HomeMy WebLinkAboutMASON STREET INFRASTRUCTURE PROJECT - FDP230016 - SUBMITTAL DOCUMENTS - ROUND 2 - Variance Request (3) NORTHERNENGINEERING.COM | 970.221.4158 VARIANCE REQUEST: MASON STREET INFRASTRUCTURE FORT COLLINS | GREELEY 1 | 2 VARIANCE REQUEST October 4th, 2023 City of Fort Collins Development Review 281 N College Ave. Fort Collins, CO 80524 RE: MASON STREET INFRASTRUCTURE STREETS VARIANCE REQUEST - MINIMUM K-VALUE FOR VERTICAL CURVES CRITERIA NORTHERN PROJECT #1971-001 City staff: The following is an official variance request to Section 7.4.B.4 in Larimer County Urban Area Street Standards (LUCASS) that states “K-values for design shall conform to Table 7-3” for Collector Streets. General information about the project is presented below and detailed information about the nature of this request follows. General Information The project site is located along N Mason Street in between Hickory Street and Hibdon Court in Fort Collins. The site is currently vacant with an interim N Mason Street alignment and road section. The proposed development will include a regional detention pond, 2 lots for future commercial development and the ultimate N Mason Street alignment. Variance Description The criteria in question is Section 7.4.B.4 of LCUASS and the K-values for a vertical curve in a Collector Street (40mph design = 44(crest) and 64(sag)). This variance request is to allow the Mason Street Infrastructure project to reduce the minimum K-values for N Mason Street from ‘Minor Collector’ to meet the ‘industrial local’ required K-values (30mph design = 19(crest) and 37(sag)). See the attached exhibit showing the locations of the vertical curves with the requested modifications. Justification This project will construct the ultimate alignment of N Mason Street and the Hickory Regional Detention Pond. Due to the City planned high water elevation for the regional pond the adjacent N Mason Street and surrounding future developments need to be raised in elevation to allow for water treatment and conveyance to the regional pond. The raised elevation in Mason Street will also allow for adequate cover over proposed storm and sanitary sewer. The vertical curve requirements and K-values for the ‘Collector Street’ limit the elevation change on N Mason Street and the required elevations cannot be met due to the tie-in elevations along the south property and Hibdon Court. The reduced K-values will allow N Mason Street to meet the needed elevations through this property to improve drainage to the regional pond and utility cover. This section of N Mason will have a reduced posted speed limit of 25mph(30mph design) which will meet the criteria for the reduced K-values. These reduced speeds and cross-section will prevent any excess speeds along this alignment and maintain driver safety and control through the vertical curves. This variance requested in this letter will not be detrimental to public health, safety, or