October 20, 2014
Steve Steinbicker RESPONSE COMMENTS; ARCHITECTURE WEST LLC - NOVEMBER 12, 2014
Architecture West LLC
4710 S. College Ave
Fort Collins, CO 80525
RE: Ziegler-Harvest Park, FDP140022, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Lindsay Ex, at 970-224-6143 or
lex@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Lindsay Ex, 970-224-6143, lex(c�fcgov.com
Topic: Building Elevations
,�mment Number: 1 Comment Originated: 10/03/2014
10/03/2014: For the elevations, the entries to the buildings are still not aligning with the site
plan. Can this be updated? REVISED AND RE-SUBMITTED.
Comment Number: 2 Comment Originated: 10/03/2014
10/03/2014: Can you provide photos of the materials you are proposing or a materials board
�"�� so we can get a better understanding of what you are suggesting?
FINAL SELECTIONS PENDING - MATERIALS AND COLORS LISTED ON THE ELEVATiONS.
Topic: General
Comment Number: 3 Comment Originated: 10/03/2014
10/03/2014: I have a lot of comments on the overall sidewalk network - see the redlines. The
sidewalk network needs to be prioritized a bit more in the design, e.g., from Buildings B and C
"� out to Ziegler and then from Building B north to County Fair Lane, etc.
„
ADDED STEPPING STONE CONNECTION ON THE WEST SIDE, ALL OTHER WALKS REMAINED
AS-IS, NO ADDITIONAL WALKS, REVISED AND RE-SUBMITTED.
Comment Number: 4 Comment Originated: 10/03/2014
"10/03/2014: The �nd landscape plans could be simplified b�rnoving the grading lines
and the utilities - this will help with overall legibility of the plans. REvisE� Atv� RE-suBnn�nE�.
Comment Number: 5 Comment Originated: 10/03/2014
` 10/03/2014: On the landscape details sheet, I've made some notes about language that can
be removed, see redlines. REVISED AND RE-SUBMITTED.
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirataa(�.fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 10/15/2014
10/15/2014: The street connection of County Fair Lane and the driveway approach removal
both along Ziegler Road needs to both reflect an asphalt patch that encompasses the entire
bikelane witlth. REv�sE�.
Comment Number: 4 Comment Originated: 10/15/2014
10/15/2014: For the concrete paving of County Fair Lane, on Sheet 14, the joint pattern should
be shown continued out to Ziegler Road, with a note indicating that joint pattern shown is
illustrative and final design to be coordinated with City Engineering Inspection in conjunction
with a pavement design. It should also be indicated that the concrete panels may need to be
dowelled into the curb and gutter depending on the pavement section in the pavement design. REv�SE�.
Comment Number: 5 Comment Originated: 10/15/2014
10/15/2014: The removal of the CDOT M standard M-412-1 is fine (rather than putting an "x"
through it) since this is a local street. REv�sE�.
Comment Number: 6 Comment Originated: 10/15/2014
10/15/2014: There appears to be a storm line crossing of County Fair Lane that's less than the
3' standard. The design should be attempting to maximize the cover (options such as elliptical
pipe?) PIPE IN THE ROW HAS BEEN CHANGED TO 19"x30" ELLIPTICAL PIPE TO PROVIDE A
MINIMUM OF 2.38' OF COVER.
Comment Number: 7 Comment Originated: 10/15/2014
10/1512014: The drive approach shown being constructed on the north side of County Fair Lane
should show the curb return with the curb head removed where the future sidewalk would
extend. REVISED.
Comment Number: 8 Comment Originatetl: 10/15/2014
10/15/2014: Please provide existing and proposed contours on the plan and profile sheet, as
evidence of the roadway and site development being able to be constructed within right-of-way
and/or within the development boundary. rtEv�SE�.
Comment Number: 9 Comment Originated: 10/15/2014
10/15/2014: Please provide spot elevations for the County Fair Lane/Ziegler Road intersection
in accordance with LCUASS Detail 7-28. Ensure that the transition point to remove the crown of
County Fair Lane is depicted as well. REvisE�.
