Loading...
HomeMy WebLinkAboutNORTH COLLEGE PROPERTIES PUD - PRELIMINARY - 48-87 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSCITY OF FORT COLLINS OFFICE OF DEVELOPMENT SERVICES, PLANNING DEPARTMENT August 24, 1987 Mr.. Dick Rutherford Stewart Engineering 214 North Howes Street Fort Collins, CO. 80521 Dear Mr. Rutherford: Staff has reviewed the preliminary PUD plan for the North College PUD and offers the following comments: 1. The improvement of the existing access to Highway 287 will require a State Highway Access Permit. Application for this permit is made through the City of Fort Collins. Jim Newell or Mike Herzig will assist in this process. Application must be made prior to final submittal. 2. The landscape plan shows landscaping within the state highway right- of-way. This is allowed provided that it is maintained by the private property owner and it does not impair sight distance at the access or pre- sent a safety hazard. 3. Staff_ is applauds the area set aside for an access to the north adja- cent property. However, to guarantee that this access will be available in the future, this access easement should be placed in a dedicated easement. 4. The Light and Power Department requests a minimum of an 8 foot wide easement along the east property line to provide for future underground capability of the existing overhead utilities in the alley. 5. The Poudre Valley Fire Authority requests that any existing under- ground storage tanks not in use must be removed. 6. There should be a landscaped island at the east end of the row of parking. Also, one space should be designated as handicapped, one space designated as motorcycle parking. Bicycle racks should also be provided. 7. All signs must comply with the sign code. Please describe all signage on the site. SERVICES, PLANNING • 8. The site plan should contain a land use data table describing in both square footage and percentage of the total the characteristics of the site such as building area, landscaped area, and parking, drive, and circulation area. This concludes staff comments at this time. Please note the following deadlines for the September Planning and Zoning Board hearing: Plan revisions are due September 10, 1987 PMr's, colored renderings, and 10 prints due September 21, 1987 Please call if there are any questions or concerns. Sincerely, Ted Shepard Project Planner TS/bh