HomeMy WebLinkAboutBLOOM FILING THREE MULTI-FAMILY DWELLINGS - PDP220011 - SUBMITTAL DOCUMENTS - ROUND 4 - DRAINAGE REPORT
Preliminary Drainage and Erosion Control Report
for
Bloom Filing Three
Fort Collins, Colorado
June 14, 2023
June 14, 2023
Mr. Wes Lamarque
City of Fort Collins
Water Utilities--Storm water
700 Wood Street
Fort Collins, Colorado 80521
RE: Preliminary Drainage and Erosion Control Report Bloom Filing Three
Dear Wes:
We are pleased to submit to you, for your review and approval, this Preliminary Drainage and
Erosion Control Report for Bloom Filing Three. All computations within this report have been
completed in compliance with the City of Fort Collins Storm Drainage Design Criteria.
We appreciate your time and consideration in reviewing this submittal. Please call if you have any
questions.
Respectfully,
Aspen Engineering
John Gooch, P.E.
Principal
TABLE OF CONTENTS
DESCRIPTION PAGE
I. GENERAL LOCATION AND DESCRIPTION 5
A. LOCATION 5
B. DESCRIPTION OF PROPERTY 5
II. DRAINAGE BASINS 6
A. MAJOR BASIN DESCRIPTION 6
B. EXISTING SUB-BASIN DESCRIPTION 6
C. PROPOSED SUB-BASIN DESCRIPTION 6
III. DRAINAGE DESIGN CRITERIA 7
A. REGULATIONS 7
B. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS 7
C. HYDROLOGIC CRITERIA 8
D. HYDRAULIC CRITERIA 8
E. VARIANCES 8
IV. DRAINAGE FACILITY DESIGN 8
A. GENERAL CONCEPT 8
B. SPECIFIC DETAILS 9
C. RAIN GARDEN 16
D. STREET CAPACITIES 16
V. STORM WATER QUALITY 16
A. GENERAL CONCEPT & SPECIFIC DETAILS 16
VI. EROSION CONTROL 17
A. GENERAL CONCEPT 17
VII. CONCLUSIONS 18
A. COMPLIANCE WITH STANDARDS & STORMWATER 18
OPERATIONS/ MAINTENANCE PROCEDURE
B. DRAINAGE CONCEPT 19
C. STORM WATER QUALITY 19
D. EROSION CONTROL CONCEPT 19
E. EROSION CONTROL ESCROW ESTIMATE 20
REFERENCES 21
APPENDIX
PAGE
VICINITY MAP, SOILS MAP A
RATIONAL METHOD HYDROLOGY B
LID CALCULATIONS & STORM SEWER PIPE SIZING C
INLET & CONCRETE SIDEWALK CULVERT SIZING D
SWALE SIZING E
EROSION CONTROL & RIPRAP SIZING F
PROPOSED AND EXISTING DRAINAGE BASIN EXHIBITS G
5
PRELIMINARY DRAINAGE
AND EROSION CONTROL REPORT
FOR BLOOM FILING THREE
FORT COLLINS, COLORADO
I. GENERAL LOCATION AND DESCRIPTION
A. Location
The Bloom Filing Three project is located within the Bloom Masterplan
Development (Bloom Filing 1) and will be bounded by International Boulevard to
the north, Aria Way to the east, Donella Drive to the south, and Delozier Road to the
west, once the adjacent Bloom Masterplan Development roadway infrastructure is
completed.
The project site can also be described as situated in the southwest quarter of Section
9, Township 7 North, Range 68 West of the 6th P.M., City of Fort Collins, County of
Larimer, State of Colorado. The site (property boundary) comprises approximately
16.36 acres (see vicinity map Appendix A).
B. Description of Property
The project site is currently an existing 16.36-acre agricultural field. With the Bloom
Masterplan Development (Bloom Filing 1), the Bloom Filing Three site will be
overlot graded, along with adjacent roadway and utility infrastructure also
constructed.
The existing site has topography which generally slopes from the northwest to the
south-southeast at approximately 0.8%, with varying slopes from 0.4% to 2.1%.
The proposed development consists of 360 apartment units housed in 15 buildings, a
Community Building with pool, and associated street, water, sanitary sewer, storm
sewer, and private infrastructure improvements, as well as intermittent green spaces
and outdoor spaces.
6
II. DRAINAGE BASINS
A. Major Basin Description
The Bloom Filing Three project is located within the City of Fort Collins Lower
Cooper Slough Drainage Basin. The Lower Cooper Slough Drainage Basin
generally flows from the northwest to southeast and ultimately outlets into the
Poudre River.
B. Existing Sub-Basin Description
The Bloom Filing Three project site is located within proposed Drainage Basin FUT-
G, of the Bloom Filing 1 Final Drainage Report. For the purposes of this report,
basin FUT-G is considered the “Existing Drainage Basin” for the Bloom Filing Three
site.
The rational calculations in the Bloom Filing 1 Final Drainage Report provide for the
Bloom Filing Three site being approximately 17.03 acres, with a 100-year allowable
release rate of 145.9 cfs, or approximately 8.57 cfs/acre. The C2 and C100 values for
basin FUT-G are shown to be 0.90 and 1.00, respectively for the 2-year and 100-year
imperviousness ratios in the Bloom Filing 1 report.
Runoff from the attributable portions of the Bloom Filing Three site, within existing
basin FUT-G, will be conveyed to Ponds E, G, and G1 as shown in the Bloom Filing
1 Final Drainage Report.
Please refer to the Bloom Filing 1 Final Drainage Report for masterplan drainage
details. Please also see the excerpts from the Bloom Filing 1 Final Drainage Report
for the Existing Drainage Basin Exhibit, which can be found in Appendix G.
C. Proposed Sub-Basin Description
The proposed development consists of approximately 16.36 acres, and will include
360 apartment units housed in 15 buildings, a Community Building with pool, and
associated street, water, sanitary sewer, storm sewer, and private infrastructure
improvements, as well as intermittent green spaces and outdoor spaces.
Runoff from the proposed 16.36-acre site will be ultimately conveyed to the offsite
regional water quality and detention Ponds E, G and G1 within the Masterplan
Development. Pond E is located northeast of the Bloom Filing Three site, while
Pond G is located east, from the southeast corner of the Bloom Filing Three site.
Pond G1 is located south, from the southwest corner of the site.
Approximately 12.98 acres of the 16.36-acre site area will also have flow pass
through the large on-site rain garden, located in the south end of the Bloom Filing
7
Three site, prior to attributing flow being directed to the offsite regional water quality
and detention Pond G1. The proposed design provides LID treatment for
approximately 84% of the new impervious area of the proposed site and applicable
attributing basins to the LID basin (rain garden).
It is important to note that a small portion of the site (approximately 0.2 acres) along
the northeast portion of the north boundary of the site will flow to the adjacent public
streets and storm inlet system, as provided by the Bloom Masterplan Development.
Please refer to the Bloom Filing 1 Final Drainage Report for details on these areas, as
well as the routing of storm flow from the Bloom Filing Three Development and
associated Bloom Masterplan Development to the ultimate downstream receiving
waters.
The proposed private drives and adjacent parking areas will be constructed of
concrete or asphalt, while interior sidewalks will be constructed of concrete to serve
pedestrians and provide access throughout the site. Lawn areas and landscaping will
be provided throughout the site, as shown in the site and landscape plans.
III. DRAINAGE BASIN CRITERIA
A. Regulations
The Bloom Filing Three project is being constructed, and drainage design completed
in accordance with the Bloom Filing 1 Final Drainage Report for the overall Bloom
Masterplan. It’s important to note that proposed offsite, regional Ponds E, G, and G1
are designed to detain and provide water quality for the attributable 16.36-acre
Bloom Filing Three site; however, LID requirements will be fully provided on-site
by the Bloom Filing Three development.
B. Development Criteria Reference and Constraints
The criteria and constraints from the City of Fort Collins, as well as those required in
the Bloom Filing 1 Final Drainage Report for the Bloom Filing Three site, will be
met. Water quality and detention requirements for the site are being provided for via
the proposed offsite regional Ponds E, G, and G1, which are being designed and
constructed by others. LID requirements for the Bloom Filing Three site are being
met by a large on-site rain garden, which treats approximately 84% of new,
applicable LID impervious area within the Bloom Filing Three Development, thus
exceeding the 75% treatment area requirement, per City criteria.
8
C. Hydrologic Criteria
The Rational Method for determining surface runoff was used for the project site.
The 2-year and 100-year storm event intensities were used in calculating runoff
values. The City of Fort Collins intensity duration frequency curves were used to
obtain rainfall data for each storm specified.
D. Hydraulic Criteria
All hydraulic calculations within this report have been prepared in accordance with
the City of Fort Collins Drainage Criteria and are also included in the Appendices.
Final sizing of storm sewer pipes, inlets, culverts, curb cuts, swales, and riprap and
erosion control calculations will be completed during final design. LID calculations
have been provided in this report, and can be found in Appendix C.
E. Variances
No variances are being requested at this time.
IV. DRAINAGE FACILITY DESIGN
A. General Concept
Forty proposed onsite drainage basins have been created to analyze the drainage for
the proposed development.
Basins 1-23 (12.98 acres) will drain ultimately to the proposed rain garden, located in
the south end of the site, via overland flow, curb and gutter, and proposed storm
sewer systems. The majority of flow from the site will pass through the rain garden,
before being routed to the offsite regional Pond G1, located south of the Bloom
Filing Three site.
Basins 24-38 (2.94 ac) will drain to the adjacent public streets, where runoff will be
directed to the inlets within the public street system, then conveyed to the offsite
regional Ponds G, G1, and E, of the Bloom Filing 1 Development.
Storm flows from Basin 24 (0.20 ac) flow overland onto International Blvd. to a
Type R inlet, and then ultimately to Regional Pond E.
Storm flows from Basins 25-33 (1.7 ac) flow overland and through chases onto Aria
Way, where runoff is directed to Type R Inlets, and the ultimately to Regional Pond
G1.
9
Storm flows from Basins 34-38 (1.02 ac) flow overland and through chases onto
International Blvd. and Delozier Road to a Type R inlet near the south end of
Delozier Road, and then ultimately to Regional Pond G1.
Basins 39 and 40 (0.45 ac) drainage flows to an area inlet and then through a
concrete pipe to the Bloom Filing 1 stormwater system and into Pond G1.
The 100-year peak flow (approximate, cumulative added flows) from the 40 basins
within the Bloom Filing Three site is approximately 134 cfs, in which approximately
123 cfs of the total flow will be routed directly to offsite regional Pond G1, with
approximately 10 cfs being routed to Pond G1, and approximately 1 cfs being routed
directly to Pond E. Ponds E, G, and G1 will provide water quality and detention for
the 16.36-acre Bloom Filing 3 site, per the Bloom Filing 1 Final Drainage Report.
Please refer to the rational calculations in Appendix B and the Proposed and
Existing Drainage Basin Exhibits in Appendix G for additional information.
The inlets and storm sewer system for the Bloom Filing Three site will be sized in
final design.
B. Specific Details
Drainage to the onsite Rain Garden:
Runoff from basins 1-23 (12.97 acres) will be conveyed to the proposed rain garden,
located near the south-central portion of the site, before flows are then routed east via
storm sewer piping to the offsite, regional water quality and detention Pond G1, of
the Bloom Masterplan Report.
Basin 1
Runoff in Basin 1 will be conveyed via roof drains, overland flow, curb and
gutter, curb cuts and chases, and a grass-lined swale with trickle pan to an
area inlet, which discharges into the proposed storm sewer system at design
point 1. Storm flows from design point 1 flow via a concrete pipe to a
manhole to combine with flows from Basins 2 and 3.
Basin 2
Runoff in Basin 2 will be conveyed via roof drains, overland flow, curb and
gutter, and curb cuts and chases before flow is captured by a proposed 10’
Type R inlet, which discharges to the proposed storm sewer system at design
point 2. Storm flows from design point 2 flow via and HDPE pipe to the 10’
Type R inlet at design point 3.
10
Basin 3
Runoff in Basin 3 will be conveyed via roof drains and overland flow to a
proposed 10’ Type R inlet, which discharges to the proposed storm sewer
system at design point 3. Storm flows from Basins 2 and 3 then flow via
concrete pipe to join with flows from Basin 1.
Basin 4
Runoff in Basin 4 will be conveyed via roof drains, overland flow, curb and
gutter, and curb cuts and chases before flow is captured by a proposed 10’
Type R inlet, which discharges to the proposed storm sewer system at design
point 4. Storm flow from design point 4 flows via a concrete pipe to a
manhole joining flows from Basins 1,2 and 3.
Basin 5
Runoff in Basin 5 will be conveyed via roof drains, overland flow, curb and
gutter, and curb cuts, grass swale with a trickle pan and chases before flow is
captured by an area inlet and 10’ Type R Inlet. Storm flow leaves the 10’
Type R inlet via an HDPE pipe, which discharges to the proposed storm
sewer system at design point 5. Storm flows from design point 5 then
conveyed via a concrete pipe to a manhole where the join the flows from
Basins 1,2,3 and 4.
Basin 6
Runoff in Basin 6 will be conveyed via roof drains, overland flow, curb and
gutter, and curb cuts and chases before flow is captured by a proposed 10’
Type R inlet, which discharges to the proposed storm sewer system at design
point 6. Storm flows from Basin 6 flow are conveyed by an HDPE pipe to an
area inlet at design point 7.
Basin 7
Runoff in Basin 7 will be conveyed via roof drains and overland flow to a
proposed Nyloplast drain basin/area inlet at design point 7. Storm flows
from Basins 6 and 7 are conveyed by an HDPE pipe to an area inlet at design
point 8.
