Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Spencer Branson, at 970-224-6086 or sbranson@fcgov.com.
Comment Summarv:
Department: Planning Services
Contact: Spencer Branson, 970-224-6086, sbranson@fcgov.com
Topic: Building Elevations
Comment Number: 7 Comment Originated: 02/16/2016
02/16/2016: Consider adding brick lintels over windows on stucco walls.
Res�onse: The intent of the design is �o closely match the adjacent existing condo bui'-1'�g
exterior finishes and materials. Aa��n�� b� ic�; '�.irte:s ti�����i!�� create a�iscontin,_ious �lestn�tic a.s t;ie
existing bui!ding has stucco lintels.
Comment Number: 8 Comment Originated: 02/16/2016
02/16/2016: Please provide a link to the manufactured stone called out on the
elevations.
Res�onse: Ti��� manuf�c���reci st�ne ��,i[I ���at�h, as closely Gs possib!e, the �.djacent existi�ng
con�� stone.
Topic: General
Comment Number: 10 Comment Originated: 02/16/2016
02/16/2016: Plans need to be updated with current standard notes. I will email
them to you.
Response: Plans have been u,�dated v�ith neU�� sia.nda.rd notes.
Topic: Landscape Plans
Comment Number: 1
Comment Originated: 02/16/2016
02/1612016: Consider adding additional trees to the common space between
the buildings.
�i�S�?On��: �'�C�C�iI`.IOr�'i� 0�"fl�;fll��l�a� a"1C� S11'c1Gl,'-; �i�"� �� �iaV2 iJ�2�l "cldCac� Ifl COiI'llTlOi� S�aC?.
Comment Num� 2
�mment Originated: 02/16/2016
02/16/2016: Consider replacing the Thin Leaf Alder with a more appropriate
species for this site.
Response: Thi,� Leaf Alder has been removed from the plans.
Comment Number: 3
Comment Originated: 02/16/2016
02/16/2016: The proposed landscape plan does not meet the minimum
standard for full tree stocking. Additional perimeter tree stocking is needed
along Centre Avenue and Worthington Circle. Trees can be planted in a row or
more informal arrangement, whichever is more appropriate for the utilities.
Shade trees should be used whenever possible.
Respo�se: Additional trees have been added along Centre Avenue and Worthington Circle.
Topic: Lighting Plan
Comment Number: 9 Comment Originated: 02/16/2016
02/16/2016: All exterior lighting shall be full cut off down directional.
Response: Lighting plan5 ha��re k�aerR adjusted per above commen�.
Topic: Site Plan
Comment Number: 4
Comment Originated: 02/16/2016
02/16/2016: The front entrances of the one story building should face the street
and have connecting walkways to the street sidewalk.
Response: Connecting sidewalks have been added
Update: I will have an answer regarding how the buildings address the public
realm on Tuesday the 23rd.
Comment Number: 5 Comment Originated: 02/16/2016
02/16/2016: Please indicate what the gross land area is that was used in the
land-use statistics.
Response: Gross land area boundary has been added and labeled.
Comment Number: 6 Comment Originated: 02/16/2016
02/16/2016: This site is not in the TOD Overlay Zone. Please update the site
plan to reflect the standard attached residential parking calculations.
Respanse: Parking calculations have been adjusted to standard residential.
Department: Engineering Development Review
Contact: Katie Sexton, 970-221-6501, ksexton@fcqov.com
Topic: General
Comment Number: 1 Comment Originated:
02/16/2016: Please show public pedestrian ramps on plans.
Response: Provided call-outs for existing pedestrian ramps on plans
Comment Number: 2 Comment Originated:
02/16/2016: An offsite utility and construction easement will need to be
obtained from the property owner to the east. A letter of intent from the property
will need to be submitted before final plans can be approved.
Response: Utility and Construction easements to be provided by separate document.
Comment Number: 3 Comment Originated:
02/16/2016: There needs to be more discussion regarding the plat.
Response: Acknowledged
02/16/2016
02/16/2016
02/16/2016
Comment Nu�: 4 �omment Originated: 02/16/2016
02/16/2016: All applicable items on Appendix E-4 will needs to be checked off
before FDP is approved.
