATION SYSTEM. THE IRRIGATION PLAN MUST BE REVIEWED AND APPROVED BY THE CITY OF FORT COLLINS WATER UTILITIES DEPARTMENT PRIOR TO THE ISSUANCE OF A BUILDING PERMIT. ALL TURF AREAS SHALL BE IRRIGATED WITH AN AUTOMATIC POP-UP IRRIGATION SYSTEM. ALL SHRUB BEDS AND TREES, INCLUDING IN NATIVE SEED AREAS, SHALL BE IRRIGATED WITH AN AUTOMATIC DRIP (TRICKLE) IRRIGATION SYSTEM, OR WITH AN ACCEPTABLE ALTERNATIVE APPROVED BY THE CITY WITH THE IRRIGATION PLANS. THE IRRIGATION SYSTEM SHALL BE ADJUSTED TO MEET THE WATER REQUIREMENTS OF THE INDIVIDUAL PLANT MATERIAL. IRRIGATION SYSTEMS TO BE TURNED OVER TO THE CITY PARKS DEPARTMENT FOR MAINTENANCE MUST BE APPROVED BY THE PARKS MANAGER AND MEET PARKS IRRIGATION STANDARDS. DESIGN REVIEW SHALL OCCUR DURING UTILITIES DEPARTMENT IRRIGATION REVIEW PRIOR TO THE ISSUANCE OF A BUILDING PERMIT AND CONSTRUCTION OBSERVATION AND INSPECTION BY PARKS SHALL BE INCORPORATED INTO THE CONSTRUCTION PROCESS. \ 3.TOPSOIL: TO THE MAXIMUM EXTENT FEASIBLE, TOPSOIL THAT IS REMOVED DURING CONSTRUCTION ACTIVITY SHALL BE CONSERVED FOR LATER USE ON AREAS REQUIRING REVEGETATION AND LANDSCAPING. 4.SOIL AMENDMENTS: SOIL AMENDMENTS SHALL BE PROVIDED AND DOCUMENTED IN ACCORDANCE WITH CITY CODE SECTION 12-132. THE SOIL IN ALL LANDSCAPE AREAS, INCLUDING PARKWAYS AND MEDIANS, SHALL BE THOUGHLY LOOSENED TO A DEPTH OF NOT LESS THAN EIGHT(8) INCHES AND SOIL AMENDMENT SHALL BE THOROUGHLY INCORPORATED INTO THE SOIL OF ALL LANDSCAPE AREAS TO A DEPTH OF AT LEAST SIX(6) INCHES BY TILLING, DISCING OR OTHER SUITABLE METHOD, AT A RATE OF AT LEAST THREE (3) CUBIC YARDS OF SOIL AMENDMENT PER ONE THOUSAND (1,000) SQUARE FEET OF LANDSCAPE AREA. PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY, A WRITTEN CERTIFICATION MUST BE SUBMITTED TO THE CITY THAT ALL PLANTED AREAS, OR AREAS TO BE PLANTED, HAVE BEEN THOROUGHLY LOOSENED AND THE SOIL AMENDED, CONSISTENT WITH THE REQUIREMENTS SET FORTH IN SECTION 12-132. 5.INSTALLATION AND GUARANTEE: ALL LANDSCAPING SHALL BE INSTALLED ACCORDING TO SOUND HORTICULTURAL PRACTICES IN A MANNER DESIGNED TO ENCOURAGE QUICK ESTABLISHMENT AND HEALTHY GROWTH. ALL LANDSCAPING FOR EACH PHASE MUST BE EITHER INSTALLED OR THE INSTALLATION MUST BE SECURED WITH AN IRREVOCABLE LETTER OF CREDIT, PERFORMANCE BOND, OR ESCROW ACCOUNT FOR 125% OF THE VALUATION OF THE MATERIALS AND LABOR PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY FOR ANY BUILDING IN SUCH PHASE. 6.MAINTENANCE: TREES AND VEGETATION, IRRIGATION SYSTEMS, FENCES, WALLS AND OTHER LANDSCAPE ELEMENTS WITH THESE FINAL PLANS SHALL BE CONSIDERED AS ELEMENTS OF THE PROJECT IN THE SAME MANNER AS PARKING, BUILDING MATERIALS AND OTHER SITE DETAILS. THE APPLICANT, LANDOWNER OR SUCCESSORS IN INTEREST SHALL BE JOINTLY AND SEVERALLY RESPONSIBLE FOR THE REGULAR MAINTENANCE OF ALL LANDSCAPING ELEMENTS IN GOOD CONDITION. ALL LANDSCAPING SHALL BE MAINTAINED FREE FROM DISEASE, PESTS, WEEDS AND LITTER, AND ALL LANDSCAPE STRUCTURES SUCH AS FENCES AND WALLS SHALL BE REPAIRED AND REPLACED PERIODICALLY TO MAINTAIN A STRUCTURALLY SOUND CONDITION. 7.REPLACEMENT: ANY LANDSCAPE ELEMENT THAT DIES, OR IS OTHERWISE REMOVED, SHALL BE PROMPTLY REPLACED IN ACCORDANCE WITH THE REQUIREMENTS OF THESE PLANS. 8.THE FOLLOWING SEPARATIONS SHALL BE PROVIDED BETWEEN TREES/SHRUBS AND UTILITIES: 40 FEET BETWEEN CANOPY TREES AND STREET LIGHTS 15 FEET BETWEEN ORNAMENTAL TREES AND STREETLIGHTS 10 FEET BETWEEN TREES AND PUBLIC WATER, SANITARY AND STORM SEWER MAIN LINES 6 FEET BETWEEN TREES AND PUBLIC WATER, SANITARY AND STORM SEWER SERVICE LINES. 4 FEET BETWEEN SHRUBS AND PUBLIC WATER AND SANITARY AND STORM SEWER LINES 4 FEET BETWEEN TREES AND GAS LINES 9.PLACEMENT OF ALL LANDSCAPING SHALL BE IN ACCORDANCE WITH THE SIGHT DISTANCE CRITERIA AS SPECIFIED BY THE CITY OF FORT COLLINS. NO STRUCTURES OR LANDSCAPE ELEMENTS GREATER THAN 24" SHALL BE ALLOWED WITHIN THE SIGHT DISTANCE TRIANGLE OR EASEMENTS WITH THE EXCEPTION OF DECIDUOUS TREES PROVIDED THAT THE LOWEST BRANCH IS AT LEAST 6' FROM GRADE. ANY FENCES WITHIN THE SIGHT DISTANCE TRIANGLE OR EASEMENT MUST BE NOT MORE THAN 42" IN HEIGHT AND OF AN OPEN DESIGN. 10.THE FINAL LANDSCAPE PLAN SHALL BE COORDINATED WITH ALL OTHER FINAL PLAN ELEMENTS SO THAT THE PROPOSED GRADING, STORM DRAINAGE, AND OTHER DEVELOPMENT IMPROVEMENTS DO NOT CONFLICT WITH NOR PRECLUDE INSTALLATION AND MAINTENANCE OF LANDSCAPE ELEMENTS ON THIS PLAN. 11.MINOR CHANGES IN SPECIES AND PLANT LOCATIONS MAY BE MADE DURING CONSTRUCTION -- AS REQUIRED BY SITE CONDITIONS OR PLANT AVAILABILITY. OVERALL QUANTITY, QUALITY, AND DESIGN CONCEPT MUST BE CONSISTENT WITH THE APPROVED PLANS. IN THE EVENT OF CONFLICT WITH THE QUANTITIES INCLUDED IN THE PLANT LIST, SPECIES AND QUANTITIES ILLUSTRATED SHALL BE PROVIDED. ALL CHANGES OF PLANT SPECIES AND LOCATION MUST HAVE WRITTEN APPROVAL BY THE CITY PRIOR TO INSTALLATION. 12.ALL PLANTING BEDS SHALL BE MULCHED TO A MINIMUM DEPTH OF THREE INCHES. 13.REGULATORY SIGNS MUST BE LOCATED A MINIMUM OF FIVE (5) FEET AWAY FROM ADJACENT TREES. GENERAL LANDSCAPE NOTES: 1.AS PER THE ECS'S RECOMMENDATION, A GROUND CLEARANCE NESTING SURVEY WILL BE PROVIDED SEVEN DAYS PRIOR TO INITIATION OF CONSTRUCTION. NOTES: GROUND COVERS TURF MASTER IRRIGATED SOD SEE LEGEND FOR LOCATIONS 90/10 FESCUE BLEND TREE LIST - PARK FRONTAGE RO A D W A Y A N D I N F R A S T R U C T U R E P L A N S CO M M U N I T Y P A R K F R O N T A G E L A N D S C A P E BA S I C D E V E L O P M E N T R E V I E W NOTE: LANDSCAPE, IRRIGATION, AND BENCHES ON THE PARK FRONTAGE SHEETS (ADJACENT TO THE FUTURE COMMUNITY PARK SITE) SHALL BE MAINTAINED BY THE DEVLEOPER UNTIL FUTURE COMMUNITY PARK IS COMPLETED. THEN THESE AREAS SHALL BE MAINTAINED BY CITY OF FORT COLLINS PARKS. *ALL PIPING, VALVES, VALVE BOXES, SPRINKLERS, DRIP COMPONENTS, IRRIGATION INFRASTRUCTURE, AND ALL WATER EMISSION DEVICES SHALL BE MARKED PURPLE TO INDICATE USE WITH NON-POTABLE WATER. NON-POTABLE NOTE ESTIMATED ANNUAL WATER USE THE IRRIGATION SYSTEM AS SHOWN ON THIS PLAN HAS AN ESTIMATED ANNUAL WATER USE OF 41,920 GALLONS. TO VERIFY EFFICIENT IRRIGATION SYSTEM OPERATION, THE OWNER SHALL COMPARE THIS ESTIMATED IRRIGATION WATER USE WITH ACTUAL WATER USE, AS RECORDED ON SITE, AFTER ALL PLANT MATERIAL HAS BEEN ESTABLISHED. THE ESTIMATED ANNUAL IRRIGATION WATER USE OF THIS SYSTEM IS BASED ON 30-YEARS AVERAGE EVAPOTRANSPIRATION RATES (ET) FOR THE LOCAL AREA AND TYPICAL NEW IRRIGATION SYSTEM EQUIPMENT EFFICIENCIES. MAJOR DEVIATIONS FROM THIS ESTIMATE USE SHOULD BE BROUGHT TO THE ATTENTION OF THE OWNER AND CURRENT IRRIGATION MAINTENANCE COMPANY AT THE TIME OF THE DEVIATION. TO VERIFY EFFICIENT IRRIGATION SYSTEM OPERATION AND WATER USE, AN IRRIGATION SYSTEM EVALUATION AND AUDIT SHOULD BE PERFORMED. 1.THE SYSTEM DESIGN ASSUMES A MINIMUM DYNAMIC PRESSURE FOR THE IRRIGATION SYSTEM OF 80 PSI, AT A DESIGN FLOW OF 25 GPM AT THE 1-INCH IRRIGATION POINT-OF-CONNECTION (POC). TAP, METER, BACKFLOW PREVENTER, MASTER VALVE AND FLOW METER SHALL BE SIZED AS INDICATED IN THE DRAWING LEGEND. VERIFY PRESSURE AND FLOW ON SITE PRIOR TO CONSTRUCTION. 2.READ THOROUGHLY AND BECOME FAMILIAR WITH THE SPECIFICATIONS AND INSTALLATION DETAILS FOR THIS AND RELATED WORK PRIOR TO CONSTRUCTION. 3.COORDINATE UTILITY LOCATES ("CALL BEFORE YOU DIG") OF UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 4.DO NOT PROCEED WITH THE INSTALLATION OF THE IRRIGATION SYSTEM WHEN IT IS OBVIOUS IN THE FIELD THAT OBSTRUCTIONS OR GRADE DIFFERENCES EXIST THAT MIGHT NOT HAVE BEEN CONSIDERED IN THE ENGINEERING. IF DISCREPANCIES IN CONSTRUCTION DETAILS, LEGEND, NOTES, OR SPECIFICATIONS ARE DISCOVERED, BRING ALL SUCH OBSTRUCTIONS OR DISCREPANCIES TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE. 5.THE DRAWINGS ARE DIAGRAMMATIC. THEREFORE, THE FOLLOWING SHOULD BE NOTED: A.ALTHOUGH IRRIGATION COMPONENTS MAY BE SHOWN OUTSIDE PLANTING AREAS FOR CLARITY, INSTALL IRRIGATION PIPE AND WIRING IN LANDSCAPED AREAS WHENEVER POSSIBLE. B.TREE AND SHRUB LOCATIONS AS SHOWN ON LANDSCAPE PLANS TAKE PRECEDENCE OVER IRRIGATION EQUIPMENT LOCATIONS. AVOID CONFLICTS BETWEEN THE IRRIGATION SYSTEM, PLANTING MATERIALS, AND ARCHITECTURAL FEATURES. C.USE ONLY STANDARD TEES AND ELBOW FITTINGS. USE OF TEES IN THE BULLNOSE CONFIGURATION, OR USE OF CROSS TYPE FITTINGS IS NOT ALLOWED. 6.PROVIDE THE FOLLOWING COMPONENTS TO THE OWNER PRIOR TO THE COMPLETION OF THE PROJECT: A.TWO (2) OPERATING KEYS FOR EACH TYPE OF MANUALLY OPERATED VALVES. 7.THE IRRIGATION CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF IRRIGATION SLEEVING. SLEEVES ARE REQUIRED FOR BOTH PIPING AND ELECTRICAL WIRING AT EACH HARDSCAPE CROSSING. COORDINATE INSTALLATION OF SLEEVING WITH OTHER TRADES. ANY PIPE OR WIRE WHICH PASSES BENEATH EXISTING HARDSCAPE WHERE SLEEVING WAS NOT INSTALLED WILL REQUIRE HORIZONTAL BORING BY THE IRRIGATION CONTRACTOR. PIPE SLEEVES SHALL BE SIZED TWICE THE NOMINAL SIZE OF THE PIPE PASSING THROUGH. 8.INSTALL ALL ELECTRICAL POWER TO THE IRRIGATION CONTROL SYSTEM IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE AND ALL APPLICABLE LOCAL ELECTRIC UTILITY CODES. 9.THE FOLLOWING SHOULD BE NOTED REGARDING PIPE SIZING: IF A SECTION OF UNSIZED PIPE IS LOCATED BETWEEN TWO IDENTICALLY SIZED SECTIONS, THE UNSIZED PIPE IS THE SAME NOMINAL SIZE AS THE TWO SIZED SECTIONS. THE UNSIZED PIPE SHOULD NOT BE CONFUSED WITH THE DEFAULT PIPE SIZE NOTED IN THE LEGEND. 10.INSTALL ONE (1) #14 AWG TWO-WIRE PAIR ON TWO-WIRE SYSTEMS, FOR USE AS SPARES. INSTALL SPARE WIRES FROM CONTROLLER LOCATION TO EACH DEAD-END OF MAINLINE. COIL 3 FEET OF WIRE IN VALVE BOX. TRACING WIRE TO BE INSTALLED ENTIRE LENGTH OF MAINLINE. CONSTRUCTION NOTES INSTALLATION GENERAL NOTES THE IRRIGATION SYSTEM POINT-OF-CONNECTION (POC) SHALL BE DOWNSTREAM OF THE IRRIGATION WATER TAP AND METER INSTALLED BY OTHERS AT THE APPROXIMATE LOCATION SHOWN. INSTALL BACKFLOW PREVENTION UNIT AND MASTER VALVE ASSEMBLY AS INDICATED. VERIFY EXACT LOCATION OF POC WITH OWNER'S REPRESENTATIVE. PEDESTAL MOUNT THE IRRIGATION CONTROLLER AT THE APPROXIMATE LOCATION SHOWN. COORDINATE ELECTRICAL POWER TO THE CONTROLLER WITH THE OWNER'S REPRESENTATIVE. CARE SHOULD BE TAKEN TO INSTALL THE IRRIGATION CONTROLLER IN A LOCATION THAT IS ACCESSIBLE FOR MAINTENANCE, AND SCREENED FROM VIEW EITHER BEHIND ENTRY WALLS, NEXT TO BUILDINGS, OR BEHIND PLANT MATERIAL. FINAL LOCATION TO BE APPROVED BY OWNER'S REPRESENTATIVE. MAINLINE AND CONTROL WIRE STUB OUT PLACED IN 10" ROUND VALVE BOX WITH ISOLATION GATE VALVE. IRRIGATION LEGEND CONTROLLER CHART 'A' CONTROLLER RUNTIMES *WIRES SHALL BE TESTED AT EVERY LOCATION WHERE THE WIRES CROSS ROADWAYS AND AT EVERY GROUND LOCATION (INCLUDING VALVE BOX GROUND AND END OF RUN GROUNDS). *LANDSCAPE AND IRRIGATION ON THESE ROADWAY AND INFRASTRUCTURE PLAN SHEETS SHALL BE MAINTAINED BY CITY OF FORT COLLINS PARKS. *TRACING WIRE TO BE INSTALLED ENTIRE LENGTH OF MAINLINE. NOTE IRRIGATION SLEEVE LEGEND *ALL SLEEVES SHALL BE SCH 40 PVC AND SIZED TWICE THE NOMINAL SIZE OF THE PIPE PASSING THROUGH, ALL CONTROL WIRE SLEEVES SHALL BE 2-INCH 'A'- (1) 4 -INCH, (1) 2-INCH 'B'- (1) 2-INCH WATER BUDGET: MONTHLY WATER USAGE IRRIGATION CONTROLLER UNITAWEATHERTRAK ET PRO3 WITH LTE UPGRADE KIT 3 2 1 MASTER VALVE ASSEMBLY:RAIN BIRD PESB (1") QUICK COUPLING VALVE ASSEMBLY:RAIN BIRD 5NP ISOLATION GATE VALVE ASSEMBLY:NIBCO T-113K WEATHER SENSOR:IRRITROL RAIN/FREEZE SENSOR RFS1000 GROUNDING AND SURGE ARRESTOR ASSEMBLY:GND WEATHERTRAK WT2W-H2O-SA FLOW SENSOR ASSEMBLY:F HYDROPOINT FLOWHD-PLASTIC IRRIGATION MAINLINE CAP ASSEMBLY FLUSH CAP ASSEMBLY WITH DRIP INDICATOR SLEEVES:SCH 40 PVC LATERAL PIPE TO DRIP EMITTERS: 3/4-INCH SIZE UNLESS