HomeMy WebLinkAboutHOUSKA AUTOMOTIVE EXPANSION - BDR - BDR150010 - CORRESPONDENCE - STAFF'S PROJECT COMMENTS (2)Community Development and
C�tV Qf Neighborhood Services
For't Col�ins 28� NorthCollegeAvenue
PO Box 580
Fort Collins, CO 80522
�" 4 �� 5 r � -�-) A 970.227.6750
1�—1 r� ,..._ �� ��' � °�_�/:.� Yf't S'�,�/'�;' � Q�C� 970.224.6134 - fax
�'� 6�_ � ����5 �f���v.com/develo'mentreview
� �,
April 13, 2016 �����- ���,�. Y'P� � c�s'� C-'(,�t�_� s����i'
.
iM �., r - z ,� �,� �-i ,. � ,
_ ',�^_ . '' /, _
Linda Ripley
Ripley Design, Inc.
419 Canyon Ave
Fort Collins, CO 80521
RE: Houska Automotive Expansion, BDR150010, Round Number 3
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Clark iVlapes, at
970-221-6225 or cmapes@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mraqasa(a�fcqov.com
Topic: General
Comment Number: 12 Comment Originated: 12/16/2015
04/13/2016: Please refer to the redlines on the Plat and Utility Plans. There is a
disconnect between the Utility Plans, submitted easement vacations/dedications by
separate documents and existing offsite easements. Work needs to be done to
verify all easements shown on the plat and utility plans are current.
02/24/2016: Please clearly delineate the emergency access easement and access
easement done by separate document and the emergency access easement and
utility easement done by plat. See redlines.
12/16/2015: Please clearly define what portions of the 20' Emergency Access
Easement are being dedicated by the plat and by separate document on the Utility
Plans.
Page 1 of 9
Comment Number: 13
Comment Originated: 12/16/2015
04/13/2016: It is stiil unclear what is being completed with Phase 1. Please also
include detention ponds and public infrastructure (sidewalks, driveway, parkway,
etc)
02/24/2016: Add note to Grading Plan-Phase 1 sheet about utility phasing being
constructed with Phase 1 to the Phase 2 sheet. Also, see redlines for notes to
adjust on the Phase 2 Grading Plan Sheet.
12/16/2015: The planning objectives state that all utility, stormwater systems and
driveway accesses will be completed with Phase 1. Please list all utilities and
infrastructure that will be completed in Phase 1 in the Utility Plan. A note or table can
be added to the Interim Grading Plan. Show that there will be two phases on this
sheet.
Comment Number: 19 Comment Originated: 12/16/2015
04/13/2016: Use Detail D-13 or D12B instead of D-10 for flows away from Curb and
Gutter.
02/24/2016: Where is detail D-10C being used? Is it proposed on site?
12/16/2015: Change Detail 709 to D-106 instead. The City no longer uses this
deatail for a sidewalk chase.
Comment Number: 29
02/24/2016: Provide dimensions for all easements.
Comment Originated: 02/24/2016
Comment Number: 31 Comment Originated: 02/24/2016
02/24/2016: Label curb and gutter Detail S2 as on Site Only (Sheet C11)
Comment Number: 33
Comment Originated: 02/25/2016
04/13/2016: Still have not received a formal variance request for the driveway
spacing.
02/25/2016: Please submit a variance request for the driveway spacing.
Comment Number: 34 Comment Originated: 04/13/2016
04/13/2016: Provide a Key/Legend on each sheet of the Utility Plan.
Comment Number: 35 Comment Originated: 04/13/2016
04/13/2016: The storm pipes on the north end of the property on Riverside Drive do
not meet the 3' minimum cover. Consider lowering the storm manhole closest to the
storm vault.
Comment Number: 36
Comment Originated: 04/13/2016
04/13/2016: Plans show tying into the existing storm line that crosses Riverside
Drive. How will this connection be made with RCP pipe? Will more pipe need to be
removed than what is shown? The existing pipe doesn't meet the minimum cover
and if more pipe is being removed within the roadway, something will need to be
done to account for the inadequate cover.