Basin 8
Runoff in Basin 8 will be conveyed via roof drains, overland flow, and a
grass lined swale to a Nyloplast drain basin/area inlet, which discharges into
the proposed storm sewer system at design point 8. Storm flows from Basins
6, 7, and 8 are conveyed by an HDPE pipe to a Nyloplast drain basin/area
inlet at design point 9.
Basin 9
Runoff in Basin 9 will be conveyed via roof drains and overland flow to a
Nyloplast drain basin/area inlet, which discharges into the proposed storm
11
sewer system at design point 9. Storm flows from Basins 6-9 are conveyed
by an HDPE pipe to a manhole, where the flows are combined with storm
flows from Basins 1-5.
Basin 10
Runoff in Basin 10 will be conveyed via roof drains, overland flow, curb and
gutter, and curb cuts and chases before flow is captured by a proposed 10’
Type R inlet and area inlet, which dischargs to the proposed storm sewer
system at design point 10. Storm flows from Basins 1-10 are conveyed in a
concrete pipe to the proposed rain garden in Basin 23.
Basin 11
Runoff in Basin 11 will be conveyed via roof drains, overland flow, curb and
gutter, and curb cuts and chases before flow is captured by a proposed 10’
Type R inlet, which discharges to the proposed storm sewer system at design
point 11. Storm flows are conveyed through an HDPE pipe to a manhole.
Basin 12
Runoff in Basin 12 will be conveyed via roof drains, overland flow, curb and
gutter, curb cuts and chases to a 10’ Type R inlet, which discharges into the
proposed storm sewer system at design point 12. Storm flows are conveyed
through a concrete pipe to a manhole joining storm flows from Basin 11.
Basin 13
Runoff in Basin 13 will be conveyed via roof drains, overland flow, curb and
gutter, curb cuts and chases to a 10’ Type R inlet, which discharges into the
proposed storm sewer system at design point 13. Storm flows are conveyed
to a manhole through a concrete pipe to a manhole joining flows from Basins
11 and 12.
Basin 14
Runoff in Basin 14 will be conveyed via roof drains and overland flow to a
proposed Nyloplast drain basin/area inlet at design point 14. Storm flows are
then conveyed through an HDPE pipe to a manhole joining flows from
Basins 11, 12, 13, and 15.
Basin 15
Runoff in Basin 15 will be conveyed via roof drains, overland flow, curb and
gutter to a 10’ Type R inlet, which discharges into the proposed storm sewer
system at design point 15. Storm flows are conveyed to a manhole through a
concrete pipe to a manhole joining flows from Basins 11-14.
12
Basin 16
Runoff in Basin 16 will be conveyed via roof drains and grass swale and
chase to a proposed Type C inlet at design point 16. Storm flows are then
conveyed through an HDPE pipe to a manhole joining flows from Basins 11-
15.
Basin 17
Runoff in Basin 17 will be conveyed via roof drains, overland flow, curb and
gutter to a 10’ Type R inlet, which discharges into the proposed storm sewer
system at design point 17. Storm flows are conveyed to a manhole through a
concrete pipe to a manhole joining flows from Basins 11-16. The combined
storm flows are then conveyed in a concrete pipe to the proposed rain garden
in Basin 23.
Basin 18
Runoff in Basin 18 will be conveyed via roof drains, overland flow, curb and
gutter, and curb cuts and chases before flow discharges to the rain garden
through a curb cut at design point 18.
Basin 19
Runoff in Basin 19 will be conveyed via roof drains, overland flow, curb and
gutter, and curb cuts and chases before flow discharges to the rain garden
through a curb cut at design point 19.
Basin 20
Runoff in Basin 20 will be conveyed via roof drains, overland flow, curb and
gutter, and curb cuts and chases before flow discharges to the rain garden
through a curb cut at design point 20.
Basin 21
Runoff in Basin 21 will be conveyed via roof drains, overland flow, curb and
gutter, and curb cuts and chases before flow discharges through a 7’ wide
curb chase at design point 21. Storm flows from the curb chase then flow via
a grass swale with a trickle pan east and into the rain garden.
Basin 22
Runoff in Basin 22 will be conveyed via roof drains, overland flow, curb and
gutter, and curb cuts and chases before flow discharges to the rain garden
through a curb cut at design point 22.
Basin 23
Runoff in Basin 23 will be conveyed via roof drains to a grass lined swale
with a trickle pan and overland to a rain garden. The rain garden receives
and treats flows from 84% of the site. Storm flows are treated in the rain
garden and then flow out through a Type D inlet and into the storm system
13
provided by Bloom Filing1, that ultimately delivers runoff to Regional Pond
G1, located south of the Bloom Filing Three site.
Basin 39
Runoff in Basin 39 will be conveyed via roof drains and grass swale with a
trickle pan and chases to a continuation of the grass swale with a trickle pan,
with flows continuing into Basin 40.
Basin 40
Runoff in Basin 40 will be conveyed via roof drains and grass swale with a
trickle pan and chases to an area inlet, with secondary Type C inlet. Storm
flows are conveyed to the Filing 1 storm drain system in Donella Drive, and
eventually into Regional Pond G1, located south of the Bloom Filing Three
site.
Drainage to the Public Street Systems/ Offsite Regional Ponds E, G, and G1:
The runoff from basins 24-33, and 34-38 (total of 2.94 acres) will be directed to the
adjacent public streets and associated storm sewer systems along the north, west, and
east sides of the Bloom Filing 3 site, where the masterplan storm sewer system
(constructed with Bloom Filing 1) will capture and convey runoff from Basins 24-33,
and 34-38 into Ponds E, G, and G1 of the Bloom Filing 1 Development.
Basins 24
Basin 24 will convey their runoff overland to the north and ultimately into
the curb and gutter in International Blvd. Runoff will sheet flow on to
International Blvd. and then flow to an existing Type R Inlet, provided by
Bloom Filing 1.
Basins 25-33
Basins 24-28 will convey their runoff overland to the east and ultimately into
the curb and gutter in Aria Way. Runoff will sheet flow on to Aria Way and
then flow south to an existing Type R Inlet, provided by Bloom Filing 1.
Drainage to the Public Street Systems and then offsite to the west:
The runoff from basins 34-38 (1.02 acres) will be directed to the adjacent public
street systems along the north and west sides of the Bloom Filing 3 site, with runoff
from Basins 34-38 ultimately conveyed south to an existing Type R Inlet,
constructed by the Bloom Filing 1 Development.
Basin 34
Basin 34 will convey its runoff to a swale with trickle channel to a curb cut
and chase discharging into the curb and gutter in International Blvd. Runoff
will flow west the south, then south down Delozier Road and to an existing
Type R Inlet near the south end of Delozier Road.
14
Basins 35-38
Basins 35-38 will convey their runoff from the predominantly green/ land-
scaped areas overland to the west and into the curb and gutter in Delozier
Road. Runoff will flow towards the respective design points 35-38, with
flow from basins 34-38 combining and continuing south in the east curb and
gutter in Delozier Road to an existing Type R Inlet, constructed with the
Bloom Filing 1 Development.
Overflow Conditions
Basins 1-5: Should the inlets at the low points in Basins 1-4 become obstructed and
fail to collect the required drainage, the runoff will overflow into the next
downstream basin, in which the runoff will be ultimately conveyed in the storm
sewer piping to the rain garden in basin 23.
Basin 6: Should the inlet at the low point in Basin 6 become obstructed and fail to
collect the required drainage, the runoff will overflow into Basin 7 to an area inlet,
with flow entering the inlet and storm sewer piping that conveys flow to the rain
garden in basin 23
Basin 7: Should the inlet at the low point in basin 7 become obstructed and fail to
collect the required drainage, the runoff will overflow into basin 8 and be captured
by the inlet in basin 8, with flow entering the inlet and storm sewer piping that
conveys flow to the rain garden in basin 23.
Basin 8: Should the inlet at design point 8 become obstructed and fail to collect the
required drainage, runoff will overflow south and southeast into basin 9, where the
runoff will be captured in the area inlet at design point 9, with flow entering the inlet
and storm sewer piping that conveys flow to the rain garden in basin 23
Basin 9: Should the inlet at design point 9 become obstructed and fail to collect the
required drainage, runoff will overflow south and east into basins 10 and 16, with
flow entering the inlet and storm sewer piping that conveys flow to the rain garden in
basin 23.
Basin 10: Should the inlet at design point 10 become obstructed and fail to collect
the required drainage, runoff will flow to Basins 18 and 17, with flow entering the
inlets and storm sewer piping that conveys flows to the rain garden in basin 23.
Basin 11: Should the inlet at design point 11 become obstructed and fail to collect
the required drainage, runoff will overflow to east and west to Basins 2 and 12, with
flow entering the inlets and storm sewer piping that conveys flows to the rain garden
in basin 23.
15
Basin 12: Should the inlet at design point 12 become obstructed and fail to collect
the required drainage, runoff will overflow south into basin 13, with flow entering
the inlets and storm sewer piping that conveys flows to the rain garden in basin 23.
Basin 13: Should the inlet at design point 13 become obstructed and fail to collect
the required drainage, runoff will overflow south into basin 15, with flow entering
the inlets and storm sewer piping that conveys flows to the rain garden in basin 23.
Basin 14: Should the inlet at design point 14 become obstructed and fail to collect
the required drainage, runoff will overflow east into basin 15, with flow entering the
inlets and storm sewer piping that conveys flows to the rain garden in basin 23.
Basin 15: Should the inlet at design point 15 become obstructed and fail to collect
the required drainage, runoff will overflow south into basins 20 and 29, with flows to
basin 20 flowing into the rain garden in basin 23, and flows to basin 29 spilling onto
Aria Way.
Basin 16: Should the inlet at design point 16 become obstructed and fail to collect
the required drainage, runoff will overflow south into basin 17, with flow entering
the inlets and storm sewer piping that conveys flows to the rain garden in basin 23.
Basin 17: Should the inlet at design point 17 become obstructed and fail to collect
the required drainage, runoff will overflow east into basin 20, with flows being
conveyed into a curb cut at design point 20 to the rain garden in basin 23.
Basins 18-22: Should the curb cuts with sidewalk culverts at the low points in these
basins become obstructed and fail to collect the required drainage, the runoff will
overtop the curb and gutter and will flow overland into the rain garden in basin 23.
Basin 23: Should the inlet at design point 23 become obstructed and fail to collect
the required drainage, runoff will overflow south onto Donella Drive then east to
inlets discharging to Regional Pond G.
Basins 24-33: Flows from these basins either flow overland or pass through curb
cuts and chases to International Blvd. and Aria Way to a existing Type R Inlets in
International Blvd. and Area Way. Should these inlets become obstructed and fail to
collect the required drainage, the flows will spill south on to Donella Drive and then
flow east and into the existing Type R Inlet and into regional Pond G.
Basins 34-38: Basins 34-38 all sheet flow overland to the north (basin 34) and west
(basin 32-35) and out to Delozier Road. Flows will continue south down Delozier,
then will be conveyed west in Donella Drive.
16
Basin 39: Should the curb cuts with sidewalk culverts in basin 39 become
obstructed and fail to collect and pass through the required drainage, runoff will
overflow south into basin 40.
Basin 40: Should the curb cuts with sidewalk culverts in basin 40 become
obstructed and fail to collect and pass through the required drainage, runoff will
overflow west onto Delozier Road. If the inlet at design point 40 becomes
obstructed and fail to collect and pas through the required drainage, runoff will
overflow to the south onto Donella drive and conveyed west in Donnella Drive to the
existing Type R Inlet and eventually into Regional Pond G1.
C. Rain Garden
The proposed development contains one large LID rain garden basin, located in basin
23. The proposed rain garden will treat approximately 84% of the newly added
impervious areas from the attributing basins, thus exceeding the City’s 75%
treatment requirement. Flow from basins 1-23 will be conveyed to the rain garden,
with an underground 6” perforated PVC underdrain pipe conveying infiltrated flow
to the outlet/overflow structure at design point 23. The top of bank elevation for the
rain garden is 34.50, while the flat bottom will be set at 33.50. The overflow
structure at design point 19 will be a CDOT Type D Inlet with grates set at elevation
34.50. Flows from major events that exceed the 34.50 elevation, will spill through
the grates and enter the proposed storm sewer outfall pipe that connects to the
existing storm sewer system in Donella Drive. The existing storm sewer pipe will
convey flows west and then south and into offsite, regional Pond G1. Please refer to
Appendix C for LID calculations and rain garden sizing.
D. Street Capacities
Street capacity calculations are not required for the project as there are no public
street improvements.
V. STORM WATER QUALITY
A. General Concept & Specific Details
The water quality aspect of stormwater runoff must be addressed on all final utility
plans. Therefore, the existing offsite, regional water quality/ detention ponds (Ponds
E, G, and G1) will have adequate capacity and will provide all of the required water
quality and detention up to the 100-year event for the developed condition of the
subject site, prior to releasing flows downstream.
17
It’s important to note that Bloom Filing Three site (16.36 acres) has a calculated,
combined imperviousness of 64%, and an overall site ‘c’ value of 0.69, versus the
allowable ‘c’ value of 0.90, as provided in the Bloom Filing 1 Final Drainage Report.
Furthermore, the Bloom Filing Three site has a calculated 100-year release rate of
approximately 134 cfs for 16.36 acres (8.19 cfs/acre), versus the allowable 100-year
release rate of approximately 8.57 cfs/acre, allowed in the Bloom Filing 1 Final
Drainage Report. Therefore, the Bloom Filing Three site is in accordance with the
Bloom Filing 1 Final Drainage Report.