Res�onse: AcKnowleda�d
Comment Number: 5 Comment Originated: 02/16/2016
02/16/2016: What is the thick dashed line running easUwest just north of the
garage/existing building? Include this in the legend.
Response: Line removed f�om p!an�
Department: Environmental Planning
Contact: Kelly Kimple, 970-416-2401, kkimple@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 02/17/2016
02/17/2016: The mylars for Centre Ave Residences show a Natural Habitat
Buffer Zone (NHBZ) between the development and the canal, with a standard
buffer for irrigation ditches of 50'. The NHBZ needs to be delineated on the site,
grading, utility, and landscape plans. And an Environmental Planner signature
line needs to be added to all utility plans that show the buffer.
Respo��se: NNBZ V��as been added and labeled on all plans, si��ar�at�.�re L':�c� ��,d�ad a� �,���e�l.
Comment Number: 2 Comment Originated: 02/17/2016
02/17/2016: Please also add the following notes to any sheets that show the
NHBZ:
-Please see Section 3.4.1 of the Land Use Code for allowable uses within the
buffer zone.
-The NHBZ is meant to be maintained in a native landscape.
These notes will help preserve the intention of the NHBZ and the natural features
into the future.
Response: Note has been added to both Lan�scape Sh�ets.
Comment Number: 3 Comment Originated: 02/17/2016
02/17/2016: It appears that most of the landscaping within NHBZ had been
postponed until Phase II of this project. This landscaping should be installed as
part of the major amendment. Please update the landscaping plans in the NHBZ
to show existing vegetation and proposed plantings. Within the natural habitat
buffer zone, according to Article 3.4.1(E)(1)(g), the City has the ability to
determine if the existing landscaping within the buffer zone is incompatible with
the purposes of the buffer zone.
R��;�onse: La°��c�scape in fJ�BZ i� already instalied per a�proved Minor Ammendment Phase 1 Pians.
Comment Number: 4 Comment Originated: 02/17/2016
02/17/2016: Thank you for providing a photometric plan with this PDP
submittal. Current plans do not appear to show light spillage into the delineated
50' natural habitat buffer zone; however, the photometric plan does not
accurately label the NHBZ. Please update to show the NHBZ line as on the site,
landscape and utility plans. With respect to lighting, the City of Fort Collins Land
Use Code, in Article 3.2.4(D)(6) requires that "natural areas and natural
features shall be protected from light spillage from off-site sources." Thus,
lighting from the buildings or other site amenities shall not spill over to the buffer
areas. In regard to LED light fixtures, cooler color temperatures are harsher at
night and cause more disruption to circadian rhythms for both humans and
wildlife. Please c�er a warmer color temperature (3000K)1�our LED light
fixtures. Please also consider fixtures with dimming capabilities so that light
levels can be adjusted as needed.
Respanse: Habitat buffer has been labeled. Fixtures have been addressed for warmer temperature.
Comment Number: 5
Comment Originated: 02/17/2016
02/17/2016: A security will need to be collected for the installation and
establishment of the Natural Habitat Buffer Zone, as per the approved plans and
Development Agreement. Please note the developer typically provides an
estimate of the landscaping costs for the Natural Habitat Buffer Zone, including
materials, labor and irrigation. We then use the approved estimate to collect
security at 125% of the total amount.
Response: Security will be collecied at time of installation
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: General
Comment Number: 1
02/08/2016:
Comment Originated: 02/08/2016
Show the location of significant trees to be removed. These include the 7
Honeylocust in the plaza on the east side of the project. Label the trees by
species, size and mitigation. The species and size are on the original approved
plan. Diameter will need to be measured. Contact the City Forester if
assistance is needed in measuring the diameter of these trees.
Response: Plans have been updated with Honey Locust trees and size has been listed as below 6"
And no mitigation required.
Topic: Landscape Plans
Comment Number: 2
02/08/2016:
Comment Originated: 02/08/2016
There were 13 mitigation trees required on the original plan for tree removal
which includes the mitigation for the 7 honeylocust. The mitigation for these tree
removals has been met with current tree planting.
