Loading...
HomeMy WebLinkAboutAWEIDA ANNEXATION & ZONING (FORMERLY 4101 S. TAFT HILL RD. MIXED-USE DEVELOPMENT) - ANX180002 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEWCity of Fort Callins May 31, 2018 Dana Lockwood Lockwood Architects, Inc 415 E Pitkin St Fort Collins, CO 80524 Re: 4101 S Taft Hill Rd Community Development and Neighborhood Services 281 North College Avenue PO Box 580 FoR Collins. CO 80522 970.221.6750 970.224.6134 - fax fcgov.com Description of project: This is a request to construct a mixed use project at 4101 S Taft Hill Rd (parcel #9733400024). The proposed 2'/z story building includes 4 dwelling units and commercial/retail space. The site is accessed on the east by an entrance only along Taft Hill Rd and by a full access drive on the north along W CR 38E. Parking is proposed interior to the site. The property is currently located within the county and would be annexed upon development with an amendment to the structure plan updating the zoning to Low-Density Mixed-Use (LMN). The project would be subject to Administrative (Type 1) review. Please see the following summary of comments regarding the project request referenced above. The comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you have any questions regarding these comments or the next steps in the review process, you may contact the individual commenter or direct your questions through the Project Planner, Pete Wray, at 970-221-6754 or pwray@fcgov.com. Comment Summarv: Department: Zoning Contact: Ryan Boehle, 970-416-2401, rboehle(a�fcqov.com 1. According to the structure plan the property would be annexed in as UE (urban estate). The proposed property will require an annexation and a amended plan approval to rezone to LMN. 2. Trash enclosure needed as per 3.2.5, The development shall provide adequate sized, conveniently placed trash and recycling enclosure. Design needs to include a separate walk in pedestrian access separate to the main access. The design provided lacks sidewalk access and connectivity to the rest of the development. 3. All development shall submit a landscape and tree protection plan, and all developments shall establish groves and belts of trees along all city streets, in and around parking lots, and in all landscape areas that are located within fifty (50) feet of any building or structure. 4. Site lighting needs to be provided as per 3.2.4 (C), a lighting plan, including photometrics and fixture cut sheets. Use of warmer color temperatures(3000 Kelvin or less)in site light fi�ures is preferred. 5. 4 bicycle parking spaces will need to be provided for the retail space, with one of the spaces required to be covered. 10 bicycle parking spaces must be provided for the multi-family dwelling, 60% of which must be enclosed. If the bicycle parking is to be located within the Page 1 of 10 apartments a detail must be included in the plans. 6. All mechanical equipment, meters, conduit, vents and RTU's shall be screened from public view both from above and below by integrating it into the building and roof design as per 3.5.1(I)(6). Department: Water-Wastewater Engineering Contact: Heather McDowell, 970-224-6065, hmcdowell(a�fcqov.com 1. Other service district (site specific comment): This property is located within the Fort Collins-Loveland Water District and the South Fort Collins Sanitation District. Please contact them for water and sewer availability and requirements. The City of Fort Collins does have adequate water and sewer facilities in the vicinity to service this property if you chose to petition out of the FCLWD and/or SFCSD. Department: Traffic Operations Contact: Tim Tuttle, , TTUTTLE(a�fcqov.com 1. Given the limited anticipated traffic generation the Traffic Impact Study can be waived. However there will be traffic related items that will need to be addressed that include access evaluation (allowing left turns into the site will be a challenge as the standards would require a dedicated left turn lane). 2. Please work with Engineering for any right of way dedications and adjacent improvements that are required. For instance an eastbound right turn lane from Harmony onto Taft Hill is warranted with current traffic volumes. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty(a�fcqov.com 1. As of January 1, 2015 all development plans are required to be on the NAVD88 vertical datum. Please make your consultants aware of this, prior to any surveying and/or design work. 2. This property is outside of the City limits. If an Annexation Plat will be required, addresses are not acceptable in the Plat title/name. 3. If submitting a Subdivision Plat for this property/project, addresses are not acceptable in the Subdivision Plat title/name. