June 20, 2023
262 E Mountain Ave
Fort Collins, CO 80524
RE: Mason Street Infrastructure - ODP, ODP230001, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of Mason Street Infrastructure - ODP. If you have questions
about any comments, you may contact the individual commenter or direct your questions
through your Development Review Coordinator, Brandy Bethurem Harras via phone at
970-416-2744 or via email at bbethuremharras@fcgov.com.
Ripley Design
Applicant
Northern Engineering
Fox Tuttle
Comment Summary:
Department: Development Review Coordinator
Contact: Brandy Bethurem Harras bbethuremharras@fcgov.com 970-416-2744
Topic: General
Comment Number: 1
06/02/2023: INFORMATION:
I will be your primary point of contact throughout the development review and
permitting process. If you have any questions, need additional meetings with the
project reviewers, or need assistance throughout the process, please let me
know and I can assist you and your team. Please include me in all email
correspondence with other reviewers and keep me informed of any phone conversations. Thank you!
Ripley Response: Understood, thanks Brandy.
Comment Number: 2
06/02/2023: SUBMITTAL:
As part of your resubmittal, you will respond to the comments provided in this
2
letter. This letter is provided to you in Microsoft Word format. Please use this
document to insert responses to each comment for your submittal, using a different font color.
When replying to the comment letter please be detailed in your responses, as
all comments should be thoroughly addressed. Comments requiring action
should NOT have a response such as noted or acknowledged. You will need to
provide references to specific project plans, pages, reports, or explanations of
why comments have not been addressed [when applicable].
Ripley Response: Acknowledged.
Comment Number: 3
06/02/2023: SUBMITTAL:
Correct file naming is required as part of a complete submittal. Please follow
the Electronic Submittal Requirements and File Naming Standards found here:
https://www.fcgov.com/developmentreview/files/electronic -submittal-requiremen
ts-and-file-naming-standards_v1_8-1-19.pdf?1680306305.
File names should have the corresponding number, followed by the file type
prefix, project information, and round number. For example: 1_SITE
PLAN_MasonStreet_ODP_Rd1. A list of numbers and prefixes for each file can be found at the link above.
Ripley Response: Acknowledged.
Comment Number: 4
06/02/2023: SUBMITTAL:
All plans should be saved as optimized/flattened PDFs to reduce file size and remove layers.
Per the Electronic Submittal Requirements AutoCAD SHX attributes need to be removed from the PDF’s.
AutoCAD turns drawing text into comments that appear in the PDF plan set,
and these must be removed prior to submittal as they can cause issues with the PDF file.
The default setting is "1" ("on") in AutoCAD. To change the setting and remove
this feature, type "EPDFSHX" (version 2016.1) or “PDFSHX (version 2017 and
newer) in the command line and enter "0".
Read this article at Autodesk.com for more on this topic:
https://knowledge.autodesk.com/support/autocad/troubleshooting/caas/sfdcarti
cles/sfdcarticles/Drawing-text-appears-as-Comments-in-a-PDF-created-by-AutoCAD.html
Ripley Response: Acknowledged. Submittal is flattened.
Comment Number: 5
06/02/2023: SUBMITTAL:
Resubmittals are accepted any day of the week, with Wednesday at noon being
the cut-off for routing the same week. When you are preparing to resubmit your
plans, please notify me with an expected submittal date with as much advanced notice as possible.
Ripley Response: Acknowledged.
Comment Number: 6
06/02/2023: INFORMATION:
Please resubmit within 180 days, approximately 6 months, to avoid the expiration of your project.
Ripley Response: Acknowledged.
Comment Number: 7
3
06/02/2023: INFORMATION:
ANY project that requires four or more rounds of review would be subject to an additional fee of $3,000.00.
Ripley Response: Acknowledged.
Comment Number: 8
06/02/2023: FOR HEARING:
All "For Hearing" comments need to be addressed and resolved prior to
moving forward with scheduling the Hearing. Staff will need to agree the project
is ready for Hearing approximately 4 to 8 weeks prior to the hearing.
Ripley Response: Acknowledged. Thanks, Brandy!
