HomeMy WebLinkAboutCROWNE AT SUNIGA - FDP230023 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY
CROWNE AT SUNIGA
TRANSPORTATION IMPACT STUDY
FORT COLLINS, COLORADO
FEBRUARY 2023
REVISED JUNE 2023
Prepared for:
Crowne Partners, Inc.
505 North 20th Street, Suite 1150
Birmingham, AL 35203
Prepared by:
DELICH ASSOCIATES
2272 Glen Haven Drive
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034
Project # 2261
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES
TABLE OF CONTENTS
I. INTRODUCTION ........................................................................................................ 1
II. EXISTING CONDITIONS .......................................................................................... 2
Land Use ......................................................................................................................... 2
Streets ............................................................................................................................. 2
Existing Traffic ................................................................................................................. 5
Existing Operation ........................................................................................................... 5
Pederstrian Facilities ....................................................................................................... 9
Bicycle Facilities .............................................................................................................. 9
Transit Facilities .............................................................................................................. 9
III. PROPOSED DEVELOPMENT ............................................................................... 10
Trip Generation ............................................................................................................. 10
Trip Distribution ............................................................................................................. 10
Background Traffic Projections ..................................................................................... 10
Trip Assignment/Total Traffic ........................................................................................ 14
Signal Warrants ............................................................................................................. 14
Geometry ...................................................................................................................... 20
Operation Analysis ........................................................................................................ 20
Pedestrian Level of Service ........................................................................................... 26
Bicycle Level of Service ................................................................................................ 30
Transit Level of Service ................................................................................................. 30
IV. CONCLUSIONS .................................................................................................... 31
LIST OF TABLES
1. Current Peak Hour Operation .................................................................................... 8
2. Trip Generation ....................................................................................................... 10
3. Short Range (2027) Background Peak Hour Operation .......................................... 23
4. Long Range (2045) Background Peak Hour Operation ........................................... 24
5. Short Range (2027) Total Peak Hour Operation ..................................................... 27
6. Long Range (2045) Total Peak Hour Operation ...................................................... 28
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES
LIST OF FIGURES
1. Site Location ............................................................................................................. 3
2. Existing Geometry ..................................................................................................... 4
3. Recent Peak Hour Traffic .......................................................................................... 6
4. Adjusted/Balanced Recent Peak Hour Traffic ........................................................... 7
5. Site Plan .................................................................................................................. 11
6. Trip Distribution ....................................................................................................... 12
7. Short Range (2027) Background Peak Hour Traffic ................................................ 13
8. Long Range (2045) Background Peak Hour Traffic................................................. 15
9. Short Range (2027) Site Generated Peak Hour Traffic ........................................... 16
10. Long Range (2045) Site Generated Peak Hour Traffic ............................................ 17
11. Short Range (2027) Total Peak Hour Traffic ........................................................... 18
12. Long Range (2045) Total Peak Hour Traffic ............................................................ 19
13. Short Range (2027) Geometry ................................................................................ 21
14. Long Range (2045) Geometry ................................................................................. 22
APPENDICES
A. Base Assumptions Form
B. Peak Hour Traffic Counts
C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins Motor
Vehicle LOS Standards (Intersections)
D. Signal Warrants
E. Short Range (2027) Background Peak Hour Operation
F. Long Range (2045) Background Peak Hour Operation
G. Short Range (2027) Total Peak Hour Operation
H. Long Range (2045) Total Peak Hour Operation
I. Pedestrian/Bicycle Level of Service Worksheets
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 1
I. INTRODUCTION
This transportation impact study (TIS) addresses the capacity, geometric, and
control requirements at and near the proposed Crowne at Suniga development. The
proposed Crowne at Suniga site is located in the northeast quadrant of the
Suniga/Lindenmeier intersection in Fort Collins, Colorado.
During the course of the analysis, numerous contacts were made with the owner
(Crowne Partners, Inc.), the project planning consultant (Vignette Studios), and Fort
Collins Traffic Engineering. The Transportation Impact Study Base Assumptions form and
related documents are provided in Appendix A. This study generally conforms to the
format set forth in the Fort Collins TIS Guidelines in the “Larimer County Urban Area Street
Standards” (LCUASS). Due to the trip generation, this is a full transportation impact study.
The study involved the following steps:
- Collect physical, traffic, and development data;
- Perform trip generation, trip distribution, and trip assignment;
- Determine peak hour traffic volumes;
- Conduct capacity and operational level of service analyses on key intersections;
- Analyze signal warrants;
- Conduct level of service evaluation of pedestrian, bicycle, and transit modes of
transportation
This TIS is a revision of the “Crowne at Suniga Transportation Impact Study,” dated
February 2023. It addresses City staff comments on pedestrian analysis.
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 2
II. EXISTING CONDITIONS
The location of the Crowne at Suniga development is shown in Figure 1. It is
important that a thorough understanding of the existing conditions be presented.
Land Use
Land uses in the area are primarily residential and open. There are proposed
residential uses to the west. There is open space to the east and south of the site. The
proposed Crowne at Suniga site is currently vacant. The center of Fort Collins lies to
the south of the proposed Crowne at Suniga site.
Streets
The primary streets near the Crowne at Suniga site are Suniga Road, Lemay
Avenue, Lindenmeier Road, Conifer Street, and Redwood Street. Figure 2 shows a
schematic of the existing geometry at the Lemay/Conifer, Suniga/Lemay,
Suniga/Lindenmeier, and Suniga/Redwood intersections.
Lemay Avenue is to the east of (adjacent to) the proposed Crowne at Suniga
site. It is a north-south street classified as a four-lane arterial according to the Fort
Collins Master Street Plan. Currently, Lemay Avenue has a four-lane cross section
approximately 600 feet north of Suniga Road, then has a two-lane cross section to the
north. At the Lemay/Conifer intersection, Lemay Avenue has a northbound left-turn
lane, a through lane in each direction, and a southbound right-turn lane. The
Lemay/Conifer intersection has stop sign control on Conifer Street. At the
Lemay/Suniga intersection, Lemay Avenue has a northbound left-turn lane, two through
lanes in each direction, and a southbound right-turn lane. The Lemay/Suniga
intersection has stop sign control on Suniga Road. The signal at the Lemay/Suniga
intersection will be activated in 2023. The posted speed limit in this area of Lemay
Avenue is 40 mph.
Conifer Street is to the north of the proposed Crowne at Suniga site. It is an
east-west street classified as a two-lane collector according to the Fort Collins Master
Street Plan. Conifer Street only has a west leg at the Lemay/Conifer intersection.
Currently, Conifer Street has a two-lane cross section with parking on both sides of the
street. At the Lemay/Conifer intersection, Conifer Street has an eastbound left-turn lane
and an eastbound right-turn lane. The posted speed limit in this area of Conifer Street
is 30 mph.
BURLINGTON NORTH
SCALE: 1"=1000'
SITE LOCATION Figure 1
DELICH
ASSOCIATES
Crowne at Suniga TIS, June 2023
Page 3
Vine Drive
Lincoln Avenue
Lemay Avenue
Buckingham Street
Re
d
w
o
o
d
S
t
r
e
e
t
Suniga Road
Conifer Street
Li
n
d
e
n
m
e
i
e
r
R
o
a
d
EXISTING INTERSECTION GEOMETRY Figure 2
DELICH
ASSOCIATES
Crowne at Suniga TIS, June 2023
Page 4
L
e
m
a
y A
v
e
n
u
e
Conifer Street
Suniga Road
Lindenmeier Road
Redwood Street
- Denotes Lane
ST
O
P
STOP
STOP
STOP
STOP
ST
O
P
F uture Site
A c c e s s
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 5
Suniga Road is south of (adjacent to) the proposed Crowne at Suniga site. It is
an east-west street designated as a four-lane arterial street on the Fort Collins Master
Street Plan. Currently, Suniga Road has a four-lane cross section. Suniga Road only
has a west leg at the Lemay/Suniga intersection. At the Lemay/Suniga intersection,
Suniga Road has an eastbound left-turn lane and an eastbound right-turn lane. At the
Suniga/Lindenmeier intersection, Suniga Road has eastbound and westbound left-turn
lanes, a through lane in each direction, and eastbound and westbound through/right-
turn lanes. At the Suniga/Redwood intersection, Suniga Road has eastbound and
westbound left-turn lanes, a through lane in each direction, and eastbound and
westbound through/right-turn lanes. The Suniga/Lindenmeier and Suniga/Redwood
intersections have stop sign control on Lindenmeier Road and Redwood Street,
respectively. The posted speed limit in this area of Suniga Road is 40 mph.
Lindenmeier Road is to the west of (adjacent to) the proposed Crowne at Suniga
site. It is north-south street classified as a local street according to the Fort Collins
Master Street Plan. Currently, Lindenmeier Road has a two-lane cross section. At the
Suniga/Lindenmeier, Lindenmeier Road has all movements combined into single lanes.
The posted speed limit in this area on Lindenmeier Road is 30 mph.
Redwood Street is west of the proposed Crowne at Suniga site. It is a north-
south street classified as a two-lane collector street according to the Fort Collins Master
Street Plan. Currently, Redwood Street has a two-lane cross section with parking on
both sides of the street. At the Suniga/Redwood intersection, Redwood Street has all
movements combined into single lanes. The Suniga/Redwood intersection is stop sign
controlled on Redwood Street. The posted speed limit in this area of Redwood Street is
30 mph.
Existing Traffic
Recent morning and afternoon peak hour traffic volumes are shown in Figure 3.
The traffic counts at the Lemay/Conifer, Suniga/Lemay, Suniga/Lindenmeier, and
Suniga/Redwood intersections were obtained in September and October 2022. Raw
traffic count data are provided in Appendix B. Since the counts were obtained on
different days, the counts were adjusted/balanced. The adjusted/balanced recent peak
hour traffic is shown in Figure 4.
Existing Operation
The Lemay/Conifer, Suniga/Lemay, Suniga/Lindenmeier, and Suniga/Redwood
intersections were evaluated using techniques provided in the 2016 Highway Capacity
Manual, 6th Edition. Using the morning and afternoon peak hour traffic shown in Figure
4, the peak hour operation is shown in Table 1. Calculation forms are provided in
Appendix C. The key intersections meet the City of Fort Collins Motor Vehicle LOS
RECENT PEAK HOUR TRAFFIC Figure 3
DELICH
ASSOCIATES
Crowne at Suniga TIS, June 2023
Page 6
AM/PM
L
e
m
a
y A
v
e
n
u
e
4/
1
0
20
/
5
7
9/
5
3/
3
62
/
5
2
31
/
2
3
2/8
81/60
10/13
23/26
45/112
6/17
9/
2
0
0/
0
9/
1
5
0/
0
1/
1
1/
2
0/0
84/104
4/6
6/1
83/111
12/17
93
/
1
4
7
27
5
/
7
2
4
59
/
4
8
49
2
/
3
6
8
25/50
82/110
81
/
1
3
6
35
4
/
7
9
3
17
/
1
7
65
1
/
4
4
0
18/24
123/118
Conifer Street
Suniga Road
Lindenmeier Road
Redwood Street
ADJUSTED/BALANCED
RECENT PEAK HOUR TRAFFIC Figure 4
DELICH
ASSOCIATES
Crowne at Suniga TIS, June 2023
Page 7
AM/PM
L
e
m
a
y A
v
e
n
u
e
4/
1
0
20
/
5
7
8/
6
3/
3
62
/
5
2
29
/
2
9
2/8
75/75
10/13
28/24
52/105
6/16
9/
2
0
0/
0
12
/
1
5
0/
0
1/
1
1/
2
0/0
108/104
4/6
6/1
77/125
11/19
94
/
1
4
2
27
6
/
7
0
2
59
/
4
8
53
2
/
3
6
0
25/50
89/108
78
/
1
2
8
35
2
/
8
1
9
16
/
1
7
60
5
/
4
5
1
18/25
103/96
Conifer Street
Suniga Road
Lindenmeier Road
Redwood Street
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 8
TABLE 1
Current Peak Hour Operation
Intersection Movement Level of Service
AM PM
Lemay/Conifer
(stop sign)
EB LT C C
EB RT B B
EB APPROACH B C
NB LT A A
OVERALL A A
Lemay/Suniga
(stop sign)
EB LT D D
EB RT B B
EB APPROACH B B
NB LT A A
OVERALL A A
Suniga/Lindenmeier
(stop sign)
EB LT A A
WB LT A A
NB LT/T/RT A A
SB LT/T/RT B B
OVERALL A A
Suniga/Redwood
(stop sign)
EB LT A A
WB LT A A
NB LT/T/RT B B
SB LT/T/RT B B
OVERALL A A
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 9
standards with existing control and geometry in the morning and afternoon peak hours.
A description of level of service for signalized and unsignalized intersections from the
2016 Highway Capacity Manual and a table showing the Fort Collins Motor Vehicle LOS
Standards (Intersections) are also provided in Appendix C. Acceptable operation at
signalized intersections during the peak hours is defined as level of service E or better
for each movement and leg, and level of service D or better overall. At arterial/arterial
and collector/collector stop sign controlled intersections, acceptable operation is
considered to be at level of service E, overall and level of service F, for any approach
leg. At arterial/collector, arterial/local, collector/local, and local/local stop sign controlled
intersections; acceptable operation is considered to be at level or service D, overall and
level of service F, for any approach leg.
Pedestrian Facilities
There are sidewalks along both sides of Suniga Road. There are sidewalks
along the west side of Lemay Avenue, Lindenmeier Road, and Redwood Street. There
are sidewalks along the north side of Conifer Street. It is expected that as properties in
this area are developed or redeveloped, sidewalks will be installed as part of the
street/property infrastructure.
Bicycle Facilities
Bicycle lanes exist along Lemay Avenue, Conifer Street, Suniga Road,
Lindenmeier Road, and Redwood Street within the study area.
Transit Facilities
Currently, this area of Fort Collins is served by Transfort routes 8 and 81.
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 10
III. PROPOSED DEVELOPMENT
The Crowne at Suniga is a multifamily housing development with 267 dwelling
units. Figure 5 shows a site plan of the Crowne at Suniga development. The short
range analysis (Year 2027) includes the full development of the site and an appropriate
increase in background traffic due to normal growth and other potential developments in
the area. The long range future analysis year is considered to be 2045. In the short
range (2027) future, the site plan shows that Crowne at Suniga will have a full
movement access to Lindenmeier Road and a right-in/right-out access to Lemay
Avenue.
Trip Generation
Trip generation is important in considering the impact of a development such as this
upon the existing and proposed street system. Trip generation information contain in Trip
Generation, 11th Edition, ITE was used to estimate the trips that would be generated by the
proposed/expected uses at a site. A trip is defined as a one-way vehicle movement from
origin to destination. Table 2 shows the expected trip generation on a daily and peak hour
basis. The trip generation of Crowne at Suniga development resulted in 1,786 daily trip
ends; 106 morning peak hour trip ends; and 135 afternoon peak hour trip ends.
TABLE 2
Crowne at Suniga Trip Generation
Code Use Size AWDTE AM Peak Hour PM Peak Hour
Rate Trips Rate In Rate Out Rate In Rate Out
220 Multifamily Housing (Low-Rise) 267 D.U. Eq. 1786 Eq. 25 Eq. 81 Eq. 85 Eq. 50
Trip Distribution
Trip distribution for the Crowne at Suniga was based on existing/future travel
patterns, land uses in the area, consideration of trip attractions/productions in the area,
and engineering judgment. Figure 6 shows the trip distribution for the short range
(2027) and long range (2045) analysis futures. The trip distribution was agreed to by
City of Fort Collins staff in the scoping meeting.
Background Traffic Projections
Figure 7 shows the short range (2027) background peak hour traffic forecasts.
These forecasts assume that the connection from Lindenmeier to Lemay through the
Crowne at Suniga exists. Background traffic projections for the short range were
obtained by reviewing the North Front Range Regional Transportation Plan, engineering
SITE PLAN Figure 5
DELICH
ASSOCIATES
Crowne at Suniga TIS, June 2023
Page 11
APPROXIMATE SCALE
1"=200'
BURLINGTON
SCALE: 1"=1000'
TRIP DISTRIBUTION Figure 6
DELICH
ASSOCIATES
Crowne at Suniga TIS, June 2023
Page 12
Vine Drive
Lincoln Avenue
Lemay Avenue
Buckingham Street
Re
d
w
o
o
d
S
t
r
e
e
t
Suniga Road
Conifer Street
Li
n
d
e
n
m
e
i
e
r
R
o
a
d
5%
40%/35%10%
30%
5%
10%
(Future)
Suniga Road
0%/5%
SHORT RANGE (2027) BACKGROUND
PEAK HOUR TRAFFIC Figure 7
DELICH
ASSOCIATES
Crowne at Suniga TIS, June 2023
Page 13
AM/PM
L
e
m
a
y A
v
e
n
u
e
4/
1
1
25
/
7
3
27
/
5
2
20
/
1
2
77
/
6
2
36
/
4
2
7/26
115/163
11/14
40/32
135/171
52/50
15
/
3
5
3/
7
13
/
1
7
9/
6
9/
6
13
/
1
0
4/9
183/157
14/16
13/15
112/212
12/21
10
4
/
1
5
7
31
4
/
7
8
1
66
/
5
7
59
2
/
4
0
7
32/57
98/119
11
5
/
2
2
0
38
9
/
9
0
4
22
/
2
8
66
8
/
4
9
8
29/34
180/150
Conifer Street
Suniga Road
Redwood Street
L
e
m
a
y A
v
e
n
u
e
Lindenmeier Road
31
/
2
2
11
/
8
20
/
3
1
0/
0
3/6
0/0
4
1
8/9
3
8
6
7
9/5
1
8
3/6
1 1/8
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 14
judgment, and various traffic studies prepared for this area of Fort Collins. Based upon
these sources, it was determined that the traffic volumes would increase by
approximately 2.0 percent per year. The Enclave at Redwood and Northfield
developments were added to the background traffic.
Figure 8 shows the long range (2045) background peak hour traffic forecasts.
This reflects completion of Suniga Road, as shown in the Fort Collins Master Street
Plan.
Trip Assignment/Total Traffic
Trip assignment is how the generated and distributed trips are expected to be
loaded on the street system. The assigned trips are the resultant of the trip distribution
process. Figure 9 shows the short range (2027) site generated peak hour traffic
assignment. Figure 10 shows the long range (2045) site generated peak hour traffic
assignment. Figures 11 and 12 show the respective short range (2027) and long range
(2045) total (site plus background) peak hour traffic assignment.
Signal Warrants
As a matter of policy, traffic signals are not installed at any location unless warrants
are met according to the Manual on Uniform Traffic Control Devices. For the streets in the
vicinity of the Crowne at Suniga development, four hour and/or eight hour signal warrants
are applicable. These warrants require much data and are applied when the traffic is
actually on the area street system. It is acknowledged that peak hour signal warrants
should not be applied, but since the peak hour forecasts are readily available in a traffic
impact study, it is reasonable to use them to get an idea whether other signal warrants
may be met. If peak hour signal warrants will not be met at a given intersection, it is
reasonable to conclude that it is not likely that other signal warrants would be met. If peak
hour signal warrants are met, it merely indicates that further evaluation should occur in the
future as the development occurs. However, a judgment can be made that some
intersections will likely meet other signal warrants. The signal at the Lemay/Suniga
intersection will be activated in 2023.
Using the long range (2045) total peak hour traffic (Figure 12), the Lemay/Conifer
and Suniga/Lindenmeier intersections will not meet the peak hour warrant in the morning
or afternoon peak hours. The Suniga/Redwood intersection will meet the peak hour
warrant in the afternoon peak hour. Therefore, the Suniga/Redwood intersection will be
analyzed with and without a signal in the long range (2045) future. The peak hour signal
warrant analyses are provided in Appendix D.