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, ischlam(a�fcqov.com 1. The site disturbs more than 10,000 sq. ft. and therefore Erosion and Sediment Control Materials need to be submitted. Current Erosion Control Materials Submitted do not meet requirements. The erosion control requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. a copy of the erosion control requirements can be found at www.fcgov.com/eroison. The Erosion Control Materials will need to be submitted at time of the first round of FDP. If you need clarification concerning the Erosion Control Material Requirements or Comments presented above please contact myself. Jesse Schlam (970) 224-6015 jschlam@fcgov.com 2. Master plan and criteria compliance (site specific comment): The design of this site must conform to the drainage basin design of the Mail Creek Master Drainage Plan as well the Fort Collins Stormwater Criteria Manual. Page 2 of 10 3. Documentation requirements (site specific comment): A drainage report and construction plans are required and they must be prepared by a Professional Engineer registered in the State of Colorado. The drainage report must address the four-step process for selecting structural BMPs. 4. Stormwater outfall (site specific comment): There is an existing storm pipe located within the intersection that connects two area inlets to a drainage channel at the northeast corner of the intersection. This existing pipe can serve as the stormwater outfall for this project site. However, please note that there is a stormwater master plan improvement planned for this area that includes the installation of a new, larger storm pipe within the Taft Hill and Harmony Road intersection and will extend along the north side of Harmony Road to the east. The details or timeline of this master plan improvement have not yet been determined. 5. Imperviousness documentation (standard comment): It is important to document the existing impervious area since drainage requirements and fees are based on new impervious area. An exhibit showing the existing and proposed impervious areas with a table summarizing the areas is required prior to the time fees are calculated for each building permit. 6. Detention requirements (site specific comment): Onsite detention is required for the runoff volume difference between the 100-year developed inflow rate and the 2-year historic release rate. Please note that detention is not allowed to be placed within the 15-foot utility easements that align along the back of right-of-way. 7. Detention drain times (standard comment): Per Colorado Revised Statute §37-92-602 (8) that became effective August 5, 2015, criteria regarding detention drain time will apply to this project. As part of the drainage design, the engineer will be required to show compliance with this statute using a standard spreadsheet (available on request) that will need to be included in the drainage report. Upon completion of the project, the engineer will also be required to upload the approved spreadsheet onto the Statewide Compliance Portal. This will apply to any volume based stormwater storage, including extended detention basins. 8. Standard water quality requirements (standard comment): Fifty percent of the site runoff is required to be treated using the standard water quality treatment as described in the Fort Collins Stormwater Manual, Volume 3-Best Management Practices (BMPs). (http://www.fcgov.com/utilities/business/builders-and-developers/development-forms-guideli nes-regulations/stormwater-criteria) Extended detention is the usual method selected for water quality treatment; however the use of any of the BMPs is encouraged. 9. LID requirements (standard comment): Low Impact Development (LID) requirements are required on all new or redeveloping property which includes sites required to be brought into compliance with the Land Use Code. These require a higher degree of water quality treatment with one of the two following options: 1. 50% of the newly added or modified impervious area must be treated by LID techniques and 25% of new paved areas must be pervious. 2. 75% of all newly added or modified impervious area must be treated by LID techniques. 10. Inspection and maintenance (standard comment): There will be a final site inspection of the stormwater facilities when the project is complete and the maintenance is handed over to an HOA or another maintenance organization. Standard operating procedures (SOPs) for on-going maintenance of all onsite drainage facilities will be included as part of the Development Agreement. More information and links can be found at: http://www.fcgov.com/utilities/what-we-do/stormwater/stormwater-quality/low-impact-develo pment 11. Fees (standard comment): The 2017 city wide Stormwater development fee (PIF) is $8,217/acre for new impervious Page 3 of 10 � area over 350 square feet and there is a$1,045/acre of site review fee. No fee is charged for existing impervious area. These fees are to be paid at the time each