Best Management Practices (BMP’s) for the treatment of stormwater will be
provided in the Bloom Filing Three site through the utilization of a single rain
garden, constructed near the south end of the site, to treat the first flush runoff from
pavement and other impervious areas of the developed site. The proposed rain
garden has been designed to provide LID treatment for approximately 84% of the
newly added impervious areas for attributing basins within the Bloom Filing Three
site.
Upon the rain garden filling up, overflow will be captured by a proposed CDOT
Type D Inlet, placed at the 1’ depth mark on the southeast side of the rain garden,
with the inlet and storm sewer outfall pipe conveying runoff west and south and into
offsite, regional Pond G1.
Flow from the rain garden and other areas of the Bloom Filing Three site will be
conveyed to offsite grass-lined detention ponds (Ponds E, G, and G1 of the Bloom
Masterplan Development). Ponds E, G, and G1 will be equipped with a 40-hour
extended detention structures with water quality control orifice plates, to restrict
outflow, as designed by others.
These water quality features/structures will provide a mechanism for pollutants to
settle out of the stormwater runoff before flows are directed downstream, and
ultimately into the Poudre River.
VI. EROSION CONTROL
A. General Concept
The subject site soils are classified as Hydrologic Group B, with an erosion K factor
ranging from 0.17 to 0.32. The Wind Erodibility Group is rated 4L and 5, according
to the USDA Soil Properties. The potential exists for erosion problems during
construction, but should be minimal after completion of proposed development.
18
Silt fence has been installed along the north, west, south, and east portions of the site
to prevent sediment from leaving the site. Vehicle tracking pads will also be placed
at entrances/exits to the site, with the exact location(s) provided during final design.
Straw Wattles and gravel inlet filters will be placed at proposed inlet locations to
mitigate the build-up of sediment in the proposed inlet and manhole structures.
Straw wattle check dams will also be installed at 300' intervals in the proposed
swales throughout the site, as may be applicable. Concrete forebays will be installed
at several concentrated flow areas that enter the rain garden/ LID basin.
Erosion Control Calculations and the Erosion Control Escrow Amount will be
provided during final design. Please refer to Appendix G for the Erosion Control
Plan and Erosion Control Notes and Detail Sheets.
VII. CONCLUSIONS
A. Compliance with Standards & Stormwater Operations/Maintenance Procedure
All computations within this report have been completed in compliance with the City
of Fort Collins Storm Drainage Design Criteria.
The City of Fort Collins Storm water Utility will not maintain the private on-site
storm drainage facilities within the subject site. The owners of the subject site will
maintain their on-site storm drainage facilities on a regular basis. The following
shall be implemented for the private stormwater improvements’ operations/
maintenance procedures for the project on an annual or bi-annual basis:
1) Storm Sewer Inlets, pipes and flared-end-sections, curb cuts and concrete
sidewalk culverts/chases, structures, manholes, and the water quality/ outlet
control structures, as may be applicable, shall be cleaned through the removal
of debris and sediment from the associated items to allow for adequate
drainage through the site to the interim facilities.
2) Sedimentation/ silting shall be removed to allow for adequate drainage
infiltration along the bottom of the rain garden.
3) Re-vegetation through the use of Natural Seeding/ Sod shall be provided for
disturbed areas and other permanent erosion controls shall be provided for
areas where erosion has taken place and requires remediation back to the
proposed condition shown in the plans.
19
The Stormwater Operating/ Maintenance Procedures listed above are guidelines to
the minimum procedures that shall be implemented for the Bloom Filing Three
project, with these and additional measures being utilized on an as-needed basis.
B. Drainage Concept
The proposed drainage concepts presented in this study and shown on the utility
plans adequately provide for the transmission of developed on-site runoff to the
proposed on-site rain garden, as well as the offsite, regional water quality and
detention ponds (Ponds E, G, and G1) within the Bloom Filing 1 Development.
The proposed storm sewers and surface conveyances will provide for the 100-year
developed flows from the on-site basins to reach the proposed rain garden and
offsite, regional water quality/detention Ponds E, G, and G1, prior to being released
downstream, as designed and provided by others in the Bloom Filing 1 Final
Drainage Report.
If groundwater is encountered at the time of construction, a Colorado Department of
Health Construction Dewatering Permit will be required.
C. Storm Water Quality
The preliminary design for the Bloom Filing Three project has addressed the water
quality aspect of stormwater runoff. The proposed rain garden and offsite, regional
water quality/detention ponds with extended detention and water quality, will
provide an opportunity for stormwater pollutants to filter out of the stormwater
runoff before flows are directed downstream, and ultimately into the Poudre River.
Furthermore, the proposed on-site grass/sod-lined swales, riprap pads and/or erosion
control fabric at culvert outlets and curb cuts, concrete forebays at input points to the
rain garden, and other erosion control measures which may be used for slope
stabilization, will provide additional mechanisms for pollutants to settle out of the
stormwater runoff before flows are directed offsite and ultimately into the Poudre
River.
D. Erosion Control Concept
Proposed erosion control concepts have been provided for and adequately provide for
the control of wind and rainfall erosion from the Bloom Filing Three development.
Through the construction of the proposed erosion control concepts, the City of Fort
Collins standards will be met. The proposed erosion control concepts presented in
this report and shown on the erosion control plan are in compliance with the City of
Fort Collins Erosion Control Criteria.
20
E. Erosion Control Escrow Estimate
The Erosion Control Escrow Estimate for the subject property will be provided at
final design.
21
REFERENCES
1. Storm Drainage Design Criteria and Construction Standards by the City of Fort
Collins, Colorado, May 1984, Revised January 1997, & Associated UDFCD Updates
and New City of Fort Collins Stormwater Criteria manual, adopted January 2012.
2. Erosion Control Reference Manual for Construction Sites by the City of Fort Collins,
Colorado, January 1991, Revised January 1997, & Associated UDFCD Updates and
New City of Fort Collins Stormwater Criteria manual, adopted January 2012.
3. Urban Storm Drainage Criteria Manual Volume 1; Urban Drainage and Flood
Control District, Denver, Colorado, June 2001.
4. Urban Storm Drainage Criteria Manual Volume 2; Urban Drainage and Flood
Control District, Denver, Colorado, June 2001.
5. Urban Storm Drainage Criteria Manual Volume 3, Best Management Practices;
Urban Drainage and Flood Control District, Denver, Colorado, August 2011.
6. Final Drainage Report, Bloom Filing 1, by Galloway & Company, Inc., July 13,
2022.
22
APPENDIX
23
APPENDIX A
24
VICINITY MAP & SOILS MAP
Soil Map—Larimer County Area, Colorado
(Bloom Filing Three)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/14/2022
Page 1 of 3
44
9
2
5
6
0
44
9
2
6
5
0
44
9
2
7
4
0
44
9
2
8
3
0
44
9
2
9
2
0
44
9
3
0
1
0
44
9
3
1
0
0
44
9
3
1
9
0
44
9
2
5
6
0
44
9
2
6
5
0
44
9
2
7
4
0
44
9
2
8
3
0
44
9
2
9
2
0
44
9
3
0
1
0
44
9
3
1
0
0
44
9
3
1
9
0
498280 498370 498460 498550 498640 498730
498280 498370 498460 498550 498640 498730
40° 35' 23'' N
10
5
°
1
'
1
5
'
'
W
40° 35' 23'' N
10
5
°
0
'
5
2
'
'
W
40° 35' 0'' N
10
5
°
1
'
1
5
'
'
W
40° 35' 0'' N
10
5
°
0
'
5
2
'
'
W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 150 300 600 900
Feet
0 50 100 200 300
Meters
Map Scale: 1:3,500 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 16, Sep 2, 2021
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jun 8, 2021—Jun 12,
2021
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Soil Map—Larimer County Area, Colorado
(Bloom Filing Three)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/14/2022
Page 2 of 3
K Factor, Whole Soil—Larimer County Area, Colorado
(Bloom Filing Three)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/14/2022
Page 1 of 3
44
9
2
5
6
0
44
9
2
6
5
0
44
9
2
7
4
0
44
9
2
8
3
0
44
9
2
9
2
0
44
9
3
0
1
0
44
9
3
1
0
0
44
9
3
1
9
0
44
9
2
5
6
0
44
9
2
6
5
0
44
9
2
7
4
0
44
9
2
8
3
0
44
9
2
9
2
0
44
9
3
0
1
0
44
9
3
1
0
0
44
9
3
1
9
0
498280 498370 498460 498550 498640 498730
498280 498370 498460 498550 498640 498730
40° 35' 23'' N
10
5
°
1
'
1
5
'
'
W
40° 35' 23'' N
10
5
°
0
'
5
2
'
'
W
40° 35' 0'' N
10
5
°
1
'
1
5
'
'
W
40° 35' 0'' N
10
5
°
0
'
5
2
'
'
W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 150 300 600 900
Feet
0 50 100 200 300
Meters
Map Scale: 1:3,500 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
.02
.05
.10
.15
.17
.20
.24
.28
.32
.37
.43
.49
.55
.64
Not rated or not available
Soil Rating Lines
.02
.05
.10
.15
.17
.20
.24
.28
.32
.37
.43
.49
.55
.64
Not rated or not available
Soil Rating Points
.02
.05
.10
.15
.17
.20
.24
.28
.32
.37
.43
.49
.55
.64
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data
as of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 16, Sep 2, 2021
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jun 8, 2021—Jun
12, 2021
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
K Factor, Whole Soil—Larimer County Area, Colorado
(Bloom Filing Three)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/14/2022
Page 2 of 3
K Factor, Whole Soil
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
7 Ascalon sandy loam, 0
to 3 percent slopes
.17 19.8 37.4%
35 Fort Collins loam, 0 to 3
percent slopes
.43 0.0 0.1%
40 Garrett loam, 0 to 1
percent slopes
.32 33.0 62.2%
42 Gravel pits .02 0.1 0.2%
Totals for Area of Interest 53.0 100.0%
Description
Erosion factor K indicates the susceptibility of a soil to sheet and rill erosion by
water. Factor K is one of six factors used in the Universal Soil Loss Equation
(USLE) and the Revised Universal Soil Loss Equation (RUSLE) to predict the
average annual rate of soil loss by sheet and rill erosion in tons per acre per
year. The estimates are based primarily on percentage of silt, sand, and organic
matter and on soil structure and saturated hydraulic conductivity (Ksat). Values of
K range from 0.02 to 0.69. Other factors being equal, the higher the value, the
more susceptible the soil is to sheet and rill erosion by water.
"Erosion factor Kw (whole soil)" indicates the erodibility of the whole soil. The
estimates are modified by the presence of rock fragments.
Factor K does not apply to organic horizons and is not reported for those layers.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Layer Options (Horizon Aggregation Method): Surface Layer (Not applicable)
K Factor, Whole Soil—Larimer County Area, Colorado Bloom Filing Three
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/14/2022
Page 3 of 3
Wind Erodibility Group—Larimer County Area, Colorado
(Bloom Filing Three)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/14/2022
Page 1 of 3
44
9
2
6
0
0
44
9
2
6
7
0
44
9
2
7
4
0
44
9
2
8
1
0
44
9
2
8
8
0
44
9
2
9
5
0
44
9
3
0
2
0
44
9
3
0
9
0
44
9
3
1
6
0
44
9
2
6
0
0
44
9
2
6
7
0
44
9
2
7
4
0
44
9
2
8
1
0
44
9
2
8
8
0
44
9
2
9
5
0
44
9
3
0
2
0
44
9
3
0
9
0
44
9
3
1
6
0
498250 498320 498390 498460 498530 498600 498670
498250 498320 498390 498460 498530 498600 498670
40° 35' 21'' N
10
5
°
1
'
1
4
'
'
W
40° 35' 21'' N
10
5
°
0
'
5
6
'
'
W
40° 35' 2'' N
10
5
°
1
'
1
4
'
'
W
40° 35' 2'' N
10
5
°
0
'
5
6
'
'
W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
0 100 200 400 600
Feet
0 40 80 160 240
Meters
Map Scale: 1:2,850 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
1
2
3
4
4L
5
6
7
8
Not rated or not available
Soil Rating Lines
1
2
3
4
4L
5
6
7
8
Not rated or not available
Soil Rating Points
1
2
3
4
4L
5
6
7
8
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Larimer County Area, Colorado
Survey Area Data: Version 16, Sep 2, 2021
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jun 8, 2021—Jun 12,
2021
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Wind Erodibility Group—Larimer County Area, Colorado
(Bloom Filing Three)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/14/2022
Page 2 of 3
Wind Erodibility Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
7 Ascalon sandy loam, 0
to 3 percent slopes
4L 18.8 44.0%
35 Fort Collins loam, 0 to 3
percent slopes
5 0.1 0.1%
40 Garrett loam, 0 to 1
percent slopes
5 23.8 55.7%
42 Gravel pits 8 0.1 0.3%
Totals for Area of Interest 42.7 100.0%
Description
A wind erodibility group (WEG) consists of soils that have similar properties
affecting their susceptibility to wind erosion in cultivated areas. The soils
assigned to group 1 are the most susceptible to wind erosion, and those
assigned to group 8 are the least susceptible.
Rating Options
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Lower
Wind Erodibility Group—Larimer County Area, Colorado Bloom Filing Three
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
7/14/2022
Page 3 of 3
25
APPENDIX B
26
RATIONAL METHOD
HYDROLOGY
27
APPENDIX C
28
LID CALCULATIONS & STORM
SEWER PIPE SIZING
(STORM SEWER PIPE SIZING TO BE PROVIDED AT FINAL
DESIGN)
Ne
w
I
m
p
e
r
v
i
o
u
s
A
r
e
a
(
R
o
o
f
,
P
a
v
e
m
e
n
t
a
n
d
W
a
l
k
s
)
46
3
,
5
0
3
sf
Re
q
u
i
r
e
d
M
i
n
i
m
u
m
I
m
p
e
r
v
i
o
u
s
A
r
e
a
t
o
b
e
T
r
e
a
t
e
d
(
7
5
%
o
f
I
m
p
.
