SECOND NEIGHBORHOOD INFORMATION MEETING
PROJECT:
LOCATION:
DATE:
APPLICANT:
The Gateway at Prospect Road Overall Development Plan and
Addition of Permitted Use.
Northwest quadrant of I-25 and East Prospect Road
August 10, 2016
Tim McKenna, Fort Collins/I-25 Interchange Corner LLC
CONSULTANTS: Jim Birdsall, The Birdsall Group
Kristin Turner, The Birdsall Group
Nick Haws, Northern Engineering
Matt Delich, Delich and Associates
CITY STAFF: Ted Shepard, Chief Planner
Martina Wilkinson, Traffic Operations Engineer
Project Description
As proposed, the project consists of developing the vacant land located generally at the
northwest quadrant of I-25 and East Prospect Road. This area includes 177 acres and
was formerly known as Interstate Lands Overall Development Plan. The site is zoned,
from east to west, C-G, General Commercial, E, Employment, L-M-N, Low Density
Mixed-Use Neighborhood, and U-E, Urban Estate.
The purpose of an Overall Development Plan (O.D.P.) is to establish general planning
and development control parameters for projects that will be developed in phases, with
multiple submittals, while allowing sufficient flexibility to permit detailed planning in
subsequent submittals. Approval of an O.D.P. does not establish any vested right to
develop property in accordance with the plan.
•
The request also includes an Addition of Permitted Use (A.P.U.) for Phase One of the
O.D.P. to allow multi-family dwellings with greater than 12 units per building; and with
buildings exceeding 14,000 square feet in size in the L-M-N zone. Per the City's Land
�
�
U
Use Code, multi-family is permitted in the L-M-N zone but capped at the aforementioned
parameters. Therefore, the applicant is requesting an Addition of Permitted Use to
allow multi-family apartments in buildings that are larger than would otherwise be
permitted on 12.4 acres in the L-M-N zone.
Unless otherwise noted, all responses are from the applicant or consulting team.
Questions, Comments, Concerns
In reviewing the Transportation Impact Study (T.I.S.), I see where the "short
term" is defined as five years out which take us to 2021. My concern is that
widening Prospect Road to four lanes will not take place in five years. And, there
is a need for a separate Prospect eastbound right-turn lane to turn south on I-25.
A. Yes, that is correct. The City requires the T.I.S. to consider two timeframes: the
short term is five years to 2021 and the long term is 20 years out to 2035. In
addition, the project itself will be phased. Phase One will include the residential
portion of the site and the gas/convenience store. The short range analysis
factors in the Phase One extent of the O.D.P. as opposed to a Project
Development Plan (P.D.P.). In the short term, the developer will be required to
improve their frontage to the four-lane arterial standard and build the required
auxiliary turn lanes. But, in the short term, Prospect will not be widened to four
lanes as a larger public capital project between the Poudre River and I-25.
2. Could you expand on the Prospect / I-25 interchange?
A. This interchange is the least improved of the five interchanges serving Fort
Collins. Operationally, this interchange is under the jurisdiction of the Colorado
Department of Transportation (CDOT) and they are aware of the existing
deficiencies. We are aware of the congestion due to the eastbound through lane
being combined with eastbound to southbound right turn. The City, Poudre
School District, CDOT and Timnath have been in discussions regarding the
funding and timing of the long term improvements required at this interchange.
3. What are the traffic impacts associated with Phase One?
A. The T.I.S. analysis for the ODP is a high level analysis and indicates that traffic
generated by Phase One will result in mostly acceptable Levels Of Service (LOS,
rated A— D on a scale of A— F) at the affected intersections with the
recommended construction of the necessary turn lanes. A more detailed T.I.S.
will be required for a site specific development plan for phase one with specifics
related to LOS and the applicant has to meet City standards for LOS, or request
a variance if standards are not met.
2
�
�
4. Do the findings you just mentioned include the gas/convenience store?
A. Yes.
5. What about the future employment and commercial Phases?
A. We expect that future Phases will be responsible for submitting an updated T.I.S.
to account for conditions that are being experienced at that time. This would
include all the improvements done for Phase One and the increase in
background traffic.
6. How does all this factor into Adequate Public Facilities (APF)? Without Prospect
being widened to four lanes, or without a separate eastbound to southbound
right-turn lane from Prospect to I-25, does Phase One comply with the A.P.F.
standards?