welfare. The variance will help optimize drainage and provide needed cover on utilities while maintaining driver safety with the reduced speed limit. The requested variance will not have an adverse impact on the City’s capital and maintenance costs, nor are they expected to reduce the design life of the roadway improvements. NORTHERNENGINEERING.COM | 970.221.4158 VARIANCE REQUEST: MASON STREET INFRASTRUCTURE FORT COLLINS | GREELEY 2 | 2 VARIANCE REQUEST Thank you for your consideration and attention to this request. If you have any questions, please feel free to contact me directly. Sincerely, NORTHERN ENGINEERING SERVICES, INC. MASON RUEBEL, PE Project Engineer EL E C CT V OH U G G G G SS SS DHY D S X W W LOD LOD LOD LOD LOD L O D LOD WOOD RONALD G/ JENNIFER L/ WILLARD E 122 HIBDON COURT FORT COLLINS, CO THOMPSON PROPERTIES LLC 1319 N. COLLEGE AVENUE FORT COLLINS, CO 10' UTILITY EASEMENT BK 1658 PG 746 6' SIDEWALK 9' UTILITY EASEMENT 9' UTILITY EAS E M E N T MATCH EXISTING RIBBON CURB MATCH EXISTING RIBBON CURB HOAG COMMERCIAL RENTALS, LLC 1475 N. COLLEGE AVENUE FORT COLLINS, CO LO Y D S H O L D I N G S , L L C 15 0 5 N . C O L L E G E A V E N U E FO R T C O L L I N S , C O LOT 2 LOT 3 CITY OF FORT COLLINS N MASO N S T R E E T HI B D O N C O U R T 71' ROW 42' FL-FL 10' UTILITY EASEMENT VERTICAL CURB & GUTTER VERTICAL CURB & GUTTER 8' OUTFALL CURB & GUTTER CONCRETE BUMP-OUT 4970 4975 4980 4985 4990 4995 4970 4975 4980 4985 4990 4995 4+50 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 -1.05% 2.40% -0.50% 75.0' VC HP ELEV = 4982.56 HP STA = 11+90.82 PVI STA = 11+76.22 PVI ELEV = 4982.84 BV C S : 1 1 + 3 8 . 7 2 BV C E : 4 9 8 1 . 9 4 EV C S : 1 2 + 1 3 . 7 2 EV C E : 4 9 8 2 . 4 4 A.D. = 3.45 K = 21.71 122.0' VC LP ELEV = 4979.86 LP STA = 10+01.75 PVI STA = 10+41.71 PVI ELEV = 4979.61 BC V S : 9 + 8 0 . 7 1 BV C E : 4 9 7 9 . 9 1 EC V S : 1 1 + 0 2 . 7 1 EV C E : 4 9 8 1 . 0 7 A.D. = 2.90 K = 42.07 PROPOSED GRADE @ ROAD CENTERLINE PROPOSED GRADE EXISTING GROUND EXISTING GROUND @ ROAD CENTERLINE 49 7 9 . 8 6 49 8 1 . 0 1 49 8 2 . 5 4 49 7 9 . 9 2 49 8 0 . 1 4 49 8 0 . 5 0 49 8 1 . 6 1 49 8 2 . 1 8 49 8 2 . 5 0 49 8 2 . 3 2 49 8 2 . 0 6 49 8 1 . 7 9 -0.50% PV I S T A = 4 + 8 0 . 0 1 PV I E L E V = 4 9 8 2 . 4 2 PV I S T A = 9 + 8 0 . 0 2 PV I E L E V = 4 9 7 9 . 9 2 FUTURE GROUND @ ROAD CENTERLINE 4970 4975 4980 4985 4990 4995 4970 4975 4980 4985 4990 4995 4+50 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 49 7 9 . 5 7 49 7 9 . 9 4 49 8 0 . 4 3 49 8 1 . 0 4 49 8 1 . 6 2 49 8 1 . 9 2 49 8 1 . 9 2 49 8 1 . 6 7 49 8 1 . 3 9 49 8 1 . 1 2 EXISTING GROUND @ LEFT FLOWLINE PROPOSED GRADE EXISTING GROUND PROPOSED GRADE @ LEFT FLOWLINE 2.50% -1.10% 2.00% 1.21%1.50% PV I S T A = 1 0 + 3 6 . 0 4 PV I E L E V = 4 9 7 9 . 4 1 PV I S T A = 1 0 + 5 2 . 3 3 PV I E L E V = 4 9 7 9 . 6 0 PV I S T A = 1 0 + 7 7 . 3 3 PV I E L E V = 4 9 7 9 . 9 8 PV I S T A = 1 1 + 0 2 . 3 3 PV I E L E V = 4 9 8 0 . 