A
r
e
a
)
R
G
O
n
l
y
34
7
,
6
2
7
sf
Im
p
e
r
v
i
o
u
s
A
r
e
a
T
r
e
a
t
e
d
b
y
L
I
D
T
r
e
a
t
m
e
n
t
M
e
t
h
o
d
#
1
(
L
I
D
B
a
s
i
n
D
P
2
3
)
(
B
a
s
i
n
s
1
-
2
3
)
38
7
,
1
5
8
sf
To
t
a
l
I
m
p
e
r
v
i
o
u
s
A
r
e
a
T
r
e
a
t
e
d
38
7
,
1
5
8
sf
Pe
r
c
e
n
t
L
I
D
T
r
e
a
t
m
e
n
t
P
r
o
v
i
d
e
d
f
o
r
E
n
t
i
r
e
S
i
t
e
A
r
e
a
84
%
*T
o
t
a
l
B
a
s
i
n
A
r
e
a
(
p
e
r
v
i
o
u
s
a
n
d
i
m
p
e
r
v
i
o
u
s
)
f
o
r
b
a
s
i
n
s
1
-
2
3
t
o
L
I
D
=
5
6
5
,
3
4
2
s
f
**
O
v
e
r
a
l
l
%
I
m
p
e
r
v
i
o
u
s
f
o
r
B
a
s
i
n
s
1
-
2
3
(
f
o
r
p
e
r
v
i
o
u
s
a
n
d
i
m
p
e
r
v
i
o
u
s
a
r
e
a
s
)
=
6
8
%
**
*
S
e
e
L
I
D
c
a
l
c
u
l
a
t
i
o
n
,
n
e
x
t
s
h
e
e
t
,
f
o
r
t
r
e
a
t
m
e
n
t
V
o
l
u
m
e
r
e
q
u
i
r
e
m
e
n
t
s
b
e
i
n
g
m
e
t
.
LI
D
T
A
B
L
E
Sheet 1 of 2
Designer:
Company:
Date:
Project:
Location:
1.Basin Storage Volume
A) Effective Imperviousness of Tributary Area, Ia Ia =68.0 %
(100% if all paved and roofed areas upstream of rain garden)
B) Tributary Area's Imperviousness Ratio (i = Ia/100)i =0.680
C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV =0.21 watershed inches
(WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i)
D) Contributing Watershed Area (including rain garden area)Area =565,342 sq ft
E) Water Quality Capture Volume (WQCV) Design Volume VWQCV =10,036 cu ft
Vol = (WQCV / 12) * Area
F) For Watersheds Outside of the Denver Region, Depth of d6 = in
Average Runoff Producing Storm
G) For Watersheds Outside of the Denver Region, VWQCV OTHER =cu ft
Water Quality Capture Volume (WQCV) Design Volume
H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER =cu ft
(Only if a different WQCV Design Volume is desired)
2.Basin Geometry
A) WQCV Depth (12-inch maximum)DWQCV =12 in
B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical)Z =4.00 ft / ft
(Use "0" if rain garden has vertical walls)
C) Mimimum Flat Surface Area AMin =7689 sq ft
D) Actual Flat Surface Area AActual =12394 sq ft
E) Area at Design Depth (Top Surface Area)ATop =14731 sq ft
F) Rain Garden Total Volume VT=13,563 cu ft
(VT= ((ATop + AActual) / 2) * Depth)
3.Growing Media
4.Underdrain System
A) Are underdrains provided?1
B) Underdrain system orifice diameter for 12 hour drain time
i) Distance From Lowest Elevation of the Storage y =ft
Volume to the Center of the Orifice
ii) Volume to Drain in 12 Hours Vol12 =cu ft
iii) Orifice Diameter, 3/8" Minimum DO = in
Design Procedure Form: Rain Garden (RG)
J.Gooch
Aspen Engineering
October 5, 2023
Pedcor Mulberry Apartments
Primary LID South Central Basins 1-23
UD-BMP (Version 3.07, March 2018)
Choose One
Choose One
18" Rain Garden Growing Media
Other (Explain):
YES
NO
SouthCenterPDP LID_ 9-27-2023 UD-BMP_v3.07.xlsm, RG 10/5/2023, 2:57 PM
Sheet 2 of 2
Designer:
Company:
Date:
Project:
Location:
5.Impermeable Geomembrane Liner and Geotextile Separator Fabric
A) Is an impermeable liner provided due to proximity
of structures or groundwater contamination?
6.Inlet / Outlet Control
A) Inlet Control
7.Vegetation
8.Irrigation
NO SPRINKLER HEADS ON FLAT SURFACE
A) Will the rain garden be irrigated?
Notes:
Design Procedure Form: Rain Garden (RG)
J.Gooch
Aspen Engineering
October 5, 2023
Pedcor Mulberry Apartments
Primary LID South Central Basins 1-23
Choose One
Choose One
Choose One
Sheet Flow- No Energy Dissipation Required
Concentrated Flow- Energy Dissipation Provided
Plantings
Seed (Plan for frequent weed control)
Sand Grown or Other High Infiltration Sod
Choose One
YES
NO
YES
NO
SouthCenterPDP LID_ 9-27-2023 UD-BMP_v3.07.xlsm, RG 10/5/2023, 2:57 PM
29
APPENDIX D
30
INLET, CONCRETE SIDEWALK
CULVERT SIZING
(TO BE PROVIDED AT FINAL DESIGN)
31
APPENDIX E
32
SWALE SIZING
(TO BE PROVIDED AT FINAL DESIGN)
33
APPENDIX F
34
EROSION CONTROL & RIPRAP
SIZING & EROSION CONTROL
ESCROW ESTIMATE
(TO BE PROVIDED AT FINAL DESIGN)
35
APPENDIX G
36
PROPOSED & EXISTING DRAINAGE
BASIN EXHIBITS, EROSION
CONTROL PLAN, & EROSION
CONTROL NOTES AND DETAILS
SHEET
STANDARD FORM SF-3
STORM DRAINAGE SYSTEM DESIGN
(RATIONAL METHOD PROCEDURE)
Project Name:Mulberry Filing 1
Subdivision:Mulberry Project No.:HFH22
Location:CO, Fort Collins Calculated By:MJP
Design Storm:Checked By:JP
Date:
TRAVEL TIME
STREET
Design
Point
Basin
ID
Area
(Ac)
Runoff
Coeff.
|
C
100
Tc
|
100-Year
(min)
C*A
(Ac)
I
(in/hr)
Q
(cfs)
Tc
(min)
C*A
(Ac)
I
(in/hr)
Q
(cfs)
Slope
(%)
Street
Flow
(cfs)
Design
Flow
(cfs)
Slope
(%)
Pipe
Size
(inches)
Length
(ft)
Velocity
(fps)
Tt
(min)
REMARKS
100-Year
DIRECT RUNOFF TOTAL RUNOFF STREET
6/2/21
PIPE
G1 G1 1.15 0.99 17.1 1.14 6.14 7.0
G2 G2 1.15 0.99 17.1 1.14 6.14 7.0
G3 G3 1.18 1.00 16.8 1.18 6.19 7.3
G4 G4 1.16 1.00 16.8 1.16 6.19 7.2
G5 G5 0.34 0.96 7.6 0.33 8.78 2.9
G6 G6 0.37 0.96 7.6 0.35 8.78 3.1
G6.1 G6.1 0.45 0.96 7.6 0.43 8.79 3.8
G7.1 G7.1 0.42 1.00 7.3 0.42 330.28 137.9
G7 G7 0.46 0.98 5.4 0.45 9.78 4.4
G8 G8 0.48 0.97 5.5 0.47 9.74 4.5
FUT-G FUT-G 17.03 1.00 8.1 17.03 8.57 145.9
H1 H1 0.44 0.97 5.9 0.43 9.56 4.1
H2 H2 0.53 0.96 5.9 0.51 9.55 4.9
H3 H3 0.92 1.00 5.8 0.92 9.58 8.8
H4 H4 1.02 0.99 5.9 1.02 9.56 9.7
Page 17 of 17 7/12/2022
*EXISTING BASIN RATIONAL CALCULATIONS FROM BLOOM FILING 1 FINAL DRAINAGE REPORT
G
DE
L
O
Z
I
E
R
R
O
A
D
LOT 10
LOT 7
LOT 9
LOT 8
LOT 7
LOT 10 LOT 9
LOT 8
BLOCK 28
BLOCK 30
E27
E6
E11
E24
E10
E7
E5 E22
E23
E9
E16
E14
E12
E12.1
E11.1
E24.1
E25.1
E15
E17
acres
0.68
0.85
0.63
acres
E5
0.72
0.90
1.07
acres
OS4
0.46
0.57
0.29
acres
E7
0.74
0.92
1.03
acres
E9
0.72
0.90
1.07
acres
E10
0.74
0.93
1.03
acres
E11
0.55
0.68
0.40
acres
E12
0.79
0.99
0.44
acres
E14
0.65
0.81
0.30
acres
OS3
0.33
0.41
0.85
acres
E15
0.82
1.00
0.57
acres
OS6
0.60
0.75
0.43
acres
E17
0.65
0.81
0.59
acres
OS7
0.60
0.75
0.41
acres
E22
0.76
0.96
0.99
acres
E23
0.77
0.96
0.99
acres
E24
0.54
0.67
0.73
acres
E24.1
0.67
0.84
0.36
acres
E27
0.69
0.86
0.33
acres
FUT-G
0.90
1.00
40.3
acres
OS5
0.79
0.99
0.15
acres
E15.1
0.80
1.0
1.15
acres
E26.1
0.80
1.00
0.72
acres
E14.1
0.80
1.00
1.3
acres
E12.1
0.94
1.00
0.21
acres
E25.1
0.62
0.78
0.19
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:
\
H
a
r
t
f
o
r
d
H
o
m
e
s
\
C
O
F
o
r
t
C
o
l
l
i
n
s
H
F
H
2
2
-
M
u
l
b
e
r
r
y
\
0
C
I
V
\
3
-
C
D
\
F
D
P
_
F
1
\
h
f
h
0
2
2
_
c
1
0
.
0
_
d
r
a
i
n
a
g
e
.
d
w
g
-
Ma
t
t
h
e
w
P
e
p
i
n
-
7/
1
2
/
2
0
2
2
Init.#Issue / DescriptionDate
FI
N
A
L
D
E
V
E
L
O
P
M
E
N
T
P
L
A
N
S
BL
O
O
M
F
I
L
I
N
G
O
N
E
FO
R
T
C
O
L
L
I
N
S
,
C
O
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PR
E
L
I
M
I
N
A
R
Y
NO
T
F
O
R
B
I
D
D
I
N
G
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Date:
Drawn By:
Project No:
Checked By:
06.01.2022
HFH000022
MA
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
C1
0
.
4
MATCHLINE-SEE SHEET C10.1
MATCHLINE-SEE SHEET C10.8
DESIGN POINT
DETENTION POND BASIN BOUNDARY
(i.e., MHFD-Detention_v4.03 and/or SWMM)
SUB-BASIN BOUNDARY (i.e., Rational Method)
OVERLAND FLOW DIRECTION
(I.E., LANDSCAPING)
DIRECT FLOW DIRECTION
(I.E., PAVEMENT, CURB AND
GUTTER)
BASIN ID
2-YR RUNOFF
COEFFICIENT
BASIN AREA
(ACRES)
acres
A1
0.05
0.35
2.50
A
APPROXIMATE DETENTION POND
OVERFLOW PATH
100-YR RUNOFF
COEFFICIENT
FEMA CROSS SECTION
IRRIGATION POND LIMITS
KEYMAP
Know what's
before you dig.SCALE: 1"=50'
0 20 5010
JKD
JEP
DRAINAGE PLAN
C10.2
NOTES:
1.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED, 100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST
COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE.
2.THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE
PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING, FILL, DETENTION PONDS, BIKE
PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE COOPER SLOUGH FLOODPLAIN
LIMITS--. STORAGE OF EQUIPMENT AND MATERIALS (TEMPORARY OR PERMANENT) IS NOT ALLOWED IN THE FLOODWAY. ALL ACTIVITIES WITHIN
THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE.
3.CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN. CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES, AT-RISK
POPULATION, HAZARDOUS MATERIALS, AND GOVERNMENT FACILITIES.
4.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS, WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS IS PROHIBITED IN THE
FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET. ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A
NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO. AN APPROVED FEMA ELEVATION CERTIFICATE
COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS
REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY (CO) BEING ISSUED. PLEASE NOTE: IF ANY PART OF THE
BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY, THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE
BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE.
5.ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM.
E17
acres
E17
0.65
0.81
0.59
acres
0.60
0.75
0.41
acres
FUT-G
0.90
1.00
40.3
acres
G1
0.79
0.99
1.15
acres
G2
0.79
0.99
1.15
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:
\
H
a
r
t
f
o
r
d
H
o
m
e
s
\
C
O
F
o
r
t
C
o
l
l
i
n
s
H
F
H
2
2
-
M
u
l
b
e
r
r
y
\
0
C
I
V
\
3
-
C
D
\
F
D
P
_
F
1
\
h
f
h
0
2
2
_
c
1
0
.