A; Response from City of Fort Collins Traffic Engineer: The Adequate Public
Facilities standard, as locally adopted Ordinance, cannot be applied to an
intersection that is outside the jurisdiction of the City. The interchange is under
the control of CDOT. As mentioned, we coordinate with CDOT on operational
aspects of the all the City's interchanges on a continual basis.
7. It seems to me that if the City is successful in working with CDOT on jointly
constructing a round-about at the easterly site access and the Frontage Road,
then it shouldn't be too much of a stretch to expect the City and CDOT to work
together to build the necessary improvements to the I-25 / Prospect interchange.
A. Response form City Traffic Engineer: CDOT is in the process of designing a new
interchange. We estimate that they are at about 30% design. But, at this time,
there is no project funding. The City is looking at improvements to all four
quadrants in conjunction with CDOT, the Poudre School District and Timnath.
8. I find that response to not be very comforting.
A. Response from City Traffic Engineer: While the response may seem to indicate
that improvements are a long way off, please note that multiple jurisdictions are
actively working together to try to develop an improvement plan that can be
funded from various sources and improvements can move forward.
9. For those of us who live in Sunrise Acres (north of the subject parcel), we have a
hard time getting out of our subdivision on Greenfields at the East Mulberry
intersection. With the road closures on Prospect, there is heavy traffic on
Mulberry and we need more green time to make a left turn to go west on
Highway 14.
3
�
�
A. Larimer County is in the process of improving that intersection. Once
construction is complete on Prospect, the heavy traffic on Mulberry should be
reduced.
10. Overall, Prospect needs four lanes, not two, to handle the traffic that is coming in
from around the region. I'm concerned about the 100 acres that PSD has east of
I-25 and Timnath's plans for growth.
A. Response from City Traffic Engineer: As mentioned, the City will require the
developer to dedicate the necessary public right-of-way and construct the public
improvements along their frontage to the four-lane arterial standards. In addition,
we have the ability to require the necessary off-site improvements as identified in
the T.I.S. to mitigate the impacts caused by the proposed development. But,
widening Prospect from the Poudre River to I-25 is a much larger capital project
that involves multiple jurisdictions and will require a large capital outlay. The
burden of widening Prospect Road as a four-lane arterial does not fall on one
particular development. Funds for this widening have not been approved by the
City.
11. I live in Boxelder Estates and we are experiencing too much traffic associated
with all the construction on Prospect. As we drive east on Prospect, we need a
left turn arrow to go north on Summitview from. With so little green time, it takes
several cycles to get through the intersection.
A. Response from City: We understand that with all the traffic that is re-routed due
to construction projects on Prospect, there is undue delay for left turns at the
major intersections. When Prospect reopens, we can analyze signal timing. As
traffic engineers, we are responsible for keeping traffic moving on a system-wide
basis. This means that the legs of the intersections that carry the most volume
get the most green time at the signal. Obviously, the east-west traffic on
Prospect carries more volume than Summitview so to keep the city-wide system
at optimum efficiency, Summitview green time is impacted. Another reason we
allocate more green time for the legs with the most volumes is that it reduces the
number of rear-end collisions.
12. A lot of us in Boxelder Estates are elderly. It's unnerving to have to make a right
turn on red to go west from Summitview to Prospect. We have to accelerate
rapidly because of the speed of the drivers on Prospect. My car is small and it
takes a bit of time to get up to speed after I make the right turn and the looks
(and hand gestures) I get from drivers are rude.
�
�
L�
13. Northbound Summitview to westbound Mulberry (left turn movement) is
dangerous due to the diagonal geometry of the intersection, and the fact that
east-west trucks have a hard time slowing down and stopping at the red light.
A. Response from City: We are aware of the conditions of this intersection which is
under the jurisdiction of the CDOT.
14. When do you think widening Prospect to four lanes will be funded? It's not part
of the current round of capital projects and was not voted in for the next round.
That means it will have to be approved in the following round.
A. Response from City: You are correct. As an unfunded project, it's difficult to
predict when the project would be approved. It has to be approved as a project
first and then funded as revenue becomes available. Based on this timeframe,
the widening will not occur in the short term.
15. How many apartments are planned and is there any interest from the multi-family
market in its development?
A. We are planning on 278 apartments and we are receiving significant interest from
the development community.
16.Are there any similar projects where we could see the scale and size of the
project?
A. The apartments at Timberline and Drake are roughly comparable. The new
apartments that are under construction on South Timberline Road across from
the Bacon Elementary School are similar. In addition, the apartments at the
Foothills Mall along Stanford Road are similar but are not fully constructed yet.
