Loading...
HomeMy WebLinkAboutHEARTSIDE HILL LOT ADJUSTMENTS - MA230145 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT Highland Development Services, Inc. 6355 Fairgrounds Avenue, Suite 100 | Windsor, CO 80550 | 970.674.7550 Memorandum TO: Basil Hamdan, P.E. FROM: Jason Claeys DATE: 11/14/23 PROJECT: Heartside Hill – Minor Amendment HDS JOB NO: 21-1045-00 SUBJECT: Drainage Amendment Summary This memo is prepared to summarize the drainage adjustment associated with the proposed Minor Amendment and Minor Subdivision Plat. The Heartside Hill project was approved in October of 2023 including the “Final Drainage Report for Heartside Hill”, prepared by Highland Development Services, dated August 28, 2023. The Heart of the Rockies Christian Church requested to preserve the existing modular building located near the northwest corner of Heartside Hill. In order to preserve the modular, lot lines need to be adjusted through the Minor Subdivision Plat process with a supporting Minor Amendment for the Heartside Hill site plan and utility adjustments. The preservation of the modular eliminates the need for an interim & ultimate condition for the outfall of Basin OS1 and Rain Garden OS1. The interim/ultimate conditions are described within the approved Heartside Hill - Utility Plans as Phase 4 and the supporting phasing detail on Sheet 5. Sheet 5 is now labeled as “Not Applicable”. Due to the confined area, the Rain Garden OS1 outlet needed to be updated to manage the 100-yr peak runoff from Basin OS1, rather than conveying the previous 10-yr storm. The emergency overflow was updated to manage the 100- yr overtopping flows in the event runoff exceeds the estimated 100-yr runoff rate or the outlet clogs. Other than the adjustments for the outlet and overflow detail for Basin OS1, all remaining assumptions and calculations remain unaffected. Please reference the attached calculations and updated Drainage Plan. DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST DDONOTPOLLUTE RAINSTOWATERWAYS DUCTILEIRONNYLOPLAST TRILBY ROAD BR I T T A N Y S T R E E T LE M A Y A V E N U E BR I T T A N Y S T R E E T BRITTANY KNOLLS BRITTANY KNOLLS PA R A G O N P O I N T BLOCK 1 LOT 1 LOT 2 LOT 3 LOT 4 LOT 1 LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 LOT 7 BLOCK 2 BLOCK 3 LOT 1 TRACT A BLDG 1 BLDG 2 BLDG 3 BLDG 4 BLDG 5 BLDG 6 DETENTION POND D 100 YR PEAK INFLOW = 44.16 CFS 100 YR RELEASE RATE = 13.2 CFS 100-YR VOLUME = 0.90 AC-FT 100-YR WSE = 4911.03 FT WQCV (40-HR) = 0.08 AC-FT WQCV WSE = 4908.85 FT (STANDARD WQ - AREA NOT TREATED BY LID) RAIN GARDEN D1 WQCV (12-HR) = 2,914 CU-FT RAIN GARDEN OS1 WQCV (12-HR) = 1,845 CU-FT AREA RESERVED FOR STORMWATER FACILITIES RE V I S I O N NO . BY DA T E HI G H L A N D DE V E L O P M E N T S E R V I C E S 63 5 5 F A I R G R O U N D S A V E N U E , S U I T E 1 0 0 | W I N D S O R , C O 8 0 5 5 0 PH O N E : 9 7 0 . 6 7 4 . 