OTHERWISE INDICATED, ROUTING IS DIAGRAMMATIC UV RADIATION RESISTANT POLYETHYLENE MAINLINE PIPE: 2-INCH SIZE UNLESS OTHERWISE INDICATED HDPE 4710 SDR-11 A1141" INDICATES LATERAL DISCHARGE (GPM) INDICATES VALVE SIZE (INCHES) INDICATES CONTROLLER AND STATION NUMBER INDICATES LANDSCAPE APPLICATIONTurf WATER METER AND CURB STOP ASSEMBLY:M BY OTHERS POINT-OF-CONNECTION ASSEMBLYPOINT-OF-CONNECTION ASSEMBLY REMOTE CONTROL DRIP VALVE ASSEMBLY:RAIN BIRD XCZ-100-PRBR W/ WEATHERTRAK WT2W-H2O-1VD CRITICAL ANALYSIS FLOW AVAILABLE Flow Available PRESSURE AVAILABLE Static Pressure at POC: Pressure Available: DESIGN ANALYSIS Maximum Station Flow: Flow Available at POC: Residual Flow Available: Pressure Req. at Critical Station: Loss for Lateral pipe from RCV to Sprinkler: Loss for Remote Control Valve: Loss for Main Line: Loss for Master Valve: Loss for Backflow: Loss for Meter: Loss for Service Line Length: Loss for Elevation: Miscellaneous Losses: Critical Station Pressure at POC: Residual Pressure Available: GPM PSI PSI GPM GPM GPM PSI PSI PSI PSI PSI PSI PSI PSI PSI PSI PSI PSI 25 55 80 5.35 25.0 19.65 30.0 3.0 3.0 6.0 3.0 0 3 3.9 0.0 0.0 51.9 28.1 IRRIGATION CONTROL WIRESC IN CONDUIT OR WITH WARNING TAPE INLINE TREE DRIP RING ASSEMBLY:RAIN BIRD XFS-CV-06-12 LATERAL PIPE TO TREE BUBBLERS: 1-INCH SIZE UNLESS OTHERWISE INDICATED CLASS 200 PVC B A VA U L T MOUNTAIN VISTA DRIVE N. TIM N. T I M B E R L I N E R O A D MOUNTAIN VISTA DRIVE Sheet Number: Project Number: Pr o j e c t : Cl i e n t : 1603 Oakridge Drive, Suite 100 Fort Collins, CO 80525 p. (970) 223-7577 www.bhadesign.com Landscape Architecture Urban Design Master Planning Produced by: Date: Revision: IR0 Date: RO A D W A Y & I N F R A S T R U C T U R E P L A N S MO N T A V A P H A S E G RO A D W A Y & I N F R A S T R U C T U R E P L A N S HF 2 M | C O L O R A D O MO N T A V A P H A S E G IR R I G A T I O N N O T E S A N D L E G E N D JDD 11/08/2023 1734 1 MEDIAN UPDATE 11/08/23 POC SIZE: 1-INCH PRESSURE: 55 PSI (MIN. REQUIRED) FLOW: 25 GPM CONTROLLER 120 VAC POWER REQUIRED 2 1 IR1 IR2 1 VA U L T MOUNTAIN VISTA DRIVE N. TIM N. T I M B E R L I N E R O A D 2" 2" 2" 2" 114" 1" QUICK COUPLER FOR WINTERIZATION BLOWOUT. CONTROLLER 120 VAC POWER REQUIRED POC SIZE: 1-INCH PRESSURE: 80 PSI FLOW: 25 GPM A4 1.75 Tree 1" A1 1.50 Tree 1" A2 1.90 Shrub 1" A3 1.20 Shrub 1" A8 1.20 Shrub 1" A5 5.35 Shrub 1" A6 2.35 Shrub 1" A7 1.5 Tree 1" GND A GND 3 A A A A A A B B B B A A 2 1 A MOUNTAIN VISTA DRIVE 2" A9 6.10 Shrub 1" A10 5.25 Tree 1" GND GND 3 Sheet Number: Project Number: Pr o j e c t : Cl i e n t : 1603 Oakridge Drive, Suite 100 Fort Collins, CO 80525 p. (970) 223-7577 www.bhadesign.com Landscape Architecture Urban Design Master Planning Produced by: Date: Revision: IR1 Date: RO A D W A Y & I N F R A S T R U C T U R E P L A N S MO N T A V A P H A S E G RO A D W A Y & I N F R A S T R U C T U R E P L A N S HF 2 M | C O L O R A D O MO N T A V A P H A S E G IR R I G A T I O N P L A N JDD 11/08/23 1734 1 MEDIAN UPDATE 11/08/23 0N O R T H 60'15'30' S C A L E : 1''= 3 0' MA T C H L I N E , S E E B E L O W MA T C H L I N E , S E E A B O V E 1 Sheet Number: Project Number: Pr o j e c t : Cl i e n t : 1603 Oakridge Drive, Suite 100 Fort Collins, CO 80525 p. (970) 223-7577 www.bhadesign.com Landscape Architecture Urban Design Master Planning Produced by: Date: Revision: IR2 Date: RO A D W A Y & I N F R A S T R U C T U R E P L A N S MO N T A V A P H A S E G RO A D W A Y & I N F R A S T R U C T U R E P L A N S HF 2 M | C O L O R A D O MO N T A V A P H A S E G IR R I G A T I O N D E T A I L S JDD 11/08/23 1734 1 MEDIAN UPDATE 11/08/23 1 2 43 20" JUMBO VALVE BOX WITH COVER 20" JUMBO VALVE BOX WITH COVER HDPE MAINLINE PIPE HDPE MAINLINE PIPE HDPE MAINLINE PIPE HDPE MAINLINE PIPE 7 8 65 HDPE MAINLINE PIPE HDPE MAINLINE PIPE HDPE MAINLINE PIPE Sheet Number: Project Number: Pr o j e c t : Cl i e n t : 1603 Oakridge Drive, Suite 100 Fort Collins, CO 80525 p. (970) 223-7577 www.bhadesign.com Landscape Architecture Urban Design Master Planning Produced by: Date: Revision: IR3 Date: RO A D W A Y & I N F R A S T R U C T U R E P L A N S MO N T A V A P H A S E G RO A D W A Y & I N F R A S T R U C T U R E P L A N S HF 2 M | C O L O R A D O MO N T A V A P H A S E G IR R I G A T I O N D E T A I L S JDD 11/08/23 1734 1 MEDIAN UPDATE 11/08/23 109 11 12 HDPE MAINLINE PIPE Sheet Number: Project Number: Pr o j e c t : Cl i e n t : 1603 Oakridge Drive, Suite 100 Fort Collins, CO 80525 p. (970) 223-7577 www.bhadesign.com Landscape Architecture Urban Design Master Planning Produced by: Date: Revision: IR4 Date: RO A D W A Y & I N F R A S T R U C T U R E P L A N S MO N T A V A P H A S E G RO A D W A Y & I N F R A S T R U C T U R E P L A N S HF 2 M | C O L O R A D O MO N T A V A P H A S E G IR R I G A T I O N D E T A I L S JDD 11/08/23 1734 1 MEDIAN UPDATE 11/08/23 13 14 15 16 3M DBR/Y-6 SPLICE KITS Sheet Number: Project Number: Pr o j e c t : Cl i e n t : 1603 Oakridge Drive, Suite 100 Fort Collins, CO 80525 p. (970) 223-7577 www.bhadesign.com Landscape Architecture Urban Design Master Planning Produced by: Date: Revision: IR5 Date: RO A D W A Y & I N F R A S T R U C T U R E P L A N S MO N T A V A P H A S E G RO A D W A Y & I N F R A S T R U C T U R E P L A N S HF 2 M | C O L O R A D O MO N T A V A P H A S E G IR R I G A T I O N D E T A I L S JDD 11/08/23 1734 1 MEDIAN UPDATE 11/08/23 17 18 19 MAINLINE & CONTROL WIRE STUB-OUT (FUTURE CONNECTION)20 HDPE MAINLINE SDR-1121 Sheet Number: Project Number: Pr o j e c t : Cl i e n t : 1603 Oakridge Drive, Suite 100 Fort Collins, CO 80525 p. (970) 223-7577 www.bhadesign.com Landscape Architecture Urban Design Master Planning Produced by: Date: Revision: IR6 Date: RO A D W A Y & I N F R A S T R U C T U R E P L A N S MO N T A V A P H A S E G RO A D W A Y & I N F R A S T R U C T U R E P L A N S HF 2 M | C O L O R A D O MO N T A V A P H A S E G IR R I G A T I O N D E T A I L S JDD 11/08/23 1734 1 MEDIAN UPDATE 11/08/23 *ALL PIPING, VALVES, VALVE BOXES, SPRINKLERS, DRIP COMPONENTS, IRRIGATION INFRASTRUCTURE, AND ALL WATER EMISSION DEVICES SHALL BE MARKED PURPLE TO INDICATE USE WITH NON-POTABLE WATER. NON-POTABLE NOTE ESTIMATED ANNUAL WATER USE THE IRRIGATION SYSTEM AS SHOWN ON THIS PLAN HAS AN ESTIMATED ANNUAL WATER USE OF 586,777 GALLONS. TO VERIFY EFFICIENT IRRIGATION SYSTEM OPERATION, THE OWNER SHALL COMPARE THIS ESTIMATED IRRIGATION WATER USE WITH ACTUAL WATER USE, AS RECORDED ON SITE, AFTER ALL PLANT MATERIAL HAS BEEN ESTABLISHED. THE ESTIMATED ANNUAL IRRIGATION WATER USE OF THIS SYSTEM IS BASED ON 30-YEARS AVERAGE EVAPOTRANSPIRATION RATES (ET) FOR THE LOCAL AREA AND TYPICAL NEW IRRIGATION SYSTEM EQUIPMENT EFFICIENCIES. MAJOR DEVIATIONS FROM THIS ESTIMATE USE SHOULD BE BROUGHT TO THE ATTENTION OF THE OWNER AND CURRENT IRRIGATION MAINTENANCE COMPANY AT THE TIME OF THE DEVIATION. TO VERIFY EFFICIENT IRRIGATION SYSTEM OPERATION AND WATER USE, AN IRRIGATION SYSTEM EVALUATION AND AUDIT SHOULD BE PERFORMED. 1.THE SYSTEM DESIGN ASSUMES A MINIMUM DYNAMIC PRESSURE FOR THE IRRIGATION SYSTEM OF 80 PSI, AT A DESIGN FLOW OF 50 GPM AT THE EXISTING 1.5-INCH IRRIGATION POINT-OF-CONNECTION (POC B). TAP, METER, BACKFLOW PREVENTER, MASTER VALVE AND FLOW METER SHALL BE SIZED AS INDICATED IN THE DRAWING LEGEND. VERIFY PRESSURE AND FLOW ON SITE PRIOR TO CONSTRUCTION. 2.READ THOROUGHLY AND BECOME FAMILIAR WITH THE SPECIFICATIONS AND INSTALLATION DETAILS FOR THIS AND RELATED WORK PRIOR TO CONSTRUCTION. 3.COORDINATE UTILITY LOCATES ("CALL BEFORE YOU DIG") OF UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 4.DO NOT PROCEED WITH THE INSTALLATION OF THE IRRIGATION SYSTEM WHEN IT IS OBVIOUS IN THE FIELD THAT OBSTRUCTIONS OR GRADE DIFFERENCES EXIST THAT MIGHT NOT HAVE BEEN CONSIDERED IN THE ENGINEERING. IF DISCREPANCIES IN CONSTRUCTION DETAILS, LEGEND, NOTES, OR SPECIFICATIONS ARE DISCOVERED, BRING ALL SUCH OBSTRUCTIONS OR DISCREPANCIES TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE. 5.THE DRAWINGS ARE DIAGRAMMATIC. THEREFORE, THE FOLLOWING SHOULD BE NOTED: A.ALTHOUGH IRRIGATION COMPONENTS MAY BE SHOWN OUTSIDE PLANTING AREAS FOR CLARITY, INSTALL IRRIGATION PIPE AND WIRING IN LANDSCAPED AREAS WHENEVER POSSIBLE. B.TREE AND SHRUB LOCATIONS AS SHOWN ON LANDSCAPE PLANS TAKE PRECEDENCE OVER IRRIGATION EQUIPMENT LOCATIONS. AVOID CONFLICTS BETWEEN THE IRRIGATION SYSTEM, PLANTING MATERIALS, AND ARCHITECTURAL FEATURES. C.USE ONLY STANDARD TEES AND ELBOW FITTINGS. USE OF TEES IN THE BULLNOSE CONFIGURATION, OR USE OF CROSS TYPE FITTINGS IS NOT ALLOWED. 6.PROVIDE THE FOLLOWING COMPONENTS TO THE OWNER PRIOR TO THE COMPLETION OF THE PROJECT: A.TWO (2) OPERATING KEYS FOR EACH TYPE OF MANUALLY OPERATED VALVES. 7.THE IRRIGATION CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF IRRIGATION SLEEVING. SLEEVES ARE REQUIRED FOR BOTH PIPING AND ELECTRICAL WIRING AT EACH HARDSCAPE CROSSING. COORDINATE INSTALLATION OF SLEEVING WITH OTHER TRADES. ANY PIPE OR WIRE WHICH PASSES BENEATH EXISTING HARDSCAPE WHERE SLEEVING WAS NOT INSTALLED WILL REQUIRE HORIZONTAL BORING BY THE IRRIGATION CONTRACTOR. PIPE SLEEVES SHALL BE SIZED TWICE THE NOMINAL SIZE OF THE PIPE PASSING THROUGH. 8.INSTALL ALL ELECTRICAL POWER TO THE IRRIGATION CONTROL SYSTEM IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE AND ALL APPLICABLE LOCAL ELECTRIC UTILITY CODES. 9.THE FOLLOWING SHOULD BE NOTED REGARDING PIPE SIZING: IF A SECTION OF UNSIZED PIPE IS LOCATED BETWEEN TWO IDENTICALLY SIZED SECTIONS, THE UNSIZED PIPE IS THE SAME NOMINAL SIZE AS THE TWO SIZED SECTIONS. THE UNSIZED PIPE SHOULD NOT BE CONFUSED WITH THE DEFAULT PIPE SIZE NOTED IN THE LEGEND. 10.INSTALL ONE (1) #14 AWG TWO-WIRE PAIR ON TWO-WIRE SYSTEMS, FOR USE AS SPARES. INSTALL SPARE WIRES FROM CONTROLLER LOCATION TO EACH DEAD-END OF MAINLINE. COIL 3 FEET OF WIRE IN VALVE BOX. TRACING WIRE TO BE INSTALLED ENTIRE LENGTH OF MAINLINE. CONSTRUCTION NOTES INSTALLATION GENERAL NOTES MAINLINE AND CONTROL WIRE CONNECTION TO POC B FROM PHASE G IRRIGATION SYSTEM. IRRIGATION CONTROLLER FROM PHASE G POC B WILL BE USED UNTIL THE CITY OF FORT COLLINS PARKS DEPARTMENT DEVELOPS THE REGIONAL PARK IRRIGATION SHOWN OUT OF LANDSCAPED AREA FOR CLARITY ONLY. INSTALL IRRIGATION COMPONENTS WITHIN LANDSCAPED AREA. MAINLINE AND CONTROL WIRE STUB OUT PLACED IN 10" ROUND VALVE BOX WITH ISOLATION GATE VALVE. IRRIGATION LEGEND CONTROLLER CHART 'B' CONTROLLER RUNTIMES *WIRES SHALL BE TESTED AT EVERY LOCATION WHERE THE WIRES CROSS ROADWAYS AND AT EVERY GROUND LOCATION (INCLUDING VALVE BOX GROUND AND END OF RUN GROUNDS). *LANDSCAPE AND IRRIGATION ON THESE ROADWAY AND INFRASTRUCTURE PLAN SHEETS SHALL BE MAINTAINED BY CITY OF FORT COLLINS PARKS. *TRACING WIRE TO BE INSTALLED ENTIRE LENGTH OF MAINLINE. *PARK FRONTAGE IRRIGATION HAS BEEN DESIGNED TO CITY OF FORT COLLINS PARKS DEPARTMENT STANDARDS. THE SYSTEM WILL OPERATE WITH PHASE G POC B POINT OF CONNECTION AND CONTROLLER UNTIL DEVELOPMENT OF THE REGIONAL PARK. AT THAT TIME THE SYSTEM WILL BE DISCONNECTED FROM PHASE G POC B AND CONTROLLER AND OPERATE UNDER THE CITY OF FORT COLLINS PARKS DEPARTMENT. MAINLINE HAS BEEN SIZED TO OPERATE WITH FUTURE DEVELOPMENT OF THE REGIONAL PARK. NOTE IRRIGATION SLEEVE LEGEND *ALL SLEEVES SHALL BE SCH 40 PVC AND SIZED TWICE THE NOMINAL SIZE OF THE PIPE PASSING THROUGH, ALL CONTROL WIRE SLEEVES SHALL BE 2-INCH 'A'- (1) 4 -INCH, (1) 2-INCH 'B'- (1) 2-INCH 'C'- (2) 2-INCH 3 2 1 QUICK COUPLING VALVE ASSEMBLY:RAIN BIRD 5NP ISOLATION GATE VALVE ASSEMBLY:NIBCO T-113K GROUNDING AND SURGE ARRESTOR ASSEMBLY:GND RAINBIRD IVM-SD IRRIGATION MAINLINE CAP ASSEMBLY