And, the recently approved apartments at Bucking Horse are comparable but are
not yet under construction.
17. What do the colors on the map represent?
A. The green is Boxelder Creek (and floodplain), the yellow is residential (Urban
Estate and Low Density Mixed-Use Neighborhood zone districts) and the red is
commercial (Employment and General Commercial zone districts).
18. How big are the lot sizes in the residential area?
A. In the Urban Estate, the minimum lot size is one-half acre, or less if located
within a cluster plan where one-half of the U-E ground is preserved as open
space. In the Low Density Mixed-Use Neighborhood (L-M-N), because we are
over 30 acres, we are required to have a minimum of four housing types. These
can be single family detached, single family detached with alleys, duplexes,
townhomes, and multi-family. The density range in the L-M-N is no less than
5
� �
4.00 dwelling units per net acre at the low end and no greater than 9.00 dwelling
units per gross acre at the high end. Therefore, there will be a variety of lot sizes
in the L-M-N.
19. Will your proposed multi-family buildings in the L-M-N be three stories?
A. Yes. Three story multi-family buildings are already allowed in the L-M-N zone.
20. I live west of the project on a large lot in the County. Three-story apartments
don't conform to our area. I'm concerned that the apartment folks will trespass
on my property and I have animals. I'm concerned about liability. I'm concerned
that the new development will impact my well. And, I'm concerned that the new
development will cause flooding on my property.
A. We will be using potable water from Elco, not groundwater. We are required by
the City's Stormwater Utility to not route any stormwater from our property onto
your property.
B. Response from City Planner: Please note that the property was included in the
City's Growth Management Area and was annexed in 1989 as the Interstate
Lands Annexation containing 192 acres. At that time, the parcel was zoned H-B,
Highway Business (157 acres) and R-P, Planned Residential (35 acres) with both
zone districts conditioned that any application for development be processed as
a Planned Unit Development under the Land Development Guidance System.
Then in 1997, the property was rezoned in the following manner: C, Commercial
(44.7 acres); E, Employment (104 acres); L-M-N, Low Density Mixed-Use
Neighborhood (15.7 acres); U-E, Urban Estate along the western edge as a
buffer. This rezoning was part of a city-wide rezoning to implement the City's
new comprehensive plan, Citv Plan, and the new Land Use Code which created
new zone districts and replaced the old districts and the P.U.D. system.
About 20 years ago, the landowner at the time sold a parcel of land along the
western edge of the O.D.P.to the Cooper Slough Association / Boxelder Estates
H.O.A. for a buffer. This rectangular strip ranges in width between 100 and 125
feet for a length of about 2,100 feet and contains approximately 5.18 acres. This
conveyance essentially precludes any street connection between the O.D.P. and
Boxelder Estates.
Then, in 2000, the size of the four zone districts was adjusted as part of a
rezoning to reflect changing market conditions. The effect of the rezoning was
primarily to reduce the size of the E zone by 43 acres and increase the size of
the L-M-N zone by 53 acres. This rezoning affected 65 acres.
In 2003, a Final Plan was approved on four acres along the Frontage Road for
the Harley Davidson dealership.
�
� •
In 2004, an Overall Development Plan was approved that showed various
configurations for the four zone districts in the following manner: U-E (21 acres);
L-M-N (68.6 acres); Employment (60.9 acres); and Commercial (26.9 acres).
21. What are the two current construction projects on Prospect that are causing the
full road closure?
A. The two projects are related to the improvements being constructed by the
Boxelder Basin Regional Stormwater Authority (BBRSA). First, Boxelder Creek
is being routed under Prospect by the installation of the new culverts. This
involves a new bridge which is being designed for the ultimate four-lane arterial
cross-section. Second, since the culverts are sized to only carry approximately
the 10-year storm, an overflow channel, or weir, is being excavated to handle the
amount of flood water associated with the 100-year storm. This overflow channel
will be between 85 feet and 100 feet wide and about ten feet deep and may carry
flows in more frequent events due to local tributaries. These two projects are
being constructed in conjunction with the new Grays Lake flood control reservoir
that has been built upstream on Boxelder Creek. The entire system-wide project
is designed to prevent flooding in areas along Boxelder Creek in Larimer County,
Timnath and Fort Collins.
22.And these are the improvements being constructed with the new annual
stormwater service fee assessed on our properties?
