Loading...
HomeMy WebLinkAboutST. ELIZABETH ANN SETON CATHOLIC CHURCH EXPANSION - ODP - ODP170002 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTS• Cltj/ 4f Fort Collins December 02, 2016 Johnathan Rosenthal Eidos Architecture 5400 Greenwood Plaza Blvd. Greenwood Plaza, CO 80111 Re: 5450 S Lemay Ave. — Addition �J Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. com Description of project: This is a request to build an addition to the place of worship located at 5450 S Lemay Ave. (parcel #8606316901). This addition would require amending an Overall Development Plan for the site approved in 1984. This amendment would also include other future phasing updates. The site is located in the Low Density Residential (RL) zone district. This proposal will be subject to a Major Amendment. Please see the following summary of comments regarding the project request referenced above. The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you have any questions regarding these comments or the next steps in the review process, you may contact the individual commenter or direct your questions through the Project Planner, Clay Fnckey, at 970-224- 6045 or cfrickey@fcgov.com. Comment Summarv: Department: Zoning Contact: Ali van Deutekom, 970-416-2743, avandeutekom a(�.fcaov.com 1. Will the addition create additional members? Will you provide extra parking or is the current parking underutilized? We would require a maximum of 1 parking space per 3 new seats in the worship space but I'd like to see a breakdown of the current parking spaces. RESPONSE There are currently 650 seats. The addition will create another 150 seats for a total of 800 which requires 267 spaces. The church has 257 spaces. 2. Do you have any bike parking? RESPONSE: There are bike racks located at several locations outside the existing building. There are no new racks pEanne� with the a�ditior, of tr;e wcrshi;� area 3. A landscape plan will be required. RESPONSE A fandsca�e plan is pr�vire�. 4. Any new lighting or existing lighting to be replaced must be full cut off and down directional. RESPONSE: Nc new liahting is proposed. 5. Do you have a trash enclosure? The one shown on the new parish center site plandoesn't appear in a google earth image. RESPONSE Th��r� :s a�rash encicsure i�cate�� an the east side of the building. It is called aut on the site plan. Department: Water-Wastewater Engineering Contact: Heather McDowell, 970-224-6065, hmcdowell(�fcaov.com Page 1 of 8 n U • 1. This property is located within the Fort Collins-Loveland Water District antl the South Fort Collins Sanitation District. Please contact them for any water and sewer development requirements. RESPONSE: Ackn�wledged. Department: Traffic Operations Contact: Nicole Hahn, 970-221-6820, nhahna(�.fcaov.com 1. The anticipated change in tra�c volume is not expected to rise to the threshold of needing a TIS. Please provide a brief narrative on how this addition might change traffic. RESF��NSE We k�ave prov ded a traff�e mema with the submittal. Department: Technical Services Contact: Jeff County, 970-221-6588, icountv al�fcaov.com 1. As of January 1, 2015 all development plans are required to be on the NAVD88 vertical datum. Please make your consultants aware of this, prior to any surveying andlordesign work. RESP�NSE Site s�rvey provided with NAVD88 vertical datum. Older phases of improvements were designed with NGVD29 vertical datum. Using the Vertcon website, there is a 3.01 vertical shift to go NGVD29 to NAVD88. 2. Please add "First Amendment" to the title of the amended ODP/Master Plan. RESPONSE labei adtled to titleblock. 3. If a replat is needed for this property/project, addresses are not acceptable in the Subdivision Plat title/name. RESPONSE: No replat is included. Department: Stormwater Engineering Contact: Heather McDowell, 970-224-6065, hmcdowell(a�fcgov.com 1. The design of this site must conform to the drainage basin design of the Fossil Creek Master Drainage Plan as well the Fort Collins Stormwater Criteria Manual. The drainage design for this existing site was originally done as part of the Saint Elizabeth Ann Seton CatholicChurch PUD. RESPONSE: Several oltler tlrainage reports were reviewed as part of design. Proposed tlesign conforms to the Fort Collins Stormwater Criteria Manual. The original drainage design was prepared prior to the adoption of the Fossil Creek Master Drainage Plan. After conversations with Stormwater Engineering, the St. Elizabeth Ann Seton site will be grandfathered with regard to site release rates, and will not conform to release rate criteria found in the Fossil Creek M�ster Drainage P(an. 2. A drainage report and construction plans are required and they must be prepared bya Professional Engineer registered in the State of Colorado. The drainage report must address the four-step process for selecting structural BMPs. RESPONSE: A cover sheet, standard notes and details, utility plan, site plan, and grading and erosion control plan are provided A drainage report is also provided and d�scusses the four-step process 3. It is impo�tant to document the existing impervious area since drainage requirements and fees are based on new impervious area. An exhibit showing the existing and proposed impervious areas with a table summarizing the areas is required prior to the time fees are calculated for each building permit. RESPONSE: Total new impervious area is provided and tliscussed in drainage report, as this affects the existing tletention pond and rain garden Existing site impervious area is provided for reference. 