0
_
d
r
a
i
n
a
g
e
.
d
w
g
-
Ma
t
t
h
e
w
P
e
p
i
n
-
7/
1
2
/
2
0
2
2
Init.#Issue / DescriptionDate
FI
N
A
L
D
E
V
E
L
O
P
M
E
N
T
P
L
A
N
S
BL
O
O
M
F
I
L
I
N
G
O
N
E
FO
R
T
C
O
L
L
I
N
S
,
C
O
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PR
E
L
I
M
I
N
A
R
Y
NO
T
F
O
R
B
I
D
D
I
N
G
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Date:
Drawn By:
Project No:
Checked By:
06.01.2022
HFH000022
MA
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
C1
0
.
9
MATCHLINE-SEE SHEET C10.2
MATCHLINE-SEE SHEET C10.10
DESIGN POINT
DETENTION POND BASIN BOUNDARY
(i.e., MHFD-Detention_v4.03 and/or SWMM)
SUB-BASIN BOUNDARY (i.e., Rational Method)
OVERLAND FLOW DIRECTION
(I.E., LANDSCAPING)
DIRECT FLOW DIRECTION
(I.E., PAVEMENT, CURB AND
GUTTER)
BASIN ID
2-YR RUNOFF
COEFFICIENT
BASIN AREA
(ACRES)
acres
A1
0.05
0.35
2.50
A
APPROXIMATE DETENTION POND
OVERFLOW PATH
100-YR RUNOFF
COEFFICIENT
FEMA CROSS SECTION
IRRIGATION POND LIMITS
KEYMAP
Know what's
before you dig.SCALE: 1"=50'
0 20 5010
JKD
JEP
DRAINAGE PLAN
C10.8
NOTES:
1.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED, 100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST
COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE.
2.THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE
PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING, FILL, DETENTION PONDS, BIKE
PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE COOPER SLOUGH FLOODPLAIN
LIMITS--. STORAGE OF EQUIPMENT AND MATERIALS (TEMPORARY OR PERMANENT) IS NOT ALLOWED IN THE FLOODWAY. ALL ACTIVITIES WITHIN
THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE.
3.CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN. CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES, AT-RISK
POPULATION, HAZARDOUS MATERIALS, AND GOVERNMENT FACILITIES.
4.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS, WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS IS PROHIBITED IN THE
FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET. ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A
NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO. AN APPROVED FEMA ELEVATION CERTIFICATE
COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS
REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY (CO) BEING ISSUED. PLEASE NOTE: IF ANY PART OF THE
BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY, THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE
BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE.
5.ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM.
G3
G4
G1
G2
acres
FUT-H
0.80
1.00
33.3
acres
G4
0.81
1.00
1.16
acres
G3
0.81
1.00
1.18
acres
FUT-G
0.90
1.00
40.3
-
-
-
-
-
-
-
-
-
-
-
-
-
-
STAMP
H:
\
H
a
r
t
f
o
r
d
H
o
m
e
s
\
C
O
F
o
r
t
C
o
l
l
i
n
s
H
F
H
2
2
-
M
u
l
b
e
r
r
y
\
0
C
I
V
\
3
-
C
D
\
F
D
P
_
F
1
\
h
f
h
0
2
2
_
c
1
0
.
0
_
d
r
a
i
n
a
g
e
.
d
w
g
-
Ma
t
t
h
e
w
P
e
p
i
n
-
7/
1
2
/
2
0
2
2
Init.#Issue / DescriptionDate
FI
N
A
L
D
E
V
E
L
O
P
M
E
N
T
P
L
A
N
S
BL
O
O
M
F
I
L
I
N
G
O
N
E
FO
R
T
C
O
L
L
I
N
S
,
C
O
THESE PLANS ARE AN INSTRUMENT OF SERVICE
AND ARE THE PROPERTY OF GALLOWAY, AND MAY
NOT BE DUPLICATED, DISCLOSED, OR REPRODUCED
WITHOUT THE WRITTEN CONSENT OF GALLOWAY.
COPYRIGHTS AND INFRINGEMENTS WILL BE
ENFORCED AND PROSECUTED.
COPYRIGHT
GallowayUS.com
5265 Ronald Reagan Blvd., Suite 210
Johnstown, CO 80534
970.800.3300
PR
E
L
I
M
I
N
A
R
Y
NO
T
F
O
R
B
I
D
D
I
N
G
NO
T
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
Date:
Drawn By:
Project No:
Checked By:
06.01.2022
HFH000022
MA
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
C1
0
.
1
1
MATCHLINE-SEE SHEET C10.8
MATCHLINE-SEE SHEET C10.12
DESIGN POINT
DETENTION POND BASIN BOUNDARY
(i.e., MHFD-Detention_v4.03 and/or SWMM)
SUB-BASIN BOUNDARY (i.e., Rational Method)
OVERLAND FLOW DIRECTION
(I.E., LANDSCAPING)
DIRECT FLOW DIRECTION
(I.E., PAVEMENT, CURB AND
GUTTER)
BASIN ID
2-YR RUNOFF
COEFFICIENT
BASIN AREA
(ACRES)
acres
A1
0.05
0.35
2.50
A
APPROXIMATE DETENTION POND
OVERFLOW PATH
100-YR RUNOFF
COEFFICIENT
FEMA CROSS SECTION
IRRIGATION POND LIMITS
KEYMAP
Know what's
before you dig.
SCALE: 1"=50'
0 20 5010
JKD
JEP
DRAINAGE PLAN
C10.10
NOTES:
1.PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA-REGULATED, 100-YEAR COOPER SLOUGH FLOODPLAIN/FLOODWAY AND MUST
COMPLY WITH THE SAFETY REGULATIONS OF CHAPTER 10 OF CITY MUNICIPAL CODE.
2.THE DEVELOPER SHALL OBTAIN A FLOODPLAIN USE PERMIT FROM THE CITY OF FORT COLLINS AND PAY ALL APPLICABLE FLOODPLAIN USE
PERMIT FEES PRIOR TO COMMENCING ANY CONSTRUCTION ACTIVITY (BUILDING OF STRUCTURES, GRADING, FILL, DETENTION PONDS, BIKE
PATHS, PARKING LOTS, UTILITIES, LANDSCAPED AREAS, FLOOD CONTROL CHANNELS, ETC.) WITHIN THE COOPER SLOUGH FLOODPLAIN
LIMITS--. STORAGE OF EQUIPMENT AND MATERIALS (TEMPORARY OR PERMANENT) IS NOT ALLOWED IN THE FLOODWAY. ALL ACTIVITIES WITHIN
THE FLOODPLAIN ARE SUBJECT TO THE REQUIREMENTS OF CHAPTER 10 OF THE FORT COLLINS MUNICIPAL CODE.
3.CRITICAL FACILITIES ARE PROHIBITED IN THE 100-YEAR FLOODPLAIN. CRITICAL FACILITIES INCLUDE ESSENTIAL SERVICES, AT-RISK
POPULATION, HAZARDOUS MATERIALS, AND GOVERNMENT FACILITIES.
4.CONSTRUCTION OF NEW STRUCTURES, HARD SURFACE PATHS, WALKWAYS, DRIVEWAYS, WALLS, AND PARKING AREAS IS PROHIBITED IN THE
FLOODWAY UNLESS NO-RISE CONDITIONS ARE MET. ANY CONSTRUCTION ACTIVITIES IN THE REGULATORY FLOODWAY MUST ALSO INCLUDE A
NO-RISE CERTIFICATION PREPARED BY A PROFESSIONAL ENGINEER LICENSED IN COLORADO. AN APPROVED FEMA ELEVATION CERTIFICATE
COMPLETED BY A LICENSED SURVEYOR OR CIVIL ENGINEER SHOWING THAT THE BUILDING IS CONSTRUCTED TO THE REQUIRED ELEVATION IS
REQUIRED POST-CONSTRUCTION PRIOR TO A CERTIFICATE OF OCCUPANCY (CO) BEING ISSUED. PLEASE NOTE: IF ANY PART OF THE
BUILDING IS WITHIN THE FLOODPLAIN BOUNDARY, THEN THE ENTIRE STRUCTURE IS CONSIDERED IN THE FLOODPLAIN AND THE ENTIRE
BUILDING ENVELOPE MUST MEET THE REQUIREMENTS OF ELEVATING TO THE RFPE.
5.ALL BASE FLOOD ELEVATIONS ARE BASED ON NAVD 1988 DATUM.
CITY OF GREELEY
4
1
42
39
3
5
3
6
3
7
38
39
40
40
40
40
3
7
3
8
3
8
39
39
39
39
41
41
42
42
40
40
39
40
39
39 39
40
40
40
41
40
4
0
41
41
42
42
4
1
41
42
40
40 39
3
9
4
1
4
1
41 41
40
37
3
8
39
39
40
37
38
39
41
38
3
9
39
3
9
38
3
8
39
3935
3
5
40
34
3
4
36
36
37
3
7
38
38
3
9
39
3
4
40
38
39
41
41
40
4
0
41
41
4
1
4
1
40
40
39
35
34
36
37
38 39
4
0
373839 3839
36373839
373839
38
39
3938
37
40
4
0
4
1
4
1
41
40
4
1
40
38
39
40
40
40
41
41
4
1
41
40
40
40
4
0
41 41
42
41
42 42
40
40
40
41
4
1
41
42
42
42
42
4142
4
2
41
42
42
4
2
40
4
0
4
0
41
40
39
41
42
43
44
41
41
41 414
2
42
41
41
40
40
41
41
42
42
42
42
40
41
42
43
44
42
42
42
43
43
44
44
42
42
42
41
4
2
41
4
1
4
2
43
45 45
42
43
43
44 44
42
43
44
44
44
4
4
44
45
4242
4243
4
3
43
43
44
46
45
45
43
44
46
4
6
46
46
45
46
46
46
4
3
45
45 45
45
43
4
4
46
46
46
46
47
47
47 4
6
43
43
43
41
42
44 44
45
44
46 47
45
44
46
47
47
47
42
41
41
41
42
43
40
41
41
41
4
1
42
42
43
43
4
1
41
41
41
41
4
1
44
44
42
42
42
42
41
46
40
40
37
37
38
38
39
39
41
42
43
44
45
35
32
33
34
3
6
30
35
29
31
32
33
34
36
30
29
31
36
36
40
44
37
38
39
41
42
43
45
40
36 37 38 39
373839
38
35
40
38
3
7
37
38
39
40
41
42
43
36
44
46
44 45 46
46
45
45
46
37
47
CO
CO
CO
CO
POOL
UP UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP UP
UP
UP
LOT 1/ PHASE 1
LOT 2/ PHASE 2
21
0.43 0.72
2
0.85 0.77
3
3
0.41 0.80
11
11
0.77 0.76
12
12
0.52 0.76
6
6
0.93 0.73
4
4
1.02 0.89
8
7
0.55 0.44
9
16
17
17
0.39 0.76
5
0.38 0.59
10
10
0.72 0.75
18
18
0.70 0.84 19
19
0.37 0.84
20
20
0.55 0.83
21
21
0.67 0.84
22
22
0.47 0.88
23
23
1.39 0.39
24
24
0.20 0.51
25
25
0.34 0.66
26
26
0.13 0.61
28
28
0.19 0.66
27
27
0.24 0.61
29
29
0.18 0.58
30
30
0.03 0.67
31
31
0.21 0.58
32
32
0.11 0.87
33
33
0.29 0.57
34 34
0.40 0.61
35
35
0.17 0.55
36
36
0.16 0.54
37
37
0.11 0.30
38
38
0.18 0.48
39
39
0.29 0.63
40
40
0.16 0.61
EX PROPERTY
BOUNDARY/ ROW
EX PROPERTY
BOUNDARY/ ROW
EX PROPERTY
BOUNDARY/ ROW
EX PROPERTY
BOUNDARY/ ROW
EX PROPERTY
BOUNDARY/ ROW
E.H.BARKER ET.AL.
(PARCEL NO. 8708400002)
BUILDING 1
BUILDING 2
BUILDING 3
BUILDING 4
BUILDING 5
BUILDING 6
BUILDING 7BUILDING 8
POOL
BUILDING 9
COMMUNITY
BUILDING
BUILDING 10
BUILDING 11
BUILDING 12
BUILDING 13
BUILDING 14
BUILDING 15
PRIVATE DRIVE
BARK PARK
PROPOSED
RAIN
GARDEN
BODE BOULEVARD
ANGELA AVENUE
INTERNATIONAL BLVD.
DONELLA DRIVE
AR
I
A
W
A
Y
AR
I
A
W
A
Y
DE
L
O
Z
I
E
R
R
D
.
DE
L
O
Z
I
E
R
R
D
.
EX PROPERTY
BOUNDARY/ ROW
EXISTING REGIONAL POND G
(BY OTHERS)
EXISTING REGIONAL POND E
(BY OTHERS)(TO THE NORTH OF THIS MAP)
1
5
8
0.20 0.60
7
13
0.50 0.81
13
14
0.21 0.47
14
15
0.54 0.83
15
EXISTING REGIONAL POND G1
(BY OTHERS)(TO THE SOUTH OF THIS MAP)
16
0.17 0.59
9
0.24 0.34
SHEET No:
PR
O
J
E
C
T
/
L
O
C
A
T
I
O
N
:
DR
A
W
I
N
G
:
OF
CHECKED BY:
DESIGNED BY:
DRAWN BY:
DE
S
C
R
I
P
T
I
O
N
O
F
R
E
V
I
S
I
O
N
:
DA
T
E
:
RE
V
I
S
E
D
B
Y
:
AP
P
R
O
V
E
D
B
Y
:
RE
V
.