Response: Acknowledged
Comment Number: 3
02/08/2016:
Add this tree protection note:
Comment Originated: 02/08/2016
All existing trees with the exception of 7 honeylocust shown to be removed shall
be kept in place and protected.
Response: Note has been added
Comment Number: 4
02/08/2016:
Comment Originated: 02/08/2016
There are less trees being provided with the Major Amendment than on the
original approved plan. The following are generally where there is a difference.
Evaluate these zones and any others where fewer trees are provided and
determine where it is feasible to add additional trees.
South of 3 unit building
West side of 3 unit building
SE of 3 unit buii�j �
1 shade tree south of the project entrance off Worthington Circle — none shown
North of 3 unit building
SW side of the 6 unit building
Generally along the east border of the project
F'ses�onse: Trees have be�n �dc�e�l where appropria�e to bri:�g to�al count up and soften commo;� are��s
Comment Number: 5
02/08/2016:
Comment Originated; 02/08/2016
The widths of the existing parkways are substandard so tree planting behind the
walk is appropriate.
�esponse: Acknotivledged
Comment Number: 6
02/08/2016:
Comment Originated: 02/08/2016
List trees in the plant list by caliper and B&B. Minimum caliper or heights are as
follows:
Canopy shade trees: 2.0 inch caliper
Ornamental trees 1.5 inch caliper
Evergreen trees 8 feet height
Respor�se: All required info is listed in tf�� plant list on Sh��ct 2 of Landscape Plan
Comment Number: 7
02/08/2016:
Comment Originated: 02/08/2016
Thinleaf alder is not a shade tree but is listed in that category. The location
where it is proposed on the plan appears that it should be a shade tree. Review
for making this a shade tree at this location and select an appropriate species.
Response: Thir� leaf alder has bee�� removed from the landscape pians.
Comment Number: 8
02/08/2016:
Comment Originated: 02/08/2016
Prairie Fire Crabapple is listed to have some susceptibility to the disease fire
blight in the Front Range Tree Recommendation List. Consider using another
cultivar with better disease resistance such as Thunderchild Crabapple.
Response: Thun�erchild Crabapple has replaced Prai; ie Fir�
Comment Number: 9
02/08/2016:
Comment Originated: 02/08/2016
Use the new City of Fort Collins General Landscape notes and Tree Protection
Notes on the Plan. These notes are available from the City Planner assigned to
the project or from the City Forester.
Response: Updated I�n�s��;�c �otes have b�en added ta Landscape Plans
Department: Internal Services
Contact: Sarah Carter, 970-416-2748, scarter@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 02/16/2016
02/16/2016: Please schedule a pre-submittal meeting for this project.
Pre-Submittal meetings assist the designer/builder by assuring, early on in the
design, that the new commercial or multi-family projects are on track to
complying with all of the adopted City codes and Standards listed below. The
proposed project should be in the early to mid-design stage for this meeting to
be effective. App�ts of new commercial or multi-family proj� should email
scarter@fcgov.com to schedule a pre-submittal meeting. Applicants should be
prepared to present site plans, floor plans, and elevations and be able to
discuss code issues of occupancy, square footage and type of construction
being proposed.
Respo�se: Pre submittal meeting will be scheduled.
Comment Number: 2
Comment Originated: 02/16/2016
02/16/2016: 2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com/building web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
2. Multi-family and Condominiums 3 stories max: 2012 IECC residential
chapter.
3. Commercial and Multi-family 4 stories and taller: 2012 IECC commercial
chapter.
Contact: Spencer Branson, , sbranson@fcgov.com
Topic: General
Comment Number: 3
Comment Originated: 02/17/2016
02/17/2016: Projects with three or more tenant units require the Unit Level
Addressing form to be completed and submitted to the GIS Department after
plans have met final approval through Development Review and are recorded
with the City. This can occur anytime during construction, but before any utilities
or address signs are installed. All addressing will be determined by the GIS
Department and submitted to Poudre Fire Authority, USPS, Building Services,
and Fort Collins Utilities. Failure to contact GIS and determining addresses
through other means may result in address changes.
