Loading...
HomeMy WebLinkAboutBLOOM FILING THREE MULTI-FAMILY DWELLINGS - PDP220011 - SUBMITTAL DOCUMENTS - ROUND 4 - GEOTECHNICAL (SOILS) REPORTREPORT COVER PAGE Preliminary Geotechnical Engineering Report __________________________________________________________________________ Pedcor Mulberry Apartments Fort Collins, Colorado September 14, 2021 Terracon Project No. 20205121 Prepared for: Pedcor Investments, A Limited Liability Company Carmel, Indiana Prepared by: Terracon Consultants, Inc. Fort Collins, Colorado Responsive ■Resourceful ■Reliable 1 REPORT TOPICS INTRODUCTION ............................................................................................................. 1 SITE CONDITIONS ......................................................................................................... 1 PROJECT DESCRIPTION .............................................................................................. 2 GEOTECHNICAL CHARACTERIZATION ...................................................................... 3 GEOTECHNICAL OVERVIEW ....................................................................................... 4 EARTHWORK................................................................................................................. 6 FOUNDATIONS ............................................................................................................ 11 PAVEMENTS ................................................................................................................ 12 FLOOR SYSTEMS........................................................................................................ 13 CORROSIVITY.............................................................................................................. 14 GENERAL COMMENTS ............................................................................................... 14 Note: This report was originally delivered in a web-based format.Orange Bold text in the report indicates a referenced section heading. The PDF version also includes hyperlinks which direct the reader to that section and clicking on the GeoReport logo will bring you back to this page. For more interactive features, please view your project online at client.terracon.com. ATTACHMENTS EXPLORATION AND TESTING PROCEDURES SITE LOCATION AND EXPLORATION PLANS EXPLORATION RESULTS SUPPORTING INFORMATION Note: Refer to each individual Attachment for a listing of contents. Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable i REPORT SUMMARY Topic 1 Overview Statement 2 Project Overview A preliminary geotechnical exploration has been performed for the proposed Pedcor Mulberry Apartments project to be constructed northwest of Mulberry Street and Greenfield Court in Fort Collins, Colorado. Ten (10) borings were performed to depths of approximately 5 to 20½ feet below existing site grades. Supplementary geotechnical engineering exploration should be performed at the site upon completion of initial design studies in order to confirm or modify the recommendations contained in this preliminary report and to allow the development of design-level recommendations more specific to the proposed construction. Subsurface Conditions Subsurface conditions encountered in our exploratory borings generally consisted of about 3 to 4 feet of lean clay with varying amounts of sand over interlayered silty sand, poorly graded sand and well graded sand with varying amounts of gravel encountered to the maximum depth of exploration of about 20½ feet. Boring logs are presented in the Exploration Results section of this report. Groundwater Conditions Groundwater was encountered in most of our test borings at depths of about 6½ to 13 feet below existing site grades at the time of drilling. Groundwater levels can fluctuate in response to site development and to varying seasonal and weather conditions, irrigation on or adjacent to the site and fluctuations in nearby water features. Geotechnical Concerns ■Shallow groundwater was measured on this site. Terracon recommends maintaining a separation of at least 3 feet between the bottom of proposed below-grade foundations and measured groundwater levels. It is also possible and likely that groundwater levels below this site may rise as water levels in nearby water features rise. Final site grading should be planned and designed to avoid cuts where shallow groundwater is known to exist, and also in areas where such grading would create shallow groundwater conditions. If deeper cuts and/or a basement level is planned for the proposed structures, installation of a subsurface drainage system may be needed. ■Comparatively soft lean clay and very loose to loose sand soils were encountered within the upper approximately 5 to 15 feet of the borings completed at this site. These materials present a risk for potential settlement of shallow foundations, floor slabs, pavements and other surficial improvements. These materials can also be susceptible to disturbance and loss of strength under repeated construction traffic loads and unstable conditions could develop. Stabilization of soft and/or loose soils will be required at some locations to provide adequate support for construction equipment and proposed structures. Earthwork On-site soils typically appear suitable for use as general engineered fill and backfill on the site provided they are placed and compacted as described in this report. Import materials (if needed) should be evaluated and approved by Terracon prior to delivery to the site. Earthwork recommendations are presented in the Earthwork section of this report. Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable ii Topic 1 Overview Statement 2 Ground Improvements Comparatively soft clay soils and very loose to loose soils were encountered in our borings completed at this site. These materials will present a risk of shallow foundation settlement. To reduce soil related movement and to enhance performance, we anticipate recommending ground modification (over-excavation, moisture conditioning and recompaction or rammed-aggregate piers) of the soils below foundations and floor slabs. We anticipate over-excavation depths on the order of 4 to 6 feet below foundations and floor slabs. Ground modification depths and recommendations will be further discussed in a design-level report. Grading and Drainage As discussed in the Grading and Drainage section of this report, surface drainage should be designed, constructed and maintained to provide rapid removal of surface water runoff away from the proposed buildings and pavements. Water should not be allowed to pond adjacent to foundations or on pavements and conservative irrigation practices should be followed to avoid wetting foundation/slab soils and pavement subgrade. Excessive wetting of foundations/slab soils and subgrade can cause movement and distress to foundations, floor slabs, concrete flatwork and pavements. Foundations Comparatively soft clay soils and very loose to loose soils were encountered at anticipated shallow foundation bearing depths. Preliminary shallow foundation settlement calculations indicate settlement may be an issue on this site. We believe the proposed buildings can likely be constructed on shallow foundations such as spread footing or post-tensioned slab foundation systems, provided some form of ground modification takes place. This may include over-excavation of on-site soils below the bottom of foundations and replacement with moisture conditioned, properly compacted fill or aggregate piers. As a lower risk alternative, we believe the proposed buildings can be constructed on deep foundations such as drilled piers or helical piles bottomed in bedrock. Additional deeper boring will be necessary to determine depth of bedrock. Floor Systems A concrete slab-on-grade Floor System will likely be appropriate for the proposed buildings. In order to reduce risk for potential floor slab settlement, we anticipate over- excavation will likely be necessary to depths of about 2 to 5 feet below floor slabs. If little movement cannot be tolerated, a structurally-supported floor system, supported independent of the subgrade materials, will be needed. Pavements We anticipate lean clay and silty sand soils will be present at proposed pavement subgrade levels. These soils generally provide poor pavement support. Pavement thickness will likely be on the order of 4 to 5 inches of asphalt over 6 to 8 inches of aggregate base course in lightly-loaded areas and about 5 to 6 inches of asphalt over about 6 to 10 inches of aggregate base course in heavy-duty areas. Seismic Considerations As presented in the Seismic Considerations section of this report, the International Building Code, which refers to Section 20 of ASCE 7, indicates the seismic site classification for this site is D. Construction Observation and Testing Close monitoring of the construction operations and implementing drainage recommendations discussed herein will be critical in achieving the intended foundation, slab and pavement performance. We therefore recommend that Terracon be retained to monitor this portion of the work. General Comments This section contains important information about the limitations of this geotechnical engineering report. 1.If the reader is reviewing this report as a pdf, the topics (bold orange font) above can be used to access the appropriate section of the report by simply clicking on the topic itself. 2.This summary is for convenience only. It should be used in conjunction with the entire report for design making and design purposes. It should be recognized that specific details were not included or fully developed in this section, and the report must be read in its entirety for a comprehensive understanding of the items contained herein. Responsive ■Resourceful ■Reliable 1 INTRODUC TION Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments Northwest of Mulberry Street and Greenfield Court Fort Collins, Colorado Terracon Project No. 20205121 September 14, 2021 INTRODUCTION This report presents the results of our subsurface exploration and geotechnical engineering services performed for the proposed apartments to be located northwest of Mulberry Street and Greenfield Court Fort Collins, Colorado. The purpose of these services is to provide information and preliminary geotechnical engineering recommendations relative to: ■Subsurface soil conditions ■Foundation design and construction ■Groundwater conditions ■Floor system design and construction ■Site preparation and earthwork ■Pavement design and construction ■Excavation considerations The geotechnical engineering scope of services for this project included the advancement of ten (10) test borings to depths ranging from approximately 5 to 20½ feet below existing site grades. Maps showing the site and boring locations are shown in the Site Location and Exploration Plan sections, respectively. The results of the laboratory testing performed on soil samples obtained from the site during the field exploration are included on the boring logs and as separate graphs in the Exploration Results section of this report. SITE CONDITIONS The following description of site conditions is derived from our site visit in association with the field exploration and our review of publicly available geologic and topographic maps. Item Description Parcel Information The approximately 16.4-acre project site is located northwest of the intersection of Mulberry Street and Greenfield Court in Fort Collins, Colorado. The site is a northwest section of Parcel Number 8709000006. The approximate Latitude/Longitude of the center of the site is 40.5869 °N / 105.0185 °W. See Site Location. Existing Improvements The site is currently irrigated farmland. Current Ground Cover The current ground cover is tilled soil currently used to cultivate beet crop. Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable 2 Item Description Existing Topography The site is relatively flat. PROJECT DESCRIPTION Our final understanding of the project conditions is as follows: Item Description Information Provided The following project information was provided through a Request for Proposals prepared by Pedcor Investments and dated December 8, 2020. Project Description Based on provided site plans, we understand the proposed project includes 14 apartment buildings, a clubhouse with a pool and a retention pond. Parking and drive lanes and landscaped areas are also planned for the project. Project Understanding Terracon’s proposed scope of services presented in this proposal has been provided under the belief that this site will be used as apartments. As such, Terracon would like to inform the Client that if this apartment project is converted at any time to another purpose such as condominiums, the Client understands the services Terracon is proposing are not applicable for a condominium project and that a separate consultant will need to be retained for such services. Terracon will have no liability for any such unintended use of our services and Client agrees to defend, indeminify, and hold harmless Terracon for any such unintended usage. Proposed Construction We anticipate the proposed apartment buildings will be 2 to 3 stories and the clubhouse will be 1 to 2 stories. We anticipate elevators will be included in the proposed buildings. Based on our experience with similar projects, we anticipate the buildings will likely be supported on post-tensioned slab foundations. Maximum Loads Loads were not provided at the time this report was prepared. Grading/Slopes We anticipate minor cuts and fills on the order of 5 feet or less will be required to achieve proposed grades. Free-standing Retaining Walls Retaining walls are not expected to constructed as part of site development to achieve final grades. Pavements We anticipate paved parking areas and drives, along with the installation of utilities within. We assume both rigid (concrete) and flexible (asphalt) pavement sections should be considered. If project information or assumptions vary from what is described above or if location of construction changes, we should be contacted as soon as possible to confirm and/or modify our recommendations accordingly. Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable 3 GEOTECHNICAL CHARACTERIZATION Subsurface Profile We have developed a general characterization of the subsurface conditions based upon our review of the subsurface exploration, laboratory data, geologic setting and our understanding of the project. This characterization, termed GeoModel, forms the basis of our geotechnical calculations and evaluation of site preparation and foundation options. Conditions encountered at each exploration point are indicated on the individual logs. The individual logs and the GeoModel can be found in the Exploration Results section this report. As part of our analyses, we identified the following model layers within the subsurface profile. For a more detailed view of the model layer depths at each boring location, refer to the GeoModel. Model Layer Layer Name General Description Approximate Depth to Bottom of Stratum 1 Lean to Fat Clay Lean to fat clay with varying amounts of sand and trace amounts of gravel, brown to dark brown with red and white, moist, soft to stiff. About 3 to 15½ feet below existing site grades. 2 Silty Sand Silty sand with varying amounts of gravel, brown, moist to wet, very loose to medium dense. About 3 to 15 feet below existing site grades. 3 Poorly Graded Sand Poorly graded sand with silt and gravel, brown and light pinkish white, dry to wet, loose to medium dense. About 3 to 15 feet below existing site grades. 4 Well Graded Sand Well graded sand with varying amounts of gravel and trace amounts of silt, brown and light pinkish white, moist to wet, very loose to dense. About 9 to 20½ feet below existing site grades. As noted in General Comments, this characterization is based upon widely spaced exploration points across the site and variations are likely. Groundwater Conditions The boreholes were observed while drilling and shortly after completion for the presence and level of groundwater. The water levels observed in the boreholes are noted on the attached boring logs, and are summarized below: Boring Number Depth to Groundwater after Drilling, ft. Elevation of Groundwater after Drilling, ft. B-1 13 4,928 Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable 4 Boring Number Depth to Groundwater after Drilling, ft. Elevation of Groundwater after Drilling, ft. B-2 11 4,928 B-3 9.6 4,924.4 B-4 11.6 4,928.4 B-5 7.6 4,928.4 B-6 Not encountered - B-7 10½4,926½ P-1 Not encountered - R-1 6½4,928½ R-2 8.3 4,926.7 These observations represent short-term groundwater conditions at the time of and shortly after the field exploration and may not be indicative of other times or at other locations. Groundwater levels can be expected to fluctuate with varying seasonal and weather conditions, and other factors. Groundwater level fluctuations occur due to seasonal variations in the water levels present in nearby water features, amount of rainfall, runoff and other factors not evident at the time the borings were performed. Therefore, groundwater levels during construction or at other times in the life of the structure(s) may be higher or lower than the levels indicated on the boring logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project. Fluctuations in groundwater levels can best be determined by implementation of a groundwater monitoring plan. Such a plan would include installation of groundwater piezometers, and periodic measurement of groundwater levels over a sufficient period of time. GEOTECHNICAL OVERVIEW The preliminary recommendations presented in this report are based on the assumption that the subsurface conditions encountered in the widely spaced preliminary borings provide an accurate representation of the entire site. Supplementary geotechnical engineering services should be performed at the site upon completion of initial design studies in order to confirm or modify the recommendations contained in this preliminary report and to allow the development of design- level recommendations more specific to the proposed construction. Based on subsurface conditions encountered in the borings, the site appears suitable for the proposed construction from a geotechnical point of view provided certain precautions and design and construction recommendations described in this report are followed. We have identified several geotechnical conditions that could impact design, construction and performance of the Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable 5 proposed structures, pavements, and other site improvements. These included existing, shallow groundwater and potentially loose sand soils and comparatively soft, low strength clay soils. These conditions will require particular attention in project planning, design and during construction and are discussed in greater detail in the following sections. Shallow Groundwater As previously stated, groundwater was measured at depths ranging from about 6½ to 13 feet below existing site grades. In general, measured groundwater levels were shallowest on the southeast portion of the site in the vicinity of Boring Nos. B-7, R-1 and R-2. Terracon recommends maintaining a separation of at least 3 feet between the bottom of proposed below-grade foundations and measured groundwater levels. It is also possible and likely that groundwater levels below this site may rise as water levels in the Cache la Poudre River and the Lake Canal rise. Final site grading should be planned and designed to avoid cuts where shallow groundwater is known to exist, and also in areas where such grading would create shallow groundwater conditions. If deeper cuts are unavoidable, temporary construction dewatering and/or installation of a subsurface drainage system may be needed. Low Strength Soils Comparatively soft lean clay soils and very loose to loose sand soils were encountered within the upper approximately 5 to 15 feet of the borings completed at this site. These materials present a risk for potential settlement of shallow foundations, floor slabs, pavements and other surficial improvements. These materials can also be susceptible to disturbance and loss of strength under repeated construction traffic loads and unstable conditions could develop. Stabilization of soft and/or loose soils will be required at some locations to provide adequate support for construction equipment and proposed structures. Foundation and Floor System Recommendations Comparatively soft lean clay and very loose to loose sand soils were encountered at anticipated shallow foundation bearing depths. Preliminary shallow foundation settlement calculations indicate settlement may be an issue on this site. We believe the proposed buildings can likely be constructed on shallow foundations such as spread footing or post-tensioned slab foundation systems, provided some form of ground modification takes place. This may include over- excavation of on-site soils below the bottom of foundations and replacement with moisture conditioned, properly compacted fill or aggregate piers. As a lower risk alternative, we believe the proposed buildings can be constructed on deep foundations such as drilled piers or helical piles bottomed in bedrock. Additional deeper boring will be necessary to determine depth of bedrock. A concrete slab-on-grade Floor System will likely be appropriate for the proposed buildings. In order to reduce risk for potential floor slab settlement, we anticipate over-excavation will likely be necessary Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable 6 to depths of about 2 to 5 feet below floor slabs. If little movement cannot be tolerated, a structurally- supported floor system, supported independent of the subgrade materials, will