Ted Shepard
From:
Sent:
To:
Subject:
Ted,
Jesse Schlam
Tuesday, March 31, 2015 4:30 PM
Ted Shepard; Wes Lamarque; Tim Buchanan
RE: Global Village Academy
Below are the comments from the reviews of the project.
�� �` � d'�'�!r� • � '�'' .�, � � �� �
2/10/2015: Repeat - Saw n�te.
01/13/2015: The site disturbs more than 10,000 sq ft, therefore Erosion and Sediment Control Materials need to be
submitted for FDP. The erosion control requirements are in the Stormwater Design Crrteria under the Amendments of
Vo(ume 3 Chapter 7 Sectian 1.3.3. Current Erosion Control Materials Submitted does not meet requirements. Please
submit; Erosion Contro! Ptan, Erasion Control Report, and an Escrow/Security Calculation. !f you need clarification
concerning this section, or if there are any questions please contact lesse Schlam 970-218-2932 or email @
lschlam@fcpov.com
Comment has not been addressed. Note attached on 2/10/15 was that they were going to provide erosion control
materials. Thus far no materials have been delivered. Comment from 1/13/2015 still valid.
Full materials should be summited post haste since site is already under construction and na erosion control material
have been prepared for this portion of the praject.
If you need anything else from me please let me know.
Jesse Schlam, CFM
Ciiy of Fort Coilins
Utilrties:: Regulatory & Goverr�rnenf Affarrs Urvisrort
Environmei�tal Regul�tnry Specrafist
(970) 218-2932 c.
(970) 224-6015 0.
jschlann(a�?fcqov.com
Tell us a6out our service we want to know
From: Ted Shepard
Sent: Thursday, March 26, 2015 10:04 AM
To: Jesse Schlam; Wes Lamarque; Tim Buchanan
Subject: FW: Global Village Academy
Jesse, Wes, and Tim,
•
�:€r����"
f_rFort Collins
'�' �l"""�,,.
Attached are the latest round of plans for Giobal Village Academy, Phase Two Expansion. This is a post pubiic hearing,
pre-mylar round of review that we are doing electronically on the assumption that most of the plan reviewers are at the
punch list stage. Please take a look to make sure that your comments are addressed. If not, please let me know and
Tyler Siegmund will forward to the applicant.
I know we continue to be very busy-T"hanks for your participation on this one.�
Thanks, Ted
From: Tyler Siegmund
Sent: Monday, March Z3, 2015 3:23 PM
To: Ted Shepard; Martina Wilkinson
Subject: FW: Global Village Academy
Ted/Martina,
Attached are the updated GVA Phase II plans for review. Maybe we can discuss internally after Wednesdays staff
meetings.
Martina- At first glance, it appears that the right turn lane design is meeting the storage and taper lengths that Ward
provided and recommended with phase I in regard to this turn lane. I have attached an email from Ward with his
recommendation. Let's touch base once you get a chance to review.
Thanks,
.ivCer� �ic;��t���;:;,:a
Ci1�r of' E�'�rf �'c�liits�,
I.l I ;1�t�'G i �tl�i� I �i��."�':'?;. : � :l`.,�; t �
c? 1�.2� �.Fi�>�� 1
"t:�ic��ni�ta.d(rc-ic�,ov.c���ti
From: Erik T. Nakos [mailto:enakosC�jvaiva_com]
Sent: Monday, March 16, 2015 5:30 PM
To: Tyler Siegmund
Cc: Karen R. Brigman; Dawn S. Fairchild
Subject: Global Village Academy
Tyler,
Please find attached our Site Plan and Public Improvement Plans for the Phase 2 of Global Village. Per our discussion a
couple of weeks ago, I am only including the Site Plan, Utility Plan, and Road Improvement Plan for City approval.
Let me know if you have any questions or need anything else.
Thanks.
ERIK T. NAKOS, PE
Project Manager
JVA, Incorporated
25 Old Town Square, Suite 200
Fort Collins, CO 80524
www. ivaiva.com
�
�;r�ct ':a:: ��w:,;�
:" � � �=':�,une: �70.22 a.9Q�9
M � �- .x 91t� 22.5 6923
•
�sauider • Fort Coliins • Winter Park • Glenwood 5prings