#
1 2 3 4 5 6 7
PRE
L
I
M
I
N
A
R
Y
NOT
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
project no:
date:
BL
O
O
M
F
I
L
I
N
G
T
H
R
E
E
FO
R
T
C
O
L
L
I
N
S
,
C
O
L
O
R
A
D
O
DR
A
I
N
A
G
E
E
X
H
I
B
I
T
C-013
13 20
JULY 27, 2022
801-004
JRG
JRG
JRG
ASPEN
0'
SCALE: 1" = 60'
60'120'
LEGEND
EXISTING CONTOURS
NEW INTERMEDIATE CONTOURS39
40 NEW INDEX CONTOURS
PROPOSED FLOWLINE
EX RIGHT-OF-WAY/ PROPERTY BOUNDARY
PROPOSED DRAINAGE BASIN
BOUNDARY LINE
PROPOSED STORM PIPE
EXISTING STORM PIPE & MANHOLE
RD
PROPOSED ROOF DRAIN AND STORM PIPE
1.PROPOSED ELEVATIONS SHOWN ARE RELATIVE TO A DATUM OF 4900 FEET, AND ARE BASED ON THE
BENCHMARKS DESCRIBED ON SHEET C-001.
2.THE DRAINAGE BASINS SHOWN ON THIS EXHIBIT WILL BE ULTIMATELY CONVEYED TO OFFSITE REGIONAL
DETENTION PONDS, LOCATED NORTHEAST AND SOUTH OF THE BLOOM SITE, AND WITHIN THE MASTERPLAN
DEVELOPMENT AREA. THE MASTERPLAN PONDS WILL PROVIDE WATER QUALITY AND DETENTION FOR THE
DEVELOPED CONDITION OF THE BLOOM SITE. THE MAJORITY OF THE DEVELOPED SITE RUNOFF FROM THE
ATTRIBUTING BASINS IS CONVEYED TO THE PROPOSED RAIN GARDEN, LOCATED NEAR THE SOUTHERN
PROPERTY BOUNDARY, WHILE THE REMAINING SITE AREA RUNOFF IS CONVEYED TO STORM SYSTEMS, WHICH
CONVEY RUNOFF DIRECTLY TO THE OFFSITE REGIONAL PONDS.
3.DRAINAGE DESIGN FOR THE PROPOSED SITE IS IN ACCORDANCE WITH THE MATERPLAN DEVELOPMENT, BY
OTHERS.
4.PLEASE REFER TO THE RATIONAL METHOD CALCULATIONS FOR PRELIMINARY BASIN FLOW CALCULATIONS.
ROUTED FLOWS WILL BE PROVIDED IN FINAL DESIGN.
5.12" OF CDOT CLASS 'A' BEDDING MATERIAL SHALL BE PLACED UNDER ALL RIPRAP SHOWN.
6.ROOF DRAINS FROM THE PROPOSED BUILDINGS ARE ANTICIPATED TO DISCHARGE OVERLAND TO NEARBY
SWALES, INLETS, OR CURB AND GUTTER.
7.RUNOFF FROM THE SITE WILL DRAIN TO LOW POINTS AND PASS THROUGH CURB CUTS, SIDEWALK CHASES,
SWALES, AND STORM SEWER PIPES, WHICH ULTIMATELY DISCHARGE TO THE PROPOSED ONSITE RAIN
GARDEN, AND OFFSITE REGIONAL DETENTION PONDS. PERMANENT GEOTEXTILE FABRIC AND GRASS LINED
DRAINAGE CHANNELS WILL ENHANCE EROSION CONTROL WITHIN THE SITE LIMITS. SITE BMP'S WILL BE
IMPLEMENTED TO REDUCE SEDIMENT TRANSPORT OFFSITE, AND WILL BE SHOWN IN THE FINAL EROSION
CONTROL PLAN/EXHIBIT.
8.ALL PROPOSED STORM DRAINAGE PIPES AND STRUCTURES (OUTSIDE OF PLATTED ROW) WILL BE PRIVATELY
OWNED AND MAINTAINED BY THE OWNER. ALL EXISTING STORM SEWER WITHIN PUBLIC ROW, WILL BE OWNED
AND MAINTAINED BY THE CITY OF FORT COLLINS.
NOTES:
PROPOSED DRAINAGE BASIN SUMMARY TABLE:
PROPOSED DRAINAGE BASIN ID
ACRES / 'C' VALUE
PROPOSED DRAINAGE DESIGN POINT
DRAINAGE FLOW DIRECTION
DRAINAGE SWALE
0.720.43
1
PROPOSED LID SUMMARY TABLE:
4
1
42
39
3
5
3
6
3
7
38
39
40
40
40
40
3
7
3
8
3
8
39
39
39
39
41
41
42
42
40
40
39
40
39
39 39
40
40
40
41
40
4
0
41
41
42
42
4
1
41
42
40
40 39
3
9
4
1
4
1
41 41
40
3
7
3
8
39
39
40
37
38
39
41
38
3
9
39
3
9
38
3
8
39
3935
3
5
40
34
3
4
36
36
37
3
7
38
38
3
9
39
3
4
40
38
39
41
41
40
4
0
41
41
4
1
4
1
40
40
39
35
34
36
37
38 39
4
0
373839 3839
36373839
373839
38
39
3938
37
40
4
0
4
1
4
1
41
40
4
1
40
38
39
40
40
40
41
41
4
1
41
40
40
40
4
0
41 41
42
41
42 42
40
40
40
41
4
1
41
42
42
42
42
4142
4
2
41
42
42
4
2
40
4
0
4
0
41
40
39
41
42
43
44
41
41
41 414
2
42
41
41
40
40
41
41
42
42
42
42
40
41
42
43
44
42
42
42
43
43
44
44
42
42
42
41
4
2
41
4
1
4
2
43
45 45
42
43
43
44 44
42
43
44
44
44
4
4
44
45
4242
4243
4
3
43
43
44
46
45
45
43
44
46
4
6
46
46
45
46
46
46
4
3
45
45 45
45
43
4
4
46
46
46
46
47
47
47 4
6
43
43
43
41
42
44 44
45
44
46 47
45
44
46
47
47
47
42
41
41
41
42
43
40
41
41
41
4
1
42
42
43
43
4
1
41
41
41
41
4
1
4
4
44
42
42
42
42
41
46
40
40
37
37
38
38
39
39
41
42
43
44
45
36
36
40
44
37
38
39
41
42
43
45
4
6
40
36 37 38 39
3839
35
3
7
37
38
39
40
41
42
43
36
44
46
44 45 46
46
45
45
46
47
CO
CO
CO
CO
POOL
UP UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP UP
UP
UP
LOT 1/ PHASE 1
LOT 2/ PHASE 2
LIMITS OF DISTURBANCE
BUILDING 1
BUILDING 2
BUILDING 3
BUILDING 4
BUILDING 5
BUILDING 6
BUILDING 7
BUILDING 8
BUILDING 9
COMMUNITY
BUILDING
BUILDING 10
BUILDING 11
BUILDING 12
BUILDING 13
BUILDING 14BUILDING 15
BODE BOULEVARD
ANGELA AVENUE
INTERNATIONAL BLVD.
DONELLA DRIVE
AR
I
A
W
A
Y
AR
I
A
W
A
Y
E.H.BARKER ET.AL.
(PARCEL NO. 8708400002)
EX PROPERTY
BOUNDARY/ROW
EX PROPERTY
BOUNDARY/ ROW
EX PROPERTY
BOUNDARY/ROW
EX PROPERTY
BOUNDARY/ ROW
EX PROPERTY
BOUNDARY/ ROW
EX PROPERTY
BOUNDARY/ROW
EX PROPERTY
BOUNDARY/ROW
EX PROPERTY
BOUNDARY/ROW
POOL
PROPOSED
RAIN
GARDEN
PLAYGROUND
TOT
LOT
BARK PARK
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCELIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE LIMITS OF
DISTURBANCE
LIMITS OF DISTURBANCE
SF
SF
SF
SF
SFSF
SF
SF
SF
SF
SF SF
GF
GF
GF
VTC
VTCVTC
VTC
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
INSTALL OUTLET
GRAVEL FILTER
RS
RS
RS
RS
RS
GB
RS
RS
RS
RS
RS
GB
GB
RS
RS
RS
RS
IP
IP
IP
5
DE
L
O
Z
I
E
R
R
O
A
D
IPIP
IP IP
IP
IP
EX TOPO
CONTOUR
(TYP)
MASTERPLAN
PROP CONTOUR
(TYP)
EX TOPO
CONTOUR
(TYP)
MASTERPLAN
PROP CONTOUR
(TYP)
EX TOPO
CONTOUR
(TYP)
MASTERPLAN
PROP CONTOUR
(TYP)
EX TOPO
CONTOUR
(TYP)
MASTERPLAN
PROP CONTOUR
(TYP)
GB
VTC
VTC
SF
RS
IP
RS
IP
IP
LOT 1/ PHASE 1
LOT 2/ PHASE 2
PROP 10'
TYPE R INLETPROP 10'
TYPE R INLET
PROP 10'
TYPE R INLET
PROP 10'
TYPE R INLET
PROP CDOT
TYPE D INLET
PROP CDOT
TYPE C INLET
4
5
4
5
4
3
PROP CDOT
TYPE C INLET
INSTALL OUTLET
GRAVEL FILTER
1
PROP 10'
TYPE R INLET
PROP 10'
TYPE R INLET
PROP 10'
TYPE R INLET
PROP 10'
TYPE R INLET
EX PROPERTY
BOUNDARY/ROW
CWO
PROP 10'
TYPE R INLET
IP
SHEET No:
PR
O
J
E
C
T
/
L
O
C
A
T
I
O
N
:
DR
A
W
I
N
G
:
OF
CHECKED BY:
DESIGNED BY:
DRAWN BY:
DE
S
C
R
I
P
T
I
O
N
O
F
R
E
V
I
S
I
O
N
:
DA
T
E
:
RE
V
I
S
E
D
B
Y
:
AP
P
R
O
V
E
D
B
Y
:
RE
V
.
#
1 2 3 4 5 6 7
PRE
L
I
M
I
N
A
R
Y
NOT
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
project no:
date:
BL
O
O
M
F
I
L
I
N
G
T
H
R
E
E
FO
R
T
C
O
L
L
I
N
S
,
C
O
L
O
R
A
D
O
ER
O
S
I
O
N
C
O
N
T
R
O
L
P
L
A
N
C-008
8 20
JUNE 14, 2023
801-004
JRG
JRG
JRG
ASPEN
0'
SCALE: 1" = 60'
60'120'
NOTES: .
1.PERIMETER SILT FENCE SHALL BE INSTALLED ALONG
PROPERTY BOUNDARY, AND IS SHOWN OFFSET FROM
PROPERTY BOUNDARY ON THIS PLAN FOR CLARITY.
·PERIMETER SILT FENCE AROUND SITE = 3,709 LF . WHERE
ACCESS DRIVES OCCUR AND TRACKING PADS ARE INSTALLED,
SILT FENCE WILL NOT OCCUR AND WILL STOP AT EDGE OF
TRACKING PADS.
2.ALL DISTURBED AREAS ARE TO BE SEEDED AND MULCHED.
3.STOCK PILES SHALL NOT TO EXCEED 10' IN HEIGHT.
4.ALL OFFSITE AREAS DISTURBED DURING CONSTRUCTION ARE
TO BE RE-VEGETATED AND RETURNED TO HISTORIC
CONDITION. STRAW WATTLES OR GRAVEL INLET FILTERS MAY
BE INSTALLED (IF NECESSARY AND AS REQUIRED) ON
EXISTING, OFFSITE/DOWNSTREAM INLETS.
5.VEHICLE TRACKING PAD(S) LOCATIONS SHALL BE DETERMINED
BY THE CONTRACTOR, PRIOR TO CONSTRUCTION, AND SHALL
BE INSTALLED ACCORDINGLY.
6.SEE SHEET C-009 & C-010 FOR EROSION CONTROL NOTES AND
DETAILS.
7.NORTH AMERICAN GREEN C350 FABRIC WILL BE UTILIZED AT
MINOR OUTFALL LOCATIONS SHOWN, WITH CONCRETE
FOREBAYS UTILIZED WHERE LARGER STORM FLOWS WILL
DISCHARGE TO THE LARGE PROPOSED LID BASIN IN THE
SOUTHERN END OF THE SITE.
8.PERMANENT STORMWATER CONTROL MEASURES SUCH AS LID
BASINS, RAINGARDENS, STORM TECH SYSTEMS, BIOSWALES OR
BIORETENTION PONDS SHALL BE CONSTRUCTED IN THE LAST
PHASE OF CONSTRUCTION ON THE SITE TO MINIMIZE THE
POTENTIAL FOR SEDIMENTATION. ONCE THE RAIN GARDEN IS
INSTALLED, SILT FENCE SHALL BE PLACED AROUND THE RAIN
GARDEN FOR PROTECTION AND TO MITIGATE SEDIMENTATION.
9.NO DEBRIS OR MUD SHALL BE TRACKED ONTO ADJACENT
STREETS AND ANY TRACKING THAT DOES OCCUR, WILL BE
CLEANED IMMEDIATELY BY THE CONTRACTOR.
10.PER CITY EROSION CONTROL REQUEST, CONTRACTOR TO NOTE
THAT SYMBOLS SHOWN ON THIS PLAN ARE NOT TO SCALE.
LEGEND .