Comment Number: 10 Comment Originated: 10/15/2014
10/15/2014: Does their need to be a restriping of the lane configuration on Saber Cat Drive
across the street with the extension of County Fair Lane? It seems that offsetting lefts and the
lack of a striped westbound through movement might be of concern. REv�SE�.
Topic: General
Comment Nu�er: 2 �Comment Originated: 10/15/2014
10/15/2014: Is the crosswalk striping across Ziegler Road supported by Traffic Operations? I
don't recall that City transportation staff would support this crossing at this uncontrolled location.
CROSSWALK STRIPING HAS BEEN REMOVED PER TRAFFIC OPERATIONS REQUEST.
Topic: Landscape Plans
Comment Number: 12 Comment Originated: 10/15/2014
10/15/2014: The street trees along County Fair Lane appear to be up against the curb and
gutter, is this intended? REVISED AND RE-SUBMITTED.
Topic: Plat
Comment Number: 3 Comment Originated: 10/15/2014
10/15/2014: On the plat, please remove "Triangle" from the "Sight Distance Triangle Easement"
notation. REVISED AND RE-SUBMITTED.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Topic: Construction Drawings
Comment Number: 1
Comment Originated: 10/03/2014
10/03/2014: Please add a note to the grading and utility plans that states the following: Please
see Section 3.4.1 of the Land Use Code for allowable uses within the buffer zone. The buffer
zone needs to be labeled on these plans as well. REVISED AND RE-SUBMITTED.
Topic: General
Comment Number: 2
Comment Originated: 10/03/2014
10/03/2014: A note should be added to the site, landscape, utility, grading, and storm sewer
plan that the natural habitat area is meant to be maintained in a native landscape. This will help
preserve the intention behind the buffer zones and the natural features into the future.
REVISED AND RE-SUBMITTED.
Comment Number: 3
Comment Originated: 10/03/2014
10/03/2014: I will have Development Agreement language for this project, including a weed
management plan, a bond prior to CO for 67% of the planting costs in the buffer zone to ensure
this area's success, and a plan for how we'll evaluate success of the buffer zone three years
post-construction (the typical time it takes for these areas to establish). connnnENT NorE�.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan a(�fcgov.com
Topic: Landscape Plans
Comment Number: 1
Comment Originated: 10/14/2014
10/14/2014:
This item may have been part of a previous discussion but am asking for confirmation. Thank
You.
An apparent storm drain line is shown passing right by the large cottonwood at the southeast
portion of the site. Is this line proposed or existing? If proposed the line would need to be
repositioned to protect this significant tree. THE TREE AND STORM PIPE ARE EXISTING.
Department: Internal Servic�
Contact: Lindsay Ex, 970-224-6143, lex(�a.fcqov.com
Topic: General
Comment Number: 1
�
Comment Originated: 09/29I2014
09/29/2014: Per Kerri Allison (970.416.2669) with Real Estate Services: Tract A is not actually
owned by the City; we only have an easement on it. We are maintaining it, but I need the small
block at the bottom of the page 1 of the plat to say the city will be deeded the property by a
separate document. COMMENT NOTED, THIS IS IN PROCESS.
Comment Number: 3 Comment Originated: 10/15/2014
10/15/2014: From Todd Reidenbach (GIS)
1. Addresses will be assigned by the GIS Department after the plans have met final approval
through Development Review and are recorded with the City. ConnnnENT NOTE�.
2. Projects with three or more tenant units require the Unit Level Addressing form to be
completed and submitted to the GIS Department once plans have met final approval through
Development Review and are recorded with the City. This can occur anytime during
construction, but before any utilities or address signs are installed. All addressing will be
determined by the GIS Department and submitted to Poudre Fire Authority, USPS, Building
Services, and Fort Collins Utilities. Failure to contact GIS and determining addresses through
other means may result in address changes. COMMENT NOTED.
The Unit Level Addressing form can be obtained by contacting the GIS office at
gis@fcgov.com or (970) 416-2483. NOTE�.