Department: Historic Preservation
Contact: Jim Bertolini jbertolini@fcgov.com 970-416-4250
Topic: General
Comment Number: 1
06/15/2023: INFORMATION:
No Preservation concerns. There are properties along the project extent that are
over fifty years of age but none have UpToDate - findings of Eligibility and the
Site Plan indicates none are proposed for demolition/significant redevelopment.
Ripley Response: Thank you.
Department: Engineering Development Review
Contact: Sophie Buckingham sbuckingham@fcgov.com
Topic: General
Comment Number: 1
06/23/2023: FOR HEARING:
Engineering would like to be involved in any further discussions with Traffic
about a phasing plan and Multi Modal Level of Service.
Northern Response: A phasing schedule has been added to the ODP documents showing what will be constructed with the future
development of each lot.
Department: Traffic Operation
Contact: Steve Gilchrist sgilchrist@fcgov.com 970-224-6175
Topic: General
Comment Number: 1
06/20/2023: FOR HEARING:
The Transportation Impact Study has been received and reviewed. See
subsequent comments regarding content.
Fox Tuttle Response: Comments will be addressed for hearing.
Comment Number: 2
06/20/2023: FOR HEARING:
We would like to see a phasing plan included with this project. With this being
converted to an ODP, and now an infrastructure project, we want clear details
4
on the phasing for this development and what will be built with each phase. With
this project having all of Mason incorporated within the property boundary, when
do plan to build the east side, south of the east lot?
Northern Response: A phasing schedule has been added to the ODP documents showing what will be constructed with the future
development of each lot.
Ripley Response: A phasing plan is included in the civil set for the ODP.
Comment Number: 3
06/20/2023: FOR HEARING:
Within the ODP phasing plan, we would like it noted that the sidewalk
connection from Mason to College along Hibdon will be required to be built with
the Fort Collins Rescue Mission property in order to meet Multi Modal Level of
Service Standards. This will be required even if parcel B is not yet developing.
Northern Response: A 5’ sidewalk connection has been made to the existing 4’ sidewalk on Hibdon and extended to Mason Street
Comment Number: 4
06/20/2023: INFORMATION:
Without clear detail on how the east lot will develop, the general use of the
Daycare trip generation is accepted. However, if this parcel moves forward to
develop into another use this will be reviewed for conformance to this ODP and
may or may not require further improvements if significant changes in the anticipated trips occurs.
Ripley Response: Understood.
Comment Number: 5
06/20/2023: INFORMATION:
The TIS details information to justify a change in classification from a collector
roadway to a local street based strictly on anticipated traffic volumes. Mason
will remain as a collector, even with this justification.
Ripley Response: Acknowledged.
Comment Number: 6
06/20/2023: FOR HEARING:
The Multi Modal Level of Service did not fully evaluate the Directness,
Continuity, Street Crossings, Visual Interest and Amenity, and Security of the
location identified within the TIS Base Assumption Form. Details on the Level
of service can be found in Appendix H of the LCUASS (will provide,) or within
the City of Fort Collins Pedestrian Plan 2011- page 33
Ripley Response: Acknowledged. We will continue working with staff on including these evaluations prior to the scheduled hear ing.
Department: Stormwater Engineering
Contact: Matt Simpson masimpson@fcgov.com (970) 416-2754
Topic: General
Comment Number: 1
06/20/2023: FOR HEARING:
Please review the ODP drainage map and report requirements in the FCSCM.
The drainage memo will need to be upgraded to a drainage report, both
formatting and content. See redlines for more information.
5
Northern Response: A drainage report has been prepared with this submittal following the stormwater criteria manual checklist.
Comment Number: 2
06/20/2023: FOR HEARING:
Please show the existing, proposed, and future storm mains on the Master Utility Plan.
Northern Response: Approximate locations of proposed and future storm drains have been added to Master Utility Plan.
Comment Number: 3
06/20/2023: FOR HEARING:
Provide in the drainage report an impervious area and water quality treatment
exhibit for the ODP. Specifically, it needs to be shown which properties are
responsible for treating the adjacent N Mason roadway areas.
Northern Response: An exhibit has been added to the drainage report showing which future development is responsible for
treatment of the adjacent Mason Street.