SLEEVES:SCH 40 PVC MAINLINE PIPE: 2 1/2-INCH SIZE UNLESS OTHERWISE INDICATED CLASS 200 PVC A1141" INDICATES LATERAL DISCHARGE (GPM) INDICATES VALVE SIZE (INCHES) INDICATES CONTROLLER AND STATION NUMBER INDICATES LANDSCAPE APPLICATIONTurf POINT-OF-CONNECTION ASSEMBLYPOINT-OF-CONNECTION ASSEMBLY CRITICAL ANALYSIS FLOW AVAILABLE Flow Available PRESSURE AVAILABLE Static Pressure at POC: Pressure Available: DESIGN ANALYSIS Maximum Station Flow: Flow Available at POC: Residual Flow Available: Pressure Req. at Critical Station: Loss for Lateral pipe from RCV to Sprinkler: Loss for Remote Control Valve: Loss for Main Line: Loss for Master Valve: Loss for Backflow: Loss for Meter: Loss for Service Line Length: Loss for Elevation: Miscellaneous Losses: Critical Station Pressure at POC: Residual Pressure Available: GPM PSI PSI GPM GPM GPM PSI PSI PSI PSI PSI PSI PSI PSI PSI PSI PSI PSI 50 80 80 40.7 50 9.3 45 4.5 3.0 8 3.5 0 3 3.9 0.0 0.0 7.09 9.1 INLINE TREE DRIP RING ASSEMBLY:RAIN BIRD XFS-CV-06-12 LATERAL PIPE TO TREE BUBBLERS: 1-INCH SIZE UNLESS OTHERWISE INDICATED CLASS 200 PVC B A C POP-UP SPRAY SPRINKLER: PRESSURE: RADIUS: FLOW (GPM): RAIN BIRD RD1806-S-P30 W/MPR SERIES NOZZLE 30 PSI 4 FEET X 15 FEET HEVAN08-1.17 HEVAN10-1.78 HEVAN12-2.37 HEVAN15-3.70 POP-UP SPRAY SPRINKLER: PRESSURE: RADIUS: FLOW (GPM): RAIN BIRD RD1806-S-P30 W/U-SERIES 10 NOZZLE 30 PSI 10 FEET Q-0.41 H-0.82 F-1.64 POP-UP SPRAY SPRINKLER: PRESSURE: RADIUS: FLOW (GPM): RAIN BIRD RD1806-S-P30 W/U-SERIES 8 NOZZLE 30 PSI 8 FEET Q-0.26 H-0.52 F-1.05 REMOTE CONTROL VALVE ASSEMBLY FOR SPRINKLER LATERALS: RAIN BIRD PE-IVM (SIZED PER PLAN) LATERAL PIPE TO SPRINKLERS: 1-INCH SIZE UNLESS OTHERWISE INDICATED CLASS 200 PVC UNCONNECTED PIPE CROSSING REMOTE CONTROL DRIP VALVE ASSEMBLY:RAIN BIRD XCZ-100-IVM WATER BUDGET: MONTHLY WATER USAGE 4 POP-UP ROTATING SPRAY SPRINKLER: PRESSURE: RADIUS: FLOW (GPM): AD-RAIN BIRD RD1806-S-P45 W/RVAN14 SERIES NOZZLE 45 PSI 8 FEET TO 14 FEET Q-0.32 H-0.63 F-1.27 POP-UP ROTATING SPRAY SPRINKLER: PRESSURE: RADIUS: FLOW (GPM): 18 RAIN BIRD RD1806-S-P45 W/RVAN18 SERIES NOZZLE 45 PSI 13 FEET TO 18 FEET Q-0.50 H-1.02 F-1.85 POP-UP ROTATING SPRAY SPRINKLER: PRESSURE: RADIUS: FLOW (GPM): 24 RAIN BIRD RD1806-S-P45 W/RVAN24 SERIES NOZZLE 45 PSI 17 FEET TO 24 FEET Q-0.92 H-1.84 F-3.67 Sheet Number: Project Number: Pr o j e c t : Cl i e n t : 1603 Oakridge Drive, Suite 100 Fort Collins, CO 80525 p. (970) 223-7577 www.bhadesign.com Landscape Architecture Urban Design Master Planning C: \ H I N E S I N C D R O P B O X \ D E S I G N \ P R O J E C T S \ H F 2 M P R O P E R T Y - M O N T A V A \ M O N T A V A N O N - P O T A B L E W A T E R S T U D Y \ A C A D \ 0 4 P A R K F R O N T A G E \ I R - P A R K F R O N T A G E . D W G Pl o t D a t e : 10 / 1 2 / 2 0 2 3 4 : 2 7 P M P l o t t e d B y : Ju s t i n D a n n e l l y Da t e C r e a t e d : 9/ 2 6 / 2 0 2 3 Produced by: Date: Revision: IR0 Date: MO N T A V A S U B D I V I S I O N P H A S E G RO A D W A Y & I N F R A S T R U C T U R E P L A N HF 2 M | C O L O R A D O PH A S E G JDD 10/13/2023 1734 RO A D W A Y A N D I N F R A S T R U C T U R E P L A N S CO M M U N I T Y P A R K F R O N T A G E OV E R A L L N O T E S A N D L E G E N D V A U L T VAU L T VAU L T V A U L T VAULT 212" 212" POC MAINLINE AND CONTROL WIRE CONNECTION TO POC B FROM PHASE G IRRIGATION SYSTEM. 112" 114" 114" 2"112"112" 114" 2" 112" 114" 114" 114" 114" 112" 114" 114" B114 31.1 Turf 112" B116 20.4 Turf 1"B117 40.7 Turf 112" B119 22.5 Turf 1" B120 40.7 Turf 112" B121 20.5 Turf 1" B123 30.7 Turf 112" B124 31.1 Turf 112" B115 3.5 Tree 1" B118 5.0 Tree 1" B122 7.0 Tree 1" GND GND LONG W O O D D R I V E (CON N E C T O R L O C A L ) 1 114" 112" 212" 212" 212" A A A A A A B B B C 3 3 212" 3 VAULT MAINLINE SIZED AT 2.5" FOR FUTURE EXPANSION 114" 112" 114" 114" 112" 2" B125 22.6 Turf 1" B127 27.7 Turf 112" B128 26.0 Turf 112" B129 38.1 Turf 112" B126 3.5 Tree 1" GND GND 24 24 24 24 AD- AD- AD- 18 18 18 18 18 18 18 24 24 24 24 24 24 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 21 2" 212" 212" A A A A B C 3 4 Sheet Number: Project Number: Pr o j e c t : Cl i e n t : 1603 Oakridge Drive, Suite 100 Fort Collins, CO 80525 p. (970) 223-7577 www.bhadesign.com Landscape Architecture Urban Design Master Planning C: \ H I N E S I N C D R O P B O X \ D E S I G N \ P R O J E C T S \ H F 2 M P R O P E R T Y - M O N T A V A \ M O N T A V A N O N - P O T A B L E W A T E R S T U D Y \ A C A D \ 0 4 P A R K F R O N T A G E \ I R - P A R K F R O N T A G E . D W G Pl o t D a t e : 10 / 1 2 / 2 0 2 3 4 : 2 7 P M P l o t t e d B y : Ju s t i n D a n n e l l y Da t e C r e a t e d : 9/ 2 6 / 2 0 2 3 Produced by: Date: Revision: IR1 Date: MO N T A V A S U B D I V I S I O N P H A S E G RO A D W A Y & I N F R A S T R U C T U R E P L A N HF 2 M | C O L O R A D O PH A S E G JDD 10/13/2023 1734 MA T C H L I N E , S E E B E L O W NOTE: LANDSCAPE AND IRRIGATION ON THESE ROADWAY AND INFRASTRUCTURE PLAN SHEETS SHALL BE MAINTAINED BY CITY OF FORT COLLINS PARKS. MA T C H L I N E , S E E A B O V E KEY MAP 1 2 SCALE:1" = 30'-0"2 PARK FRONTAGE SCALE:1" = 30'-0"1 PARK FRONTAGE RO A D W A Y A N D I N F R A S T R U C T U R E P L A N S CO M M U N I T Y P A R K F R O N T A G E IR R I G A T I O N P L A N NOTE: LANDSCAPE AND IRRIGATION ON THIS ROADWAY AND INFRASTRUCTURE PLAN SHEET SHALL BE MAINTAINED BY THE DEVELOPER UNTIL FUTURE COMMUNITY PARK IS COMPLETED. THEN SHALL BE MAINTAINED BY CITY OF FORT COLLINS PARKS. Sheet Number: Project Number: Pr o j e c t : Cl i e n t : 1603 Oakridge Drive, Suite 100 Fort Collins, CO 80525 p. (970) 223-7577 www.bhadesign.com Landscape Architecture Urban Design Master Planning C: \ H I N E S I N C D R O P B O X \ D E S I G N \ P R O J E C T S \ H F 2 M P R O P E R T Y - M O N T A V A \ M O N T A V A N O N - P O T A B L E W A T E R S T U D Y \ A C A D \ 0 4 P A R K F R O N T A G E \ I R - P A R K F R O N T A G E . D W G Pl o t D a t e : 10 / 1 2 / 2 0 2 3 4 : 2 7 P M P l o t t e d B y : Ju s t i n D a n n e l l y Da t e C r e a t e d : 9/ 2 6 / 2 0 2 3 Produced by: Date: Revision: IR2 Date: MO N T A V A S U B D I V I S I O N P H A S E G RO A D W A Y & I N F R A S T R U C T U R E P L A N HF 2 M | C O L O R A D O PH A S E G JDD 10/13/2023 1734 RO A D W A Y A N D I N F R A S T R U C T U R E P L A N S CO M M U N I T Y P A R K F R O N T A G E IR R I G A T I O N D E T A I L S 1 3 2 4 Sheet Number: Project Number: Pr o j e c t : Cl i e n t : 1603 Oakridge Drive, Suite 100 Fort Collins, CO 80525 p. (970) 223-7577 www.bhadesign.com Landscape Architecture Urban Design Master Planning C: \ H I N E S I N C D R O P B O X \ D E S I G N \ P R O J E C T S \ H F 2 M P R O P E R T Y - M O N T A V A \ M O N T A V A N O N - P O T A B L E W A T E R S T U D Y \ A C A D \ 0 4 P A R K F R O N T A G E \ I R - P A R K F R O N T A G E . D W G Pl o t D a t e : 10 / 1 2 / 2 0 2 3 4 : 2 7 P M P l o t t e d B y : Ju s t i n D a n n e l l y Da t e C r e a t e d : 9/ 2 6 / 2 0 2 3 Produced by: Date: Revision: IR3 Date: MO N T A V A S U B D I V I S I O N P H A S E G RO A D W A Y & I N F R A S T R U C T U R E P L A N HF 2 M | C O L O R A D O PH A S E G JDD 10/13/2023 1734 RO A D W A Y A N D I N F R A S T R U C T U R E P L A N S CO M M U N I T Y P A R K F R O N T A G E IR R I G A T I O N D E T A I L S 5 7 6 8 Sheet Number: Project Number: Pr o j e c t : Cl i e n t : 1603 Oakridge Drive, Suite 100 Fort Collins, CO 80525 p. (970) 223-7577 www.bhadesign.com Landscape Architecture Urban Design Master Planning C: \ H I N E S I N C D R O P B O X \ D E S I G N \ P R O J E C T S \ H F 2 M P R O P E R T Y - M O N T A V A \ M O N T A V A N O N - P O T A B L E W A T E R S T U D Y \ A C A D \ 0 4 P A R K F R O N T A G E \ I R - P A R K F R O N T A G E . D W G Pl o t D a t e : 10 / 1 2 / 2 0 2 3 4 : 2 8 P M P l o t t e d B y : Ju s t i n D a n n e l l y Da t e C r e a t e d : 9/ 2 6 / 2 0 2 3 Produced by: Date: Revision: IR4 Date: MO N T A V A S U B D I V I S I O N P H A S E G RO A D W A Y & I N F R A S T R U C T U R E P L A N HF 2 M | C O L O R A D O PH A S E G JDD 10/13/2023 1734 RO A D W A Y A N D I N F R A S T R U C T U R E P L A N S CO M M U N I T Y P A R K F R O N T A G E IR R I G A T I O N D E T A I S 9 10 11 12 City of Fort Collins, Colorado UTILITY PLAN APPROVAL APPROVED: City Engineer, APPROVED: Water & Wastewater Utility, APPROVED: Stormwater Utility, APPROVED: Park Planning and Development, APPROVED: Traffic Operations, APPROVED: Environmental Planner,Approved Sheets Date Approved Sheets Date Approved Sheets Date Approved Sheets Date Approved Sheets Date Approved Sheets Date ’ “” – ’ ’ ’ — ’ “” “” “”“” – “” – – VAULT VAULT VAU L T V A U L T VA U L T VA U L T VAUL T VA U L T VAULT VA U L T VAUL T VA U L T VA U L T VA U L T VAULT VAULT VAULT VA U L T VAULT VAULT VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VAULT VA U L T VAULT VAULT VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VAULT VAULT VAULT VAULT V A U L T VAULT VA U L T VAULT VA U L T VA U L T · · VAULT · · VAULT VAULT VAULT VAULT · · VA U L T VAULT VAULT VAULT VA U L T VA U L T VA U L T VAULT VAULT VAULT VAULT VA U L T NO . 8 D I T C H MO N T A V A I R R I G A T I O N LA T E R A L (N P I C / W S S C W A T E R ) CRESCENT PARK (FC) LA R I M E R & W E L D C A N A L NO . 8 D I T C H PSD (ELEM) FORT COLLINS PARK WSSC DELIVERY LINE NPIC DELI V E R Y L I N E WATERTRONICS WATERTRONICS WATERTRONICS SECTION B-B SECTION A-A SECTION C-C SPLITTER STRUCTURE DETAIL (SEE STRUCTURAL PLANS SHEETS 36-37(S7-S8)) SECTION B-B SECTION A-A NON-POT POND OUTLET DETAIL N.T.S. TRAFFIC BOLLARD DETAIL NTS Montava - West Vault Elevations & Pump Rates Well Name Finished Grade at Vault Top of Vault Portner Well: No. 1 5011.12 5011.62 Portner Well: No. 2 5010.92 5011.42 Kluver PS 1: Well No. 1 5003.49 5003.99 Kluver PS 1: Well No. 2 5003.20 5003.70 MONTAVA WEST POND WELL 5004.00 5004.50 c Dale F. Jones, PROJECT: SCALE: SHEET U.N.O. #2935 MO N T A V A NO N - P O T P U M P S T A T I O N Fo r t C o l l i n s , C o l o r a d o THIS DRAWING IS INTENDED TO BE PRINTED ON 24" x 36" PAPER DALE F. JONES, STRUCTURAL ENGINEER, Inc. 3250 SEDGWICK CIRCLE LOVELAND, CO 80538 (970) 568-2919 mobile djones@dfjse.com State of Colorado License Professional Engineer #32364 32364 F.ELAD S E N OJ ODAROLOC D E S N ECIL RP R O F E SIONA L E N GINEE S Structural Engineer, Inc., 2023 ISSUED AS: DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION PRELIMINARY - NOT FOR CONSTRUCTION 9/26/2023 REVISIONS DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION TYPICAL HORIZONTAL REINFORCING LAPS AT WALL CORNERS 3 GENERAL NOTES THESE DRAWINGS ARE FOR THE STRUCTURAL DESIGN OF THE WET WELL, INTAKE PIPE SUPPORTS, SPLITTER STRUCTURE AND TWO HEADWALLS. OTHER STRUCTURAL ELEMENTS OF THE OVERALL PROJECT, SUCH AS THE BUILDINGS AND BUILDING FOUNDATIONS, ARE TO BE DESIGNED BY, AND ARE THE RESPONSIBILITY OF OTHERS. THE CONTRACTOR SHALL MAINTAIN A COPY OF THE APPROVED (BY THE GOVERNING AGENCY) DRAWINGS AND SPECIFICATIONS AT THE JOB SITE. THESE APPROVED DOCUMENTS SHALL GOVERN OVER ALL OTHER ISSUED DOCUMENTS. ALL WORK SHALL BE IN CONFORMANCE WITH THE CONTRACT DOCUMENTS, THE 2021 EDITION OF THE INTERNATIONAL BUILDING CODE AND ALL LOCAL BUILDING ORDINANCES. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS AND EXISTING CONDITIONS AT THE JOB SITE. THE CONTRACTOR SHALL CONTACT THE STRUCTURAL ENGINEER WHERE EXISTING CONDITIONS REQUIRE CONSTRUCTION DIFFERENT FROM THAT SHOWN ON THE PLANS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE EXCAVATION PROCEDURES AND DESIGNING AND PROVIDING ALL BRACING AND SHORING AS REQUIRED FOR PROTECTION OF LIFE AND PROPERTY DURING CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR ALL METHODS AND MEANS OF CONSTRUCTION AS WELL AS ALL JOB SITE SAFETY AND HEALTH PRECAUTIONS. THE CONTRACTOR IS RESPONSIBLE FOR DESIGN AND INSTALLATION OF ANY DEWATERING REQUIRED DURING CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR ALL COORDINATION WITH ADJACENT PROPERTY OWNERS, UTILITY COMPANIES, AND DITCH COMPANIES TO GAIN ACCESS TO THE SITE. DESIGN CRITERIA THE STRUCTURES HAVE BEEN DESIGNED FOR THE FOLLOWING LOADINGS: BUILDING CODE ....................................................................................... 2021 INTERNATIONAL BUILDING CODE DESIGN OF REINFORCED CONCRETE .................................... ACI 350 RISK CATEGORY ..................................................................................... II SEISMIC IMPORTANCE FACTOR (Ie) ........................................ 1.00 MAPPED SPECTRAL RESPONSE ACCELERATIONS ....... Ss = 0.186, S1 = 0.055 SEISMIC SITE CLASS ......................................................................... SEISMIC SITE CLASS D SEISMIC SPECTRAL RESPONSE COEFFICIENTS ........... Sds = 0.199, Sd1 = 0.088 SEISMIC DESIGN CATEGORY ........................................................ SDC B FOUNDATIONS THE CONTRACTOR SHALL OBTAIN A COPY OF THE PROJECT GEOTECHNICAL REPORT, DATED MAY 20, 2022, AND SUBSEQUENT RECOMMENDATIONS BY EARTH ENGINEERING CONSULTANTS (EEC) OF WINDSOR, COLORADO AND BECOME FAMILIAR WITH THE REQUIREMENTS CONTAINED THEREIN. ALL GRADING, EXCAVATION, FILLS (INCLUDING BACKFILLS), DRAINAGE AND FOUNDATION CONSTRUCTION SHALL BE DONE IN ACCORDANCE WITH THE PROJECT GEOTECHNICAL REPORT AND UNDER THE OBSERVATION OF THE GEOTECHNICAL ENGINEER. PER THE PROJECT GEOTECHNICAL RECOMMENDATIONS, THE FOLLOWING VALUES WERE USED FOR FOUNDATION DESIGN: WET WELLS AND SPLITTER STRUCTURE AT-REST HORIZONTAL SOIL PRESSURE ON WALLS: 64 PCF ABOVE GROUNDWATER ELEVATION 102 PCF BELOW GROUNDWATER ELEVATION WET WELLS ALLOWABLE SOIL BEARING PRESSURE: 3,000 POUNDS PER SQUARE FOOT (3'-0" OF IMPORTED FILL BELOW BASE SLABS) SPLITTER STRUCTURE ALLOWABLE SOIL BEARING PRESSURE: 2,500 POUNDS PER SQUARE FOOT (3'-0" OF IMPORTED FILL BELOW BASE SLABS) INTAKE PIPE SUPPORTS AND HEADWALLS AT REST HORIZONTAL SOIL PRESSURE: 58 PCF ABOVE GROUNDWATER ELEVATION (IMPORTED MEDIUM DENSE GRANULAR BACKFILL) 96 PCF BELOW GROUNDWATER ELEVATION (IMPORTED MEDIUM DENSE GRANULAR BACKFILL) INTAKE PIPE SUPPORTS AND HEADWALLS ALLOWABLE SOIL BEARING PRESSURE: 2,500 POUNDS PER SQUARE FOOT (2'-0" OF IMPORTED FILL BELOW BASE SLAB/FOOTING) TO ACCOUNT FOR THE ADDITIONAL HORIZONTAL SOIL PRESSURE ON THE WET WELLS FROM THE BUILDING FOUNDATIONS AS WELL AS VEHICLE AND STORAGE LOADINGS INSIDE THE BUILDING, THE WET WELLS WERE DESIGNED FOR SURCHARGE LOADING EQUIVALENT TO AN ADDITIONAL THREE FEET OF SOIL. TO ACCOUNT FOR THE ADDITIONAL HORIZONTAL SOIL PRESSURE ON THE SPLITTER STRUCTURE AND HEADWALLS FROM POTENTIAL ADJACENT LIGHT VEHICLE LOADINGS, THESE STRUCTURES WERE DESIGNED FOR A SURCHARGE LOADING EQUIVALENT TO AN ADDITIONAL FOOT OF SOIL. REINFORCING FOR CONCRETE WORK THE PLACING AND SUPPORTING OF REINFORCING SHALL BE IN ACCORDANCE WITH ACI 350.5-12 AND THE LATEST EDITION OF "CRSI RECOMMENDED PRACTICE FOR PLACING REINFORCING BARS". ALL REINFORCING BARS AT THE WET WELLS, INTAKE PIPE SUPPORTS, SPLITTER STRUCTURE, AND HEADWALLS SHALL BE EPOXY COATED. REINFORCING BARS SHALL CONFORM TO ASTM A615, GRADE 60. EPOXY COATED REINFORCING BARS SHALL CONFORM TO ASTM A775. FABRICATION AND HANDLING OF EPOXY COATED REINFORCING BARS SHALL BE IN ACCORDANCE WITH ASTM D3963. SEE DETAIL 1/S1 FOR TYPICAL REINFORCING BAR BEND DIAMETERS. SEE DETAIL 2/S1 FOR STANDARD HOOKS. SEE DETAIL 3/S1 FOR TYPICAL CONDITION AT CORNERS, U.N.O. BASE SLAB OR FOOTING "L" BARS SHALL BE TIED IN PLACE PRIOR TO PLACEMENT OF CONCRETE. DO NOT WET-SET. DO NOT BEND OR STRAIGHTEN REINFORCEMENT EMBEDDED IN CAST CONCRETE WITHOUT PRIOR APPROVAL OF THE STRUCTURAL ENGINEER. MINIMUM CLEAR DISTANCE BETWEEN REINFORCING BARS SHALL BE ONE & ONE-HALF TIMES THE BAR DIAMETER, BUT NOT LESS THAN ONE & ONE-HALF INCH. PROVIDE THE FOLLOWING CLEAR DISTANCES BETWEEN THE REINFORCING AND THE FORMWORK U.N.O.: 3" .............................................................................. CONCRETE CAST AGAINST EARTH 2 1/2" (2" STRICT MINIMUM) ............... FORMED CONCRETE THE CONTRACTOR SHALL SUBMIT REINFORCING STEEL PLACING DRAWINGS (PRIOR TO FABRICATION) TO THE STRUCTURAL ENGINEER FOR REVIEW FOR CONFORMANCE WITH THE DESIGN DRAWINGS. THE DESIGN DRAWINGS SHALL GOVERN OVER PLACING DRAWINGS IN ALL CASES UNLESS MODIFICATIONS ARE APPROVED IN WRITING BY THE STRUCTURAL ENGINEER. ABBREVIATIONS ADD'L ......... ADDITIONAL ACI .............. AMERICAN CONCRETE INSTITUTE ASTM ......... AMERICAN SOCIETY FOR TESTING AND MATERIALS B.O. .............. BOTTOM OF DIA. ............. DIAMETER EA. ............... EACH EXIST'G .... EXISTING F.O. .............. FACE OF Fy ................. YIELD STRESS GALV. ......... GALVANIZED H.D. .............. HOT-DIPPED KSI .............. KIPS PER SQUARE INCH IBC .............. INTERNATIONAL BUILDING CODE MIN. ............. MINIMUM MAX. ........... MAXIMUM o/c ............... ON CENTER PSI ............... POUNDS PER SQUARE INCH PSF ............. POUNDS PER SQUARE FOOT REINF. ....... REINFORCEMENT REQ'D ......... REQUIRED T.O. .............. TOP OF TYP. ............ TYPICAL U.N.O. .......... UNLESS NOTED OTHERWISE w/ ................. WITH NOT TO SCALE S1 GENERAL STRUCTURAL NOTES & TYPICAL DETAILS WATER STOPS AT CONCRETE CONSTRUCTION JOINTS WATER STOPS SHALL BE SIKA GREENSTREAK FLAT RIBBED, PVC, WITHOUT CENTER BULB OR TEAR WEB. MODEL NUMBER SHALL BE #679 (6") AT WET WELLS AND #781 (4") AT SPLITTER STRUCTURE AND HEADWALLS. IF CONTRACTOR DESIRES TO USE ALTERNATE PRODUCTS, THEY SHALL BE SUBMITTED TO ENGINEER PRIOR TO USE. WATERSTOPS SHALL BE INSTALLED IN THE LOCATIONS SPECIFIED ON THE DETAILS. WATERSTOPS SHALL BE SPLICED BY HEAT WELDING PER THE MANUFACTURER'S RECOMMENDATIONS AT ALL SPLICES AND CORNERS FOR A CONTINUOUS SEAL. WATERSTOPS SHALL NOT BE LAP SPLICED. BEND DIAMETERS AT REINFORCING STEELINSIDEBEND DIAMETERMINIMUM INSIDE BEND DIAMETER TO BE AS FOLLOWS: 6 BAR DIAMETERS FOR #3 THROUGH #8 BARS (EXCEPT FOR STIRRUPS AND TIES) 4 BAR DIAMETERS FOR #3, #4 AND #5 TIES AND STIRRUPS BAR DIAMETER 1 INSI D E BEND D I A M E T E R (SE E D E T A I L 1 / S 1 ) STANDARD HOOKS 2 12 B A R D I A M E T E R S PA S T B E N D A T 90 D E G R E E H O O K S CONCRETE WORK ALL CONCRETE WORK SHALL CONFORM TO ACI 350.5-12. CONCRETE SHALL CONFORM TO THE FOLLOWING CRITERIA: AGGREGATE SHALL CONFORM TO ASTM C33 AND SHALL BE NON-ALKALI-SILICA REACTIVE. CEMENT SHALL BE PORTLAND, TYPE V, ASTM C150 (HIGH SULFATE RESISTANCE). FLYASH SHALL CONFORM TO ASTM C618. AIR-ENTRAINING ADMIXTURES SHALL CONFORM TO ASTM C260. OTHER ADMIXTURES SHALL CONFORM TO ASTM C494. DO NOT USE ADMIXTURES CONTAINING CALCIUM CHLORIDE. MIXING WATER SHALL BE POTABLE. MIX SHALL BE TRANSIT MIX AS PER ASTM C94. NO ALUMINUM ITEMS SHALL BE EMBEDDED IN ANY CONCRETE. CONCRETE SHALL BE PROPORTIONED, MIXED, DELIVERED, PLACED & CURED IN ACCORDANCE w/ ACI 350. CONCRETE FOR BASE SLAB AND FOOTINGS SHALL BE PLACED IN ONE CONTINUOUS OPERATION. CONCRETE FOR THE WALLS SHALL BE PLACED IN A CONTINUOUS OPERATION WITHOUT ANY CONSTRUCTION JOINTS. EXPOSED OUTSIDE CONCRETE CORNERS OF THE WALLS, EXCEPT AT THE TOP OF THE WET WELLS, SHALL BE CHAMFERED 3/4". CONCRETE SHALL CONFORM TO: MINIMUM OF 560 POUNDS OF CEMENTITIOUS MATERIAL (CEMENT AND FLYASH) PER CUBIC YARD OF CONCRETE A MINIMUM 20 PERCENT (BY WEIGHT) SUBSTITUTION OF FLYASH SHALL BE USED 5,000 PSI CONCRETE STRENGTH AT 28 DAYS 0.40 MAXIMUM WATER/CEMENTITIOUS RATIO (INCLUDING POZZOLANS) 3/4" MINIMUM, 1" MAXIMUM AGGREGATE SIZE 6% AIR CONTENT (DELIVERED AIR CONTENT SHALL BE +/- 1 1/2%) THE CONCRETE MIX DESIGN REQUIREMENTS SPECIFIED ABOVE ARE INTENDED TO PROVIDE RESISTANCE TO THE SEVERE SULFATE EXPOSURE NOTED IN THE GEOTECHNICAL REPORT AND TO LIMIT CONCRETE SHRINKAGE. THE CONTRACTOR SHALL SUBMIT TO THE STRUCTURAL ENGINEER FOR REVIEW, A PROPOSED CONCRETE MIX DESIGN WHICH MEETS THE ABOVE CRITERIA AND PROVIDES THE REQUIRED WORKABILITY FOR PROPER PLACEMENT AND CONSOLIDATION OF THE CONCRETE. TO ACHIEVE THE SLUMP REQUIRED FOR WORKABILITY AND CONSOLIDATION, WATER REDUCING AND/OR PLASTICIZING ADMIXTURES MAY BE PROPOSED PROVIDED THEY HAVE BEEN SHOWN NOT TO INCREASE CONCRETE SHRINKAGE OR DECREASE SULFATE RESISTANCE. SEE "CONCRETE TESTING REQUIRED BY AN INDEPENDENT AGENCY" NOTES BELOW FOR FIELD TESTING OF AIR CONTENT AND SAMPLING AND TESTING OF CONCRETE FOR STRENGTH. NO ADDITIONAL WATER SHALL BE ADDED TO THE CONCRETE MIX BEYOND WHAT IS ALLOWED FOR IN THE CONCRETE MIX DESIGN SUBMITTED TO THE STRUCTURAL ENGINEER. TIE "L" BAR IN 2 PLACES AT BOTTOM TIE TOP OF "L" BAR TO TEMPORARY HORIZONTAL SPACER BAR TYPICAL "L" BAR, SEE OTHER DETAILS FOR SIZES & LENGTHS "L" BARS SHALL NOT BE "WET-SET" AND SHALL BE TIED IN PLACE AS SHOWN ABOVE PRIOR TO PLACEMENT OF CONCRETE. DO NOT DISTURB PLACEMENT OF "L" BARS AFTER CONCRETE PLACEMENT. TYPICAL BASE SLAB AND FOOTING "L" BARS 4 FO O T I N G O R B A S E S L A B (R E I N F F O R C I N G N O T S H O W N ) WELL WELL LADDER, WET WELL COVER PLATES AND INTAKE PIPE SUPPORTS ALL WELDING SHALL BE IN ACCORDANCE WITH THE MOST RECENT VERSION OF THE "STRUCTURAL WELDING CODE" BY THE AMERICAN WELDING SOCIETY. WELDING ELECTRODES SHALL BE 70 KSI. STEEL SHALL CONFORM TO THE FOLLOWING STANDARD U.N.O.: STRUCTURAL SHAPES .......................................... ASTM A992 (Fy=50 KSI) ANGLES, BARS & PLATES ................................ ASTM A36 PIPE .................................................................................... ASTM A53 THE WET WELL LADDER, MONTAVA WET WELL COVER PLATE, INTAKE PIPE TEE SUPPORT & INTAKE PIPE SUPPORT SADDLES SHALL BE HOT-DIPPED GALVANIZED AFTER FABRICATION. ANY FIELD WELDED AREAS OR OTHER AREAS DISTURBED (CUTS, SCRATCHES, ETC.), SHALL BE COLD GALVANIZED WITH GALVANIZING PAINT IN ACCORDANCE WITH GALVANIZING PAINT MANUFACTURER'S SPECIFICATIONS. THE PARKS DEPARTMENT WET WELL COVER SHALL BE PRIMED WITH BARE METAL PRIMER AND PAINTED WITH TWO COATS OF EXTERIOR PAINT (COLOR TO BE SELECTED BY OWNER). METAL SHALL BE PREPARED AND PRIMER AND PAINT APPLIED IN ACCORDANCE WITH PRIMER AND PAINT MANUFACTURER'S SPECIFICATIONS. REINFORCING STEEL INSPECTIONS REQUIRED BY AN INDEPENDENT AGENCY CONCRETE SHALL NOT BE PLACED UNTIL ANY NOTED DEFICIENCIES HAVE BEEN CORRECTED AND ACCEPTED BY THE INDEPENDENT TESTING AGENCY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE INSPECTION PRIOR TO PLACEMENT OF CONCRETE. OBSERVATION OF THE REINFORCING STEEL AT THE WELL WELL BASE SLABS, SPLITTER STRUCTURE BASE SLAB, AND HEADWALL FOOTING IS REQUIRED PRIOR TO CONCRETE PLACEMENT. ALL REINFORCING SHALL BE IN PLACE AT TIME OF OBSERVATION, INCLUDING FOOTING "L" BARS WHICH ARE TO BE TIED IN PLACE. OBSERVATION OF THE REINFORCING STEEL AT THE WET WELL WALLS, SPLITTER STRUCTURE WALLS, HEADWALLS, AND INTAKE PIPE SUPPORT WALLS IS REQUIRED PRIOR TO CONCRETE PLACEMENT. AT THE WET WELLS, SPLITTER STRUCTURE AND HEADWALLS, THE FORM ON ONE SIDE OF THE WALLS SHALL BE IN PLACE BUT THE OTHER SIDE SHALL BE FULLY OPEN TO ALLOW FOR FULL OBSERVATION OF THE CONDITION OF THE TOP OF THE BASE SLAB, THE WATERSTOP, AND THE WALL REINFORCING. CONCRETE TESTING REQUIRED BY AN INDEPENDENT INSPECTION AGENCY JOBSITE TESTING OF DELIVERED CONCRETE AIR CONTENT IS REQUIRED FOR THE FIRST LOAD OF EACH DAY. ANY CONCRETE LOAD WHICH FAILS AIR CONTENT SHALL BE FIELD MODIFIED UNTIL ACCEPTANCE IS ACHIEVED. IF FIELD MODIFICATION OF AIR CONTENT IS REQUIRED FOR THE FIRST LOAD, THE SECOND LOAD SHALL BE TESTED FOR AIR CONTENT. IF SECOND LOAD REQUIRES MODIFICATION FOR AIR CONTENT, ALL REMAINING LOADS THAT DAY SHALL BE TESTED FOR AIR CONTENT AND FIELD MODIFIED AS REQUIRED. THE INDEPENDENT TESTING AGENCY SHALL OBTAIN A SAMPLE FOR COMPRESSION TESTING FROM THE FIRST LOAD OF EACH DAY'S CONCRETE, AND EVERY THIRD FOLLOWING LOAD (LOAD 1, LOAD 4, LOAD 7, ETC.) UNLESS OTHERWISE DIRECTED BY THE STRUCTURAL ENGINEER. EACH SAMPLE SHALL CONSIST OF FOUR TEST CYLINDERS WHICH ARE TO BE TESTED AT 7 DAYS (1 CYLINDER) & 28 DAYS (2 CYLINDERS). THE REMAINING CYLINDER SHALL BE HELD IN CASE ADDITIONAL TESTING IS REQUIRED. THE INDEPENDENT INSPECTION AGENCY SHALL SUBMIT TEST RESULTS TO THE OWNER, CONTRACTOR AND ENGINEER. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE TESTING WITH THE INDEPENDENT AGENCY. CONCRETE FORMING CONCRETE FORMING SHALL CONFORM TO ACI 350.5-12. THE CONTRACTOR SHALL SUBMIT PROPOSED FORM TIE SYSTEM AND FORM HOLE GROUTING SYSTEM TO STRUCTURAL ENGINEER FOR REVIEW. THE FORM TIE ASSEMBLIES SHALL LEAVE NO METAL (EXCEPT STAINLESS STEEL) OR ANY OTHER MATERIAL SUBJECT TO CORROSION OR DEGRADATION WITHIN 1" OF THE FORMED SURFACE OF THE CONCRETE. TIE HOLES SHALL BE FILLED WITH GROUT PER ACI 350.5-12. TAPERED WALL TIES SHALL NOT BE USED. CONCRETE PLACEMENT THE LIFT HEIGHT FOR THE CONCRETE IN THE WET WELL WALLS SHALL ALLOW THE CONCRETE TO BE VIBRATED FOR THE FULL HEIGHT OF THE LIFT. EACH LIFT SHALL BE VIBRATED FULLY TO COMPLETELY CONSOLIDATE THE CONCRETE AROUND THE REINFORCING AND TO AVOID HONEYCOMBS AND ROCK POCKETS. THE VIBRATION FOR THE UPPER LIFTS SHALL EXTEND A MINIMUM OF SIX INCHES INTO THE PREVIOUS LIFT. CONCRETE FOR THE LOWER 10'-0" OF THE WET WELL WALLS SHALL BE PLACED THROUGH A DROP CHUTE. CONCRETE FOR THE REMAINDER OF THE WALL MAY BE DROPPED WITHOUT A DROP CHUTE IF THE FALLING CONCRETE IS DIRECTED TO AVOID OBSTRUCTIONS SUCH AS FORM TIES AND REINFORCING WHICH WOULD CAUSE SEGREGATION OF THE AGGREGATES FROM THE CONCRETE MIX. BACKFILL PLACEMENT BACKFILL MAY BE PLACED AND COMPACTED WHEN THE CONCRETE HAS OBTAINED A COMPRESSIVE STRENGTH OF 4,000 PSI (80 PERCENT OF 28 DAY STRENGTH). REPAIR OF SURFACE DEFECTS AT WALLS AFTER REMOVAL OF WALL FORMS, CLEAN AND REPAIR SURFACE DEFECTS PER ACI 350.5-12. AT WALLS EXTEND ALL HORIZONTAL BARS TO 2 1/2" CLEAR FROM FAR FACE OF WALL (2" STRICT MINIMUM) AND PROVIDE STANDARD HOOKS STANDARD HOOKS, SEE 2/S1 1.VERTICAL REINFORCING NOT SHOWN. STANDARD HOOKS, SEE 2/S1 1'-6" A T BENDS LE S S THAN 90 D E G R E E S c Dale F. Jones, PROJECT: SCALE: SHEET U.N.O. #2935 MO N T A V A NO N - P O T P U M P S T A T I O N Fo r t C o l l i n s , C o l o r a d o THIS DRAWING IS INTENDED TO BE PRINTED ON 24" x 36" PAPER DALE F. JONES, STRUCTURAL ENGINEER, Inc. 3250 SEDGWICK CIRCLE LOVELAND, CO 80538 (970) 568-2919 mobile djones@dfjse.com State of Colorado License Professional Engineer #32364 32364 F.ELAD S E N OJ ODAROLOC D E S N ECIL RP R O F E SIONA L E N GINEE S Structural Engineer, Inc., 2023 ISSUED AS: DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION PRELIMINARY - NOT FOR CONSTRUCTION 9/26/2023 REVISIONS DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION 1/4" = 1'-0" WET WELL BASE SLAB PLANS (SCALE: 1 4 " = 1'-0") 1.ALL REINFORCING FOR WET WELL BASE SLAB AND WALLS SHALL BE EPOXY COATED. 2.THE TOP OF THE BASE SLAB SHALL BE FINISHED WITH A TROWEL FINISH. 3.SEE SECTION VIEW FOR BASE SLAB ELEVATIONS. 4.SEE SHEET S1 FOR TYPICAL NOTES AND SPECIFICATIONS. 5.SEE SHEET S1 FOR REINFORCING INSPECTION REQUIRED BY AN INDEPENDENT AGENCY. 7'-6" TO CENTER OF PIPE CROSS 13'-0" CENTER TO CENTER OF PIPE SUPPORTS PIPE SADDLE SUPPORT AT RESERVOIR INTAKE, SEE 1/S5 INTAKE SCREENS NOT SHOWN, SEE CIVIL DRAWINGS (1) PIPE TEE SUPPORT AT RESERVOIR INTAKE, SEE 1/S5 INTAKE PIPE SUPPORT FOUNDATION PLAN (SCALE: 1 4 " = 1'-0") SEE CIVIL DRAWINGS FOR LENGTH AND LOCATION OF INTAKE PIPE NOR T H SEE SECTION VIEWS ON SHEET S5 FOR PIPE SUPPORT ELEVATIONS NOT TO SCALE, SEE CIVIL DRAWINGS PIPE SADDLE SUPPORT AT RESERVOIR INTAKE, SEE 1/S5 IN T A K E P I P E (S E E O T H E R D R A W I N G S ) , SE E 1 / S 4 F O R R E I N F O R C I N G AT W A L L P E N E T R A T I O N WET WELLS AND INTAKE PIPE SUPPORT PLANS S2 L 3 x 3 x 1/4 PERIMETER ANGLE, TYP. 3 SIDES GUARDRAIL AT ACCESS HATCH, SEE MANUFACTURER'S LITERATURE ACCESS HATCH HINGES ON THIS SIDE 6'-0" CLEAR BETWEEN WALLS 1'-8" WALLS 1'-8" WALLS 9'-4" OUTSIDE FACES OF WALLS 15 ' - 0 " C L E A R BE T W E E N W A L L S 1' - 8 " WA L L S 1' - 8 " WA L L S 18 ' - 4 " OU T S I D E F A C E S O F W A L L S 12'-8" BASE SLAB 1'-8"1'-8" 21 ' - 8 " B A S E S L A B 1' - 8 " 1' - 8 " NOR T H TOP OF WET WELL PLANS (SCALE: 1 4 " = 1'-0") NOR T H PIPE (SEE OTHER DRAWINGS), SEE 1/S4 FOR REINFORCING AT WALL PENETRATIONS PARKS DEPARTMENT WET WELL PLAN VIEW AT TOP OF PARKS DEPARTMENT WET WELL SEE DETAIL 3/S1 FOR WALL REINFORCING AT CORNERS TYP.1 S3 4'- 9 " T O CE N T E R O F IN T A K E P I P E 6'-0" CLEAR BETWEEN WALLS 1'-8" WALLS 1'-8" WALLS 9'-4" OUTSIDE FACES OF WALLS 15 ' - 0 " C L E A R BE T W E E N W A L L S 1' - 8 " WA L L S 1' - 8 " WA L L S 18 ' - 4 " OU T S I D E F A C E S O F W A L L S 12'-8" BASE SLAB 1'-8"1'-8" 21 ' - 8 " B A S E S L A B 1' - 8 " 1' - 8 " SEE DETAIL 3/S1 FOR WALL REINFORCING AT CORNERS TYP.1 S3 WT 5 x 15 HATCH OPENING 1' - 1 0 " IN S I D E F . O . W A L L T O CE N T E R O F L A D D E R 4'- 1 " I N S I D E F . O . W A L L TO E D G E O F C O V E R P L A T E 2" F R O M I N S I D E F . O . W A L L T O OU T S I D E E D G E O F P L A T E ( 3 S I D E S ) 3'- 7 1 / 2 " F R O M IN S I D E F . O . W A L L T O CE N T E R O F W T B E A M 4'- 3 " O U T T O O U T OF C O V E R P L A T E PU M P S K I D , SE E O T H E R D R A W I N G S 6'-4" OUT TO OUT OF COVER PLATE 4" F R O M IN S I D E F . O . W A L L TO E D G E O F O P E N I N G ACCESS AND ACCESS GUARDRAIL PLAN PLAN AT TOP OF WET WELL SHOWING COVER PLATE 1 S6 SEE DETAIL 2/S6 FOR CONDITION AT ENDS OF WT BEAM GUARDRAIL GATE, THIS SIDE SEE 4/S6 FOR LADDER SEE DETAIL 3/S6 FOR ACCESS HATCH AND GUARDRAIL SPECIFICATIONS. AN C H O R A T CE N T E R O F W A L L SE E 1 / S 6 3'- 0 " CL E A R 3'-2" CLEAR WT 5 x 15 3'- 9 " WT 5 x 15 WT 5 x 15 2 E Q U A L S P A C E S CENTER OF 2 PAD EYES (SEE 3/S6) CENTER OF WET WELL 3'- 3 " 3'- 3 " CENTER OF WT INSIDE F.O. WALL CENTER OF WT 3'- 9 " INSIDE F.O. WALL 6'-4" OUT TO OUT OF COVER PLATE L 3 x 3 x 1/4 PERIMETER ANGLE, TYP. 4 SIDES SEE DETAIL 2/S6 FOR CONDITION AT ENDS OF WT BEAM 2" F R O M IN S I D E F . O . W A L L TO O U T S I D E E D G E O F CO V E R P L A T E ( 4 S I D E S ) 1 S6 CENTER OF 2 PAD EYES (SEE 3/S6) 1.ALL REINFORCING FOR INTAKE PIPE SUPPORTS SHALL BE EPOXY COATED. 2.SEE SHEET S1 FOR TYPICAL NOTES AND SPECIFICATIONS. 3.SEE SHEET S1 FOR REINFORCING INSPECTION REQUIRED BY AN INDEPENDENT AGENCY. c Dale F. Jones, PROJECT: SCALE: SHEET U.N.O. #2935 MO N T A V A NO N - P O T P U M P S T A T I O N Fo r t C o l l i n s , C o l o r a d o THIS DRAWING IS INTENDED TO BE PRINTED ON 24" x 36" PAPER DALE F. JONES, STRUCTURAL ENGINEER, Inc. 3250 SEDGWICK CIRCLE LOVELAND, CO 80538 (970) 568-2919 mobile djones@dfjse.com State of Colorado License Professional Engineer #32364 32364 F.ELAD S E N OJ ODAROLOC D E S N ECIL RP R O F E SIONA L E N GINEE S Structural Engineer, Inc., 2023 ISSUED AS: DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION PRELIMINARY - NOT FOR CONSTRUCTION 9/26/2023 REVISIONS DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION 3/4" = 1'-0" S3 WET WELL SECTION CLEARANCE FROM THE OUTSIDE FACE OF THE WALL HORIZONTAL BARS, TO THE FACE OF FORMWORK SHALL BE DETAILED AT 2 1/2", WITH A STRICT FIELD MINIMUM OF 2" CLEAR. T.O. WET WELL WALLS (T.O. FUTURE BUILDING SLAB) ELEV. 5003.50' T.O. WET WELL BASE SLAB ELEV. 4982.00' B.O. WET WELL BASE SLAB ELEV. 4980.00' 21 ' - 6 " W E T W E L L W A L L S 2'- 0 " BA S E S L A B BASE SLAB, SEE PLAN FOR WIDTHS 3'- 0 " I M P O R T F I L L , SE E G E O T E C H N I C A L R E P O R T 3'-0" MIN., FOUR SIDES SEE PLAN FOR CLEAR DISTANCE BETWEEN WALLS 1'-8" WALL THICKNESS1'-8" WALL THICKNESS 1 TYPICAL SECTION THROUGH WET WELLS SEE CIVIL DRAWINGS FOR INTAKE PIPE INVERT IN T A K E P I P E (W H E R E O C C U R S , S E E O T H E R D R A W I N G S ) SE E 1 / S 4 F O R R E I N F O R C I N G A T W A L L P E N E T R A T I O N S NATIVE SAND AND GRAVEL MATERIAL OR AN IMPORTED GRANULAR STRUCTURAL FILL MATERIAL. THIS LAYER SHALL BE PLACED AND COMPACTED AS SPECIFIED IN THE GEOTECHNICAL RECOMMENDATIONS. EXCAVATION AND SHORING: ALL EXCAVATION PROCEDURES, INCLUDING SHORING REQUIRED FOR PROTECTION OF LIFE AND PROPERTY, ARE THE RESPONSIBILITY OF THE CONTRACTOR. DEWATERING PROCEDURES ARE THE RESPONSIBILITY OF THE CONTRACTOR. TYPICAL REINFORCING NOTES: ALL REINFORCING FOR THE WET WELL BASE SLAB AND WALLS SHALL BE EPOXY COATED. SEE NOTES ON SHEET S1. TYPICAL BASE SLAB NOTES: THE BASE SLAB SHALL BE PLACED IN ONE MONOLITHIC POUR. THERE SHALL BE NO SPLICES IN THE BASE SLAB REINFORCING. 3" CLEAR SHALL BE PROVIDED BETWEEN THE REINFORCING AND THE BOTTOM OF THE BASE SLAB. 4" CLEAR SHALL BE PROVIDED BETWEEN THE REINFORCING AND THE TOP OF THE BASE SLAB TO ALLOW FOR WATERSTOP PLACEMENT. THE BASE SLAB TOP REINFORCING SHALL BE #6 BARS AT 0'-8" o/c, EACH WAY. BASE SLAB TOP BARS SHALL HAVE STANDARD HOOKS EACH END. THE BASE SLAB BOTTOM REINFORCING SHALL BE #7 BARS AT 0'-8" o/c, EACH WAY. BASE SLAB BOTTOM BARS SHALL HAVE STANDARD HOOKS EACH END. TYPICAL WALL NOTES: THE WALLS SHALL BE PLACED IN ONE MONOLITHIC POUR UNLESS APPROVED IN ADVANCE BY THE STRUCTURAL ENGINEER. EXCEPT WHERE SHOWN OTHERWISE, THE REINFORCING SHALL BE DETAILED TO PROVIDE A TYPICAL CLEARANCE OF 2 1/2" FROM REINFORCING TO FACE OF CONCRETE TO ALLOW FOR TOLERANCE IN BAR PLACEMENT. AT THE WALLS, A STRICT MINIMUM OF 2" CLEAR SHALL BE PROVIDED BETWEEN THE FACE OF CONCRETE AND THE REINFORCING. THE HORIZONTAL WALL REINFORCING SHALL NOT BE SPLICED. THE VERTICAL WALL REINFORCING SHALL NOT BE SPLICED. TYPICAL WALL REINFORCING: OUTSIDE FACE BASE SLAB "L" BARS ..................................... #7 "L" BARS AT 0'-8" o/c OUTSIDE FACE VERTICAL BARS ............................................ #5 BARS AT 0'-8" o/c (OUTSIDE VERTICAL "L" BAR SIZE & VERTICAL BAR SIZE DOES NOT MATCH) INSIDE FACE BASE SLAB "L" BARS ........................................ #5 "L" BARS AT 0'-8" o/c INSIDE FACE VERTICAL BARS ............................................... #5 BARS AT 0'-8" o/c OUTSIDE FACE HORIZONTAL BARS ....................................... #7 BARS AT 0'-8" o/c STANDARD HOOK AT CORNERS, DO NOT SPLICE INSIDE FACE HORIZONTAL BARS .......................................... #5 BARS AT 0'-8" o/c STANDARD HOOK AT CORNERS, DO NOT SPLICE SEE NOTES AT LEFT (THIS DETAIL) FOR TYP. WALL REINFORCING TURN "L" BAR HOOKS TOWARD CENTER OF BASE SLAB BASE SLAB "L" BARS EACH FACE OF WALL (STANDARD HOOKS AT BOTTOM), SEE NOTES AT LEFT (THIS DETAIL) FOR "L" BAR SIZE & SPACING SEE ABOVE RIGHT FOR WATERSTOP 4" C L E A R T O TO P R E I N F O R C I N G TO A L L O W F O R WA T E R S T O P I N S T A L L A T I O N STANDARD 90 DEGREE HOOKS ON ALL BASE SLAB REINFORCING (TOP & BOTTOM LAYERS) 3" CLEAR TO HOOKS SEE NOTES AT LEFT (THIS DETAIL) FOR BASE SLAB REINFORCING 1.DO NOT BEND OR STRAIGHTEN REINFORCEMENT CAST IN CONCRETE WITHOUT PRIOR APPROVAL OF THE STRUCTURAL ENGINEER. 2.DO NOT WET-SET ANY BARS, INCLUDING BASE SLAB "L" BARS. SEE DETAIL 4/S1. NOTE: OUTSIDE FACE "L" BAR SIZE DOES NOT MATCH OUTSIDE FACE VERTICAL REINFORCING SIZE. SEE NOTES AT LEFT (THIS DETAIL) FOR SIZES. 