INSTALL VEHICLE TRACKING PAD
INSTALL SILT FENCE
INSTALL CONCRETE WASHOUT
HAY OR STRAW DRY MULCH (1-5%)
INSTALL 12" STRAW WATTLE CHECK DAM
LIMITS OF DISTURBANCE
INSTALL CURB INLET GRAVEL FILTER
INSTALL AREA INLET GRAVEL FILTER
PROPOSED DIRECTION OF SURFACE FLOW
INSTALL ROCK SOCK FILTER
INSTALL GRAVEL CURB CHECK BAG
INSTALL NORTH AMERICAN GREEN C350
PROPOSED MAJOR CONTOUR - 5 FT INTERVAL
PROPOSED MINOR CONTOUR - 1 FT INTERVAL
EXISTING MAJOR CONTOUR - 5 FT INTERVAL
EXISTING MINOR CONTOUR - 1 FT INTERVAL
VTC
SF
W
IP
IP
GB
MU
CWO
RS
GF
EXISTING DIRECTION OF SURFACE FLOW
INSTALL RIPRAP PROTECTION (TYPE M D =12")RR 50
35
36
FOR THE MARKING OF UNDERGROUND
BEFORE YOU DIG, GRADE, OR EXCAVATE
CALL 2 BUSINESS DAYS IN ADVANCE
CENTER OF COLORADO
CALL UTILITY NOTIFICATION
1-800-922-1987
MEMBER UTILITIES.
KEY NOTE LEGEND .
1 PROPOSED 30" DRAIN BASIN
2 PROPOSED 12" DRAIN BASIN
3 PROPOSED 15" DRAIN BASIN
4 PROPOSED 18" DRAIN BASIN
5 PROPOSED AREA INLET W/ MH BASE
www.herefordnrcd.com/Straw_Wattles.pdf) AND PER DETAILS
AND INSTALLATION INSTRUCTIONS CALLED FOR ON THIS SHEET.
2. IF GRAVEL INLET FILTERS ARE USED, REFER TO "CURB INLET GRAVEL FILTER" DETAIL, THIS SHEET.
STRAW
WATTLE/ROCK
SOCK CHECK
DAM
www.herefordnrcd.com/Straw_Wattles.pdf
WOODEN
STAKE
(TYP)STRAW
WATTLE WOODEN
STAKE
(TYP)
EMBED
WATTLE/ROCK
SOCK FILTERS
3" TO 5" INTO
SOIL
EMBED
WATTLE/ROCK
SOCK 3" TO 5"
INTO SOIL
General Erosion Control Requirements
These notes are a summary for the legal requirements, that are set forth in the Fort Collins Stormwater Criteria Manual (FCSCM), and that any conflict is resolved
by the more stringent requirement controlling.
1)The Property Owner, Owner's Representative, Developer, Design Engineer, General Contractor, Sub-contractors, or similar title for the developing entity
(here after referred to as the Developer) has provided these Erosion Control Materials in accordance with Erosion Control Criteria set forth in the Manual as an
attempt to identify erosion, sediment, and other potential pollutant sources associated with these Construction Activities and preventing those pollutants from
leaving the project site as an illicit discharge. Full City requirements and are outlined and clarified in the Manual under Chapter 4: Construction Control Measures
and should be used to identify and define what is needed on a project.
2)The Developer shall make themselves thoroughly familiar with the provisions and the content of the specifications laid out in the Manual, the Development
Agreement, the Erosion Control Materials compiled for this project, and the following notes as all these materials are applicable to this project.
3)The Developer shall implement and maintain Control Measures for all potential pollutants from the start of land disturbing activities until final stabilization
of the construction site.
4)The City Erosion Control Inspector shall be notified at least twenty-four (24) hours prior to the desired start of any construction activities on this site to
allow adequate time for on-site confirmation (initial inspection which can take up to two business days after receiving the request) that the site is in fact protected
from sediment and pollutants discharges off site. Please contact erosion@fcgov.com early to schedule those Initial Erosion Control Inspections well in advance so
that demolition, clearing, grubbing, tree removal, and scraping may begin without delay. Failure to receive an on-site confirmation before construction activities
commence is an automatic “Notice of Violation” and can result in further enforcement actions.
5)The Developer shall proactively provide all appropriate Control Measures to prevent damage to adjacent downstream and leeward properties. This includes
but is not limited to: trees, shrubs, lawns, walks, pavements, roadways, structures, creeks, wetlands, streams, rivers, and utilities that are not designed for removal,
relocation, or replacement in the course of construction.
6)At all times the Developer shall be responsible to ensure adequate Control Measures are designed, selected, installed, maintain, repaired, replaced, and
ultimately removed in order to prevent and control erosion suspension, sediment transportation, and pollutant discharge as a result of construction activities
associated with this project.
7)All applicable Control Measures based upon the sequencing and/or phasing of the project shall be installed prior to those construction activities
commencing.
8)As dynamic conditions (due to the nature, timing, sequence, and phasing of construction) in the field may warrant Control Measures in addition, or different,
to what is shown on these plans, the Developer shall at all times be responsible to implement the Control Measures that are most effective with the current state
and progress of construction. The Developer shall implement whatever measures are determined necessary, and/or as directed by the City Erosion Control
Inspector. The Developer shall insure that all Erosion Control Plans (Maps) or SWMP documents are updated to reflect the current site conditions, with updates
being initialed and dated. These site inspections and site condition updates shall be made available upon request by the City.
9)All listings, provisions, materials, procedures, activities, site work and the like articulated in this or other written site-specific documents (Including but not
limited to the erosion control reports, development agreements, landscape, and drainage materials) shall meet or exceed the most restrictive language for City,
County, State, and Federal regulations with regards to erosion, sediment, pollutant, and other pollution source Control Measures. The Developer shall be
responsible to comply with all of these aforementioned laws and regulations.
10)The Developer shall ensure that all appropriate permits (CDPS General Permit Stormwater Discharges Associated with Construction Activity, Dewatering,
Clean Water Act, Army Corps of Engineers' 404 Wetlands Mitigation Permit, etc.) have been attained prior to the relevant activity has begun. These permits or
copies shall be made available upon request by the City.
11)The Developer shall furnish all conveniences and assistances to aid the Erosion Control Inspectors of materials, workmanship, records, and self-inspections,
etc. of the Control Measures involved in the construction activities.
12)The Developer shall request clarification of all apparent site construction issues that may arise due to inconsistencies in construction plans for the site or site
conditions around the selected Control Measures by contacting the Erosion Control Inspector. The Erosion Control Inspector will not be responsible for any
explanations, interpretations, or supplementary data provided by others.
13)All Control Measures shall be installed in accordance with the Manual.
14)The City reserves the right to require additional Control Measures as site conditions warrant, to the extent authorized by relevant legal authority.
15)As with any construction standards, occasions may arise where the minimum erosion control standards are either inappropriate or cannot be justified. In
these cases, a variance to these standards may be applied for pursuant to the terms, conditions, and procedures of the Manual.
16)Inspection. The contractor shall inspect site pollutant sources and implement Control Measures at a minimum of once every two weeks during construction
and within 24 hours following a precipitation event. Documentation of each inspection shall be recorded and retained by the contractor.
17)All temporary Control Measures shall be cleaned, repaired, or reconstructed as necessary in order to assure continual performance of their intended
function. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their
release into any drainage way.
18)Any Control Measure may be substituted for another standard Control Measure so long as that Control Measure is equal to, or of greater protection than
the original Control Measure that was to be used in that location. (ex. silt fence, for wattles, or for compact berms) Wattle alone on commercial construction sites
have shown to be an ineffective substitute for silt fence or compact berms unless it is accompanied by a construction fence to prevent vehicle traffic.
19)Any implementation or replacement of existing Control Measures for a non-standard control, or alternative Control Measure, shall require the review and
acceptance by the City erosion control staff before the measure will be allowed to be used on this project. These Control Measures' details shall be submitted,
reviewed and accepted to be in accordance with the Erosion Control Criteria based upon the functionality and effectiveness in accordance with sound engineering
and hydrological practices
Land disturbance, Stockpiles, and Storage of Soils
20)There shall be no earth-disturbing activity outside the limits designated on the accepted plans. Off road staging areas or stockpiles must be preapproved by
the City. Disturbances beyond these limits will be restored to original condition.
21)Pre-disturbance vegetation shall be identified, protected, and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to
the area required for immediate construction operations, and for the shortest practical period of time. This should include sequencing and phasing construction
activities in a way so that the soil is not exposed for long periods of time by schedule or limit grading to small areas. This should also include when practical
advancing the schedule on stabilization activities such that landscaping takes place shortly if not immediately after grading has occurred. Vegetation efforts shall
start as soon as possible to return the site to a stabilized condition. Sensitive areas should avoid clearing and grading activities as much possible.
22)All exposed soils or disturbed areas are considered a potential pollutant and shall have Control Measures implemented on the site to prevent materials from
leaving the site.
23)All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition at all
times by equipment tracking, scarifying or disking the surface on a contour with a 2 to 4 inch minimum variation in soil surface until mulch, vegetation, and/or
other permanent erosion control is installed.
24)No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport through the use of surface roughening,
watering, and down gradient perimeter controls. All soil stockpiles shall be protected from sediment transport by wind in accordance with Municipal Code §12-150.
All stockpiles shall be flattened to meet grade or removed from site as soon as practical, and no later than the completion of construction activities or
abandonment of the project. All off-site stockpile storage locations in City limits shall have a stockpile permit from the City Engineering Department prior to using
the area to store material. If frequent access from hardscape to the stockpile is needed a structural tracking Control Measure shall be implemented.
25)All required Control Measures shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc.). All of the required erosion Control
Measures must be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion
control report.
26)All inlets, curb-cuts, culverts, and other storm sewer infrastructure which could be potentially impacted by construction activities shall be protected with
Control Measures. Material accumulated from this Control Measure shall be promptly removed and in cases where the protection has failed, the pipes shall be
thoroughly cleaned out.
27)All streams, stream corridors, buffers, woodlands, wetlands, or other sensitive areas shall be protected from impact by any construction activity through the
use of Control Measures.
28)All exposed dirt shall have perimeter control. Any perimeter controls that drain off or has the ability to be tracked onto the nearby hardscape shall have
some form of effective sediment control as the, or as part of the, perimeter control.
29)All exposed slopes should be protected. All exposed steep slopes (Steeper than 3:1 H:V) shall be protected from erosion and sediment transport through use
of Control Measures.
30)No soils shall remain exposed by land disturbing activity for more than thirty (30) days after activity has ceased before required temporary seeding or
permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed. This is not just limited to projects that are abandoned; this includes any project that is
temporarily halted and no immediate activity is to resume within the next thirty (30) days, unless otherwise approved by the City Erosion Control Inspector. During
a season when seeding does not produce vegetative cover, another temporary erosion control shall be implemented with or until temporary seeding or permanent
erosion control can be performed.
31)All individual lots shall have effective sediment controls located on the street side and any down gradient side. Typically most lots drain to the front yet on
those cases where houses are along a pond or drainage swale have the lot drain in a different direction than the street, those individual lots will need protection on
that down gradient side to prevent sediment from leaving the lot. See the Individual Lot Details for further clarification.
Vehicle Tracking
32)At all points where vehicles exit or leave the exposed dirt area on to a hardscape or semi hardscape (concrete, asphalt, road base, etc.) shall have installed at
least one structural tracking Control Measure to prevent vehicle tracking. All areas not protected by an adequate perimeter control shall be considered a point
where vehicles exit the site. Access points should be limited to as few entrances as possible (All perimeter areas shall be protected from tracking activities).
33)In all areas that the structural tracking Control Measures fail to prevent vehicle tracking, collection and proper disposal of that material is required. All inlets
located near access points and affected by tracking activities shall be prevented from the introduction of sediment into the drainage system.
34)City Municipal Code §20-62, among other things, prohibits the tracking, dropping, or depositing of soils or any other material onto city streets by or from any
source. City Municipal Code, §26-498, among other things, prohibits the discharge of pollutants on public or private property if there is a significant potential for
migration of such pollutant. Therefore, all tracked or deposited materials (intentional or inadvertent) are not permitted to remain on the street or gutter and shall
be removed and legally disposed of by the Developer in a timely and immediate manner. Dirt ramps installed in the curb-lines are not exempt to these sections of
code and shall not be permitted in the street right of way (public or private).
35)If repeated deposit of material occurs on a site, additional structural tracking controls may be required of the Developer by the City Erosion Control
Inspector. Loading and Unloading Operations
36)The Developer shall apply Control Measure to limit traffic (site worker or public) impacts and proactively locate material delivered to the site in close
proximity to the work area or immediately incorporated in the construction to limit operational impacts to disturbed areas, vehicle tracking, and sediment
deposition that could impact water quality.
Outdoor Storage or Construction Site Materials, Building Materials, Fertilizers, and Chemicals
37)Any materials of a non-polluting nature (steel, rock, brick, lumber, etc.) shall be inspected for any residue coming off the material during routine inspection
and will generally be located where practical at least fifty (50) feet from any permanent or interim drainage ways.
38)Any high environmental impact pollutant materials that have a high likelihood to result in discharge when in contact with stormwater (lubricants, fuels,
paints, solvents, detergents, fertilizers, chemical sprays, bags of cement mix, etc.) should not be kept on site where practical. When not practical, they should be
stored inside (vehicle, trailer, connex, building, etc.) and out of contact with stormwater or stormwater runoff. Where not available, they shall be stored outside in
a raised (high spots or on pallets), covered (plastic or tarped), and sealed (leak proof container) in secondary containment location. The secondary containment or
other Control Measure shall be adequately sized, located, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage
ways and shall be monitored as part of the routine inspections.
Vehicle and equipment maintenance and fueling
39)Parking, refueling, and maintenance of vehicles and equipment should be limited in one area of the site to minimize possible spills and fuel storage areas.