Comment Number: 37
Comment Originated: 04/13/2016
04/13/2016: Plans show a waterline lowering to account for the new storm line at
the driveway. More details will be needed for the water line lowering.
Comment Number: 38 Comment Originated: 04/13/2016
04/13/2016: For all offsite easements, show Rec #'s associated with each vacation
and dedication. The two new easements will need to have reception number
references on the plat.
Page 2 of 9
Topic: Plat
Comment Number: 27
Comment Originated: 12/17/2015
04/13/2016: See Comment 12.
02/24/2016: The easement configurations on the Utility Plans do not match what is
shown on the Plat. The emergency access easement may interfere with the
landscape island. Please see redlines.
12/17/2015: It appears that the existing Emergency Access Easement on Lot 1 is in
the incorrect location. It is being depicted as being next to the property line, however,
there is a landscape area between the lot line and easement. This easement can't
be vacated by the plat until new emergency access is constructed. This will need to
be done by separate document.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan(o�fcqov.com
Topic: Landscape Plans
Comment Number: 1
Comment Originated: 12/28/2015
12/28/2015:
In place of the Lindens used in parking lot areas Honeylocust could be better
adapted to these locations that are dryer and exposed.
Comment Number: 2
Comment Originated: 12/28/2015
12/28/2015:
Provide 20 upsized mitigation trees. The Hackberry are upsized but other trees will
also need to be upsized.
Shade Trees 3.0 inch caliper
Ornamental Trees 2.5 inch caliper
For the bigtooth maple consider specifying them as 6-8 foot clump or equivalent.
Comment Number: 3 Comment Originated: 12/28/2015
12/28/2015:
The first Hackberry from the curb cut is too close to the Sewer line (10 feet
separation needed) and may cause some site distance conflict. It appears this tree
will not work at this location and should be eliminated.
Comment Number: 4
Comment Originated: 12/28/2015
12/28/2015:
Show locations of any street lights and if needed provide the tree separations that
meet the LUC standard LUC 3.2.1 K.
40 feet for Shade trees
15 feet for ornamental trees
Comment Number: 5
Comment Originated: 12/28/2015
12/28/2015:
List the percentage of trees used and adjust quantities to meet the minimum
species diversity standard in LUC 3.2.1 D 3. Hackberry is 50% of the trees but will
need to be reduced to 33%. Consider changing 3 or 4 of the Hackberry along
Riverside to Bur Oak.
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland(a�fcqov.com
Topic: Building Insp Plan Review
Page 3 of 9
Comment Number: 1
Comment Originated: 12/15/2015
12/15/2015: Please schedule a pre-submittal meeting for this project. Pre-Submittal
meetings assist the designer/builder by assuring, early on in the design, that the
new commercial or multi-family projects are on track to complying with all of the
adopted City codes and Standards listed below. The proposed project should be in
the early to mid-design stage for this meeting to be effective. Applicants of new
commercial or multi-family projects should email scarter@fcgov.com to schedule a
pre-submittal meeting. Applicants should be prepared to present site plans, floor
plans, and elevations and be able to discuss code issues of occupancy, square
footage and type of construction being proposed.
Contact: Sarah Carter, 970-416-2748, sca�ter(c�fcqov.com
Topic: Building Insp Plan Review
Comment Number: 2
Comment Originated: 02/12/2016
02/12/2016: Construction shall comply with the following adopted codes as
amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com/building web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
2. Multi-family and Condominiums 3 stories max: 2012 IECC residential chapter.
3. Commercial and Multi-family 4 stories and taller: 2012 IECC commercial chapter.
Department: Light And Power
Contact: Coy Althoff, , CAlthoff(a�fcqov.com
Topic: General
Comment Number: 1
Comment Originated: 12/14/2015
12/14/2015: Light & Power has primary cable with 3-phase capability running along
both the West and South sides of the property lines.