A. Yes, all residential properties within the BBRSA are assessed an annual fee of
$60.00 to cover all the new construction, and, as time goes on, to cover the long
term maintenance of the facilities. In addition, for any new construction in the
BBRSA that results in new impervious surface, there is a stormwater system
development fee based on the amount new impervious surface area that is
created.
23. Can you describe the details of the A.P.U. for the multi-family in the L-M-N?
A. Yes, as mentioned, multi-family, per se, is a permitted use in the L-M-N but is
capped in the following manner: no greater than 12 units per building; no greater
than 14,000 square feet per building; and on an individual phase that is no
greater than 12.00 dwelling units per gross acre of land. Our proposal would
increase the number of units per building to exceed 12, increase the size of the
building to exceed 14,000 square feet, and to increase the density to greater than
12.00 dwelling units per gross acre.
7
•
24. By how much would you exceed these limits?
•
A. Our buildings would be a mix of 24-plex and 36-plex structures. The size of the
buildings has not yet been determined but will exceed 14,000 square feet. And,
we estimate that our phase of multi-family in the L-M-N will come in around 13
dwelling units per gross acre.
25. Would the multi-family phase cause the overall 77-acre L-M-N area to reach a
density that exceeds the maximum allowable 9.00 dwelling units per gross acre?
A. No, our overall L-M-N density on the entire 77 acres, plus the multi-family, would
not exceed 9.00 dwelling units per gross acre.
26. I don't support the request for the A.P.U. The expectation under zoning is that
the property will develop as L-M-N, not M-M-N. How do you justify this request?
A. We see a multi-family component as adding to the mix of housing types for a
mixed-use neighborhood. With close proximity to I-25, we do not want to
develop the ground as an isolated truck stop with highway-oriented uses like you
see along the interstates in other jurisdictions. We see value in developing a
neighborhood that offers a wide range of housing for a variety of people in a wide
range of incomes. We see the multi-family component has a part of the highest
and best use for this portion of the site.
27.You cannot use an economic benefit argument as a justification for an A.P.U.
A. Understood.
28. An L-M-N neighborhood is supposed to have an L-M-N neighborhood center. I
don't see the gas/convenience store as being an L-M-N neighborhood center. I
don't see any amenities. The development appears isolated from the City.
A. We see multi-family as adding diversity to the neighborhood. We recognize that
we are separated from the City but this is primarily due to the Poudre River
floodplain, natural areas and existing County subdivisions. The parcel, however,
is inside the Growth Management Area, and was then annexed and zoned, and
then master planned as Interstate Lands Overall Development Plan. We see the
land as being a unique parcel that is near I-25 and major employment areas.
There are other neighborhoods in the City where the neighborhood center is a
gas/convenience store.
29. But I still don't see a walkable neighborhood center. Access from the L-M-N to
the gas/convenience store is via a round-about which is difficult to cross as a
pedestrian. It looks to me like the gas/convenience store will be highway
oriented, not neighborhood oriented. And, it's located in the commercial zoned
area, not in the L-M-N. You still need an L-M-N neighborhood center.
:
�
�
A. We understand the requirement for an L-M-N neighborhood center.
30. In general, I'm not seeing any neighborhood amenities.
A. As noted, we intended to pursue the conveyance of a parcel to the City Parks
Department for a future public neighborhood park. In addition, the Parks
Planning Department has identified a portion of our northeast area as logical
segment for the future regional bike trail. Our goal is to develop the commercial
area for neighborhood oriented businesses and services. As mentioned, we
don't want to replicate the highway oriented land uses found at the I-25 and
Highway 14 interchange.
31. I'm concerned that Phase One represents a five year build out and we would still
experience congestion and failing levels of service for certain turn movements at
I-25 and Prospect.
A. We understand your concerns. The T.I.S., at this stage, is intended to provide a
broad analysis at the appropriate level for an Overall Development Plan. As
noted, the big picture issues have been identified. With each subsequent phase
that is submitted for a Project Development Plan, a new T.I.S. will be required
that provides analysis at a more refined level of detail.
32. Does the City keep data on accident statistics?
A. Response from City: Yes, keeping track of accident statistics is very important to
us. We continually analyze crash data city-wide as one of our core functions.
33.1 would like to remind everyone that an A.P.U. in the L-M-N zone goes on to City
Council for consideration. It is my opinion that the request for an A.P.U. is
speculative and for purposes of the developer trying to enhance the marketability
of the property.