building permit is issued. Information on fees can be found at: http://www.fcgov.comlutilities/business/builders-and-developers/plant-investment-developme nt-fees or contact our Utility Fee and Rate Specialists at (970) 416-4252 for questions on fees. There is also an erosion control escrow required before the Development Construction permit is issued. The amount of the escrow is determined by the design engineer, and is based on the site disturbance area, cost of the measures, or a minimum amount in accordance with the Fort Collins Stormwater Manual. Department: Historical Preservation Contact: Maren Bzdek, 970-221-6206, mbzdek(c�fcqov.com 1. The City Historic Preservation office has no documentation regarding landmark eligibility of the single-family structure on the parcel. Please contact me at 221-6206 if a determination of eligibility is needed. Department: Fire Authority Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler(a�poudre-fire.orq 1. WATER SUPPLY Hydrants on the opposite sides of major arterial roadways are not considered available for use and the installation of a fire hydrant will be required with this project. Code language provided below. > IFC 507.5 and PFA Policy: COMMERCIAL REQUIREMENTS - Hydrants to provide 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building. 2. FIRE LANES Fire access is required to within 150' of all exterior portions of any building, or facility as measured by an approved route around the perimeter, and for the purposes of this section, fire access cannot be measured from an arterial road (Harmony or Taft Hill Roads). A fire lane will be required on the property in order to meet minimum fire access requirements. A fire lane plan shall be submitted for approval prior to installation. Fire lane specifications provided below. 3. FIRE LANE SPECIFICATIONS In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: > Shall be designated on the plat as an Emergency Access Easement. > Maintain the required 20 foot minimum unobstructed width 8� 14 foot minimum overhead clearance. > Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons. > The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside. Turning radii shall be detailed on submitted plans. > Be visible by red curb and/or signage, and maintained unobstructed at all times. 4. FIRE LANE SIGNS The limits of the fire lane shall be fully defined. Fire lane sign locations should be indicated on future plan sets. Refer to LUCASS detail #1418 &#1419 for sign type, placement, and spacing. Appropriate directional arrows required on all signs. Posting of additional fire lane signage may be determined at time of fire inspection. Page 4 of 10 5. AUTOMATIC FIRE SPRINKLER SYSTEM This mixed-use building will require a full NFPA 13 automatic fire sprinkler system under a separate permit. Please contact Assistant Fire Marshal, Joe Jaramillo with any fire sprinkler related questions at 970-416-2868. 6. FDC > IFC 912.2: Fire Department Connections shall be installed in accordance with NFPA standards. Fire department connections shall be located on the street side of buildings (or as otherwise determined by the fire code official), fully visible and recognizable from the street or nearest point of fire department vehicle access. The location of the FDC shall be reviewed and approved by the fire department and the location labeled on Utility Plans. 7. PREMISE IDENTIFICATION: ADDRESS POSTING Address numerals shall be posted on the street address side. Address numerals along with full street name shall be posted on the adjoining street side on the building. Code language provided below. > IFC 505.1: New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible, visible from the street or road fronting the property, and posted with a minimum of six-inch numerals on a contrasting background. > IFC 505.1.8: Buildings that are addressed on one street, but are accessible from other streets, shall have the address numbers AND STREET NAME on each side that is accessible form another street. Department: Environmental Planning Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak(a�fcqov.com 1. 1. No major environmental planning issues to address as site does not contain nor is within 500 ft of known natural habitats and features as defined by LUC 3.4.1. The following include standard comments and contacts to follow up with. 2. 2. Note the City Land Use Code requires that to the extent reasonably feasible, all plans be designed to incorporate water conservation materials and techniques. This includes use of low-water-use plants and grasses in landscaping or re-landscaping and reducing bluegrass lawns as much as possible. Native plants and wildlife-friendly (ex: pollinators, butterflies, songbirds) landscaping and maintenance are also encouraged. See City of Fort Collins Natural Areas Department for guidance on native plants is: http://www.fcgov.com/naturalareas/pdf/nativeplants2013.pdf or City of Fort Collins Plant List : https://www.fcgov.com/forestry/plant_list.pdf. 3. 