The Unit Level Addressing form can be obtained by contacting the GIS office
after the plans are recorded at gis@fcgov.com or (970) 416-2483.
R�sy�orise: Proper forms ����ill be complet2d if necessary
Department: Light And Power
Contact: Tyler Siegmund, 970-416-2772, tsiegmund@fcqov.com
Topic: General
Comment Num�: 1 �omment Originated: 02/17/2016
02/17/2016: Light and Power has electric facilities along Worthington Circle,
southeast of the existing drive, that can be utilized to provide power. Is it
anticipated that single or three phase power will be needed?
Res;�onse: Meeiir�g wi:l be scheci�.ilecl, power will be addresseu.
Comment Number: 2
Comment Originated: 02/17/2016
02/17/2016: Electric capacity fees, development fees, building site charges
and any system modification charges necessary will apply to this development.
Please visit the below link to utilize our fee estimator to get an estimate of
electric fees for this project. Please contact me for any questions regarding
electrical development fees.
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees
Response: Any fees will be submi�;e�i
Comment Number: 3
Comment Originated: 02/17/2016
02/17/2016: The transformer location will need to be coordinated with Light &
Power. The transformer must be placed within 10 ft of a drivable surface for
installation and maintenance purposes. The transformer must also have a front
clearance of 10 ft and side/rear clearance of 3 ft minimum. Please show and
label the transformer location(s) on the site plan, landscape plan, and utility plan.
Response: Item as beint� adcli��ssed, trar�sformers vuill be added
Comment Number: 4
Comment Originated: 02/17/2016
02/17/2016: Meter locations will need to be coordinated with Light and Power
Engineering. Each unit will need to be metered individually. Please gang the
meters on one side of the building, opposite of the gas meters. Please show
and label the electric meters on the site/landscape plans and utility plans.
Response: Meter locations will be coordinated and shown on plans
Comment Number: 5
Comment Originated: 02/17/2016
02/17/2016: Please provide a one line diagram and a Commercial Service
(C-1) Form to Light and Power Engineering. The C-1 form can be found at:
http://zeus.fcgov.com/utils-procedures/files/EnqWiki/WikiPdfs/C/C-1 Form.pdf
Respor�se: Diagram will be complete�
Comment Number: 6 Comment Originated
02/17/2016: Light & Power will need the following documentation to be
submitted before design will begin and construction release for the project:
AutoCAD files of the approved Site Plan, Plat, Landscape Plan, and Utility
Plans. Please send to tsiegmund@fcgov.com once plans are approved.
Response: Required documentation will be submitted prior to construction release.
Department: Outside Agencies
Contact: Spencer Branson, , sbranson@fcqov.com
Topic: General
02/17/2016
Comment Number: 2 Comment Originated: 02/16/2016
02/16/2016: Comments from Dan Kapperman (970-567-0245) at Comcast:
Can plat be spel�ut as a access + utility easement �
Comcast facility needs to be in a 6' utility easement to building
Response: Changes have been made to plat
Topic: Plat
Comment Number: 1
Comment Originated: 02/16/2016
Comment from Megan Harrity (mharrity@larimer.orgj �vith Larimer C�urty
Assessor:
In 2012 this property was platted as Arrowhead Condominiums. The plat was
recorded on 1/3/2012 at 20120000249. The land surrounding the platted ten
condo units is GCE for the units of Arrowhead Condos.
Typically a Supplemental Condo Map would be recorded for the development of
future buildings, but this preliminary is not for condominiums. Will there be a
document recorded to vacate the existing Arrowhead Condos?
Response: A document 4vill be recorded if necessary
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, I�ynxwiler@poudre-fire.orq
Topic: General
Comment Number: 1 Comment Originated: 02/16/2016
02/16/2016: EMERGENCY ACCESS EASEMENT
The limits of the EAE may be adjusted as per redline.