A. As we have mentioned, for an O.D.P. that is 177 acres in size, having a multi-
family component enriches the mix of housing on a city-wide basis.
34. Do you already have a buyer lined up for the multi-family?
A. No, we do not.
35. Where exactly is the A.P.U. parcel and how big is it?
A. It is at the south end of the area zoned L-M-N, closest to Prospect Road. It is
about 12.4 acres in size.
E
�
•
36. What will be the density on the L-M-N as a result of the A.P.U.?
A. The density will be about 13.00 dwelling units per gross acre which is slightly
over the maximum allowed in any on phase in L-M-N of 12.00 d.u./a.
37. Will there be a buffer between the apartments and the existing homes to the
west?
A. Yes, we estimate that the closest house will be about 130 feet away from the
nearest apartment building. Other houses will be further away by a distance
ranging from 793 feet to 875 feet.
38. What will be the size of the lots on the very west edge of the site?
A. This area is zoned Urban Estate. As a result, this area will have our largest lots.
As noted, in the U-E, lots must be a minimum of one-half acre. Or, lots can be
smaller but only if arranged within a Cluster Development where one-half of the
land area is preserved as open space and the other half is the clustered lots that
can be smaller than one-half acre.
39. I live to the west and in my opinion; our large lots will need more of a transition
than what you are describing.
A. We are aware of your concerns. As you know, Boxelder Estates purchased from
the previous owner a swath of land about 40 feet in width along their eastern
edge. This buffer will contribute to making a transition and also precludes any
street connections.
40. I live on three acres. Multi-family doesn't conform to our neighborhood character.
41. When was the property annexed into the City?
. .;
42. When do you think you will break ground?
A. The first thing we have to do is apply to F.E.M.A. for an amendment to their
floodplain maps based on the improvements being done by the Boxelder Creek
Flood Control Project. This requires a process known as a Letter of Map
Revision (LOMR). This could take us into 2018. We can be submitting our
Phase One plans and having our plans reviewed by the City somewhat
concurrently to the F.E.M.A. process. So as you can see, it may be at some
point in 2018 when we can break ground on Phase One.
10
�J
.
43.Will the requested density associated with the A.P.U. in the L-M-N zone be
capped?
A. Response from City Planner: Yes, all requested A.P.U. metrics will be capped
and not open-ended. This is what was done for the multi-family project in
Bucking Horse which was also an A.P.U.
44. I live in Sunrise Acres to the north. Is the proposed public neighborhood park still
indicated to be north of the ditch? If so, I'm concerned about trespassing.
A. No, we are now discussing with Parks Planning about conveying a parcel that is
south of the ditch and just north of the proposed multi-family parcel. This parcel
would be about four acres and is centrally located within the larger residential
area. This would a public neighborhood park.
45. Will you be putting any of the ditches into a pipe to gain more ground?
A. No, we are not thinking about putting any ditches into a pipe.
46. We need to be realistic that a City-funded Prospect Road widening capital project
will not happen in the short term (2021). Such a project would likely have to be
put to the voters as part of a package to renew one of the sales taxes that is
dedicated to transportation improvements. And then, if approved by the voters
as part of a sales tax capital projects package, it would then have to wait for
revenues to come in. As a result, it may be at least 10 years out or longer before
Prospect could be widened to four lanes.
A. Response for City Traffic Engineer: That is correct. It is unlikely that Prospect
will be widened to four lanes by 2021. Large capital projects that benefit the
City's arterial system as a whole are generally funded by one of the dedicated
sales taxes specifically earmarked for transportation improvements. As you
mentioned, these funding sources expire after their term and must be renewed
by the voters. These projects are intended to address existing deficiencies and
are not considered the obligation of any one particular development proposal.
Please note that dedicated sales tax revenue is just one funding source. Other
sources include the City's Street Oversizing Fund, and grants from the
Metropolitan Planning Organization, State of Colorado and the federal
government. Oftentimes, multiple funding sources are consolidated to move a
project up on the priority list.
47. I'm concerned about the future development of PSD property on the east side of
I-25. This is a 100-acre parcel that PSD has indicated could be used for schools
serving grades K through 12 as well as a district-wide athletic facility. PSD is
seeking voter approval this Fall for a bond issue that would fund these planned
schools and facilities.
11
• •
A. Response from City Traffic Engineer: We are in discussions with PSD. We have
been told that the schools planned for this parcel will draw primarily from
students who already reside east of I-25. We are also aware that the planned
athletic facility would be the new French Field and draw participants district-wide.