7 5 5 0 | E M A I L : I n f o @ H i g h l a n d - D S . c o m | w w w . H i g h l a n d - D S . c o m PREPARED BY OR UNDER THE DIRECT SUPERVISION OF: FOR AND ON BEHALF OF HIGHLAND DEVELOPMENT SERVICES REVIEW SET NOT FOR CONSTRUCTION OFSHEET DRAWN BY CHECKED BY DATE SCALE (H) HDS PROJECT # SCALE (V) HE A R T S I D E H I L L DR A I N A G E P L A N 9/27/23 1" = 40' N/A JTC JTC 21-1045-00 C2.00 9 27 1 M& M - L O T L I N E & U T I L I T Y A D J U S T M E N T S ZM W 11 / 1 4 / 2 3 CALL UTILITY NOTIFICATION CENTER OF COLORADO CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. before you dig.CallKnow what's below. R N W E S 0 SCALE: 1" = 40' 80402040 LEGEND EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY DRAINAGE BASIN FLOW PATH NOTES 1.CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH OWNER'S APPROVAL FOR REMOVAL. 2.THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM WATERWAY POLLUTION. 3.LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. 4.STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 5.SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 6.ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 7.AREAS THAT EXPERIENCE EROSION ISSUES FROM STEEP SLOPES OR WATER EROSION RESULTING IN SEED NOT BEING ABLE TO ESTABLISH DURING THE FIRST GROWING SEASON SHALL REQUIRE RESEEDING AND EROSION CONTROL BLANKETS TO STABILIZE THE SOIL. Heartside Hill TYPE D AREA INLET SIZING CALCULATION Design Engineer: Design Firm: Project Number: Date: DESIGN CRITERIA EQUATIONS: Q i = Grate Capacity w/o Reduction Factor (cfs) C = Orifice Discharge Coefficient = 0.67 A = Orifice area (ft2) - Open Area of Grate G = Gravitational Constant (32.2 ft/s2) H = Allowed Head on Grate, Ponding Depth (ft) Grate Dimensions and Information: 2.92 ft 5.67 ft 0.65 sqft/sqft 50% 10.76 sqft Allowed Head (ft) Inlet Capacity (Qi, cfs) Inlet Capacity w/ Reduction Factor (Qg, cfs) 0.25 28.93 14.47 0.50 40.91 20.46 1.00 57.86 28.93 1.50 70.87 35.43 2.00 81.83 40.91 INLET SIZING CALCULATIONS Inlet ID: Design Flow Rate (Q 100 , cfs): Allowed Head (H , ft): Inlet Capacity (Qg, cfs) Design Flow Depth (H, ft) OS1 15.84 1.00 28.93 0.30 J.Claeys Highland Development Services 21-1045-00 November 20, 2023 Apply Reduction Factor for the Allowable Capacity. Assumed Capacity per Head Allowed Width (W ): Length (L ): Opening Ratio (R ): Reduction Factor (F ): Inlet Grate Open Area (A ): Heartside Hill Emergency Overflow Spillway Calculations - Basin OS1 Design Engineer: Design Firm: Project Number: Date: Broad-Crested Weir Equation-Trapezoidal Shape where:Q = Discharge (cfs) C = Weir Coeffecient L = Weir Length (ft) H = Average Weir Head (ft) H:V =Side Slope Calculations Knowns: 4.00 0.50 ft 2.6 4930.00 ft 15.84 cfs 15.23 ft 16 ft 0.50 ft 1.00 ft 4931.00 ft Desired Spillway Head J.Claeys Highland Development Services 21-1045-00 November 20, 2023 Side Slopes (H:V) Total Spillway Depth Top of Berm Elevation Weir Coefficient Spillway Elevation 100-yr Pond Inflow Calculated Spillway Use Spillway Length Spillway Freeboard 21-1045-00 PondCalcs.xlsx - Spillway (2) Page 1 of 1 Highland Development Services Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Nov 20 2023 Basin OS1 - Emergency Outfall Channel Rectangular Bottom Width (ft) = 7.00 Total Depth (ft) = 1.82 Invert Elev (ft) = 4929.33 Slope (%) = 2.00 N-Value = 0.030 Calculations Compute by: Known Q Known Q (cfs) = 15.84 Highlighted Depth (ft) = 0.54 Q (cfs) = 15.84 Area (sqft) = 3.78 Velocity (ft/s) = 4.19 Wetted Perim (ft) = 8.08 Crit Depth, Yc (ft) = 0.55 Top Width (ft) = 7.00 EGL (ft) = 0.81 0 1 2 3 4 5 6 7 8 9 Elev (ft)Depth (ft)Section 4928.50 -0.83 4929.00 -0.33 4929.50 0.17 4930.00 0.67 4930.50 1.17 4931.00 1.67 4931.50 2.17 4932.00 2.67 Reach (ft)