Loading...
HomeMy WebLinkAboutZIEGLER-HARVEST PARK - FDP - FDP140022 - CORRESPONDENCE - OTHER WATER AND OR SANITATION DISTRICTSFORT COLLINS�LOVELAND ��':1 1 1:(2 I)!ti I RIC' I v September 22, 2014 Ms. Lindsay Ex, Planner Current Planning City of Fort Collins P.O. Box 580 Fort Collins, CO 80525 RE: FDP 140022 Ziegler — Harvest Park FDP Third Submittal Dear Ms. Ex, SOUTH FORTCOLLINS SANI"1'A"IION DISTRIC'�I' �-�`�-p � 3 201�r �;� The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District have reviewed the above mentioned project and submit the following comment. There are reimbursements required for the existing water and sanitary facilities. The District will require payment of the reimbursements priar to connection to existing facilities. The South Fort Collins Sanitation District will require the property to petition into the District prior to approval. The petition process takes approximately 2 months. The District will provide comments when the construction drawings are submitted for review. Please do not hesitate to contact me at 226-3104, ext. 104, if you have any questions or require additional information. Respectfully, � �J Mr. Te W. Farrill, P.E. District Engineer xc: Mr. Michael D. DiTullio, District Manager Architecture West LLC � I�0 Snead Drive, Fort Collins, CO 80�2� Phone (970) 226-3104 Fax (970) 226-0186