Memorandum
0
CO
p
To: Bill Reynolds
o
Eldon Ward
0
Rick Ensdorff
J
O
01.
10
`O
M
From: Matt Delich
0
Z
3
Date: July 3, 1989
W
>p
Subject: Preliminary traffic study of the Vine Business
Park. Master Plan
W
Z
W
a
This memorandum presents a preliminary traffic
z
study of the Vine Business Park Master Plan addressing
}
specific concerns. The following specific concerns are
Z
presented:
a
CO
C'
- Trip generation
M
- Trip distribution
- Access locations
- Road geometrics
This study relates to the preliminary conceptual plan
prepared by Cityscape Urban Design, Inc. dated June 19p
1989. The master plan is presented in a conceptual
sense. When specific development proposals are put
forth on all or part of the land, a detailed traffic
study should be performed.
Streets
CM
z
LU
This proposed development is located at the
w
z
northwest quadrant of I-25 and Vine Street in Fort
z
Collins, Colorado. Vine Street is classified as an
�+!
L
_,
arterial and I-25 is a freeway. There is no interchange
CL:
>
on I-25 at Vine Street. A number of alternative
o
corridors for the Fort Collins Expressway pass through
z
this area. Two of the alternatives' alignment are on
v
a
Vine Street itself and approximately 1500 north of Vine
Street. As an arterial, Vine Street will have an ulti-
UJ
®
cc
a
mate cross section of four lanes with a center turn lane
z
at appropriate locations. The timing of the Fort
cc
Collins Expressway is dependent upon funding and plan-
ning decisions by the Colorado Department of Highways
c�
and the City of Fort Collins.
Lu
5-
Figure I shows the proposed road system within the
F.-
Vine Business Park and through the adjacent land to the
�.
north. The land to the north is owned by Anheuser Busch
.Company and is the subject of current discussions
0 0 A(�y
Entrance to
Anheuser Busch Brewery —�
COUNTY ROAD 50
Anheuser Busch
Agricultural Property
O
Ix
ua
i-
Ix
VINE DRIVE (FORT COLLINS EXPRESSWAY)
PROPOSE® ftAD SYSTEM 0 . Figure 1
C_
0
regarding access through the property. The road through
the Anheuser Busch property is master planned at/near
the location shown in Figure 1.
Vine Business Park Master Plan
Vine Business Park is proposed to be an industrial.
park development. There is a total of 165.7 acres, with
13.5 acres intended as a regional detention area. A
schematic of the plan is shown in Figure 2. The letters
on the schematic plan refer to parcels which are shown
in Table 1, Trip Generation.
The northern portion of Parcel A is under
consideration for a bottle and can warehouse. This use
is directly related to the Anheuser Busch Brewery,
approximately one mile to the north. There are options
regarding access from Parcel A to the Anheuser Busch
Brewery: (1) access via the master planned street
through the property to the north; and (2) access
via the planned streets in the Vine Business Park to the
south to Vine Street, then east to the frontage road,
then north to County Road 50, then west to the brewery
entrance road. These two options will be discussed
further, later in this report.
Trip Generation
Trip generation is important in considering the
impact of a development such as this upon the existing
and proposed street system. A compilation of trip
generation information was prepared by the Institute of
Transportation Engineers in 1976, updated in 1987, and
was used to project trips tha.t would be generated by the
proposed uses at this site. Table 1 shows the expected
trip generation on a daily and peak hour basis. The
assumed use category for the Vine Business Park from the
Trip Generation Manual was industrial park. The
building areas were estimated by Cityscape. The
analysis assumed no transit, ridesharing, or internal
trips. As such, the generation values used in subse-
quent analyses are conservatively high.
Trip Distribution
Directional distribution of the generated trips
from/to the Vine Business Park was determined assuming
the future street system in the area and future land
uses in the city. The distribution shoran in Figure 3
was used in this preliminary traffic analysis. The
VINE
Anheuser Busch
Agricultural Property
ORT CO
B i
ego• �oo�
re a a ® oo C� Oml
g
NS
AY)
VINE BUSINOSS PARK SITE PLA# Figure 2
n
U
0
Land Use
Phase 1 - 150 KSF
Bottle/can warehouse
Remainder of Parcel A
325 KSF
Parcel B - 622 KSF
Parcel C - 158 KSF
Parcel D - 160 KSF
Parcel E - 243 KSF
Total
Tabl e i
Trip Generation
Daily A.M. Peak
Trips Trips Trips
in out
1045 114 25
P.M. Peak
Trips Trips
in out
31 115
2265
247
54
66
249
4335
473
104
127
477
1100
120
26
32
12.1
1115
122
27
33
123
1695
185
41
50
186
119555
1261
277
339
1271
11
11
I:J
m--
TRIP ®ISTRJTI®IV 0 Figure 3
North Front Range Corridor Study was used to develop the
long range future trip distribution.
Traffic Assignment
Using the above trip generation and trip
distribution, an average daily traffic assignment was
performed. A daily, rather than peak hour assignment,
was performed since this conceptual master plan is not
specific and is intended only to show order of magnitude
traffic. Detailed analysis of individual intersections
should be performed in later traffic studies when more
specific development proposals are put forth. The
traffic assignment is shown in Figure 4. This
assignment assumes that the road through the Anheuser
Busch property to the north is complete according to the
master plan on that property. Background traffic was
obtained from the North Front Range Corridor Study and
other traffic studies performed in this general area.
