Loading...
HomeMy WebLinkAboutCOLLEGE & TRILBY MULTIFAMILY COMMUNITY - PDP220009 - SUBMITTAL DOCUMENTS - ROUND 3 - RESPONSE TO STAFF REVIEW COMMENTS (8)A Westrian Company The horizontal control plan indicates a 10-foot sidewalk. Please clarify if there is a separate bike lane or multi-use path being constructed with the Capital Project. City of Fort Collins Development Review Engineering Sophie Buckingham, EI Date:11/22/2022 A W e s t r i a n C o m p a n y Please update this note to reflect the approved variance request. What about Core Lane, Nova Lane, Galactic Lane, and Moonbeam Way? Comments on this sheet are for final approval and do not need to be resolved prior to the hearing, but you are welcome to resolve them now. City of Fort Collins Development Review Engineering Sophie Buckingham, EI Date:11/22/2022 A W e s t r i a n C o m p a n y Know what's below. before you dig.Call R WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T MA R S D R I V E RO V E R W A Y GA L A C T I C L A N E N O V A L A N E G A L A C T I C L A N E MO O N B E A M W A Y Please revise the labeling of these lots to match the plat. I believe Tract G has been shifted to what is currently labeled 217. Wherever Tract G is located, please add a pedestrian connection across this tract. City of Fort Collins Development Review Engineering Sophie Buckingham, EI Date:11/22/2022 A W e s t r i a n C o m p a n y Know what's below. before you dig.Call R WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T MA R S D R I V E R O V E R W A Y NO V A L A N E CO R E L A N E MO O N B E A M W A Y N O V A L A N E STELLAR CIRCLE OXENFREE DRIVE GA L A C T I C L A N E Is this an area inlet? spelling: UTILITY City of Fort Collins Development Review Engineering Sophie Buckingham, EI Date:11/22/2022 Redline responses indicated that this is a drainage easement, not a utility easement. Please correct the label. Please add ramps for pedestrian crossing. A W e s t r i a n C o m p a n y WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T Know what's below. before you dig.Call R RO V E R W A Y MA R S D R I V E NO V A L A N E NO V A L A N E GA L A C T I C L A N E MO O N B E A M W A Y G A L A C T I C L A N E Repeat comment: please adjust the scale bar to say 50 City of Fort Collins Development Review Engineering Sophie Buckingham, EI Date:11/22/2022 A W e s t r i a n C o m p a n y Know what's below. before you dig.Call R WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T Altitu d e : 0 . 0 0 0 0 _ _ _ _ _ _ _ _ _ Name : C o l l e g e _ T r i l b y _ G E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Long i t u d e : - 1 0 5 . 0 7 6 8 6 9 7 9 0 8 1 2 0 0 Lati t u d e : 4 0 . 4 9 4 5 6 2 4 2 7 4 7 3 3 3 _ _ RO V E R W A Y MA R S D R I V E STELLAR CIRCLE NO V A L A N E CO R E L A N E OXEN F R E E D R I V E ROVE R W A Y Where are the proposed contours? Can this label be moved so it doesn't block the alley flowline? City of Fort Collins Development Review Engineering Sophie Buckingham, EI Date:11/22/2022 A W e s t r i a n C o m p a n y Know what's below. before you dig.Call R WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T M R O V E R W A Y MA R S D R I V E NO V A L A N E G A L A C T I C L A N E V A U L T VAU L T VA U L T VA U L T VA U L T VA U L T M M M M M M M M M M M M M M M M M M M M M M M M Repeat comment: please adjust the scale bar to say 50 This linetype does not match the legend symbol for proposed sanitary sewer. Please revise to match. Is this an area inlet? A small landscape area? Something else? Please ensure adequate separation between fire hydrant and underground electric line Is this a proposed street light? Please add a symbol to the legend. City of Fort Collins Development Review Engineering Sophie Buckingham, EI Date:11/22/2022 A W e s t r i a n C o m p a n y Know what's below. before you dig.Call R WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T M RO V E R W A Y MA R S D R I V E NO V A L A N E N O V A L A N E GA L A C T I C L A N E MO O N B E A M W A Y STELLAR CIRCLE R O V E R W A Y VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T VA U L T M M M M M M M M M M M M M M M M M MM M M M M M M M M M M M M M M M M M M M M M M M M M M M M M M VAULT VAULT Repeat comment: please adjust the scale bar to say 50 Please ensure adequate separation between fire hydrant and underground electric line Please ensure adequate separation between fire hydrant and underground electric line Are two street lights proposed right next to each other? City of Fort Collins Development Review Engineering Sophie Buckingham, EI Date:11/22/2022 Sanitary vs. storm vs. water main manhole? A W e s t r i a n C o m p a n y Know what's below. before you dig.Call R WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T M Altitu d e : 0 . 0 0 0 0 _ _ _ _ _ _ _ _ _ Nam e : C o l l e g e _ T r i l b y _ G E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Long i t u d e : - 1 0 5 . 0 7 6 8 6 9 7 9 0 8 1 2 0 0 Latitu d e : 4 0 . 4 9 4 5 6 2 4 2 7 4 7 3 3 3 _ _ MA R S D R I V E NO V A L A N E CO R E L A N E OXEN F R E E D R I V E ROVE R W A Y VA U L T M M M M M M M M M M M M M M M What's this?Please ensure adequate separation between fire hydrant and sidewalk, but be mindful of the underground electric line Please ensure adequate separation between fire hydrant and underground electric line Please ensure adequate separation between fire hydrant and underground electric line City of Fort Collins Development Review Engineering Sophie Buckingham, EI Date:11/22/2022 A W e s t r i a n C o m p a n y Know what's below. before you dig.Call R WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T MARS DRIVE CL PROFILE STA. 10+00 TO 21+00.00 MARS DRIVE PLAN STA. 10+00 TO 21+00.00 MARS DRIVE (COLLECTOR WITH PARKING) VAULT VAULT VAULT VAULT VAULT M MM M MM M M M M M M M M M M M M M M M M M MARS DRIVE (COLLECTOR WITH PARKING) RO V E R W A Y OX E N F R E E D R I V E NOVA LANE NOVA L A N E ST E L L A R C I R C L E Redline responses stated that the deflection angle for this curve is less than 10 degrees. Please ensure that this label shows the correct deflection angle. What does this label refer to? N City of Fort Collins Development Review Engineering Sophie Buckingham, EI Date:11/22/2022 A W e s t r i a n C o m p a n y Know what's below. before you dig.Call R WEST TRILBY ROAD SO U T H C O L L E G E A V E N U E SO L A R C O U R T ROAD 1 PLAN STA. 10+00 TO 17+25.00 ROAD 1 CL PROFILE STA. 10+00 TO 17+25.00 OXENFREE DRIVE / ROVER WAY VA U L T VA U L T M M M M M M M M M MA R S D R I V E OXENFREE DRIVE ROV E R W A Y NO V A L A N E No single point grade break can exceed 0.50%, per LCUASS 7.4.1.B.4. Vertical curves are required for grade changes that exceed 1.0%, per LCUASS 7.4.1.B.4. In the previous submittal, there was a vertical curve here. Please put the vertical curve back in and ensure that the curve length is adequate for a 30mph design speed, per LCUASS Figure 7-17. What is the existing centerline grade out to College Ave? Approximate bounds of horizontal curve. The horizontal curve is still beginning near the bottom of the sag curve, which is not acceptable per LCUASS 7.4.1.A.5. City of Fort Collins Development Review Engineering Sophie Buckingham, EI Date:11/22/2022