Loading...
HomeMy WebLinkAboutGATEWAY AT PROSPECT AMENDED ODP - ODP160001 - CORRESPONDENCE - OTHER WATER AND OR SANITATION DISTRICTS (2)�� �.�_ i � Farnsworth ���2����t PointRoad,Suite 105 E§ Colorado 80525-9770 G RO U P p 970.484.7477 f 970.484 .7488 www.f.w.com I www.greennavigatlon.com June 21, 2016 Ted Shepard City of Fort Collins Planning P.O. Box580 FortCollins, C080522-0580 RE: Case Number: NIA Title: Gateway at Prospect ODP/ADP Owner/Applicant: FortCollins/1-25 InterchangeCorner, LLC Owner Contact: Tim McKenna and Randy Samelson Parcel Number(s}: N!A On behalfofthe Boxelder Sanitation District (BSD), Farnsworth Group has reviewedthe OveraH Development Plan identified as: Master Utility Plan review for the Gateway at Prospect multi-zoned/multi-use development. The Utility Plan proposes sanitary sewers running throughout the development connecting to BSD's existing sanitary sewers. The District hereby advises as follows: Itl There is no objection to this proposal. Itl Responses reauired to comments below. D The Districtwill respond atthe hearing date of Comments: 1) ThispropertyiswithintheBoxelderserviceareaandhasexistingsewersadjacenttothe property. Additional information shall Ue required infuture submittals, including (but not limited to) connection and termination call.outs. RESPONSE: Additional information has been added to the ODP plan 2) Significantsewerrelocationswillberequiredasdevelopmentoccurswithinthissite. Coordinationwith BSDwillberequiredaspartofanydevelopmentplanparticular1ywithall Parcels shown. RESPONSE: The project team has coordinated with BSD to create the proposed ODP Plan. The proposed relocation of the BXI through the Gateway site was approved by BSD in previous meetings. A portion of the commercial parcels are expected to be serviced by the existing BXI line that will continue south of Prospect Road. This was confirmed in a call with Brian Zick. This plan serves as the general framework for the sanitary connection. At the time of PDP, additional details will be provided in regards to proposed alignment and construction details. The District hasadequate capacityto servicethe property referenced above. The Districtisinfull compliance with Federal and State water quality requirements. We lookforward to review future submittalsonthisproject. Pleasefeelfreetocontactmeifyouhaveanyquestions. Sincerely, Brian Zick, P.E. District Engineer CC Karen Reynolds. Boxelder Sanitation DistricYs General Manager