RE: Global Village Academy II, SPA150001, Round Number 2
Community Development and
Neighborhood Services
7_81 North College Avenue
PO Box 580
Fort Collins. CO 80522
970.221.6750
970.224.6134-fax
tcgov. com/developmentreview
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Ted Shepard, at 970-221-6343 or tshepard @fcgov.com.
Comment Summarv:
Department: Engineering Development Review
Contact: Tyler Siegmund, 970-221-6501, tsiegmund@fc, o�
Topic: General
Comment Number: 2 Comment Originated: 01/21/2015
01/21/2015: With the addition of the paved lanes interior to the property and the
new curb and gutter along the private drive a grading plan will need to be
submitted for review as part of the project. Will the existing inlet (near Bronson)
be relocated?
Comment Number: 3 Comment Originated: 01/21/2015
01/21/2015: Please submit the temporary access easement vacation
documents and the new emergency access dedication documents (legal
description and exhibits for both easements). There will be an additional
TDRFee due to vacate and dedicate easements by separate document. You
can contact me or visit http://www.fcgov.com/engineering/devrev.php for
additional information on the process to vacate and dedicate easements by
separate document.
Comment Number: 5 Comment Originated: 01/21/2015
01/21/2015: A DCP or excavation permit will need to be obtained prior to
starting any work on the site.
Comment Number: 6 Comment Originated: 01/21/2015
01/21/2015: Please add the following note to the Utility plan and site plan:
Any damaged curb, gutter and sidewalk existing prior to construction, as well as
streets, sidewalks, curbs and gutters, destroyed, damaged or removed due to
construction of this project, shall be replaced or restored to City of Fort Collins
standards at the�veloper's expense prior to the acceptance�ompleted
improvements.
Comment Number: 7 Comment Originated:
01/21/2015: Please add our standard signature block to the utility and drainage
plans and our standard LCUASS notes to the utility plan set. Please contact me
for a copy of our standard utility plan set notes.
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish@fcqov.com
Topic: General
Comment Number: 1 Comment Originated:
01/20/2015: Light & Power installed a new 3-phase 277/480v transformer with
the construction of Global Village Academy 1. Any relocation or modification to
the existing electric facilities will be at the owners expense.
Comment Number: 2 Comment Originated:
01/20/2015: If the applicant anticipates a need to increase/change there
existing electric load please contact Rob Irish w/Light & Power Engineering at
970-224-6167. Any change to existing electric load would require submittal of a
C-1 Form and One-line diagram to Light & Power Engineering.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, ischlam@fcqov.com
Topic: Erosion Control
Comment Number: 1
01 /21 /2015
01 /20/2015
01 /20/2015
Comment Originated: 01/13/2015
02/10/2015: Repeat - Saw note.
01/13/2015: The site disturbs more than 10,000 sq-ft, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials
Submitted does not meet requirements. Please submit; Erosion Control Plan,
Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning this section, or if there are any questions please contact
Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcqov.com
Topic: General
Comment Number: 2
Comment Originated: 01/23I2015
02/13/2015: Reminder comment.
01/23/2015: Please provide a drainage letter describing the drainage
improvements and showing conformance with the approved drainage report for
Global Village Academy.
Comment Number: 3 Comment Originated: 01/23/2015
02/13/2015: Reminder comment.
01/23/2015: Please provide a grading plan.
Comment Number: 4
Comment Originated: 01/23/2015
02/13/2015: Reminder comment.
01/23/2015: Please provide all storm water and LID details that are proposed.
�
U
Department: Technical Services
Contact: Jeff County, 970-221-6588, icounty@fcgov.com
Topic: Landscape Plans
Comment Number: 11 Comment Originated
02/10/2015: IRRIGATION PLANS: There are line over text issues. See
redlines.
Comment Number: 12 Comment Originated
02/10/2015: IRRIGATION PLANS: The lighter text & linework marked is not
acceptable. It will not scan or reproduce. Please darken it up. See redlines.
Topic: Site Plan
02/10/2015
02/10/2015
Comment Number: 8 Comment Originated: 01/20/2015
02/10/2015: There are still line over text issues. See redlines.
01/20/2015: There are line over te� issues. See redlines.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcqov.com
Topic: Site Plan
Comment Number: 1 Comment Originated: 01/23/2015
01/23/2015: Please add directional ramps at the sidewalk across the new
parking lot north of the school.
Topic: Traffic Impact Study
Comment Number: 2 Comment Originated:
01/23/2015: The TIS shows that four auxiliary turn lanes are warranted but not
constructed within the study area. One lane (NB right at Taft/Horsetooth) is not
impacted by this proposal. One lane (WB right at Horsetooth and Silver Trails)
will be done by the City with striping after the overlay project this summer. The
two remaining lanes (SB rights from Taft onto Bronson and Horsetooth) are
impacted by school traffic. If GVA proposes to not build the lanes, please
provide a variance request with narrative and justification. Thanks.
Department: Water-Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcqov.com
Topic: General
Comment Number: 1 Comment Originated:
02/13/2015: Reminder comment.
01/23/2015: A swivel tee is required for the connection with the fire line.
Comment Number: 2 Comment Originated:
02/13/2015: Reminder comment.
01/23/2015: Please provide all water details that are being proposed.
01 /23/2015
01 /23/2015
01 /23/2015
Department: Zoning •
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1
�J
Comment Originated: 01/20/2015
01/20/2015: Along the south side on new south parking area there should be at
least two trees include in the landscaped setback.
Comment Number: 2 Comment Originated: 01/20/2015
01/20/2015: The mechanical equipment both on the ground and on the rooftop
should be screen? Please provide screening.