3. It appears trees will be impacted thus note LUC 3.2.1(C) requiring developments to submit a landscape and tree protection plan, and if receiving water service from the City, an irrigation plan, that: "...(4) protects significant trees, natural systems, and habitat, and (5) enhances the pedestrian environment.� Note that a significant tree is defined as a tree having DBH (Diameter at Breast Height) of six inches or more." If any of the trees within this site have a DBH of greater than six inches, a review of the trees shall be conducted with Tim Buchanan, City Forester (970-221-6361 or tbuchanan@fcgov.com) to determine the status of the existing trees and any mitigation requirements that could result from the proposed development. 4. 4. In regard to lighting, especially LED light fixtures, cooler color temperatures are harsher at night and cause more disruption to circadian (biological) rhythms for both humans and wildlife. Warmer color temperature (warm white, 3000K or less) for any LED light fixtures is Page 5 of 10 preferred. Please also consider fixtures with dimming capabilities so that light levels can be adjusted as needed. Site light sources shall be fully shielded and down-directional to minimize up-light, light spillage and glare [see LUC 3.2.4(D)(3)]. For further information regarding health effects please see: http://darksky.org/ama-report-affirms-human-health-impacts-from-leds/ 5. 5. Due to arrangement of proposed plan (commercial and residential) and different waste/recycling needs required by these different uses, highly suggest reaching out to Jonathon Nagel to discuss trash enclosure planning, bins and pick-up service circulation. City Waste Reduction and Recycling Assistance Program (WRAP) http://fcgov.com/recycling/wrap. php Contact Jonathon Nagel at 970-416-2701 or jnagel@fcgov.com 6. 6. Our city has an established identity as a forward-thinking community that cares about the quality of life it offers its citizens now and generations from now. Thus, the City of Fort Collins has many sustainability programs and goals that may benefit this project. Of particular interest may be: 1) ClimateWise program: http://fcgov.com/climatewise, contact Heidi Wagner at970-416-2230 or climatewise@fcgov.com 2) Zero Waste Plan and the Waste Reduction and Recycling Assistance Program (WRAP): http://fcgov.com/recycling/wrap.php, contact Jonathon Nagel at 970-416-2701 or jnagel@fcgov.com 3) Green Building Program: http://fcgov.com/greenbuilding contact Tony Raeker at 970-416-4238 or traeker@fcgov.com 4) Solar Energy: www.fcgov.com/solar, contact Rhonda Gatzke at 970-416-2312 or rgatzke@fcgov.com 5) Integrated Design Assistance Program: http://fcgov.com/idap, contact Gary Schroeder at 970-224-6003 or gschroeder@fcgov.com 6) Bike Share Program: http://fcgov.com/bikeshare, contact Stacy Sebeczek at Bike Fort Collins at stacy@bikefortcollins.org or 970-481-5577 Department: Engineering Development Review Contact: Katie Andrews, 970-221-6501, kandrews(a�fcqov.com 1. Larimer County Road Impact Fees and Transportation Expansion Fees are due at the time of building permit. Please contact Kyle Lambrecht at 221-6566 if you have any questions. 2. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional information on these fees, please see: http://www.fcgov.com/engineering/dev-review. php 3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 4. All public sidewalk, driveways and ramps existing or proposed adjacent or within the site need to meet ADA standards, if they currently do not, they will need to be reconstructed so that they do meet current ADA standards as a part of this project. Page 6 of 10 5. Any public improvements must be designed and built in accordance with the Larimer County Urban Area Street Standards (LCUASS). They are available online at: http://www.larimer.org/engineering/GMARdStds/UrbanSt.htm 6. The property's Taft Hill Road and CR 38 frontages will need to be designed and constructed in accordance with the LCUASS arterial standards. 7. This project is responsible for dedicating any right-of-way and easements that are necessary or required by the City for this project. Most easements to be dedicated need to be public easements dedicated to the City. This shall including the standard utility easements that are to be provided behind the right-of-way (15 foot along CR 38 and along Taft Hill). Information on the dedication process can be found at: http://www.fcgov.com/engineering/devrev.php 8. Additional assessment of the access points/traffic to the site will need to be completed before the current access design can be approved. 9. LCUASS parking setbacks (Figure 19-6) apply and will need to be followed depending on parking design. For an arterial roadway, setbacks are between 50-100 feet depending on average daily traffic. 