LONG RANGE (2045) BACKGROUND
PEAK HOUR TRAFFIC Figure 8
DELICH
ASSOCIATES
Crowne at Suniga TIS, June 2023
Page 15
17
0
/
2
3
5
56
5
/
1
0
0
0
40
/
1
7
0
10
5
/
1
0
0
99
5
/
7
7
0
10
5
/
1
6
0
45/85
285/405
175/170
150/205
305/310
175/95
L
e
m
a
y A
v
e
n
u
e
40
/
7
0
45
/
1
3
5
50
/
1
4
5
80
/
7
5
65
/
7
5
30
/
4
5
50/110
360/460
45/65
50/35
425/510
145/100
20
/
4
5
5/
1
0
20
/
2
5
10
/
1
0
10
/
5
15
/
1
0
10/10
470/625
20/25
15/20
550/600
15/25
25
0
/
2
7
5
51
0
/
1
0
1
5
85
/
7
0
10
6
0
/
7
4
5
45/70
140/280
Conifer Street
Suniga Road
Redwood Street
L
e
m
a
y A
v
e
n
u
e
Lindenmeier Road
35
/
2
5
10
/
1
0
30
/
4
0
0/
0
5/5
0/0
7
6
0/1
2
9
0
1
1
9
5/1
0
2
0
5/5
1 0/1 0
AM/PM
Rounded to Nearest
5 Vehicles
SHORT RANGE (2027) SITE
GENERATED PEAK HOUR TRAFFIC Figure 9
DELICH
ASSOCIATES
Crowne at Suniga TIS, June 2023
Page 16
AM/PM
L
e
m
a
y A
v
e
n
u
e
2/
9
1/
4
8/25
4/2
24/15
8/5
3/
9
36
/
2
2
8/
5
14
/
9
11/38
10/34
4/
3
1/
4
10
/
3
4
23
/
1
4
4/3
10/6
Conifer Street
Suniga Road
Redwood Street
Lindenmeier Road
24
/
8
1
58/36
4/3
1/4
2 3/1 4
LONG RANGE (2045) SITE
GENERATED PEAK HOUR TRAFFIC Figure 10
DELICH
ASSOCIATES
Crowne at Suniga TIS, June 2023
Page 17
AM/PM
9/
3
0
20
/
1
2
3/
2
4/3
1/1
9/5
1/4
L
e
m
a
y A
v
e
n
u
e
2/
9
1/
4
8/25
4/2
24/15
8/5
3/
9
36
/
2
2
8/
5
14
/
9
11/38
10/34
4/
3
1/
4
Conifer Street
Suniga Road
Redwood Street
Lindenmeier Road
24
/
8
1
58/36
4/3
1/4
2 3/1 4
SHORT RANGE (2027) TOTAL
PEAK HOUR TRAFFIC Figure 11
DELICH
ASSOCIATES
Crowne at Suniga TIS, June 2023
Page 18
AM/PM
L
e
m
a
y A
v
e
n
u
e
4/
1
1
25
/
7
3
29
/
6
1
20
/
1
2
77
/
6
2
37
/
4
6
7/26
123/188
11/14
44/34
159/186
60/55
15
/
3
5
6/
1
6
13
/
1
7
45
/
2
8
17
/
1
1
27
/
1
9
15/47
183/157
14/16
23/49
112/212
12/21
10
4
/
1
5
7
31
8
/
7
8
4
66
/
5
7
59
3
/
4
1
1
32/57
98/119
12
5
/
2
5
4
38
9
/
9
0
4
22
/
2
8
69
1
/
5
1
2
33/37
190/156
Conifer Street
Suniga Road
Redwood Street
L
e
m
a
y A
v
e
n
u
e
Lindenmeier Road
31
/
2
2
11
/
8
20
/
3
1
24
/
8
1
3/6
58/36
4
2
2/9
4
1
6
7
9/5
1
84/1
0
3 4/2 2
LONG RANGE (2045) TOTAL
PEAK HOUR TRAFFIC Figure 12
DELICH
ASSOCIATES
Crowne at Suniga TIS, June 2023
Page 19
18
0
/
2
6
5
56
5
/
1
0
0
0
40
/
1
7
0
10
5
/
1
0
0
10
1
5
/
7
8
0
11
0
/
1
6
5
50/90
285/405
185/175
150/205
310/315
175/95
L
e
m
a
y A
v
e
n
u
e
40
/
7
0
45
/
1
3
5
55
/
1
5
5
80
/
7
5
65
/
7
5
30
/
5
0
50/110
370/485
45/65
55/40
450/525
155/105
20
/
4
5
10
/
2
0
20
/
2
5
45
/
3
5
20
/
1
0
30
/
2
0
20/50
470/625
20/25
25/55
550/600
15/25
25
0
/
2
7
5
51
5
/
1
0
2
0
85
/
7
0
10
6
5
/
7
5
0
45/70
140/280
Conifer Street
Suniga Road
Redwood Street
L
e
m
a
y A
v
e
n
u
e
Lindenmeier Road
35
/
2
5
10
/
1
0
30
/
4
0
25
/
8
0
5/5
60/35
7
6
5/1
2
9
5
1
1
9
5/1
0
2
0
1
0/1
0
3 5/2 5
AM/PM
Rounded to Nearest
5 Vehicles
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 20
Geometry
Figure 13 shows a schematic of the short range (2027) geometry. This is existing
geometry at the existing Lemay/Conifer, Suniga/Lemay, Suniga/Lindenmeier, and
Suniga/Redwood intersections. The Lemay/Site Access and Lindenmeier/Site Access
intersections are future intersections. The Lemay/Site Access intersection is proposed as
right-in/right-out. A northbound left-turn lane at the Lemay/Site Access intersection will not
meet deceleration and storage criteria. The distance from the Lemay/Suniga intersection
to the Lemay/Site Access intersection is approximately 638 feet (on-centers). This meets
the intersection spacing requirement of 460-660 feet. The existing median on Lemay
Avenue will be extended to the north to restrict the Lemay/Site Access intersection to right-
in/right-out.
Figure 14 show a schematic of the long range (2045) geometry. An additional
northbound and southbound through lane on Lemay Avenue, north of Suniga Road. A
northbound and southbound right-turn lane is required at the Suniga/Redwood intersection
in the long range future, as recommended in the “Enclave at Redwood Traffic Impact
Study.” The Lemay/Suniga intersection will have an east leg in the long range future. The
long range (2045) geometry figure includes the auxiliary lane lengths.
Operation Analysis
Operation analyses were performed at the Lemay/Conifer, Lemay/Site Access
(Right-in/Right-out), Suniga/Lemay, Suniga/Lindenmeier, Suniga/Redwood, and
Lindenmeier/Site Access intersections. The operations analyses were conducted for the
short range and long range futures, reflecting year 2027 and 2045 conditions, respectively.
The long range (2045) analysis is provided for informational purposes and to identify
potential operational and/or geometric issues.
Using the traffic volumes shown in Figure 7, the Lemay/Conifer, Lemay/Site
Access (Right-in/Right-out), Suniga/Lemay, Suniga/Lindenmeier, Suniga/Redwood, and
Lindenmeier/Site Access intersections operate in the short range (2027) background
traffic future as indicated in Table 3. Calculation forms for these analyses are provided in
Appendix E. The key intersections will meet the Fort Collins criteria with regard to
operation using the existing geometry and a signal at the Lemay/Suniga intersection.
Using the traffic volumes shown in Figure 8, the Lemay/Conifer, Lemay/Site
Access (Right-in/Right-out), Suniga/Lemay, Suniga/Lindenmeier, Suniga/Redwood, and
Lindenmeier/Site Access intersections operate in the long range (2045) background traffic
future as indicated in Table 4. Calculation forms for these analyses are provided in
Appendix F. The key intersections will meet the Fort Collins criteria with regard to
operation using the existing geometry and a signal at the Lemay/Suniga and
Suniga/Redwood intersections. The Suniga/Redwood intersection does will meet the Fort
Collins criteria with stop sign control. At the Lemay/Conifer intersection, the calculated
delay for the eastbound left-turn lane will be commensurate with level of service F in the
morning and afternoon peak hours. This is considered to be normal during the peak hours
at stop sign controlled intersections along arterial streets.
SHORT RANGE (2027) GEOMETRY Figure 13
DELICH
ASSOCIATES
Crowne at Suniga TIS, June 2023
Page 21
L
e
m
a
y A
v
e
n
u
e
Conifer Street
Suniga Road
Redwood Street
L
e
m
a
y A
v
e
n
u
e
Lindenmeier Road
Suniga Road
- Denotes Lane
ST
O
P
STOP
STOP
STOP
STOP
ST
O
P
STOP
LONG RANGE (2045) GEOMETRY Figure 14
DELICH
ASSOCIATES
Crowne at Suniga TIS, June 2023
Page 22
L
e
m
a
y A
v
e
n
u
e
Conifer Street
Suniga Road
Redwood Street
L
e
m
a
y A
v
e
n
u
e
Lindenmeier Road
Suniga Road
- Denotes Lane
ST
O
P
STOP
STOP
ST
O
P
STOP
33
5
f
e
e
t
,
in
c
.
B
T
1
0
:
1
33
5
f
e
e
t
,
in
c
.
B
T
1
0
:
1
48
5
f
e
e
t
,
in
c
.
B
T
1
3
.
3
:
1
520 feet,
inc. BT 13.3:1
615 feet,
inc. BT 13.3
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 23
TABLE 3
Short Range (2027) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Lemay/Conifer
(stop sign)
EB LT C D
EB RT C B
EB APPROACH C C
NB LT A A
OVERALL A A
Lemay/Site Access (r-in/r-out)
(stop sign)
EB RT B B
OVERALL A A
Lemay/Suniga
(signal)
EB LT D D
EB RT D D
EB APPROACH D D
NB LT A A
NB T A A
NB APPROACH A A
SB T A A
SB RT A A
SB APPROACH A A
OVERALL A A
Suniga/Lindenmeier
(stop sign)
EB LT A A
WB LT A A
NB LT/T/RT B B
SB LT/T/RT B B
OVERALL A A
Suniga/Redwood
(stop sign)
EB LT A A
WB LT A A
NB LT/T/RT C C
SB LT/T/RT B C
OVERALL A A
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 24
TABLE 4
Long Range (2045) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Lemay/Conifer
(stop sign)
EB LT F (59.7 secs) F (56.9 secs)
EB RT C C
EB APPROACH D C
NB LT C B
OVERALL A A
Lemay/Site Access (r-in/r-out)
(stop sign)
EB RT B B
OVERALL A A
Lemay/Suniga
(signal)
EB LT C C
EB T D D
EB RT D C
EB APPROACH D D
WB LT C C
WB T D D
WB RT C C
WB APPROACH C D
NB LT B B
NB T B B
NB RT B B
NB APPROACH B B
SB LT B B
SB T B B
SB RT B B
SB APPROACH B B
OVERALL C C
Suniga/Lindenmeier
(stop sign)
EB LT A A
WB LT A A
NB LT/T/RT C D
SB LT/T/RT C C
OVERALL A A
Continued on next page
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 25
Continued from previous page
TABLE 4
Long Range (2045) Background Peak Hour Operation
Intersection Movement Level of Service
AM PM
Suniga/Redwood
(stop sign)
EB LT A A
WB LT A A
NB LT/T F (140.3 secs) F (1888.6 secs)
NB RT B B
NB APPROACH F (125.5 secs) F (1110.9 secs)
SB LT/T F (126.4 secs) F
SB RT B B
SB APPROACH F (108.3 secs) F
OVERALL D F (214.3 secs)
Suniga/Redwood
(signal)
EB LT A B
EB T A C
EB T/RT B C
EB APPROACH A C
WB LT A B
WB T A C
WB T/RT A C
WB APPROACH B D
NB LT/T B A
NB RT B D
NB APPROACH B B
SB LT/T B A
SB RT B B
SB APPROACH B B
OVERALL A C
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 26
Using the traffic volumes shown in Figure 11, the Lemay/Conifer, Lemay/Site
Access (Right-in/Right-out), Suniga/Lemay, Suniga/Lindenmeier, Suniga/Redwood, and
Lindenmeier/Site Access intersections operate in the short range (2027) background
traffic future as indicated in Table 5. Calculation forms for these analyses are provided in
Appendix G. The key intersections will meet the Fort Collins criteria about operation using
the existing geometry and a signal at the Lemay/Suniga intersection.
Using the traffic volumes shown in Figure 12, the Lemay/Conifer, Lemay/Site
Access (Right-in/Right-out), Suniga/Lemay, Suniga/Lindenmeier, and Lindenmeier/Site
Access intersections operate in the long range (2045) background traffic future as
indicated in Table 6. Calculation forms for these analyses are provided in Appendix H.
The key intersections will meet the Fort Collins criteria with regard to operation using the
proposed geometry and a signal at the Lemay/Suniga and Suniga/Redwood intersections.
The Suniga/Redwood intersection will not meet the Fort Collins criteria with stop sign
control. At the Lemay/Conifer intersection, the calculated delay for the eastbound left-turn
lane will be commensurate with level of service F in the morning and afternoon peak
hours. At the Suniga/Lindenmeier intersection, the calculated delay for the northbound
approach will be commensurate with level of service F in the afternoon peak hour. This is
considered to be normal during the peak hours at stop sign controlled intersections along
arterial streets
Pedestrian Level of Service
Appendix I shows a map of the area that is within 1320 feet of the Crowne at
Suniga development. There are four pedestrian destinations within 1320 feet of the
Crowne at Suniga development. These are: 1) the residential area to the south of the
site; 2) Sugar Beet Park to the south of the site; 3) the future residential area
(Northfield) to the west of the site; and 4) the future trail to the north of the site. The
Crowne at Suniga site is located within an area termed as “other,” which sets the level of
service threshold at LOS C for all other measured categories.
Directness – The distance ratio to all pedestrian destinations is less than 1.6
(LOS C).
Continuity – The continuity to pedestrian destinations 3 and 4 will be acceptable
at LOS C, since Suniga Road has sidewalk with landscaped parkways and
Lindenmeier Road, north of Suniga Road, will have sidewalk on both sides with
competition of the Crowne at Suniga development. The Crowne at Suniga
development will connect the proposed sidewalk on the east side of Lindenmeier
Road to the existing sidewalk at the Lemay Avenue trail underpass. Continuity to
pedestrian destinations 1 and 2 will not be meet the level of service threshold
since the sidewalks on west Lindenmeier Road south of Suniga Road only goes
to the Northfield property line.
Street Crossings – The street crossings to all pedestrian destinations will be
acceptable at LOS C or better, since the street crossings are all five lanes or
fewer.
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 27
TABLE 5
Short Range (2027) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Lemay/Conifer
(stop sign)
EB LT C D
EB RT C B
EB APPROACH C C
NB LT A A
OVERALL A A
Lemay/Site Access (r-in/r-out)
(stop sign)
EB RT C B
OVERALL A A
Lemay/Suniga
(signal)
EB LT D D
EB RT D D
EB APPROACH D D
NB LT A A
NB T A A
NB APPROACH A A
SB T A A
SB RT A A
SB APPROACH A A
OVERALL A A
Suniga/Lindenmeier
(stop sign)
EB LT A A
WB LT A A
NB LT/T/RT B B
SB LT/T/RT B B
OVERALL A A
Suniga/Redwood
(stop sign)
EB LT A A
WB LT A A
NB LT/T/RT B C
SB LT/T/RT C C
OVERALL A A
Lindenmeier/Site Access
(stop sign)
WB LT/RT A A
SB LT/T A A
OVERALL A A
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 28
TABLE 6
Long Range (2045) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Lemay/Conifer
(stop sign)
EB LT F (61.3 secs) F (57.6 secs)
EB RT C C
EB APPROACH D C
NB LT C B
OVERALL A A
Lemay/Site Access (r-in/r-out)
(stop sign)
EB RT B B
OVERALL A A
Lemay/Suniga
(signal)
EB LT C C
EB T D D
EB RT D C
EB APPROACH D D
WB LT C C
WB T D D
WB RT C C
WB APPROACH C D
NB LT B B
NB T B B
NB RT B B
NB APPROACH B B
SB LT B B
SB T B B
SB RT B B
SB APPROACH B B
OVERALL C C
Suniga/Lindenmeier
(stop sign)
EB LT A A
WB LT A A
NB LT/T/RT C F (60 secs)
SB LT/T/RT C D
OVERALL A A
Continued on next page
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 29
Continued from previous page
TABLE 6
Long Range (2045) Total Peak Hour Operation
Intersection Movement Level of Service
AM PM
Suniga/Redwood
(stop sign)
EB LT A A
WB LT A A
NB LT/T F (142.4 secs) F (4307.0 secs)
NB RT B B
NB APPROACH F (127.5 secs) F (2457.6 secs)
SB LT/T F (128.9 secs) F
SB RT B B
SB APPROACH F (110.7 secs) F
OVERALL D F (469.1 secs)
Suniga/Redwood
(signal)
EB LT A C
EB T B C
EB T/RT B C
EB APPROACH A C
WB LT A C
WB T A C
WB T/RT A C
WB APPROACH A D
NB LT/T B E (54.8 secs)
NB RT B B
NB APPROACH B D
SB LT/T B C
SB RT B A
SB APPROACH B B
OVERALL A C
Lindenmeier/Site Access
(stop sign)
WB LT/RT A A
SB LT/T A A
OVERALL A A
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 30
Visual Interest and Amenity – The visual interest and amenity to all pedestrian
destinations is acceptable at LOS B, since most of the sidewalks have a
residential neighborhood character.
Security - The security to all pedestrian destinations is acceptable at LOS B,
since most of the sidewalks are adjacent to residential land uses and the area
has a residential neighborhood character.
Acceptable pedestrian level of service will be achieved for all pedestrian
destinations within 1320 of the Crowne at Suniga, except for continuity to the residential
area to the south and Sugar Beet Park. The Pedestrian LOS Worksheet is provided in
Appendix I. The Crowne at Suniga development will install the curb & gutter and
sidewalk along the Lindenmeier Road adjacent to the site. The Crowne at Suniga
development will connect the proposed sidewalk on the east side of Lindenmeier Road
to the existing sidewalk at the Lemay Avenue trail underpass.
Bicycle Level of Service
Appendix I shows a map of the area that is within 1320 feet of the Crowne at
Suniga development. The future trail to the north of the site and Sugar Beet Park to the
south are the only bicycle destination within 1320 feet of the Crowne at Suniga
development. The Bicycle LOS Worksheet is provided in Appendix I. The minimum
level of service for this site is C. This site is connected to bike lanes on Lemay Avenue,
Suniga Road, and Lindenmeiere Road. Therefore, it is concluded that level of service A
can be achieved.
Transit Level of Service
This area of Fort Collins is served by Transfort Routes 8 and 81.
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 31
IV. CONCLUSIONS
This study assessed the impacts of the Crowne at Suniga on the street system in
the vicinity of the proposed development in the short range (2027) and long range (2045)
futures. As a result of this analysis, the following is concluded:
- The development of the Crowne at Suniga is feasible from a traffic engineering
standpoint. The Crowne at Suniga development will generate approximately 1,786
daily trips, 106 morning peak hour trip ends, and 135 afternoon peak hour trip ends.
- Current operation at the Lemay/Conifer, Suniga/Lemay, Suniga/Lindenmeier, and
Suniga/Redwood intersections meet the City of Fort Collins Motor Vehicle LOS
standards with existing control and geometry in the morning and afternoon peak
hours. At the Lemay/Conifer intersection, the calculated delay for the eastbound
left-turn lane will be commensurate with level of service E in the afternoon peak
hour.
- The signal at the Lemay/Suniga intersection will be activated in the fourth quarter of
2022. The Lemay/Conifer and Suniga/Lindenmeier intersections will not meet the
peak hour warrant in the morning or afternoon peak hours in the long range (2045)
future. The Suniga/Redwood intersection will meet the peak hour warrant in the
afternoon peak hour in the long range (2045) future.
- In the short range (2027) future, given the development of the Crowne at Suniga
and an increase in background traffic, the Lemay/Conifer, Lemay/Site Access
(Right-in/Right-out), Suniga/Lemay, Suniga/Lindenmeier, Suniga/ Redwood, and
Lindenmeier/Site Access intersections will meet the Fort Collins criteria with regard
to operation using the existing geometry and a signal at the Lemay/Suniga
intersection.
- In the long range (2045) future, given development of the Crowne at Suniga and an
increase in background traffic, the Lemay/Conifer, Lemay/Site Access (Right-
in/Right-out), Suniga/Lemay, Suniga/Lindenmeier, Suniga/Redwood, and
Lindenmeier/Site Access intersections will meet the Fort Collins criteria with regard
to operation using the proposed geometry and a signal at the Lemay/Suniga and
Suniga/Redwood intersections. The Suniga/Redwood intersection will not meet the
Fort Collins criteria with stop sign control. At the Lemay/Conifer intersection, the
calculated delay for the eastbound left-turn lane will be commensurate with level of
service F in the morning and afternoon peak hours. At the Suniga/ Lindenmeier
intersection, the calculated delay for the northbound approach will be
commensurate with level of service F in the afternoon peak hour. This is
considered to be normal during the peak hours at stop sign controlled intersections
along arterial streets.
DELICH Crowne at Suniga TIS, June 2023 ASSOCIATES Page 32
- Figure 13 shows a schematic of the short range (2027) geometry. This is existing
geometry at the existing Lemay/Conifer, Suniga/Lemay, Suniga/Lindenmeier, and
Suniga/Redwood intersections. The Lemay/Site Access and Lindenmeier/Site
Access intersections are future intersections. The existing median on Lemay
Avenue will be extended to the north to restrict the Lemay/Site Access intersection
to right-in/right-out.
- Figure 14 shows a schematic of the long range (2045) geometry. This is existing
geometry at the Lemay/Conifer and Suniga/Lindenmeier intersections. A
northbound and southbound right-turn lane is required at the Suniga/Redwood
intersection in the long range future, as recommended in the “Enclave at Redwood
Traffic Impact Study.” The Lemay/Suniga intersection will have an east leg in the
long range future. The long range (2045) geometry figure includes the auxiliary
lane lengths.
- Acceptable level of service is achieved for pedestrian, bicycle, and transit modes
based upon the measures in the multi-modal transportation guidelines and future
improvements to the street system in the area, except for continuity to Sugar Beet
Park and the residential area to the south. The practical limits of pedestrian
improvements would be on the Crowne at Suniga site, along the east side of
Lindenmeier Road, and a connection from the proposed sidewalk to the existing
sidewalk at the Lemay Avenue trail underpass.
APPENDIX A
1
2
3
4
5
APPENDIX B
6
D
E
L
I
C
H
A
S
S
O
C
I
A
T
E
S
2
2
7
2
G
L
E
N
H
A
V
E
N
D
R
I
V
E
L
O
V
E
L
A
N
D
,
C
O
8
0
5
3
8
P
h
o
n
e
:
(
9
7
0
)
6
6
9
-
2
0
6
1
TA
B
U
L
A
R
S
U
M
M
A
R
Y
O
F
V
E
H
I
C
L
E
C
O
U
N
T
S
Da
t
e
:
10
/
5
/
2
0
2
2
O
b
s
e
r
v
e
r
:
Vi
c
k
i
e
Da
y
:
We
d
n
e
s
d
a
y
Ju
r
i
s
d
i
c
t
i
o
n
:
Fo
r
t
C
o
l
l
i
n
s
R
=
r
i
g
h
t
t
u
r
n
In
t
e
r
s
e
c
t
i
o
n
:
Le
m
a
y
/
C
o
n
i
f
e
r
S
=
s
t
r
a
i
g
h
t
L
=
l
e
f
t
t
u
r
n
Ti
m
e
N
o
r
t
h
b
o
u
n
d
:
Le
m
a
y
S
o
u
t
h
b
o
u
n
d
:
Le
m
a
y
To
t
a
l
E
a
s
t
b
o
u
n
d
:
Co
n
i
f
e
r
W
e
s
t
b
o
u
n
d
:
To
t
a
l
To
t
a
l
Be
g
i
n
s
L
S
R
To
t
a
l
L
S
R
To
t
a
l
no
r
t
h
/
s
o
u
t
h
L
S
R
To
t
a
l
L
S
R
To
t
a
l
ea
s
t
/
w
e
s
t
Al
l
7:
0
0
11
19
30
72
8
80
11
0
4
15
19
0
19
12
9
7:
1
5
21
37
58
98
5
10
3
16
1
1
25
26
0
26
18
7
7:
3
0
15
45
60
14
9
15
16
4
22
4
10
22
32
0
32
25
6
7:
4
5
27
71
98
13
0
23
15
3
25
1
8
26
34
0
34
28
5
#
8:
0
0
27
59
86
10
9
7
11
6
20
2
2
23
25
0
25
22
7
#
8:
1
5
18
73
91
12
0
14
13
4
22
5
12
17
29
0
29
25
4
#
8:
3
0
21
72
93
13
3
15
14
8
24
1
3
16
19
0
19
26
0
#
8:
4
5
17
60
77
13
0
8
13
8
21
5
4
14
18
0
18
23
3
#
7:
4
5
-
8
:
4
5
93
27
5
0
36
8
0
49
2
59
55
1
91
9
25
0
82
10
7
0
0
0
0
10
7
10
2
6
PH
F
0.
8
6
0.
9
4
n/
a
0.
9
4
n/
a
0.
9
2
0.