4 8 75.0' VC HP ELEV = 4981.95 HP STA = 11+87.41 PVI STA = 11+72.81 PVI ELEV = 4982.24 BV C S : 1 1 + 3 5 . 3 1 BV C E : 4 9 8 1 . 3 0 EV C S : 1 2 + 1 0 . 3 1 EV C E : 4 9 8 1 . 8 3 A.D. = 3.60 K = 20.82 4970 4975 4980 4985 4990 4995 4970 4975 4980 4985 4990 4995 4+50 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 49 8 0 . 4 9 49 8 0 . 4 7 49 8 0 . 3 5 49 8 0 . 3 1 49 8 0 . 0 7 49 7 9 . 9 4 49 7 9 . 9 3 49 7 9 . 8 1 49 7 9 . 8 3 49 7 9 . 9 1 49 8 0 . 0 1 49 7 9 . 6 6 49 7 9 . 9 1 49 7 9 . 7 5 49 7 9 . 2 4 49 7 8 . 7 9 EXISTING GROUND @ RIGHT FLOWLINE PROPOSED GRADE EXISTING GROUND PROPOSED GRADE @ RIGHT FLOWLINE 2.00% 2.31% -1.01% 1.00%1.54% PV I S T A = 1 0 + 3 0 . 0 0 PV I E L E V = 4 9 7 9 . 3 6 PV I S T A = 1 0 + 5 3 . 0 9 PV I E L E V = 4 9 7 9 . 5 9 PV I S T A = 1 0 + 7 8 . 0 9 PV I E L E V = 4 9 7 9 . 9 8 PV I S T A = 1 1 + 0 3 . 0 9 PV I E L E V = 4 9 8 0 . 4 8 78.0' VC HP ELEV = 4981.97 HP STA = 11+94.82 PVI STA = 11+79.63 PVI ELEV = 4982.24 BV C S : 1 1 + 4 0 . 6 3 BV C E : 4 9 8 1 . 3 4 EV C S : 1 2 + 1 8 . 6 3 EV C E : 4 9 8 1 . 8 5 A.D. = 3.32 K = 23.51 R1 PL A N & P R O F I L E N M A S O N S T R E E T 11 NORTH CENTERLINE N MASON STREET SCALE : 1" = 40' (H) 1" = 5' (V) ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 Sheet Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 26 MA S O N S T R E E T I N F R A S T R U C T U R E EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER PROPOSED EDGE OF ASPHALT PROPOSED STORM MANHOLE / / / / / / / / PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 4.EXISTING AND PROPOSED MANHOLE RIMS AND VALVE BOX LIDS TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE EXISTING LOT LINE PROPOSED STORM INLET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R L I N E M A T C H S T A 1 3 + 0 0 S E E S H T R 2 KEYMAP LEFT FLOWLINE N MASON STREET SCALE : 1" = 40' (H) 1" = 5' (V) RIGHT FLOWLINE N MASON STREET SCALE : 1" = 40' (H) 1" = 5' (V) ST A MA T C H L I N E SE E S H E E T 14 + 5 0 R2 FOR REFERENCE ONLY SEE UTILITY PLANS FOR APPROVED MASON STREET DESIGN CT V CT V OH U OH U H2 O F E S F E S W W W W X X X X W W W W X X X ELE C X X X X X X X X X X X X X W W LOD L O D LOD LOD LOD LOD LOD LOD LOD LOD LOD X X X X X X 8" W QR INC. 200 HICKORY STREET FORT COLLINS, CO GRATITUDE LLC 1303 N. COLLEGE AVENUE FORT COLLINS, CO 6' SIDE W A L K 9' UTI L I T Y E A S E M E N T NON-EXCLUSIVE ACCESS EASEMENT REC. NO. 20140030921 24' EXISTING EOC-EOC 24' ACCESS EASEMENT REC. NO. 20140036292 20' WATERLINE AND ROW EASEMENT REC. NO. 85040113 FUTURE 71' ROW 30' EASEMENT FOR ROAD PURPOSES BK 1143 PG 187 (EXCEPTION PARCEL PIB FCIF25205400) LOT LINE LOT 1 ACCESS EASEMENT REC. NO.2014001239 71' ROW 42' FL-FL FUTURE 42' FL-FL STANDARD DRIVEWAY APPROACH (LCUASS DTL 707.1) 22' EOA-EOA 1' CONCRETE RIBBON CURB STORM DRAIN A SEE SHEET 9 STORM DRAIN B SEE SHEET 9 OFFSITE STORM DRAIN C SEE SHEET 10 ACCESS EASEMENT BY SEPARATE DOCUMENT 4970 4975 4980 4985 4990 4995 4970 4975 4980 4985 4990 4995 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 3.7-FT 49 8 0 . 