10. Utility plans will be required and a Development Agreement will be recorded once the project is finalized. 11. As of January 1, 2015 all development plans are required to be on the NAVD88 vertical datum. Please make your consultants aware of this, prior to any surveying and/or design work. 12. A Development Construction Permit (DCP) will need to be obtained prior to starting any work on the site. 13. All fences, barriers, posts or other encroachments within the public right-of-way are only permitted upon approval of an encroachment permit. Applications for encroachment permits shall be made to Engineering Department for review and approval prior to installation. Encroachment items shall not be shown on the site plan as they may not be approved, need to be modified or moved, or if the permit is revoked then the site/ landscape plan is in non-compliance. 14. Any rain gardens within the right-of-way cannot be used to treat the developmenU site storm runoff. We can look at the use of rain gardens to treat street flows — the design standards for these are still in development. 15. Doors are not allowed to open out into the right-of-way. 16. Bike parking required for the project cannot be placed within the right-of-way and if placed just behind the right-of-way need to be placed so that when bikes are parked they do not extend into the right-of-way. 17. In regards to construction of this site: the public right-of-way shall not be used for staging or storage of materials or equipment associated with the Development, nor shall it be used for parking by any contractors, subcontractors, or other personnel working for or hired by the Developer to construct the Development. The Developer will need to find a location(s) on private property to accommodate any necessary Staging and/or parking needs associated with the completion of the Development. Information on the location(s) of these areas will be required to be provided to the City as a part of the Development Construction Permit application. Department: Electric Engineering Contact: Tyler Siegmund, 970-416-2772, tsieqmund(a�fcqov.com 1. Light and Power has single phase electric facilities along the north edge of the property that can be extended into the site. Page 7 of 10 2. Electric capacity fees, development fees, building site charges and any system modification charges necessary to feed the site will apply to this development. Please contact me or visit the following website for an estimate of charges and fees: http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-developme nt-fees 3. Modifications to our existing electrical infrastructure is needed to feed power to the site. System modification costs will be the responsibility of the Developer/Owner. 4. A commercial service information form (C-1 form) and a one line diagram for the will need to be completed and submitted to Light & Power Engineering for review. A link to the C-1 form is below: http://www.fcgov.com/utilities/business/builders-and-developers/development- forms-guidelines-regulations 5. Electric meter locations will need to be coordinated with Light and Power Engineering. Each residential unit will need to be individually metered. Please gang the electric meters on one side of the building, opposite of the gas meters. All multifamily buildings larger than a duplex or 200 amp service is considered a commercial service, therefore the owner is responsible to provide and maintain the electrical service from the transformer to the meter bank. 6. Transformer locations will need to be coordinated with Light & Power. Transformers must be placed within 10 ft of a drivable surface for installation and maintenance purposes. The transformer must also have a front clearance of 10 ft and side/rear clearance of 3 ft minimum. 7. Streetlights will be installed along the public streets adjacent to the site. Shade trees are required to maintain 40 feet of separation and ornamental trees are required to maintain 15 feet of separation from streetlights. A link to the City of Fort Collins street lighting requirements can be found below: http://www.larimer.org/engineering/GMARdStds/Ch 15_04_01_2007.pdf Planning Services Contact: Pete Wray, 970-221-6754, pwravCc�fcqov.com 1. The County zoning is (R) Residential and City Structure Plan map shows Urban Estate (UE). With the annexation step, a plan amendment would need to be approved for requested Low Density Mixed-Use Neighborhoods (LMN) designation prior to zoning. Staff recommends the applicant proceeds with the annexation, plan amendment and zoning separate from the project development plan (PDP) process, to get initial approval by the Planning and Zoning Board and City Council. 