6
4
0.
9
0.
9
2
0.
5
2
n/
a
0.
7
9
0.
7
9
n/
a
n/
a
n/
a
n/
a
0.
7
9
0.
9
4:
0
0
23
15
2
17
5
76
4
80
25
5
12
32
44
0
44
29
9
4:
1
5
34
14
3
17
7
79
8
87
26
4
4
41
45
0
45
30
9
4:
3
0
34
14
5
17
9
72
11
83
26
2
10
37
47
0
47
30
9
4:
4
5
47
17
4
22
1
94
12
10
6
32
7
14
32
46
0
46
37
3
#
5:
0
0
30
16
9
19
9
87
8
95
29
4
14
26
40
0
40
33
4
#
5:
1
5
35
19
9
23
4
10
2
15
11
7
35
1
8
23
31
0
31
38
2
#
5:
3
0
35
18
2
21
7
85
13
98
31
5
14
29
43
0
43
35
8
#
5:
4
5
36
13
7
17
3
81
9
90
26
3
5
27
32
0
32
29
5
#
4:
4
5
-
5
:
4
5
14
7
72
4
0
87
1
0
36
8
48
41
6
12
8
7
50
0
11
0
16
0
0
0
0
0
16
0
14
4
7
PH
F
0.
7
8
0.
9
1
n/
a
0.
9
3
n/
a
0.
9
0.
8
0.
8
9
0.
9
2
0.
8
9
n/
a
0.
8
6
0.
8
7
n/
a
n/
a
n/
a
n/
a
0.
8
7
0.
9
5
7
D
E
L
I
C
H
A
S
S
O
C
I
A
T
E
S
2
2
7
2
G
L
E
N
H
A
V
E
N
D
R
I
V
E
L
O
V
E
L
A
N
D
,
C
O
8
0
5
3
8
P
h
o
n
e
:
(
9
7
0
)
6
6
9
-
2
0
6
1
TA
B
U
L
A
R
S
U
M
M
A
R
Y
O
F
V
E
H
I
C
L
E
C
O
U
N
T
S
Da
t
e
:
10
/
4
/
2
0
2
2
O
b
s
e
r
v
e
r
:
Vi
c
k
i
e
Da
y
:
Tu
e
s
d
a
y
Ju
r
i
s
d
i
c
t
i
o
n
:
Fo
r
t
C
o
l
l
i
n
s
R
=
r
i
g
h
t
t
u
r
n
In
t
e
r
s
e
c
t
i
o
n
:
Le
m
a
y
/
S
u
n
i
g
a
S
=
s
t
r
a
i
g
h
t
L
=
l
e
f
t
t
u
r
n
Ti
m
e
N
o
r
t
h
b
o
u
n
d
:
Le
m
a
y
S
o
u
t
h
b
o
u
n
d
:
Le
m
a
y
To
t
a
l
E
a
s
t
b
o
u
n
d
:
Su
n
i
g
a
W
e
s
t
b
o
u
n
d
:
To
t
a
l
To
t
a
l
Be
g
i
n
s
L
S
R
To
t
a
l
L
S
R
To
t
a
l
no
r
t
h
/
s
o
u
t
h
L
S
R
To
t
a
l
L
S
R
To
t
a
l
ea
s
t
/
w
e
s
t
Al
l
7:
0
0
20
51
71
10
0
4
10
4
17
5
4
22
26
0
26
20
1
7:
1
5
18
53
71
16
4
3
16
7
23
8
6
35
41
0
41
27
9
7:
3
0
17
99
11
6
19
6
4
20
0
31
6
4
34
38
0
38
35
4
7:
4
5
22
94
11
6
16
1
3
16
4
28
0
3
33
36
0
36
31
6
#
8:
0
0
24
10
8
13
2
13
0
7
13
7
26
9
5
21
26
0
26
29
5
#
8:
1
5
17
69
86
12
3
9
13
2
21
8
3
16
19
0
19
23
7
#
8:
3
0
22
87
10
9
15
4
6
16
0
26
9
4
21
25
0
25
29
4
#
8:
4
5
18
10
6
12
4
12
1
2
12
3
24
7
3
23
26
0
26
27
3
#
7:
1
5
-
8
:
1
5
81
35
4
0
43
5
0
65
1
17
66
8
11
0
3
18
0
12
3
14
1
0
0
0
0
14
1
12
4
4
PH
F
0.
8
4
0.
8
2
n/
a
0.
8
2
n/
a
0.
8
3
0.
6
1
0.
8
4
0.
8
7
0.
7
5
n/
a
0.
8
8
0.
8
6
n/
a
n/
a
n/
a
n/
a
0.
8
6
0.
8
8
4:
0
0
30
15
7
18
7
12
4
3
12
7
31
4
5
27
32
0
32
34
6
4:
1
5
38
19
7
23
5
10
6
3
10
9
34
4
7
34
41
0
41
38
5
4:
3
0
35
19
4
22
9
12
0
3
12
3
35
2
5
35
40
0
40
39
2
4:
4
5
22
19
9
22
1
10
2
5
10
7
32
8
4
22
26
0
26
35
4
#
5:
0
0
41
20
3
24
4
11
2
6
11
8
36
2
8
27
35
0
35
39
7
#
5:
1
5
20
21
5
23
5
10
0
5
10
5
34
0
4
25
29
0
29
36
9
#
5:
3
0
33
20
4
23
7
10
7
4
11
1
34
8
4
14
18
0
18
36
6
#
5:
4
5
29
13
7
16
6
93
2
95
26
1
7
25
32
0
32
29
3
#
4:
1
5
-
5
:
1
5
13
6
79
3
0
92
9
0
44
0
17
45
7
13
8
6
24
0
11
8
14
2
0
0
0
0
14
2
15
2
8
PH
F
0.
8
3
0.
9
8
n/
a
0.
9
5
n/
a
0.
9
2
0.
7
1
0.
9
3
0.
9
6
0.
7
5
n/
a
0.
8
4
0.
8
7
n/
a
n/
a
n/
a
n/
a
0.
8
7
0.
9
6
8
D
E
L
I
C
H
A
S
S
O
C
I
A
T
E
S
2
2
7
2
G
L
E
N
H
A
V
E
N
D
R
I
V
E
L
O
V
E
L
A
N
D
,
C
O
8
0
5
3
8
P
h
o
n
e
:
(
9
7
0
)
6
6
9
-
2
0
6
1
TA
B
U
L
A
R
S
U
M
M
A
R
Y
O
F
V
E
H
I
C
L
E
C
O
U
N
T
S
Da
t
e
:
9/
2
2
/
2
0
2
2
O
b
s
e
r
v
e
r
:
Vi
c
k
i
e
Da
y
:
Th
u
r
s
d
a
y
Ju
r
i
s
d
i
c
t
i
o
n
:
Fo
r
t
C
o
l
l
i
n
s
R
=
r
i
g
h
t
t
u
r
n
In
t
e
r
s
e
c
t
i
o
n
:
Su
n
i
g
a
/
L
i
n
d
e
n
m
e
i
e
r
S
=
s
t
r
a
i
g
h
t
L
=
l
e
f
t
t
u
r
n
Ti
m
e
N
o
r
t
h
b
o
u
n
d
:
Li
n
d
e
n
m
e
i
e
r
S
o
u
t
h
b
o
u
n
d
:
Li
n
d
e
n
m
e
i
e
r
To
t
a
l
E
a
s
t
b
o
u
n
d
:
Su
n
i
g
a
W
e
s
t
b
o
u
n
d
:
Su
n
i
g
a
To
t
a
l
To
t
a
l
Be
g
i
n
s
L
S
R
To
t
a
l
L
S
R
To
t
a
l
no
r
t
h
/
s
o
u
t
h
L
S
R
To
t
a
l
L
S
R
To
t
a
l
ea
s
t
/
w
e
s
t
Al
l
7:
0
0
0
0
1
1
0
0
0
0
1
2
19
0
21
3
13
0
16
37
38
7:
1
5
0
0
3
3
0
0
0
0
3
0
27
0
27
1
14
0
15
42
45
7:
3
0
1
0
0
1
0
1
0
1
2
0
30
0
30
2
16
1
19
49
51
7:
4
5
2
0
0
2
0
1
0
1
3
0
26
1
27
2
16
2
20
47
50
#
8:
0
0
6
0
5
11
0
1
0
1
12
0
17
0
17
4
27
1
32
49
61
#
8:
1
5
1
0
2
3
1
0
0
1
4
0
21
0
21
0
19
2
21
42
46
#
8:
3
0
0
0
2
2
0
0
0
0
2
0
24
2
26
3
15
2
20
46
48
#
8:
4
5
2
0
0
2
0
0
0
0
2
0
22
2
24
5
22
1
28
52
54
#
8:
0
0
-
9
:
0
0
9
0
9
18
1
1
0
2
20
0
84
4
88
12
83
6
10
1
18
9
20
9
PH
F
0.
3
8
n/
a
0.
4
5
0.
4
1
0.
2
5
0.
2
5
n/
a
0.
5
0.
4
2
n/
a
0.
8
8
0.
5
0.
8
5
0.
6
0.
7
7
0.
7
5
0.
7
9
0.
9
1
0.
8
6
4:
0
0
9
0
3
12
0
1
0
1
13
0
37
0
37
0
25
1
26
63
76
4:
1
5
6
0
4
10
0
0
0
0
10
0
18
1
19
5
34
0
39
58
68
4:
3
0
3
0
4
7
2
0
0
2
9
0
29
2
31
8
31
0
39
70
79
4:
4
5
2
0
4
6
0
0
0
0
6
0
20
3
23
4
21
0
25
48
54
#
5:
0
0
3
1
4
8
0
0
0
0
8
0
23
5
28
2
34
0
36
64
72
#
5:
1
5
2
0
4
6
0
0
1
1
7
0
17
2
19
4
31
0
35
54
61
#
5:
3
0
1
0
6
7
0
0
0
0
7
0
28
2
30
8
28
0
36
66
73
#
5:
4
5
2
0
2
4
1
0
0
1
5
0
19
1
20
2
27
0
29
49
54
#
4:
0
0
-
5
:
0
0
20
0
15
35
2
1
0
3
38
0
10
4
6
11
0
17
11
1
1
12
9
23
9
27
7
PH
F
0.
5
6
n/
a
0.
9
4
0.
7
3
0.
2
5
0.
2
5
n/
a
0.
3
8
0.
7
3
n/
a
0.
7
0.
5
0.
7
4
0.
5
3
0.
8
2
0.
2
5
0.
8
3
0.
8
5
0.
8
8
9
D
E
L
I
C
H
A
S
S
O
C
I
A
T
E
S
2
2
7
2
G
L
E
N
H
A
V
E
N
D
R
I
V
E
L
O
V
E
L
A
N
D
,
C
O
8
0
5
3
8
P
h
o
n
e
:
(
9
7
0
)
6
6
9
-
2
0
6
1
TA
B
U
L
A
R
S
U
M
M
A
R
Y
O
F
V
E
H
I
C
L
E
C
O
U
N
T
S
Da
t
e
:
10
/
4
/
2
0
2
2
O
b
s
e
r
v
e
r
:
Vi
c
k
i
e
Da
y
:
Tu
e
s
d
a
y
Ju
r
i
s
d
i
c
t
i
o
n
:
Fo
r
t
C
o
l
l
i
n
s
R
=
r
i
g
h
t
t
u
r
n
In
t
e
r
s
e
c
t
i
o
n
:
Su
n
i
g
a
/
R
e
d
w
o
o
d
S
=
s
t
r
a
i
g
h
t
L
=
l
e
f
t
t
u
r
n
Ti
m
e
N
o
r
t
h
b
o
u
n
d
:
Re
d
w
o
o
d
S
o
u
t
h
b
o
u
n
d
:
Re
d
w
o
o
d
To
t
a
l
E
a
s
t
b
o
u
n
d
:
Su
n
i
g
a
W
e
s
t
b
o
u
n
d
:
Su
n
i
g
a
To
t
a
l
To
t
a
l
Be
g
i
n
s
L
S
R
To
t
a
l
L
S
R
To
t
a
l
no
r
t
h
/
s
o
u
t
h
L
S
R
To
t
a
l
L
S
R
To
t
a
l
ea
s
t
/
w
e
s
t
Al
l
7:
0
0
0
0
0
0
1
7
0
8
8
1
19
1
21
2
9
7
18
39
47
7:
1
5
0
3
3
6
10
16
0
26
32
0
20
1
21
0
10
4
14
35
67
7:
3
0
1
5
0
6
12
11
2
25
31
1
23
3
27
1
7
6
14
41
72
7:
4
5
2
9
2
13
5
21
1
27
40
0
21
3
24
3
14
6
23
47
87
#
8:
0
0
1
3
4
8
4
14
0
18
26
1
17
3
21
2
14
7
23
44
70
#
8:
1
5
2
3
1
6
4
13
0
17
23
0
11
1
12
3
11
12
26
38
61
#
8:
3
0
1
3
2
6
7
11
1
19
25
0
4
2
6
6
7
5
18
24
49
#
8:
4
5
2
6
0
8
7
18
1
26
34
1
16
2
19
3
13
5
21
40
74
#
7:
1
5
-
8
:
1
5
4
20
9
33
31
62
3
96
12
9
2
81
10
93
6
45
23
74
16
7
29
6
PH
F
0.
5
0.
5
6
0.
5
6
0.
6
3
0.
6
5
0.
7
4
0.
3
8
0.
8
9
0.
8
1
0.
5
0.
8
8
0.
8
3
0.
8
6
0.
5
0.
8
0.
8
2
0.
8
0.
8
9
0.
8
5
4:
0
0
3
18
2
23
2
13
1
16
39
1
13
3
17
7
17
5
29
46
85
4:
1
5
4
18
1
23
5
16
1
22
45
2
24
1
27
2
15
6
23
50
95
4:
3
0
0
18
1
19
8
17
0
25
44
3
18
6
27
4
24
7
35
62
10
6
4:
4
5
4
13
1
18
5
14
3
22
40
1
11
1
13
2
29
4
35
48
88
#
5:
0
0
5
10
1
16
2
9
0
11
27
3
15
4
22
5
28
9
42
64
91
#
5:
1
5
1
16
2
19
8
12
0
20
39
1
16
2
19
6
31
6
43
62
10
1
#
5:
3
0
2
8
3
13
7
15
0
22
35
1
20
2
23
2
23
2
27
50
85
#
5:
4
5
1
13
2
16
4
11
2
17
33
0
16
3
19
3
29
7
39
58
91
#
4:
3
0
-
5
:
3
0
10
57
5
72
23
52
3
78
15
0
8
60
13
81
17
11
2
26
15
5
23
6
38
6
PH
F
0.
5
0.
7
9
0.
6
3
0.
9
5
0.
7
2
0.
7
6
0.
2
5
0.
7
8
0.
8
5
0.
6
7
0.
8
3
0.
5
4
0.
7
5
0.
7
1
0.
9
0.
7
2
0.
9
0.
9
2
0.
9
1
10
APPENDIX C
11
HCM 6th TWSC
1: Lemay & Conifer Recent AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 2.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 25 89 94 276 532 59
Future Vol, veh/h 25 89 94 276 532 59
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 250 - - 250
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 22222
Mvmt Flow 28 99 104 307 591 66
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1106 591 657 0 - 0
Stage 1 591 -----
Stage 2 515 -----
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 233 507 931 - - -
Stage 1 553 -----
Stage 2 600 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 207 507 931 - - -
Mov Cap-2 Maneuver 339 -----
Stage 1 491 -----
Stage 2 600 -----
Approach EB NB SB
HCM Control Delay, s 14.4 2.4 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBTEBLn1EBLn2 SBT SBR
Capacity (veh/h)931 - 339 507 - -
HCM Lane V/C Ratio 0.112 - 0.082 0.195 - -
HCM Control Delay (s) 9.4 - 16.6 13.8 - -
HCM Lane LOS A - C B - -
HCM 95th %tile Q(veh) 0.4 - 0.3 0.7 - -
12
HCM 6th TWSC
1: Lemay & Conifer Recent PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 2.6
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 50 108 142 702 360 48
Future Vol, veh/h 50 108 142 702 360 48
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 250 - - 250
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 53 114 149 739 379 51
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1416 379 430 0 - 0
Stage 1 379 -----
Stage 2 1037 -----
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 151 668 1129 - - -
Stage 1 692 -----
Stage 2 342 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 131 668 1129 - - -
Mov Cap-2 Maneuver 252 -----
Stage 1 601 -----
Stage 2 342 -----
Approach EB NB SB
HCM Control Delay, s 15.1 1.5 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBTEBLn1EBLn2 SBT SBR
Capacity (veh/h)1129 - 252 668 - -
HCM Lane V/C Ratio 0.132 - 0.209 0.17 - -
HCM Control Delay (s) 8.7 - 23 11.5 - -
HCM Lane LOS A - C B - -
HCM 95th %tile Q(veh) 0.5 - 0.8 0.6 - -
13
HCM 6th TWSC
3: Lemay & Suniga Recent AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 18 103 78 352 605 16
Future Vol, veh/h 18 103 78 352 605 16
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 0 250 - - 250
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 88 88 88 88 88 88
Heavy Vehicles, % 2 22222
Mvmt Flow 20 117 89 400 688 18
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1066 344 706 0 - 0
Stage 1 688 -----
Stage 2 378 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 217 652 888 - - -
Stage 1 460 -----
Stage 2 663 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 195 652 888 - - -
Mov Cap-2 Maneuver 195 -----
Stage 1 414 -----
Stage 2 663 -----
Approach EB NB SB
HCM Control Delay, s 13.8 1.7 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBTEBLn1EBLn2 SBT SBR
Capacity (veh/h)888 - 195 652 - -
HCM Lane V/C Ratio 0.1 - 0.105 0.18 - -
HCM Control Delay (s) 9.5 - 25.6 11.7 - -
HCM Lane LOS A - D B - -
HCM 95th %tile Q(veh) 0.3 - 0.3 0.7 - -
14
HCM 6th TWSC
3: Lemay & Suniga Recent PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 1.9
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 25 96 128 819 451 17
Future Vol, veh/h 25 96 128 819 451 17
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 0 250 - - 250
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 96 96 96 96 96 96
Heavy Vehicles, % 2 22222
Mvmt Flow 26 100 133 853 470 18
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1163 235 488 0 - 0
Stage 1 470 -----
Stage 2 693 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 188 767 1071 - - -
Stage 1 595 -----
Stage 2 457 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 165 767 1071 - - -
Mov Cap-2 Maneuver 165 -----
Stage 1 521 -----
Stage 2 457 -----
Approach EB NB SB
HCM Control Delay, s 14.6 1.2 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBTEBLn1EBLn2 SBT SBR
Capacity (veh/h)1071 - 165 767 - -
HCM Lane V/C Ratio 0.124 - 0.158 0.13 - -
HCM Control Delay (s) 8.8 - 30.9 10.4 - -
HCM Lane LOS A - D B - -
HCM 95th %tile Q(veh) 0.4 - 0.5 0.4 - -
15
HCM 6th TWSC
4: Lindenmeier & Suniga Recent AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 1.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 108 4 11 77 6 9 0 12 1 1 0
Future Vol, veh/h 0 108 4 11 77 6 9 0 12 1 1 0
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 86 86 86 86 86 86 86 86 86 86 86 86
Heavy Vehicles, % 2 22222222222
Mvmt Flow 0 126 5 13 90 7 10 0 14 1 1 0
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 97 0 0 131 0 0 201 252 66 183 251 49
Stage 1 ------129129-120120-
Stage 2 ------72123-63131-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 1494 - - 1452 - - 739 650 984 761 651 1009
Stage 1 ------861788-872796-
Stage 2 ------929793-941787-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1494 - - 1452 - - 733 644 984 745 645 1009
Mov Cap-2 Maneuver ------733644-745645-
Stage 1 ------861788-872789-
Stage 2 ------919786-928787-
Approach EB WB NB SB
HCM Control Delay, s 0 0.9 9.3 10.2
HCM LOS A B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)858 1494 - - 1452 - - 691
HCM Lane V/C Ratio 0.028 - - - 0.009 - - 0.003
HCM Control Delay (s) 9.3 0 - - 7.5 - - 10.2
HCM Lane LOS A A - - A - - B
HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0
16
HCM 6th TWSC
4: Lindenmeier & Suniga Recent PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 1.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 104 6 19 125 1 20 0 15 2 1 0
Future Vol, veh/h 0 104 6 19 125 1 20 0 15 2 1 0
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 22222222222
Mvmt Flow 0 118 7 22 142 1 23 0 17 2 1 0
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 143 0 0 125 0 0 238 309 63 246 312 72
Stage 1 ------122122-187187-
Stage 2 ------116187-59125-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 1437 - - 1459 - - 696 604 988 687 602 975
Stage 1 ------869794-797744-
Stage 2 ------876744-946792-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1437 - - 1459 - - 687 595 988 667 593 975
Mov Cap-2 Maneuver ------687595-667593-
Stage 1 ------869794-797733-
Stage 2 ------861733-930792-
Approach EB WB NB SB
HCM Control Delay, s 0 1 9.8 10.7
HCM LOS A B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)790 1437 - - 1459 - - 640
HCM Lane V/C Ratio 0.05 - - - 0.015 - - 0.005
HCM Control Delay (s) 9.8 0 - - 7.5 - - 10.7
HCM Lane LOS A A - - A - - B
HCM 95th %tile Q(veh) 0.2 0 - - 0 - - 0
17
HCM 6th TWSC
5: Redwood & Suniga Recent AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 3.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 2 75 10 6 52 28 4 20 8 29 32 3
Future Vol, veh/h 2 75 10 6 52 28 4 20 8 29 32 3
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 2 88 12 7 61 33 5 24 9 34 38 4
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 94 0 0 100 0 0 162 206 50 152 196 47
Stage 1 ------9898-9292-
Stage 2 ------64108-60104-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 1498 - - 1490 - - 788 690 1008 801 698 1012
Stage 1 ------898813-905818-
Stage 2 ------939805-944808-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1498 - - 1490 - - 749 686 1008 769 694 1012
Mov Cap-2 Maneuver ------749686-769694-
Stage 1 ------897812-904814-
Stage 2 ------888801-907807-
Approach EB WB NB SB
HCM Control Delay, s 0.2 0.5 10 10.4
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)754 1498 - - 1490 - - 737
HCM Lane V/C Ratio 0.05 0.002 - - 0.005 - - 0.102
HCM Control Delay (s) 10 7.4 - - 7.4 - - 10.4
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.2 0 - - 0 - - 0.3
18
HCM 6th TWSC
5: Redwood & Suniga Recent PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 8 75 13 16 105 24 10 57 6 29 52 3
Future Vol, veh/h 8 75 13 16 105 24 10 57 6 29 52 3
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 2 22222222222
Mvmt Flow 9 82 14 18 115 26 11 63 7 32 57 3
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 141 0 0 96 0 0 229 284 48 255 278 71
Stage 1 ------107107-164164-
Stage 2 ------122177-91114-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 1440 - - 1496 - - 707 624 1011 677 629 977
Stage 1 ------887806-822761-
Stage 2 ------869752-906800-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1440 - - 1496 - - 645 613 1011 611 618 977
Mov Cap-2 Maneuver ------645613-611618-
Stage 1 ------882801-817752-
Stage 2 ------791743-825795-
Approach EB WB NB SB
HCM Control Delay, s 0.6 0.8 11.5 11.8
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)638 1440 - - 1496 - - 624
HCM Lane V/C Ratio 0.126 0.006 - - 0.012 - - 0.148
HCM Control Delay (s) 11.5 7.5 - - 7.4 - - 11.8
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.4 0 - - 0 - - 0.5
19
UNSIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 15
C > 15 and < 25
D > 25 and < 35
E > 35 and < 50
F > 50
SIGNALIZED INTERSECTIONS
Level-of-Service Average Total Delay
sec/veh
A < 10
B > 10 and < 20
C > 20 and < 35
D > 35 and < 55
E > 55 and < 80
F > 80
20
Larimer County Urban Area Street Standards – Repealed and Reenacted August 1, 2021 Page 4-23
Adopted by Larimer County, City of Loveland, City of Fort Collins
Table 4-2
Fort Collins (GMA and City Limits)
Motor Vehicle LOS Standards (Intersections)
Overall Any
Approach leg
Any
Movement
Signalized D1 E E2
Unsignalized
Arterial / Arterial
Collector / Collector
E3 F4
Unsignalized
Arterial / Collector
Arterial / Local
Collector / Local
Local / Local
D3 F4
Roundabout E 3,5 E54 E5
1 In mixed use district including downtown as defined by structure plan, overall LOS
E is acceptable
2 Applicable with at least 5% of total entering volume
3 Use weighted average to identify overall delay
4 Mitigation may be required
5 Apply unsignalized delay value thresholds to determine LOS
21
APPENDIX D
22
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
100
200
300
400
500
600
AM
1
9
1
5
V
P
H
*100
*150
2
O
R
M
O
R
E
L
A
N
E
S
&
1
L
A
N
E
1
L
A
N
E
&
1
L
A
N
E
2
O
R
M
O
R
E
L
A
N
E
S
&
2
O
R
M
O
R
E
L
A
N
E
S
PM
2
1
1
5
V
P
H
EB
A
M
4
5
V
P
H
EB
P
M
7
0
V
P
H
MINOR STREET APPROACH - VPH
MA
J
O
R
S
T
R
E
E
T
-
T
O
T
A
L
O
F
B
O
T
H
A
P
P
R
O
A
C
H
-
VE
H
I
C
L
E
S
P
E
R
H
O
U
R
(
V
P
H
)
*N
o
t
e
:
1
5
0
v
p
h
a
p
p
l
i
e
s
a
s
t
h
e
l
o
w
e
r
t
h
r
e
s
h
o
l
d
v
o
l
u
m
e
f
o
r
a
m
i
n
o
r-
s
t
r
e
e
t
ap
p
r
o
a
c
h
w
i
t
h
t
w
o
o
r
m
o
r
e
l
a
n
e
s
a
n
d
1
0
0
v
p
h
a
p
p
l
i
e
s
a
s
t
h
e
l
o
w
e
r
th
r
e
s
h
o
l
d
v
o
l
u
m
e
f
o
r
a
m
i
n
o
r
-
s
t
r
e
e
t
a
p
p
r
o
a
c
h
w
i
t
h
o
n
e
l
a
n
e
.