be needed. Preliminary recommendations for foundations for the proposed structures and related structural elements are presented in the following sections. The General Comments section provides an understanding of the report limitations. EARTHWORK The following presents recommendations for site preparation, excavation, subgrade preparation, fill materials, compaction requirements, utility trench backfill, grading and drainage and exterior slab design and construction. Earthwork on the project should be observed and evaluated by Terracon. Evaluation of earthwork should include observation and/or testing of over-excavation, removal of existing fill, subgrade preparation, placement of engineered fills, subgrade stabilization and other geotechnical conditions exposed during the construction of the project. Site Preparation Prior to placing any fill, strip and remove existing vegetation, topsoil, and any other deleterious materials from the proposed construction areas. Stripped organic materials should be wasted from the site or used to re-vegetate landscaped areas after completion of grading operations. Prior to the placement of fills, the site should be graded to create a relatively level surface to receive fill, and to provide for a relatively uniform thickness of fill beneath proposed structures. Excavation It is anticipated that excavations for the proposed construction can be accomplished with conventional earthmoving equipment. Excavations into the on-site soils will encounter weak and/or saturated soil conditions with possible caving conditions. The soils to be excavated can vary significantly across the site as their classifications are based solely on the materials encountered in widely-spaced exploratory test borings. The contractor should verify that similar conditions exist throughout the proposed area of excavation. If different subsurface conditions are encountered at the time of construction, the actual conditions should be evaluated to determine any excavation modifications necessary to maintain safe conditions. Although evidence of fills or underground facilities such as grease pits, septic tanks, vaults, basements, and utilities was not observed during the site reconnaissance, such features could be encountered during construction. If unexpected underground facilities are encountered, such features should be removed and the excavation thoroughly cleaned prior to backfill placement and/or construction. Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable 7 Depending upon depth of excavation and seasonal conditions, surface water infiltration and/or groundwater may be encountered in excavations on the site. It is anticipated that pumping from sumps may be utilized to control water within excavations. Well points may be required for significant groundwater flow, or where excavations penetrate groundwater to a significant depth. The subgrade soil conditions should be evaluated during the excavation process and the stability of the soils determined at that time by the contractors’ Competent Person. Slope inclinations flatter than the OSHA maximum values may have to be used. The individual contractor(s) should be made responsible for designing and constructing stable, temporary excavations as required to maintain stability of both the excavation sides and bottom. All excavations should be sloped or shored in the interest of safety following local, and federal regulations, including current OSHA excavation and trench safety standards. As a safety measure, it is recommended that all vehicles and soil piles be kept a minimum lateral distance from the crest of the slope equal to the slope height. The exposed slope face should be protected against the elements. Subgrade Preparation After the deleterious material been removed from the construction area, the top 10 inches of the exposed ground surface should be scarified, moisture conditioned, and recompacted to at least 95 percent of the maximum dry unit weight as determined by ASTM D698 before any new fill or foundation or pavement is placed. After the bottom of the excavation has been compacted, engineered fill can be placed to bring the building pad and pavement subgrade to the desired grade. Engineered fill should be placed in accordance with the recommendations presented in subsequent sections of this report. The stability of the subgrade may be affected by precipitation, repetitive construction traffic or other factors. If unstable conditions develop, workability may be improved by scarifying and drying. Alternatively, over-excavation of wet zones and replacement with granular materials may be used, or crushed gravel and/or rock can be tracked or “crowded” into the unstable surface soil until a stable working surface is attained. Use of lime, fly ash, or geotextiles could also be considered as a stabilization technique. Laboratory evaluation is recommended to determine the effect of chemical stabilization on subgrade soils prior to construction. Lightweight excavation equipment may also be used to reduce subgrade pumping. Fill Materials The on-site soils or approved granular and low plasticity cohesive imported materials may be used as fill material. The earthwork contractor should expect significant mechanical processing and moisture conditioning of the site soils and/or bedrock will be needed to achieve proper compaction Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable 8 Imported soils (if required) should meet the following material property requirements: Gradation Percent finer by weight (ASTM C136) 4”100 3”70-100 No. 4 Sieve 30-100 No. 200 Sieve 60 (max.) Soil Properties Values Liquid Limit 35 (max.) Plasticity Index 15 (max.) Other import fill materials types may be suitable for use on the site depending upon proposed application and location on the site, and could be tested and approved for use on a case-by-case basis. Compaction Requirements Engineered fill should be placed and compacted in horizontal lifts, using equipment and procedures that will produce recommended moisture contents and densities throughout the lift. Item Description Fill lift thickness 9 inches or less in loose thickness when heavy, self- propelled compaction equipment is used 4 to 6 inches in loose thickness when hand-guided equipment (i.e. jumping jack or plate compactor) is used Minimum compaction requirements 95 percent of the maximum dry unit weight as determined by ASTM D698 Moisture content cohesive soil (clay)-1 to +3 % of the optimum moisture content Moisture content cohesionless soil (sand)-3 to +3 % of the optimum moisture content 1.We recommend engineered fill be tested for moisture content and compaction during placement. Should the results of the in-place density tests indicate the specified moisture or compaction limits have not been met, the area represented by the test should be reworked and retested as required until the specified moisture and compaction requirements are achieved. 2.Specifically, moisture levels should be maintained low enough to allow for satisfactory compaction to be achieved without the fill material pumping when proof rolled. 3.Moisture conditioned clay materials should not be allowed to dry out. A loss of moisture within these materials could result in an increase in the material’s expansive potential. Subsequent wetting of these materials could result in undesirable movement. Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable 9 Utility Trench Backfill All trench excavations should be made with sufficient working space to permit construction including backfill placement and compaction. All underground piping within or near the proposed structures should be designed with flexible couplings, so minor deviations in alignment do not result in breakage or distress. Utility knockouts in foundation walls should be oversized to accommodate differential movements. It is imperative that utility trenches be properly backfilled with relatively clean materials. If utility trenches are backfilled with relatively clean granular material, they should be capped with at least 18 inches of cohesive fill in non-pavement areas to reduce the infiltration and conveyance of surface water through the trench backfill. Utility trenches are a common source of water infiltration and migration. All utility trenches that penetrate beneath the buildings should be effectively sealed to restrict water intrusion and flow through the trenches that could migrate below the buildings. We recommend constructing an effective clay “trench plug” that extends at least 5 feet out from the face of the building exteriors. The plug material should consist of clay compacted at a water content at or above the soil’s optimum water content. The clay fill should be placed to completely surround the utility line and be compacted in accordance with recommendations in this report. It is strongly recommended that a representative of Terracon provide full-time observation and compaction testing of trench backfill within building and pavement areas. Grading and Drainage Grades must be adjusted to provide effective drainage away from the proposed buildings during construction and maintained throughout the life of the proposed project. Infiltration of water into foundation excavations must be prevented during construction. Landscape irrigation adjacent to foundations should be minimized or eliminated. Water permitted to pond near or adjacent to the perimeter of the structures (either during or post-construction) can result in significantly higher soil movements than those discussed in this report. As a result, any estimations of potential movement described in this report cannot be relied upon if positive drainage is not obtained and maintained, and water is allowed to infiltrate the fill and/or subgrade. Exposed ground (if any) should be sloped at a minimum of 10 percent grade for at least 10 feet beyond the perimeter of the proposed buildings, where possible. Locally, flatter grades may be necessary to transition ADA access requirements for flatwork. The use of swales, chases and/or area drains may be required to facilitate drainage in unpaved areas around the perimeter of the buildings. Backfill against foundations and exterior walls should be properly compacted and free of all construction debris to reduce the possibility of moisture infiltration. After construction of the Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable 10 proposed buildings and prior to project completion, we recommend verification of final grading be performed to document positive drainage, as described above, has been achieved. Flatwork and pavements will be subject to post-construction movement. Maximum grades practical should be used for paving and flatwork to prevent areas where water can pond. In addition, allowances in final grades should take into consideration post-construction movement of flatwork, particularly if such movement would be