4. The erosion control report requirements are in Section 1.3.3, Volume 3, Chapter 7 of theFort Collins Stormwater Criteria Manual. If you need clarification concerning this section, please contact the Erosion Control Inspector, Jesse Schlam at 224-6015 orjschlam@fcgov.com. RES�'ONSE: Preliminary erosion control and water quality is discussetl in the provided drainage report. At this tir�e expected disturbance is around 1 acre, so a separate SWMP will neetl to be prepared to meet Ft. Collins requirements, and also is likely needetl to meet State requirements. 5. When improvements are proposed to an existing developed site and there is an increase in impervious area Page 2 of 8 . • greater than 1000 square feet, onsite detention is required with a 2-year historic release rate for water quantity. In the Fossil Creek basin the 2-year historic release rate is 0.2 cfs/acre. RESFON�E impro�dernents a�e propose� �n rf,e �xisting developed site that do exceed � 00� square feet An existing detention pond and outlet structure has already been constructed. Based on the review of previous drainage designs, the outlet structure and pipe have restricted the release rate from the site to 12 cfs. The proposed impervious improvements will drain to the existing detention pond; and the release from the site will not exceed 12 cfs. 6. Please note that the original detention pond design for this site was likely done using old rainfall data. Therefore, the entire site and detention pond will need to be re-analyzed and brought into compliance utilizing current rainfall data. Also, stormwater conveyance fromthe storm pipe at Seton Street and Lemay will need to be maintained through this site with any site improvements or grading modifications made to the site. This drainage conveyance will also need to be in an easement if it isn'talready. RESPONSE: Page 5 of the 2003 Parish Cer,ter Drainage report has the following sentences, "The 1998 report documented a 100-year dhischarge of 12.4 cfs from the detention pond for the proposed condition (which is considered as the existing condition for the current analysis). For the existing condition analysis the only modification to the previous modeling was the inclusion of the updated rainfall hyetograph....Table 4 provides the 1998 results, and the currer�t ex s`�-�� a��r� ;vr�.�csc��! condition res�.�".s " It appears the rainfal! data uvas �apdated in the 20�J3 drainage report 7. Fifty percent of the site runoff is required to be treated using the standard water quality treatment as described in the Fort Collins Stormwater Manual, Volume 3-Best Management Practices (BMPs). (http://www.fcgov.comlutilities/business/builders-and-developers/development-forms-guitleli nes- regulations/stormwater-criteria) Extended tletention is the usual method selected for water quality treatment; however the use of any of the BMPs is encouraged. I?�SFGNS� M«ch mc�e than 50°�� af'h� s�t� drains to the existing tletention pond which includes a WQCV and autlet struciure 8. Low Impact Development (LID) requirements are required on all new or redeveloping property which includes sites required to be brought into compliance with the Land Use Cotle. These require a higher degree of water quality treatment with one of the two following options: a. 50°/a of the newly addetl or modified impervious area must be treated by LID techniques and 25% of new paved areas must be pervious. b. 75% of all newly added or modified impervious area must be treated by LlDtechniques. RESPONSE: A rain gar�en is proposed and has been sized based on UD�CD spreadsheets. Due to the nature and configuration of the proposed improvements, it was not practical to treat the new impervious areas with an LID feature. So, and area-swap has been proposed, and the proposed rain garden intercepts runoff from the parking lot east of the church, which has more impervious area than the proposetl improvements 9. There will be a final site inspection of the stormwater facilities when the project is complete and the maintenance is handed over to an HOA or another maintenance organization, Standard operating procedures (SOPs) for on-going maintenance of all onsite drainage facilities will be included as part of the Development Agreement. More information and links can be found at: http:l/www.fcqov.comlutilities/wh at-we-do/stormwate rlstormwater-q ua lity/low-im pact-develop ment RESPONSE Acknowledged, but there should no� be any change i� managemen; 10. Per