10" FROM INSIDE FACE OF WALL TO CENTER OF WATERSTOP CONSTRUCTION JOINT AND WATERSTOP AT TOP OF BASE SLAB AT ALL WALLS PRIOR TO PLACEMENT OF THE WALLS, THE TOP OF THE BASE SLAB CONCRETE SHALL BE CLEAN AND FREE OF LAITANCE, AND THE SURFACE OF THE BASE SLAB SHALL BE WETTED AND STANDING WATER REMOVED. TOP OF BASE SLAB REINFORCING NOT SHOWN 1.DO NOT BEND OR STRAIGHTEN REINFORCEMENT CAST IN CONCRETE WITHOUT PRIOR APPROVAL OF THE STRUCTURAL ENGINEER. WATERSTOP, SEE "WATERSTOP" NOTES ON SHEET S1 3" C L E A R EX T E N D # 5 " L " B A R S 2'- 6 " I N T O W A L L , EX T E N D # 7 " L " B A R S 3'- 3 " I N T O W A L L T.O. "L" BARS 3 3/8" TO EDGE OF BASE SLAB "L" BARS AND VERTICAL WALL BARS 3 3/8" TO EDGE OF BASE SLAB "L" BARS AND VERTICAL WALL BARS 1'-8" WALL NATIVE SAND AND GRAVEL MATERIAL OR AN IMPORTED GRANULAR STRUCTURAL FILL MATERIAL TROWEL FINISH ON TOP OF WALLS THE FILL TO BE USED FOR BACKFILLING THE WET WELL EXCAVATIONS SHALL BE COORDINATED WITH THE BUILDING FOUNDATION AND SLAB REQUIREMENTS, CONSIDERING BEARING PRESSURE REQUIREMENTS, EXPANSION POTENTIAL, AND POTENTIAL FILL SETTLEMENT. c Dale F. Jones, PROJECT: SCALE: SHEET U.N.O. #2935 MO N T A V A NO N - P O T P U M P S T A T I O N Fo r t C o l l i n s , C o l o r a d o THIS DRAWING IS INTENDED TO BE PRINTED ON 24" x 36" PAPER DALE F. JONES, STRUCTURAL ENGINEER, Inc. 3250 SEDGWICK CIRCLE LOVELAND, CO 80538 (970) 568-2919 mobile djones@dfjse.com State of Colorado License Professional Engineer #32364 32364 F.ELAD S E N OJ ODAROLOC D E S N ECIL RP R O F E SIONA L E N GINEE S Structural Engineer, Inc., 2023 ISSUED AS: DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION PRELIMINARY - NOT FOR CONSTRUCTION 9/26/2023 REVISIONS DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION S4 3/4" = 1'-0" OPENING SLEEVE, SEE NOTE AT RIGHT 1. THE ADDITIONAL VERTICAL, HORIZONTAL & CIRCULAR REINFORCING OCCURS AT EACH FACE OF THE WALL. #6 CIRCULAR BAR EACH FACE OF WALL. CIRCULAR BARS TO BE INSIDE OF HORIZONTAL & VERTICAL BARS. LA P 2 ' - 9 " CIRCULAR BARS 1 REINFORCING AT PENETRATIONS IN WET WELL FOR 24" AND 36" PIPES SLEEVES AND SEALS AT WET WELLS INSTALL A NON-CORROSIVE (PVC OR STAINLESS STEEL) SLEEVE IN THE FORMS PRIOR TO CONCRETE PLACEMENT. THE INSIDE DIAMETER OF THE SLEEVED OPENINGS SHALL ALLOW PROPER CLEARANCE FOR THE PIPE & SEAL. VERIFY PIPE OUTSIDE DIAMETERS & SEE SEAL MANUFACTURER'S RECOMMENDATIONS FOR CLEARANCES REQUIRED FOR INSTALLATION OF SEALS. THE SEALS SHALL BE A TRUMBULL INDUSTRIES, INC. LINK-SEAL, MODEL "S-316", MODULAR SEAL WITH 316 STAINLESS STEEL BOLTS & NUTS. SEALS SHALL BE SIZED & INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. TYPICAL BASE SLAB "L" BAR SPACING, EACH FACE OF WALL PLAN VIEW OF WET WELL SHOWING ADDITIONAL REINFORCING AT INLET PIPE OPENING(S) REDUCED SCALE, TYPICAL REINFORCING NOT SHOWN #6 VERTICAL BARS (FOUR TOTAL) #6 CIRCULAR BAR EACH FACE, SEE BELOW ADDITIONAL HORIZONTAL BARS ABOVE AND BELOW PENETRATION FOR 36" PIPE, SEE VIEW AT LEFT (THIS DETAIL) FOR SPACING #6 VERTICAL BARS (FOUR TOTAL) #6 CIRCULAR BAR EACH FACE, SEE BELOW ADDITIONAL HORIZONTAL BARS ABOVE AND BELOW PENETRATIONS FOR 24" PIPE, SEE VIEW AT LEFT (THIS DETAIL) FOR SPACING 2'- 0 " BA S E S L A B O P E N I N G F O R P I P E , D I A M E T E R A S R E Q ' D F O R P I P E & P E R I M E T E R S E A L 2 " C L E A R T O A L L R E I N F . CUT VERTICAL BARS AT PIPE OPENING CU T H O R I Z O N T A L B A R S AT P I P E O P E N I N G (B A R S A T 0 ' - 8 " o / c ) (7 ) H O R I Z . B A R S A T 4 " o / c A B O V E P I P E P E N E T R A T I O N S (# 7 B A R S A T O U T S I D E F A C E , # 5 B A R S A T I N S I D E F A C E ) (3 ) H O R I Z . B A R S A T 4 " o / c B E L O W P I P E P E N E T R A T I O N S (# 7 B A R S A T O U T S I D E F A C E , # 5 B A R S A T I N S I D E F A C E ) #6 x 8'-0" VERTICAL BAR EACH SIDE OF OPENING, EACH FACE OF WALL (FOUR BARS TOTAL AT EACH PIPE), ADDITIONAL BASE SLAB "L" BARS ARE NOT REQUIRED WET WELL DETAILS c Dale F. Jones, PROJECT: SCALE: SHEET U.N.O. #2935 MO N T A V A NO N - P O T P U M P S T A T I O N Fo r t C o l l i n s , C o l o r a d o THIS DRAWING IS INTENDED TO BE PRINTED ON 24" x 36" PAPER DALE F. JONES, STRUCTURAL ENGINEER, Inc. 3250 SEDGWICK CIRCLE LOVELAND, CO 80538 (970) 568-2919 mobile djones@dfjse.com State of Colorado License Professional Engineer #32364 32364 F.ELAD S E N OJ ODAROLOC D E S N ECIL RP R O F E SIONA L E N GINEE S Structural Engineer, Inc., 2023 ISSUED AS: DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION PRELIMINARY - NOT FOR CONSTRUCTION 9/26/2023 REVISIONS DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION S5 3/4" = 1'-0" INTAKE PIPE SUPPORT DETAILS 1 PIPE SUPPORTS AT RESERVOIR INTAKE - LOOKING WEST END VIEW OF TYPICAL PIPE SADDLE SUPPORTS PIPE, SEE OTHER DRAWINGS T.O. CONCRETE ELEV. 4982.67, VERIFY w/ SADDLE DESIGN PIPE INVERT ELEV. 4983.67, VERIFY w/ CIVIL DRAWINGS B.O. FOOTING 4979.00 3'-0"3'-0" 3'-6"3'-6" 6"6" 7'-0" FOOTING 1' - 0 " FO O T I N G 3" CL E A R REMOVABLE STRAP PLATE OVER PIPE BOLTS FOR REMOVABLE STRAP PIPE SADDLES AND ANCHORAGE TO CONCRETE TO BE DESIGNED BY SADDLE MANUFACTURER, SEE NOTES ABOVE PIPE SADDLES AND ATTACHMENTS TO THE CONCRETE SHALL BE DESIGNED (BY MANUFACTURER) FOR 6,000 POUNDS UPLIFT. PIPE SADDLES AND ATTACHMENTS SHALL BE HOT-DIPPED GALVANIZED. THE ANCHORS SHALL ALLOW REMOVAL OF THE SADDLES WITHOUT REMOVAL OF THE ANCHORS (REMOVABLE NUTS ON TOP OF ANCHORS). PI P E , SE E O T H E R DR A W I N G S 22'-0" MIN. PIPE LENGTH WITHOUT SPLICE 7'-6" FROM CENTER OF PIPE SADDLE SUPPORT TO CENTER OF PIPE TEE SUPPORT 13'-0", CENTER TO CENTER OF PIPE SADDLE SUPPORTS SIDE VIEW OF PIPE SUPPORTS 4'-6" FOOTING 2'-3" 3'- 0 " M I N . FR O S T D E P T H 1'-0" 1' - 0 " FO O T I N G FOOTING REINFORCING, (9) #6 BARS IN SHORT DIRECTION (5) #6 BARS IN LONG DIRECTION 2 1/2" CLEAR, SIDES, TOP & ENDS #6 BARS AT 0'-11" o/c w/ STANDARD HOOKS EACH END T.O. CONCRETE ELEV. 4982.67, VERIFY w/ SADDLE DESIGN SEE OTHER PIPE SUPPORT FOR DETAILS PIPE SADDLE PIPE INVERT ELEV. 4983.67, VERIFY w/ CIVIL DRAWINGS PLAN VIEW OF WARPED BEARING PLATE SIDE VIEW OF WARPED BEARING PLATE LOOKING TOWARD PUMP STATION 1/2" THICK x 1'-4" SQUARE PLATE CENTER OF PIPE TEE, WARPED PLATE & VERTICAL PIPE WARP PLATE TO THE CONTOUR OF THE UNDERSIDE OF PIPE TEE 1/2" THICK x 1'-4" SQUARE PLATE 4'-0" SQUARE FOOTING 3'- 0 " M I N . FR O S T D E P T H 1' - 0 " FO O T I N G FOOTING REINFORCING, FIVE #6 BARS, EACH WAY 3" CL E A R T.O. CONCRETE, MATCH ELEV. OF THE TYP. PIPE SADDLE SUPPORTS B.O. FOOTINGS 4979.00 4" STANDARD PIPE (SCHEDULE 40) WARPED BEARING PLATE, SEE ABOVE 1/4 TOP & BOTTOM OF PIPE 1/2" THICK x 1'-0" SQUARE BASE PLATE WITH FOUR 7/8" DIA. HOLES AT 0'-8" o/c EACH WAY THE PIPE SUPPORT ASSEMBLY SHALL BE H.D. GALV. AFTER FABRICATION 1'-6" SQUARE CONCRETE COLUMN 2 1/2" CLEAR, ALL SIDES CENTER OF PIPE TEE, PIPE SUPPORT, CONCRETE COLUMN AND FOOTING, EACH WAY CLOSED TIES 90 DEGREE HOOKS w/ 3" EXTENSIONS 1'-1" SQUARE (OUTSIDE) END VIEW OF SUPPORT FOR PIPE TEE REDUCER, SEE CIVIL DRAWINGS SUCTION SCREEN BEYOND, SEE CIVIL DRAWINGS SUPPORT FOR PIPE TEE, SEE END VIEW ABOVE SEE CIVIL DRAWINGS FOR INTAKE SCREENS, PIPE SPOOLS, PIPE TEE, PIPE REDUCER & FLANGE CONNECTIONS (SHOWN ON STRUCTURAL PLANS FOR REFERENCE ONLY) SEE OTHER DRAWINGS FOR PIPE, PIPE BEDDING AND PIPE JOINT SPECIFICATIONS PIPE SADDLE PIPE SPOOL, SEE CIVIL DRAWINGS SEE CIVIL DRAWINGS FOR INTAKE SCREENS, PIPE SPOOLS, PIPE TEE, PIPE REDUCER & FLANGE CONNECTIONS (SHOWN ON STRUCTURAL PLANS FOR REFERENCE ONLY) 3'- 0 " M I N . FR O S T D E P T H B.O. RESERVOIR ELEV. 4982.00 B.O. FOOTINGS 4979.00 2'-3" 1'-0" 4'-0" SQUARE FOOTING (4) 3/4" DIA. H.D. GALVANIZED ASTM F1554, GRADE 36 THREADED RODS, EMBEDDED 0'-10" INTO CONCRETE w/ SIMPSON SET-XP EPOXY ADHESIVE B.O. RESERVOIR ELEV. 4982.00 #6 HORIZONTAL BARS AT 0'-9" o/c, EACH FACE (4) #6 VERTICAL BARS w/ STANDARD HOOKS AT BOTTOM #4 CLOSED TIES AT 0'-8" o/c, TWO TIES IN TOP 5" WARPED BEARING PLATE, SEE ABOVE PIPE TEE, SEE CIVIL DRAWINGS WARP PLATE UP AT 2 CORNERS SIDE VIEW OF WARPED BEARING PLATE LOOKING AWAY FROM PUMP STATION 1/2" THICK x 1'-4" SQUARE PLATE 2'-0" (ALL SIDES) 2'-0" LAYER OF IMPORTED GRANULAR STRUCTURAL FILL PLACED AND COMPACTED IN ACCORDANCE WITH THE GEOTECHNICAL RECOMMENDATIONS 2'- 0 " c Dale F. Jones, PROJECT: SCALE: SHEET U.N.O. #2935 MO N T A V A NO N - P O T P U M P S T A T I O N Fo r t C o l l i n s , C o l o r a d o THIS DRAWING IS INTENDED TO BE PRINTED ON 24" x 36" PAPER DALE F. JONES, STRUCTURAL ENGINEER, Inc. 3250 SEDGWICK CIRCLE LOVELAND, CO 80538 (970) 568-2919 mobile djones@dfjse.com State of Colorado License Professional Engineer #32364 32364 F.ELAD S E N OJ ODAROLOC D E S N ECIL RP R O F E SIONA L E N GINEE S Structural Engineer, Inc., 2023 ISSUED AS: DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION PRELIMINARY - NOT FOR CONSTRUCTION 9/26/2023 REVISIONS DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION S6 3/4" = 1'-0" WET WELL COVER PLATE AND LADDER DETAILS 5/16" x 3" BENT BAR w/ 11/16" DIA. HOLE FOR ANCHOR 1" DIAMETER STEEL RUNGS, COATED WITH SLIP RESISTANT MATERIAL TO PREVENT SLIPPAGE PER OSHA 1926.1053 (a) (6) (i) FACE OF WET WELL WALL FI E L D M E A S U R E T.O. CONCRETE SLAB EQ U A L L Y S P A C E L A D D E R R U N G S ( + / - 3 / 8 " ) , SP A C I N G T O B E 1 0 " M I N I M U M , 1 4 " M A X I M U M 1'-11 3/4" CLEAR 1/ 4 " PLAN VIEW OF LADDER 3/16 TYP. 1/2" x 2 1/2" BAR SIDE RAILS 3" 1 1/2" 1" 2'- 6 " M A X . 6'- 0 " M A X . BE T W E E N S U P P O R T S TOP OF CONCRETE SLAB FACE OF CONCRETE WALL SIDE VIEW OF LADDER ATTACH LADDER TO THE CONCRETE WALL w/ 5/8" DIAMETER HOT-DIPPED GALVANIZED TITEN HD ANCHORS INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS & ICC REPORT ESR-2713. EMBEDMENT OF ANCHORS INTO CONCRETE SHALL BE 5" MIN. 15" MIN. FROM CENTER OF LADDER TO ANY OBSTRUCTION, EACH SIDE OF LADDER THE ACCESS HATCH IS TO BE A: PAINTED 3'-0" CLEAR x 3'-2" CLEAR, BILCO TYPE SS-40, SINGLE LEAF ROOF SCUTTLE. SEE "ACCESS AND ACCESS GUARDRAIL PLAN" ON SHEET S2 FOR CLEAR DIMENSIONS AND ORIENTATION. THE HATCH GUARDRAIL SHALL BE A YELLOW POWDER COATED BILCO BIL-GUARD RL2-E SAFETY RAILING SYSTEM (GUARDRAIL NOT SHOWN). THE LADDER SHALL BE PROVIDED WITH A HOT-DIPPED GALVANIZED BILCO LU2 LADDER UP SAFETY POST (NOT SHOWN). T.O. HATCH FRAME 1'-0" FROM CENTER OF RUNG TO FACE OF CONCRETE WALL FRONT VIEW OF LADDER CENTER OF RUNG TO BE AT TOP OF HATCH FRAME ELEVATION 2'- 6 " M A X . WET WELL, REINFORCING NOT SHOWN 30 " M I N . F R O M CE N T E R O F R U N G S TO A N Y O B S T R U C T I O N 4 LADDER IN WET WELL WT 5 x 15 ASTM A992 STIFFENER (SEE PLAN FOR LOCATION) 2 1/2" PLATE EXTENSION BEYOND ANGLE 1/2" GAP BETWEEN INSIDE FACE OF CONCRETE WELL AND FACE OF STEEL ANGLE SEE PLAN L 3 x 3 x 1/4 EDGE ANGLE AT PERIMETER OF COVER PLATE 1/4" THICK CARBON STEEL (ASTM A36) CHECKER PLATE (PLACE LUGS UP) 3/16 1 @ 8 3/16 1 @ 8 3/16 1 @ 8 3/16 1 @ 8TYP. AT PERIMETER ANGLES TYP. AT WT STIFFENER WT 5 x 15 (ASTM A992) STIFFENER (SEE PLAN FOR LOCATION) 2 1/2" PLATE EXTENSION BEYOND ANGLE 1/2" GAP BETWEEN INSIDE EDGE OF CONCRETE WELL AND FACE OF STEEL ANGLE (GAP ALL SIDES OF COVER) PERIMETER ANGLE 1/4" THICK CARBON STEEL (ASTM A36) CHECKER PLATE (PLACE LUGS UP) 3/16 1 1/2 WT STEM TO PERIMETER ANGLE CLIP STEM OF WT STIFFENER, 2" x 2" 1 1 / 4 " CO P E ON W T 3/16 1 1/2 PLATE OVERLAPS CONCRETE WALL 2" (ALL SIDES) TYPICAL CONDITION AT PERIMETER OF COVER PLATES 1 TYPICAL ATTACHMENT OF WT STIFFENERS TO PERIMETER ANGLES 2 PAD EYES AT PARKS DEPT. COVER PLATE 3 3/4" HEAVY HEX NUT, TACK WELDED TO BOTTOM OF ANGLE (3 SIDES) PAD EYE AT CENTER OF ANGLE REMOVABLE PAD EYE PAD EYE PAD EYE WITH 3,000 POUND CAPACITY (3/4" THREADED SHANK) CHECKER PLATE PROVIDE 7/8" DIAMETER HOLE IN CHECKER PLATE AND ANGLE FOR PAD EYE PERIMETER ANGLE POSITION HATCH ON COVER PLATE SO CENTER OF LADDER RUNGS ARE 7" FROM INSIDE FACE OF HATCH COVER HATCH COVER THE GUARDRAIL SYSTEM IS NOT SHOWN ON THIS DETAIL 1. SEE SHEET S1 FOR "WET WELL LADDER, WELL COVER PLATES & INTAKE PIPE SUPPORTS" NOTES. 