This area shall be located, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as
part of the routine inspections. All areas shall keep spill kits and supplies close.
Significant Dust or Particulate generating Process
40)The property must be actively preventing the emission of fugitive dust at all times during construction and vegetation activities. All land disturbing activities
that result in fugitive dust shall be in accordance with Municipal Code §12-150 to reduce the impacts to adjacent properties and community health. All required
practices shall be implemented and additional ones shall be followed. These practices include watering the sites and discontinuing construction activities until the
wind subsides as determined by any City Inspectors.
Concrete truck / equipment washing, including the concrete truck chute and associated fixtures and equipment
41)All concrete and equipment washing shall use structural Control Measures appropriate to the volume of wash and frequency of use. These Control Measures
shall be located, where practical, at least fifty (50) feet from any permanent or interim stormwater structures or drainage ways and shall be monitored as part of
the routine inspections. These areas shall be clearly identified and protected from any wash from leaving the Control Measure. If frequent FORT COLLINS
STORMWATER CRITERIA MANUAL Appendix F Page 7 access from hardscape to the Control Measure is to occur, a structural tracking Control Measure shall be
implemented. These Control Measures shall be frequently cleaned out.
42)The Developer is responsible for ensuring washing activity is taking place at the appropriate Control Measure and site workers are not washing or dumping
wash water on to the dirt or other uncontrolled locations.
Dedicated Asphalt and concrete batch plants
43)Dedicated asphalt and concrete batch plants are not acceptable on construction sites within the City of Fort Collins without an expressed written request
and plan to reduce pollutants associated with that type of activity and approval by the City of Fort Collins specifically the Erosion Control Inspector. The Developer
shall inform the erosion control inspection staff of any dedicated asphalt, or concrete batch plants that is to be used on site.
Concrete Saw Cutting Materials
44)Saw cutting material shall be in accordance with Municipal Code §12-150 for air emissions and all water applications to the saw cutting shall prevent
material from leaving the immediate site and collected. These cutting locations, once dried, shall be swept and scraped of all material and shall have proper and
legal disposal.
Waste Materials Storage and Sanitary Facilities
45)Trash, debris, material salvage, and/or recycling areas shall be, where practical, at least fifty (50) feet from any permanent or interim stormwater structures
or drainage ways and shall be monitored as part of the routine inspections. These facilities should be located out of the wind and covered as able. Where not able to
cover, locating said areas on the side of other structures to reduce exposure to winds, and follow maximum loading guidelines as marked on the container. The
Developer is required to practice good housekeeping to keep the construction site free of litter, construction debris, and leaking containers.
46)Sanitary facilities shall be prevented from tipping through the use of anchoring to the ground or lashing to a stabilized structure. These facilities shall also be
located as far as practical from an inlet, curb cut, drainage swale or other drainage conveyances to prevent material transport from leaving the local area. This
consists of the facility being located, where practical, at least fifty (50) feet from any permanent or interim drainage ways.
Other Site Operations and Potential Spill Areas
47 )Spills: For those minor spills that; are less than the State's reportable quantity for spills, stay within the permitted area, and in no way threaten any
stormwater conveyance, notify the FORT COLLINS STORMWATER CRITERIA MANUAL Appendix F Page 8 City of Fort Collins Utilities by email at erosion@fcgov.com
or phone (970) 817-4770. For any significant, major, or hazardous spills, notify the City of Fort Collins Utilities by phone only after Emergency Response (911) has
been notified and is on route, County Health Department (LCDHE) has been notified through Larimer County Sheriff Dispatch (970) 416-1985, and the State Spill
Hotline Incident Reporting have been contacted 1-877-518-5608. Written documentation shall be provided to the City within 5 days of the event. All spills shall be
cleaned up immediately.
48)Selection of “plastic welded” erosion control blankets shall not be used in areas that wildlife, such as snakes, are likely to be located as these have proven to
cause entrapment issues.
Final stabilization and project completion
49) Any stormwater facilities used as a temporary Control Measure will be restored and storm sewer lines will be cleaned upon completion of the project and
before turning the maintenance over to the Owner, Homeowners Association (HOA), or other party responsible for long term maintenance of those facility.
50)All final stabilization specifications shall be done in accordance with the Manual, Chapter 4: Construction Control Measures.
51)All disturbed areas designed to be vegetated shall be amended, seeded & mulched, or landscaped as specified in the landscape plans within 14 working days
of final grading.
52 Soil in all vegetated (landscaped or seeded) areas, including parkways and medians shall comply with all requirements set forth in Sections 12-130 through
12-132 of the City Municipal Code, as well as Section 3.8.21 for the City Land Use Code.
53)All seeding shall refer to landscaping plans for species mixture and application rates and depths requirements.
54)All seed shall be drilled where practical to a depth based upon the seed type. Broadcast seeding shall be applied at double the rate as prescribed for drill
seeding and shall be lightly hand raked after application. Hydroseeding may be substituted for drill seeding on slopes steeper than 3(H):1(V) or on other areas not
practical to drill seed and crimp and mulch. All hydroseeding must be conducted as two separate processes of seeding and tackification.
55)All seeded areas must be mulched within twenty-four (24) after planting. All mulch shall be mechanically crimped and or adequately applied tackifier. The use
of crimped mulch or tackifier may require multiple re-applications if not properly installed or have weathered or degraded before vegetation has been established.
Areas of embankments having slopes greater than or equal to 3H:1V shall be stabilized with an erosion mat or approved equal to ensure seed will be able to
germinate on the steep slopes. During a season when seeding does FORT COLLINS STORMWATER CRITERIA MANUAL Appendix F Page 9 not produce vegetative
cover, another temporary erosion control shall be implemented along with, or until, temporary seeding or permanent erosion control can be performed.
56)The Developer shall warranty and maintain all vegetative measures for two growing seasons after installation or until seventy percent (70%) vegetative cover
has been established, whichever is longer and meets all the Criteria outlined in the Fort Collins Stormwater Criteria Manual Chapter 4: Construction Control
Measures.
57)The Developer shall maintain, monitor, repair, and replace any and all applicable Control Measures until final stabilization has been obtained. All Control
Measures must remain until such time as all upstream contributing pollutant sources have been vegetated or removed from the site. When any Control Measure is
removed, the Developer shall be responsible for the cleanup and removal of all sediment and debris from that Control Measure. At the point at which the site has
been deemed stabilized and verified by City Erosion Control Inspector, all temporary Control Measures can then be fully removed. All measures shall be removed
within 30 days after final stabilization is achieved.
58) The responsible party shall maintain and keep current all payments or related forms of security for the Erosion Control Escrow until 1) stabilization has been
reached and 2) all Control Measures and/or BMPs have sediment materials collected and the Control Measure removed from the site. At that time the site will be
considered completed and any remaining Erosion Control Escrow shall be returned to the appropriate parties.
SHEET No:
PR
O
J
E
C
T
/
L
O
C
A
T
I
O
N
:
DR
A
W
I
N
G
:
OF
CHECKED BY:
DESIGNED BY:
DRAWN BY:
DE
S
C
R
I
P
T
I
O
N
O
F
R
E
V
I
S
I
O
N
:
DA
T
E
:
RE
V
I
S
E
D
B
Y
:
AP
P
R
O
V
E
D
B
Y
:
RE
V
.
#
1 2 3 4 5 6 7
PRE
L
I
M
I
N
A
R
Y
NOT
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
project no:
date:
BL
O
O
M
F
I
L
I
N
G
T
H
R
E
E
FO
R
T
C
O
L
L
I
N
S
,
C
O
L
O
R
A
D
O
ER
O
S
I
O
N
C
O
N
T
R
O
L
N
O
T
E
S
&
D
E
T
A
I
L
S
C-009
9 20
JUNE 14, 2023
801-004
JRG
JRG
JRG
SLOPE
INSTALLATION
DETAIL
Drawing Not To Scale
1.Prepare soil before installing rolled
erosion control products (RECPs),
including any necessary
application of lime, fertilizer, and
seed.
2.Begin at the top of the slope by
anchoring the RECPs in a
6"(15cm) deep X 6"(15cm) wide
trench with approximately 12"
(30cm) of RECPs extended beyond
the up-slope portion of the trench.
Anchor the RECPs with a row of
staples/stakes approximately 12"
(30cm) apart in the bottom of the
trench. Backfill and compact the
trench after stapling. Apply seed to
the compacted soil and fold the
remaining 12"(30cm) portion of
RECPs back over the seed and
compacted soil. Secure RECPs
over compacted soil with a row
of staples/stakes spaced
approximately 12"(30cm) apart
across the width of the RECPs.
3.Roll the RECPs (A) down or (B)
horizontally across the slope.
RECPs will unroll with appropriate
side against the soil surface. All
RECPs must be securely fastened
to soil surface by placing
staples/stakes in appropriate
locations as shown in the staple
pattern guide.
4.The edges of parallel RECPs must
be stapled with approximately 2" -
5" (5-12.5cm) overlap depending
on the RECPs type.
5.Consecutive RECPs spliced down
the slope must be end over end
(Shingle style) with an approximate
3"(7.5cm) overlap. Staple through
overlapped area, approximately
12"(30cm) apart across entire
RECPs width.
Drawn on: 5-4-17
Disclaimer:
The information presented herein is general design information only. For specific applications,
consult an independent professional for further design guidance.
2"-5"
(5-12.5cm)
3B
4
2
5
1
3A
12"(30cm)
6"
(15cm)
6"
(15cm)
*NOTE:
In loose soil conditions, the use of
staple or stake lengths greater than
6"(15cm) may be necessary to
properly secure the RECP's.
3"(7.5cm)
5401 St. Wendel - Cynthiana Rd.
Poseyville, IN 47633
PH: 800-772-2040
www.nagreen.com
CHANNEL
INSTALLATION
DETAIL
Drawing Not To Scale
1.Prepare soil before installing rolled
erosion control products (RECPs),
including any necessary application of
lime, fertilizer, and seed.
2.Begin at the top of the channel by
anchoring the RECPs in a 6"(15cm)
deep X 6"(15cm) wide trench with
approximately 12"(30cm) of RECPs
extended beyond the up-slope portion
of the trench. Use ShoreMax mat at the
channel/culvert outlet as supplemental
scour protection as needed. Anchor the
RECPs with a row of staples/stakes
approximately 12"(30cm) apart in the
bottom of the trench. Backfill and
compact the trench after stapling. Apply
seed to the compacted soil and fold the
remaining 12"(30cm) portion of RECPs
back over the seed and compacted soil.
Secure RECPs over compacted soil
with a row of staples/stakes spaced
approximately 12" apart across the
width of the RECPs.
3.Roll center RECPs in direction of water
flow in bottom of channel. RECPs will
unroll with appropriate side against the
soil surface. All RECPs must be
securely fastened to soil surface by
placing staples/stakes in appropriate
locations as shown in the staple pattern
guide.
4.Place consecutive RECPs end-over-end
(Shingle style) with a 4"-6" overlap. Use
a double row of staples staggered 4"
apart and 4" on center to secure
RECPs.
5.Full length edge of RECPs at top of side
slopes must be anchored with a row of
staples/stakes approximately 12"(30cm)
apart in a 6"(15cm) deep X 6"(15cm)
wide trench. Backfill and compact the
trench after stapling.
6.Adjacent RECPs must be overlapped
approximately 2"-5" (5-12.5cm)
(Depending on RECPs type) and
stapled.
7.In high flow channel applications a
staple check slot is recommended at 30
to 40 foot (9 -12m) intervals. Use a
double row of staples staggered
4"(10cm) apart and 4"(10cm) on center
over entire width of the channel.
8.The terminal end of the RECPs must be
anchored with a row of staples/stakes
approximately 12" (30cm) apart in a
6"(15cm) deep X 6"(15cm) wide trench.
Backfill and compact the trench after
stapling.
Drawn on: 5-4-17
Disclaimer:
The information presented herein is general design information only. For specific applications,
consult an independent professional for further design guidance.
2"-5"
(5-12.5cm)
6
2
4
12"(30cm)
6"
(15cm)
6"
(15cm)
4"-6"
(10-15cm)
8
6"
(15cm)
5 7
4"(10cm)
3
1
A
B
C
A
B C
NOTES:
*Horizontal staple spacing should be
altered if necessary to allow staples to
secure the critical points along the channel
surface.
**In loose soil conditions, the use of staple
or stake lengths greater than 6"(15cm) may
be necessary to properly secure the
RECP's.
CRITICAL POINTS
A. Overlaps and Seams
B. Projected Water Line
C. Channel Bottom/Side Slope Vertices
4"(10cm)
6"
(15cm)
5401 St. Wendel - Cynthiana Rd.
Poseyville, IN 47633
PH: 800-722-2040
www.nagreen.com
SHEET No:
PR
O
J
E
C
T
/
L
O
C
A
T
I
O
N
:
DR
A
W
I
N
G
:
OF
CHECKED BY:
DESIGNED BY:
DRAWN BY:
DE
S
C
R
I
P
T
I
O
N
O
F
R
E
V
I
S
I
O
N
:
DA
T
E
:
RE
V
I
S
E
D
B
Y
:
AP
P
R
O
V
E
D
B
Y
:
RE
V
.
#
1 2 3 4 5 6 7
PRE
L
I
M
I
N
A
R
Y
NOT
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
project no:
date:
BL
O
O
M
F
I
L
I
N
G
T
H
R
E
E
FO
R
T
C
O
L
L
I
N
S
,
C
O
L
O
R
A
D
O
ER
O
S
I
O
N
C
O
N
T
R
O
L
D
E
T
A
I
L
S
C-010
10 20
JUNE 14, 2023
801-004
JRG
JRG
JRG