Todd Reidenbach, GISP
GIS Mapping Specialist
treidenbach@fcgov.com
970.416.2483 Work
Contact: Russell Hovland, 970-416-2341, rhovland a(�.fcqov.com
Topic: Building Insp Plan Review
Comment Number: 2
10/14/2014:
Comment Originated: 10/14/2014
Building Permit Pre-Submittal Meeting COMMENTS NOTED.
Pre-Submittal meetings are offered to assist the designer/builder by assuring, early on in the
tlesign, that the new commercial or multi-family projects are on track to complying with all of the
adopted City codes and Standards listed below. The proposed project should be in the early
to mid-design stage for this meeting to be effective and is typically scheduled after the Current
Planning conceptual review meeting. Applicants of new commercial or multi-family projects are
advised to call 416-2341 to schedule a pre-submittal meeting. Applicants should be prepared
to present site plans, floor plans, and elevations and be able to discuss code issues of
occupancy, square footage and type of construction being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 Internati� Plumbing Code (IPC) as amended by the�te of Coloratlo
2014 National Electrical Code (NEC) as amended by the State of Colorado
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
2. Multi-family and Condominiums 3 stories max: 2012 IECC residential chapter.
3. Commercial and Multi-family 4 stories and taller: 2012 IECC commercial chapter.
Fort Collins Green Code Amendments effective starting 1-1-2012. A copy of these
requirements can be obtained at the Building Office or contact the above phone number.
Ziegler Harvest park — project specific concerns: connnnENTs NOTE�.
1. Fire-sprinkler systems are required. A new code amendment effective in 2014 will require a
full NFPA-13 sprinkler system and not allow a 13-R system.
2. Bedroom egress windows required below 4th floor regardless of fire-sprinkler.
3. All windows above the 1 st floor require minimum sill height of 24"
4. Building code and State statute CRS 9-5 requires project provide accessible units.
5. New Green Code requires:
a. Upgraded insulation is required for buildings using electric heat or cooling,
b. Exterior walls and roof must meet a STC (sound resistance) rating of 40 min. if building
located within 1000ft to train tracks.
c. Low-flow Watersense plumbing fixtures (toilet, faucets, shower heads) are required.
d. Special combustion safety requirements for natural draft gas appliances.
e. Low VOC interior finishes.
City of Fort Collins
Building Services
Plan Review
416-2341
Department: Outside Agencies
Contact: Lindsay Ex, 970-224-6143, lex fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/22/2014
09/22/2014: From Bob Rulli at Comcast (970.490.7503 or robert.rulli@centurylink.com)
1. Noted on sheet 7 is relocation of existing telco pedestals. This is billable to developer.
appears to be minor and I believe it is the end of the line so not a huge expense to relocate.
COMMENT NOTED.
2. This access ped is also the developer start point for service to these proposed townhomes.
Per PUC tariff, developer responsible to provide conduit backbone and laterals to each
building from this si�oint. Route TBD This needs to be �tlinated with myself for cable
placement in developer conduit to provide service here. Typical Centurylink conduit
specification apply. Space on units for demarcation necessary . Nothing out of the usual
noted. COMMENTS NOTED.
3. Lastly, PLAT could use contact update. My name ok, but current phone is 490.7503 at
address 3702 Automation Way Suite 106 (Eastbrook office was relocated here about 7 years
ago) CONTACT INFO ON THE UTILITY PLAN COVER SHEET HAS BEEN UPDATED.
Comment Number: 2 Comment Originated: 10/03/2014
10/03/2014: From Terry Farrill (970.226.3104, ext. 104) with the Fort Collins Loveland Water
District:
1. There are reimbursements requiretl for the existing water and sanitary facilities. The District
will require payment of the reiimbursements prior to connection to existing facilities. connnnENT NOTE�.
2. The South Fort Collins Sanitation District will require the property to petition into the District
prior to approval. The petition process takes approximately 2 months.
COMMENT NOTED, IN - PROGRESS.
