Loading...
HomeMy WebLinkAboutCSU PHEMISTER TRAIL - SITE PLAN ADVISORY REVIEW - SPA230001 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANS20+93 10 + 0 0 12+ 0 0 14 + 0 0 16 + 0 0 1 8 + 0 0 20 + 0 0 PROJECT LOCATION MAP CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below.before you dig.Call R TABULATION OF LENGTH & DESIGN DATA PROJECT LOCATION STATE OF COLORADODEPARTMENT OF TRANSPORTATION CONSTRUCTION PROJECT CODE NO. 25298 HIGHWAY CONSTRUCTION BID PLANS OF PROPOSED FEDERAL AID PROJECT NO. MTF M455-147 COLORADO STATE UNIVERSITY PHEMISTER TRAILLARIMER COUNTY SCALE: 1" =400' 0200'200' 400' 600' Rh o n d a B u n n e r 8 : 2 4 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r C D O T I n d e x . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS SHEET INDEX INDEX NO. SHEET NO.DESCRIPTION TITLE SHEET INDEX GENERAL NOTES SHEETS 1 GE1 TITLE SHEET 2 GE2 INDEX OF SHEETS 3 GE3 STANDARD PLANS LIST 4 GE4 SURVEY TABULATION SHEET 5 GE5 GENERAL NOTES 6 GE6 EROSION CONTROL NOTES 7 GE7 LEGEND, ABBREVIATIONS, AND GENERAL NOTES TYPICAL SECTIONS SHEETS 8 TY1 TYPICAL SECTIONS TABULATIONS SHEETS 9 TB1 SUMMARY OF APPROXIMATE QUANTITIES PHASING AND TRAFFIC CONTROL SHEETS 10 TE1 PHASING AND TRAFFIC CONTROL PLANS EXISTING AND DEMOLITION SHEETS 11 RV1 OVERALL EXISTING AND DEMOLITION PLAN 12 RV2 EXISTING CONDITIONS AND DEMOLITION PLAN 13 RV3 EXISTING CONDITIONS AND DEMOLITION PLAN 14 RV4 EXISTING CONDITIONS AND DEMOLITION PLAN 15 RV5 EXISTING CONDITIONS AND DEMOLITION PLAN GEOMETRY SHEETS 16 KM1 KEY MAP PLAN AND PROFILE SHEETS 17 GM1 GEOMETRIC CONTROL LAYOUT 18 GM2 GEOMETRIC CONTROL LAYOUT 19 GM3 GEOMETRIC CONTROL LAYOUT 20 GM4 GEOMETRIC CONTROL LAYOUT GRADING AND EROSION CONTROL SHEETS 21 EC1 GRADING AND EROSION CONTROL PLAN 22 EC2 GRADING AND EROSION CONTROL PLAN 23 EC3 GRADING AND EROSION CONTROL PLAN 24 EC4 GRADING AND EROSION CONTROL PLAN 25 DG1 BAY DRIVE / CENTRE AVENUE DETAILED GRADING 26 DG2 BAY DRIVE / CENTRE AVENUE DETAILED GRADING 27 DG3 BAY DRIVE / CENTRE AVENUE DETAILED GRADING 28 DG4 BAY DRIVE / CENTRE AVENUE DETAILED GRADING SHEET INDEX INDEX NO. SHEET NO.DESCRIPTION PHEMISTER TRAIL PLAN AND PROPFILE SHEETS 29 TR1 PHEMISTER TRAIL PLAN & PROFILE STA 10+00 TO STA 12+40 30 TR2 PHEMISTER TRAIL PLAN & PROFILE STA 12+40 TO STA 14+80 31 TR3 PHEMISTER TRAIL PLAN & PROFILE STA 14+80 TO STA 17+20 32 TR4 PHEMISTER TRAIL PLAN & PROFILE STA 17+20 TO END CROSS SECTION SHEETS 33 XS1 PHEMISTER TRAIL CROSS SECTIONS STA 10+00 TO STA 12+25 34 XS2 PHEMISTER TRAIL CROSS SECTIONS STA 12+50 TO STA 16+00 35 XS3 PHEMISTER TRAIL CROSS SECTIONS STA 16+25 TO STA 18+75 36 XS4 PHEMISTER TRAIL CROSS SECTIONS STA 19+00 TO STA 20+75 SIGNING AND STRIPING SHEETS 37 ST1 CENTRE AVENUE SIGNING AND STRIPING PLAN DETAIL SHEETS 38 DT1 BRIDGE DETAILS 39 DT2 WINGWALL DETAILS 40 DT3 GENERAL DETAILS 41 DT4 GENERAL DETAILS 42 DT5 EROSION CONTROL DETAILS LANDSCAPE SHEETS 43 LS1 LANDSCAPE Rh o n d a B u n n e r 8 : 0 9 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r C D O T P l a n s L i s t . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS Rh o n d a B u n n e r 3 : 3 9 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r C D O T S u r v e y T a b u l a t i o n . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS Rh o n d a B u n n e r 3 : 1 9 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r C D O T G e n e r a l N o t e s . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS CSU GENERAL NOTES:GENERAL NOTES (City of Fort Collins) A. Grading and Erosion Control Notes B. Street Improvement Notes C. Traffic Signing and Pavement Marking Construction Notes D. Utility Notes Rh o n d a B u n n e r 6 : 1 9 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r E r o s i o n N o t e s . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS GENERAL EROSION CONTROL REQUIREMENTS ’ “ ” ’ ’ Land disturbance, Stockpiles, and Storage of Soils Vehicle Tracking Loading and Unloading Operations Outdoor Storage or Construction Site Materials, Building Materials, Fertilizers, and Chemicals Vehicle and equipment maintenance and fueling Significant Dust or Particulate generating Process Concrete truck / equipment washing, including the concrete truck chute and associated fixtures and equipment Dedicated Asphalt and concrete batch plants Concrete Saw Cutting Materials Waste Materials Storage and Sanitary Facilities Other Site Operations and Potential Spill Areas ’ “” Final stabilization and project completion Rh o n d a B u n n e r 1 0 : 5 7 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r C D O T G e n e r a l I n f o . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS GENERAL NOTES: FIELD SURVEY BY: GEOTECHNICAL EXPLORATION BY: LEGEND: 1 2 STRIPING AND SIGNAGE LEGEND: B C A 3 D E F G H 4 I 5 J K ABBREVIATIONS: IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII X X E E E FO FO FO GAS GAS GAS 30'' W (CFC)30'' W (CFC) 16'' W (CFC)16'' W (CFC) W V H2O IRR Fiber O Vault ElectricVault 100 P R LOD LOD 4.0:1 2.0% DT2 A 101 DT3 68'-0" RIGHT OF WAY 10'-0" PROPOSED SIDEWALK / TRAIL 5'-0" EXISTING SIDEWALK 68'-0" RIGHT OF WAY 10'-0" PROPOSED SIDEWALK / TRAIL 5'-0" BIKE LANE 11'-0" TRAVEL 11'-0" LEFT TURN 12'-0" TRAVEL 2'-6" C&G 6" SIDEWALK PROPOSED CURB & GUTTER 6" HMA 6" ABC SUBBASE 34'-0" 34'-0" 6" TRAIL SUBBASE Rh o n d a B u n n e r 9 : 3 0 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r C D O T T y p i c a l S e c t i o n s . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS CENTRE AVENUE & PHEMISTER TRAIL CENTRE AVENUE & PHEMISTER TRAIL Rh o n d a B u n n e r 3 : 1 4 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r C D O T T a b u l a t i o n s . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS Contract Item No.Contract Item Unit ROADWAY STRUCTURES PROJECT TOTALS Plan As Const.Plan As Const.Plan As Const. 626-00000 Mobilizaton LS 1 1 201-00000 Clearing and Grubbing LS 1 1 202-00010 Removal of Tree EACH 5 5 202-00200 Removal of Sidewalk SY 89 89 202-00203 Removal of Curb and Gutter LF 135 135 202-00206 Removal of Concrete Curb Ramp SY 125 125 202-00220 Removal of Asphalt Mat SY 55 55 203-00010 Unclassified Excavation (Complete in Place)CY 210 210 203-00060 Embankment Material (Complete in Place)CY 310 310 206-00000 Structure Excavation CY 20 20 206-00100 Structure Backfill (Class I)CY 10 10 207-00700 Topsoil (On-Site)CY 175 175 207-00210 Stockpile Topsoil CY 175 175 208-00046 Pre-fabricated Concrete Washout Structure (Type I)EACH 1 1 208-00054 Storm Drain Inlet Protection (Type I)EACH 4 4 208-00035 Aggregate Bag LF 20 20 208-00075 Pre-fabricated Vehicle Tracking Pad EACH 1 1 208-00207 Erosion Control Management DAY 5 5 403-00720 Hot Mix Asphalt (Patching)(Asphalt)TON 27 27 412-00800 Concrete Pavement (8 Inch)SY 37 37 601-03040 Concrete Class D (Bridge)CY 25 25 608-00010 Concrete Curb Ramp SY 125 125 608-00026 Concrete Bikeway (6 Inch)SY 1260 1260 609-24006 Gutter Type 2 (6 Foot)LF 25 25 609-21901 Curb and Gutter Type II LF 110 110 612-00706 Seeding (Native) Drill ACRE 0.15 0.15 620-00020 Sanitary Facility EACH 1 1 625-00000 Construction Surveying LS 1 1 627-00001 Pavement Marking Paint GAL 3.00 3 627-00070 Preformed Plastic Pavement Marking SF 275 275 628-00061 Bridge Girder and Deck Unit (60 Feet to 65 Feet) (Special)EACH 1 1 630-00000 Flagging HOUR 60 60 630-80359 Portable Message Sign DAY 14 14 630-00007 Traffic Control Inspection DAY 16 16 630-00012 Traffic Control Management DAY 40 40 F.A.F.A. - Minor Contract Revisions F.A.0 F.A. F.A. - Erosion Control F.A.0 FOFO FOFO FO FO FO FO FO FO FO E E I I I III IIIII I II IIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII GAS GAS GAS GAS GAS GAS GAS GAS GA S GA S 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC) IIIIII IIIIII IIIIII III I I I I I I I I I IIIII I II I I I I IIIIII IIIIII IIIIII IIII II IIIIII IIIIII IIIIII I I I I I I IIIIII IIIIII IIIIII IIIIII I I I I I I IIIIII IIIIII IIIIII II I I II IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII X X W V W V H2 O H2 O G IR R Fib e r O Va u l t El e c t r i c Va u l t ST O P W V IR R IR R IR R IR R IR R Ba y D r i v e Centre Avenue Sh e r w o o d L a t e r a l Sp r i n g C r e e k Rh o n d a B u n n e r 1 0 : 1 9 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r T r a f f i c . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS SCALE: 1" =80' 040'40' 80' 120' FOFO FOFO FO FO FO FO FO FO FO E E I I I III IIIII I I I I I I I IIIIIIIIIIII II IIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII GAS GAS GAS GAS GAS GAS GAS GAS GA S GA S 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC) IIIIII IIIIII IIIIII III I I I I I I I I I IIIIII IIIIII IIIIII IIIII I II I I I I IIIIII IIIIII IIIIII I I I II I IIII II IIIIII IIIIII IIIIII I I I I I I IIIIII IIIIII IIIIII IIIIII I I I I I I IIIIII IIIIII IIIIII II I I II IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII IIIIII IIIIII IIIIII IIIIIIIIIIII IIIIII IIIIII IIIIII I I I I I I I I I I I I I I I I I I I IIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII II I III II II I I I II I II II I I I I I I I I I I I I I I I I X X W V W V H2 O H2 O G IR R Fib e r O Va u l t El e c t r i c Va u l t ST O P W V IR R IR R IR R IR R IR R Ba y D r i v e Centre Avenue LO D LO D LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LOD LOD LOD LOD LO D L O D LOD LOD LOD LOD LOD LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LO D L O D LOD LOD LOD LODLOD LO DLOD LO D LOD LOD LOD LOD LOD LO D LOD LOD LOD LOD L O D Sh e r w o o d L a t e r a l Sp r i n g C r e e k RR LIMTS OF REMOVAL LIMTS OF CLEARING AND GRUBBING X ###### X ###### X ###### Rh o n d a B u n n e r 1 0 : 2 3 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r E x i s t i n g O A . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS SCALE: 1" =80' 040'40' 80' 120' R FO FO FO FO FO FO FOFOFOFOFOFO F O FOFOFOFOFOFOFO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOFO FO E E E E EEEEEE E E I I IIII I IIIII IIIIII IIIIII IIIIII IIIIII I IIIII IIIIII III I I I I I IIII IIII I I I I II I I I I I III I I I III IIIIII I I I I I I I I II I I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I I I I I I I I I I I I IIIII I II I I II I I IIII III II I I I I I I I I I I I I I IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GA S GA S GAS GA S GA S GA S GA S GA S GA S GA S 16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC) 16 ' ' W ( C F C ) 16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC) 16'' W (CFC) 16'' W (CFC) 16'' W (CFC) GAS W V W V H2 O H2 O G IR R Fi b e r O Va u l t El e c t r i c Va u l t ST O P Ba y D r i v e Centre Avenue LOD LOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLOD LO D LO D LODLODLODLODLODLOD LO D LO D LOD LO D L O D LODLOD LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D L O D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD Sh e r w o o d L a t e r a l X ###### LIMTS OF REMOVAL LIMTS OF CLEARING AND GRUBBING Rh o n d a B u n n e r 1 0 : 4 5 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r R e m o v a l . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS MA T C H L I N E - S E E S H E E T R V 3 SCALE: 1" =20' 010'10' 20' 30' FO FO FO FO FO FO FO FO FO FO FO FO FO IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII GAS GAS GAS GAS GAS 16'' W (CFC) 16'' W (CFC) 16'' W (CFC) 16'' W (CFC) IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I IIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII X X X X X X X X W V L O D L O D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D L O D L O D L O D LO D LODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D L O D LIMTS OF CLEARING AND GRUBBING LIMTS OF CLEARING AND GRUBBING Rh o n d a B u n n e r 1 0 : 4 5 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r R e m o v a l . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS MA T C H L I N E - S E E S H E E T R V 4 MA T C H L I N E - S E E S H E E T R V 2 SCALE: 1" =20' 010'10' 20' 30' 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) III IIIIII IIIIII IIIII I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I IIIII I I I II I I IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIIIIIIIII IIIIII IIIIII IIIIII II II II I IIIII IIIII I II IIII I I I I I I I I I I I I IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII I I I I I I I I I I I I I I I I I I I I I I II IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII II I II I I III II II I I II I I I II I IIII I I II I I II I I III I IIII I I II I III I IIIII IIII I I I I I III I III I I I I I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LIMTS OF CLEARING AND GRUBBING Rh o n d a B u n n e r 1 0 : 4 5 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r R e m o v a l . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS MA T C H L I N E - S E E S H E E T R V 5 MA T C H L I N E - S E E S H E E T R V 3 SCALE: 1" =20' 010'10' 20' 30' 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) IIIIII IIIII I IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII I I IIII IIIIII IIII I I I I I III IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII I I II I I I I I I I II II II I I I I II II III III IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII I I I I II I I I II I I I I II I IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IR R IR R IR R IR R IR R LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LO D LO D LO D L O D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD X ###### Sp r i n g C r e e k X ###### LIMTS OF CLEARING AND GRUBBING Rh o n d a B u n n e r 1 0 : 4 5 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r R e m o v a l . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS MA T C H L I N E - S E E S H E E T R V 4 SCALE: 1" =20' 010'10' 20' 30' FOFO FOFO FO FO FO FO FO FO FO E E I I I III IIIII I II IIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII GAS GAS GAS GAS GAS GAS GAS GAS GA S GA S 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC) IIIIII IIIIII IIIIII III I I I I I I I I I IIIII I II I I I I IIIIII IIIIII IIIIII IIII II IIIIII IIIIII IIIIII I I I I I I IIIIII IIIIII IIIIII IIIIII I I I I I I IIIIII IIIIII IIIIII II I I II IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII X X W V W V H2 O H2 O G IR R Fib e r O Va u l t El e c t r i c Va u l t ST O P W V IR R IR R IR R IR R IR R Ba y D r i v e Centre Avenue Sh e r w o o d L a t e r a l Sp r i n g C r e e k PHEMISTER TRAILPLAN & PROFILE (SEE PLAN SHEETS TR4) PHEMISTER TRAILPLAN & PROFILE (SEE PLAN SHEETS TR3) PHEMISTER TRAILPLAN & PROFILE (SEE PLAN SHEETS TR2) PHEMISTER TRAILPLAN & PROFILE (SEE PLAN SHEETS TR1) INT ###### INT ###### INT ###### INT ###### INT ###### INT ###### Rh o n d a B u n n e r 1 1 : 2 6 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r K e y . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS SCALE: 1" =80' 040'40' 80' 120' FO FO FO FO FO FO FOFOFOFOFOFO F O FOFOFOFOFOFOFO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOFO FO E E E E EEEEEE E E I I IIII I IIIII IIIIII IIIIII IIIIII IIIIII I IIIII IIIIII III I I I I I IIII IIII I I IIIII I II I I II I I IIII III II I I I I I I I I I I I I I IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GA S GA S GAS GA S GA S GA S GA S GA S GA S GA S 16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC) 16 ' ' W ( C F C ) 16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC) 16'' W (CFC) 16'' W (CFC) 16'' W (CFC) GAS W V W V H2 O H2 O G IR R Fi b e r O Va u l t El e c t r i c Va u l t ST O P Ba y D r i v e Centre Avenue Sh e r w o o d L a t e r a l INT ###### INT ###### INT ###### INT ###### INT ###### INT ###### INT ###### SIGNING AND STRIPING (SEE PLAN SHEET DG1 - DG2) Rh o n d a B u n n e r 6 : 1 4 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r G e o m e t r i c . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS MA T C H L I N E - S E E S H E E T G M 2 SCALE: 1" =20' 010'10' 20' 30' FO FO FO FO FO FO FO FO FO FO FO FO FO IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII GAS GAS GAS GAS GAS 16'' W (CFC) 16'' W (CFC) 16'' W (CFC) 16'' W (CFC) IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII X X X X X X X X W V INT ###### INT ###### Rh o n d a B u n n e r 6 : 1 4 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r G e o m e t r i c . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS MA T C H L I N E - S E E S H E E T G M 3 MA T C H L I N E - S E E S H E E T G M 1 SCALE: 1" =20' 010'10' 20' 30' 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) III IIIIII IIIIII IIIII I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I IIIII I I I II I I IIIIII IIIIII IIIIII IIIIII II II II I IIIII IIIII I II IIII I I I I I I I I I I I I IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII INT ###### INT ###### Phemister Trail Line Table LINE L1 L2 L3 L4 L5 L6 L7 L8 LENGTH 25.77' 74.26' 15.89' 25.86' 228.01' 119.72' 145.15' 18.69' BEARING S89°27'27.60"E S00°21'45.86"W S38°51'54.30"W S45°41'45.39"W S10°21'26.88"W S36°53'55.40"W S14°40'28.78"W S23°46'07.78"W BEGIN LINE N: 1449507.24 E: 3116421.64 N: 1449507.00 E: 3116447.41 N: 1449432.73 E: 3116446.94 N: 1449210.88 E: 3116453.44 N: 1449096.73 E: 3116385.90 N: 1448830.37 E: 3116326.51 N: 1448703.40 E: 3116239.53 N: 1448549.51 E: 3116198.07 END LINE N: 1449507.00 E: 3116447.41 N: 1449432.73 E: 3116446.94 N: 1449420.36 E: 3116436.97 N: 1449192.82 E: 3116434.94 N: 1448872.44 E: 3116344.91 N: 1448734.63 E: 3116254.63 N: 1448562.99 E: 3116202.76 N: 1448532.41 E: 3116190.53 Phemister Trail Curve Table CURVE C1 C2 C3 C4 C5 C6 C7 DELTA 15°14'41" 61°02'58" 19°40'50" 15°39'28" 26°32'29" 22°13'27" 9°05'39" RADIUS 685.00' 30.00' 160.00' 200.00' 100.00' 90.00' 90.00' LENGTH 182.26' 31.97' 54.96' 54.66' 46.32' 34.91' 14.29' BEARING S07°43'52"E S15°10'16"W S35°51'20"W S18°11'11"W S23°37'41"W S25°47'12"W S19°13'18"W CHORD 181.72' 30.47' 54.69' 54.49' 45.91' 34.69' 14.27' BEGIN CURVE N: 1449420.36 E: 3116436.97 N: 1449240.29 E: 3116461.42 N: 1449192.82 E: 3116434.94 N: 1449148.49 E: 3116402.91 N: 1448872.44 E: 3116344.91 N: 1448734.63 