2. The land Use is Mixed-use dwellings vs. Multi-family since ground floor retail is included. Maximum building height is 2 1/2 stories and foot print of less than 20,000 SF. The proposed numbers for each are incompliance with the standards. 3. the LMN density requires a minimum net density of 4 du/ac and 9 gross. the proposed building includes a gross density of 9.3 du/ac, exceeding this standard. 4, Bike parking area moved to provide more direct pedestrian sidewalk to 38E, see redline. 5. Building entrances need to front and face directly to the street. In this case what is proposed with front entrances facing west, the sidewalk provides a direct connection to the north and CR 38E. Page 8 of 10 6. Need landscape, lighting and building elevation plans. 7. Bike Parking: Minimum one space per bedroom or 10 spaces based on multi-family dwelling (6 enclosed and 4 fixed rack), and one/4000 sf of commercial. 8. Need more information of building design for architectural articulation, roof pitch, materials and treatments. 9. The proposed development project is subject to a Type 1 review and public hearing, the decision maker for Type 1 hearings is an Administrative Hearing Officer. The applicant for this development request is not required to hold a neighborhood meeting for a Type 1 hearing, but if you would like to have one to notify your neighbors of the proposal, please let me know and I can help you in setting a date, time and location for a meeting. Neighborhood Meetings are a great way to get public feedback and avoid potential hiccups that may occur later in the review process. 10. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color coded flowchart with comprehensive, easy to read information on each step in the process. This guide includes links to just about every resource you need during development review. 11. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code (LUC), including Article 3 General Development Standards. The entire LUC is available for your review on the web at http://www.colocode.com/ftcollins/landuse/begin.htm. 12, If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply for a Modification of Standard. 13. Please see the Submittal Requirements and Checklist at: http:/lwww.fcgov.com/developmentreview/applications. php. 14. The request will be subject to the Development Review Fee Schedule that is available in the Community Development and Neighborhood Services office. The fees are due at the time of submittal of the required documents for the appropriate development review process by City staff and affected outside reviewing agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal. 15. When you are ready to submit your formal plans, please make an appointment with Community Development and Neighborhood Services at (970)221-6750. Page 9 of 10 Pre-Submittal Meetinqs for Buildinq Permits Pre-Submittal meetings are offered to assist the designeNbuilder by assuring, early on in the design, that new commercial or multi-familv proiects are on track to complying with all of the adopted City codes and Standards listed below. The proposed project should be in the early to mid-design stage for this meeting to be effective and is typically scheduled after the Current Planning conceptual review meeting. Applicants of new commercial or multi-familv proiects should call 970-416-2748 or email scarter .fcaov.com to schedule a pre-submittal meeting. Applicants should be prepared to present site plans, floor plans, and elevations and be able to discuss code issues of occupancy, square footage, and type of construction being proposed. Construction shall comply with the followinq adopted codes as amended: 2015 Infemational Building Code (IBC) with local amendments 2015 International Residential Code (IRC) with local amendments 2015 International Energy Conservation Code (/ECC) with local amendments 2015 International Mechanical Code (IMC) with local amendments 2015 Intemational Fuel Gas Code (IFGC) with local amendments 2015 Intemational Plumbing Code (IPC) as amended by the State of Colorado 2017 National Electrical Code (NEC) as amended by the State of Colorado Current codes and amendments are effective as of July 17, 2017. Copies of the code amendments can be obtained at www.fcqov.com/buildinq/codes.php or at the Building Services office. Accessibilitv: State Law CRS 9-5 & ICC/ANSI A117.1-2009. Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF. Frost Depth: 30 inches. Wind Load: 129vu1t or 100mph 3 Second Gust Exposure B. Seismic Desiqn: Category B. Climate Zone: Zone 5. Enerav Code Use: 1. Single Family; Duplex; Townhomes: 2015 IRC Chapter 11 or 20151ECC Residential Provisions 2. Multi-family and Condominiums 3 stories max: 2015 IECC Chapter 4 Residential Provisions. 3. Commercial and Multi-family 4 stories and taller: 2015 IECC Chapter 4 Commercial Provisions. City of Fort Collins Building Services Plan Review 970-416-2748 scarter(c�.fcqov.com Page 10 of 10