Response: EAE adjusted per redlines
Department: Stormwater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
Topic: Construction Drawings
Comment Number: 1
Comment Originated: 02/10/2016
02/10/2016: Sheet G1: Grading Plan
Please provide additional slope and spot elevation information.
Response: SIop2 and spot el�;vation information 2dcie�c�
Comment Number: 2 Comment Originated: 02/10/2016
02/10/2016: Sheet G1: Grading Plan
Please provide the finished floor elevation for the detached garage.
Response: Garage floar elevatio� information added
Comment Number: 3 Comment Originated: 02/10/2016
02/10/2016: Sheet G1: Grading Plan
There is a storm pipe shown along the northeasterly boundary of the site that is
located within the neighboring property in two locations. Please note that you
will need to procure and easement from the neighboring property owner if this is
truly the pipe alignment you plan for. You will need to provide a letter of intent
from that property owner prior to hearing that basically states that they
understand your plans and will provide easement when the final design is
complete.
Response: Easement by separate document to be provi��ed and letter of intent to be issued prior to fi�al
c�G���ic7?lC•2. •
Comment Number: 4
•
Comment Originated: 02/10/2016
02/10/2016: Sheet G1: Grading Plan
This project was routed as an "FDP" but the plans are at a"preliminary" level,
not "final". Please ciarify if the plans are supposed to be preliminary or final.
Final level plans will require more detail and I can comment on final level detail
in the next round if needed.
Response: Submit'tal is preliminary, more info will be provided at finai.
Comment Number: 5
Comment Originated: 02/10/2016
02/10/2016: Sheet G1: Grading Plan
This project is considered a Major Amendment and as such is required to meet
current Land Use Code requirements, which includes LID. It looks like the plans
do include a bio-swale and some permeable pavement. Please also provide
information in the plans and in the drainage report that shows how you're
complying with the required LID percentage rates. Please note that the current
LID requirements can be met in one of two ways:
- 50% of the newly added or modified impervious area must be treated by LID
techniques and 25% of new paved areas must be pervious.
- 75% of all newly added or modified impervious area must be treated by LID
techniques.
Response: LID compliance le�fer provio���
Comment Number: 6
02/10/2016: Sheet G1: Grading Plan
See redlines for other comments.
Respo�se: Acknowledg�d
Comment Number: 7
Comment Originated: 02/10/2016
Comment Originated: 02/10/2016
02/10/2016: Sheet D3: Drainage Details
The bioswale detail does not meet the City requirements. Please replace this
detail with City of Fort Collins Detail D-53.
Res�ons�: Detail D-53 a����: �n p'.�-��.
Topic: Drainage Report
Comment Number: 8
Comment Originated: 02/10/2016
02/10/2016: The report states previously assumed imperviousness that was
approved as part of the Centre Avenue Residences project, but I can't duplicate
that number. Please provide an excerpt from that report and/or show how you
obtained this number. Also, for this project the proposed imperviousness stated
in the report doesn't seem to match what is provided in the Rational Method
tables.
Pes;�on��: Uqci�t=�ci i����,�2rvious �i�e��<s t��:� m�'c�� ��revic�us repo��t.
Topic: General
Comment Number: 9
Comment Originated: 02/10/2016
02/10/2016: Provide LID information and calculations. Also, provide an LID
table on the Drainage Plan. An LID table typically provides information such as:
impervious area, impervious area treated by each LID system, run-on ratios.
Response: LID compliance letter provided
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
• •
Comment Number: 10 Comment Originated:
02/16/2016: The site disturbs more than 10,000 sq-ft, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials
Submitted and make reference to documents that were approved under prior
criteria and do not meet current requirements. Please submit; Erosion Control
Plan (based upon redlines), Erosion Control Report (references to old materials
and placing SWMP responsibility on the contract is not in accordance with
design criteria), and an Escrow / Security Calculation (will need to be
recalculated to reflect the current scope of work) . If you need clarification
concerning the erosion control section, or if there are any questions please
contact Jesse Schlam 970-218-2932 or email @ jschlam@fcqov.com
Response: Erosion Control M�ierials to be included with final submittal.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 14 Comment Originated
02/11/2016: Please remove "Centre Avenue Residences" from the title &
titleblock, and add "Cottages" to "Arrowhead". See redlines.