Additional comments will be provided when the construction drawings are submitted for review.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler(a�poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 10/14/2014
10/14/2014: 2012 IFC CODE ADOPTION
The Poudre Fire Authority and the City of Fort have adopted the 2012 International Fire Code.
Building plan reviews shall be subject to the adopted version of the fire code in place at the
time of plan review submittal and permit application. connnnENT NOTE�.
Comment Number: 2 Comment Originated: 10/14/2014
10/14/2014: FIRE ACCESS COMMENTS NOTED.
> A portion of the fire lane is labeled as being surfaced with "proposed light duty PCC
pavement." Please note: all portions of the fire lane shall be required to support 40 tons.
> Turning radii of the hammerhead have not been included in the dedicated EAE. Turning radii
shall be a minimum of 25 feet inside and 50 feet outside.
Comment Number: 3 Comment Originated: 10/14/2014
10/14/2014: PREMISE IDENTIFICATION COMMENT NOTED AND RE-SUBMITfED.
A plan for addressing these units shall be submitted for review and approval. A monument sign
will be required.
> 2012 IFC 505.1: New and existing buildings shall have approvetl address numbers, building
numbers or approved building identification placed in a position that is plainly legible, visible
from the street or road fronting the property, and posted with a minimum of six-inch numerals on
a contrasting background. Where access is by means of a private road and the building cannot
be viewed from the public way, a monument, pole or other sign or means shall be used to
identify the structure.
Comment Number: 4 Comment Originated: 10/14/2014
10/14/2014: �LIC-SAFETY RADIO AMPLIFICATION S�EM COMMENT NOTED.
New buildings require a fire department, emergency communication system evaluation after the
core/shell but prior to final build out. For the purposes of this section, fire walls shall not be
used to define separate buildings. Where adequate radio coverage cannot be established
within a building, public-safety radio amplification systems shall be designed and installed in
accordance with criteria established by the Poudre Fire Authority. Poudre Fire Authority Bureau
Admin Policy #07-01
Follow-up to staff meeting: The fire marshal has been out of the office and I haven't been able
to meet with him to discuss is each building will require a radio communication evaluation
however, this shall not hold up the development review process and may be deferred to the
plan review stage. COMMENT NOTED, AWAITING FURTHER DISCUSSION.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, Ischlam an.fcqov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 10/15/2014
10/15/2014: See redlines from 10/7/2014 for corrections in the Erosion Control Plan. Erosion
Control Report was missing an actual percent of "Original Vegetation". Also, IP is ineffective as
a BMP for a Sediment Basin please place an adequate BMP detail to be used at the outlet
structure box that will reduce sediment from leaving the site and accommodate that volume of
water. If you need clarification concerning this section, or if there are any questions please
contact Jesse Schlam 970-218-2932 or email @ jschlam@fc o�m REVISED.
Contact: Mark Taylor, 970-416-2494, mtaylor fcgov.com
Topic: Floodplain
Comment Number: 8
Comment Originated: 10/17/2014
10/17/2014: On the Site Plan, please label the 100-year floodplain as "100-year Floodway and
Floodplain Boundary" and please draw arrows to both the north and south sides of the
flo0dplain. REVISED AND RE-SUBMITTED.
Comment Number: 9 Comment Originated: 10/17/2014
10/17/2014: On the Drainage Plan (Sheet 15 of 24), please add a 5th note: Temporary or
Permanent Storage of Equipment and Materials is not allowed within the 100-year floodway. REv�sE�.
Comment Number: 10 Comment Originated: 10/17/2014
10/17/2014: On the Drainage Plan (Sheet 15 of 24), as of the first of the year, the City is using
the NAVD1988 elevation tlatum, rather than NGVD1929. Due to this, please change the
elevation datum on all cross sections to match NAVD88 elevations. The conversion between
the two at this location is NGVD29 + 3.19 feet = NAVD88 REVISED.