LO
N
G
R
A
N
G
E
(
2
0
4
5
)
T
O
T
A
L
P
E
A
K
H
O
U
R
W
A
R
R
A
N
T
A
T
L
E
M
A
Y
/
C
O
N
I
F
E
R
MU
T
C
D
,
2
0
0
3
E
D
I
T
I
O
N
,
P
A
G
E
4
C
-
7
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
100
200
300
400
500
600
AM
1
9
1
5
V
P
H
*100
*150
2
O
R
M
O
R
E
L
A
N
E
S
&
1
L
A
N
E
1
L
A
N
E
&
1
L
A
N
E
2
O
R
M
O
R
E
L
A
N
E
S
&
2
O
R
M
O
R
E
L
A
N
E
S
PM
2
1
1
5
V
P
H
EB
A
M
4
5
V
P
H
EB
P
M
7
0
V
P
H
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
100
200
300
400
500
600
AM
1
9
1
5
V
P
H
*100
*150
2
O
R
M
O
R
E
L
A
N
E
S
&
1
L
A
N
E
1
L
A
N
E
&
1
L
A
N
E
2
O
R
M
O
R
E
L
A
N
E
S
&
2
O
R
M
O
R
E
L
A
N
E
S
PM
2
1
1
5
V
P
H
EB
A
M
4
5
V
P
H
EB
P
M
7
0
V
P
H
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
100
200
300
400
500
600
AM
1
9
1
5
V
P
H
*100
*150
2
O
R
M
O
R
E
L
A
N
E
S
&
1
L
A
N
E
1
L
A
N
E
&
1
L
A
N
E
2
O
R
M
O
R
E
L
A
N
E
S
&
2
O
R
M
O
R
E
L
A
N
E
S
PM
2
1
1
5
V
P
H
EB
A
M
4
5
V
P
H
EB
P
M
7
0
V
P
H
23
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
100
200
300
400
500
600
*100
*150
2
O
R
M
O
R
E
L
A
N
E
S
&
1
L
A
N
E
1
L
A
N
E
&
1
L
A
N
E
2
O
R
M
O
R
E
L
A
N
E
S
&
2
O
R
M
O
R
E
L
A
N
E
S
PM
1
3
8
0
V
P
H
NB
A
M
5
0
V
P
H
NB
P
M
9
0
V
P
H
SB
A
M
9
5
V
P
H
SB
P
M
6
5
V
P
H
AM
1
1
0
0
V
P
H
MINOR STREET APPROACH - VPH
MA
J
O
R
S
T
R
E
E
T
-
T
O
T
A
L
O
F
B
O
T
H
A
P
P
R
O
A
C
H
-
VE
H
I
C
L
E
S
P
E
R
H
O
U
R
(
V
P
H
)
*N
o
t
e
:
1
5
0
v
p
h
a
p
p
l
i
e
s
a
s
t
h
e
l
o
w
e
r
t
h
r
e
s
h
o
l
d
v
o
l
u
m
e
f
o
r
a
m
i
n
o
r-
s
t
r
e
e
t
ap
p
r
o
a
c
h
w
i
t
h
t
w
o
o
r
m
o
r
e
l
a
n
e
s
a
n
d
1
0
0
v
p
h
a
p
p
l
i
e
s
a
s
t
h
e
l
o
w
e
r
th
r
e
s
h
o
l
d
v
o
l
u
m
e
f
o
r
a
m
i
n
o
r
-
s
t
r
e
e
t
a
p
p
r
o
a
c
h
w
i
t
h
o
n
e
l
a
n
e
.
LO
N
G
R
A
N
G
E
(
2
0
4
5
)
T
O
T
A
L
P
E
A
K
H
O
U
R
W
A
R
R
A
N
T
A
T
S
U
N
I
G
A
/
L
I
N
D
E
N
M
E
I
E
R
MU
T
C
D
,
2
0
0
3
E
D
I
T
I
O
N
,
P
A
G
E
4
C
-
7
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
100
200
300
400
500
600
*100
*150
2
O
R
M
O
R
E
L
A
N
E
S
&
1
L
A
N
E
1
L
A
N
E
&
1
L
A
N
E
2
O
R
M
O
R
E
L
A
N
E
S
&
2
O
R
M
O
R
E
L
A
N
E
S
PM
1
3
8
0
V
P
H
NB
A
M
5
0
V
P
H
NB
P
M
9
0
V
P
H
SB
A
M
9
5
V
P
H
SB
P
M
6
5
V
P
H
AM
1
1
0
0
V
P
H
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
100
200
300
400
500
600
*100
*150
2
O
R
M
O
R
E
L
A
N
E
S
&
1
L
A
N
E
1
L
A
N
E
&
1
L
A
N
E
2
O
R
M
O
R
E
L
A
N
E
S
&
2
O
R
M
O
R
E
L
A
N
E
S
PM
1
3
8
0
V
P
H
NB
A
M
5
0
V
P
H
NB
P
M
9
0
V
P
H
SB
A
M
9
5
V
P
H
SB
P
M
6
5
V
P
H
AM
1
1
0
0
V
P
H
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
100
200
300
400
500
600
*100
*150
2
O
R
M
O
R
E
L
A
N
E
S
&
1
L
A
N
E
1
L
A
N
E
&
1
L
A
N
E
2
O
R
M
O
R
E
L
A
N
E
S
&
2
O
R
M
O
R
E
L
A
N
E
S
PM
1
3
8
0
V
P
H
NB
A
M
5
0
V
P
H
NB
P
M
9
0
V
P
H
SB
A
M
9
5
V
P
H
SB
P
M
6
5
V
P
H
AM
1
1
0
0
V
P
H
24
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
100
200
300
400
500
600
*100
*150
2
O
R
M
O
R
E
L
A
N
E
S
&
1
L
A
N
E
1
L
A
N
E
&
1
L
A
N
E
2
O
R
M
O
R
E
L
A
N
E
S
&
2
O
R
M
O
R
E
L
A
N
E
S
PM
1
3
7
0
V
P
H
NB
A
M
8
5
V
P
H
NB
P
M
2
3
0
V
P
H
SB
A
M
9
5
V
P
H
SB
P
M
1
2
5
V
P
H
AM
1
1
4
5
V
P
H
MINOR STREET APPROACH - VPH
MA
J
O
R
S
T
R
E
E
T
-
T
O
T
A
L
O
F
B
O
T
H
A
P
P
R
O
A
C
H
-
VE
H
I
C
L
E
S
P
E
R
H
O
U
R
(
V
P
H
)
*N
o
t
e
:
1
5
0
v
p
h
a
p
p
l
i
e
s
a
s
t
h
e
l
o
w
e
r
t
h
r
e
s
h
o
l
d
v
o
l
u
m
e
f
o
r
a
m
i
n
o
r-
s
t
r
e
e
t
ap
p
r
o
a
c
h
w
i
t
h
t
w
o
o
r
m
o
r
e
l
a
n
e
s
a
n
d
1
0
0
v
p
h
a
p
p
l
i
e
s
a
s
t
h
e
l
o
w
e
r
th
r
e
s
h
o
l
d
v
o
l
u
m
e
f
o
r
a
m
i
n
o
r
-
s
t
r
e
e
t
a
p
p
r
o
a
c
h
w
i
t
h
o
n
e
l
a
n
e
.
LO
N
G
R
A
N
G
E
(
2
0
4
5
)
T
O
T
A
L
P
E
A
K
H
O
U
R
W
A
R
R
A
N
T
A
T
S
U
N
I
G
A
/
R
E
D
W
O
O
D
MU
T
C
D
,
2
0
0
3
E
D
I
T
I
O
N
,
P
A
G
E
4
C
-
7
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
100
200
300
400
500
600
*100
*150
2
O
R
M
O
R
E
L
A
N
E
S
&
1
L
A
N
E
1
L
A
N
E
&
1
L
A
N
E
2
O
R
M
O
R
E
L
A
N
E
S
&
2
O
R
M
O
R
E
L
A
N
E
S
PM
1
3
7
0
V
P
H
NB
A
M
8
5
V
P
H
NB
P
M
2
3
0
V
P
H
SB
A
M
9
5
V
P
H
SB
P
M
1
2
5
V
P
H
AM
1
1
4
5
V
P
H
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
100
200
300
400
500
600
*100
*150
2
O
R
M
O
R
E
L
A
N
E
S
&
1
L
A
N
E
1
L
A
N
E
&
1
L
A
N
E
2
O
R
M
O
R
E
L
A
N
E
S
&
2
O
R
M
O
R
E
L
A
N
E
S
PM
1
3
7
0
V
P
H
NB
A
M
8
5
V
P
H
NB
P
M
2
3
0
V
P
H
SB
A
M
9
5
V
P
H
SB
P
M
1
2
5
V
P
H
AM
1
1
4
5
V
P
H
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
100
200
300
400
500
600
*100
*150
2
O
R
M
O
R
E
L
A
N
E
S
&
1
L
A
N
E
1
L
A
N
E
&
1
L
A
N
E
2
O
R
M
O
R
E
L
A
N
E
S
&
2
O
R
M
O
R
E
L
A
N
E
S
PM
1
3
7
0
V
P
H
NB
A
M
8
5
V
P
H
NB
P
M
2
3
0
V
P
H
SB
A
M
9
5
V
P
H
SB
P
M
1
2
5
V
P
H
AM
1
1
4
5
V
P
H
25
APPENDIX E
26
HCM 6th TWSC
1: Lemay & Conifer Short Background AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 2.5
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 32 98 104 314 592 66
Future Vol, veh/h 32 98 104 314 592 66
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 250 - - 250
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 22222
Mvmt Flow 36 109 116 349 658 73
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1239 658 731 0 - 0
Stage 1 658 -----
Stage 2 581 -----
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 194 464 873 - - -
Stage 1 515 -----
Stage 2 559 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 168 464 873 - - -
Mov Cap-2 Maneuver 302 -----
Stage 1 447 -----
Stage 2 559 -----
Approach EB NB SB
HCM Control Delay, s 15.9 2.4 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBTEBLn1EBLn2 SBT SBR
Capacity (veh/h)873 - 302 464 - -
HCM Lane V/C Ratio 0.132 - 0.118 0.235 - -
HCM Control Delay (s) 9.8 - 18.5 15.1 - -
HCM Lane LOS A - C C - -
HCM 95th %tile Q(veh) 0.5 - 0.4 0.9 - -
27
HCM 6th TWSC
1: Lemay & Conifer Short Background PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 2.8
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 57 119 157 781 407 57
Future Vol, veh/h 57 119 157 781 407 57
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 250 - - 250
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 60 125 165 822 428 60
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1580 428 488 0 - 0
Stage 1 428 -----
Stage 2 1152 -----
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 120 627 1075 - - -
Stage 1 657 -----
Stage 2 301 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 102 627 1075 - - -
Mov Cap-2 Maneuver 219 -----
Stage 1 556 -----
Stage 2 301 -----
Approach EB NB SB
HCM Control Delay, s 17.2 1.5 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBTEBLn1EBLn2 SBT SBR
Capacity (veh/h)1075 - 219 627 - -
HCM Lane V/C Ratio 0.154 - 0.274 0.2 - -
HCM Control Delay (s) 9 - 27.5 12.2 - -
HCM Lane LOS A - D B - -
HCM 95th %tile Q(veh) 0.5 - 1.1 0.7 - -
28
HCM 6th TWSC
2: Lemay & Site Access Short Background AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 11 0 418 679 3
Future Vol, veh/h 0 11 0 418 679 3
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 0 13 0 492 799 4
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 801 - 0 - 0
Stage 1 ------
Stage 2 ------
Critical Hdwy - 6.23 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.319 ----
Pot Cap-1 Maneuver 0 384 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 384 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB NB SB
HCM Control Delay, s 14.7 0 0
HCM LOS B
Minor Lane/Major Mvmt NBTEBLn1 SBT SBR
Capacity (veh/h)- 384 - -
HCM Lane V/C Ratio - 0.034 - -
HCM Control Delay (s) - 14.7 - -
HCM Lane LOS - B - -
HCM 95th %tile Q(veh) - 0.1 - -
29
HCM 6th TWSC
2: Lemay & Site Access Short Background PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 8 0 938 518 6
Future Vol, veh/h 0 8 0 938 518 6
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 0 9 0 1104 609 7
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 613 - 0 - 0
Stage 1 ------
Stage 2 ------
Critical Hdwy - 6.23 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.319 ----
Pot Cap-1 Maneuver 0 492 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 492 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB NB SB
HCM Control Delay, s 12.5 0 0
HCM LOS B
Minor Lane/Major Mvmt NBTEBLn1 SBT SBR
Capacity (veh/h)- 492 - -
HCM Lane V/C Ratio - 0.019 - -
HCM Control Delay (s) - 12.5 - -
HCM Lane LOS - B - -
HCM 95th %tile Q(veh) - 0.1 - -
30
HCM 6th Signalized Intersection Summary
3: Lemay & Suniga Short Background AM
Synchro 11 Light Report
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 29 180 115 389 668 22
Future Volume (veh/h) 29 180 115 389 668 22
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 33 6 131 442 759 17
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, %222222
Cap, veh/h 64 57 658 3044 2650 1182
Arrive On Green 0.04 0.04 0.06 0.86 0.75 0.75
Sat Flow, veh/h 1781 1585 1781 3647 3647 1585
Grp Volume(v), veh/h 33 6 131 442 759 17
Grp Sat Flow(s),veh/h/ln 1781 1585 1781 1777 1777 1585
Q Serve(g_s), s 1.5 0.3 1.1 1.7 5.8 0.2
Cycle Q Clear(g_c), s 1.5 0.3 1.1 1.7 5.8 0.2
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 64 57 658 3044 2650 1182
V/C Ratio(X) 0.52 0.11 0.20 0.15 0.29 0.01
Avail Cap(c_a), veh/h 630 560 887 3044 2650 1182
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 39.5 39.0 1.8 1.0 3.4 2.7
Incr Delay (d2), s/veh 6.4 0.8 0.1 0.1 0.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.8 0.3 0.2 0.2 1.6 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 46.0 39.8 1.9 1.1 3.7 2.8
LnGrp LOS D D AAAA
Approach Vol, veh/h 39 573 776
Approach Delay, s/veh 45.0 1.3 3.7
Approach LOS D A A
Timer - Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc), s 76.0 7.5 9.3 66.7
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 71.5 29.5 15.5 51.5
Max Q Clear Time (g_c+I1), s 3.7 3.5 3.1 7.8
Green Ext Time (p_c), s 3.4 0.1 0.2 6.4
Intersection Summary
HCM 6th Ctrl Delay 3.9
HCM 6th LOS A
31
Timing Report, Sorted By Phase
3: Lemay & Suniga Short Background AM
Synchro 11 Light Report
Phase Number 2456
Movement NBTL EBL NBL SBT
Lead/Lag Lead Lag
Lead-Lag Optimize Yes Yes
Recall Mode Max None None Max
Maximum Split (s)76 34 20 56
Maximum Split (%) 69.1% 30.9% 18.2% 50.9%
Minimum Split (s)22.5 22.5 9.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5
All-Red Time (s)1111
Minimum Initial (s)5555
Vehicle Extension (s)3333
Minimum Gap (s)3333
Time Before Reduce (s)0000
Time To Reduce (s)0000
Walk Time (s)7 7 7
Flash Dont Walk (s)11 11 11
Dual Entry Yes Yes No Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s)0 76 0 20
End Time (s)76 0 20 76
Yield/Force Off (s)71.5 105.5 15.5 71.5
Yield/Force Off 170(s) 60.5 94.5 15.5 60.5
Local Start Time (s)90 56 90 0
Local Yield (s)51.5 85.5 105.5 51.5
Local Yield 170(s)40.5 74.5 105.5 40.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Uncoordinated
Natural Cycle 55
Splits and Phases: 3: Lemay & Suniga
32
Queues
3: Lemay & Suniga Short Background AM
Synchro 11 Light Report
Lane Group EBL EBR NBL NBT SBT SBR
Lane Group Flow (vph) 33 205 131 442 759 25
v/c Ratio 0.21 0.63 0.23 0.15 0.31 0.02
Control Delay 40.3 15.0 2.9 2.1 6.5 2.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 40.3 15.0 2.9 2.1 6.5 2.5
Queue Length 50th (ft) 17 0 10 18 75 0
Queue Length 95th (ft) 44 58 26 38 127 8
Internal Link Dist (ft) 605 305 340
Turn Bay Length (ft) 250 250
Base Capacity (vph) 591 665 687 2866 2411 1086
Starvation Cap Reductn 000000
Spillback Cap Reductn 000000
Storage Cap Reductn 000000
Reduced v/c Ratio 0.06 0.31 0.19 0.15 0.31 0.02
Intersection Summary
33
HCM 6th Signalized Intersection Summary
3: Lemay & Suniga Short Background PM
Synchro 11 Light Report
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 34 150 220 904 498 28
Future Volume (veh/h) 34 150 220 904 498 28
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 35 5 229 942 519 22
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, %222222
Cap, veh/h 61 55 802 3090 2730 1218
Arrive On Green 0.03 0.03 0.05 0.87 0.77 0.77
Sat Flow, veh/h 1781 1585 1781 3647 3647 1585
Grp Volume(v), veh/h 35 5 229 942 519 22
Grp Sat Flow(s),veh/h/ln 1781 1585 1781 1777 1777 1585
Q Serve(g_s), s 1.8 0.3 2.2 4.4 3.7 0.3
Cycle Q Clear(g_c), s 1.8 0.3 2.2 4.4 3.7 0.3
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 61 55 802 3090 2730 1218
V/C Ratio(X) 0.57 0.09 0.29 0.30 0.19 0.02
Avail Cap(c_a), veh/h 561 499 1267 3090 2730 1218
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 44.6 43.8 1.6 1.1 2.9 2.6
Incr Delay (d2), s/veh 8.0 0.7 0.2 0.3 0.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.9 0.0 0.3 0.4 1.0 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 52.6 44.5 1.8 1.3 3.1 2.6
LnGrp LOS D D AAAA
Approach Vol, veh/h 40 1171 541
Approach Delay, s/veh 51.6 1.4 3.1
Approach LOS D A A
Timer - Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc), s 86.0 7.7 9.5 76.5
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 81.5 29.5 29.5 47.5
Max Q Clear Time (g_c+I1), s 6.4 3.8 4.2 5.7
Green Ext Time (p_c), s 8.8 0.1 0.7 4.0
Intersection Summary
HCM 6th Ctrl Delay 3.1
HCM 6th LOS A
34
Timing Report, Sorted By Phase
3: Lemay & Suniga Short Background PM
Synchro 11 Light Report
Phase Number 2456
Movement NBTL EBL NBL SBT
Lead/Lag Lead Lag
Lead-Lag Optimize Yes Yes
Recall Mode Max None None Max
Maximum Split (s)86 34 34 52
Maximum Split (%) 71.7% 28.3% 28.3% 43.3%
Minimum Split (s)22.5 22.5 9.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5
All-Red Time (s)1111
Minimum Initial (s)5555
Vehicle Extension (s)3333
Minimum Gap (s)3333
Time Before Reduce (s)0000
Time To Reduce (s)0000
Walk Time (s)7 7 7
Flash Dont Walk (s)11 11 11
Dual Entry Yes Yes No Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s)0 86 0 34
End Time (s)86 0 34 86
Yield/Force Off (s)81.5 115.5 29.5 81.5
Yield/Force Off 170(s) 70.5 104.5 29.5 70.5
Local Start Time (s)86 52 86 0
Local Yield (s)47.5 81.5 115.5 47.5
Local Yield 170(s)36.5 70.5 115.5 36.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Uncoordinated
Natural Cycle 55
Splits and Phases: 3: Lemay & Suniga
35
Queues
3: Lemay & Suniga Short Background PM
Synchro 11 Light Report
Lane Group EBL EBR NBL NBT SBT SBR
Lane Group Flow (vph) 35 156 229 942 519 29
v/c Ratio 0.25 0.58 0.31 0.32 0.21 0.03
Control Delay 46.6 16.3 2.9 2.4 5.7 2.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 46.6 16.3 2.9 2.4 5.7 2.2
Queue Length 50th (ft) 21 0 19 48 50 0
Queue Length 95th (ft) 52 59 42 87 88 9
Internal Link Dist (ft) 605 305 360
Turn Bay Length (ft) 250 250
Base Capacity (vph) 531 584 951 2934 2482 1118
Starvation Cap Reductn 000000
Spillback Cap Reductn 000000
Storage Cap Reductn 000000
Reduced v/c Ratio 0.07 0.27 0.24 0.32 0.21 0.03
Intersection Summary
36
HCM 6th TWSC
4: Lindenmeier & Suniga Short Background AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 1.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 183 14 12 112 13 15 3 13 13 9 9
Future Vol, veh/h 4 183 14 12 112 13 15 3 13 13 9 9
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 86 86 86 86 86 86 86 86 86 86 86 86
Heavy Vehicles, % 2 22222222222
Mvmt Flow 5 213 16 14 130 15 17 3 15 15 10 10
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 145 0 0 229 0 0 329 404 115 284 405 73
Stage 1 ------231231-166166-
Stage 2 ------98173-118239-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 1435 - - 1336 - - 600 534 916 646 533 974
Stage 1 ------751712-820760-
Stage 2 ------898755-874706-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1435 - - 1336 - - 578 527 916 625 526 974
Mov Cap-2 Maneuver ------578527-625526-
Stage 1 ------749710-818752-
Stage 2 ------867747-852704-
Approach EB WB NB SB
HCM Control Delay, s 0.1 0.7 10.6 10.8
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)676 1435 - - 1336 - - 657
HCM Lane V/C Ratio 0.053 0.003 - - 0.01 - - 0.055
HCM Control Delay (s) 10.6 7.5 - - 7.7 - - 10.8
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.2 0 - - 0 - - 0.2
37
HCM 6th TWSC
4: Lindenmeier & Suniga Short Background PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 2.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 9 157 16 21 212 15 35 7 17 10 6 6
Future Vol, veh/h 9 157 16 21 212 15 35 7 17 10 6 6
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 22222222222
Mvmt Flow 10 178 18 24 241 17 40 8 19 11 7 7
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 258 0 0 196 0 0 379 513 98 411 514 129
Stage 1 ------207207-298298-
Stage 2 ------172306-113216-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 1304 - - 1374 - - 553 463 939 525 463 897
Stage 1 ------776729-686666-
Stage 2 ------813660-880723-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1304 - - 1374 - - 532 451 939 498 451 897
Mov Cap-2 Maneuver ------532451-498451-
Stage 1 ------770723-681655-
Stage 2 ------784649-846717-
Approach EB WB NB SB
HCM Control Delay, s 0.4 0.6 11.8 11.9
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)593 1304 - - 1374 - - 549
HCM Lane V/C Ratio 0.113 0.008 - - 0.017 - - 0.046
HCM Control Delay (s) 11.8 7.8 - - 7.7 - - 11.9
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.4 0 - - 0.1 - - 0.1
38
HCM 6th TWSC
5: Redwood & Suniga Short Background AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 5.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 115 11 52 135 40 4 25 27 36 77 20
Future Vol, veh/h 7 115 11 52 135 40 4 25 27 36 77 20
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 8 135 13 61 159 47 5 29 32 42 91 24
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 206 0 0 148 0 0 405 486 74 403 469 103
Stage 1 ------158158-305305-
Stage 2 ------247328-98164-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 1363 - - 1431 - - 530 480 973 532 491 932
Stage 1 ------828766-680661-
Stage 2 ------735646-898761-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1363 - - 1431 - - 424 456 973 471 467 932
Mov Cap-2 Maneuver ------424456-471467-
Stage 1 ------823761-676633-
Stage 2 ------588618-830756-
Approach EB WB NB SB
HCM Control Delay, s 0.4 1.7 11.6 15.3
HCM LOS B C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)609 1363 - - 1431 - - 506
