June 15, 2018
Clint Anders
Ripley Design, Inc.
419 Canyon Ave, Suite 200
Fort Collins, CO 80521
•
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/de velopmentreview
RE: Old Town North Fourth Filing Replat of Tract HHH, BDR180003, Round Number
2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Ted Shepard, at 970-221-6343 ortshepard@fcgov.com.
Comment Summarv:
Department: Engineering Development Review
Contact: Spencer Smith, 970-221-6603, smsmith@fcgov.com
Topic: Construction Drawings
Comment Number: 5
06/12/2018: Not all previous redlines were addressed.
02/26/2018: See redlines for comments on note sheet (2 of 8)
Comment Number: 6
Comment Originated: 02/26/2018
Comment Originated: 02/26/2018
06/12/2018: See redlines for additional discussion. Comment still not
addressed accurately.
02/26/201 S: I don't believe that Osiander St. is being shown accurately on the
construction plans. Make it clear where the existing (current) improvements
are/end and what is future and/or "by others"
Comment Number: 8
Comment Originated: 06/12/2018
06/12/2018: Make sure that the topo plan and plat that are included for
reference, are current, revised versions. All revisions on those documents
need to be reflected on the copies included in the utility plan for reference.
Comment Number: 10
06/12/2018: Refer to redlines for additional comments.
Comment Originated: 06/12/2018
1
Topic: Easements .
�
Comment Number: 2 Comment Originated: 02/26/2018
06/12/2018: Please include a signature block on the utility plans for the ditch
company.
02/26/2018: I understand that the applicant is working with the Lake Canal ditch
company regarding an easement for the existing box culvert at the southeast
corner of the site. The easement will need to be included on the plat and plans
once it is finalized.
Comment Number: 3
Comment Originated: 02/26/2018
06/12/2018: Comment addressed. Please note that the property owner(s) will
be responsible for initiating the easement vacation once the conditions of the
DA are met.
02/26/2018: The existing temporary turnaround easement will need to remain
until Osiander is connected to Redwood and Alley L is connected to Osiander
(per the original Development Agreement). Another option would be to
dedicate a replacement temporary turnaround easement and then vacate the
existing one. Once the roadway connections are complete, then the easement
can be vacated by separate instrument.
Topic: General
Comment Number: 1 Comment Originated: 02/26/2018
02/26/2018: A Development Agreement will be required as part of this project.
Comment Number: 9 Comment Originated: 06/12/2018
06/12/2018: There are now sections of the proposed alley that do not have the
8' easement and setback on both sides. There should be a typical section in
the plans that illustrates this condition.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcqov.com
Topic: Landscape Plans
Comment Number: 8
Comment Originated: 06/12/2018
06/12/2018: ARP qty 4 shown on plan (symbology) and qty 6 shown on plant
list for the manzanita. Please update.
Comment Number: 9
Comment Originated: 06/12/2018
06/12/2018: For any rock material note following requests:
A. Avoid using large river rock around 1 gallon or smaller plant material - this is
failing on multiple projects as the plants cannot compete with the large cobble
and are fighting to grow up and through.
B. Use 1.5 inch or less rock material if/when chosen as a material and/or pea
gravel especially for any 1 gallon shrubs or smaller plant material.
C. Police services does not prefer large river rock cobble as this material
poses a danger for ankle injuries if/when crossing over it during emergency or
other security operations.
D. Please only use large river rock cobble for river features and/or stormwater
stabilization purposes not general landscaping.
2
. Comment Numb� 10 �ment Originated: 06/12/2018
06/12/2018: The "Option A" landscape plan is rather complex. A heads up it
may be difficult long-term to maintain this design to a level necessary along a
highly visible roadway. It might be worthwhile to simplify this design. Something
to consider.
Department: Forestry
Contact: Molly Roche, , mroche@fcqov.com
Topic: Landscape Plans
Comment Number: 7 Comment Originated: 06/13/2018
06/13/2018:
Please explore the opportunity to add additional street trees along Redwood.
There appears to be room for 2-3 additional trees, even within the site triangle.
Please include all utilities on the landscape plans in order for Forestry to review
tree-utility separations.