critical. Where paving or flatwork abuts the structures, care should be taken that joints are properly sealed and maintained to prevent the infiltration of surface water. Planters located adjacent to structures should preferably be self-contained. Sprinkler mains and spray heads should be located a minimum of 5 feet away from the building line(s). Low-volume, drip style landscaped irrigation should be used sparingly near the building. Roof drains should discharge on to pavements or be extended away from the structures a minimum of 10 feet through the use of splash blocks or downspout extensions. A preferred alternative is to have the roof drains discharge by solid pipe to storm sewers, a detention pond, or other appropriate outfall. Exterior Slab Design and Construction Exterior slabs on-grade, exterior architectural features, and utilities founded on, or in backfill or the site soils will likely experience some movement due to the volume change of the material. Potential movement could be reduced by: n Minimizing moisture increases in the backfill; n Controlling moisture-density during placement of the backfill; n Using designs which allow vertical movement between the exterior features and adjoining structural elements; and n Placing control joints on relatively close centers. Construction Observation and Testing The earthwork efforts should be monitored under the direction of Terracon. Monitoring should include documentation of adequate removal of vegetation and topsoil, proof rolling, and mitigation of areas delineated by the proof roll to require mitigation. Each lift of compacted fill should be tested, evaluated, and reworked as necessary until approved by Terracon prior to placement of additional lifts. In areas of foundation excavations, the bearing subgrade and exposed conditions at the base of the recommended over-excavation should be evaluated under the direction of Terracon. In the event that unanticipated conditions are encountered, Terracon should prescribe mitigation options. Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable 11 In addition to the documentation of the essential parameters necessary for construction, the continuation of Terracon into the construction phase of the project provides the continuity to maintain Terracon’s evaluation of subsurface conditions, including assessing variations and associated design changes. FOUNDATIONS Foundation selection will be dependent upon the type of construction planned, foundation loading conditions and geometry, site specific geotechnical conditions and final site grading configurations. Additional geotechnical exploration will be necessary on the site in order to more accurately define subsurface conditions and to develop specific foundation recommendations and design parameters after final building location, site grading and type of construction have been determined. Field and laboratory testing completed for this study indicate the clay soils have negligible to low swell potential at their in-place moisture content and density. Furthermore, the clays typically exhibit negligible to low compressibility (settlement potential) when loaded. Considering the subsurface conditions encountered in the preliminary test borings, it appears several foundation systems may be appropriate for use on the site and will depend primarily upon building foundation loads. For lightly-loaded structures, shallow foundation systems such as spread footings, reinforced concrete mats, and/or post-tensioned slabs bearing on undisturbed native soils or properly compacted engineered fill could be used for support of the structure provided some movement can be tolerated and/or accounted for in the design. Low strength and/or compressible clay and/or sand soils are present on this site. We do not believe the subsoils at and within the zone of influence of shallow foundations have adequate compressibility properties to support moderate to heavy foundation loads with less than an inch of settlement. Based on this information and the preliminary geotechnical data, we anticipate recommending ground modification consisting of over-excavation and recompaction or aggregate piers for this site. As a lower risk alternative, we believe the heavily-loaded structures can be constructed on deep foundations such as drilled piers or helical piles bottomed in bedrock. Additional deeper boring will be necessary to determine depth of bedrock. Deep Foundations Deep foundations, such as drilled piers socketed into bedrock, are commonly used for structures with moderate to heavy loads and where compressible or lower strength soils are present in order to control settlement and post-construction foundation movement. Competent bedrock was not encountered in the borings completed on this site. We recommend subsequent design-level Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable 12 geotechnical investigations at this site include extending borings to identify depths to competent bedrock. Shallow Foundations Data from this study indicates the native clay soils have negligible to low swell potential at their in-place moisture content and density. Based on the preliminary data, we believe lightly-loaded structures could be supported on shallow foundations provided some movement can be tolerated and site grading fill is controlled so that it has low swell potential. However, due to the presence of lower strength and comparatively soft clay and very loose to loose sand soils, some method of ground modification/soil improvement below foundations will be needed in order to reduce settlement potential. This could include over-excavation and replacement with select imported granular materials. Soil improvement depth below footings could be in the range of 4 to 6 feet, or more, depending upon building specific geotechnical conditions and actual foundation loads and geometry. Ground improvement using aggregate piers may also be used. Lightly-loaded spread footings bearing on native sands or on an appropriate thickness of properly compacted fill may be preliminarily evaluated using a maximum bearing pressure in the range of 1,500 to 2,000 pounds per square foot (psf). Additional geotechnical exploration will be necessary on the site in order to more accurately define subsurface conditions and engineering properties of the soils and to develop specific foundation recommendations and design parameters once final building location, actual foundation loads and site grading have been determined. PAVEMENTS Assuming only minor cuts are planned for site development, we anticipate lean clays, silty sands or site grading fill comprised of similar material will support pavements on most of the site. Soil classification according to the American Association of State Highway and Transportation Officials (AASHTO) and our experience indicate the near surface soils on the site offer poor pavement support. Preliminary data suggests the near surface clays have low swell potential when wetted. Therefore, it does not appear special design and construction precautions to mitigate pavement heave concerns will be needed for this site. Consequently, standard pavement construction and practices and subgrade preparation methods should be appropriate for this site. However, cut areas of the site (if any) may encounter groundwater and low strength soils which may require stabilization to provide adequate support for pavements. Generally speaking, we recommend Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable 13 pavement subgrade be situated at least 3 feet, and preferable more, above groundwater. If this minimum separation cannot be achieved, consideration should be given to installing pavement subdrains. In any event, we recommend grading be planned and designed to avoid cuts. The preliminary pavement thicknesses presented are based on assumed 18-kip equivalent daily load application (EDLA) values of 3 to 5 for car parking areas only and 10 to 15 for truck access and drive lanes. For planning purposes and preliminary cost estimating, we anticipate a pavement section of around 4 to 5 inches of asphalt over 6 to 8 inches of aggregate base course in lightly- loaded areas and about 5 to 6 inches of asphalt over about 6 to 10 inches of aggregate base course in heavy-duty areas. A detailed subgrade evaluation and pavement thickness design should be completed during the design-level geotechnical exploration. The final design will account for traffic type and volume and variations in pavement subgrade soils which may occur in cut/fill sections required to bring the site to construction grade and within the actual pavement areas. FLOOR SYSTEMS Swell-consolidation tests indicate the clay soils likely to influence floor slab performance on this site have negligible to low swell potential at their in-place moisture content and density. Engineered fill consisting of the on-site soils and/or import materials having similar or better properties is expected to have low swell potential provided it is properly moisture conditioned and compacted. Even when bearing on properly prepared soils, movement of the slab-on-grade floor system is possible should the subgrade soils undergo an increase in moisture content. A concrete slab-on- grade Floor System will likely be appropriate for the proposed buildings. In order to reduce risk for potential floor slab settlement, we anticipate over-excavation will likely be necessary to depths of about 2 to 5 feet below floor slabs. If little movement cannot be tolerated, a structurally-supported floor system, supported independent of the subgrade materials, will be needed. If conventional slab- on-grade is utilized, the subgrade soils should be prepared as presented in the Earthwork section of this report. Other typical slab-on-grade design and construction considerations commonly used in the front range are as follows: n Positive separations and/or isolation joints should be provided between slabs and all foundations, columns, or utility lines to allow independent movement. Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable 14 n Control joints should be saw-cut in slabs in accordance with ACI Design Manual, Section 302.1R-37 8.3.12 (tooled control joints are not recommended) to control the location and extent of cracking. n Interior utility trench backfill placed beneath slabs should be compacted in accordance with the recommendations presented in the Earthwork section of this report. n Floor slabs should not be constructed on frozen subgrade. n The use of a vapor retarder should be considered beneath concrete slabs that will be covered with wood, tile, carpet or other moisture sensitive or impervious floor coverings, or when the slab will support equipment sensitive to moisture. When conditions warrant the use of a vapor retarder, the slab designer and slab contractor should refer to ACI 302 for procedures and cautions regarding the use and placement of a vapor retarder. n Other design and construction considerations, as outlined in the ACI Design Manual, Section 302.1R are recommended. CORROSIVITY Results of water-soluble sulfate testing indicate Exposure Class S0 and S1 according to ACI 318. ASTM Type I or II portland cement should be specified for all project concrete on and below grade. Foundation concrete should be designed for low to moderate sulfate exposure in accordance with the provisions of the ACI Design Manual, Section 318, Chapter 4. Sample Identification Water-soluble Sulfate (%) Boring No. B-1 at 2 feet <1 Boring No. B-5 at 2 feet <1 Boring No. B-7 at 2 feet <1 GENERAL COMMENTS As the project progresses, we address assumptions by incorporating information provided by the design team, if any. Revised project information that reflects actual conditions important to our services is reflected in the final report. The design team should collaborate with Terracon to confirm these assumptions and to prepare the final design plans and specifications. This facilitates the incorporation of our opinions related to implementation of our geotechnical recommendations. Any information conveyed prior to the final report is for informational purposes only and should not be considered or used for decision-making purposes. Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable 15 Our analysis and opinions are based upon our understanding of the project, the geotechnical conditions in the area, and the data obtained from our site exploration. Natural variations will occur between exploration point locations or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction. Terracon should be retained as the Geotechnical Engineer, where noted in the final report, to provide observation and testing services during pertinent construction phases. If variations appear, we can provide further evaluation and supplemental recommendations. If variations are noted in the absence of our observation and testing services on-site, we should be immediately notified so that we can provide evaluation and supplemental recommendations. Our scope of services does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. Our services and any correspondence or collaboration through this system are intended for the sole benefit and exclusive use of our client for specific application to the project discussed and are accomplished in accordance with generally accepted geotechnical engineering practices with no third-party beneficiaries intended. Any third-party access to services or correspondence is solely for information purposes to support the services provided by Terracon to our client. Reliance upon the services and any work product is limited to our client, and is not intended for third parties. Any use or reliance of the provided information by third parties is done solely at their own risk. No warranties, either express or implied, are intended or made. Site characteristics as provided are for design purposes and not to estimate excavation cost. Any use of our report in that regard is done at the sole risk of the excavating cost estimator as there may be variations on the site that are not apparent in the data that could significantly impact excavation cost. Any parties charged with estimating excavation costs should seek their own site characterization for specific purposes to obtain the specific level of detail necessary for costing. Site safety, and cost estimating including, excavation support, and dewatering requirements/design are the responsibility of others. If changes in the nature, design, or location of the project are planned, our conclusions and recommendations shall not be considered valid unless we review the changes and either verify or modify our conclusions in writing. Responsive ■Resourceful ■Reliable ATTACHMENTS Contents: EXPLORATION AND TESTING PROCEDURES SITE LOCATION AND EXPLORATION PLANS EXPLORATION RESULTS SUPPORTING INFORMATION Note: Refer to each individual Attachment for a listing of contents. Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable EXPLORATION AND TESTING PROCEDURES 1 of 2 EXPLORATION AND TESTING PROCEDURES Field Exploration Pedcor Investments prescribed the following boring locations and depths: Number of Borings Boring Depth (feet)Location 7 15 or auger refusal Planned buildings 2 20 or auger refusal Planned pond location 1 5 or auger refusal Planned pavement areas Boring Layout and Elevations: We used handheld GPS equipment to locate borings with an estimated horizontal accuracy of +/-20 feet. A ground surface elevation at each boring location was obtained by Terracon by interpolation from USGS topographic maps. Subsurface Exploration Procedures: We advanced soil borings with a truck-mounted drill rig using continuous-flight, solid-stem augers. Three samples were obtained in the upper 10 feet of each boring and at intervals of 5 feet thereafter. Soil sampling was performed using thin-wall tube, modified California barrel and standard split-barrel sampling procedures. For the standard split- barrel sampling procedure, a standard 2-inch outer diameter split-barrel sampling spoon is driven into the ground by a 140-pound automatic hammer falling a distance of 30 inches. The number of blows required to advance the sampling spoon the last 12 inches of a normal 18-inch penetration is recorded as the Standard Penetration Test (SPT) resistance value. The SPT resistance values, also referred to as N-values, are indicated on the boring logs at the test depths. For the modified California barrel sampling procedure, a 2½-inch outer diameter split-barrel sampling spoon is used for sampling. Modified California barrel sampling procedures are similar to standard split- barrel sampling procedures; however, blow counts are typically recorded for 6-inch intervals for a total of 12 inches of penetration. The samples were placed in appropriate containers, taken to our soil laboratory for testing, and classified by a geotechnical engineer. In addition, we observed and recorded groundwater levels during drilling observations. Our exploration team prepared field boring logs as part of standard drilling operations including sampling depths, penetration distances, and other relevant sampling information. Field logs included visual classifications of materials encountered during drilling, and our interpretation of subsurface conditions between samples. Final boring logs, prepared from field logs, represent the geotechnical engineer's interpretation, and include modifications based on observations and laboratory test results. Property Disturbance: We backfilled borings with auger cuttings after completion. Our services did not include repair of the site beyond backfilling our boreholes. However, after discussion with Preliminary Geotechnical Engineering Report Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Responsive ■Resourceful ■Reliable EXPLORATION AND TESTING PROCEDURES 2 of 2 the project team, we mobilized a field crew to the site the following day to repair damage done to irrigation ditches by the drill rig. Laboratory Testing The project engineer reviewed field data and assigned various laboratory tests to better understand the engineering properties of various soil strata. Laboratory testing was conducted in general accordance with applicable or other locally recognized standards. Procedural standards noted in this report are for reference to methodology in general. In some cases, variations to methods are applied as a result of local practice or professional judgement. Testing was performed under the direction of a geotechnical engineer and included the following: ■Visual classification ■Moisture content ■Dry density ■Atterberg limits ■Grain-size analysis ■One-dimensional swell ■Water-soluble sulfates ■Unconfined compressive strength Our laboratory testing program includes examination of soil samples by an engineer. Based on the material’s texture and plasticity, we described and classified soil samples in accordance with the Unified Soil Classification System (USCS). Soil samples obtained during our field work will be disposed of after laboratory testing is complete unless a specific request is made to temporarily store the samples for a longer period of time. Responsive ■Resourceful ■Reliable SITE LOCATION AND EXPLORATION PLANS Contents: Site Location Plan Exploration Plan Note: All attachments are one page unless noted above. SITE LOCATION Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Note to Preparer: This is a large table with outside borders. Just click inside the table above this text box, then paste your GIS Toolbox image. When paragraph markers are turned on you may notice a line of hidden text above and outside the table – please leave that alone. Limit editing to inside the table. The line at the bottom about the general location is a separate table line. You can edit it as desired, but try to keep to a single line of text to avoid reformatting the page. SITE LOCA TION DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES MAP PROVIDED BY MICROSOFT BING MAPS EXPLORATION PLAN Pedcor Mulberry Apartments ■ Fort Collins, Colorado September 14, 2021 ■ Terracon Project No. 20205121 Note to Preparer: This is a large table with outside borders. Just click inside the table above this text box, then paste your GIS Toolbox image. When paragraph markers are turned on you may notice a line of hidden text above and outside the table – please leave that alone. Limit editing to inside the table. The line at the bottom about the general location is a separate table line. You can edit it as desired, but try to keep to a single line of text to avoid reformatting the page. EXPLORATION P LAN DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES MAP PROVIDED BY MICROSOFT BING MAPS EXPLORATION RESULTS Contents: GeoModel Boring Logs (10 pages) Atterberg Limits Grain Size Distribution (2 pages) Consolidation/Swell (3 pages) Unconfined Compressive Strength Corrosivity Note: All attachments are one page unless noted above. 4,914 4,916 4,918 4,920 4,922 4,924 4,926 4,928 4,930 4,932 4,934 4,936 4,938 4,940 4,942 EL E V A T I O N ( M S L ) ( f e e t ) Pedcor Mulberry Apartments Fort Collins, CO Terracon Project No. 20205121 Layering shown on this figure has been developed by the geotechnical engineer for purposes of modeling the subsurface conditions as required for the subsequent geotechnical engineering for this project. Numbers adjacent to soil column indicate depth below ground surface. NOTES: B-1 B-2 B-3 B-4 B-5 B-6 B-7 P-1 R-1 R-2 GEOMODEL This is not a cross section. This is intended to display the Geotechnical Model only. See individual logs for more detailed conditions. Groundwater levels are temporal. The levels shown are representative of the date and time of our exploration. Significant changes are possible over time. Water levels shown are as measured during and/or after drilling. In some cases, boring advancement methods mask the presence/absence of groundwater. See individual logs for details. First Water Observation Poorly graded sand with silt and gravel, brown and light pinkish white, dry to wet, loose to medium dense.3 Well graded sand with varying amounts of gravel and trace amounts of silt, brown and light pinkish white, moist to wet, very loose to dense. 