HCM Lane V/C Ratio 0.108 0.006 - - 0.043 - - 0.309
HCM Control Delay (s) 11.6 7.7 - - 7.6 - - 15.3
HCM Lane LOS B A - - A - - C
HCM 95th %tile Q(veh) 0.4 0 - - 0.1 - - 1.3
39
HCM 6th TWSC
5: Redwood & Suniga Short Background PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 6.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 26 163 14 50 171 32 11 73 52 42 62 12
Future Vol, veh/h 26 163 14 50 171 32 11 73 52 42 62 12
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 2 22222222222
Mvmt Flow 29 179 15 55 188 35 12 80 57 46 68 13
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 223 0 0 194 0 0 483 578 97 504 568 112
Stage 1 ------245245-316316-
Stage 2 ------238333-188252-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 1343 - - 1377 - - 467 425 940 451 431 920
Stage 1 ------737702-670654-
Stage 2 ------744642-796697-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1343 - - 1377 - - 383 399 940 342 405 920
Mov Cap-2 Maneuver ------383399-342405-
Stage 1 ------721687-655628-
Stage 2 ------628616-646682-
Approach EB WB NB SB
HCM Control Delay, s 1 1.5 15 18.1
HCM LOS C C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)509 1343 - - 1377 - - 401
HCM Lane V/C Ratio 0.294 0.021 - - 0.04 - - 0.318
HCM Control Delay (s) 15 7.7 - - 7.7 - - 18.1
HCM Lane LOS C A - - A - - C
HCM 95th %tile Q(veh) 1.2 0.1 - - 0.1 - - 1.3
40
APPENDIX F
41
HCM 6th TWSC
1: Lemay & Conifer Long Background AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 4.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 45 140 250 510 1060 85
Future Vol, veh/h 45 140 250 510 1060 85
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 250 - - 250
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 47 147 263 537 1116 89
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1911 558 1205 0 - 0
Stage 1 1116 -----
Stage 2 795 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 60 473 575 - - -
Stage 1 275 -----
Stage 2 405 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver ~ 33 473 575 - - -
Mov Cap-2 Maneuver 111 -----
Stage 1 149 -----
Stage 2 405 -----
Approach EB NB SB
HCM Control Delay, s 26.6 5.4 0
HCM LOS D
Minor Lane/Major Mvmt NBL NBTEBLn1EBLn2 SBT SBR
Capacity (veh/h)575 - 111 473 - -
HCM Lane V/C Ratio 0.458 - 0.427 0.312 - -
HCM Control Delay (s) 16.4 - 59.7 16 - -
HCM Lane LOS C - F C - -
HCM 95th %tile Q(veh) 2.4 - 1.8 1.3 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
42
HCM 6th TWSC
1: Lemay & Conifer Long Background PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 4.9
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 70 280 275 1015 745 70
Future Vol, veh/h 70 280 275 1015 745 70
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 250 - - 250
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 74 295 289 1068 784 74
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1896 392 858 0 - 0
Stage 1 784 -----
Stage 2 1112 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver ~ 61 607 779 - - -
Stage 1 410 -----
Stage 2 276 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver ~ 38 607 779 - - -
Mov Cap-2 Maneuver 139 -----
Stage 1 258 -----
Stage 2 276 -----
Approach EB NB SB
HCM Control Delay, s 24.5 2.6 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBTEBLn1EBLn2 SBT SBR
Capacity (veh/h)779 - 139 607 - -
HCM Lane V/C Ratio 0.372 - 0.53 0.486 - -
HCM Control Delay (s) 12.3 - 56.9 16.4 - -
HCM Lane LOS B - F C - -
HCM 95th %tile Q(veh) 1.7 - 2.6 2.7 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
43
HCM 6th TWSC
2: Lemay & Site Access Long Background AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 10 0 760 1195 5
Future Vol, veh/h 0 10 0 760 1195 5
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 0 11 0 800 1258 5
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 632 - 0 - 0
Stage 1 ------
Stage 2 ------
Critical Hdwy - 6.94 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.32 ----
Pot Cap-1 Maneuver 0 423 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 423 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB NB SB
HCM Control Delay, s 13.7 0 0
HCM LOS B
Minor Lane/Major Mvmt NBTEBLn1 SBT SBR
Capacity (veh/h)- 423 - -
HCM Lane V/C Ratio - 0.025 - -
HCM Control Delay (s) - 13.7 - -
HCM Lane LOS - B - -
HCM 95th %tile Q(veh) - 0.1 - -
44
HCM 6th TWSC
2: Lemay & Site Access Long Background PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 10 0 1290 1020 5
Future Vol, veh/h 0 10 0 1290 1020 5
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 0 11 0 1358 1074 5
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 540 - 0 - 0
Stage 1 ------
Stage 2 ------
Critical Hdwy - 6.94 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.32 ----
Pot Cap-1 Maneuver 0 486 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 486 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB NB SB
HCM Control Delay, s 12.6 0 0
HCM LOS B
Minor Lane/Major Mvmt NBTEBLn1 SBT SBR
Capacity (veh/h)- 486 - -
HCM Lane V/C Ratio - 0.022 - -
HCM Control Delay (s) - 12.6 - -
HCM Lane LOS - B - -
HCM 95th %tile Q(veh) - 0.1 - -
45
HCM 6th Signalized Intersection Summary
3: Lemay & Suniga Long Background AM
Synchro 11 Light Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 45 285 175 175 305 150 170 565 40 105 995 105
Future Volume (veh/h) 45 285 175 175 305 150 170 565 40 105 995 105
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 47 300 7 184 321 5 179 595 5 111 1047 6
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, %222222222222
Cap, veh/h 269 424 189 311 619 276 365 1881 839 523 1811 808
Arrive On Green 0.05 0.12 0.12 0.11 0.17 0.17 0.07 0.53 0.53 0.05 0.51 0.51
Sat Flow, veh/h 1781 3554 1585 1781 3554 1585 1781 3554 1585 1781 3554 1585
Grp Volume(v), veh/h 47 300 7 184 321 5 179 595 5 111 1047 6
Grp Sat Flow(s),veh/h/ln 1781 1777 1585 1781 1777 1585 1781 1777 1585 1781 1777 1585
Q Serve(g_s), s 2.1 7.6 0.4 8.1 7.7 0.2 4.4 8.8 0.1 2.7 19.1 0.2
Cycle Q Clear(g_c), s 2.1 7.6 0.4 8.1 7.7 0.2 4.4 8.8 0.1 2.7 19.1 0.2
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 269 424 189 311 619 276 365 1881 839 523 1811 808
V/C Ratio(X) 0.17 0.71 0.04 0.59 0.52 0.02 0.49 0.32 0.01 0.21 0.58 0.01
Avail Cap(c_a), veh/h 508 893 398 356 703 314 479 1881 839 557 1811 808
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 32.9 39.6 36.4 30.0 35.1 32.0 12.1 12.4 10.4 9.9 15.9 11.3
Incr Delay (d2), s/veh 0.3 2.2 0.1 2.0 0.7 0.0 1.0 0.4 0.0 0.2 1.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.9 3.4 0.1 3.6 3.3 0.1 1.7 3.5 0.0 1.0 7.7 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 33.2 41.8 36.5 32.0 35.7 32.0 13.1 12.9 10.4 10.1 17.3 11.3
LnGrp LOS CDDCDC BBBBBB
Approach Vol, veh/h 354 510 779 1164
Approach Delay, s/veh 40.5 34.4 12.9 16.6
Approach LOS D C B B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 9.2 54.0 14.6 15.7 11.1 52.2 9.5 20.8
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 6.5 49.5 12.5 23.5 12.5 43.5 17.5 18.5
Max Q Clear Time (g_c+I1), s 4.7 10.8 10.1 9.6 6.4 21.1 4.1 9.7
Green Ext Time (p_c), s 0.0 4.6 0.1 1.6 0.2 8.1 0.1 1.3
Intersection Summary
HCM 6th Ctrl Delay 21.8
HCM 6th LOS C
46
Timing Report, Sorted By Phase
3: Lemay & Suniga Long Background AM
Synchro 11 Light Report
Phase Number 12345678
Movement SBL NBTL WBL EBTL NBL SBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Max None None None Max None None
Maximum Split (s)11 54 17 28 17 48 22 23
Maximum Split (%) 10.0% 49.1% 15.5% 25.5% 15.5% 43.6% 20.0% 20.9%
Minimum Split (s)9.5 22.5 9.5 22.5 9.5 22.5 22.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)11111111
Minimum Initial (s)55555555
Vehicle Extension (s)33333333
Minimum Gap (s)33333333
Time Before Reduce (s)00000000
Time To Reduce (s)00000000
Walk Time (s)7 7 7 7 7
Flash Dont Walk (s)11 11 11 11 11
Dual Entry No Yes No Yes No Yes Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s)0 11 65 82 0 17 65 87
End Time (s)11 65 82 0 17 65 87 0
Yield/Force Off (s)6.5 60.5 77.5 105.5 12.5 60.5 82.5 105.5
Yield/Force Off 170(s) 6.5 49.5 77.5 94.5 12.5 49.5 71.5 94.5
Local Start Time (s)93 104 48 65 93 0 48 70
Local Yield (s)99.5 43.5 60.5 88.5 105.5 43.5 65.5 88.5
Local Yield 170(s)99.5 32.5 60.5 77.5 105.5 32.5 54.5 77.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Uncoordinated
Natural Cycle 90
Splits and Phases: 3: Lemay & Suniga
47
Queues
3: Lemay & Suniga Long Background AM
Synchro 11 Light Report
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 47 300 184 184 321 158 179 595 42 111 1047 111
v/c Ratio 0.17 0.59 0.48 0.57 0.39 0.31 0.58 0.34 0.05 0.24 0.64 0.13
Control Delay 26.0 45.0 10.1 34.1 35.6 4.3 18.0 16.6 0.1 11.2 24.2 0.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 26.0 45.0 10.1 34.1 35.6 4.3 18.0 16.6 0.1 11.2 24.2 0.3
Queue Length 50th (ft) 21 96 0 91 97 0 48 119 0 29 267 0
Queue Length 95th (ft) 48 140 59 149 143 32 94 175 0 59 386 0
Internal Link Dist (ft) 605 948 305 360
Turn Bay Length (ft) 250 250 250 250 250 250 250 250
Base Capacity (vph) 444 833 513 334 814 513 349 1755 860 458 1628 832
Starvation Cap Reductn 000000000000
Spillback Cap Reductn 000000000000
Storage Cap Reductn 000000000000
Reduced v/c Ratio 0.11 0.36 0.36 0.55 0.39 0.31 0.51 0.34 0.05 0.24 0.64 0.13
Intersection Summary
48
HCM 6th Signalized Intersection Summary
3: Lemay & Suniga Long Background PM
Synchro 11 Light Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 85 405 170 95 310 205 235 1000 170 160 770 100
Future Volume (veh/h) 85 405 170 95 310 205 235 1000 170 160 770 100
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 89 426 20 100 326 32 247 1053 79 168 811 5
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, %222222222222
Cap, veh/h 266 574 256 232 573 255 472 1842 822 355 1754 782
Arrive On Green 0.06 0.16 0.16 0.06 0.16 0.16 0.09 0.52 0.52 0.07 0.49 0.49
Sat Flow, veh/h 1781 3554 1585 1781 3554 1585 1781 3554 1585 1781 3554 1585
Grp Volume(v), veh/h 89 426 20 100 326 32 247 1053 79 168 811 5
Grp Sat Flow(s),veh/h/ln 1781 1777 1585 1781 1777 1585 1781 1777 1585 1781 1777 1585
Q Serve(g_s), s 3.9 10.9 1.0 4.4 8.1 1.7 6.3 19.4 2.4 4.4 14.3 0.2
Cycle Q Clear(g_c), s 3.9 10.9 1.0 4.4 8.1 1.7 6.3 19.4 2.4 4.4 14.3 0.2
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 266 574 256 232 573 255 472 1842 822 355 1754 782
V/C Ratio(X) 0.33 0.74 0.08 0.43 0.57 0.13 0.52 0.57 0.10 0.47 0.46 0.01
Avail Cap(c_a), veh/h 499 1061 473 279 688 307 725 1842 822 521 1754 782
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 30.6 38.1 34.0 31.2 37.0 34.3 11.1 15.7 11.7 12.4 15.9 12.3
Incr Delay (d2), s/veh 0.7 1.9 0.1 1.3 0.9 0.2 0.9 1.3 0.2 1.0 0.9 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.7 4.8 0.4 2.0 3.5 0.6 2.4 7.7 0.9 1.7 5.8 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 31.3 40.0 34.1 32.4 37.9 34.5 12.0 17.0 11.9 13.4 16.7 12.3
LnGrp LOS CDCCDC BBBBBB
Approach Vol, veh/h 535 458 1379 984
Approach Delay, s/veh 38.4 36.5 15.8 16.1
Approach LOS D D B B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 11.1 54.0 10.5 19.9 13.4 51.6 10.5 19.9
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 15.5 49.5 8.5 28.5 22.5 42.5 18.5 18.5
Max Q Clear Time (g_c+I1), s 6.4 21.4 6.4 12.9 8.3 16.3 5.9 10.1
Green Ext Time (p_c), s 0.3 9.3 0.0 2.5 0.6 6.3 0.1 1.4
Intersection Summary
HCM 6th Ctrl Delay 22.3
HCM 6th LOS C
49
Timing Report, Sorted By Phase
3: Lemay & Suniga Long Background PM
Synchro 11 Light Report
Phase Number 12345678
Movement SBL NBTL WBL EBTL NBL SBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Max None None None Max None None
Maximum Split (s)20 54 13 33 27 47 23 23
Maximum Split (%) 16.7% 45.0% 10.8% 27.5% 22.5% 39.2% 19.2% 19.2%
Minimum Split (s)9.5 22.5 9.5 22.5 9.5 22.5 22.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)11111111
Minimum Initial (s)55555555
Vehicle Extension (s)33333333
Minimum Gap (s)33333333
Time Before Reduce (s)00000000
Time To Reduce (s)00000000
Walk Time (s)7 7 7 7 7
Flash Dont Walk (s)11 11 11 11 11
Dual Entry No Yes No Yes No Yes Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s)0 20 74 87 0 27 74 97
End Time (s)20 74 87 0 27 74 97 0
Yield/Force Off (s)15.5 69.5 82.5 115.5 22.5 69.5 92.5 115.5
Yield/Force Off 170(s) 15.5 58.5 82.5 104.5 22.5 58.5 81.5 104.5
Local Start Time (s)93 113 47 60 93 0 47 70
Local Yield (s)108.5 42.5 55.5 88.5 115.5 42.5 65.5 88.5
Local Yield 170(s) 108.5 31.5 55.5 77.5 115.5 31.5 54.5 77.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Uncoordinated
Natural Cycle 90
Splits and Phases: 3: Lemay & Suniga
50
Queues
3: Lemay & Suniga Long Background PM
Synchro 11 Light Report
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 89 426 179 100 326 216 247 1053 179 168 811 105
v/c Ratio 0.29 0.67 0.41 0.42 0.48 0.45 0.59 0.63 0.21 0.54 0.51 0.13
Control Delay 29.9 45.8 8.6 33.3 42.2 8.8 16.0 24.2 3.6 17.1 23.7 0.4
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 29.9 45.8 8.6 33.3 42.2 8.8 16.0 24.2 3.6 17.1 23.7 0.4
Queue Length 50th (ft) 44 141 0 49 105 0 69 268 0 45 197 0
Queue Length 95th (ft) 87 204 58 96 165 66 129 421 42 89 323 0
Internal Link Dist (ft) 605 948 305 360
Turn Bay Length (ft) 250 250 250 250 250 250 250 250
Base Capacity (vph) 412 963 561 243 693 484 551 1673 843 400 1585 806
Starvation Cap Reductn 000000000000
Spillback Cap Reductn 000000000000
Storage Cap Reductn 000000000000
Reduced v/c Ratio 0.22 0.44 0.32 0.41 0.47 0.45 0.45 0.63 0.21 0.42 0.51 0.13
Intersection Summary
51
HCM 6th TWSC
4: Lindenmeier & Suniga Long Background AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 1.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 470 20 15 550 15 20 10 20 15 10 10
Future Vol, veh/h 10 470 20 15 550 15 20 10 20 15 10 10
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 22222222222
Mvmt Flow 11 495 21 16 579 16 21 11 21 16 11 11
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 595 0 0 516 0 0 855 1155 258 894 1157 298
Stage 1 ------528528-619619-
Stage 2 ------327627-275538-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 977 - - 1046 - - 252 196 741 236 195 698
Stage 1 ------502526-443478-
Stage 2 ------660474-708521-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 977 - - 1046 - - 233 191 741 215 190 698
Mov Cap-2 Maneuver ------233191-215190-
Stage 1 ------496520-438471-
Stage 2 ------626467-666515-
Approach EB WB NB SB
HCM Control Delay, s 0.2 0.2 19.4 21.4
HCM LOS C C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)303 977 - - 1046 - - 256
HCM Lane V/C Ratio 0.174 0.011 - - 0.015 - - 0.144
HCM Control Delay (s) 19.4 8.7 - - 8.5 - - 21.4
HCM Lane LOS C A - - A - - C
HCM 95th %tile Q(veh) 0.6 0 - - 0 - - 0.5
52
HCM 6th TWSC
4: Lindenmeier & Suniga Long Background PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 2.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 625 25 25 600 20 45 10 25 10 5 10
Future Vol, veh/h 10 625 25 25 600 20 45 10 25 10 5 10
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 22222222222
Mvmt Flow 11 658 26 26 632 21 47 11 26 11 5 11
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 653 0 0 684 0 0 1064 1398 342 1052 1401 327
Stage 1 ------693693-695695-
Stage 2 ------371705-357706-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 930 - - 905 - - 177 140 654 181 139 669
Stage 1 ------400443-399442-
Stage 2 ------622437-633437-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 930 - - 905 - - 164 134 654 158 133 669
Mov Cap-2 Maneuver ------164134-158133-
Stage 1 ------395438-394429-
Stage 2 ------587424-586432-
Approach EB WB NB SB
HCM Control Delay, s 0.1 0.4 33.8 24
HCM LOS D C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)207 930 - - 905 - - 216
HCM Lane V/C Ratio 0.407 0.011 - - 0.029 - - 0.122
HCM Control Delay (s) 33.8 8.9 - - 9.1 - - 24
HCM Lane LOS D A - - A - - C
HCM 95th %tile Q(veh) 1.8 0 - - 0.1 - - 0.4
53
HCM 6th TWSC
5: Redwood & Suniga Long Background AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 27.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 50 360 45 145 425 50 40 45 50 30 65 80
Future Vol, veh/h 50 360 45 145 425 50 40 45 50 30 65 80
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 22222222222
Mvmt Flow 53 379 47 153 447 53 42 47 53 32 68 84
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 500 0 0 426 0 0 1073 1315 213 1099 1312 250
Stage 1 ------509509-780780-
Stage 2 ------564806-319532-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 1060 - - 1130 - - 175 157 792 167 157 750
Stage 1 ------515536-354404-
Stage 2 ------478393-667524-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1060 - - 1130 - - 79 129 792 97 129 750
Mov Cap-2 Maneuver ------79129-97129-
Stage 1 ------489509-336349-
Stage 2 ------295340-536498-
Approach EB WB NB SB
HCM Control Delay, s 0.9 2 125.5 108.3
HCM LOS F F
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)147 1060 - - 1130 - - 190
HCM Lane V/C Ratio 0.967 0.05 - - 0.135 - - 0.97
HCM Control Delay (s) 125.5 8.6 - - 8.7 - - 108.3
HCM Lane LOS F A - - A - - F
HCM 95th %tile Q(veh) 7 0.2 - - 0.5 - - 8
54
HCM 6th TWSC
5: Redwood & Suniga Long Background PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 214.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 110 460 65 100 510 35 70 135 145 45 75 75
Future Vol, veh/h 110 460 65 100 510 35 70 135 145 45 75 75
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 ----200--200
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 22222222222
Mvmt Flow 116 484 68 105 537 37 74 142 153 47 79 79
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 574 0 0 552 0 0 1268 1534 276 1311 1550 287
Stage 1 ------750750-766766-
Stage 2 ------518784-545784-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 995 - - 1014 - - 125 ~ 115 721 116 113 710
Stage 1 ------369417-361410-
Stage 2 ------509402-490402-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 995 - - 1014 - - ~ 23 ~ 91 721 - 89 710
Mov Cap-2 Maneuver ------~ 23~ 91--89-
Stage 1 ------326368-319367-