NOTE: Spare 4" conduit was verified on the S.E. corner of this property in March
2016. Primary power could be most easily fed in from that location.
Comment Number: 2
Comment Originated: 12/14/2015
12/14/2015: Development charges, electric Capacity Fee, Building Site charges
and any system modification charges necessary will apply to this development.
Please reference our policies, development charge processes, and use our fee
estimator at http://www.fcgov.com/utilities/business/builders-and-developers
Page 4 of 9
Comment Number: 3 Comment Originated: 12/14/2015
12/14/2015: For commercial services: Please provide a one line diagram and a
C-1 form to Light and Power Engineering. The C-1 form can be found at:
http://zeus.fcgov.comlutils-procedures/files/EngWiki/WikiPdfs/C/C-1 Form.pdf
Comment Number: 4 Comment Originated: 12/14/2015
12/14/2015: Contact Light and Power Engineering to coordinate the transformer
and electric meter locations, please show the locations on the utility plans. Pad
mount transformers must be no more than 10' from a paved surface, have 8'
clearance from the front and 3' clearance around the back and sides.
Comment Number: 5 Comment Originated: 12/14/2015
12/14/2015: Streetlights will be placed along public streets. A 40 feet separation on
both sides of the light is required between canopy trees and streetlights. A 15 feet
separation on both sides of the light is required between ornamental trees and
streetlights.
Comment Number: 6 Comment Originated: 12/14/2015
12/14/2015: Please contact Light 8� Power Engineering if you have any questions at
221-6700. Please reference our policies, development charge processes, and use
our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers.
Comment Number: 7 Comment Originated: 02/23/2016
02/23/2016: No changes or additions on behalf of Light & Power since the last
review.
Comment Number: 8 Comment Originated: 04/11/2016
04/11/2016: Comment number 1 was modified to include information regarding
spare 4" conduit verification.
Department: Stormwater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell(a�fcqov.com
Topic: Construction Drawings
Comment Number: 57 Comment Originated: 04/05/2016
04/05/2016: You call out Drain Basins for the 12" HDPE pipe along the east side of
the site. Please provide a detail of what type of drain basins you're proposing.
Comment Number: 58 Comment Originated: 04/05/2016
04/05/2016: Please show the lowered waterline in the storm profile.
Comment Number: 60 Comment Originated: 04/05/2016
04/05/2016: The area inlet at the east end of the site is not drawn in to scale.
Please draw it to scale so you can verify that the incoming and outgoing pipe
geometry is going to work.
Comment Number: 67 Comment Originated: 04/05/2016
04/05/2016: The plans will need to include another page or exhibit that shows the
regional improvements only so that its clear what is included in the Developer Repay
scope of work and what is not.
Comment Number: 68 Comment Originated: 04/05/2016
04/05/2016: See redlines for other minor comments.
Topic: Drainage Report
Page 5 of 9
Comment Number: 48
Comment Originated: 02/23/2016
04/05/2016: Thank you for providing runoff calculations using City of Fort Collins
rainfall data. It looks like you accidentally assumed the 10-yr intensity in the 2-yr
intensity column.
02/23/2016: Urban Drainage spreadsheets can�t be used for calculating runoff
because we utilize different rainfall data. Please put together your own spreadsheets
for calculating runoff.
Comment Number: 52
Comment Originated: 02/23/2016
04/05/2016: Appendix II — please also include a weir calculation for the 100-yr flow
out of the outlet structure to ensure that the outlet structure is sized properly.
02/23/2016: Please provide a design for the outlet structure for the pond. The
analysis of this needs to be included in the report. The outlet structure needs to be
sized and drawn to scale in the drawings and a detail of the outlet structure also
needs to be included in the plans.
