Loading...
HomeMy WebLinkAboutGLOBAL VILLAGE ACADEMY II - SITE PLAN ADVISORY REVIEW - SPA150001 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (3)� • City of Fort �ollins � 1� r March 26, 2015 � �'� 3ta� �0 N� ,� � ��J1c� ;�-' h� . ��,t Q �, � � RE: Global Village Academy II, SPA150001, Round Number 2 Community Development and Neighborhood Services 7_81 North College Avenue PO Box 580 Fort Collins. CO 80522 970.221.6750 970.224.6134-fax tcgov. com/developmentreview Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343 or tshepard @fcgov.com. Comment Summarv: Department: Engineering Development Review Contact: Tyler Siegmund, 970-221-6501, tsiegmund@fc, o� Topic: General Comment Number: 2 Comment Originated: 01/21/2015 01/21/2015: With the addition of the paved lanes interior to the property and the new curb and gutter along the private drive a grading plan will need to be submitted for review as part of the project. Will the existing inlet (near Bronson) be relocated? Comment Number: 3 Comment Originated: 01/21/2015 01/21/2015: Please submit the temporary access easement vacation documents and the new emergency access dedication documents (legal description and exhibits for both easements). There will be an additional TDRFee due to vacate and dedicate easements by separate document. You can contact me or visit http://www.fcgov.com/engineering/devrev.php for additional information on the process to vacate and dedicate easements by separate document. Comment Number: 5 Comment Originated: 01/21/2015 01/21/2015: A DCP or excavation permit will need to be obtained prior to starting any work on the site. Comment Number: 6 Comment Originated: 01/21/2015 01/21/2015: Please add the following note to the Utility plan and site plan: Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced or restored to City of Fort Collins standards at the�veloper's expense prior to the acceptance�ompleted improvements. Comment Number: 7 Comment Originated: 01/21/2015: Please add our standard signature block to the utility and drainage plans and our standard LCUASS notes to the utility plan set. Please contact me for a copy of our standard utility plan set notes. Department: Light And Power Contact: Rob Irish, 970-224-6167, rirish@fcqov.com Topic: General Comment Number: 1 Comment Originated: 01/20/2015: Light & Power installed a new 3-phase 277/480v transformer with the construction of Global Village Academy 1. Any relocation or modification to the existing electric facilities will be at the owners expense. Comment Number: 2 Comment Originated: 01/20/2015: If the applicant anticipates a need to increase/change there existing electric load please contact Rob Irish w/Light & Power Engineering at 970-224-6167. Any change to existing electric load would require submittal of a C-1 Form and One-line diagram to Light & Power Engineering. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, ischlam@fcqov.com Topic: Erosion Control Comment Number: 1 01 /21 /2015 01 /20/2015 01 /20/2015 Comment Originated: 01/13/2015 02/10/2015: Repeat - Saw note. 01/13/2015: The site disturbs more than 10,000 sq-ft, therefore Erosion and Sediment Control Materials need to be submitted for FDP. The erosion control requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials Submitted does not meet requirements. Please submit; Erosion Control Plan, Erosion Control Report, and an Escrow / Security Calculation. If you need clarification concerning this section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Contact: Wes Lamarque, 970-416-2418, wlamarque@fcqov.com Topic: General Comment Number: 2 Comment Originated: 01/23I2015 02/13/2015: Reminder comment. 01/23/2015: Please provide a drainage letter describing the drainage improvements and showing conformance with the approved drainage report for Global Village Academy. Comment Number: 3 Comment Originated: 01/23/2015 02/13/2015: Reminder comment. 01/23/2015: Please provide a grading plan. Comment Number: 4 Comment Originated: 01/23/2015 02/13/2015: Reminder comment. 01/23/2015: Please provide all storm water and LID details that are proposed. � U Department: Technical Services Contact: Jeff County, 970-221-6588, icounty@fcgov.com Topic: Landscape Plans Comment Number: 11 Comment Originated 02/10/2015: IRRIGATION PLANS: There are line over text issues. See redlines. Comment Number: 12 Comment Originated 02/10/2015: IRRIGATION PLANS: The lighter text & linework marked is not acceptable. It will not scan or reproduce. Please darken it up. See redlines. Topic: Site Plan 02/10/2015 02/10/2015 Comment Number: 8 Comment Originated: 01/20/2015 02/10/2015: There are still line over text issues. See redlines. 01/20/2015: There are line over te� issues. See redlines. Department: Traffic Operation Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcqov.com Topic: Site Plan Comment Number: 1 Comment Originated: 01/23/2015 01/23/2015: Please add directional ramps at the sidewalk across the new parking lot north of the school. Topic: Traffic Impact Study Comment Number: 2 Comment Originated: 01/23/2015: The TIS shows that four auxiliary turn lanes are warranted but not constructed within the study area. One lane (NB right at Taft/Horsetooth) is not impacted by this proposal. One lane (WB right at Horsetooth and Silver Trails) will be done by the City with striping after the overlay project this summer. The two remaining lanes (SB rights from Taft onto Bronson and Horsetooth) are impacted by school traffic. If GVA proposes to not build the lanes, please provide a variance request with narrative and justification. Thanks. Department: Water-Wastewater Engineering Contact: Wes Lamarque, 970-416-2418, wlamarque@fcqov.com Topic: General Comment Number: 1 Comment Originated: 02/13/2015: Reminder comment. 01/23/2015: A swivel tee is required for the connection with the fire line. Comment Number: 2 Comment Originated: 02/13/2015: Reminder comment. 01/23/2015: Please provide all water details that are being proposed. 01 /23/2015 01 /23/2015 01 /23/2015 Department: Zoning • Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com Topic: General Comment Number: 1 �J Comment Originated: 01/20/2015 01/20/2015: Along the south side on new south parking area there should be at least two trees include in the landscaped setback. Comment Number: 2 Comment Originated: 01/20/2015 01/20/2015: The mechanical equipment both on the ground and on the rooftop should be screen? Please provide screening.