Colorado Revised Statute §37-92-602 (8) effective August 5, 2015, criteria regarding detention drain time will apply to this project. As part of the drainage design, the engineer will be required to show compliance with this statute using a standard spreatlsheet (available on request) that will need to be includetl in the drainage report. Upon completion of the project, the engineer will also be required to upload the approved spreadsheet onto the Statewide Compliance Portal. This will apply to any volume based stormwater storage, including extended detention basins. RESPONSE: Acknowledg�d, drai� time �a�cs ��e �rcv���ed w�it�iir�s tf �e ��ai�n��e re��rt for the existing detention po�d New ori�ice c��,cs are �.u�se� fo� th�� st�ge�'re;�ase infe on the s�rea��sheet Page 3 of 8 • • 11. The 2016 city wide Stormwater development fee (PIF) is $8,217/acre for new impervious area over 350 square feet and there is a$1,045/acre of site review fee. No fee is charged for existing impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found at: http://www.fcgov.com/utilitieslbusinesslbuilders-and-developerslplant-investment-developme nt-fees or contact our Utility Fee and Rate Specialists at (970) 416-4252 for questions on fees. There is also an erosion control escrow required before the Development Construction permit is issued. The amount of the escrow is determined by the design engineer, and is based on the site disturbance area, cost of the measures, or a minimum amount in accordance with the Fort Collins Stormwater Manual. RESP�NSE� Ackncwne�ged Department: Fire Authority Contact: Jim Lynxwiler, 970-416-2869, ilvnxwilerC�qoudre-fire.ora 1. 2015 IFC CODE ADOPTION The Poudre Fire Authority and the City of Fort Collins are in the process of adopting the 2015 International Fire Code. Building plan reviews shall be subject to the adopted version of the fire code in place at the time of plan review submittal and permit application. RESFONSE: Ackncwiecged 2. AUTOMATIC FIRE SPRINKLER SYSTEM Extension or modification of the existing automatic sprinkler system will require a separate permit. Please contact Assistant Fire Marshal, Joe Jaramillo with any fire sprinkler related questions at 970-416-2868. RESPONSE: Acknowletlged 3. FIRE LANES Before an accurate assessment of fire access requirements can be completed, more information as to the building addition's height will be needed. In general, fire access is required to within 150' of all e�erior portions of any building, or facility as measured by an approved route around the perimeter. For the purposes of this section, fire access cannot be measured from an arterial road (S Lemay Ave), but may be measured from a collector (Southridge Greens Blvd), as well as from any fire lanes internal to the site. If a fire lane has not been previously provided on this property, one will be needed at this time, along with fire lane signage. Any private drive serving as a fire lane shall be dedicated as an Emergency Access Easement (EAE) and be designed to standard fire lane specifications. Rc�FONSE ���n�wlecged. The existing site condition puts the building perimeter out of fire access by approximately 250'. The proposed builtling adtlition will extend the out-of-access condition to approximately 475'. The design team will need to explore options that could help to mitigate perimeter access, In addition, aerial apparatus access requirements are triggered for buildings in excess of 30' in height. Code language and fire lane speciflcations provided below. RESPONSE: As �iscussed, a new fire lane will be constructed per re.:u -�ments. > IFC 503.1.1: Approved fire Lanes shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall e�end to within 150 feet of all po�tions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. When any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access, the fire code official is authorized to increase the dimension if the building is equippetl throughout with an approved, automatic fire-sprinkler system. RESFONSE: Acic�aw9edged. 4. FIRE LANE SPECIFICATIONS A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: > Shall be designated on the plat as an Emergency Access Easement. Page 4 of 8 • • > Maintain the required 20 foot minimum unobstructed width & 14 foot minimum overhead clearance. > Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons. > Dead-end fire access roads in excess of 150 feet in length shall be provided with an approved area for turning around fire apparatus. > The required tuming radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside. Turning radii shall be detailed on submitted plans. > Be visible by painting and/or signage, and maintained unobstructed at all times. Sign locations or red curbing should be labeled and detailed on final plans. > Additional access requirements exist for buildings greater than 30' in height. Refer to Appendix D of the 2012 IFC or contact PFA for details. International Fire Code 503.2.3, 503.2.4, 503.2.5, 503.3, 503.4 and Appendix D; FCLUC 3.6.2(B)2006 and Local Amendments. RESPONSE. An easement by separate tlocument will be providetl at a later tlate for the emergency access. An 18' concrete access has been provided. Existing landscaping will be removed to ensure a minimum of 20 feet urobstructed wid?h� Inside radius is 66 feet 5. STRUCTURES EXCEEDING 30' IN HEIGHT > IFC Appendix D; Poudre Fire Authority Administrative Policy 85-5: In order to accommodate the access requirements for aerial fire apparatus (ladder trucks), required fire lanes shall be 30 foot wide minimum on at least one long side of the building. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet and a maximum of 30 feet from the building, and shall be positioned parallel to one entire side of the building. RESP^NSE�. '�ti�e� ;:����,ie�ti�e� ou� coornic.�tic���� �w�itn i���e PFA ��d our E��ro�o����d layout meet these requirements. 6. FIRE LANE SIGNS The limits of the fire lane shall be fully defined. Fire lane sign locations should be indicated on future plan sets. Code language provided below. > IFC D103.6: Where required by the fire code official, fire apparatus access roads shall be marked with permanent NO PARKING - FIRE LANE signs complying with Figure D103.6. Signs shall have a minimum dimension of 12 inches wide by 18 inches high and have red letters on a white reflective background. Signs shall be posted on one or both sides of the fire apparatus road as required by Section D103.6.1 or D103.6.2. RES�ONSE: Acknowle�ged. 7. PUBLIC-SAFETY RADIO AMPLIFICATION SYSTEM TEST > IFC 510 & 1103.2: New and existing buildings require a fire department, emergency communication system evaluation after the core/shell but prior to final build out. For the purposes of this section, fire walls shall not be used to define separate buildings. Where adequate radio coverage cannot be established within a building, public-safety radio amplification systems shall be designed and installed in accordance with criteria established by the Poudre Fire Authority. RtSPONS� Acknowledged. LOCAL EXCEPTION: PFA will waive the testing requirement and system installation in all buildings less than 10,000 sq. ft. and any Type V construction building less than 15,000 sq. ft. PFA policy P15-510.1 8. PRIVATE HYDRANTS There is a question if the hydrant internal to the site is public or private. The installation of private hydrants require special permitting. Private fire hydrants shall have an approved maintenance plan as per IFC 507.5.3. Fire hydrants must be the type approved by the water district having jurisdiction and the Fire Department. RESPO�lSE: Acknowledgetl. Department: Environmental Planning Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak a(�.fcgov.com 1. If uptlates to lighting will be proposed note: regarding LED light fixtures, cooler color temperatures are harsher at night and cause more disruption to circadian (biological) rhythms for both humans and wiltllife. Warmer color Page 5 of 8 • . temperature (warm white, 3000K or less) for any LED light fixtures requested and those with dimming capabilities so that light levels can be adjusted. Site light sources shall be fully shielded and down-directional to minimize up-light, light spillage and glare [see LUC 3.2.4(D)(3)]. For further information pleasesee: http://darksky.org/ama-report- affirms-human-health-impacts-from-leds/ RESPONSE No new lighting is proposed 2. City of Fort Collins Land Use Code [Section 3.2.1 (E)(3)], requires that to the extent reasonably feasible, all plans be designed to incorporate water conservation materials and techniques. This includes use of low-water-use plants and grasses in landscaping or re-landscaping and reducing bluegrass lawns as much as possible. Native plants and wildlife-friendly (ex: pollinators, butterflies, songbirds) landscaping and maintenance are also encouraged. Please refer to the Fort Collins Native Plants document available online and published by the City of Fort Collins Natural Areas Department for guidance on native plants is: http://www.fcgov.com/naturalareas/pdf/nativeplants2013.pdf. RESPONUc. ��e ;�rovi�ed ICn�scape piar�. 3. If trees will be impacted on site note LUC Section 3.2.1(C) requiring developments to submit a landscape and tree protection plan, and if receiving water service from the City, an irrigation plan, that: "...(4) protects significant trees, natural systems, antl habitat, and (5) enhances the pedestrian environment." Note that a significant tree is defined as a tree having DBH (Diameter at Breast Height) of six inches or more. If any of the trees within this site have a DBH of greater than six inches, a review of the trees shall be conducted with Tim Buchanan, City Forester (970-221-6361 or tbuchanan@fcgov.com) to determine the status of the existing trees and any mitigation requirements that could result from the proposed development. RESPONSE: Several trees will be impacted by the proposed addition The applicant s landscape architect will be scheduling an on-site meeting with the City Forester. 