Stage 2 ------318360-209355-
Approach EB WB NB SB
HCM Control Delay, s 1.6 1.4 $ 1110.9
HCM LOS F -
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1SBLn2
Capacity (veh/h)45 721 995 - - 1014 - - - 710
HCM Lane V/C Ratio 4.795 0.212 0.116 - - 0.104 - - - 0.111
HCM Control Delay (s) $ 1888.6 11.3 9.1 - - 9 - - - 10.7
HCM Lane LOS F B A - - A - - - B
HCM 95th %tile Q(veh) 24.6 0.8 0.4 - - 0.3 - - - 0.4
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
55
HCM 6th Signalized Intersection Summary
5: Redwood & Suniga Long Background AM
Synchro 11 Light Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 50 360 45 145 425 50 40 45 50 30 65 80
Future Volume (veh/h) 50 360 45 145 425 50 40 45 50 30 65 80
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 53 379 38 153 447 44 42 47 0 32 68 5
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, %222222222222
Cap, veh/h 537 835 83 610 1036 102 268 183 267 222 230 267
Arrive On Green 0.06 0.26 0.26 0.12 0.32 0.32 0.17 0.17 0.00 0.17 0.17 0.17
Sat Flow, veh/h 1781 3263 325 1781 3269 320 534 1087 1585 367 1365 1585
Grp Volume(v), veh/h 53 205 212 153 242 249 89 0 0 100 0 5
Grp Sat Flow(s),veh/h/ln 1781 1777 1812 1781 1777 1813 1621 0 1585 1732 0 1585
Q Serve(g_s), s 0.6 2.9 2.9 1.7 3.2 3.2 0.0 0.0 0.0 0.0 0.0 0.1
Cycle Q Clear(g_c), s 0.6 2.9 2.9 1.7 3.2 3.2 1.4 0.0 0.0 1.4 0.0 0.1
Prop In Lane 1.00 0.18 1.00 0.18 0.47 1.00 0.32 1.00
Lane Grp Cap(c), veh/h 537 454 463 610 563 574 452 0 267 452 0 267
V/C Ratio(X) 0.10 0.45 0.46 0.25 0.43 0.43 0.20 0.00 0.00 0.22 0.00 0.02
Avail Cap(c_a), veh/h 1182 2365 2412 1866 3084 3146 1905 0 1736 1999 0 1736
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 7.2 9.3 9.3 6.5 8.0 8.0 10.8 0.0 0.0 10.8 0.0 10.3
Incr Delay (d2), s/veh 0.1 0.7 0.7 0.2 0.5 0.5 0.2 0.0 0.0 0.2 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.8 0.9 0.4 0.8 0.9 0.4 0.0 0.0 0.5 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 7.3 10.0 10.0 6.7 8.5 8.5 11.0 0.0 0.0 11.1 0.0 10.3
LnGrp LOS AABAAABAABAB
Approach Vol, veh/h 470 644 89 105
Approach Delay, s/veh 9.7 8.1 11.0 11.0
Approach LOS AABB
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 8.1 12.1 9.5 6.3 13.9 9.5
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 24.5 39.5 32.5 12.5 51.5 32.5
Max Q Clear Time (g_c+I1), s 3.7 4.9 3.4 2.6 5.2 3.4
Green Ext Time (p_c), s 0.4 2.7 0.5 0.1 3.3 0.4
Intersection Summary
HCM 6th Ctrl Delay 9.1
HCM 6th LOS A
56
Timing Report, Sorted By Phase
5: Redwood & Suniga Long Background AM
Synchro 11 Light Report
Phase Number 124568
Movement WBL EBTL SBTL EBL WBTL NBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None None Min None None Min
Maximum Split (s)29 44 37 17 56 37
Maximum Split (%) 26.4% 40.0% 33.6% 15.5% 50.9% 33.6%
Minimum Split (s)9.5 22.5 22.5 9.5 22.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)111111
Minimum Initial (s)555555
Vehicle Extension (s)333333
Minimum Gap (s)333333
Time Before Reduce (s)000000
Time To Reduce (s)000000
Walk Time (s)7 7 7 7
Flash Dont Walk (s)11 11 11 11
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s)0 29 73 0 17 73
End Time (s)29 73 0 17 73 0
Yield/Force Off (s)24.5 68.5 105.5 12.5 68.5 105.5
Yield/Force Off 170(s) 24.5 57.5 105.5 12.5 57.5 105.5
Local Start Time (s)81 0 44 81 98 44
Local Yield (s)105.5 39.5 76.5 93.5 39.5 76.5
Local Yield 170(s) 105.5 28.5 76.5 93.5 28.5 76.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Uncoordinated
Natural Cycle 55
Splits and Phases: 5: Redwood & Suniga
57
Queues
5: Redwood & Suniga Long Background AM
Synchro 11 Light Report
Lane Group EBL EBT WBL WBT NBT NBR SBT SBR
Lane Group Flow (vph) 53 426 153 500 89 53 100 84
v/c Ratio 0.10 0.42 0.26 0.34 0.27 0.12 0.28 0.20
Control Delay 5.0 13.1 5.7 9.3 16.9 2.1 16.9 4.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 5.0 13.1 5.7 9.3 16.9 2.1 16.9 4.6
Queue Length 50th (ft) 4 38 13 22 16 0 19 0
Queue Length 95th (ft) 15 78 35 86 51 8 55 21
Internal Link Dist (ft) 321 567 322 290
Turn Bay Length (ft) 250 250 200 200
Base Capacity (vph) 805 3288 1206 3483 1249 1329 1346 1329
Starvation Cap Reductn 00000000
Spillback Cap Reductn 00000000
Storage Cap Reductn 00000000
Reduced v/c Ratio 0.07 0.13 0.13 0.14 0.07 0.04 0.07 0.06
Intersection Summary
58
HCM 6th Signalized Intersection Summary
5: Redwood & Suniga Long Background PM
Synchro 11 Light Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 110 460 65 100 510 35 70 135 145 45 75 75
Future Volume (veh/h) 110 460 65 100 510 35 70 135 145 45 75 75
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 116 484 59 105 537 32 74 142 30 47 79 19
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, %222222222222
Cap, veh/h 297 719 87 298 750 45 86 134 806 89 119 806
Arrive On Green 0.07 0.23 0.23 0.06 0.22 0.22 0.51 0.51 0.51 0.51 0.51 0.51
Sat Flow, veh/h 1781 3190 387 1781 3408 203 27 264 1585 28 233 1585
Grp Volume(v), veh/h 116 269 274 105 280 289 216 0 30 126 0 19
Grp Sat Flow(s),veh/h/ln 1781 1777 1801 1781 1777 1834 291 0 1585 261 0 1585
Q Serve(g_s), s 3.3 9.2 9.3 3.0 9.7 9.7 1.7 0.0 0.6 1.7 0.0 0.4
Cycle Q Clear(g_c), s 3.3 9.2 9.3 3.0 9.7 9.7 33.9 0.0 0.6 33.9 0.0 0.4
Prop In Lane 1.00 0.22 1.00 0.11 0.34 1.00 0.37 1.00
Lane Grp Cap(c), veh/h 297 401 406 298 391 404 221 0 806 207 0 806
V/C Ratio(X) 0.39 0.67 0.68 0.35 0.71 0.72 0.98 0.00 0.04 0.61 0.00 0.02
Avail Cap(c_a), veh/h 616 973 986 600 947 977 723 0 1297 688 0 1297
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 18.8 23.5 23.6 18.8 24.1 24.1 17.2 0.0 8.2 15.4 0.0 8.1
Incr Delay (d2), s/veh 0.8 2.0 2.0 0.7 2.4 2.4 23.4 0.0 0.0 2.9 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.3 3.8 3.9 1.2 4.1 4.2 3.0 0.0 0.2 1.0 0.0 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 19.6 25.5 25.5 19.5 26.5 26.5 40.6 0.0 8.2 18.2 0.0 8.1
LnGrp LOS B C C B C C D AABAA
Approach Vol, veh/h 659 674 246 145
Approach Delay, s/veh 24.5 25.4 36.7 16.9
Approach LOS C C D B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 8.8 19.9 40.0 9.2 19.5 40.0
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 15.5 36.5 54.5 16.5 35.5 54.5
Max Q Clear Time (g_c+I1), s 5.0 11.3 35.9 5.3 11.7 35.9
Green Ext Time (p_c), s 0.2 3.4 0.7 0.2 3.6 1.2
Intersection Summary
HCM 6th Ctrl Delay 25.9
HCM 6th LOS C
59
Timing Report, Sorted By Phase
5: Redwood & Suniga Long Background PM
Synchro 11 Light Report
Phase Number 124568
Movement WBL EBTL SBTL EBL WBTL NBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None None Min None None Min
Maximum Split (s)20 41 59 21 40 59
Maximum Split (%) 16.7% 34.2% 49.2% 17.5% 33.3% 49.2%
Minimum Split (s)9.5 22.5 22.5 9.5 22.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)111111
Minimum Initial (s)555555
Vehicle Extension (s)333333
Minimum Gap (s)333333
Time Before Reduce (s)000000
Time To Reduce (s)000000
Walk Time (s)7 7 7 7
Flash Dont Walk (s)11 11 11 11
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s)0 20 61 0 21 61
End Time (s)20 61 0 21 61 0
Yield/Force Off (s)15.5 56.5 115.5 16.5 56.5 115.5
Yield/Force Off 170(s) 15.5 45.5 115.5 16.5 45.5 115.5
Local Start Time (s)99 119 40 99 0 40
Local Yield (s)114.5 35.5 94.5 115.5 35.5 94.5
Local Yield 170(s) 114.5 24.5 94.5 115.5 24.5 94.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Uncoordinated
Natural Cycle 55
Splits and Phases: 5: Redwood & Suniga
60
Queues
5: Redwood & Suniga Long Background PM
Synchro 11 Light Report
Lane Group EBL EBT WBL WBT NBT NBR SBT SBR
Lane Group Flow (vph) 116 552 105 574 216 153 126 79
v/c Ratio 0.23 0.47 0.22 0.52 0.48 0.27 0.29 0.16
Control Delay 7.6 15.4 7.8 17.1 20.7 5.0 18.0 5.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 7.6 15.4 7.8 17.1 20.7 5.0 18.0 5.5
Queue Length 50th (ft) 14 64 13 71 53 0 29 0
Queue Length 95th (ft) 43 130 39 144 127 36 77 26
Internal Link Dist (ft) 321 567 322 290
Turn Bay Length (ft) 250 250 200 200
Base Capacity (vph) 780 2611 776 2578 1517 1520 1475 1516
Starvation Cap Reductn 00000000
Spillback Cap Reductn 00000000
Storage Cap Reductn 00000000
Reduced v/c Ratio 0.15 0.21 0.14 0.22 0.14 0.10 0.09 0.05
Intersection Summary
61
APPENDIX G
62
HCM 6th TWSC
1: Lemay & Conifer Short Total AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 2.6
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 32 98 104 318 593 66
Future Vol, veh/h 32 98 104 318 593 66
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 250 - - 250
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 22222
Mvmt Flow 36 109 116 353 659 73
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1244 659 732 0 - 0
Stage 1 659 -----
Stage 2 585 -----
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 192 464 873 - - -
Stage 1 515 -----
Stage 2 557 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 166 464 873 - - -
Mov Cap-2 Maneuver 301 -----
Stage 1 447 -----
Stage 2 557 -----
Approach EB NB SB
HCM Control Delay, s 16 2.4 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBTEBLn1EBLn2 SBT SBR
Capacity (veh/h)873 - 301 464 - -
HCM Lane V/C Ratio 0.132 - 0.118 0.235 - -
HCM Control Delay (s) 9.8 - 18.6 15.1 - -
HCM Lane LOS A - C C - -
HCM 95th %tile Q(veh) 0.5 - 0.4 0.9 - -
63
HCM 6th TWSC
1: Lemay & Conifer Short Total PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 2.8
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 57 119 157 784 411 57
Future Vol, veh/h 57 119 157 784 411 57
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 250 - - 250
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 60 125 165 825 433 60
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1588 433 493 0 - 0
Stage 1 433 -----
Stage 2 1155 -----
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 119 623 1071 - - -
Stage 1 654 -----
Stage 2 300 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 101 623 1071 - - -
Mov Cap-2 Maneuver 218 -----
Stage 1 553 -----
Stage 2 300 -----
Approach EB NB SB
HCM Control Delay, s 17.2 1.5 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBTEBLn1EBLn2 SBT SBR
Capacity (veh/h)1071 - 218 623 - -
HCM Lane V/C Ratio 0.154 - 0.275 0.201 - -
HCM Control Delay (s) 9 - 27.7 12.2 - -
HCM Lane LOS A - D B - -
HCM 95th %tile Q(veh) 0.5 - 1.1 0.7 - -
64
HCM 6th TWSC
2: Lemay & Site Access Short Total AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 33 0 422 679 4
Future Vol, veh/h 0 33 0 422 679 4
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 0 39 0 496 799 5
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 802 - 0 - 0
Stage 1 ------
Stage 2 ------
Critical Hdwy - 6.23 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.319 ----
Pot Cap-1 Maneuver 0 383 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 383 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB NB SB
HCM Control Delay, s 15.5 0 0
HCM LOS C
Minor Lane/Major Mvmt NBTEBLn1 SBT SBR
Capacity (veh/h)- 383 - -
HCM Lane V/C Ratio - 0.101 - -
HCM Control Delay (s) - 15.5 - -
HCM Lane LOS - C - -
HCM 95th %tile Q(veh) - 0.3 - -
65
HCM 6th TWSC
2: Lemay & Site Access Short Total PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 22 0 940 518 10
Future Vol, veh/h 0 22 0 940 518 10
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 0 26 0 1106 609 12
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 615 - 0 - 0
Stage 1 ------
Stage 2 ------
Critical Hdwy - 6.23 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.319 ----
Pot Cap-1 Maneuver 0 490 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 490 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB NB SB
HCM Control Delay, s 12.8 0 0
HCM LOS B
Minor Lane/Major Mvmt NBTEBLn1 SBT SBR
Capacity (veh/h)- 490 - -
HCM Lane V/C Ratio - 0.053 - -
HCM Control Delay (s) - 12.8 - -
HCM Lane LOS - B - -
HCM 95th %tile Q(veh) - 0.2 - -
66
HCM 6th Signalized Intersection Summary
3: Lemay & Suniga Short Total AM
Synchro 11 Light Report
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 33 189 125 389 690 22
Future Volume (veh/h) 33 189 125 389 690 22
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 38 16 142 442 784 17
Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88
Percent Heavy Veh, %222222
Cap, veh/h 76 68 640 3022 2628 1172
Arrive On Green 0.04 0.04 0.06 0.85 0.74 0.74
Sat Flow, veh/h 1781 1585 1781 3647 3647 1585
Grp Volume(v), veh/h 38 16 142 442 784 17
Grp Sat Flow(s),veh/h/ln 1781 1585 1781 1777 1777 1585
Q Serve(g_s), s 1.8 0.8 1.3 1.8 6.2 0.2
Cycle Q Clear(g_c), s 1.8 0.8 1.3 1.8 6.2 0.2
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 76 68 640 3022 2628 1172
V/C Ratio(X) 0.50 0.24 0.22 0.15 0.30 0.01
Avail Cap(c_a), veh/h 625 556 866 3022 2628 1172
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 39.4 38.9 2.0 1.1 3.7 2.9
Incr Delay (d2), s/veh 5.0 1.8 0.2 0.1 0.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.9 0.8 0.2 0.2 1.7 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 44.4 40.7 2.1 1.2 4.0 2.9
LnGrp LOS D D AAAA
Approach Vol, veh/h 54 584 801
Approach Delay, s/veh 43.3 1.4 3.9
Approach LOS D A A
Timer - Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc), s 76.0 8.1 9.3 66.7
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 71.5 29.5 15.5 51.5
Max Q Clear Time (g_c+I1), s 3.8 3.8 3.3 8.2
Green Ext Time (p_c), s 3.4 0.1 0.3 6.7
Intersection Summary
HCM 6th Ctrl Delay 4.4
HCM 6th LOS A
67
Timing Report, Sorted By Phase
3: Lemay & Suniga Short Total AM
Synchro 11 Light Report
Phase Number 2456
Movement NBTL EBL NBL SBT
Lead/Lag Lead Lag
Lead-Lag Optimize Yes Yes
Recall Mode Max None None Max
Maximum Split (s)76 34 20 56
Maximum Split (%) 69.1% 30.9% 18.2% 50.9%
Minimum Split (s)22.5 22.5 9.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5
All-Red Time (s)1111
Minimum Initial (s)5555
Vehicle Extension (s)3333
Minimum Gap (s)3333
Time Before Reduce (s)0000
Time To Reduce (s)0000
Walk Time (s)7 7 7
Flash Dont Walk (s)11 11 11
Dual Entry Yes Yes No Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s)0 76 0 20
End Time (s)76 0 20 76
Yield/Force Off (s)71.5 105.5 15.5 71.5
Yield/Force Off 170(s) 60.5 94.5 15.5 60.5
Local Start Time (s)90 56 90 0
Local Yield (s)51.5 85.5 105.5 51.5
Local Yield 170(s)40.5 74.5 105.5 40.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Uncoordinated
Natural Cycle 55
Splits and Phases: 3: Lemay & Suniga
68
Queues
3: Lemay & Suniga Short Total AM
Synchro 11 Light Report
Lane Group EBL EBR NBL NBT SBT SBR
Lane Group Flow (vph) 38 215 142 442 784 25
v/c Ratio 0.24 0.64 0.25 0.15 0.33 0.02
Control Delay 40.8 14.8 3.2 2.2 6.7 2.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 40.8 14.8 3.2 2.2 6.7 2.5
Queue Length 50th (ft) 20 0 11 18 80 0
Queue Length 95th (ft) 49 59 29 39 135 9
Internal Link Dist (ft) 605 305 340
Turn Bay Length (ft) 250 250
Base Capacity (vph) 590 671 674 2861 2399 1081
Starvation Cap Reductn 000000
Spillback Cap Reductn 000000
Storage Cap Reductn 000000
Reduced v/c Ratio 0.06 0.32 0.21 0.15 0.33 0.02
Intersection Summary
69
HCM 6th Signalized Intersection Summary
3: Lemay & Suniga Short Total PM
Synchro 11 Light Report
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (veh/h) 36 156 253 904 512 28
Future Volume (veh/h) 36 156 253 904 512 28
Initial Q (Qb), veh 000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 38 11 264 942 533 22
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96
Percent Heavy Veh, %222222
Cap, veh/h 68 61 792 3077 2704 1206
Arrive On Green 0.04 0.04 0.06 0.87 0.76 0.76
Sat Flow, veh/h 1781 1585 1781 3647 3647 1585
Grp Volume(v), veh/h 38 11 264 942 533 22
Grp Sat Flow(s),veh/h/ln 1781 1585 1781 1777 1777 1585
Q Serve(g_s), s 2.0 0.6 2.6 4.5 4.0 0.3
Cycle Q Clear(g_c), s 2.0 0.6 2.6 4.5 4.0 0.3
Prop In Lane 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 68 61 792 3077 2704 1206
V/C Ratio(X) 0.56 0.18 0.33 0.31 0.20 0.02
Avail Cap(c_a), veh/h 558 497 1248 3077 2704 1206
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 44.5 43.8 1.7 1.1 3.2 2.7
Incr Delay (d2), s/veh 6.9 1.4 0.2 0.3 0.2 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.0 0.0 0.4 0.5 1.1 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 51.3 45.2 1.9 1.4 3.3 2.8
LnGrp LOS D D AAAA
Approach Vol, veh/h 49 1206 555
Approach Delay, s/veh 50.0 1.5 3.3
Approach LOS D A A
Timer - Assigned Phs 2 4 5 6
Phs Duration (G+Y+Rc), s 86.0 8.1 9.9 76.1
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 81.5 29.5 29.5 47.5
Max Q Clear Time (g_c+I1), s 6.5 4.0 4.6 6.0
Green Ext Time (p_c), s 8.8 0.1 0.8 4.2
Intersection Summary
HCM 6th Ctrl Delay 3.4
HCM 6th LOS A
70
Timing Report, Sorted By Phase
3: Lemay & Suniga Short Total PM
Synchro 11 Light Report
Phase Number 2456
Movement NBTL EBL NBL SBT
Lead/Lag Lead Lag
Lead-Lag Optimize Yes Yes
Recall Mode Max None None Max
Maximum Split (s)86 34 34 52
Maximum Split (%) 71.7% 28.3% 28.3% 43.3%
Minimum Split (s)22.5 22.5 9.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5
All-Red Time (s)1111
Minimum Initial (s)5555
Vehicle Extension (s)3333
Minimum Gap (s)3333
Time Before Reduce (s)0000
Time To Reduce (s)0000
Walk Time (s)7 7 7
Flash Dont Walk (s)11 11 11
Dual Entry Yes Yes No Yes
Inhibit Max Yes Yes Yes Yes
Start Time (s)0 86 0 34
End Time (s)86 0 34 86
Yield/Force Off (s)81.5 115.5 29.5 81.5
Yield/Force Off 170(s) 70.5 104.5 29.5 70.5
Local Start Time (s)86 52 86 0
Local Yield (s)47.5 81.5 115.5 47.5
Local Yield 170(s)36.5 70.5 115.5 36.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Uncoordinated
Natural Cycle 55
Splits and Phases: 3: Lemay & Suniga
71
Queues
3: Lemay & Suniga Short Total PM
Synchro 11 Light Report
Lane Group EBL EBR NBL NBT SBT SBR
Lane Group Flow (vph) 38 163 264 942 533 29
v/c Ratio 0.27 0.59 0.36 0.32 0.22 0.03
Control Delay 47.0 16.2 3.3 2.4 6.0 2.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 47.0 16.2 3.3 2.4 6.0 2.3
Queue Length 50th (ft) 23 0 23 49 53 0
Queue Length 95th (ft) 54 60 50 87 93 10
Internal Link Dist (ft) 605 305 360
Turn Bay Length (ft) 250 250
Base Capacity (vph) 530 588 942 2931 2461 1109
Starvation Cap Reductn 000000