2. THE LADDER SHALL BE HOT-DIPPED GALVANIZED AFTER FABRICATION. 1. SEE SHEET S1 FOR "WET WELL LADDER, WELL COVER PLATES & INTAKE PIPE SUPPORTS" NOTES.1. SEE SHEET S1 FOR "WET WELL LADDER, WELL COVER PLATES & INTAKE PIPE SUPPORTS" NOTES. 2. THE MONTAVA COVER PLATE SHALL BE HOT-DIPPED GALVANIZED AFTER FABRICATION. 3. THE PARKS DEPTMENT COVER PLATE SHALL BE PRIMED AND PAINTED (2 COATS) AFTER FABRICATION. WET WELL WALL WET WELL WALL SEE PLAN FOR LOCATION OF COVER PLATE ANCHOR AT MONTAVA WET WELL (ONE ANCHOR), 5/8" DIA. HOT-DIPPED GALVANIZED THREADED ROD (THREADED FULL LENGTH) EPOXY GROUTED 6" INTO CONCRETE WALL WITH SIMPSON STRONG-TIE SET-3G EPOXY. 1 3 / 4 " THREADED ROD SHALL EXTEND 2" BEYOND INSIDE FACE OF WALL. PROVIDE 3/4" DIAMETER HOLE IN PERIMETER ANGLE. PROVIDE 5/8" HOT-DIPPED GALVANIZED NUT (DO NOT CLOSE GAP BETWEEN ANGLE & WALL). SEE SHEET S2 FOR CLEAR OPENING IN THIS DIRECTION WET WELL WALL COVER PLATE CONTINUES AT PARKS DEPT. WET WELL WET WELL WALL AT PERIMETER OF PARKS DEPARTMENT WET WELL COVER (4 SIDES) PROVIDE 1" WIDE x 3/4" TALL, CLOSED CELL, SEAL FOAM TAPE (ADHESIVE SIDE ATTACHED TO WET WELL) PARKS DEPARTMENT COVER PLATE FOAM TAPE AT PARKS DEPARTMENT WET WELL 1. SEE SHEET S1 FOR "WET WELL LADDER, WELL COVER PLATES & INTAKE PIPE SUPPORTS" NOTES. c Dale F. Jones, PROJECT: SCALE: SHEET U.N.O. #2935 MO N T A V A NO N - P O T P U M P S T A T I O N Fo r t C o l l i n s , C o l o r a d o THIS DRAWING IS INTENDED TO BE PRINTED ON 24" x 36" PAPER DALE F. JONES, STRUCTURAL ENGINEER, Inc. 3250 SEDGWICK CIRCLE LOVELAND, CO 80538 (970) 568-2919 mobile djones@dfjse.com State of Colorado License Professional Engineer #32364 32364 F.ELAD S E N OJ ODAROLOC D E S N ECIL RP R O F E SIONA L E N GINEE S Structural Engineer, Inc., 2023 ISSUED AS: DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION PRELIMINARY - NOT FOR CONSTRUCTION 9/26/2023 REVISIONS DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION 1/4" = 1'-0" SPLITTER STRUCTURE PLANS S7 7' - 0 " 3'- 1 0 " 1' - 0 " W A L L 1' - 0 " W A L L 12 ' - 1 0 " 5'-0"2'-5" 7'-5" OUTSIDE TO OUTSIDE OF WALLS 3'-3 3/4" 2'-2 5/16" 4'-3 5/16" 3'- 7 3 / 8 " 3'- 1 0 " 6'- 1 1 / 2 " 3'- 1 0 3 / 4 " 2'- 7 1 / 8 " 16 ' - 5 3 / 8 " O U T S I D E T O O U T S I D E O F W A L L S 3 ' - 0 " C L E A R 1'-0" WALL 3'-0" CLEAR 1'-0" WALL SEE DETAIL 2/S8 FOR GRATING AND BEAM DETAILS. GRATING PANELS SHALL BE H.D. GALV., NON-SERRATED BAR GRATING. BEARING BARS SHALL BE 3/16" WIDE x 1" TALL, SPACED AT 1 3/16" ON CENTER. THE ARROWS ON THE PLAN INDICATE DIRECTION OF BEARING BARS AT EACH PANEL. CROSS BARS SHALL BE 1/4" (ROUND OR SQUARE) AND SPACED AT 0'-4" ON CENTER. THE ENDS OF THE BEARING BARS SHALL BE BANDED. THE GRATING IS NOT DESIGNED FOR TRUCK WHEEL LOADING. THE GRATING IS DESIGNED FOR 100 PSF UNIFORM LIVE LOAD. GRATING PANEL "A": FIELD MEASURE WIDTH (VERIFY CLEARANCE FOR OUTLET GATE ASSEMBLY). FIELD MEASURE LENGTH (1/4" GAP AT NOTCH IN CONCRETE WALL AT EACH END OF PANEL). GRATING PANEL "B": PANEL WIDTH = 35 13/16". FIELD MEASURE LENGTH (1/4" GAP AT NOTCH IN CONCRETE WALL AND 1/4" FROM CENTER OF BEAM). GRATING PANEL "C": FIELD MEASURE WIDTH (3/4" GAP TO CONCRETE WALL AND 1" MAX. GAP BETWEEN ADJACENT PANELS). FIELD MEASURE LENGTH (1/4" FROM CENTER OF BEAMS). GRATING PANEL "D": PANEL WIDTH = 35 13/16". FIELD MEASURE LENGTH (1/4" FROM CENTER OF BEAMS). GRATING PANEL "E": FIELD MEASURE WIDTH (3/4" GAP TO CONCRETE WALL AND 1" MAX. GAP BETWEEN ADJACENT PANELS). FIELD MEASURE LENGTH (1/4" GAP AT NOTCH IN CONCRETE WALL AND 1/4" FROM CENTER OF BEAM). GRATING PANEL "F": FIELD MEASURE WIDTH (VERIFY CLEARANCE FOR OUTLET GATE ASSEMBLY). FIELD MEASURE LENGTH (1/4" GAP AT NOTCH IN CONCRETE WALL AT EACH END OF PANEL). 4'- 0 " 3'- 3 " GRATING PANEL "A" W 5 x 16 BEAMS (SEE 2/S8), TYP. FOR THREE BEAMS CENTER OF BEAM GRATING PANEL "F" GRATING PANEL "D" GRATING PANEL "B" CENTER OF BEAM GRATING PANEL "E" 4" WIDE LEDGE EA. SIDE AT GRATING PANEL "F" 4" WI D E LE D G E 4 " W I D E L E D G E E A . S I D E A T G R A T I N G P A N E L " A " 4" WI D E LE D G E 1' - 0 " T O O U T S I D E F . O . W A L L 1'-0" TO OUTSIDE F.O. WALL 11'-6" BASE SLAB 18 ' - 0 " B A S E S L A B SPLITTER STRUCTURE BASE SLAB PLAN (SCALE: 1 4 " = 1'-0") 1.TOP OF BASE SLAB SHALL BE LEVEL. SEE DETAIL 1/S8 FOR ELEVATION. 2.THE TOP OF THE BASE SLAB SHALL BE FINISHED WITH A TROWEL FINISH. 3.ALL REINFORCING FOR WET WELL BASE SLAB AND WALLS SHALL BE EPOXY COATED. SEE NOTES ON S1. NO R T H OUTLINE OF WALLS, SEE WALL PLAN VIEW AT RIGHT FOR DIMENSIONS BASE SLAB REINFORCING, SEE DETAIL 1/S8 SPLITTER STRUCTURE WALL PLAN (SCALE: 1 4 " = 1'-0") 1.SEE DETAIL 1/S8 FOR TOP OF WALL ELEVATION. 2.REINFORCING FOR WET WELL BASE SLAB AND WALLS SHALL BE EPOXY COATED. SEE NOTES ON S1. 3.SEE 3/S8 FOR WALL CONDITION AT INLET AND OUTLET PIPES. NO R T H SPLITTER STRUCTURE GRATING PLAN (SCALE: 1 4 " = 1'-0") 1.TOP OF GRATING ELEVATION SHALL MATCH TOP OF WALL ELEVATION. NO R T H INLET PIPE, SEE OTHER DRAWINGS OUTLET PIPE, SEE OTHER DRAWINGS OUTLET PIPE, SEE OTHER DRAWINGS OUTLET GATE ASSEMBLY, SEE OTHER DRAWINGS OUTLET GATE ASSEMBLY, SEE OTHER DRAWINGS GRATING PANEL "C" 4'- 4 3 / 4 " TO C E N T E R OF B E A M 5'- 1 1 " T O CE N T E R O F S T E P S STEPS STEPS 1 S8 SEE 2/S8 FOR H.D. GALV. SADDLE CLIP AT EACH END OF EACH GRATING PANEL 1 S8 1 S8 4 1 / 2 " C L E A R B E T W E E N WA L L A N D G R A T I N G P A N E L , VE R I F Y C L E A R A N C E R E Q ' D FO R O U T L E T G A T E A S S E M B L Y 3/4" GAP BETWEEN WALL AND SIDE OF GRATING PANEL, 1" MAX. GAP BETWEEN ADJACENT GRATING PANELS 4 1 / 2 " C L E A R B E T W E E N WAL L A N D G R A T I N G P A N E L , VE R I F Y C L E A R A N C E R E Q ' D FO R O U T L E T G A T E A S S E M B L Y GRATING PANEL NOTES SEE DETAIL 3/S1 FOR WALL REINFORCING AT CORNERS c Dale F. Jones, PROJECT: SCALE: SHEET U.N.O. #2935 MO N T A V A NO N - P O T P U M P S T A T I O N Fo r t C o l l i n s , C o l o r a d o THIS DRAWING IS INTENDED TO BE PRINTED ON 24" x 36" PAPER DALE F. JONES, STRUCTURAL ENGINEER, Inc. 3250 SEDGWICK CIRCLE LOVELAND, CO 80538 (970) 568-2919 mobile djones@dfjse.com State of Colorado License Professional Engineer #32364 32364 F.ELAD S E N OJ ODAROLOC D E S N ECIL RP R O F E SIONA L E N GINEE S Structural Engineer, Inc., 2023 ISSUED AS: DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION PRELIMINARY - NOT FOR CONSTRUCTION 9/26/2023 REVISIONS DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION 3/4" = 1'-0" S8 SPLITTER STRUCTURE DETAILS 1'-0" THICK CONCRETE WALL (REINFORCING NOT SHOWN) T.O. CONCRETE WALL T. O . B E A M 1" B E L O W T. O . W A L L ANCHORS END PLATE PLAN VIEW AT EACH END OF BEAM SIDE VIEW AT EACH END OF BEAM END VIEW AT EACH END OF BEAM BE A M , SE E P L A N SPLITTER STRUCTURE GRATING SUPPORT BEAMS 2 1/4" THICK STEEL PLATE WITH TWO 3/4" DIAMETER HOLES BEAM END PLATES 3/16 BEAM TO END PLATES 1.BEAMS SHALL BE H.D. GALVANIZED AFTER FABRICATION (INCLUDING END PLATES) SECTION THROUGH BEAM CENTER OF HOLES T. O . P L A T E 1 / 4 " BE L O W T . O . B E A M 2 3 / 4 " F R O M T. O . P L A T E T O CE N T E R O F H O L E S 6" 1 1/2", EACH SIDE 5 1 / 2 " TO P F L A N G E OF S T E E L B E A M ATTACH BEAM TO CONCRETE WALL WITH TWO 5/8" DIA. x 5" LONG TITEN HD ANCHORS (ASTM B695, CLASS 65 MECHANICALLY GALVANIZED) INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS WALL REINFORCING NOT SHOWN WALL REINFORCING NOT SHOWN 1" HIGH x 4" WIDE NOTCH IN T.O. WALL (WHERE OCCURS, SEE PLAN) ANCHORS, SEE ABOVE 1'-0" THICK CONCRETE WALL (REINFORCING NOT SHOWN) CROSS BARS BEARING BARS END BAND GRATING PANELGRATING PANEL SEE PLAN FOR DIRECTION OF BEARING BARS GRATING PANEL CENTER OF SADDLE CLIP 1 1/4" FROM END OF GRATING PANEL 1/4" DIA. H.D. GALV. THREADED ROD WITH THREE H.D. GALV. NUTS (1 NUT BELOW BEAM FLANGE, ONE ABOVE BEAM FLANGE, ONE AT SADDLE CLIP), THREADED ROD SHALL NOT EXTEND ABOVE T.O. GRATING STEEL BEAM, SEE PLAN DRILL 5/16" DIA. HOLE IN TOP FLANGE (FOR 1/4" RODS) AT APPROXIMATE CENTER OF GRATING PANELS (CENTER HOLE BETWEEN BEARING BARS) ATTACHMENT OF GRATING PANELS TO STEEL BEAMS THERE SHALL BE ONE SADDLE CLIP AT EACH END OF EACH GRATING PANEL (NOT REQUIRED AT SIDES OF PANELS) 1/4" GAP BETWEEN GRATING PANEL AND CENTER OF BEAM GRATING PANEL CENTER OF SADDLE CLIP 1 1/4" FROM END OF GRATING PANEL 1/4" DIA. H.D. GALV. THREADED ROD EPOXY GROUTED 3" INTO CONCRETE WALL WITH SIMPSON STRONG-TIE SET3G ADHESIVE. LOCATE HOLE AT APPROXIMATE CENTER OF GRATING PANEL (CENTER BETWEEN BEARING BARS) ATTACHMENT OF GRATING PANELS TO CONCRETE WALL THERE SHALL BE ONE SADDLE CLIP AT EACH END OF EACH GRATING PANEL (NOT REQUIRED AT SIDES OF PANELS) 1/4" GAP BETWEEN GRATING PANEL & EDGE OF NOTCH 1'-0" THICK CONCRETE WALL (REINFORCING NOT SHOWN) T.O. CONCRETE WALL NOTCH IN T.O. WALL 1/4" FROM CENTER OF BEAM (EACH WAY) TO GRATING PANEL, TYP. SEE ABOVE FOR ATTACHMENT OF GRATING PANELS TO BEAMS AND CONCRETE WALL SECTION THROUGH SPLITTER STRUCTURE 1 T.O. BASE SLAB ELEV. 5025.30' (LEVEL) T.O. WALL ELEV. 5031.50' SEE DETAIL 2/S8 FOR GRATING STEEL BEAM BEYOND, SEE 2/S8 FINISH GRADE, SEE OTHER DRAWINGS 1'-0" THICK WALLS, TYP. SE E 3 / S 8 FO R C O N D I T I O N AT I N L E T A N D OU T L E T P I P E S 3 1/4" TO EDGE OF BASE SLAB "L" BARS AND VERTICAL WALL BARS, TYP. EACH SIDE OF WALL BASE SLAB "L" BARS EACH FACE OF WALL (STANDARD HOOKS AT BOTTOM), SEE NOTES ABOVE (THIS DETAIL) FOR "L" BAR SIZE & SPACING CLEARANCE FROM THE OUTSIDE FACE OF THE HORIZONTAL BARS, TO THE FACE OF FORMWORK SHALL BE DETAILED AT 2 1/2", WITH A STRICT FIELD MINIMUM OF 2" CLEAR. SEE NOTES ABOVE (THIS DETAIL) FOR TYP. WALL REINFORCING T.O. "L" BARS EX T E N D " L " B A R S 2'- 6 " I N T O W A L L SEE ABOVE LEFT FOR WATERSTOP 6" FROM INSIDE FACE OF WALL TO CENTER OF WATERSTOP CONSTRUCTION JOINT AND WATERSTOP AT TOP OF BASE SLAB AT ALL WALLS TOP OF BASE SLAB REINFORCING NOT SHOWN 1.DO NOT BEND OR STRAIGHTEN REINFORCEMENT CAST IN CONCRETE WITHOUT PRIOR APPROVAL OF THE STRUCTURAL ENGINEER. WATERSTOP, SEE "WATERSTOP" NOTES ON SHEET S1 1'-0" WALL TROWEL FINISH ON TOP OF WALLS SEE NOTES ABOVE (THIS DETAIL) FOR BASE SLAB REINFORCING TURN "L" BAR HOOKS TOWARD CENTER OF BASE SLAB STANDARD 90 DEGREE HOOKS ON ALL BASE SLAB REINFORCING (TOP & BOTTOM LAYERS), TURN HOOKS SIDEWAYS 3" CLEAR TO HOOKS BASE SLAB, SEE PLAN FOR WIDTHS 1' - 2 " B A S E S L A B 3" C L E A R 3" C L E A R A T T O P R E I N F O R C I N G TO A L L O W F O R W A T E R S T O P I N S T A L L A T I O N EXCAVATION AND SHORING: ALL EXCAVATION PROCEDURES, INCLUDING SHORING REQUIRED FOR PROTECTION OF LIFE AND PROPERTY, ARE THE RESPONSIBILITY OF THE CONTRACTOR. DEWATERING PROCEDURES ARE THE RESPONSIBILITY OF THE CONTRACTOR. SPLITTER STRUCTURE REINFORCING NOTES: ALL REINFORCING FOR THE SPLITTER STRUCTURE BASE SLAB AND WALLS SHALL BE EPOXY COATED. SEE NOTES ON SHEET S1. SPLITTER STRUCTURE BASE SLAB NOTES: THE SPLITTER STRUCTURE BASE SLAB SHALL BE PLACED IN ONE MONOLITHIC POUR. THERE SHALL BE NO SPLICES IN THE BASE SLAB REINFORCING. 