Comment Number: 11 Comment Originated: 10/17/2014
10/17/2014: On the Drainage Plan (Sheet 15 of 24), also because of the change in elevation
datums and the fact that the conversion between datums is not a whole number, the BFE lines
shown are no longer accurate. Please remove them. REv�sEo.
Comment Number: 12 Comment Originated: 10/17/2014
10/17/2014: In the Drainage Report, in the last paragraph of page 1, when discussing the
McClelland's floodplain and the mapping, reference the McClelland's Master Drainage Plan
Update by Icon En�ring, dated November 30, 2003. REv�s�
Comment Number: 13 Comment Originated: 10/17/2014
10/17/2014: In the Drainage Report, although this is not a FEMA floodplain, we still require that
a copy of the FEMA FIRM panet w/the site location highlighted be included in the report. REv�sE�.
Contact: Wes Lamarque, 970-416-2418, wlamarque(�fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 10/15/2014
10/15/2014: Please provide a riprap detail. Riprap needs to be buried with 6 inches of topsoil
and have temporary erosion control. RIPRAP DETAIL IS ON SHEET 17.
Comment Number: 3 Comment Originated: 10/15/2014
10/15/2014: Please revise underdrain detail to replace the fabric layer with a pea gravei layer.
REVISED.
Comment Number: 4 Comment Originated: 10/15/2014
10/15/2014: Please label all storm sewers as public or private on the profiles. REVISED.
Comment Number: 5 Comment Originated: 10/15/2014
10/15/2014: The WQ detail is missing the water quality hole diameter and number of columns.
Please revise. REvisEo.
Comment Number: 6 Comment Originated: 10/15/2014
10/15/2014: Please provide 10 feet of separation between trees and the storm sewers. The
tree next to the water quality pond outlet structure and the tree at the corner of Ziegler and
County Fair are too close. THE TREE AND STORM PIPE ARE EXISTING.
Comment Number: 7 Comment Originated: 10/15/2014
10/15/2014: Finalization of the land transfer located within the floodplain needs to occur.
COMMENT NOTED, IN - PROGRESS.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcountvC�fcqov.com
Topic: Building Elevations
Comment Number: 1
10/14/2014: No comments.
Comment Originated: 10/14/2014
Topic: Construction Drawings
Comment Number: 4 Comment Originated: 10/14/2014
10/1412014: Sheet 24 was missing from our review set. DE�ETE�.
Topic: Landscape Plans
Comment Number: 5 Comment Originated: 10/14/2014
10/14/2014: There are line over text issues. See redlines. REVISED AND RE-SUBMITTED.
Comment Number: 6 Comment Originated: 10/14/2014
10/14/2014: There are cut off text issues. See redlines. REVISED AND RE-SUBMrrr'ED.
Topic: Lighting Plan
Comment Number: 7 Comment Originated: 10/14/2014
10/14/2014: No plans were provided for review. RE-SUBnn�nE�.
0
Topic: Site Plan
� Comment NumZ%r: 10 •Comment Originated: 10/14/2014
10/14/2014: There are text over text issues. See redlines. REv�sE� AN� RE-SUBnnirT'E�.
Comment Number: 11 Comment Originated: 10/14/2014
10/14/2014: There is duplicated text. See redlines. REvisE� arv� RE-suBnn�nE�.
Comment Number: 12 Comment Originated: 10/14/2014
10/14/2014: There are line over text issues. See redlines. REVISED AND RE-SUBMITTED.
Comment Number: 13 Comment Originated: 10/14/2014
10/14/2014: There are spelling issues with some text. See redlines. REVISED AND RE-SUBMITTED.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson(a�fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 10/14/2014
10/14/2014: Replace General Note 32 with the following text: 2.PRIOR TO THE
COMMENCEMENT OF ANY CONSTRUCTION THAT WILL AFFECT TRAFFIC SIGNS OF ANY
TYPE THE CONTRACTOR SHALL NOTIFY THE CITY OF FORT COLLINS TRAFFIC
OPERATION'S DEPARTMENT OF THE NUMBER, TYPE, AND LOCATION OF THE SIGNS
BEING REMOVED. ALL COSTS ASSOCIATED WITH REMOVING AND REPLACING THE SIGNS
SHALL BE THE CONTRACTOR'S RESPONSIBILITY. REv�sE�.