7 8 49 8 1 . 0 4 49 7 8 . 9 6 49 8 1 . 2 7 49 8 1 . 0 0 49 8 0 . 8 1 49 8 0 . 9 2 49 8 1 . 2 0 49 8 1 . 2 8 49 8 0 . 4 9 49 7 9 . 8 2 49 7 9 . 3 0 1.20% -2.80% -0.65% -1.05% 78.0' VC HP ELEV = 4981.29 HP STA = 14+68.95 PVI STA = 14+84.58 PVI ELEV = 4981.62 BV C S : 1 4 + 4 5 . 5 8 BV C E : 4 9 8 1 . 1 5 EV C S : 1 5 + 2 3 . 5 8 EV C E : 4 9 8 0 . 5 3 A.D. = 4.00 K = 19.52 85.0' VC LP ELEV = 4980.77 LP STA = 13+91.53 PVI STA = 13+94.22 PVI ELEV = 4980.54 BC V S : 1 3 + 5 1 . 7 2 BV C E : 4 9 8 0 . 9 8 EC V S : 1 4 + 3 6 . 7 2 EV C E : 4 9 8 1 . 0 4 A.D. = 2.25 K = 37.75 80.0' VC PVI STA = 15+74.84 PVI ELEV = 4979.09 BC V S : 1 5 + 3 4 . 8 4 BV C E : 4 9 8 0 . 2 1 EC V S : 1 6 + 1 4 . 8 4 EV C E : 4 9 7 8 . 8 3 A.D. = 2.15 K = 37.24 PROPOSED GRADE EXISTING GROUND PROPOSED GRADE @ ROAD CENTERLINE -0.65% -3.00 % PV I S T A = 1 6 + 1 7 . 4 6 PV I E L E V = 4 9 7 8 . 8 1 PV I S T A = 2 0 + 1 2 . 6 3 PV I E L E V = 4 9 7 4 . 8 4 PV I S T A = 2 0 + 1 0 . 6 3 PV I E L E V = 4 9 7 4 . 7 1 PV I S T A = 2 0 + 1 9 . 6 1 PV I E L E V = 4 9 7 5 . 2 5 PV I S T A = 2 0 + 4 0 . 2 8 PV I E L E V = 4 9 7 5 . 9 0 75.0' VC PVI STA = 19+44.55 PVI ELEV = 4976.69 BV C S : 1 9 + 0 7 . 0 5 BV C E : 4 9 7 6 . 9 3 EV C S : 1 9 + 8 2 . 0 5 EV C E : 4 9 7 5 . 5 6 A.D. = 2.35 K = 31.89 FUTURE GROUND @ ROAD CENTERLINE 15" RCP STORM STA.=15+26.32 INV.=4974.37 15" HDPE STORM STA.=14+14.19 INV.=4975.33 3.3-FT EXISTING GROUND @ ROAD CENTERLINE 4970 4975 4980 4985 4990 4995 4970 4975 4980 4985 4990 4995 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 49 7 5 . 2 0 49 7 5 . 5 9 49 7 5 . 9 0 49 7 6 . 1 1 49 7 6 . 3 4 49 7 6 . 3 9 49 7 6 . 5 8 49 7 6 . 6 4 49 7 6 . 6 6 49 7 6 . 8 7 49 7 7 . 0 5 49 7 7 . 3 2 49 7 8 . 1 1 49 7 8 . 8 8 49 7 7 . 9 5 49 7 7 . 6 7 49 7 8 . 0 6 49 7 8 . 0 0 49 7 7 . 5 9 49 7 7 . 7 1 49 7 7 . 3 7 49 7 7 . 1 4 49 7 7 . 0 0 49 7 6 . 9 8 49 7 6 . 9 7 49 7 6 . 7 8 49 7 6 . 6 5 49 7 5 . 8 4 49 7 5 . 0 1 EXISTING GROUND @ RIGHT FLOWLINE PROPOSED GRADE EXISTING GROUND PROPOSED GRADE @ RIGHT FLOWLINE 15" RCP STORM STA.=15+35.10 INV.=4974.42 15" HDPE STORM STA.=14+48.23 INV.=4975.18 -2.80% -0.70% -1.01%1.15%0.61%-0.54% PV I S T A = 1 6 + 3 2 . 6 4 PV I E L E V = 4 9 7 8 . 2 2 PV I S T A = 1 3 + 6 2 . 3 5 PV I E L E V = 4 9 8 0 . 3 9 PV I S T A = 1 4 + 5 0 . 8 5 PV I E L E V = 4 9 8 0 . 4 5 PV I S T A = 1 4 + 0 1 . 3 0 PV I E L E V = 4 9 8 0 . 1 8 PV I S T A = 1 4 + 0 6 . 3 0 PV I E L E V = 4 9 8 0 . 1 8 78.0' VC HP ELEV = 4980.71 HP STA = 14+84.75 PVI STA = 15+01.04 PVI ELEV = 4981.03 BV C S : 1 4 + 6 2 . 0 4 BV C E : 4 9 8 0 . 5 8 EV C S : 1 5 + 4 0 . 0 4 EV C E : 4 9 7 9 . 9 4 A.D. = 3.95 K = 19.76 78.0' VC PVI STA = 15+90.83 PVI ELEV = 4978.52 BC V S : 1 5 + 5 1 . 8 3 BV C E : 4 9 7 9 . 6 1 EC V S : 1 6 + 2 9 . 8 3 EV C E : 4 9 7 8 . 2 4 A.D. = 2.09 K = 37.24 4970 4975 4980 4985 4990 4995 4970 4975 4980 4985 4990 4995 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 49 8 0 . 