Department: Water-Wastewater Engineering
Contact: Stephen Agenbroad sagenbroad@fcgov.com
Topic: General
Comment Number: 1
06/19/2023: FOR HEARING:
To reduce redundant comments between the ODP and FDP, comments
regarding water and wastewater utilities will be focused primarily on the FDP.
Please update the ODP plans as the plans for the FDP are updated through the review process.
Northern Response: We will respond to comments on FDP comment letter.
Department: Erosion Control
Contact: Basil Hamdan bhamdan@fcgov.com 970-222-1801
Topic: Erosion Control
Comment Number: 1
06/14/2023: INFORMATION:
No comment from Erosion Control on ODP, all comments will be provided at PDP/FDP level.
Northern Response: Erosion control plans have been provided with the FDP submittal.
Department: Environmental Planning
Contact: Kristie Raymond kraymond@fcgov.com
Topic: General
Comment Number: 1
06/05/2023: FOR HEARING:
According to Section 2.3.2(H)(3)(5) of the Land Use Code, "the overall
development plan shall show the general location and approximate size of all
natural areas, habitats and features within its boundaries and shall indicate the
applicant's proposed rough estimate of the natural area buffer zones as
required pursuant to Section 3.4.1(E)." The plans will need to include
approximate buffer zones for Dry Creek and the riparian forest, and any other
6
wetlands or natural features present on the site.
Please include the following note on the ODP: "This Overall Development Plan
shows the general location and approximate size of all natural areas, habitats,
and features within its boundaries and the proposed rough estimate of the
natural area buffer zones as required by Land Use Code Section 3.4.1(E).
Detailed mapping of the site's natural areas, habitats, and features will be
provided at the time of individual PDP submittals. General buffer zones shown
on this ODP may be reduced or enlarged by the decision maker during the PDP process."
Ripley Response: Note is included on ODP site plan.
Comment Number: 2
06/05/2023: FOR HEARING:
Dry Creek, trees, and showy milkweed were items discussed in the ECS to be
protected. A Natural Habitat Buffer Zone of 100' from Dry Creek was noted,
however, make sure it is shown for the entire section of Dry Creek for the plan.
Please revisit the plans to ensure the Natural Habitat Buffer Zone includes the
southern and southeast portion of Dry Creek and the riparian forest.
Ripley Response: 100’ buffer from Dry Creek is shown for the entire section.
Comment Number: 3
06/05/2023: FOR HEARING:
Please add the following statement to the notes on any sheets of the ODP,
Master Utility Plan and Master Drainage Plan that show the Natural Habitat
Buffer Zone: "Please see Section 3.4.1 of the Land Use Code for allowable
uses within the natural habitat buffer zones."
Ripley Response: Note is included on ODP site plan.
Northern Response: Natural Habitat buffer zone linework and notes have been added to the master utility and master drainage
plans.
Comment Number: 4
06/05/2023: INFORMATION ONLY:
If the project progresses to the final development plan stage, Development
Agreement language regarding the natural features on site will be provided.
Ripley Response: Understood. We will continue to track this item.
Department: Light And Power
Contact: Cody Snowdon csnowdon@fcgov.com 970-416-2306
Topic: General
Comment Number: 1
06/21/2023: INFORMATION:
Light and Power does not have any concerns or comments regarding the Overall Development Plan.
Northern Response: Thank you
Department: PFA
Contact: Marcus Glasgow marcus.glasgow@poudre-fire.org 970-416-2869
7
Topic: General
Comment Number: 1
06/19/2023: INFORMATION:
PFA has no comments for the ODP. Please see FDP for all comments.
Northern Response: Thank you
Department: Building Services
Contact: Russell Hovland rhovland@fcgov.com 970-416-2341
Topic: Building Insp Plan Review
Comment Number: 1
06/20/2023: No comments
Ripley Response: Noted. Thank you.
Department: Technical Services
Contact: Jeff County jcounty@fcgov.com 970-221-6588
Topic: General
Comment Number: 1
06/15/2023: FOR FINAL APPROVAL:
We have no comments but will need to see any future submittals.
Ripley Response: Understood.