Response: Centre Avenue Residences has been removed from titles.
Topic: Construction Drawings
Comment Number: 16
02/16/2016
02/11 /2016
Comment Originated: 02/11/2016
02/11/2016: Please provide the following information for the Benchmark
Statement in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 - X.XX'.
Response: Benchmark Statement added as sho�vn.
Comment Number: 17 Comment Originated: 02/11/2016
02/11/2016: Why is the Basis Of Bearings not the same bearing & line as the
Subdivision Plat?
Response: Basis of bearing corrected
Comment Num� 18 �mment Originated:
02/11/2016: All benchmark statements must match on all sheets.
Resr�o�-�s�: Benchmark statements match on all sh�ets
Comment Number: 19 Comment Originated:
02/11/2016: There are spelling issues with some text. See redlines.
�esponse: Corrected spelling issue
Comment Number: 20 Comment Originated: 02/11/2016
02/11/2016: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
Fies�onse: Masked all text in hatched areas.
Comment Number: 21 Comment Originated:
02/11/2016: There are line over text issues. See redlines.
Response: Corrected line of text issues
Comment Number: 22 Comment Originated:
02/11/2016: Please tie the coordinate values shown for utilities to the project
boundary. We would prefer that this be done by adding property corner values
to each sheet, or showing the property corner values on the horizontal control
plans and adding a note to each sheet with coordinate values.
�es}�orse: Ad���' p,,���-���;� cu���� � I_���-. _, � f������ r���i�o ���.I co�����ol r�=��.
Topic: Landscape Plans
Comment Number: 11
02/11 /2016
02/11 /2016
02/11 /2016
02/11 /2016
Comment Originated: 02/11/2016
02/11/2016: Please remove "Centre Avenue Residences" from the title &
titleblock. See redlines.
Res�:�onse: Centre Avenue Residences has been removed
Comment Number: 12 Comment Originated: 02/11/2016
02/1112016: There are line over te� issues. See redlines.
Response: Line over text issues have bee� addressed
Comment Number: 13 Comment Originated: 02/11/2016
02/11/2016: There is text that needs to be masked. Mask all text in hatched
areas. See redlines.
Response: Texi i�:::� ;�. _�� __� .._i
Topic: Lighting Plan
Comment Number: 15
Comment Originated: 02/11/2016
02/11/2016: Please remove "Centre Avenue Residences" from the title &
titleblock, and add "Cottages" to "Arrowhead". See redlines.
Response: Title block has been updated
Topic: Plat
Comment Number: 1 Comment Originated: 02/11/2016
02/11/2016: Please add new title commitment information as available.
. Response: No title Comrr�itment provideci to the surveyor. Title commitment note revised.
Comment Number: 2
02/11/2016: Please add floodplain information.
Respor�se: Floodplain note added.
Comment Originated: 02/11/2016
Comment Number: 3 Comment Originated: 02/11/2016
02/11/2016: Please add bearings, distances, and/or curve data as marked.
See redlineso � �
Re�poi�se: Red�ines r�ot p�c���l��d to surveyor. Plat revisions m�de
Comment Number: 4
Comment Originated: 02/11/2016
02/11/2016: The area inside the building envelopes are existing Condos. Do
those Condo owners need to sign the Plat? They own the Condos, but what
about their LCE, GCE areas & access to their Condos?
Response: Item is bei�g adc�ress��. No revision made at this time.
Comment Number: 5 Comment Originated:
02/11/2016: There are no outer boundary monuments shown.
Response: monuments shown.
Comment Number: 6 Comment Originated:
02/11/2016: Why are there curves C1 & C2? The parent Plat is just one curve.
See redlines.
Response: no redlines provided to the surveyor. There are 2 curves on the parent plat.
1 curve is labeled with curve data the other is labeled as C3.
Topic: Site Plan
Comment Number: 7
02/11 /2016
02/11 /2016
Comment Originated: 02/11/2016
02/11/2016: Please remove "Centre Avenue Residences" from the title &
title block. See redlines.