4 LEGEND Sandy Lean Clay Poorly-graded Sand with Silt and Gravel Silty Sand with Gravel Well-graded Sand with Gravel Lean Clay with Sand Silty Sand Well-graded Sand with Silt and Gravel Fat Clay Model Layer General DescriptionLayer Name Lean clay with varying amounts of sand and trace amounts of gravel, brown to dark brown with red and white, moist, soft to stiff. 1 Silty sand with varying amounts of gravel, brown, moist to wet, very loose to medium dense.2 POORLY GRADED SAND WELL GRADED SAND LEAN CLAY SILTY SAND 3 15 1 3 13 2.5 4 11 15.5 1 3 2 4 11 4 15 3 29.6 3 9 14 15 2 1 2 4 11.6 4 5.5 14 15.5 3 2 4 2 7.6 4 14 15.5 2 4 1 3.5 9 15 2 4 2 10.5 4 5 3 2 3 4 20.5 1 2 4 6.5 4 9 19 20 1 2 4 2 8.3 2-2-2 N=4 3-6 2-3-5 N=8 12-20 14.4 10.4 18.6 10.6 118 130 SANDY LEAN CLAY, dark brown, moist, soft POORLY GRADED SAND WITH SILT AND GRAVEL, brown with light pinkish white, moist, loose to medium dense interlayered sandy lean clay and clayey sand, light brown to brown, moist to wet Boring Terminated at 15 Feet 3.0 15.0 4938+/- 4926+/- Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 2 0 2 0 5 1 2 1 P E D C O R A P A R T M E N T S . G P J T E R R A C O N _ D A T A T E M P L A T E . G D T 9 / 1 4 / 2 1 WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 FI E L D T E S T RE S U L T S SW E L L / CO N S O L I D A T I O N (P S F ) UN C O N F I N E D CO M P R E S S I V E ST R E N G T H ( p s f ) PE R C E N T F I N E S WA T E R CO N T E N T ( % ) DR Y U N I T WE I G H T ( p c f ) ATTERBERG LIMITS LL-PL-PI LOCATION See Exploration Plan Latitude: 40.5885° Longitude: -105.0198° GR A P H I C L O G MO D E L L A Y E R DEPTH ELEVATION (Ft.) Approximate Surface Elev.: 4941 (Ft.) +/- Page 1 of 1 Advancement Method: Advanced using 4-inch diameter, continuous-flight, solid-stem auger. Abandonment Method: Boring backfilled with auger cuttings upon completion. Notes: Project No.: 20205121 Drill Rig: CME 55 BORING LOG NO. B-1 Pedcor Investments, LLCCLIENT: Carmel, IN Driller: Drilling Engineers, Inc. Boring Completed: 09-01-2021 PROJECT: Pedcor Mulberry Apartments Elevations were interpolated from online topographic maps. See Supporting Information for explanation of symbols and abbreviations. Northwest of Mulberry Street and Greenfield Court Fort Collins, CO SITE: Boring Started: 09-01-2021 1901 Sharp Point Dr Ste C Fort Collins, CO 13 feet at completion of drilling. WATER LEVEL OBSERVATIONS 1 3 SA M P L E T Y P E 3.7 10.2 20.3 13.5 132 101 4-6 2-2-6 N=8 6-11 4-5-10 N=15 <+0.1/150 SANDY LEAN CLAY, dark brown, moist, stiff POORLY GRADED SAND WITH SILT AND GRAVEL, brown and light pinkish white, moist, loose SILTY SAND WITH GRAVEL, fine to coarse grained, brown, moist, medium dense trace gravel, moist to wet WELL GRADED SAND WITH GRAVEL, trace silt, brown, wet, medium dense Boring Terminated at 15.5 Feet 2.5 4.0 11.0 15.5 4936.5+/- 4935+/- 4928+/- 4923.5+/- Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 2 0 2 0 5 1 2 1 P E D C O R A P A R T M E N T S . G P J T E R R A C O N _ D A T A T E M P L A T E . G D T 9 / 1 4 / 2 1 WA T E R L E V E L OB S E R V A T I O N S PE R C E N T F I N E S WA T E R CO N T E N T ( % ) DR Y U N I T WE I G H T ( p c f ) ATTERBERG LIMITS LL-PL-PI LOCATION See Exploration Plan Latitude: 40.5872° Longitude: -105.0198° GR A P H I C L O G DE P T H ( F t . ) 5 10 15 FI E L D T E S T RE S U L T S SW E L L / CO N S O L I D A T I O N (P S F ) UN C O N F I N E D CO M P R E S S I V E ST R E N G T H ( p s f ) MO D E L L A Y E R DEPTH ELEVATION (Ft.) Approximate Surface Elev.: 4939 (Ft.) +/- Page 1 of 1 Advancement Method: Advanced using 4-inch diameter, continuous-flight, solid-stem auger. Abandonment Method: Boring backfilled with auger cuttings upon completion. Notes: Project No.: 20205121 Drill Rig: CME 55 BORING LOG NO. B-2 Pedcor Investments, LLCCLIENT: Carmel, IN Driller: Drilling Engineers, Inc. Boring Completed: 09-01-2021 PROJECT: Pedcor Mulberry Apartments Elevations were interpolated from online topographic maps. See Supporting Information for explanation of symbols and abbreviations. Northwest of Mulberry Street and Greenfield Court Fort Collins, CO SITE: Boring Started: 09-01-2021 1901 Sharp Point Dr Ste C Fort Collins, CO 11 feet at completion of drilling. WATER LEVEL OBSERVATIONS 1 3 2 4 SA M P L E T Y P E 2-2-2 N=4 2-4 4-4-7 N=11 8-18 19 5.2 5.5 21.0 6.6 97 138 NP POORLY GRADED SAND WITH SILT AND GRAVEL, light pinkish white and brown, dry to moist, loose SILTY SAND WITH GRAVEL (SM), brown, loose to medium dense interlayered sandy lean clay, brown, moist to wet, trace iron oxide staining trace gravel, light pinkish white and brown, wet Boring Terminated at 15 Feet 4.0 15.0 4930+/- 4919+/- Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 2 0 2 0 5 1 2 1 P E D C O R A P A R T M E N T S . G P J T E R R A C O N _ D A T A T E M P L A T E . G D T 9 / 1 4 / 2 1 WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 FI E L D T E S T RE S U L T S SW E L L / CO N S O L I D A T I O N (P S F ) UN C O N F I N E D CO M P R E S S I V E ST R E N G T H ( p s f ) PE R C E N T F I N E S WA T E R CO N T E N T ( % ) DR Y U N I T WE I G H T ( p c f ) ATTERBERG LIMITS LL-PL-PI LOCATION See Exploration Plan Latitude: 40.5857° Longitude: -105.0198° GR A P H I C L O G MO D E L L A Y E R DEPTH ELEVATION (Ft.) Approximate Surface Elev.: 4934 (Ft.) +/- Page 1 of 1 Advancement Method: Advanced using 4-inch diameter, continuous-flight, solid-stem auger. Abandonment Method: Boring backfilled with auger cuttings upon completion. Notes: Project No.: 20205121 Drill Rig: CME 55 BORING LOG NO. B-3 Pedcor Investments, LLCCLIENT: Carmel, IN Driller: Drilling Engineers, Inc. Boring Completed: 09-01-2021 PROJECT: Pedcor Mulberry Apartments Elevations were interpolated from online topographic maps. See Supporting Information for explanation of symbols and abbreviations. Northwest of Mulberry Street and Greenfield Court Fort Collins, CO SITE: Boring Started: 09-01-2021 1901 Sharp Point Dr Ste C Fort Collins, CO 9.6 feet at completion of drilling. WATER LEVEL OBSERVATIONS 3 2 SA M P L E T Y P E 1-1-1 N=2 2-4 2-3-8 N=11 18-30 +0.3/500 84 12.5 21.7 23.5 10.0 101 131 44-13-31 SILTY SAND WITH GRAVEL, brown, moist, very loose LEAN CLAY WITH SAND (CL), brown, moist, soft to medium stiff trace iron oxide staining SILTY SAND, brown, moist to wet, medium dense WELL GRADED SAND WITH SILT AND GRAVEL, brown, wet, dense Boring Terminated at 15 Feet 3.0 9.0 14.0 15.0 4937+/- 4931+/- 4926+/- 4925+/- Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 2 0 2 0 5 1 2 1 P E D C O R A P A R T M E N T S . G P J T E R R A C O N _ D A T A T E M P L A T E . G D T 9 / 1 4 / 2 1 WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 FI E L D T E S T RE S U L T S SW E L L / CO N S O L I D A T I O N (P S F ) UN C O N F I N E D CO M P R E S S I V E ST R E N G T H ( p s f ) PE R C E N T F I N E S WA T E R CO N T E N T ( % ) DR Y U N I T WE I G H T ( p c f ) ATTERBERG LIMITS LL-PL-PI LOCATION See Exploration Plan Latitude: 40.5876° Longitude: -105.0188° GR A P H I C L O G MO D E L L A Y E R DEPTH ELEVATION (Ft.) Approximate Surface Elev.: 4940 (Ft.) +/- Page 1 of 1 Advancement Method: Advanced using 4-inch diameter, continuous-flight, solid-stem auger. Abandonment Method: Boring backfilled with auger cuttings upon completion. Notes: Project No.: 20205121 Drill Rig: CME 55 BORING LOG NO. B-4 Pedcor Investments, LLCCLIENT: Carmel, IN Driller: Drilling Engineers, Inc. Boring Completed: 09-01-2021 PROJECT: Pedcor Mulberry Apartments Elevations were interpolated from online topographic maps. See Supporting Information for explanation of symbols and abbreviations. Northwest of Mulberry Street and Greenfield Court Fort Collins, CO SITE: Boring Started: 09-01-2021 1901 Sharp Point Dr Ste C Fort Collins, CO 11.6 feet at completion of drilling. WATER LEVEL OBSERVATIONS 2 1 2 4 SA M P L E T Y P E 3-4 2-2-4 N=6 5-24 2-4-6 N=10 45 12.5 12.9 14.4 21.0 121 123 NP POORLY GRADED SAND WITH SILT AND GRAVEL, interlayered sandy lean clay, light brown to dark brown, moist, loose, trace calcium carbonate SILTY SAND (SM), brown, moist, loose WELL GRADED SAND WITH GRAVEL, trace silt, light pinkish white, medium dense with silt SILTY SAND, brown, wet, medium dense Boring Terminated at 15.5 Feet 4.0 5.5 14.0 15.5 4932+/- 4930.5+/- 4922+/- 4920.5+/- Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 2 0 2 0 5 1 2 1 P E D C O R A P A R T M E N T S . G P J T E R R A C O N _ D A T A T E M P L A T E . G D T 9 / 1 4 / 2 1 WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 FI E L D T E S T RE S U L T S SW E L L / CO N S O L I D A T I O N (P S F ) UN C O N F I N E D CO M P R E S S I V E ST R E N G T H ( p s f ) PE R C E N T F I N E S WA T E R CO N T E N T ( % ) DR Y U N I T WE I G H T ( p c f ) ATTERBERG LIMITS LL-PL-PI LOCATION See Exploration Plan Latitude: 40.5864° Longitude: -105.0188° GR A P H I C L O G MO D E L L A Y E R DEPTH ELEVATION (Ft.) Approximate Surface Elev.: 4936 (Ft.) +/- Page 1 of 1 Advancement Method: Advanced using 4-inch diameter, continuous-flight, solid-stem auger. Abandonment Method: Boring backfilled with auger cuttings upon completion. Notes: Project No.: 20205121 Drill Rig: CME 55 BORING LOG NO. B-5 Pedcor Investments, LLCCLIENT: Carmel, IN Driller: Drilling Engineers, Inc. Boring Completed: 09-01-2021 PROJECT: Pedcor Mulberry Apartments Elevations were interpolated from online topographic maps. See Supporting Information for explanation of symbols and abbreviations. Northwest of Mulberry Street and Greenfield Court Fort Collins, CO SITE: Boring Started: 09-01-2021 1901 Sharp Point Dr Ste C Fort Collins, CO 7.6 feet at completion of drilling. WATER LEVEL OBSERVATIONS 3 2 4 2 SA M P L E T Y P E 5-6 8-14-11 N=25 8-13 3-4-6 N=10 99 12.1 3.2 4.9 31.5 123 125 75-22-53 SILTY SAND, trace gravel, brown, moist, loose to medium dense, trace calcium carbonate WELL GRADED SAND WITH GRAVEL, trace clay, light pinkish white and brown, medium dense FAT CLAY (CH), brown with red and white, stiff Boring Terminated at 15.5 Feet 4.0 14.0 15.5 4936+/- 4926+/- 4924.5+/- Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 2 0 2 0 5 1 2 1 P E D C O R A P A R T M E N T S . G P J T E R R A C O N _ D A T A T E M P L A T E . G D T 9 / 1 4 / 2 1 WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 FI E L D T E S T RE S U L T S SW E L L / CO N S O L I D A T I O N (P S F ) UN C O N F I N E D CO M P R E S S I V E ST R E N G T H ( p s f ) PE R C E N T F I N E S WA T E R CO N T E N T ( % ) DR Y U N I T WE I G H T ( p c f ) ATTERBERG LIMITS LL-PL-PI LOCATION See Exploration Plan Latitude: 40.5884° Longitude: -105.0181° GR A P H I