3 0 49 8 0 . 1 2 49 7 8 . 2 4 49 8 0 . 5 7 49 8 0 . 3 4 49 8 0 . 1 9 49 8 0 . 4 8 49 8 0 . 6 8 49 8 0 . 5 6 49 7 9 . 4 3 49 7 8 . 8 6 49 7 8 . 4 6 EXISTING GROUND @ LEFT FLOWLINE PROPOSED GRADE EXISTING GROUND PROPOSED GRADE @ LEFT FLOWLINE 15" RCP STORM STA.=15+17.54 INV.=4974.33 INLET B2 (PUBLIC) INV. OUT=4975.48 (S) FG=4980.18 -1.10%1.25% -2.80% -0.60% 0.66%-0.59% PV I S T A = 1 3 + 4 1 . 0 8 PV I E L E V = 4 9 8 0 . 3 9 PV I S T A = 1 6 + 0 2 . 3 5 PV I E L E V = 4 9 7 8 . 2 2 PV I S T A = 1 4 + 2 2 . 5 8 PV I E L E V = 4 9 8 0 . 4 5 PV I S T A = 1 3 + 7 6 . 7 5 PV I E L E V = 4 9 8 0 . 1 8 PV I S T A = 1 3 + 8 1 . 7 5 PV I E L E V = 4 9 8 0 . 1 8 77.0' VC HP ELEV = 4980.69 HP STA = 14+53.39 PVI STA = 14+68.14 PVI ELEV = 4981.02 BV C S : 1 4 + 2 9 . 6 4 BV C E : 4 9 8 0 . 5 4 EV C S : 1 5 + 0 6 . 6 4 EV C E : 4 9 7 9 . 9 4 A.D. = 4.05 K = 19.03 80.0' VC PVI STA = 15+58.74 PVI ELEV = 4978.48 BC V S : 1 5 + 1 8 . 7 4 BV C E : 4 9 7 9 . 6 0 EC V S : 1 5 + 9 8 . 7 4 EV C E : 4 9 7 8 . 2 4 A.D. = 2.19 K = 36.45 X X X X X X X W W LOD LOD LOD LOD22' EOA-EOA 1' CONCRETE RIBBON CURB 24' ACCESS EASEMENT REC. NO. 20140036292 ACCESS EASEMENT BY SEPARATE DOCUMENT R2 PL A N & P R O F I L E N M A S O N S T R E E T 12 NORTH CENTERLINE N MASON STREET SCALE : 1" = 40' (H) 1" = 5' (V) ( IN FEET ) 1 inch = ft. Feet04040 40 80 120 Sheet Th e s e d r a w i n g s a r e in s t r u m e n t s o f s e r v i c e pr o v i d e d b y N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . an d a r e n o t t o b e u s e d f o r an y t y p e o f c o n s t r u c t i o n un l e s s s i g n e d a n d s e a l e d b y a P r o f e s s i o n a l E n g i n e e r i n th e e m p l o y o f N o r t h e r n En g i n e e r i n g S e r v i c e s , I n c . N O T F O R C O N S T R U C T I O N R E V I E W S E T of 26 MA S O N S T R E E T I N F R A S T R U C T U R E EXISTING RIGHT-OF-WAY LEGEND: PROPOSED STORM SEWER EXISTING STORM SEWER PROPOSED EDGE OF ASPHALT PROPOSED STORM MANHOLE / / / / / / / / PROPOSED CURB & GUTTER PROPOSED CENTERLINE PROPOSED CONCRETE CROSSPAN (TYP.) PROPOSED RIGHT-OF-WAY NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND RECOMMENDATIONS. 3.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH TOWN STREET REPAIR STANDARDS. 4.EXISTING AND PROPOSED MANHOLE RIMS AND VALVE BOX LIDS TO BE ADJUSTED TO 1 4" BELOW FINISHED GRADE. IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS. PROPERTY BOUNDARY PROPOSED LOT LINE EASEMENT LINE SAWCUT LINE EXISTING LOT LINE PROPOSED STORM INLET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. before you dig.Call R LI N E MA T C H ST A 13 + 0 0 SE E S H T R1 KEYMAP RIGHT FLOWLINE N MASON STREET SCALE : 1" = 40' (H) 1" = 5' (V) LEFT FLOWLINE N MASON STREET SCALE : 1" = 40' (H) 1" = 5' (V) ST A MA T C H L I N E SE E S H E E T 13 + 0 0 R1 FOR REFERENCE ONLY SEE UTILITY PLANS FOR APPROVED MASON STREET DESIGN