Spillback Cap Reductn 000000
Storage Cap Reductn 000000
Reduced v/c Ratio 0.07 0.28 0.28 0.32 0.22 0.03
Intersection Summary
72
HCM 6th TWSC
4: Lindenmeier & Suniga Short Total AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 3.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 15 183 14 12 112 23 15 6 13 26 17 44
Future Vol, veh/h 15 183 14 12 112 23 15 6 13 26 17 44
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 86 86 86 86 86 86 86 86 86 86 86 86
Heavy Vehicles, % 2 22222222222
Mvmt Flow 17 213 16 14 130 27 17 7 15 30 20 51
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 157 0 0 229 0 0 358 440 115 316 435 79
Stage 1 ------255255-172172-
Stage 2 ------103185-144263-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 1420 - - 1336 - - 573 510 916 613 513 965
Stage 1 ------727695-813755-
Stage 2 ------892746-844689-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1420 - - 1336 - - 517 499 916 586 502 965
Mov Cap-2 Maneuver ------517499-586502-
Stage 1 ------718687-803747-
Stage 2 ------814739-812681-
Approach EB WB NB SB
HCM Control Delay, s 0.5 0.6 11.2 11
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)616 1420 - - 1336 - - 703
HCM Lane V/C Ratio 0.064 0.012 - - 0.01 - - 0.144
HCM Control Delay (s) 11.2 7.6 - - 7.7 - - 11
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.2 0 - - 0 - - 0.5
73
HCM 6th TWSC
4: Lindenmeier & Suniga Short Total PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 3.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 46 157 16 21 212 48 35 16 17 18 11 28
Future Vol, veh/h 46 157 16 21 212 48 35 16 17 18 11 28
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 88 88 88 88 88 88 88 88 88 88 88 88
Heavy Vehicles, % 2 22222222222
Mvmt Flow 52 178 18 24 241 55 40 18 19 20 13 32
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 296 0 0 196 0 0 466 635 98 519 617 148
Stage 1 ------291291-317317-
Stage 2 ------175344-202300-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 1262 - - 1374 - - 480 394 939 440 404 872
Stage 1 ------693670-669653-
Stage 2 ------810635-781664-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1262 - - 1374 - - 431 372 939 396 381 872
Mov Cap-2 Maneuver ------431372-396381-
Stage 1 ------665643-642642-
Stage 2 ------752624-713637-
Approach EB WB NB SB
HCM Control Delay, s 1.7 0.6 14 12.6
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)478 1262 - - 1374 - - 536
HCM Lane V/C Ratio 0.162 0.041 - - 0.017 - - 0.121
HCM Control Delay (s) 14 8 - - 7.7 - - 12.6
HCM Lane LOS B A - - A - - B
HCM 95th %tile Q(veh) 0.6 0.1 - - 0.1 - - 0.4
74
HCM 6th TWSC
5: Redwood & Suniga Short Total AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 5.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 123 11 60 158 44 4 25 29 37 77 20
Future Vol, veh/h 7 123 11 60 158 44 4 25 29 37 77 20
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 85 85 85 85 85 85 85 85 85 85 85 85
Heavy Vehicles, % 2 22222222222
Mvmt Flow 8 145 13 71 186 52 5 29 34 44 91 24
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 238 0 0 158 0 0 449 548 79 457 528 119
Stage 1 ------168168-354354-
Stage 2 ------281380-103174-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 1326 - - 1419 - - 493 442 965 487 454 910
Stage 1 ------817758-636629-
Stage 2 ------702612-892754-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1326 - - 1419 - - 386 417 965 426 429 910
Mov Cap-2 Maneuver ------386417-426429-
Stage 1 ------812753-632598-
Stage 2 ------551581-822749-
Approach EB WB NB SB
HCM Control Delay, s 0.4 1.8 12.1 16.7
HCM LOS B C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)578 1326 - - 1419 - - 465
HCM Lane V/C Ratio 0.118 0.006 - - 0.05 - - 0.339
HCM Control Delay (s) 12.1 7.7 - - 7.7 - - 16.7
HCM Lane LOS B A - - A - - C
HCM 95th %tile Q(veh) 0.4 0 - - 0.2 - - 1.5
75
HCM 6th TWSC
5: Redwood & Suniga Short Total PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 26 188 14 55 186 34 11 73 60 46 62 12
Future Vol, veh/h 26 188 14 55 186 34 11 73 60 46 62 12
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 91 91 91 91 91 91 91 91 91 91 91 91
Heavy Vehicles, % 2 22222222222
Mvmt Flow 29 207 15 60 204 37 12 80 66 51 68 13
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 241 0 0 222 0 0 529 634 111 545 623 121
Stage 1 ------273273-343343-
Stage 2 ------256361-202280-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 1323 - - 1344 - - 433 395 921 421 401 908
Stage 1 ------710683-646636-
Stage 2 ------726624-781678-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1323 - - 1344 - - 349 369 921 310 375 908
Mov Cap-2 Maneuver ------349369-310375-
Stage 1 ------694668-632607-
Stage 2 ------607596-624663-
Approach EB WB NB SB
HCM Control Delay, s 0.9 1.6 15.8 20.2
HCM LOS C C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)489 1323 - - 1344 - - 367
HCM Lane V/C Ratio 0.324 0.022 - - 0.045 - - 0.359
HCM Control Delay (s) 15.8 7.8 - - 7.8 - - 20.2
HCM Lane LOS C A - - A - - C
HCM 95th %tile Q(veh) 1.4 0.1 - - 0.1 - - 1.6
76
HCM 6th TWSC
15: Lindenmeier & Site Access Short Total AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 4.4
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 56 3 20 24 11 31
Future Vol, veh/h 56 3 20 24 11 31
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 66 4 24 28 13 36
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 100 38 0 0 52 0
Stage 1 38 -----
Stage 2 62 -----
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 899 1034 - - 1554 -
Stage 1 984 -----
Stage 2 961 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 891 1034 - - 1554 -
Mov Cap-2 Maneuver 891 -----
Stage 1 984 -----
Stage 2 952 -----
Approach WB NB SB
HCM Control Delay, s 9.4 0 1.9
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h)- - 897 1554 -
HCM Lane V/C Ratio - - 0.077 0.008 -
HCM Control Delay (s) - - 9.4 7.3 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.3 0 -
77
HCM 6th TWSC
15: Lindenmeier & Site Access Short Total PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 2.4
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 35 6 31 79 8 22
Future Vol, veh/h 35 6 31 79 8 22
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 85 85 85 85 85 85
Heavy Vehicles, % 2 22222
Mvmt Flow 41 7 36 93 9 26
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 127 83 0 0 129 0
Stage 1 83 -----
Stage 2 44 -----
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 868 976 - - 1457 -
Stage 1 940 -----
Stage 2 978 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 863 976 - - 1457 -
Mov Cap-2 Maneuver 863 -----
Stage 1 940 -----
Stage 2 972 -----
Approach WB NB SB
HCM Control Delay, s 9.3 0 2
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h)- - 878 1457 -
HCM Lane V/C Ratio - - 0.055 0.006 -
HCM Control Delay (s) - - 9.3 7.5 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.2 0 -
78
APPENDIX H
79
HCM 6th TWSC
1: Lemay & Conifer Long Total AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 4.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 45 140 250 515 1065 85
Future Vol, veh/h 45 140 250 515 1065 85
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 250 - - 250
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 47 147 263 542 1121 89
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1918 561 1210 0 - 0
Stage 1 1121 -----
Stage 2 797 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver 59 471 572 - - -
Stage 1 273 -----
Stage 2 404 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver ~ 32 471 572 - - -
Mov Cap-2 Maneuver 109 -----
Stage 1 147 -----
Stage 2 404 -----
Approach EB NB SB
HCM Control Delay, s 27.1 5.4 0
HCM LOS D
Minor Lane/Major Mvmt NBL NBTEBLn1EBLn2 SBT SBR
Capacity (veh/h)572 - 109 471 - -
HCM Lane V/C Ratio 0.46 - 0.435 0.313 - -
HCM Control Delay (s) 16.5 - 61.3 16.1 - -
HCM Lane LOS C - F C - -
HCM 95th %tile Q(veh) 2.4 - 1.9 1.3 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
80
HCM 6th TWSC
1: Lemay & Conifer Long Total PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 4.9
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 70 280 275 1020 750 70
Future Vol, veh/h 70 280 275 1020 750 70
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 50 250 - - 250
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 74 295 289 1074 789 74
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1904 395 863 0 - 0
Stage 1 789 -----
Stage 2 1115 -----
Critical Hdwy 6.84 6.94 4.14 - - -
Critical Hdwy Stg 1 5.84 -----
Critical Hdwy Stg 2 5.84 -----
Follow-up Hdwy 3.52 3.32 2.22 - - -
Pot Cap-1 Maneuver ~ 61 604 775 - - -
Stage 1 408 -----
Stage 2 275 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver ~ 38 604 775 - - -
Mov Cap-2 Maneuver 138 -----
Stage 1 256 -----
Stage 2 275 -----
Approach EB NB SB
HCM Control Delay, s 24.7 2.6 0
HCM LOS C
Minor Lane/Major Mvmt NBL NBTEBLn1EBLn2 SBT SBR
Capacity (veh/h)775 - 138 604 - -
HCM Lane V/C Ratio 0.374 - 0.534 0.488 - -
HCM Control Delay (s) 12.4 - 57.6 16.5 - -
HCM Lane LOS B - F C - -
HCM 95th %tile Q(veh) 1.7 - 2.6 2.7 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
81
HCM 6th TWSC
2: Lemay & Site Access Long Total AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 35 0 765 1195 10
Future Vol, veh/h 0 35 0 765 1195 10
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 0 37 0 805 1258 11
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 635 - 0 - 0
Stage 1 ------
Stage 2 ------
Critical Hdwy - 6.94 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.32 ----
Pot Cap-1 Maneuver 0 421 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 421 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB NB SB
HCM Control Delay, s 14.4 0 0
HCM LOS B
Minor Lane/Major Mvmt NBTEBLn1 SBT SBR
Capacity (veh/h)- 421 - -
HCM Lane V/C Ratio - 0.088 - -
HCM Control Delay (s) - 14.4 - -
HCM Lane LOS - B - -
HCM 95th %tile Q(veh) - 0.3 - -
82
HCM 6th TWSC
2: Lemay & Site Access Long Total PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 0.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 25 0 1295 1020 10
Future Vol, veh/h 0 25 0 1295 1020 10
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length - 0 ----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 0 26 0 1363 1074 11
Major/Minor Minor2 Major1 Major2
Conflicting Flow All - 543 - 0 - 0
Stage 1 ------
Stage 2 ------
Critical Hdwy - 6.94 ----
Critical Hdwy Stg 1 ------
Critical Hdwy Stg 2 ------
Follow-up Hdwy - 3.32 ----
Pot Cap-1 Maneuver 0 484 0 - - -
Stage 1 0 - 0 - - -
Stage 2 0 - 0 - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - 484 ----
Mov Cap-2 Maneuver ------
Stage 1 ------
Stage 2 ------
Approach EB NB SB
HCM Control Delay, s 12.9 0 0
HCM LOS B
Minor Lane/Major Mvmt NBTEBLn1 SBT SBR
Capacity (veh/h)- 484 - -
HCM Lane V/C Ratio - 0.054 - -
HCM Control Delay (s) - 12.9 - -
HCM Lane LOS - B - -
HCM 95th %tile Q(veh) - 0.2 - -
83
HCM 6th Signalized Intersection Summary
3: Lemay & Suniga Long Total AM
Synchro 11 Light Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 50 285 185 175 310 150 180 565 40 110 1015 105
Future Volume (veh/h) 50 285 185 175 310 150 180 565 40 110 1015 105
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 53 300 18 184 326 5 189 595 5 116 1068 6
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, %222222222222
Cap, veh/h 268 426 190 311 620 277 362 1880 838 523 1800 803
Arrive On Green 0.05 0.12 0.12 0.11 0.17 0.17 0.07 0.53 0.53 0.05 0.51 0.51
Sat Flow, veh/h 1781 3554 1585 1781 3554 1585 1781 3554 1585 1781 3554 1585
Grp Volume(v), veh/h 53 300 18 184 326 5 189 595 5 116 1068 6
Grp Sat Flow(s),veh/h/ln 1781 1777 1585 1781 1777 1585 1781 1777 1585 1781 1777 1585
Q Serve(g_s), s 2.4 7.6 0.9 8.1 7.8 0.2 4.7 8.9 0.1 2.9 19.8 0.2
Cycle Q Clear(g_c), s 2.4 7.6 0.9 8.1 7.8 0.2 4.7 8.9 0.1 2.9 19.8 0.2
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 268 426 190 311 620 277 362 1880 838 523 1800 803
V/C Ratio(X) 0.20 0.70 0.09 0.59 0.53 0.02 0.52 0.32 0.01 0.22 0.59 0.01
Avail Cap(c_a), veh/h 506 892 398 356 703 313 469 1880 838 556 1800 803
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 33.0 39.6 36.7 30.0 35.1 32.0 12.5 12.5 10.4 10.1 16.3 11.4
Incr Delay (d2), s/veh 0.4 2.1 0.2 2.0 0.7 0.0 1.2 0.4 0.0 0.2 1.4 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.0 3.4 0.4 3.6 3.4 0.1 1.8 3.5 0.0 1.1 7.9 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 33.4 41.7 36.9 32.0 35.8 32.0 13.7 12.9 10.4 10.3 17.7 11.5
LnGrp LOS CDDCDC BBBBBB
Approach Vol, veh/h 371 515 789 1190
Approach Delay, s/veh 40.3 34.4 13.1 17.0
Approach LOS D C B B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 9.3 54.0 14.6 15.7 11.4 51.9 9.5 20.8
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 6.5 49.5 12.5 23.5 12.5 43.5 17.5 18.5
Max Q Clear Time (g_c+I1), s 4.9 10.9 10.1 9.6 6.7 21.8 4.4 9.8
Green Ext Time (p_c), s 0.0 4.6 0.1 1.6 0.2 8.2 0.1 1.3
Intersection Summary
HCM 6th Ctrl Delay 22.1
HCM 6th LOS C
84
Timing Report, Sorted By Phase
3: Lemay & Suniga Long Total AM
Synchro 11 Light Report
Phase Number 12345678
Movement SBL NBTL WBL EBTL NBL SBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Max None None None Max None None
Maximum Split (s)11 54 17 28 17 48 22 23
Maximum Split (%) 10.0% 49.1% 15.5% 25.5% 15.5% 43.6% 20.0% 20.9%
Minimum Split (s)9.5 22.5 9.5 22.5 9.5 22.5 22.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)11111111
Minimum Initial (s)55555555
Vehicle Extension (s)33333333
Minimum Gap (s)33333333
Time Before Reduce (s)00000000
Time To Reduce (s)00000000
Walk Time (s)7 7 7 7 7
Flash Dont Walk (s)11 11 11 11 11
Dual Entry No Yes No Yes No Yes Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s)0 11 65 82 0 17 65 87
End Time (s)11 65 82 0 17 65 87 0
Yield/Force Off (s)6.5 60.5 77.5 105.5 12.5 60.5 82.5 105.5
Yield/Force Off 170(s) 6.5 49.5 77.5 94.5 12.5 49.5 71.5 94.5
Local Start Time (s)93 104 48 65 93 0 48 70
Local Yield (s)99.5 43.5 60.5 88.5 105.5 43.5 65.5 88.5
Local Yield 170(s)99.5 32.5 60.5 77.5 105.5 32.5 54.5 77.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Uncoordinated
Natural Cycle 90
Splits and Phases: 3: Lemay & Suniga
85
Queues
3: Lemay & Suniga Long Total AM
Synchro 11 Light Report
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 53 300 195 184 326 158 189 595 42 116 1068 111
v/c Ratio 0.19 0.59 0.49 0.58 0.45 0.33 0.62 0.34 0.05 0.25 0.66 0.13
Control Delay 26.3 45.0 10.2 34.4 37.9 4.6 20.1 16.6 0.1 11.3 24.8 0.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 26.3 45.0 10.2 34.4 37.9 4.6 20.1 16.6 0.1 11.3 24.8 0.3
Queue Length 50th (ft) 24 96 0 91 98 0 51 119 0 30 279 0
Queue Length 95th (ft) 52 140 60 149 146 32 109 175 0 61 397 0
Internal Link Dist (ft) 605 948 305 360
Turn Bay Length (ft) 250 250 250 250 250 250 250 250
Base Capacity (vph) 444 833 521 329 737 482 343 1755 860 459 1616 827
Starvation Cap Reductn 000000000000
Spillback Cap Reductn 000000000000
Storage Cap Reductn 000000000000
Reduced v/c Ratio 0.12 0.36 0.37 0.56 0.44 0.33 0.55 0.34 0.05 0.25 0.66 0.13
Intersection Summary
86
HCM 6th Signalized Intersection Summary
3: Lemay & Suniga Long Total PM
Synchro 11 Light Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 90 405 175 95 315 205 265 1000 170 165 780 100
Future Volume (veh/h) 90 405 175 95 315 205 265 1000 170 165 780 100
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 95 426 25 100 332 32 279 1053 79 174 821 5
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, %222222222222
Cap, veh/h 266 574 256 232 563 251 478 1835 819 358 1721 768
Arrive On Green 0.07 0.16 0.16 0.06 0.16 0.16 0.10 0.52 0.52 0.07 0.48 0.48
Sat Flow, veh/h 1781 3554 1585 1781 3554 1585 1781 3554 1585 1781 3554 1585
Grp Volume(v), veh/h 95 426 25 100 332 32 279 1053 79 174 821 5
Grp Sat Flow(s),veh/h/ln 1781 1777 1585 1781 1777 1585 1781 1777 1585 1781 1777 1585
Q Serve(g_s), s 4.2 10.9 1.3 4.4 8.3 1.7 7.2 19.5 2.4 4.6 14.8 0.2
Cycle Q Clear(g_c), s 4.2 10.9 1.3 4.4 8.3 1.7 7.2 19.5 2.4 4.6 14.8 0.2
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 266 574 256 232 563 251 478 1835 819 358 1721 768
V/C Ratio(X) 0.36 0.74 0.10 0.43 0.59 0.13 0.58 0.57 0.10 0.49 0.48 0.01
Avail Cap(c_a), veh/h 492 1057 471 278 686 306 712 1835 819 519 1721 768
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 30.8 38.3 34.2 31.5 37.5 34.7 11.5 15.9 11.8 12.7 16.6 12.8
Incr Delay (d2), s/veh 0.8 1.9 0.2 1.3 1.0 0.2 1.1 1.3 0.2 1.0 0.9 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.8 4.9 0.5 2.0 3.7 0.7 2.8 7.8 0.9 1.8 6.0 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 31.7 40.2 34.4 32.7 38.4 34.9 12.7 17.2 12.0 13.7 17.5 12.8
LnGrp LOS CDCCDC BBBBBB
Approach Vol, veh/h 546 464 1411 1000
Approach Delay, s/veh 38.4 37.0 16.0 16.8
Approach LOS D D B B
Timer - Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 11.3 54.0 10.5 20.0 14.4 50.9 10.8 19.7
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 15.5 49.5 8.5 28.5 22.5 42.5 18.5 18.5
Max Q Clear Time (g_c+I1), s 6.6 21.5 6.4 12.9 9.2 16.8 6.2 10.3
Green Ext Time (p_c), s 0.3 9.2 0.0 2.5 0.7 6.3 0.2 1.4
Intersection Summary
HCM 6th Ctrl Delay 22.7
HCM 6th LOS C
87
Timing Report, Sorted By Phase
3: Lemay & Suniga Long Total PM
Synchro 11 Light Report
Phase Number 12345678
Movement SBL NBTL WBL EBTL NBL SBTL EBL WBTL
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Max None None None Max None None
Maximum Split (s)20 54 13 33 27 47 23 23
Maximum Split (%) 16.7% 45.0% 10.8% 27.5% 22.5% 39.2% 19.2% 19.2%
Minimum Split (s)9.5 22.5 9.5 22.5 9.5 22.5 22.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)11111111
Minimum Initial (s)55555555
Vehicle Extension (s)33333333
Minimum Gap (s)33333333
Time Before Reduce (s)00000000
Time To Reduce (s)00000000
Walk Time (s)7 7 7 7 7
Flash Dont Walk (s)11 11 11 11 11
Dual Entry No Yes No Yes No Yes Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes Yes Yes
Start Time (s)0 20 74 87 0 27 74 97
End Time (s)20 74 87 0 27 74 97 0