Comment Number: 8 Comment Originated: 06/13/2018
06/13/2018:
Please use a Linden in place of a Honeylocust on the Option B sketch.
Comment Number: 9 Comment Originated: 06/13/2018
06/13/2018:
Option A appears to present future maintenance concerns due to the detail of
the landscape design (turf mowers will have a difficult time maneuvering around
trees and mulch/rock shrub beds. Option B appears to be a much more feasible
design.
Department: PFA
Contact: Andrew Rosen, , arosen@fcqov.com
Topic: General
Comment Number: 2 Comment Originated: 06/04/2018
06/04/2018: UPDATE
ADDRESSING
To assist with prompt emergency response, the new residence address shall
be clearly visible from the street in 8" numerals
Department: Planning Services
Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com
Topic: General
Comment Number: 7 Comment Originated: 06/13/2018
06/13/2018: On the Landscape Plan, please note that Ornamental Trees may
be placed to within 15-feet of a streetlight. Please add Ornamental Trees
so there is no 80-foot gap in tree plantings along the street.
3
Comment Nu�: 8
�omment Originated: 06/15/2018
06/15/2018: This concludes the development review rounds of review. Moving
forward, the applicant and consulting team are expected to contact each of the
departments on an individual basis in order to resolve all outstanding
comments. Staff will mail out the notification letter advertising the two week
open comment period. This comment period will be from Wednesday, June
20th to Thursday, July 5th. At the conclusion of this comment period, Staff will
forward a decision request to the Planning Director who may approve, approve
with conditions, deny or continue the item based on compliance with applicable
standards. As you are aware, there is no public hearing.
Department: Stormwater Engineering
Contact: Basil Hamdan, 970-224-6035, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 02/27/2018
06/12/2018: Erosion Control Plan and Details are acceptable on this project.
Please provide a escrow estimate as no estimate was provided as part of the
supplied materials, please email a copy of the estimate sheet. If you need
clarification concerning the Erosion Control Material Requirements or
Comments presented above please contact myself. Jesse Schlam (970)
224-6015 jschlam @fcgov.com
03/07/2018: Per phone call with Mike Cole, verified that we will need an
updated erosion control escrow calculation but no report will be needed. The
erosion control plan included with the Utilities Plan Set is acceptable. -Jesse
Schlam
02/27/2018: Development area is over 10,000 square feet. Please provide
erosion control measures for the site and show these on the Utilities plan. An
erosion control escrow estimate should also be calculated.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 6 Comment Originated: 02/26/2018
02/26/2018: Sheet 2 of 2 of the Subdivision Plat does not match the Plat
submitted for review. Please make sure the Plat copy is correct, or remove it
from the plan set.
Comment Number: 8 Comment Originated: 06/12/201 S
06/12/2018: Some of the sheet titles in the sheet index do not match the sheet
titles on the noted sheets. See redlines.
Topic: Landscape Plans
Comment Number: 7
Comment Originated: 06/12/201 S
06/12/2018: The plan does not match the Subdivision Plat. We will do a review
when it is revised to match.
4
� Topic: Plat •
•
Comment Number: 1 Comment Originated: 02/26/2018
06/12/2018: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections
were not made. Please provide any responses on redlined sheets and/or in
response letter.
02/26/2018: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections
were not made. Please provide any responses on redlined sheets and/or in
response letter.
Topic: Site Plan
Comment Number: 3 Comment Originated: 02/26/2018
06/12/2018: The plan does not match the Subdivision Plat. We will do a review
when it is revised to match.
02/26/2018: The Site Plan does not match the Subdivision Plat. See redlines.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcqov.com
Topic: General
Comment Number: 1 Comment Originated: 02/22/2018
02/22/2018: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Department: Zoning
Contact: Missy Nelson,
Topic: Site Plan
, mnelson@fcqov.com
Comment Number: 3 Comment Originated: 02/26/2018
6/13/2018: Site plan still only says "Director Signature" on signature block.
Please correct.
02/26/2018: Change planning signature block, signature line to "Director of
Community Development and Neighborhood Services."
5