E: 3116254.63 N: 1448562.99 E: 3116202.76 END CURVE N: 1449240.29 E: 3116461.42 N: 1449210.88 E: 3116453.44 N: 1449148.49 E: 3116402.91 N: 1449096.73 E: 3116385.90 N: 1448830.37 E: 3116326.51 N: 1448703.40 E: 3116239.53 N: 1448549.51 E: 3116198.07 Flowline Line Table LINE L9 L10 L11 L12 L13 L14 L15 L16 LENGTH 19.41' 5.50' 88.67' 16.93' 26.44' 13.39' 8.42' 2.43' BEARING N02°24'36.62"W N11°50'34.75"E N00°21'45.86"E N07°45'12.07"W N00°28'13.04"E S89°30'23.41"E S34°12'48.27"W S89°19'13.20"W BEGIN LINE N: 1449387.34 E: 3116451.89 N: 1449406.73 E: 3116451.07 N: 1449413.21 E: 3116452.32 N: 1449504.52 E: 3116452.72 N: 1449521.30 E: 3116450.44 N: 1449521.41 E: 3116437.05 N: 1449519.22 E: 3116432.91 N: 1449510.07 E: 3116424.10 END LINE N: 1449406.73 E: 3116451.07 N: 1449412.12 E: 3116452.20 N: 1449501.87 E: 3116452.88 N: 1449521.30 E: 3116450.44 N: 1449547.74 E: 3116450.65 N: 1449521.30 E: 3116450.44 N: 1449512.26 E: 3116428.18 N: 1449510.04 E: 3116421.67 Flowline Curve Table CURVE C8 C9 C10 C11 C12 DELTA 11°28'49" 7°35'24" 66°39'07" 71°54'27" 55°06'25" RADIUS 5.50' 20.00' 20.00' 5.00' 5.00' LENGTH 1.10' 2.65' 23.27' 6.28' 4.81' BEARING N06°06'10"E N03°25'56"W N40°33'11"W S70°10'02"W S61°46'01"W CHORD 1.10' 2.65' 21.98' 5.87' 4.63' BEGIN CURVE N: 1449412.12 E: 3116452.20 N: 1449501.87 E: 3116452.88 N: 1449504.52 E: 3116452.72 N: 1449521.21 E: 3116438.43 N: 1449512.26 E: 3116428.18 END CURVE N: 1449413.21 E: 3116452.32 N: 1449504.52 E: 3116452.72 N: 1449521.21 E: 3116438.43 N: 1449519.22 E: 3116432.91 N: 1449510.07 E: 3116424.10 Rh o n d a B u n n e r 6 : 1 4 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r G e o m e t r i c . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS MA T C H L I N E - S E E S H E E T G M 4 MA T C H L I N E - S E E S H E E T G M 2 SCALE: 1" =20' 010'10' 20' 30' 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) 30 ' ' W ( C F C ) IIIIII IIIII I IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII I I IIII IIIIII IIII I I I I I III IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII I I II I I I I I I I II II II I I I I II II III III IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII I I I I II I I I II I I I I II I IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IR R IR R IR R IR R IR R Sp r i n g C r e e k INT ###### INT ###### INT ###### Rh o n d a B u n n e r 6 : 1 4 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r G e o m e t r i c . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS MA T C H L I N E - S E E S H E E T G M 3 SCALE: 1" =20' 010'10' 20' 30' I I IIII I IIIII IIIIII IIIIII IIIIII IIIIII I IIIII IIIIII III I I I I I IIII IIII I I IIIII I II I I II I I IIII III II I I I I I I I I I I I I I IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII W V W V H2 O H2 O G IR R Fi b e r O Va u l t El e c t r i c Va u l t ST O P Ba y D r i v e Centre Avenue Sh e r w o o d L a t e r a l SIGNING AND STRIPING (SEE PLAN SHEET DG1 - DG2) DETAILED GRADING (SEE PLAN SHEETS DG1)DETAILED GRADING (SEE PLAN SHEETS DG2) SF IP SCL SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SCL SCL SF DETAILED GRADING (SEE PLAN SHEETS DG3) Rh o n d a B u n n e r 1 2 : 3 4 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r G r a d i n g . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS MA T C H L I N E - S E E S H E E T E C 2 SCALE: 1" =20' 010'10' 20' 30' IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII X X X X X X X X W V SF SF SF SF SF SF SF SF SF S F S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SCL SCL SCL SCL SCL SCL SCL SCL SCL SF DETAILED GRADING (SEE PLAN SHEETS DG4) Rh o n d a B u n n e r 1 2 : 3 4 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r G r a d i n g . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS MA T C H L I N E - S E E S H E E T E C 3 MA T C H L I N E - S E E S H E E T E C 1 SCALE: 1" =20' 010'10' 20' 30' III IIIIII IIIIII IIIII I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I IIIII I I I II I I IIIIII IIIIII IIIIII IIIIII II II II I IIIII IIIII I II IIII I I I I I I I I I I I I IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF S F S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SCL SCL SCL SCL SCL SCL Rh o n d a B u n n e r 1 2 : 3 4 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r G r a d i n g . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS MA T C H L I N E - S E E S H E E T E C 4 MA T C H L I N E - S E E S H E E T E C 2 SCALE: 1" =20' 010'10' 20' 30' IIIIII IIIII I IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII I I IIII IIIIII IIII I I I I I III IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII I I II I I I I I I I II II II I I I I II II III III IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII I I I I II I I I II I I I I II I IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IR R IR R IR R IR R IR R Sp r i n g C r e e k S F SF SF SF SF SF SF SF SF SF SF SF SF S F SF SF SF SF SF SF SF SF SF SF S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF Rh o n d a B u n n e r 1 2 : 3 4 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r G r a d i n g . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS MA T C H L I N E - S E E S H E E T E C 3 SCALE: 1" =20' 010'10' 20' 30' III I I I I I IIII IIII I I I I I III IIII I I IIIIII IIIIII IIII I I I I I III IIIIII IIIIII IIII II IIIIII IIIIII IIIIII IIIIII I IIIII I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I III IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII Ba y D r i v e Centre Avenue 2.3% INT ###### INT ###### 2. 7 % 7. 6 % 1.8% 20. 0 : 1 2.0:1 0 . 5 % 0.5 % 0 . 5 % 6.1 % 5.0 % 5.5% 0.1% 0.1% 5.7%5.7%2.6% 8.3% 2. 0 % INT ###### INT ###### INT ###### INT ###### Rh o n d a B u n n e r 4 : 3 8 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r D e t a i l G r a d i n g . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS MA T C H L I N E - S E E S H E E T D G 2 SCALE: 1" =6' 03'3' 6' 9' IIIII Centre Avenue Sh e r w o o d L a t e r a l 2. 0 % 1.0% 2. 0 % 2.2%2.3%2.3% 2.1%2.1%2.1% INT ###### INT ###### 2. 0 % Rh o n d a B u n n e r 4 : 3 8 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r D e t a i l G r a d i n g . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS MA T C H L I N E - S E E S H E E T D G 1 SCALE: 1" =6' 03'3' 6' 9' MA T C H L I N E - S E E S H E E T D G 3 IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII 2.1% INT ###### Centre Avenue INT ###### 2 . 0 % 2 . 0 % Rh o n d a B u n n e r 4 : 3 8 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r D e t a i l G r a d i n g . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS MA T C H L I N E - S E E S H E E T D G 2 SCALE: 1" =6' 03'3' 6' 9' MA T C H L I N E - S E E S H E E T D G 4 IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII II X X X X X X X X X X PHEMISTER TRAILPLAN AND PROFILE (SEE PLAN & PROFILE SHEETS TR1 - TR4) Centre Avenue INT ###### INT ###### 2 . 0 % 2 . 0 % 3.9: 1 3.0 : 1 Rh o n d a B u n n e r 4 : 3 8 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r D e t a i l G r a d i n g . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS MA T C H L I N E - S E E S H E E T D G 3 SCALE: 1" =6' 03'3' 6' 9' 3 0 ' ' W ( C F C ) 3 0 ' ' W ( C F C ) 3 0 ' ' W ( C F C ) 3 0 ' ' W ( C F C ) 3 0 ' ' W ( C F C ) 3 0 ' ' W ( C F C ) 3 0 ' ' W ( C F C ) 3 0 ' ' W ( C F C ) 3 0 ' ' W ( C F C ) I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII II II II IIIIII IIIIII IIIIII IIIIII IIIIII IIIII I I III I I IIIIII I III I I I I I I I I II III I I I III I IIIIII IIIIII IIIIII III I I III I I I IIII IIIII I II I III IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII II I I I I I II I I I III III IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIII I R R I R R I R R I R R PEDESTRIAN BRIDGE (SEE PLAN SHEET ###### - ######) S p r i n g C r e e k 2. 0 % 1. 0 % 0. 0 % 0. 0 % 0. 0 % 1. 0 % 2. 0 % ∆∆ 4.0 : 1 2.0 : 1 3.9 : 1 2.0 : 1 2.0 % INT ###### INT ###### 4. 0 : 1 4. 0 : 1 4. 0 : 1 3 . 9 : 1 4988 4990 4992 4994 4996 4998 5000 5002 4988 4990 4992 4994 4996 4998 5000 5002 9+8010+0010+2010+4010+6010+8011+0011+2011+4011+6011+8012+0012+2012+4012+60 C S p r i n g C r e e k L PEDESTRIAN BRIDGE (SEE PLAN SHEET ###### - ######) Rh o n d a B u n n e r 6 : 1 2 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r T r a i l P & P . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS CENTERLINE PROFILEPHEMISTER TRAIL LIN E MA T C H ST A 12 + 4 0 MA T C H L I N E ST A 12 + 4 0 SCALE: 1" =20' 010'10' 20' 30' 10-year II IIIIII III II I IIIIII IIIIII IIIIII IIIIII IIIIII III ∆ 4.0 : 1 2.0 : 1 3.9 : 1 2.0 : 1 2.0 % 2 . 0 % 4. 0 : 1 4.0 : 1 2.0 : 1 2 . 0 : 1 4 . 0 : 1 2. 0 : 1 4 . 0 : 1 2 . 0 : 1 2.0 % INT ###### 4990 4992 4994 4996 4998 5000 5002 5004 4990 4992 4994 4996 4998 5000 5002 5004 12+2012+4012+6012+8013+0013+2013+4013+6013+8014+0014+2014+4014+6014+8015+00 Rh o n d a B u n n e r 6 : 1 2 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r T r a i l P & P . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS LIN E MA T C H ST A 12 + 4 0 MA T C H L I N E ST A 12 + 4 0 LI N E MA T C H S T A 1 4 + 8 0 MA T C H L I N E ST A 14 + 8 0 SCALE: 1" =20' 010'10' 20' 30' CENTERLINE PROFILEPHEMISTER TRAIL FO FO FO FO FO FO IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII X X X X X X X X W V ∆ ∆ ∆ 4 . 0 : 1 2 . 0 : 1 2 . 0 % 2.0 % 4 . 0 : 1 2 . 0 : 1 2. 0 : 1 3. 0 : 1 3.0 : 1 4.0 : 1 3.0 : 1 3.9 : 1 3. 0 : 1 INT ###### 4992 4994 4996 4998 5000 5002 5004 5006 4992 4994 4996 4998 5000 5002 5004 5006 14+6014+8015+0015+2015+4015+6015+8016+0016+2016+4016+6016+8017+0017+2017+40 Rh o n d a B u n n e r 6 : 1 2 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r T r a i l P & P . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS LI N E MA T C H ST A 14 + 8 0 LIN EMA T C H ST A 17 + 2 0 MA T C H L I N E ST A 12 + 4 0 MA T C H L I N E ST A 14 + 8 0 SCALE: 1" =20' 010'10' 20' 30' CENTERLINE PROFILEPHEMISTER TRAIL FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOFO FO IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS 16'' W (CFC)16'' W (CFC) 16 ' ' W ( C F C ) 16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC)16'' W (CFC) 16'' W (CFC) 16'' W (CFC) 16'' W (CFC) 16'' W (CFC) 16'' W (CFC) IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII X X X X X X X X H2 O H2 O W V Sh e r w o o d L a t e r a l Centre Avenue ∆ ∆ ∆ 4.0: 1 3.0: 1 3.9: 1 3.0 : 1DETAILED GRADING (SEE PLAN SHEET DG1 - DG4)INT ###### INT ###### 2 . 0 % 2. 0 % 2. 0 % 1.0% SIGNING AND STRIPING (SEE PLAN SHEET DG1 - DG2) 2. 0 % 4996 4998 5000 5002 5004 5006 5008 5010 4996 4998 5000 5002 5004 5006 5008 5010 17+0017+2017+4017+6017+8018+0018+2018+4018+6018+8019+0019+2019+4019+6019+80 DETAILED GRADING (SEE PLAN SHEET DG1 - DG2) Rh o n d a B u n n e r 6 : 1 2 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r T r a i l P & P . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS LIN EMAT C H STA 17+ 2 0 MA T C H L I N E ST A 17 + 2 0 SCALE: 1" =20' 010'10' 20' 30' CENTERLINE PROFILEPHEMISTER TRAIL 10+00 4992 4996 4992 4996 0 200-20 10+25 4992 4996 4992 4996 0 200-20 10+50 4992 4996 5000 4992 4996 5000 0 200-20 10+75 4988 4992 4996 5000 4988 4992 4996 5000 0 200-20 11+00 4988 4992 4996 5000 4988 4992 4996 5000 0 200-20 11+25 4992 4996 5000 4992 4996 5000 0 200-20 11+50 4992 4996 5000 4992 4996 5000 0 200-20 11+75 4992 4996 5000 4992 4996 5000 0 200-20 12+00 4992 4996 5000 4992 4996 5000 0 200-20 12+25 4996 5000 4996 5000 0 200-20 49 9 4 . 7 49 9 4 . 5 49 9 5 . 5 4 49 9 4 . 2 49 9 6 . 6 5 49 9 2 . 7 49 9 7 . 2 0 49 9 2 . 8 49 9 7 . 2 0 49 9 2 . 7 49 9 7 . 1 9 49 9 3 . 4 49 9 6 . 7 6 49 9 4 . 7 49 9 6 . 9 3 49 9 5 . 5 49 9 7 . 9 1 49 9 8 . 4 49 9 8 . 6 1 Rh o n d a B u n n e r 2 : 1 4 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r C r o s s S e c t i o n s . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS CROSS SECTIONSPHEMISTER TRAIL 12+50 4992 4996 5000 4992 4996 5000 0 200-20 12+75 4992 4996 5000 4992 4996 5000 0 200-20 13+00 4992 4996 5000 4992 4996 5000 0 200-20 13+25 4992 4996 5000 4992 4996 5000 0 200-20 13+50 4992 4996 5000 4992 4996 5000 0 200-20 13+75 4992 4996 5000 4992 4996 5000 0 200-20 14+00 4992 4996 5000 4992 4996 5000 0 200-20 14+25 4992 4996 5000 4992 4996 5000 0 200-20 14+50 4992 4996 5000 4992 4996 5000 0 200-20 14+75 4992 4996 5000 4992 4996 5000 0 200-20 15+00 4992 4996 5000 4992 4996 5000 0 200-20 15+25 4992 4996 5000 4992 4996 5000 0 200-20 15+50 4992 4996 5000 4992 4996 5000 0 200-20 15+75 4992 4996 5000 4992 4996 5000 0 200-20 16+00 4992 4996 5000 4992 4996 5000 0 200-20 49 9 8 . 0 49 9 8 . 2 1 49 9 7 . 7 49 9 7 . 2 5 49 9 6 . 2 49 9 6 . 4 3 49 9 6 . 6 49 9 6 . 5 7 49 9 8 . 3 49 9 7 . 6 1 49 9 8 . 4 49 9 8 . 0 2 49 9 8 . 3 49 9 8 . 0 5 49 9 8 . 2 49 9 8 . 0 9 49 9 8 . 1 49 9 8 . 1 2 49 9 8 . 1 49 9 8 . 1 5 49 9 8 . 1 49 9 8 . 1 8 49 9 8 . 1 49 9 8 . 2 1 49 9 8 . 0 49 9 8 . 2 4 49 9 8 . 0 49 9 8 . 2 7 49 9 8 . 1 49 9 8 . 3 0 Rh o n d a B u n n e r 2 : 1 4 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r C r o s s S e c t i o n s . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS CROSS SECTIONSPHEMISTER TRAIL 16+25 4992 4996 5000 4992 4996 5000 0 200-20 16+50 4992 4996 5000 4992 4996 5000 0 200-20 16+75 4996 5000 5004 4996 5000 5004 0 200-20 17+00 4996 5000 5004 4996 5000 5004 0 200-20 17+25 4996 5000 5004 4996 5000 5004 0 200-20 17+50 4996 5000 5004 4996 5000 5004 0 200-20 17+75 5000 5004 5000 5004 0 200-20 18+00 4996 5000 5004 4996 5000 5004 0 200-20 18+25 4996 5000 5004 4996 5000 5004 0 200-20 18+50 5000 5004 5008 5000 5004 5008 0 200-20 18+75 4996 5000 5004 5008 4996 5000 5004 5008 0 200-20 49 9 8 . 