Comment Number: 2 Comment Originated: 10/14/2014
10/14/2014: Please revise the Signing and Pavement Marking Construction Notes to state the
Local Entity Traffic Engineer at all instances that the NOTES currently state the Local Entity
Engineer. This is a permanent revision for Fort Collins Signing and Marking Notes. Please
revise your files to reflect the revision. This impacts tra�c notes 6, 11 and 14. (Note 14 needs
to be revised in two locations). REv�SE�.
Comment Number: 3 Comment Originated: 10/14/2014
10/14/2014: On the striping plan please remove the stop bar and both crosswalks. rtEv�sE�.
Comment Number: 4 Comment Originated: 10/14/2014
10/14/2014: On the striping plan you'll need to work with the School District to revise their
westbound striping on SaberCat as it approaches Ziegler to reflect the 4-legged intersection (it
currently only has right and left arrows). The solution is likely to remove the right only arrow and
signage). Steve Gilchrist in our office (224-6175) can help coordinate this. School district
contact is Pete Hall - Director of Facilities phall@psdschools.org or 970-490-3425. Or contact
his office administrator Leigh Anne Williamson at 490-3537. Ps� cotvTacTE�, REVISED.
Topic: Site Plan
Comment Number: 5
Comment Originated: 10/14/2014
10/14/2014: Transportation Planning would like to know where are the outdoor bike parking
spaces? ThOSe ShOUId be deplCt2d OCl th@ jJIaI1S. RACK LOCATION NOTED ON PLAN.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson(c�fcgov.com
Topic: General
Comment Numbe�1 �ment Originated: 10/02/2014
10/02/2014: Irrigation plans are required no later than at the time of building permit. The
irrigation plans must comply with the provisions o�,tlined in Section 3,2.1(J) of the Land Use
Code. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or
eolson@fcgov.com COMMENT NOTED.
Department: Zoning
Contact: Noah Beals,
Topic: General
970-416-2313, nbeals(a�fcqov.com
Comment Number: 1
Comment Originated: 10/13/2014
10/13/2014:
04/01/2013: The building elevations do not match the building footprints on the site plan. This
will need to be revised so that they do match. REVISED AND RE-SUBMITTED.
Comment Number: 2 Comment Originated: 10/13/2014
10/13/2014: The elevations, site plan and landscape plan shall include the locations of the
mechanical/utility (vents, flues, meters, boxes, conduit, HVAC...) equipment with notes on how
SUCh eqUlpmeflt IS SCI'8211@d/palftt@d. NOTED, REVISED AND RE-SUBMITTED.
Comment Number: 3 Comment Originated: 10/13/2014
10/13/2014: On the landscape plan on the southend, there appears to be landscaping
proposed on top of sidewalk and paved driveways. REVISED AND RE-SUBMITTED.
The southend needs something to prevent vehicles driving on top of the landscaped area,
either vertical curb and gutter or wheel stops. REVISED AND RE-SUBMITTED.
Comment Number: 4 Comment Originated: 10/13/2014
10/13/2014: Please change the signature block on the site plan and the plat from Director of
Planning to Director of Community Development and Neighborhood Services.
REVISED AND RE-SUBMITTED.
Comment Number: 5 Comment Originated: 10/13/2014
10/13/2014: Zoning echoes the comments made by planning concerning the sidewalk network.
ADDED STEPPING STONE CONNECTION ON THE WEST SIDE, ALL OTHER WALKS REMAINED
AS-IS, NO ADDITIONAL WALKS, REVISED AND RE-SUBMITTED.
Comment Number: 6 Comment Originated: 10/13/2014
10/13/2014: The submitted existing tree and landscape plan seems to be for Lot 1 and not Lot
2 of Ziegler Harvest Park. LOT 1 TREE MITIGATION (NOTED -°M°) PROVIDED ON LOT 2.