Only a long range (2010) traffic projection was
conducted in this preliminary traffic study. Short and
long range projections should be shown in subsequent
traffic studies when specific developments are proposed.
Fort Collins Expressway
The City of Fort Collins and the State of Colorado
are evaluating alternative alignments for the Fort
Collins Expressway in this area and its eventual
interchange with I-25. The current alignment has the
expressway intersecting with State Highway 14 near
Summit View. Two of the alternative alignments being
considered are on Vine Drive and approximately 1500 feet
north of Vine Street. The later alignment would bisect.
the Vine Business Park and would not offer significant
benefit to this property or a number of others in the
area. Keeping the expressway alignment on an existing
street right-of-way (Vine Drive),.with some additional
dedication for widening, would appear to be the best for
area property owners and development of land in the
area. Since no decision has been made regarding the
expressway alignment, this master plan and preliminary
traffic study assume that the expressway will not follow
the alignment located 1500 feet north of Vine Drive.
Future Access
The following comments are made concerning access
and geometrics with regards to the Vine Business Park
Master Plan.
0 is
® Alk
LONG RANG* DAILY TRAFFIC ob Figure 4
- In the long range, access from the Vine Business
Park can be made at two locations, one being to the
south to Vine Drive (possible expressway location) and
the other being to the north to County Road 50 through
the Anheuser Busch property. Depending upon the allowed
access to the expressway, the access to Vine Drive may,
in fact, be to a collector/arterial road system rather
than the expressway itself.
- In the short range, access to County Road 50 (to
the north) can be made through the Anheuser Busch
property. The developer of the Vine Business Park is
prepared to construct the necessary streets in order tc
make this connection. While Anheuser Busch may not be
ready to develop this property to the north, there
appears to be no negatives to allowing the construction
of the road through the property. The current use is
agriculture, which the road will not affect other than
slightly reducing the amount of land under cultivation.
The positive impact to the Anheu..ser Busch property is
that the already master planned road will be built,
opening the propety to development interests.
- Completion of the road through the Anheuser
Busch property to the north has advantages to the first
phase user of the Vine Business Park, the bottle and can
warehouse. Since most/all of the business of the
warehouse involves interaction with the Anheuser Busch
Brewery, the travel time and distance will be
significantly reduced with the completion of the road.
The distance from the warehouse to the south entrance to
the brewery at County Road 50 is 2400 feet (0.45 miles)..
The distance from the warehouse to the same location via
the shortest route on the existing public street system
is 12,600 feet (2.40 miles). There is almost a 2 mile
reduction in travel distance. Assuming an average
travel speed of 25 mph, the longer route will require
almost five mi'ntes longer for this trip. While five
minutes is not perceived as a long time, it is actually
more than five times longer than the more direct route
through the property to the north. Depending upon the
number of trips per day between the warehouse and the
brewery, this can be a significant amount of time and
fuel consumed.
- Completion of the road through the Anheuser
Busch property to the north of the Vine Business Park
has advantages to the City of Fart Collins, also.
o The reduced travel time and distance will cause
a corresponding reduction in air pollution
generated due to motor vehicle travel.
o The completion of the link between Vine Drive
and County Road 50 west of I-25 will provide an
important road connection in this area of Fort
Collins. It will provide another alternative
route for brewery employees and visitors. It
will also act as a frontage road on the west
side of I-25.
o Improvement of the transportation network will
make this area of Fort Collins more attractive
for development. For a long time, the City has
attempted to encourage development in the north
area of Fort Collins. It will likely spawn
industrial/business park development which is
well suited in this area.
Figure 5 shows the long range lane requirements
on the area roads. These are based upon the traffic
volumes shown in Figure 4.
This preliminary traffic study only addresses the
traffic impacts in a generalized manner and is only
appropriate for the master plan submitted. It is
recommended that a more detailed traffic study be
considered as the various elements of this project
advance through the planning process.
Conclusions
The following conclusions are drawn from this
preliminary traffic analysis of Vine Business Park
Master Plan:
- It is expected that this proposed development,
at full build -out as described, will generate
approximately 11,500 vehicle trip ends on an average
weekday.
- Traffic volumes on the various streets and
highways in this area are in line with the North Front
Range Corridor Study. They are also at levels that can
be handled on the collectors and arterials in this area
of Fort Collins.
- The geometric requirements in this area are in
basic accordance with the Fort Collins Master Street
Plan.
- The location of the Fort Collins Expressway is
currently under study. Locating the expressway on the
Vine Drive alignment would be of benefit to the Vine
Business Park, since it would not bisect the property as
another alignment under consideration.
LONG RANCf LINE REQUIREM TS Figure 5
It is recommended that access to County Road 54
through the Anheuser Busch agricultural property to the
north of the Vine Business. Park be implemented as soon
as possible. This connection has advantages to the
first proposed user of the Vine Business Park (bottle
and can warehouse), Anheuser Busch, and the City of Fort
Collins.
- Additional traffic studies should be conducted
when specific development proposals are put forth.
Ideally, a traffic impact study should be conduc.ted
which considers this property as well as other nearby
development proposals.