3" CLEAR SHALL BE PROVIDED BETWEEN THE REINFORCING AND THE BOTTOM OF THE BASE SLAB. 3" CLEAR SHALL BE PROVIDED BETWEEN THE REINFORCING AND THE TOP OF THE BASE SLAB TO ALLOW FOR WATERSTOP PLACEMENT. THE BASE SLAB TOP AND BOTTOM REINFORCING SHALL BE #5 BARS AT 1'-0" o/c, EACH WAY. BASE SLAB TOP AND BOTTOM BARS SHALL HAVE STANDARD HOOKS EACH END. SPLITTER STRUCTURE WALL REINFORCING: OUTSIDE FACE BASE SLAB "L" BARS ..................................... #5 "L" BARS AT 1'-0" o/c OUTSIDE FACE VERTICAL BARS ............................................ #5 BARS AT 1'-0" o/c INSIDE FACE BASE SLAB "L" BARS ........................................ #5 "L" BARS AT 1'-0" o/c INSIDE FACE VERTICAL BARS ............................................... #5 BARS AT 1'-0" o/c OUTSIDE FACE HORIZONTAL BARS ....................................... #5 BARS AT 1'-0" o/c STANDARD HOOK AT CORNERS, DO NOT SPLICE INSIDE FACE HORIZONTAL BARS .......................................... #5 BARS AT 1'-0" o/c STANDARD HOOK AT CORNERS, DO NOT SPLICE SPLITTER STRUCTURE WALL NOTES: THE WALLS SHALL BE PLACED IN ONE MONOLITHIC POUR. EXCEPT WHERE SHOWN OTHERWISE, THE REINFORCING SHALL BE DETAILED TO PROVIDE A TYPICAL CLEARANCE OF 2 1/2" FROM REINFORCING TO FACE OF CONCRETE TO ALLOW FOR TOLERANCE IN BAR PLACEMENT. AT THE WALLS, A STRICT MINIMUM OF 2" CLEAR SHALL BE PROVIDED BETWEEN THE FACE OF CONCRETE AND THE REINFORCING. THE HORIZONTAL WALL REINFORCING SHALL NOT BE SPLICED. THE VERTICAL WALL REINFORCING SHALL NOT BE SPLICED. PRIOR TO PLACEMENT OF THE WALLS, THE TOP OF THE BASE SLAB CONCRETE SHALL BE CLEAN AND FREE OF LAITANCE, AND THE SURFACE OF THE BASE SLAB SHALL BE WETTED AND STANDING WATER REMOVED. SEE "SPLITTER STRUCTURE GRATING PLAN" ON SHEET S7 FOR NOTCH LOCATIONS CONDITION AT SPLITTER STRUCTURE INLET AND OUTLET PIPES 3 3" T O B O T T O M HO R I Z . R E I N F O R C I N G AT S P L I T T E R W A L L S CUT VERTICAL BARS AT PIPE OPENING #6 VERTICAL BAR EACH SIDE OF OPENING, EACH FACE OF WALL (FOUR BARS TOTAL AT EACH PIPE), ADDITIONAL BASE SLAB "L" BARS ARE NOT REQUIRED CU T H O R I Z . B A R S AT P I P E O P E N I N G 1' - 2 " BA S E S L A B BOTTOM HORIZ. BARS TO BE CONTINUOUS FO U R # 5 HO R I Z . B A R S A T 4" o / c A B O V E P I P E EXTEND ALL HORIZONTAL BARS, INCLUDING ADD'L HORIZONTAL BARS TO CORNERS AND HOOK PER 3/S1 1. THE ADDITIONAL VERTICAL, HORIZONTAL & CIRCULAR REINFORCING OCCURS AT EACH FACE OF THE WALL. 2" C L E A R F R O M O U T S I D E O F P I P E T O A L L R E I N F O R C I N G PRIOR TO PLACING WALL CONCRETE, EXTEND PIPE 6" INTO WALL FORMS AND CAST CONCRETE AROUND PIPE WHEN PLACING WALL CONCRETE, VIBRATE CONCRETE THOROUGHLY FO R M E D R O U N D O P E N I N G A T P I P E (M A T C H I N S I D E P I P E D I A M E T E R ) SECTION VIEW THROUGH WALL AT PIPES IN L E T O R OU T L E T P I P E SEE CIVIL DRAWINGS FOR INTAKE PIPE INVERT #5 CIRCULAR BAR EACH FACE OF WALL. CIRCULAR BARS TO BE INSIDE OF HORIZONTAL & VERTICAL BARS, LAP 2'-0" (SIMILAR TO DETAIL 1/S4) 2'-0" (ALL SIDES) 2'- 0 " 2'-0" LAYER OF IMPORTED GRANULAR STRUCTURAL FILL PLACED AND COMPACTED IN ACCORDANCE WITH THE GEOTECHNICAL RECOMMENDATIONS MANHOLE STEPS SHALL CONFORM TO AASHTO M 199, SEE PLAN VIEWS FOR LOCATION c Dale F. Jones, PROJECT: SCALE: SHEET U.N.O. #2935 MO N T A V A NO N - P O T P U M P S T A T I O N Fo r t C o l l i n s , C o l o r a d o THIS DRAWING IS INTENDED TO BE PRINTED ON 24" x 36" PAPER DALE F. JONES, STRUCTURAL ENGINEER, Inc. 3250 SEDGWICK CIRCLE LOVELAND, CO 80538 (970) 568-2919 mobile djones@dfjse.com State of Colorado License Professional Engineer #32364 32364 F.ELAD S E N OJ ODAROLOC D E S N ECIL RP R O F E SIONA L E N GINEE S Structural Engineer, Inc., 2023 ISSUED AS: DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION PRELIMINARY - NOT FOR CONSTRUCTION 9/26/2023 REVISIONS DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION 1/4" = 1'-0" WSSC HEADWALL S9 3'-0"3'-6"3'-6"6'-0"1'-6" T.O. FOOTING ELEV. 5102.50' T.O. WALL ELEV. 5110.00' PIPE INVERT 5102.96'1'-0" THICKWALL, TYP.6'-0"10'-0" 10'-0"10'-0" 20'-0" BASE SLAB PIPE, SEE OTHER DRAWINGS 2'- 0 " 11 ' - 0 " 13 ' - 0 " B A S E S L A B WSSC HEADWALL BASE ELEVATION VIEW 1.TOP OF BASE SLAB AND WALLS SHALL BE LEVEL. 2.ALL REINFORCING FOR BASE SLAB AND WALLS SHALL BE EPOXY COATED. SEE NOTES ON S1. WSSC HEADWALL BASE SLAB PLAN (SCALE: 1 4 " = 1'-0") 1.ALL REINFORCING FOR BASE SLAB AND WALLS SHALL BE EPOXY COATED. SEE NOTES ON S1. (SCALE: 1 4 " = 1'-0") 45 . 0 0 ø D E G R E E S , TY P . E A C H S I D E 3'- 0 " 3'- 0 " 1 S9 1' - 0 " W I D E CU T O F F W A L L SEE 1/S10 FOR CONDITION AT PIPE PENETRATION 1 S9 1' - 2 " F O O T I N G 2'- 4 " C U T O F F W A L L 1 MIN. 1 T.O. WALL, SEE ELEVATION VIEW T.O. FOOTING, SEE ELEVATION VIEW 3'- 6 " 1' - 2 " FO O T I N G CU T O F F 1'-0" WIDE CUTOFF FOOTING, SEE PLAN FOR WIDTHS VARIES, SEE PLAN 2'-0" 1'-0" WALL THIS AREA BEHIND THE HEADWALLS SHALL BE BACKFILLED WITH NATIVE OR IMPORTED DENSE TO MEDIUM DENSE SOILS WITH A WET UNIT WEIGHT OF 135 PCF AND A FRICTION ANGLE OF 35 DEGREES (SEE SOILS RECOMMENDATIONS) FINISH GRADE, SEE OTHER DRAWINGS 3 1/4" TO EDGE OF BASE SLAB "L" BARS AND VERTICAL WALL BARS, TYP. EACH SIDE OF WALL BASE SLAB "L" BARS EACH FACE OF WALL (STANDARD HOOKS AT BOTTOM), SEE NOTES ABOVE (THIS DETAIL) FOR "L" BAR SIZE & SPACING SEE NOTES ABOVE (THIS DETAIL) FOR TYP. WALL REINFORCING T.O. "L" BARS SEE ABOVE FOR WATERSTOP TROWEL FINISH ON TOP OF WALLS 3" T O BO T T O M HO R I Z O N T A L RE I N F O R C I N G AT H E A D W A L L S WSSC AND NPIC HEADWALL EXCAVATION AND SHORING: ALL EXCAVATION PROCEDURES, INCLUDING SHORING REQUIRED FOR PROTECTION OF LIFE AND PROPERTY, ARE THE RESPONSIBILITY OF THE CONTRACTOR. DEWATERING PROCEDURES ARE THE RESPONSIBILITY OF THE CONTRACTOR. WSSC AND NPIC HEADWALLS REINFORCING NOTES: ALL REINFORCING FOR THE BASE SLAB AND WALLS AT THE HEADWALLS SHALL BE EPOXY COATED. SEE NOTES ON SHEET S1. WSSC AND NPIC HEADWALLS BASE SLAB NOTES: THE BASE SLAB FOR THE HEADWALLS SHALL BE PLACED IN ONE MONOLITHIC POUR. THERE SHALL BE NO SPLICES IN THE BASE SLAB REINFORCING. 3" CLEAR SHALL BE PROVIDED BETWEEN THE REINFORCING AND THE BOTTOM OF THE BASE SLAB. 3" CLEAR SHALL BE PROVIDED BETWEEN THE REINFORCING AND THE TOP OF THE BASE SLAB TO ALLOW FOR WATERSTOP PLACEMENT. THE BASE SLAB TOP AND BOTTOM REINFORCING SHALL BE #5 BARS AT 1'-0" o/c, EACH WAY. BASE SLAB TOP AND BOTTOM BARS AT THE HEADWALLS DO NOT REQUIRE HOOKS AT ENDS. WALL REINFORCING AT WSSC AND NPIC HEADWALLS: OUTSIDE FACE BASE SLAB "L" BARS ..................................... #5 "L" BARS AT 1'-0" o/c OUTSIDE FACE VERTICAL BARS ............................................ #5 BARS AT 1'-0" o/c INSIDE FACE BASE SLAB "L" BARS ........................................ #5 "L" BARS AT 1'-0" o/c INSIDE FACE VERTICAL BARS ............................................... #5 BARS AT 1'-0" o/c OUTSIDE FACE HORIZONTAL BARS ....................................... #5 BARS AT 1'-0" o/c STANDARD HOOK AT CORNERS, DO NOT SPLICE INSIDE FACE HORIZONTAL BARS .......................................... #5 BARS AT 1'-0" o/c STANDARD HOOK AT CORNERS, DO NOT SPLICE WSSC AND NPIC HEADWALLS WALL NOTES: THE WALLS SHALL BE PLACED IN ONE MONOLITHIC POUR. EXCEPT WHERE SHOWN OTHERWISE, THE REINFORCING SHALL BE DETAILED TO PROVIDE A TYPICAL CLEARANCE OF 2 1/2" FROM REINFORCING TO FACE OF CONCRETE TO ALLOW FOR TOLERANCE IN BAR PLACEMENT. AT THE WALLS, A STRICT MINIMUM OF 2" CLEAR SHALL BE PROVIDED BETWEEN THE FACE OF CONCRETE AND THE REINFORCING. THE HORIZONTAL WALL REINFORCING SHALL NOT BE SPLICED. THE VERTICAL WALL REINFORCING SHALL NOT BE SPLICED. 3" C L E A R TO B O T T O M RE I N F O R C I N G 3" C L E A R T O TO P R E I N F O R C I N G EX T E N D " L " B A R S 2'- 6 " I N T O W A L L TWO #5 BARS AT 1'-0" o/c 3" CLEAR #5 AT 1'-0" o/c, STANDARD HOOK AT TOP #5 BARS AT 1'-0" o/c, EACH WAY, TOP & BOTTOM 6" FROM INSIDE FACE OF WALL TO CENTER OF WATERSTOP CONSTRUCTION JOINT AND WATERSTOP AT TOP OF BASE SLAB AT ALL WALLS TOP OF BASE SLAB REINFORCING NOT SHOWN 1.DO NOT BEND OR STRAIGHTEN REINFORCEMENT CAST IN CONCRETE WITHOUT PRIOR APPROVAL OF THE STRUCTURAL ENGINEER. WATERSTOP, SEE "WATERSTOP" NOTES ON SHEET S1 1'-0" WALL PRIOR TO PLACEMENT OF THE WALLS, THE TOP OF THE BASE SLAB CONCRETE SHALL BE CLEAN AND FREE OF LAITANCE, AND THE SURFACE OF THE BASE SLAB SHALL BE WETTED AND STANDING WATER REMOVED. 1 TYPICAL SECTION THROUGH WSSC AND NPIC HEADWALLS 1.DO NOT BEND OR STRAIGHTEN REINFORCEMENT CAST IN CONCRETE WITHOUT PRIOR APPROVAL OF THE STRUCTURAL ENGINEER. 2.DO NOT WET-SET ANY BARS, INCLUDING BASE SLAB "L" BARS. SEE DETAIL 4/S1. 2'- 0 " L A Y E R O F I M P O R T E D GR A N U L A R S T R U C T U R A L F I L L PL A C E D A N D C O M P A C T E D I N AC C O R D A N C E W I T H T H E GE O T E C H N I C A L R E C O M M E N D A T I O N S c Dale F. Jones, PROJECT: SCALE: SHEET U.N.O. #2935 MO N T A V A NO N - P O T P U M P S T A T I O N Fo r t C o l l i n s , C o l o r a d o THIS DRAWING IS INTENDED TO BE PRINTED ON 24" x 36" PAPER DALE F. JONES, STRUCTURAL ENGINEER, Inc. 3250 SEDGWICK CIRCLE LOVELAND, CO 80538 (970) 568-2919 mobile djones@dfjse.com State of Colorado License Professional Engineer #32364 32364 F.ELAD S E N OJ ODAROLOC D E S N ECIL RP R O F E SIONA L E N GINEE S Structural Engineer, Inc., 2023 ISSUED AS: DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION PRELIMINARY - NOT FOR CONSTRUCTION 9/26/2023 REVISIONS DRAWING DATES ** PRELIMINARY ** NOT FOR CONSTRUCTION 1/4" = 1'-0" NPIC HEADWALL S10 NPIC HEADWALL BASE ELEVATION VIEW 1.TOP OF BASE SLAB AND WALLS SHALL BE LEVEL. 2.ALL REINFORCING FOR BASE SLAB AND WALLS SHALL BE EPOXY COATED. SEE NOTES ON S1. NPIC HEADWALL BASE SLAB PLAN (SCALE: 1 4 " = 1'-0") 1.ALL REINFORCING FOR BASE SLAB AND WALLS SHALL BE EPOXY COATED. SEE NOTES ON S1. (SCALE: 1 4 " = 1'-0") PIPE, SEE OTHER DRAWINGS 1'-0"3'-0"3'-6"6'-0"1'-0" THICK WALL, TYP.1'-6"4" 13'-0" BASE SLAB 2'- 0 " 10 ' - 0 " 12 ' - 0 " B A S E S L A B 45 . 0 0 ø DE G R E E S 4'- 0 " 3'- 0 " T.O. FOOTING ELEV. 5110.00' T.O. WALL ELEV. 5116.80' PIPE INVERT 5112.97' 2 ' - 1 0 1 / 2 " EXIST'G STRUCTURE NEW HEADWALL EX I S T ' G W A L L EX I S T ' G FO O T I N G CONFIGURATION AND ELEVATION OF EXIST'G FOOTING IS UNKNOWN. CONTACT ENGINEER IF ALTERNATE CONNECTION DETAIL IS REQUIRED. EXIST'G STRUCTURE TO REMAIN EXIST'G STRUCTURE EXIST'G STRUCTURE EXIST'G STRUCTURE DEMO THIS PORTION OF EXIST'G STRUCTURE 1' - 0 " W I D E CU T O F F W A L L 1 S9 1 S9 SEE 1/S10 FOR CONDITION AT PIPE PENETRATION 1' - 2 " F O O T I N G 2'- 4 " C U T O F F W A L L SEE 2/S10 FOR CONNECTION OF NEW WALL TO EXIST'G WALL T.O. WALL, SEE ELEVATION VIEW 1'-0" WALL 3" C L E A R TO B O T T O M RE I N F O R C I N G FO R M E D R O U N D O P E N I N G A T P I P E (M A T C H I N S I D E P I P E D I A M E T E R ) PI P E BOTTOM HORIZ. BARS TO BE CONTINUOUS EXTEND ALL HORIZONTAL BARS, INCLUDING ADD'L HORIZONTAL BARS TO CORNERS AND HOOK PER 3/S1 TH R E E # 5 HO R I Z O N T A L B A R S A B O V E PI P E , E A C H F A C E O F W A L L CUT TYP. VERTICAL & HORIZONTAL BARS 2" CLEAR FROM OUTSIDE DIAMETER OF PIPE PRIOR TO PLACING WALL CONCRETE, EXTEND PIPE 6" INTO WALL FORMS AND CAST CONCRETE AROUND PIPE WHEN PLACING WALL CONCRETE, VIBRATE CONCRETE THOROUGHLY #5 CIRCULAR BAR EACH FACE OF WALL. CIRCULAR BARS TO BE INSIDE OF HORIZONTAL & VERTICAL BARS, LAP 2'-0" (SIMILAR TO DETAIL 1/S4) 1 PIPE PENETRATION AT HEADWALLS 1.FOR DETAILS NOT SHOWN OR NOTED, SEE DETAIL 3/S8. ADD'L VERTICAL #6 BARS NOT REQUIRED AT HEADWALLS. 2 1/2" CLEAR 6 " E M B E D M E N T EX I S T ' G CO N C R E T E W A L L EXIST'G HEADWALL NEW HEADWALL, TYP. REINFORCING NOT SHOWN #5 BARS AT 1'-0" o/c, EPOXY GROUTED INTO EXIST'G HEADWALL WITH SIMPSON SET-3G EPOXY ADHESIVE STANDARD HOOK 2 CONNECTION OF NEW HEADWALL TO EXISTING HEADWALL 1.CONNECTION TO EXISTING FOOTING IS NOT REQUIRED.