RE: Rally 5 Canopy - 2310 & 2350 E Harmony, MA220149, Round Number 1
Comment Summary:
Department: Engineering Development Review
Contact: Sophie Buckingham, , sbuckingham@fcgov.com
Topic: General
01/03/2023: FOR APPROVAL:
There is an existing easement where you are proposing the canopy. This easement
will need to be vacated in order for you to receive a building permit for the canopy.
You will need to hire a surveyor to determine the area within the existing easement
that will need to be vacated. Please submit an easement vacation application, fee,
legal description, and sketch with the next round of this Minor Amendment, and keep
in mind that there is no guarantee that the City will be able to fulfill the request and
vacate the easement. Please review the instructions and submittal form for the
easement vacation process at
https://www.fcgov.com/engineering/devrev.php#cb-38309-6601 and you may
contact me with any questions.
Comment Number: 1
01/03/2023: FOR APPROVAL:
Thank you for providing a copy of the lease agreement for the patio area between
the buildings. Has the landlord provided written consent for the installation of the
canopy?
Comment Number: 2
Department: Traffic Operation
Contact: Steve Gilchrist, 970-224-6175, sgilchrist@fcgov.com
Topic: General
12/26/2022: No comments.
Comment Number: 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of Rally 5 Canopy - 2310 & 2350 E Harmony . If you have questions about any comments,
you may contact the individual commenter or direct your questions through your Project Planner, Rob
Bianchetto at or rbianchetto@fcgov.com.
Page 1 of 3
Please see the attached 648-002 - Bldg Envelope Exhibit for
vacation information. Replatting the envelopes into one
eliminates the need for landlord approval.
Department: Stormwater Engineering
Contact: Andrew Crecca, , acrecca@fcgov.com
Topic: Erosion Control
12/28/2022: For Information:
No Comment from Erosion Control. Based upon the submitted materials it has been
determined that this project; will disturb less than 10,000 sq. ft., is not proposed to
be in a sensitive area, has no steep slopes (greater than 3H:1V) within or adjacent to
the project, and is not part of a larger common development that will or is under
construction. Therefore, Erosion Control Material submittal is not needed. If this
project substantially changes in size or design where the above criteria now apply,
erosion control materials should be submitted. Although the project at this time
requires no erosion control material submittal, the project still must be swept and
maintained to prevent dirt, saw cuttings, concrete wash, trash & debris, landscape
materials and other pollutants from the potential of leaving the site and entering the
storm sewer at all times during the project in accordance with City Code §26-498. If
complaints are received or site observation of the project seem not to prevent the
pollutants from being discharged the City may require the project to install erosion
and sediment control measures. Nearby inlets that may be impacted by the
pollutants, in particular dirt, should be protected as a good preventative practice and
individual lots should be protected from material escaping onto the sidewalk through
the use of straw wattles or silt fence. If at building permit issuance any issues arise
please email erosion@fcgov.com to help facilitate getting these permits signed off.
Comment Number: 1
Contact: Dan Mogen, 970-305-5989, dmogen@fcgov.com
Topic: General
12/29/2022: It is the understanding of the Stormwater Department that this minor
amendment will maintain existing grading and drainage patterns and not impede
existing drainage. If this understanding is incorrect or if plans change, please
contact me to discuss and determine what requirements, if any, will apply. Thank
you.
Comment Number: 1
Department: Water-Wastewater Engineering
Contact: Dan Mogen, 970-305-5989, dmogen@fcgov.com
Topic: General
12/29/2022: It does not appear this minor amendment will cause a change to the
existing water or sewer services, adjacent City facilities, or the usage within the
building. If this is incorrect or if plans change, please contact me directly to discuss.
Thank you.
Comment Number: 1
Department: Light And Power
Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com
Topic: General
12/27/2022: It is the understanding of Light and Power that this minor amendment
will not cause a change to the electric capacity needs or the location of our facilities.
If this an incorrect understanding or if plans change, please contact me directly at
akreager@fcgov.com or (970)224-6152. Thank you.
Comment Number: 1
Page 2 of 3
Acknowledged
Acknowledged
Acknowledged
Acknowledged
Department: Environmental Planning
Contact: Scott Benton, (970)416-4290, sbenton@fcgov.com
Topic: General
01/05/2023: No comments.
Comment Number: 1
Department: Forestry
Contact: Carrie Tomlinson, , ctomlinson@fcgov.com
Topic: General
01/05/2023: Please submit the landscape escrow for the landscape tree to be
installed by the applicant when seasonally appropriate.
Comment Number: 1
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: General
01/05/2023: Please revise the legal description as marked. See redlines.
Comment Number: 1
Department: Zoning
Contact: Rob Bianchetto, , rbianchetto@fcgov.com
Topic: General
01/05/2023: FOR APPROVAL
The proposed canopy is going over the building envelopes on the approved
subdivision plat. A replat through BDR will need to be completed to revise the
building envelopes prior to further review of the minor amendment.
Comment Number: 1
01/05/2023: FOR APPROVAL
The canopy is located within a utility and access easement. You will need to request
a vacation of the easement.
Comment Number: 2
01/05/2023: INFORMATION ONLY
A building permit will be required.
Comment Number: 3
Page 3 of 3
This tree was planted in
MA220095.
Legal description revised as requested.
A copy of the replat has been attached
to the resubmittal.
Please see the attached 648-002 - Bldg
Envelope Exhibit for vacation
information.
The BDR will be submitted.