Comment Number: 61
Comment Originated: 04/05/2016
04/05/2016: Drainage Plan: Please also indicate the required volume for each of the
bio-retention areas (the volume you calculated in the report)
Comment Number: 62
Comment Originated: 04/05/2016
04/05/2016: Drainage Plan: Please verify that the volume provided in your grading
design of the bio-retention pond 1 is actually 1600 sf.
Comment Number: 63
Comment Originated: 04/05/2016
04/05/2016: Drainage Report Appendix II — please just add a line in this table that
states the "Resulting LID Requirement" = 0.62 for easier reference later.
Topic: General
Comment Number: 59
Comment Originated: 04/05/2016
04/05/2016: The outlet structure is sticking out in pretty far into the water quality
pond. Can you tuck it into the bank to make it less visible? It looks like you might be
able to tuck some of the FES's into the bank a little more too.
Topic: Landscape Plans
Comment Number: 66
Comment Originated: 04/05/2016
04/05/2016: I did not receive Landscape Plans this submittal. The landscape plans
will need to reflect our discussions about plantings within the water quality basin.
Topic: Plat
Comment Number: 12
Comment Originated: 12/14/2015
04/05/2016: I did not receive a Plat this submittal. A plat will need to be reviewed for
accurate drainage easements for the water quality basin and for the bio-retention
areas.
02/23/2016: The rain garden will need to be in a drainage easement.
The proposed curb stops need to be in a utility easement that is dedicated on the
plat.
12/14/2015: Plat
- Drainage easements will be needed for the extended detention pond and also for
any other volume-based LID feature on the site.
- The proposed water meters need to be in a utility easement that is dedicated on
the plat.
Topic: Site Plan
Page 6 of 9
Comment Number: 65
Comment Originated: 04/05/2016
04/05/2016: Please label the "Water Quality/Detention/Regional Detention" basin
simply as "Regional Water Quality Basin".
Contact: Mark Taylor, 970-416-2494, mtaylor(a�fcgov.com
Topic: Floodplain
Comment Number: 30
Comment Originated: 02/23/2016
04/08/2016: Please include distances between the building corners and the
floodplain boundary on the Drainage Plan C8. Also, please include the floodplain
cross sections, along with their stationing and BFE elevations (NAVD88) on
Drainage Plain C8.
02/23/2016: On the Site Plan, Grading Plans (Phase 1 and Phase 2), and anywhere
else applicable; please label the distance between the buiding corners and the
floodplain boundary. We will require that these building corners be staked in the field
prior to construction to insure that the building is not located in the 100-year
floodplain.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcountv(o�fcqov.com
Topic: Construction Drawings
Comment Number: 5
Comment Originated: 12/16/2015
02/23/2016: Please remove the "Legal Description", and add "Located in the
Northeast...State of Colorado" back on the sheet.
12/16/2015: Please remove the "Legal Description" & other crossed out text as
marked. See redlines.
Comment Number: 6 Comment Originated: 12/16/2015
02/23/2016: This is not correct. Please make changes as marked. See redlines.
12/16/2015: Please provide the following information in the EXACT format shown
below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM.
SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE
FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88
- X.XX�.
Comment Number: 7
Comment Originated: 12/16/2015
02/23/2016: There are line over text issues. See redlines.
12/16/2015: There are line over text issues. See redlines.
Comment Number: 29
Comment Originated: 02/23/2016
02/23/2016: Some of the titles in the sheet index do not match the titles on the
noted sheets. See redlines.
Page 7 of 9
Comment Number: 30 Comment Originated: 02/23/2016
02/23/2016: All benchmark statements must match on all sheets.
Comment Number: 31 Comment Originated: 02/23/2016
02/23/2016: There is text that needs to be masked. Mask all text in hatched areas.
See redlines.
Topic: Plat
Comment Number: 14 Comment Originated: 12/16/2015
02/23/2016: These were not received.
12/16/2015: Please provide current acceptable monument records for the aliquot
corners shown. These should be emailed directly to Jeff at jcounty@fcgov.com
Comment Number: 17 Comment Originated: 02/23/2016
02/23/2016: Are there any Lienholders for this property? If so, please add a
signature block. If not, please add a note stating there are none, and include
response in written comments.
