DEVELOPMENT REVIEW FEES – effective January 1, 2022
Service Name Fee Notes
Planning Services
Annexation $5,825
Rezoning $4,800
Plan Amendment $11,150 Applies to requested amendments to City Plan, Structure
Plan or adopted Subarea Plans.
Text Amendments $3,200 Applies to requested amendments to Land Use Code.
Planned Unit Development (PUD) $54,475
Overall Development Plan $11,775
Project Development Plan (PDP) $27,675 For Combo PDP/FDP projects only the PDP fee is
assessed (not the FDP fee).
Final Development Plan (FDP) $21,575 For Combo PDP/FDP projects only the PDP fee is
assessed (not the FDP fee).
Basic Development Review (BDR) $16,900
Site Plan Advisory Review (SPAR) No fee
Major Amendment (MJA) $18,975 Final Plan process also required for Major Amendments.
Minor Amendment / Change of Use $1,500
Minor Subdivision $2,300 For projects that include subdivision only, no land use
approval.
Infrastructure Project $13,625 For projects that include grading or infrastructure only, no
land use approval.
Extra Occupancy Unit $2,025 Fee assessed per unit.
Modification of Standards $1,675
Applies to stand-alone modification requests (not in
conjunction with a development plan). Fee assessed for
each modification requested.
Addition of Permitted Use (APU) $3,500 Applies to stand-alone APU requests (not in conjunction
with a development plan).
Additional Rounds of Review $3,000 Charged once for projects that require 4 or more rounds
of review.
Preliminary Design Review (PDR) $1,000
Appeal of Administrative Decision $100
For appeals of Basic Development Review, Minor
Amendment, Administrative Interpretation, or other
decisions by the Director.
Limited-Scope Development Project $6,925
Director approval required based on project-specific
criteria. For Combo PDP/FDP, fee is only assessed
once. Still subject to fees for additional rounds of review.
Limited-Scope Minor Amendment $500 Director approval required based on project-specific
criteria.
Engineering Services
Development Construction Permit (DCP) $2,425
Easement/Right-of-way Dedication $725
Easement Vacation $1,300
Right of Way Vacation $2,050
Zoning Services
Off-site Construction Staging $475
Variance $300
Short Term Rental Denial Appeal $100
Zoning Verification Letter $100
Parkway Landscape Amendment No fee
*Fees cover costs of all departments involved in reviewing or processing the project (including Planning, Engineering, Utilities,
Forestry/Parks, administrative support, mailings, sign postings, and other functions).
**Does not include Poudre Fire Authority fees, which are additional and calculated at the time of submittal. PFA permit requirements
and fee info available here: https://www.poudre-fire.org/online-services/apply-for-permits
LIMITED-SCOPE PROJECT FEE CRITERIA
Requests for a limited-scope (small project) fee must be approved by the Community Development & Neighborhood
Services Director (or designee) prior to project submittal. Even if the general criteria are met, the Director reserves
the right to reject reduced fee requests if the costs of project review are anticipated to exceed the Limited-Scope Fee.
Fee Categories Fee Notes
Development Plan (Limited Scope) $6,925 Includes PDP, FDP, BDR, and MJA project types.
Minor Amendment (Limited Scope) $500
Limited-Scope Development Plan Criteria
The following types of PDP, FDP, BDR and MJA projects are eligible for the Limited-Scope Development Plan Fee:
1. Residential
a. Structural additions or alterations for single family, two-family, and small multi-family (up to 4 units)
dwellings. Includes addition of up to 4 new units.
b. New residential development of 4 or fewer dwelling units (single-family detached, single-family
attached, two-family, or multi-family).
c. Group homes and shelters for victims of domestic violence.
d. Conversion of an existing residential building to fraternity, sorority, or other group living quarters.
e. Conversion of existing residential units to short-term rentals.
2. Commercial
a. Structural additions, alterations or adaptive reuse of existing commercial buildings that will not
substantially alter building height or square footage, site infrastructure, drainage patterns, and/or
existing or approved site features.
b. Change of use if the proposed conversion will not substantially alter building height or square
footage, site infrastructure, drainage patterns, and/or existing or approved site features.
c. New commercial development where public infrastructure already exists (e.g., a pad site within a
larger approved development plan). Public infrastructure includes sidewalks, roadways, and utility
services.
3. Other
a. Rooftop or building-mounted wireless telecommunications equipment. Does not include stand-
alone wireless telecommunications facilities (e.g., cell towers).
b. Minor public facilities.
c. Seasonal overflow shelters.
d. Surface parking lots as a principal use.
e. Agricultural activities, including urban agriculture.
f. Small-scale and medium-scale solar energy systems, as defined in the Land Use Code.
g. Open air farmer’s markets, outdoor vendors and food truck rallies.
h. Land uses that do not involve the construction of occupied buildings.
Limited-Scope Minor Amendment Criteria
The following types of Minor Amendments are eligible for the Limited-Scope Minor Amendment Fee:
a. 2nd Kitchen Minor Amendments
b. Stationary Vendors
c. Lighting Retrofits
d. Temporary Sales Trailers
e. Changes of use that do not result in any exterior/site changes (or “no required site work”)
f. Landscape conversions, except those located along an arterial and converting a large portion of
development’s original approved landscaping.
g. Other minor amendments with a similarly limited scope of work.