4 49 9 8 . 4 5 49 9 8 . 6 49 9 8 . 7 9 49 9 9 . 0 49 9 9 . 2 0 49 9 9 . 6 49 9 9 . 7 3 50 0 0 . 5 50 0 0 . 4 7 50 0 1 . 7 50 0 1 . 3 1 50 0 2 . 3 50 0 2 . 1 5 50 0 2 . 5 50 0 2 . 5 7 50 0 2 . 9 50 0 2 . 9 1 50 0 3 . 2 50 0 3 . 3 6 50 0 3 . 7 50 0 3 . 8 4 Rh o n d a B u n n e r 2 : 1 4 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r C r o s s S e c t i o n s . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS CROSS SECTIONSPHEMISTER TRAIL 19+00 4996 5000 5004 5008 4996 5000 5004 5008 0 200-20 19+25 5000 5004 5008 5000 5004 5008 0 200-20 19+50 5000 5004 5008 5000 5004 5008 0 200-20 19+75 5004 5008 5004 5008 0 200-20 20+00 5004 5008 5004 5008 0 200-20 20+25 5004 5008 5012 5004 5008 5012 0 200-20 20+50 5004 5008 5004 5008 0 200-20 20+75 5004 5008 5012 5004 5008 5012 0 200-20 20+92.70 5008 5012 5008 5012 0 200-20 50 0 4 . 2 50 0 4 . 2 5 50 0 4 . 7 50 0 4 . 7 0 50 0 5 . 0 50 0 5 . 2 0 50 0 5 . 7 50 0 5 . 7 9 50 0 6 . 3 50 0 6 . 3 6 50 0 6 . 9 50 0 6 . 9 7 50 0 7 . 3 50 0 7 . 7 8 50 0 8 . 4 50 0 8 . 5 Rh o n d a B u n n e r 2 : 1 4 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r C r o s s S e c t i o n s . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS CROSS SECTIONSPHEMISTER TRAIL I I IIII I IIIII IIIIII IIIIII IIIIII IIIIII I IIIII IIIIII III I I I I I IIII IIII I I IIIII I II I I II I I IIII III II I I I I I I I I I I I I I IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII W V W V H2 O H2 O G IR R Fi b e r O Va u l t El e c t r i c Va u l t ST O P Ba y D r i v e Centre Avenue Sh e r w o o d L a t e r a l Rh o n d a B u n n e r 3 : 5 0 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r S i g n i n g . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS SCALE: 1" =20' 010'10' 20' 30' 60'-2" 1'-0" 2'-6" 1'-912" ELEV: 97.20 EXISTING GROUND: ± 94.3 SOUTH ABUTMENT ± 93.8 NORTH ABUTMENT 3'-0" 1'-0" #5 @ 12" O.C. TOP AND SIDES 8 x #5 6 x #5 #5 @12" E.W.#5 @ 12" O.C. 1'-0"1'-0" 3" CLEAR; TYP Rh o n d a B u n n e r 6 : 4 1 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r C D O T B r i d g e D e t a i l s . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS PLAN VIEW SCALE: 1" = 10' 05'5' 10' 15' A #### SECTION A Rh o n d a B u n n e r 7 : 1 7 A M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r W i n g w a l l D e t a i l s . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS PLAN VIEW SCALE: 1" = 10' 05'5' 10' 15' A #### SECTION A PLAN VIEW Rh o n d a B u n n e r 1 : 0 0 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r D e t a i l s . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS CURB AND GUTTER101 DT3 STANDARD PAVEMENT MARKINGS105 DT3 CURB AND GUTTER / SIDEWALK STANDARD DRIVEWAY APPROACH STREET INTERSECTION CROSSPAN STANDARD SIDEWALK 102 DT3 SIDEWALK DETAIL107 DT3 106 DT3 103 DT3 ACCESS RAMP DETAILS 104 DT3 108 DT3 6" TRAIL SUBBASE SLOPE VARIES; SEE GRADING PLANS EXISTING SIDEWALK CONNECT TO EXIST WALK 10'-0" SLOPE: 2%SLOPE 5'-0" 6" SIDEWALK PROPOSED TYPE II CURB & GUTTER 6" HMA 6" ABC SUBBASE SLOPE VARIES; SEE GRADING PLANS 10'-0" SLOPE: 2% 6" TRAIL SUBBASE CONSTRUCTION CL CONTROL 7'-0"5'-0" 12'-0" SLOPE: 2% SLOPE VARIES; SEE GRADING PLANS Rh o n d a B u n n e r 1 : 0 0 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r D e t a i l s . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS TRUNCATED DOME WARNING FOR ACCESS RAMPS109 DT4 CONCRETE TRAIL DETAIL113 DT3 SIDEWALK WIDENING DETAILS110 DT4 PROPOSED SIDEWALK TO EXISTING WALK112 DT4 SIDEWALK CURB AND GUTTER111 DT4 TREE PROTECTION AREA 1.5 X's DISTANCE BETWEEN TRUNK AND DRIP LINE, OR 1 FOOT FOR EVERY DIAMETER INCH OF TRUNK, WHICHEVER IS GREATER ZONE 1 BRANCH PROTECTION -PROTECT LOWER BRANCHES OF TREE CANOPY PROVIDE 6' HIGH CHAINLINK FENCING AT DRIPLINE (MIN.) ZONE 2 TRUNK PROTECTION -REQUIRED IF WHEELED CONSTRUCTION EQUIPMENT INVOLVED WITHIN 10' OR LESS NO MATERIALS SHALL BE STORED WITHIN THE TREE PROTECTION AREAZONE 3 ROOT PROTECTION -VARIES PER TREE SIZE EXTENDS FROM DRIPLINE TO DRIPLINE 6'x6' PERIMETER w/ TREE WRAP TREE PROTECTION DETAIL114 DT4 FENCE / GATE DETAIL115 DT4 Rh o n d a B u n n e r 1 2 : 3 2 P M Z : \ ~ B u s i n e s s F o c u s \ P M _ C M \ C o l o r a d o S t a t e U n i v e r s i t y \ F a c i l i t i e s M a n a g e m e n t \ ~ P r o j e c t s \ P h e m i s t e r T r a i l \ D r a w i n g s \ C A D \ S h e e t s \ P h e m i s t e r E r o s i o n D e t a i l s . d w g 60% PLAN SET NOT FOR CONSTRUCTION SHEET STATUS