Response: Title and title block have been updated
Comment Number: 8 Comment Originated: 02/11/2016
02/11/2016: There are line over text issues. See redlines.
.Response: no redlines provided to the surveyor. There are 2 curves on the parent plat.
1 curve is labelea with curve clata the other is labeled as C3.
Comment Number: 9 Comment Originated: 02/11/2016
02/11/2016: Please correct the project name shown with "Site Plan". See
redlines.
Response: Project name updated
Comment Number: 10 Comment Originated: 02/11/2016
02/11/2016: Please revise the legal description as marked. See redlines.
Response: Legal description updated
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/17/2016
02/17/2016: no comments
Response: Acknowledged
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 02/16/2016
02/16/2016: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the L� Use Code. Direct questions concerning i�tion
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Department: Water-Wastewater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
Topic: Construction Drawings
Comment Number: 1
Comment Originated: 02/10/2016
02/10/2016: Sheet EX1: Ex. Conditions & Demo Plan
Please provide callouts for all existing water and sanitary sewer taps with their
sizes. See redlines for more info.
Resp�nse: l_��.be!ecf existing water and s�nitai�y sewer services
Comment Number: 2
Comment Originated: 02/10/2016
02/10/2016: Sheet U1: Utility Plan
Provide callouts for the existing water and sewer services you intend to utilize
with this project.
Response: .Adde� c�.11o��ts ta s�rvi�es we intenC to use.
Comment Number: 3
Comment Originated: 02/10/2016
02/10/2016: Sheet U1: Utility Plan
Provide water meter size information for the new water service. Please note that
the water meter cannot be within the bio-swale that you have proposed. Please
also note that the water meter does not need to be in an easement, so you can
remove the small pocket easement shown.
R�sponse: Added water servi�e size and moved meier pit away from bio-swale.
Comment Number: 4 Comment Originated: 02/10/2016
02/10/2016: Sheet U1: Utility Plan
See redlines for other minor comments.
Response: F�ckno���^�ledged
Topic: Site Plan
Comment Number: 5
Comment Originated: 02/10/2016
02/10/2016: Landscape Plans
Landscape Note no. 1 needs to also include separation information between
shrubs and water/sewer services: No shrubs shall be planted within 4' of water
or sewer mains and/or service lines. Please update landscape plans
accordingly if there are shrubs within 4' of service lines.
t`�2Sp0i�Se: �'�,C�CnO'�;4'I2C'�I��C�I
Comment Number: 1
02/17/2016: The 3 unit building needs to include Direct sidewalk connections
from the units.
Response: Side��Jalks have been added
Department: Zoning
Contact: Noah Beals,
Topic: General
970-416-2313, nbeals@fcgov.com
Comment Originated: 02/17/2016
Comment Number: 2 Comment Originated: 02/17/2016
02/17/2016: Is that a retaining wall along the west and south side of the 3 unit?
R�s}�ons�: C�on�re�e biosv��aJe
Comment Numk,� 3 �mment Originated: 02/17/2016
02/17/2016: Please provide a detail of the garage to show how the required
bike spaces fit.
Response: Comment is being addressed
Is there a fixed bike rack near the 6 unit bailing?
Response: No bike rack is currently proposed in this location
Comment Number: 4 Comment Originated: 02/17/2016
02/17/2016:
Comment Number: 5 Comment Originated: 02/17/2016
02/17/2016: Need to include a sheet index on the site plan.
Respo:~�se: Sheet index added
Comment Number: 6 Comment Originated: 02/17/2016
02/17/2016: The light fixture states in comes in two different temperature levels.
Please add a note the the 3000K temperature is the one that will be used
Response: 3000K Note added
Comment Number: 7 Comment Originated: 02/17/2016
02/17/2016: Where are the elevations for the garage?
Fiesponse: Elevations updated
Comment Number: 8 Comment Originated: 02/17/2016
02/17/2016: Need more trees along the west and south side of the 3 unit
Building
Response: Trees have be�n added