Comment Number: 18 Comment Originated: 02/23/2016
02/23/2016: There are spelling issues with some text. See redlines.
Comment Number: 19 Comment Originated: 02/23/2016
02/23/2016: Please use larger text on the major street names and the word "Site" in
the vicinity map. See redlines.
Comment Number: 20 Comment Originated: 02/23/2016
02/23/2016: All reception numbers for documents recorded by separate document
must be added prior to mylars.
Comment Number: 21 Comment Originated: 02/23/2016
02/23/2016: What are the extents of the Public Access portion of the 20'
Emergency Access And Public Access Easement? See redlines.
Comment Number: 22 Comment Originated: 02/23/2016
02/23/2016: Please add bearings, distances, and/or curve data as marked. See
redlines.
Comment Number: 23 Comment Originated: 02/23/2016
02/23/2016: Please make the floodway boundary line darker.
Comment Number: 24 Comment Originated: 02/23/2016
02/23/2016: Please add dedication information for all street rights of way. See
redlines.
Comment Number: 25 Comment Originated: 02/23/2016
02/23/2016: Lot 1 can not be 2.490 Acres with right of way being dedicated.
0
Comment Number: 26 Comment Originated: 02/23/2016 �
02/23/2016: Please label the sq. ft./acreage of the right of way being dedicated.
Comment Number: 27 Comment Originated: 02/23/2016
02/23/2016: Please show right of way lines as a solid line. See redlines.
Comment Number: 28 Comment Originated: 02/23/2016
02123/2016: Please label all surrounding properties with "Unplatted" or the
subdivision name. This includes properties across right of ways. See redlines.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson(a�fcqov.com
Page 8 of 9
Topic: General
Comment Number: 2
Comment Originated: 12/17/2015
04/13/2016: Hold over comment that you'll need a work area traffic control plan for
this work from our department.
02/26/2016: Thanks for forwarding the sheets. The striping plan looks pretty good.
The existing striping on the east end is different than what is shown on the plans
(the left turn bay is longer), so the tie in will occur at about the Albertson's driveway
entrance. You'll need to work carefully with our department on work area traffic
control plans for the installation.
02/24/2016: Can I get a plan sheet detailing the proposed Riverside striping? My
submittal only had the first 3 sheets. We need to fully understand the typical
section, lane widths, and minimum lane locations (pinch points) before signing off
on the re-striping.
12/17/2015: The re-striping along Riverside is shown as 10 ft lanes and a 10.5 min
outside lane (next to curb). We indicated in our joint meeting that we need to have
at least 10 ft of asphalt in the outside lane, not including the pan. It is unclear
whether this is what is shown.
Comment Number: 4
Comment Originated: 04/13/2016
04/13/2016: Minor striping redlines to be provided (the double yellow striping starts
when the turn lane 'gap' begins in the middle of the road.)
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson(a�fcctov.com
Topic: General
Comment Number: 1
Comment Originated: 12/14/2015
12/14/2015: A landscape plan shall contain accurate and identifiable hydrozones,
including a water budget chart that shows the total annual water use, which shall not
exceed fifteen (15) gallons per square foot over the site. If you have questions
contact Eric Olson at eolson@fcgov.com or 970-221-6704.
Comment Number: 2
Comment Originated: 12/14/2015
12/14/2015: Irrigation plans are required no later than at the time of building permit.
The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of
the Land Use Code. Direct questions concerning irrigation requirements to Eric
Olson, at 221-6704 or eolson@fcgov.com
Department: Water-Wastewater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell(a)fcqov.com
Topic: General
Comment Number: 13
Comment Originated: 04/05/2016
04/05/2016: Please include the design for the waterline lowering below the new 24"
storm outlet pipe.
Comment Number: 14
04/05/2016: See redlines for other minor comments.
Comment Originated: 04/05/2016
Page 9 of 9