C L O G MO D E L L A Y E R DEPTH ELEVATION (Ft.) Approximate Surface Elev.: 4940 (Ft.) +/- Page 1 of 1 Advancement Method: Advanced using 4-inch diameter, continuous-flight, solid-stem auger. Abandonment Method: Boring backfilled with auger cuttings upon completion. Notes: Project No.: 20205121 Drill Rig: CME 55 BORING LOG NO. B-6 Pedcor Investments, LLCCLIENT: Carmel, IN Driller: Drilling Engineers, Inc. Boring Completed: 09-01-2021 PROJECT: Pedcor Mulberry Apartments Elevations were interpolated from online topographic maps. See Supporting Information for explanation of symbols and abbreviations. Northwest of Mulberry Street and Greenfield Court Fort Collins, CO SITE: Boring Started: 09-01-2021 1901 Sharp Point Dr Ste C Fort Collins, CO No free water observed. WATER LEVEL OBSERVATIONS 2 4 1 SA M P L E T Y P E 3-2-5 N=7 5-7 3-3-6 N=9 2-4 11.8 4.0 27.0 26.5 122 SILTY SAND, interlayered with sandy lean clay and gravel, light brown to brown, moist, loose WELL GRADED SAND WITH GRAVEL, trace silt, light pinkish white, medium dense SILTY SAND, interlayered sandy lean clay, black, moist to wet, loose, trace iron oxide staining wet Boring Terminated at 15 Feet 3.5 9.0 15.0 4933.5+/- 4928+/- 4922+/- Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 2 0 2 0 5 1 2 1 P E D C O R A P A R T M E N T S . G P J T E R R A C O N _ D A T A T E M P L A T E . G D T 9 / 1 4 / 2 1 WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 FI E L D T E S T RE S U L T S SW E L L / CO N S O L I D A T I O N (P S F ) UN C O N F I N E D CO M P R E S S I V E ST R E N G T H ( p s f ) PE R C E N T F I N E S WA T E R CO N T E N T ( % ) DR Y U N I T WE I G H T ( p c f ) ATTERBERG LIMITS LL-PL-PI LOCATION See Exploration Plan Latitude: 40.5875° Longitude: -105.0181° GR A P H I C L O G MO D E L L A Y E R DEPTH ELEVATION (Ft.) Approximate Surface Elev.: 4937 (Ft.) +/- Page 1 of 1 Advancement Method: Advanced using 4-inch diameter, continuous-flight, solid-stem auger. Abandonment Method: Boring backfilled with auger cuttings upon completion. Notes: Project No.: 20205121 Drill Rig: CME 55 BORING LOG NO. B-7 Pedcor Investments, LLCCLIENT: Carmel, IN Driller: Drilling Engineers, Inc. Boring Completed: 09-01-2021 PROJECT: Pedcor Mulberry Apartments Elevations were interpolated from online topographic maps. See Supporting Information for explanation of symbols and abbreviations. Northwest of Mulberry Street and Greenfield Court Fort Collins, CO SITE: Boring Started: 09-01-2021 1901 Sharp Point Dr Ste C Fort Collins, CO 10.5 feet at completion of drilling. WATER LEVEL OBSERVATIONS 2 4 2 SA M P L E T Y P E 3-5 4-5 124.4 18.8 114 112 NP POORLY GRADED SAND WITH SILT AND GRAVEL (SP-SM), interlayered sandy lean clay, light brown to brown and orange, moist, loose SILTY SAND WITH GRAVEL, interlayered sandy lean clay, brown, loose, trace calcium carbonate observed Boring Terminated at 5 Feet 4.0 5.0 4930+/- 4929+/- Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 2 0 2 0 5 1 2 1 P E D C O R A P A R T M E N T S . G P J T E R R A C O N _ D A T A T E M P L A T E . G D T 9 / 1 4 / 2 1 WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 FI E L D T E S T RE S U L T S SW E L L / CO N S O L I D A T I O N (P S F ) UN C O N F I N E D CO M P R E S S I V E ST R E N G T H ( p s f ) PE R C E N T F I N E S WA T E R CO N T E N T ( % ) DR Y U N I T WE I G H T ( p c f ) ATTERBERG LIMITS LL-PL-PI LOCATION See Exploration Plan Latitude: 40.5881° Longitude: -105.0188° GR A P H I C L O G MO D E L L A Y E R DEPTH ELEVATION (Ft.) Approximate Surface Elev.: 4934 (Ft.) +/- Page 1 of 1 Advancement Method: Advanced using 4-inch diameter, continuous-flight, solid-stem auger. Abandonment Method: Boring backfilled with auger cuttings upon completion. Notes: Project No.: 20205121 Drill Rig: CME 55 BORING LOG NO. P-1 Pedcor Investments, LLCCLIENT: Carmel, IN Driller: Drilling Engineers, Inc. Boring Completed: 09-01-2021 PROJECT: Pedcor Mulberry Apartments Elevations were interpolated from online topographic maps. See Supporting Information for explanation of symbols and abbreviations. Northwest of Mulberry Street and Greenfield Court Fort Collins, CO SITE: Boring Started: 09-01-2021 1901 Sharp Point Dr Ste C Fort Collins, CO No free water observed. WATER LEVEL OBSERVATIONS 3 2 SA M P L E T Y P E 2-2-2 N=4 2-2 6-5-13 N=18 4-5 4-11-20 N=31 4 20.3 6.1 10.6 8.9 17.6 129 NP SANDY LEAN CLAY, dark brown, moist, soft SILTY SAND, trace gravel, brown, moist, very loose to loose WELL GRADED SAND WITH GRAVEL (SW), brown and light pinkish white, moist, very loose to dense trace silt interlayered clayey sand, trace iron oxide staining Boring Terminated at 20.5 Feet 3.0 4.0 20.5 4932+/- 4931+/- 4914.5+/- Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 2 0 2 0 5 1 2 1 P E D C O R A P A R T M E N T S . G P J T E R R A C O N _ D A T A T E M P L A T E . G D T 9 / 1 4 / 2 1 WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 20 FI E L D T E S T RE S U L T S SW E L L / CO N S O L I D A T I O N (P S F ) UN C O N F I N E D CO M P R E S S I V E ST R E N G T H ( p s f ) PE R C E N T F I N E S WA T E R CO N T E N T ( % ) DR Y U N I T WE I G H T ( p c f ) ATTERBERG LIMITS LL-PL-PI LOCATION See Exploration Plan Latitude: 40.5856° Longitude: -105.0188° GR A P H I C L O G MO D E L L A Y E R DEPTH ELEVATION (Ft.) Approximate Surface Elev.: 4935 (Ft.) +/- Page 1 of 1 Advancement Method: Advanced using 4-inch diameter, continuous-flight, solid-stem auger. Abandonment Method: Boring backfilled with auger cuttings upon completion. Notes: Project No.: 20205121 Drill Rig: CME 55 BORING LOG NO. R-1 Pedcor Investments, LLCCLIENT: Carmel, IN Driller: Drilling Engineers, Inc. Boring Completed: 09-01-2021 PROJECT: Pedcor Mulberry Apartments Elevations were interpolated from online topographic maps. See Supporting Information for explanation of symbols and abbreviations. Northwest of Mulberry Street and Greenfield Court Fort Collins, CO SITE: Boring Started: 09-01-2021 1901 Sharp Point Dr Ste C Fort Collins, CO 6.5 feet at completion of drilling. WATER LEVEL OBSERVATIONS 1 2 4 SA M P L E T Y P E 2-2 1-1-1 N=2 8-11 5-9-10 N=19 3-4 <-0.1/250 1710 5417.3 14.9 10.4 16.4 26.4 113 113 129 99 27-10-17 SANDY LEAN CLAY (CL), trace gravel, dark brown, moist, soft SILTY SAND, trace gravel, brown and red, moist, very loose, trace iron oxide staining WELL GRADED SAND WITH GRAVEL, trace silt, light pinkish white and brown, moist to wet, medium dense SILTY SAND, brown, wet, loose Boring Terminated at 20 Feet 4.0 9.0 19.0 20.0 4931+/- 4926+/- 4916+/- 4915+/- Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 2 0 2 0 5 1 2 1 P E D C O R A P A R T M E N T S . G P J T E R R A C O N _ D A T A T E M P L A T E . G D T 9 / 1 4 / 2 1 WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 20 FI E L D T E S T RE S U L T S SW E L L / CO N S O L I D A T I O N (P S F ) UN C O N F I N E D CO M P R E S S I V E ST R E N G T H ( p s f ) PE R C E N T F I N E S WA T E R CO N T E N T ( % ) DR Y U N I T WE I G H T ( p c f ) ATTERBERG LIMITS LL-PL-PI LOCATION See Exploration Plan Latitude: 40.5859° Longitude: -105.0181° GR A P H I C L O G MO D E L L A Y E R DEPTH ELEVATION (Ft.) Approximate Surface Elev.: 4935 (Ft.) +/- Page 1 of 1 Advancement Method: Advanced using 4-inch diameter, continuous-flight, solid-stem auger. Abandonment Method: Boring backfilled with auger cuttings upon completion. Notes: Project No.: 20205121 Drill Rig: CME 55 BORING LOG NO. R-2 Pedcor Investments, LLCCLIENT: Carmel, IN Driller: Drilling Engineers, Inc. Boring Completed: 09-01-2021 PROJECT: Pedcor Mulberry Apartments Elevations were interpolated from online topographic maps. See Supporting Information for explanation of symbols and abbreviations. Northwest of Mulberry Street and Greenfield Court Fort Collins, CO SITE: Boring Started: 09-01-2021 1901 Sharp Point Dr Ste C Fort Collins, CO 8.3 feet at completion of drilling WATER LEVEL OBSERVATIONS 1 2 4 2 SA M P L E T Y P E 0 10 20 30 40 50 60 0 20 40 60 80 100 CH o r OH CL or OL ML or OL MH or OH "U " Lin e "A " L i n e ATTERBERG LIMITS RESULTS ASTM D4318 P L A S T I C I T Y I N D E X LIQUID LIMIT PROJECT NUMBER: 20205121 SITE: Northwest of Mulberry Street and Greenfield Court Fort Collins, CO PROJECT: Pedcor Mulberry Apartments CLIENT: Pedcor Investments, LLC Carmel, IN 1901 Sharp Point Dr Ste C Fort Collins, CO LA B O R A T O R Y T E S T S A R E N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . A T T E R B E R G L I M I T S 2 0 2 0 5 1 2 1 P E D C O R A P A R T M E N T S . G P J T E R R A C O N _ D A T A T E M P L A T E . G D T 9 / 1 4 / 2 1 NP 44 NP 75 NP NP 27 NP 13 NP 22 NP NP 10 NP 31 NP 53 NP NP 17 PIPLLLBoring ID Depth B-3 B-4 B-5 B-6 P-1 R-1 R-2 18.5 84.1 44.9 99.4 11.8 3.6 54.2 Fines 4 - 5 4 - 5 4 - 5.5 14 - 15.5 2 - 3 9 - 10.5 2 - 3 SM CL SM CH SP-SM SW CL SILTY SAND with GRAVEL LEAN CLAY with SAND SILTY SAND FAT CLAY POORLY GRADED SAND with SILT and GRAVEL WELL-GRADED SAND with GRAVEL SANDY LEAN CLAY DescriptionUSCS CL-ML 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 30 40 501.5 200681014413/4 1/2 60 GRAIN SIZE IN MILLIMETERS PE R C E N T F I N E R B Y W E I G H T HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS 4 3/8 3 100 14032 GRAIN SIZE DISTRIBUTION ASTM D422 / ASTM C136 6 16 20 PROJECT NUMBER: 20205121 SITE: Northwest of Mulberry Street and Greenfield Court Fort Collins, CO PROJECT: Pedcor Mulberry Apartments CLIENT: Pedcor Investments, LLC Carmel, IN 1901 Sharp Point Dr Ste C Fort Collins, CO LA B O R A T O R Y T E S T S A R E N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G R A I N S I Z E : U S C S - 2 2 0 2 0 5 1 2 1 P E D C O R A P A R T M E N T S . G P J T E R R A C O N _ D A T A T E M P L A T E . G D T 9 / 1 4 / 2 1 SILT OR CLAY B-3 B-4 B-5 B-6 P-1 mediumcoarsecoarsefine fineCOBBLESGRAVELSAND SILTY SAND with GRAVEL (SM) LEAN CLAY with SAND (CL) SILTY SAND (SM) FAT CLAY (CH) POORLY GRADED SAND with SILT and GRAVEL (SP-SM) NP 44 NP 75 NP 1.47 4.85 1.96 838490196589899000000.00 NP 31 NP 53 NP NP 13 NP 22 NP 25.09 8.73 29.99 17337082204429600000000.00 4 - 5 4 - 5 4 - 5.5 14 - 15.5 2 - 3 5.5 21.7 12.9 31.5 4.4 B-3 B-4 B-5 B-6 P-1 99.4 11.8 3.7 9.3 8.5 14.8 74.9 36.4 4 - 5 4 - 5 4 - 5.5 14 - 15.5 2 - 3 16.1 0.0 1.0 21.9 65.4 15.9 54.1 66.3 12.5 9.5 9.5 0.075 12.5 1.447 0.059 0.234 2.243 0.35 0.044 0.06 0.493 0.058 0.007 0.008 Boring ID Depth WC (%)LL PL PI Cc Cu %Clay%Fines%Silt%Sand%Gravel Boring ID Depth D100 D60 D30 D10 USCS Classification %Cobbles 0.0 0.0 0.0 0.0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 30 40 501.5 200681014413/4 1/2 60 GRAIN SIZE IN MILLIMETERS PE R C E N T F I N E R B Y W E I G H T HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS 4 3/8 3 100 14032 GRAIN SIZE DISTRIBUTION ASTM D422 / ASTM C136 6 16 20 PROJECT NUMBER: 20205121 SITE: Northwest of Mulberry Street and Greenfield Court Fort Collins, CO PROJECT: Pedcor Mulberry Apartments CLIENT: Pedcor Investments, LLC Carmel, IN 1901 Sharp Point Dr Ste C Fort Collins, CO LA B O R A T O R Y T E S T S A R E N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G R A I N S I Z E : U S C S - 2 2 0 2 0 5 1 2 1 P E D C O R A P A R T M E N T S . G P J T E R R A C O N _ D A T A T E M P L A T E . G D T 9 / 1 4 / 2 1 SILT OR CLAY R-1 R-2 mediumcoarsecoarsefine fineCOBBLESGRAVELSAND WELL-GRADED SAND with GRAVEL (SW) SANDY LEAN CLAY (CL) NP 27 1.01NP 17 NP 10 8.999 - 10.5 2 - 3 10.6 17.3 R-1 R-2 3.6 54.2 9 - 10.5 2 - 3 22.5 0.3 73.9 45.5 19 9.5 2.592 0.094 0.868 0.288 Boring ID Depth WC (%)LL PL PI Cc Cu %Clay%Fines%Silt%Sand%Gravel Boring ID Depth D100 D60 D30 D10 USCS Classification %Cobbles 0.0 0.0 -4 -3 -2 -1 0 1 2 3 4 100 1,000 10,000 AX I A L S T R A I N , % PRESSURE, psf SWELL CONSOLIDATION TEST ASTM D4546 NOTES: Sample swelled slightly upon wetting under an applied pressure of 150 psf. PROJECT NUMBER: 20205121PROJECT: Pedcor MulberryApartments SITE: Northwest of Mulberry Streetand Greenfield Court Fort Collins, CO CLIENT: Pedcor Investments, LLC Carmel, IN1901 Sharp Point Dr Ste C Fort Collins, CO LA B O R A T O R Y T E S T S A R E N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . 6 5 1 5 5 0 4 5 - S W E L L / C O N S O L 2 0 2 0 5 1 2 1 P E D C O R A P A R T M E N T S . G P J T E R R A C O N _ D A T A T E M P L A T E . G D T 9 / 1 4 / 2 1 132 4SANDY LEAN CLAY2 - 3 ftB-2 Specimen Identification Classification , pcf WC, % -4 -3 -2 -1 0 1 2 3 4 100 1,000 10,000 AX I A L S T R A I N , % PRESSURE, psf SWELL CONSOLIDATION TEST ASTM D4546 NOTES: Sample exhibited 0.3 percent swell upon wetting under an applied pressure of 500 psf. PROJECT NUMBER: 20205121PROJECT: Pedcor MulberryApartments SITE: Northwest of Mulberry Streetand Greenfield Court Fort Collins, CO CLIENT: Pedcor Investments, LLC Carmel, IN1901 Sharp Point Dr Ste C Fort Collins, CO LA B O R A T O R Y T E S T S A R E N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . 6 5 1 5 5 0 4 5 - S W E L L / C O N S O L 2 0 2 0 5 1 2 1 P E D C O R A P A R T M E N T S . G P J T E R R A C O N _ D A T A T E M P L A T E . G D T 9 / 1 4 / 2 1 101 22LEAN CLAY with SAND(CL)4 - 5 ftB-4 Specimen Identification Classification , pcf WC, % -4 -3 -2 -1 0 1 2 3 4 100 1,000 10,000 AX I A L S T R A I N , % PRESSURE, psf SWELL CONSOLIDATION TEST ASTM D4546 NOTES: Sample exhibited slight compression upon wetting under an applied pressure of 250 psf. PROJECT NUMBER: 20205121PROJECT: Pedcor MulberryApartments SITE: Northwest of Mulberry Streetand Greenfield Court Fort Collins, CO CLIENT: Pedcor Investments, LLC Carmel, IN1901 Sharp Point Dr Ste C Fort Collins, CO LA B O R A T O R Y T E S T S A R E N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . 6 5 1 5 5 0 4 5 - S W E L L / C O N S O L 2 0 2 0 5 1 2 1 P E D C O R A P A R T M E N T S . G P J T E R R A C O N _ D A T A T E M P L A T E . G D T 9 / 1 4 / 2 1 113 17SILTY SAND4 - 5.5 ftR-2 Specimen Identification Classification , pcf WC, % 0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 0 4 8 12 16 AXIAL STRAIN - % UNCONFINED COMPRESSION TEST ASTM D2166 CO M P R E S S I V E S T R E S S - p s f PROJECT NUMBER: 20205121 SITE: Northwest of Mulberry Street and Greenfield Court Fort Collins, CO PROJECT: Pedcor Mulberry Apartments CLIENT: Pedcor Investments, LLC Carmel, IN 1901 Sharp Point Dr Ste C Fort Collins, CO LA B O R A T O R Y T E S T S A R E N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . U N C O N F I N E D W I T H P H O T O S 2 0 2 0 5 1 2 1 P E D C O R A P A R T M E N T S . G P J T E R R A C O N _ D A T A T E M P L A T E . G D T 9 / 1 4 / 2 1 SAMPLE LOCATION:R-2 @ 2 - 3 feetSAMPLE TYPE: CARS 0.43 103.77 111 Strain Rate:in/min Failure Strain:% Calculated Saturation:% Height:in. Diameter:in. SPECIMEN FAILURE PHOTOGRAPH Remarks: Percent < #200 SievePIPLLL 856 DESCRIPTION: SANDY LEAN CLAY(CL) -0.0800 Dry Density:pcf Moisture Content:% 14.02 2.06 2.6 Height / Diameter Ratio: Calculated Void Ratio: Undrained Shear Strength:(psf) Unconfined Compressive Strength (psf) 171027 Assumed Specific Gravity: 1711 3.95 1.91 SPECIMEN TEST DATA 20.4 54.2 Project Number: Service Date: Report Date: Client Analyzed By: 322 2,688 B-7 557 2-3.5 2-3.5 B-1 B-5 2-3.5 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. 20205121 Field Engineer 09/10/21 09/10/21 10400 State Highway 191 Midland, Texas 79707 432-684-9600 Project Water Soluble Sulfate (SO4), ASTM C 1580 (mg/kg)Sample Location CHEMICAL LABORATORY TEST REPORT Nohelia Monasterios Pedcor Investments, LLC Pedcor Apartments Mulberry St 770 3rd Ave SW Carmel, IN 46032-2036 Fort Collins, CO 80524 Northwest of Mulberry Street and Greenfield Court Sample Depth SUPPORTING INFORMATION Contents: General Notes Unified Soil Classification System Note: All attachments are one page unless noted above. Pedcor Apartments Mulberry St Fort Collins, CO Terracon Project No. 20205121 less than 500 1,000 to 2,000 > 8,000 Unconfined Compressive Strength Qu, (psf) 500 to 1,000 2,000 to 4,000 4,000 to 8,000 Modified California Ring Sampler Standard Penetration Test N (HP) (T) (DCP) UC (PID) (OVA) Standard Penetration Test Resistance (Blows/Ft.) Hand Penetrometer Torvane Dynamic Cone Penetrometer Unconfined Compressive Strength Photo-Ionization Detector Organic Vapor Analyzer SAMPLING WATER LEVEL FIELD TESTS GENERAL NOTES DESCRIPTION OF SYMBOLS AND ABBREVIATIONS Water levels indicated on the soil boring logs are the levels measured in the borehole at the times indicated. Groundwater level variations will occur over time. In low permeability soils, accurate determination of groundwater levels is not possible with short term water level observations. Water Initially Encountered Water Level After a Specified Period of Time Water Level After a Specified Period of Time Cave In Encountered Exploration point locations as shown on the Exploration Plan and as noted on the soil boring logs in the form of Latitude and Longitude are approximate. See Exploration and Testing Procedures in the report for the methods used to locate the exploration points for this project. Surface elevation data annotated with +/- indicates that no actual topographical survey was conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic maps of the area. LOCATION AND ELEVATION NOTES Soil classification as noted on the soil boring logs is based Unified Soil Classification System. Where sufficient laboratory data exist to classify the soils consistent with ASTM D2487 "Classification of Soils for Engineering Purposes" this procedure is used. ASTM D2488 "Description and Identification of Soils (Visual-Manual Procedure)" is also used to classify the soils, particularly where insufficient laboratory data exist to classify the soils in accordance with ASTM D2487. In addition to USCS classification, coarse grained soils are classified on the basis of their in-place relative density, and fine-grained soils are classified on the basis of their consistency. See "Strength Terms" table below for details. The ASTM standards noted above are for reference to methodology in general. In some cases, variations to methods are applied as a result of local practice or professional judgment. DESCRIPTIVE SOIL CLASSIFICATION The soil boring logs contained within this document are intended for application to the project as described in this document. Use of these soil boring logs for any other purpose may not be appropriate. RELEVANCE OF SOIL BORING LOG Descriptive Term (Consistency) CONSISTENCY OF FINE-GRAINED SOILS Hard Very Loose Loose Medium Dense Dense Very Dense Descriptive Term (Density) Standard Penetration or N-Value Blows/Ft. 0 - 3 4 - 9 10 - 29 30 - 50 > 50 Very Stiff Standard Penetration or N-Value Blows/Ft. Ring Sampler Blows/Ft. Ring Sampler Blows/Ft. 5 - 9 Stiff 6 - 14 15 - 46 47 - 79 > 80 Medium Stiff Soft Very Soft (50% or more passing the No. 200 sieve.) Consistency determined by laboratory shear strength testing, field visual-manual procedures or standard penetration resistance STRENGTH TERMS RELATIVE DENSITY OF COARSE-GRAINED SOILS (More than 50% retained on No. 200 sieve.) Density determined by Standard Penetration Resistance 2 - 4 4 - 8 8 - 15 15 - 30 > 30 0 - 1 3 - 4 < 3 10 - 18 19 - 42 > 42 0 - 5 _ UNIFIED SOIL CLASSIFICATION SYSTEM UNIFIED SOI L CLASSI FICATI ON SYSTEM Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests A Soil Classification Group Symbol Group Name B Coarse-Grained Soils: More than 50% retained on No. 200 sieve Gravels: More than 50% of coarse fraction retained on No. 4 sieve Clean Gravels: Less than 5% fines C Cu ³ 4 and 1 £ Cc £ 3 E GW Well-graded gravel F Cu < 4 and/or [Cc<1 or Cc>3.0]E GP Poorly graded gravel F Gravels with Fines: More than 12% fines C Fines classify as ML or MH GM Silty gravel F, G, H Fines classify as CL or CH GC Clayey gravel F, G, H Sands: 50% or more of coarse fraction passes No. 4 sieve Clean Sands: Less than 5% fines D Cu ³ 6 and 1 £ Cc £ 3 E SW Well-graded sand I Cu < 6 and/or [Cc<1 or Cc>3.0]E SP Poorly graded sand I Sands with Fines: More than 12% fines D Fines classify as ML or MH SM Silty sand G, H, I Fines classify as CL or CH SC Clayey sand G, H, I Fine-Grained Soils: 50% or more passes the No. 200 sieve Silts and Clays: Liquid limit less than 50 Inorganic:PI > 7 and plots on or above “A” line J CL Lean clay K, L, M PI < 4 or plots below “A” line J ML Silt K, L, M Organic:Liquid limit - oven dried < 0.75 OL Organic clay K, L, M, N Liquid limit - not dried Organic silt K, L, M, O Silts and Clays: Liquid limit 50 or more Inorganic:PI plots on or above “A” line CH Fat clay K, L, M PI plots below “A” line MH Elastic Silt K, L, M Organic:Liquid limit - oven dried < 0.75 OH Organic clay K, L, M, P Liquid limit - not dried Organic silt K, L, M, Q Highly organic soils:Primarily organic matter, dark in color, and organic odor PT Peat A Based on the material passing the 3-inch (75-mm) sieve. B If field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name. C Gravels with 5 to 12% fines require dual symbols: GW-GM well-graded gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly graded gravel with silt, GP-GC poorly graded gravel with clay. D Sands with 5 to 12% fines require dual symbols: SW-SM well-graded sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay. E Cu = D60/D10 Cc = 6010 2 30 DxD )(D F If soil contains ³ 15% sand, add “with sand” to group name. G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM. H If fines are organic, add “with organic fines” to group name. I If soil contains ³ 15% gravel, add “with gravel” to group name. J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay. K If soil contains 15 to 29% plus No. 200, add “with sand” or “with gravel,” whichever is predominant. L If soil contains ³ 30% plus No. 200 predominantly sand, add “sandy” to group name. MIf soil contains ³ 30% plus No. 200, predominantly gravel, add “gravelly” to group name. N PI ³ 4 and plots on or above “A” line. O PI < 4 or plots below “A” line. P PI plots on or above “A” line. Q PI plots below “A” line.