4. Our city has an established identity as a forward-thinking community that cares about the quality of life it offers its citizens now and generations from now. Thus, the City of Fort Collins has many sustainability programs and goals that may benefit thisproject. 1) ClimateWise program: fcgov.com/climatewise/ 2) Zero Waste Plan and the Waste Reduction and Recycling Assistance Program (WRAP): fcgov.com/recycling/pdf/_20120404_WRAP_ProgramOverview.pdf, contact Caroline Mitchell at 970-221-6288 or cmtichell@fcgov.com 3) Green Building Program: fcgov.com/enviro/green-building.php, contact Tony Raeker at 970-416-4238 or traeker@fcgov.com 4) Integrated Design Assistance Program: http://fcgov.com/idap, contact Gary Schroeder at 970-224-6003 or gsch roeder@fcgov.com 5) Nature in the City Strategic Plan: http:l/www.fcgov.com/natureinthecityl, contactJustin Scharton at 970-221-6213 or jscharton@fcgov.com Please consider City sustainability goals and ways this development can engage with these efforts. RESPONSE: A,�knowledged. Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mvirata anfcqov.com 1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit. Please contact Matt Baker at 224-6108 if you have anyquestions. RESPONSE: There are no changeslimpacts to existing roadways. 2. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional information on these fees, please see: http://www.fcgov.comlengineering/dev-review.php RESP�'VSE Acknc�n�ledge� 3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to Page 6 of 8 • • the issuance of the first Certificate of Occupancy. RESF��NSE A,�Knawledgeq. 4. All public sidewalk, driveways and ramps existing or proposed adjacent or within the site need to meet ADA standards, if they currently do not, they will need to be reconstructed so that they do meet current ADA standards as a part of this project. The existing drivewayswill need to be evaluated to determine if the slopes and width will meet ADA requirements or if they need to be reconstructed so that they do. RESPONSE: Ack�:��wledce�d. 5. Any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). They are available online at: http:llwww.larimer.org/engineering/GMARdStds/UrbanSt.htm RESFONSE� A��K�o�,ti�:Pdaed. 6. This project is responsible for dedicating any right-of-way and easements that are necessary or required by the City for this project. Most easements to be dedicated need to be public easements dedicated to the City. This shall including the standard utility easements that are to be provided behind the right-of-way (15 foot along an arterial, 8 foot along an alley, and 9 foot along all other street classifications). Information on the dedication process can be found at: http:llwww.fcgov.com/engineering/devrev.php RESPOPJSF F,�kn�wledged 7. Utility plans will be required and a Development Agreement will be recorded once the project is finalized. RESP01�lSE Acknc�wledged 8. As of January 1, 2015 all development plans are required to be on the NAVD88 vertical datum. Please make your consultants aware of this, prior to any surveying andlordesign work. RESPONSE: Site survey provided with NAVQ88 vertical datum Older pf�ases of impr•�ve�nents v�ere desig«�d with NGVD29 verticaf datum iJsing the Vertcon website there is a 3 01 vertical �hift tc �� �JGVD29 to NAVD88. 9. A Development Construction Permit (DCP) may be needed to be obtained prior to starting any work on the site. RESPONSE Acknowle�qe� Department: Electric Engineering Contact: Rob Irish, 970-224-6167, ririshC�fcgov.com 1. The existing building is currently fed by two 3-phase transformers, one on the Northeast side of the building and one on the South end of the building. Light & Power has existing electric facilities running along Lemay adjacent to this site and running into the site from Seton St. and from Southridge Greens Blvd. Please have these facilities field located to determine the exact location. RcSPGNSL Acki�owle�ged 2. Any relocation or modification to existing electric facilities will be at the expense of the owner/developer. If Light & Power's existing electric facilities are to remain within the limits of the project they must be located within a utility easement. RESPONSE: Acknowledged. 3. If the applicant anticipates any change / increase to the existing electric service please contact Light & Power Engineering @970-221-6700. RtSPOrJSE Acknoe�vleJgetl 4. Please reference our policies, development charge processes, and use our fee estimator at http://www.fcgov.com/utilitieslbusiness/builders-and-developers. RESPONSE a.cknow{edg�d. Department: Building Inspection Contact: Sarah Carter, 970-416-2748, scarteranfcQov.com 1. Construction shall comply with adopted codes as amendetl. Current adopted codesare: 2012 Intemational Building Code (IBC) 2012 Intemational Residential Code (IRC) 2012 Intemational Energy Conservation Code (IECC) 2012 International Mechanical Code (IMC) Page 7 of 8 • • 2012 Intemational Fuel Gas Code (IFGC) 2012 Intemational Plumbing Code (IPC) as amended by the State of Colorado 2014 National Electrical Code (NEC) as amended by the State of Colorado Fort Collins has amendments to most of the codes listed above. See the fcgov.com/building web page to view them. Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009. Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF. Frost Depth: 30 inches. Wind Load:100- MPH 3 Second Gust Exposure B. Seismic Design: Category B. Climate Zone: Zone 5 Energy Code Use: 2012 IECC commercial chapter. 2. Adoption of the 2015 I-Codes is anticipated for January 2017. Be advised that permit applications submitted after the code adoption date will be subject to the new codesand standards, as amended. For more information, contact Sarah Carter, Plans Examiner at 970-416-2748 or scarter@fcgov.com. 3. This project could benefit from a pre-submittal meeting with Building Services. Pre-submittal meetings assist the designer/builder by assuring, early on in the design, that the new projects are on track to complying with all of the adopted City codes and Standards listed below. The proposed project should be in the early to mid-design stage for this meeting tobe effective. Applicants of new projects should email scarter@fcgov.com to schedule a pre-submittal meeting. Applicants should be prepared to present site plans, floor plans, and elevations and be able to discuss code issues of occupancy, square footage and type of construction being proposed. RES°ONSE �cknowled�ed Planning Services Contact: Clay Frickey, 970-224-6045, cfrickev an.fcaov.com 1. This plan will constitute an amendment to the Overall Development Plan (ODP) originally approved in 1984. Please submit a revised ODP that reflects the new location of theaddition. If you anticipate any other changes to the ODP, staff recommends submitting those changes as part of this review. RESPONSE: An ODP is provided 2. Please submit building elevations as part of this project. All elevations must meet the architectural compatibility standards outlined in Land Use Code section 3.5.1. Staff will be looking to make sure the mass is well articulated with an emphasis on the bulk, mass, and scale of the addition. RESPGNSE: Building elevations are prQvi�ed v�ith the Major Amendment. 3. How tall will the new building addition be? The maximum building height in the Low Density Residential (RL) zone district is 3 stories for places ofworship. RESPOR;S�: The buildi�tg is fh�e� sto�ies. 4. All Overall Development Plans are reviewed by the Planning & Zoning Board. This also means a neighborhood meeting is required for this project. The neighborhood meeting must be held 10 days before submitting a formal development review application with the City of Fort Collins. Staff can assist you with scheduling a neighborhood meeting. RESPONSE: Acknowiedged. As discussed, a neighborh�otl meeting was held. '�'e h�v� p�ovur�e� da�.,umentation, notes and a list 5. The proposed development project is subject to a Type 2(Planning and Zoning Board) review and public hearing. The applicant for this development request is required to holtl a neighborhood information meeting prior to formal submittal of the proposal. Neighborhood meetings offer an informal way to get feedback from your surrounding neighbors and discover any potential hiccups prior to the formal hearing. Please contact me, at 221- 6750, to assist you in setting a date, time, and location. I and possibly other City staff, would be present to facilitate the meeting. RES'PGNSE: Ac�:n����vle�c,e�� ;"�,s r�i�cu�se� ; nei�i��or�aod meeting was held. We have provitled documentation, notes and a list. Page 8 of 8 • � 6. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color coded flowchart with comprehensive, easy to read information on each step in the process. This guide includes links to just about every resource you need during development review. RE�FOrJSE: Acknowledged 7. This development proposal will be subject to all applicable standards of the Fort CollinsLand Use Code (LUC), including Article 3 General Development Standards. The entire LUC is available for your review on the web at http:/lwww.colocode.com/ftcollins/landuselbegin.htm. RESPONSE Acknawledged 8. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply for a Modification of Standard. RESFOf�S'=� Acknowle�g��. 9. Please see the Submittal Requirements and Checklist at: http:/lwww.fcgov.com/developmentreviewlapplications.php. RESPONSE. Ackrowledged 10. The request will be subject to the Development Review Fee Schedule that is available in the Community Development and Neighborhood Services office. The fees are due at the time of submittal of the required documents for the appropriate development review process by City staff and affected outside reviewing agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal. RESPONSE Ackno��vle�ged 11. When you are ready to submit your formal plans, please make an appointmentwith Community Development and Neighborhood Services at(970)221-6750. RESPONSE Acknowledgetl. Page 9 of 8