48. With the Boxelder Buffer now owned by the H.O.A., does this mean there will be
no road connection?
A. Yes, that's correct — no road connection.
49. Could you tell me how much new traffic we can expect on Summitview as a
result of this project?
A. Our trip assignment estimate in the short term is shown as Figure 7 in our T.I.S.
Based on our assumptions, we see most of the trips using Prospect and the
Frontage Road versus Summitview. For example we estimate for southeast flow,
there will be six trip ends in the a.m. and 17 trip ends in the p.m. during the peak
hours. For the northwest flow, there will be 16 a.m. and 10 p.m. trip ends during
the peak hours. Please note, however, that it may be more accurate to measure
the delay at the Prospect / Summitview intersection.
50. Will the Frontage Road be widened?
A. No, but the intersections will add capacity with the auxiliary turn lanes as
recommended in the T.I.S.
51. Will there be only one access onto the Frontage Road?
A. Yes, that's correct due to the constraints of Boxelder Creek.
52. Do you have an idea about the alignment of the proposed regional trail?
A. Within our O.D.P., and between Prospect and Mulberry, this trail will generally
follow the alignment of Boxelder Creek and the two ditches. The alignment of
this trail is loosely based on the preliminary concept per the Parks 2013 Trails
Master Plan.
53. Is the applicant involved at all in the current construction on Prospect?
A. Yes, but only to the extent that we have conveyed 42 feet along our frontage to
the City of Fort Collins for the project.
54.Are you intending to sell the land for a profit?
A. Yes.
12
�
�
55. I see a big benefit in providing a safe sidewalk along Prospect from your project
to the Summitview intersection to tie into the existing trail along Prospect west of
Summitview. Since your project does not extend west to Summitview, there is a
gap. It seems like pedestrians, runners and bike riders from your project would
want to safely gain access to this trail without having to deal with unimproved
frontage along Prospect.
A. Thank you for this comment and this something we may consider for their first
phase.
56. Will there be sufficient sanitary sewer capacity to serve the site as proposed?
A. Yes, we have had conversations with the Boxelder Sanitation District and they
have indicated that there is capacity available. As you know, their treatment
plant is just south of Prospect.
57. Will there be any commercial development south of Prospect?
A. The large vacant land south of Prospect is owned by Colorado State University
Research Foundation. We do not know their plans for the property except to say
that they typically hold land for the long term for the various needs of the
University.
13
�LIGI-�I3L�RHOOD I� ' PLtiI�TIO�� tiIEETI� =__.; ���,.o`�`cc:.e �Jr-c-.
� �rtttca:\'otlfic_::or.;.�c�;: ��I
,
�/��ti�i-S/ �,,f r�� C � Ci1� F�"P'if �-iJ Ci / C, �d ��,; � of tEis �.ecc,a ' I
� � I
`�- r_CC=��� L: I I �
' � `es j '�o `'es� `��o
I � I �
- ��-� �E��-,�.� � � , r ��- � . � � �- i ! I
l/�1 � : � �l
��LCi � �1��'lE'_5� ��i�1�� !`�/�'� �.��1w.rv�.-„ _., � � ✓�
_ � I , /
v
— �l - _ �c�t�
�i'�// t�'
/ `l �/ ��I .:: .,
�m.z l ;
i � �
�S�' C', �_x� I �--_�_ i
�.�_ .
��
_ 4 � - I I
� �� �
C /� � ` �< I I j�1 I
,.
✓
� l.. � � i ler�,� � d � , I � �
� � ��/C� �„� C�a i�i t��� L..✓ �,� Z � � i/ � �
�
i i
�G,�1 I�c� efSov� �� bar�� - �sZ � I '� I'� I
��l<<<l� l��e�C� ��3 �����v�kUs� y�� ���sal � � � I � i
�,�J �
K�� � �� 3�� � �axc�r� - �t �30� �� � � I " I �
���P�� ��n�'��'1►� f���+`�'ib�'� ��k�� �X� a.�1G�, �2 ��� 2� � '� � � � �
� I/
h ��_ �-nr�s, �r>�n�v� ��I�( � % ,,��,r- �� i r% a.�- i ► / . X �
� I �
�� �� � �
���-� �� � ►
� �- ���� �
�y
. t" �- � : �
. r�,�r_ .f
.,�
� � � � �
� � � � I
; ��
I � � � �
� � �, ;
I I � � I
I i � I
i �
; I