Yield/Force Off (s)15.5 69.5 82.5 115.5 22.5 69.5 92.5 115.5
Yield/Force Off 170(s) 15.5 58.5 82.5 104.5 22.5 58.5 81.5 104.5
Local Start Time (s)93 113 47 60 93 0 47 70
Local Yield (s)108.5 42.5 55.5 88.5 115.5 42.5 65.5 88.5
Local Yield 170(s) 108.5 31.5 55.5 77.5 115.5 31.5 54.5 77.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Uncoordinated
Natural Cycle 90
Splits and Phases: 3: Lemay & Suniga
88
Queues
3: Lemay & Suniga Long Total PM
Synchro 11 Light Report
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Group Flow (vph) 95 426 184 100 332 216 279 1053 179 174 821 105
v/c Ratio 0.31 0.67 0.42 0.42 0.50 0.46 0.65 0.63 0.21 0.56 0.53 0.13
Control Delay 30.3 45.8 8.6 33.4 42.8 8.9 17.9 24.3 3.6 18.6 25.3 0.4
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 30.3 45.8 8.6 33.4 42.8 8.9 17.9 24.3 3.6 18.6 25.3 0.4
Queue Length 50th (ft) 47 141 0 49 108 0 80 269 0 47 205 0
Queue Length 95th (ft) 92 204 58 96 169 66 147 422 43 97 341 1
Internal Link Dist (ft) 605 948 305 360
Turn Bay Length (ft) 250 250 250 250 250 250 250 250
Base Capacity (vph) 408 961 564 242 688 482 539 1670 841 399 1538 788
Starvation Cap Reductn 000000000000
Spillback Cap Reductn 000000000000
Storage Cap Reductn 000000000000
Reduced v/c Ratio 0.23 0.44 0.33 0.41 0.48 0.45 0.52 0.63 0.21 0.44 0.53 0.13
Intersection Summary
89
HCM 6th TWSC
4: Lindenmeier & Suniga Long Total AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 2.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 20 470 20 15 550 25 20 10 20 30 20 45
Future Vol, veh/h 20 470 20 15 550 25 20 10 20 30 20 45
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 22222222222
Mvmt Flow 21 495 21 16 579 26 21 11 21 32 21 47
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 605 0 0 516 0 0 880 1185 258 919 1182 303
Stage 1 ------548548-624624-
Stage 2 ------332637-295558-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 969 - - 1046 - - 241 188 741 226 188 693
Stage 1 ------488515-440476-
Stage 2 ------655470-689510-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 969 - - 1046 - - 199 181 741 204 181 693
Mov Cap-2 Maneuver ------199181-204181-
Stage 1 ------477504-430469-
Stage 2 ------574463-641499-
Approach EB WB NB SB
HCM Control Delay, s 0.3 0.2 21.2 23.3
HCM LOS C C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)274 969 - - 1046 - - 295
HCM Lane V/C Ratio 0.192 0.022 - - 0.015 - - 0.339
HCM Control Delay (s) 21.2 8.8 - - 8.5 - - 23.3
HCM Lane LOS C A - - A - - C
HCM 95th %tile Q(veh) 0.7 0.1 - - 0 - - 1.5
90
HCM 6th TWSC
4: Lindenmeier & Suniga Long Total PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 5.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 50 625 25 25 600 55 45 20 25 20 10 35
Future Vol, veh/h 50 625 25 25 600 55 45 20 25 20 10 35
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 22222222222
Mvmt Flow 53 658 26 26 632 58 47 21 26 21 11 37
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 690 0 0 684 0 0 1151 1519 342 1159 1503 345
Stage 1 ------777777-713713-
Stage 2 ------374742-446790-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 900 - - 905 - - 153 118 654 151 120 651
Stage 1 ------356405-389434-
Stage 2 ------619420-561400-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 900 - - 905 - - 125 108 654 115 110 651
Mov Cap-2 Maneuver ------125108-115110-
Stage 1 ------335381-366421-
Stage 2 ------553408-479376-
Approach EB WB NB SB
HCM Control Delay, s 0.7 0.3 60 31.3
HCM LOS F D
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)154 900 - - 905 - - 204
HCM Lane V/C Ratio 0.615 0.058 - - 0.029 - - 0.335
HCM Control Delay (s) 60 9.2 - - 9.1 - - 31.3
HCM Lane LOS F A - - A - - D
HCM 95th %tile Q(veh) 3.3 0.2 - - 0.1 - - 1.4
91
HCM 6th TWSC
5: Redwood & Suniga Long Total AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 36
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 50 370 45 155 450 55 40 45 55 30 65 80
Future Vol, veh/h 50 370 45 155 450 55 40 45 55 30 65 80
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 --------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 22222222222
Mvmt Flow 53 389 47 163 474 58 42 47 58 32 68 84
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 532 0 0 436 0 0 1116 1377 218 1153 1371 266
Stage 1 ------519519-829829-
Stage 2 ------597858-324542-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 1032 - - 1120 - - 162 144 786 152 145 732
Stage 1 ------508531-331383-
Stage 2 ------456372-662518-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1032 - - 1120 - - 67 117 786 83 117 732
Mov Cap-2 Maneuver ------67117-83117-
Stage 1 ------482504-314327-
Stage 2 ------273318-527492-
Approach EB WB NB SB
HCM Control Delay, s 0.9 2.1 175.1 145.9
HCM LOS F F
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h)133 1032 - - 1120 - - 171
HCM Lane V/C Ratio 1.108 0.051 - - 0.146 - - 1.077
HCM Control Delay (s) 175.1 8.7 - - 8.8 - - 145.9
HCM Lane LOS F A - - A - - F
HCM 95th %tile Q(veh) 8.4 0.2 - - 0.5 - - 9.2
92
HCM 6th TWSC
5: Redwood & Suniga Long Total PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 469.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 110 485 65 105 525 40 70 135 155 50 75 75
Future Vol, veh/h 110 485 65 105 525 40 70 135 155 50 75 75
Conflicting Peds, #/hr 0 00000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 250 - - 250 ----200--200
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 95 95 95 95 95 95 95 95 95 95 95 95
Heavy Vehicles, % 2 22222222222
Mvmt Flow 116 511 68 111 553 42 74 142 163 53 79 79
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 595 0 0 579 0 0 1315 1594 290 1355 1607 298
Stage 1 ------777777-796796-
Stage 2 ------538817-559811-
Critical Hdwy 4.14 - - 4.14 - - 7.54 6.54 6.94 7.54 6.54 6.94
Critical Hdwy Stg 1 ------6.54 5.54 - 6.54 5.54 -
Critical Hdwy Stg 2 ------6.54 5.54 - 6.54 5.54 -
Follow-up Hdwy 2.22 - - 2.22 - - 3.52 4.02 3.32 3.52 4.02 3.32
Pot Cap-1 Maneuver 977 - - 991 - - 116 ~ 106 707 108 104 698
Stage 1 ------356405-347397-
Stage 2 ------495388-481391-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 977 - - 991 - - ~ 9 ~ 83 707 - 81 698
Mov Cap-2 Maneuver ------~ 9~ 83--81-
Stage 1 ------314357-306353-
Stage 2 ------303345-196344-
Approach EB WB NB SB
HCM Control Delay, s 1.5 1.4 $ 2457.6
HCM LOS F -
Minor Lane/Major Mvmt NBLn1NBLn2 EBL EBT EBR WBL WBT WBRSBLn1SBLn2
Capacity (veh/h)22 707 977 - - 991 - - - 698
HCM Lane V/C Ratio 9.809 0.231 0.119 - - 0.112 - - - 0.113
HCM Control Delay (s) $ 4307 11.6 9.2 - - 9.1 - - - 10.8
HCM Lane LOS F B A - - A - - - B
HCM 95th %tile Q(veh) 27.2 0.9 0.4 - - 0.4 - - - 0.4
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
93
HCM 6th Signalized Intersection Summary
5: Redwood & Suniga Long Total AM
Synchro 11 Light Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 50 370 45 155 450 55 40 45 55 30 65 80
Future Volume (veh/h) 50 370 45 155 450 55 40 45 55 30 65 80
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 53 389 38 163 474 49 42 47 5 32 68 5
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, %222222222222
Cap, veh/h 528 847 82 613 1051 108 265 180 264 220 227 264
Arrive On Green 0.06 0.26 0.26 0.12 0.32 0.32 0.17 0.17 0.17 0.17 0.17 0.17
Sat Flow, veh/h 1781 3272 318 1781 3252 335 531 1081 1585 368 1362 1585
Grp Volume(v), veh/h 53 210 217 163 258 265 89 0 5 100 0 5
Grp Sat Flow(s),veh/h/ln 1781 1777 1813 1781 1777 1810 1612 0 1585 1730 0 1585
Q Serve(g_s), s 0.6 3.0 3.0 1.9 3.4 3.5 0.0 0.0 0.1 0.0 0.0 0.1
Cycle Q Clear(g_c), s 0.6 3.0 3.0 1.9 3.4 3.5 1.4 0.0 0.1 1.4 0.0 0.1
Prop In Lane 1.00 0.18 1.00 0.19 0.47 1.00 0.32 1.00
Lane Grp Cap(c), veh/h 528 460 469 613 574 585 446 0 264 447 0 264
V/C Ratio(X) 0.10 0.46 0.46 0.27 0.45 0.45 0.20 0.00 0.02 0.22 0.00 0.02
Avail Cap(c_a), veh/h 1165 2342 2390 1849 3054 3111 1884 0 1719 1976 0 1719
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 7.2 9.3 9.3 6.5 8.0 8.0 10.9 0.0 10.4 11.0 0.0 10.4
Incr Delay (d2), s/veh 0.1 0.7 0.7 0.2 0.6 0.5 0.2 0.0 0.0 0.3 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.2 0.9 0.9 0.4 0.9 0.9 0.4 0.0 0.0 0.5 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 7.3 10.0 10.1 6.7 8.6 8.6 11.1 0.0 10.5 11.2 0.0 10.5
LnGrp LOS ABBAAABABBAB
Approach Vol, veh/h 480 686 94 105
Approach Delay, s/veh 9.8 8.1 11.1 11.2
Approach LOS AABB
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 8.2 12.3 9.5 6.3 14.2 9.5
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 24.5 39.5 32.5 12.5 51.5 32.5
Max Q Clear Time (g_c+I1), s 3.9 5.0 3.4 2.6 5.5 3.4
Green Ext Time (p_c), s 0.4 2.7 0.5 0.1 3.5 0.5
Intersection Summary
HCM 6th Ctrl Delay 9.1
HCM 6th LOS A
94
Timing Report, Sorted By Phase
5: Redwood & Suniga Long Total AM
Synchro 11 Light Report
Phase Number 124568
Movement WBL EBTL SBTL EBL WBTL NBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None None Min None None Min
Maximum Split (s)29 44 37 17 56 37
Maximum Split (%) 26.4% 40.0% 33.6% 15.5% 50.9% 33.6%
Minimum Split (s)9.5 22.5 22.5 9.5 22.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)111111
Minimum Initial (s)555555
Vehicle Extension (s)333333
Minimum Gap (s)333333
Time Before Reduce (s)000000
Time To Reduce (s)000000
Walk Time (s)7 7 7 7
Flash Dont Walk (s)11 11 11 11
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s)0 29 73 0 17 73
End Time (s)29 73 0 17 73 0
Yield/Force Off (s)24.5 68.5 105.5 12.5 68.5 105.5
Yield/Force Off 170(s) 24.5 57.5 105.5 12.5 57.5 105.5
Local Start Time (s)81 0 44 81 98 44
Local Yield (s)105.5 39.5 76.5 93.5 39.5 76.5
Local Yield 170(s) 105.5 28.5 76.5 93.5 28.5 76.5
Intersection Summary
Cycle Length 110
Control Type Actuated-Uncoordinated
Natural Cycle 55
Splits and Phases: 5: Redwood & Suniga
95
Queues
5: Redwood & Suniga Long Total AM
Synchro 11 Light Report
Lane Group EBL EBT WBL WBT NBT NBR SBT SBR
Lane Group Flow (vph) 53 436 163 532 89 58 100 84
v/c Ratio 0.10 0.42 0.28 0.35 0.27 0.14 0.28 0.20
Control Delay 5.0 13.3 5.7 9.4 17.2 2.5 17.1 4.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 5.0 13.3 5.7 9.4 17.2 2.5 17.1 4.7
Queue Length 50th (ft) 4 40 14 24 17 0 19 0
Queue Length 95th (ft) 15 81 37 92 51 10 56 21
Internal Link Dist (ft) 321 567 322 290
Turn Bay Length (ft) 250 250 200 200
Base Capacity (vph) 797 3280 1201 3483 1239 1320 1337 1320
Starvation Cap Reductn 00000000
Spillback Cap Reductn 00000000
Storage Cap Reductn 00000000
Reduced v/c Ratio 0.07 0.13 0.14 0.15 0.07 0.04 0.07 0.06
Intersection Summary
96
HCM 6th Signalized Intersection Summary
5: Redwood & Suniga Long Total PM
Synchro 11 Light Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 110 485 65 105 525 40 70 135 155 50 75 75
Future Volume (veh/h) 110 485 65 105 525 40 70 135 155 50 75 75
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 116 511 59 111 553 37 74 142 40 53 79 19
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, %222222222222
Cap, veh/h 288 727 84 290 756 51 82 128 817 87 101 817
Arrive On Green 0.07 0.23 0.23 0.07 0.22 0.22 0.52 0.52 0.52 0.52 0.52 0.52
Sat Flow, veh/h 1781 3211 370 1781 3381 226 25 248 1585 28 196 1585
Grp Volume(v), veh/h 116 282 288 111 290 300 216 0 40 132 0 19
Grp Sat Flow(s),veh/h/ln 1781 1777 1804 1781 1777 1830 273 0 1585 224 0 1585
Q Serve(g_s), s 3.5 10.2 10.3 3.3 10.6 10.6 1.6 0.0 0.9 1.6 0.0 0.4
Cycle Q Clear(g_c), s 3.5 10.2 10.3 3.3 10.6 10.6 36.1 0.0 0.9 36.1 0.0 0.4
Prop In Lane 1.00 0.20 1.00 0.12 0.34 1.00 0.40 1.00
Lane Grp Cap(c), veh/h 288 402 409 290 398 409 210 0 817 188 0 817
V/C Ratio(X) 0.40 0.70 0.70 0.38 0.73 0.73 1.03 0.00 0.05 0.70 0.00 0.02
Avail Cap(c_a), veh/h 586 927 941 568 901 928 638 0 1234 591 0 1234
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 19.6 24.9 24.9 19.6 25.2 25.2 18.2 0.0 8.4 16.4 0.0 8.3
Incr Delay (d2), s/veh 0.9 2.2 2.2 0.8 2.6 2.5 36.7 0.0 0.0 4.7 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.4 4.3 4.4 1.4 4.5 4.7 3.7 0.0 0.3 1.2 0.0 0.1
Unsig. Movement Delay, s/veh
LnGrp Delay(d),s/veh 20.6 27.1 27.1 20.5 27.8 27.8 54.8 0.0 8.5 21.2 0.0 8.3
LnGrp LOS CCCCCCFAACAA
Approach Vol, veh/h 686 701 256 151
Approach Delay, s/veh 26.0 26.6 47.6 19.6
Approach LOS C C D B
Timer - Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 9.2 20.7 42.2 9.4 20.5 42.2
Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5
Max Green Setting (Gmax), s 15.5 36.5 54.5 16.5 35.5 54.5
Max Q Clear Time (g_c+I1), s 5.3 12.3 38.1 5.5 12.6 38.1
Green Ext Time (p_c), s 0.2 3.6 0.7 0.2 3.7 1.2
Intersection Summary
HCM 6th Ctrl Delay 28.8
HCM 6th LOS C
97
Timing Report, Sorted By Phase
5: Redwood & Suniga Long Total PM
Synchro 11 Light Report
Phase Number 124568
Movement WBL EBTL SBTL EBL WBTL NBTL
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize Yes Yes Yes Yes
Recall Mode None None Min None None Min
Maximum Split (s)20 41 59 21 40 59
Maximum Split (%) 16.7% 34.2% 49.2% 17.5% 33.3% 49.2%
Minimum Split (s)9.5 22.5 22.5 9.5 22.5 22.5
Yellow Time (s)3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s)111111
Minimum Initial (s)555555
Vehicle Extension (s)333333
Minimum Gap (s)333333
Time Before Reduce (s)000000
Time To Reduce (s)000000
Walk Time (s)7 7 7 7
Flash Dont Walk (s)11 11 11 11
Dual Entry No Yes Yes No Yes Yes
Inhibit Max Yes Yes Yes Yes Yes Yes
Start Time (s)0 20 61 0 21 61
End Time (s)20 61 0 21 61 0
Yield/Force Off (s)15.5 56.5 115.5 16.5 56.5 115.5
Yield/Force Off 170(s) 15.5 45.5 115.5 16.5 45.5 115.5
Local Start Time (s)99 119 40 99 0 40
Local Yield (s)114.5 35.5 94.5 115.5 35.5 94.5
Local Yield 170(s) 114.5 24.5 94.5 115.5 24.5 94.5
Intersection Summary
Cycle Length 120
Control Type Actuated-Uncoordinated
Natural Cycle 55
Splits and Phases: 5: Redwood & Suniga
98
Queues
5: Redwood & Suniga Long Total PM
Synchro 11 Light Report
Lane Group EBL EBT WBL WBT NBT NBR SBT SBR
Lane Group Flow (vph) 116 579 111 595 216 163 132 79
v/c Ratio 0.24 0.49 0.23 0.53 0.48 0.29 0.31 0.16
Control Delay 7.6 15.6 7.8 17.0 21.0 5.0 18.6 5.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 7.6 15.6 7.8 17.0 21.0 5.0 18.6 5.6
Queue Length 50th (ft) 14 68 13 74 53 0 31 0
Queue Length 95th (ft) 43 137 41 148 128 37 81 26
Internal Link Dist (ft) 321 567 322 290
Turn Bay Length (ft) 250 250 200 200
Base Capacity (vph) 774 2602 768 2566 1510 1518 1444 1514
Starvation Cap Reductn 00000000
Spillback Cap Reductn 00000000
Storage Cap Reductn 00000000
Reduced v/c Ratio 0.15 0.22 0.14 0.23 0.14 0.11 0.09 0.05
Intersection Summary
99
HCM 6th TWSC
16: Lindenmeier & Site Access Long Total AM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 3.9
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 55 5 30 25 10 35
Future Vol, veh/h 55 5 30 25 10 35
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 58 5 32 26 11 37
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 104 45 0 0 58 0
Stage 1 45 -----
Stage 2 59 -----
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 894 1025 - - 1546 -
Stage 1 977 -----
Stage 2 964 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 888 1025 - - 1546 -
Mov Cap-2 Maneuver 888 -----
Stage 1 977 -----
Stage 2 957 -----
Approach WB NB SB
HCM Control Delay, s 9.3 0 1.6
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h)- - 898 1546 -
HCM Lane V/C Ratio - - 0.07 0.007 -
HCM Control Delay (s) - - 9.3 7.3 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.2 0 -
100
HCM 6th TWSC
16: Lindenmeier & Site Access Long Total PM
Synchro 11 Light Report
Intersection
Int Delay, s/veh 2.3
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 35 5 40 80 10 25
Future Vol, veh/h 35 5 40 80 10 25
Conflicting Peds, #/hr 0 00000
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 22222
Mvmt Flow 37 5 42 84 11 26
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 132 84 0 0 126 0
Stage 1 84 -----
Stage 2 48 -----
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 -----
Critical Hdwy Stg 2 5.42 -----
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 862 975 - - 1460 -
Stage 1 939 -----
Stage 2 974 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 855 975 - - 1460 -
Mov Cap-2 Maneuver 855 -----
Stage 1 939 -----
Stage 2 966 -----
Approach WB NB SB
HCM Control Delay, s 9.4 0 2.1
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h)- - 868 1460 -
HCM Lane V/C Ratio - - 0.049 0.007 -
HCM Control Delay (s) - - 9.4 7.5 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.2 0 -
101
APPENDIX I
102
BURLINGTON NORTH
SCALE: 1"=1000'
PEDESTRIAN INFLUENCE AREA
DELICH
ASSOCIATES
Vine Drive
Lincoln Avenue
Lemay Avenue
Buckingham Street
Re
d
w
o
o
d
S
t
r
e
e
t
Suniga Road
Conifer Street
Li
n
d
e
n
m
e
i
e
r
R
o
a
d
103
Table 1
Pedestrian LOS Worksheet
Project Location Classification: Other
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Level of Service (minimum based on project location classification)
Directness Continuity Street
Crossings
Visual
Interest &
Amenities
Security
Residential to the south Residential
Minimum C C C C C
1 Actual A D C B B
Proposed A D C B B
Sugar Beet Park to the
south Recreational
Minimum C C C C C
2 Actual A D C B B
Proposed A D C B B
Residential to the west
(under construction) Residential
Minimum C C C C C
3 Actual A C B B B
Proposed A C B B B
Future Multi-Use Trail to
the north Recreational
Minimum C C C C C
4 Actual A D B B B
Proposed A C B B B
Minimum
5 Actual
Proposed
Minimum
6 Actual
Proposed
Minimum
7 Actual
Proposed
Minimum
8 Actual
Proposed
Minimum
9 Actual
Proposed
Minimum
10 Actual
Proposed
104
BURLINGTON NORTH
SCALE: 1"=1000'
BICYCLE INFLUENCE AREA
DELICH
ASSOCIATES
Vine Drive
Lincoln Avenue
Lemay Avenue
Buckingham Street
Re
d
w
o
o
d
S
t
r
e
e
t
Suniga Road
Conifer Street
Li
n
d
e
n
m
e
i
e
r
R
o
a
d
105
Bicycle LOS Worksheet
Level of Service – Connectivity
Minimum Actual Proposed
Base Connectivity: C A A
Specific connections to priority sites:
Description of
Applicable Destination
Area Within 1320’
Destination
Area
Classification
Multi-Use Trail to the
north Recreational B A A 1
Sugar Beet Park Recreational B A A 2
3
4
106